Railway contact network cross-pole positioning method and system based on Beidou high-precision positioning
Through the Beidou high-precision positioning technology, rotation model, and phase center compensation optimization method, the problem of low informatization and insufficient accuracy in the railway catenary pillar placement has been solved, and efficient and accurate catenary cross-pole positioning and coordinate collection have been achieved. Improved construction efficiency and accuracy.
Patent Information
- Application Number
- CN202311560957.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-11-22
AI Technical Summary
In the existing technology, the railway catenary pillar stakeout collection has low informatization, low efficiency, low networking operation capabilities, and single technical functions. It cannot effectively combine with the Beidou system to reduce errors and improve accuracy, especially in hard span and hard and soft beam pillars. There are deficiencies in coordinate collection and stakeout.
A railway catenary cross-pole positioning method based on Beidou high-precision positioning is adopted. By setting up a catenary cross-Beidou positioning base station, differential data is sent to the integrated catenary cross-Beidou stakeout acquisition equipment, and the pole position is obtained by combining satellite signal analysis. The preliminary positioning results are obtained, and the final pole positioning results are obtained through error optimization of the rotation model's mapping points and phase center compensation optimization of the rail standard spatial structure.
It greatly improves the operating efficiency and effectiveness of railway catenary construction, reduces the number of stakeout personnel, improves positioning accuracy and data utilization efficiency, and enables high-precision coordinate collection and stakeout in complex environments.
Smart Images

Figure CN117930291B_ABST
Abstract
Description
Background Art
[0002] The layout of the railway overhead line across the pole is mainly concentrated in the throat area of the railway yard or large stations. The area span is large and is easily affected by locomotive obstruction during operation. The traditional steel ruler layout has the risk of "flashing red" when overlapping the rails.
[0003] The prior art discloses a technical solution: a railway overhead line and pole position determination system based on Beidou positioning technology [1], including a Beidou base station, a Beidou measurement terminal, a power supply device, a measurement notebook and a differential server. The system adopts RTK positioning mode, realizes real-time navigation using Beidou accurate positioning, completes pole tower layout, pile spacing measurement, line measurement, soft cross-over measurement, hard cross-over measurement and other tasks, does not generate cumulative errors, saves the layout process of traditional overhead line pole measurement, improves the overall work efficiency of overhead line pole measurement, and is not restricted by the environment and site.
[0004] The prior art also discloses a technical solution: a method, device and storage medium for processing soft cross-over data of a railway contact network [2], comprising: generating a first support and a second support respectively according to relevant parameters, generating a first horizontal line and a second horizontal line between the first support and the second support at a predetermined height position respectively, generating an arc reference line with the inner relative point of the first support and the second support as the starting point, determining a plurality of target points on the first horizontal line, a plurality of second target points on the second horizontal line and a plurality of third target points on the arc reference line respectively according to a plurality of track reference lines, and locking them respectively, and marking the distance between each two adjacent target points on the first horizontal line, the second horizontal line and the arc reference line using a marking command. The length of the steel strand between each two target points that needs to be determined during construction can be determined conveniently and quickly, thereby guiding the construction and improving the efficiency of the construction.
[0005] However, the above-mentioned prior art still has the following problems: (1) The mode of a single hardware terminal and a single person working in the station means that once a coordinate problem occurs, the layout personnel need to redetermine the coordinates of each point in the station, which is inefficient and does not mention the error accuracy calculation method that meets the requirements of contact network pillar collection and layout; (2) The length of the soft crossbar steel strand is calculated using the contact network pole position, without involving the hard crossbar of the contact network and the specific contact network pole position layout, and the Beidou system is not combined to reduce errors and improve accuracy.
[0006] The following documents are technical background materials related to the present invention:
[0007] [1] Liu Jie, Xu Jianguo, Wang Heng, et al., A railway overhead line and pole position determination system based on Beidou positioning technology, 2019-03-28, CN209803339U.
[0008] [2] Fu Qiang, Guo Minxiang, Ma Haiming, et al., Railway contact network soft cross-data processing method, equipment and storage medium, 2022-10-18, CN115455551A. Summary of the invention
[0009] In order to solve the above problems in the prior art, namely, the existing overhead line pillar setting out and collection has low informationization degree, low efficiency, low networking operation capability, single technical function, and no professional software platform, the present invention provides a railway overhead line cross-pole positioning method based on Beidou high-precision positioning, and the positioning method includes:
[0010] Set up a contact network across Beidou positioning base station to send differential data to multiple integrated contact network across Beidou layout and collection devices;
[0011] A plurality of said integrated contact network spanning Beidou layout acquisition devices combine said differential data with the acquired satellite signals to calculate and acquire the corresponding preliminary positioning results of the pole positions;
[0012] The error of the preliminary pole position positioning result is optimized by a mapping point pair error optimization method based on a rotation model and a phase center compensation optimization method based on a standard rail space structure, so as to obtain a final pole position positioning result.
[0013] In some preferred embodiments, the error of the preliminary pole position positioning result includes: the error caused by the tilt of the center pole used in pole position setting out and acquisition;
[0014] The error caused by the misalignment of the phase centers of the integrated overhead line across the Beidou layout and acquisition equipment antennas;
[0015] Errors caused by the movement of the integrated contact network across the Beidou stakeout and collection equipment during pole position stakeout and collection.
[0016] In some preferred embodiments, the mapping point pair error optimization method based on the rotation model is:
[0017] Place the centering rod on the corresponding target point and rotate it for multiple circles, and output the circular positioning data around the centering rod through the integrated Beidou layout measurement and acquisition equipment;
[0018] Traversing each data in the circular positioning data, respectively calculating the distance and direction between the data and other data, and selecting data with a large distance and a vertical mapping point pair as the matching point of the current data based on the maximum likelihood ratio principle, to obtain the mapping point pair corresponding to the circular positioning data;
[0019] The moving direction corresponding to each point is calculated based on the mapping point pair, the coordinate points of multiple sets of data are translated, and the multiple sets of data after translation are smoothed based on the error averaging method, so as to eliminate the error caused by the inclination of the centering pole used in pole position layout and collection.
[0020] In some preferred embodiments, the annular positioning data is:
[0021]
[0022] Among them, p(i) represents the i-th data in the circular positioning data, N represents the number of circular positioning data, lon(i) and lat(i) represent the longitude and latitude of the i-th data respectively.
[0023] In some preferred embodiments, calculating the distance and direction between the data and other data includes:
[0024]
[0025]
[0026] Among them, d i and α i Respectively represent the distance and direction between the i-th data and other data, p1(lon(1)), lat(1) represents the longitude and latitude of the first data, pi((lon(i)), lat(i)) represents the longitude and latitude of the i-th data, vincent d Represents the distance between the points corresponding to the i-th data and the first data solved by the Vincenty algorithm, Vincent α Represents the direction of the point corresponding to the i-th data and the first data solved by the Vincenty algorithm.
[0027] In some preferred embodiments, the translating of coordinate points of multiple sets of data and smoothing the translated multiple sets of data based on an error averaging method includes:
[0028] Determine the distance between the centering rod axis and the antenna phase center as d t , combined with the moving direction and longitude and latitude coordinates of each point, the coordinates of the translated points are calculated by the Vincenty algorithm. The coordinates of the kth point after translation are:
[0029]
[0030] Among them, lon k and lat k Represent the longitude and latitude of the kth data respectively;
[0031] Smoothing of multiple sets of data after translation based on error averaging method:
[0032]
[0033] Among them, O out are the latitude and longitude coordinates of the data smoothed by the error averaging method.
[0034] In some preferred embodiments, the phase center compensation optimization method based on the standard spatial structure of the rail is:
[0035] Determine the spatial position point p1 to be measured, and collect N1 data within the set time t1;
[0036] Move the device along the rail direction, collect the corresponding longitude and latitude coordinates at the first target point p2, and collect N2 data within the set time t2;
[0037] Move the device along the direction of the sleeper, collect the corresponding longitude and latitude coordinates at the second target point p3, and collect N3 data within the set time t3;
[0038] Based on the collected data, the Vincenty algorithm is used to calculate the direction angle θ from p2 to p1 21 and the angle θ from p3 to p1 31 , based on the direction angle θ 21 and direction angle θ 31 Calculate the average direction angle θ;
[0039] The distance between the axis of the centering rod and the phase center of the antenna is measured as dt. Combined with the moving direction and longitude and latitude coordinates corresponding to each point, the coordinate points after translation are calculated using the Vincenty algorithm to complete the phase center compensation optimization based on the standard spatial structure of the rail.
[0040] In some preferred embodiments, the average direction angle θ is:
[0041]
[0042] Another aspect of the present invention provides a railway overhead line cross-pole positioning system based on Beidou high-precision positioning, the positioning system comprising:
[0043] The overhead line soft cross-span rapid acquisition and layout algorithm platform is used to receive the real-time coordinate and elevation data sent by the overhead line cross-span Beidou layout acquisition equipment, distinguish the data according to the ID number, and screen, correct, calculate and comprehensively display the data of the track center line, the outermost line and the cross-pillar data. According to the cross-pillar measurement specification requirements, the positioning results are given in real time and distributed to the on-site personnel, back-end management personnel, quality inspection personnel, etc., for real-time verification and confirmation according to the business;
[0044] The contact network spans the Beidou layout and collection equipment, which is used to layout and collect coordinates of the span pillars. The contact network span pillars meet the verticality, limit and elevation requirements with the main line;
[0045] The contact network spans the Beidou positioning base station, which is used to provide differential data for positioning for the contact network spanning the Beidou layout and collection equipment.
[0046] In some preferred embodiments, data is transmitted via wireless communication between the contact network soft-span rapid acquisition and layout algorithm platform and the contact network spanning Beidou layout and acquisition equipment, and between the contact network spanning Beidou layout and acquisition equipment and the contact network spanning Beidou positioning base station; the wireless communication includes one or more of 4G communication, 5G communication, and satellite communication.
[0047] Beneficial effects of the present invention:
[0048] (1) The present invention adopts Beidou high-precision positioning technology to locate the cross-pole position of the railway overhead contact network. It sets up algorithms and corresponding hardware systems for the coordinate collection and layout of soft cross-pole and hard and soft cross-beam pillars during the construction of the overhead contact network. It reduces the number of original layout personnel from an average of more than 3 to 4 to at least 1 person, and is not affected by the operation of line vehicles, strong winds, rainy weather, etc., which greatly improves the operation efficiency and effectiveness.
[0049] (2) The present invention is based on the railway contact network cross-pole positioning method based on Beidou high-precision positioning. The integrated contact network cross-Beidou layout and collection equipment is provided with a data collection results software "virtual" display and sharing, which improves the utilization efficiency of data.
[0050] (3) The present invention is based on the railway contact network cross-pole positioning method based on Beidou high-precision positioning, and adopts a Beidou dedicated measurement system to upgrade the non-Internet mode of single-person single-machine layout to an Internet operation mode of multiple people and multiple machines or single person and multiple points, which has higher operation efficiency, especially higher operation linkage. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0052] Figure 1 It is a schematic flow chart of a method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to the present invention;
[0053] Figure 2 It is a tilt error model used in the centering pole of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention;
[0054] Figure 3It is a data plane coordinate model of the integrated Beidou layout measurement and acquisition equipment of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention;
[0055] Figure 4 It is a schematic diagram of tracks, sleepers and fasteners of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention;
[0056] Figure 5 It is an antenna phase center misalignment error model of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention;
[0057] Figure 6 It is a schematic diagram of the layout process of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention;
[0058] Figure 7 and Figure 8 It is a schematic diagram of reference point selection and error optimization of a railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, in which the main line is a straight line and the outermost side is a straight line parallel to the main line;
[0059] Fig. 9 It is a schematic diagram of reference point selection and error optimization of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, in which the main line is a straight line and the outermost line is not parallel to the main line;
[0060] Fig.10 It is a schematic diagram of reference point selection and error optimization for a railway contact network cross-pole positioning method based on Beidou high-precision positioning in which the main line is a curve, the outermost side is a curve, and the curve parameters are similar;
[0061] Figure 11-Figure 15 The invention discloses a real-time monitoring and verification error model of a reference point across a main line of a railway contact network across-pole positioning method based on Beidou high-precision positioning. DETAILED DESCRIPTION
[0062] The present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the relevant invention are shown in the accompanying drawings.
[0063] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0064] In order to more clearly illustrate the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, the following is combined with Figure 1Each step in the embodiment of the present invention is described in detail.
[0065] The method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to the first embodiment of the present invention is described in detail as follows:
[0066] Step S10, setting up one overhead contact network across Beidou positioning base station to send differential data to multiple integrated overhead contact network across Beidou layout and collection devices.
[0067] The ground satellite positioning receiver calculates the distance between itself and the satellite based on the signal propagation time and other parameters measured through decoding. The decoding process can generally obtain two types of distance measurement information, one is pseudorange measurement, and the other is carrier phase measurement. The accuracy of pseudorange measurement is about 1 meter, and the accuracy of carrier phase measurement is 0.001 meter when the integer ambiguity is fixed correctly. That is, the positioning accuracy based on pseudorange is generally at the meter level, and the positioning accuracy based on carrier phase can reach the centimeter level.
[0068] However, under actual conditions, there are many factors that affect pseudorange measurement and carrier measurement, that is, positioning accuracy. These errors include: satellite orbit error, satellite clock error, ionospheric delay, tropospheric delay, multipath effect, antenna phase center offset and change related to ground receiving equipment, and receiver clock error, etc.
[0069] In order to eliminate errors and improve positioning accuracy, a system error model can be established to estimate and compensate for error signals, or a difference method can be used to establish fixed observation points and eliminate or weaken specific errors through differences. According to how to eliminate these error sources, real-time satellite positioning methods can be simply divided into single-point positioning and RTK positioning.
[0070] Single-point positioning is completed directly based on the pseudo-range information obtained by measurement. The receiver clock error is modeled during the positioning process. Some algorithms will model the ionosphere and troposphere. The broadcast ephemeris used in the calculation has low accuracy, and the final positioning accuracy is generally at the meter level.
[0071] PPP is precise point positioning, which uses precise ephemeris and models the clock difference between the receiver and satellite, clock drift, ionosphere, and troposphere to achieve high-precision positioning. The PPP positioning accuracy can reach 10cm, but the convergence time is generally slow, requiring more than 30 minutes.
[0072] RTK is real-time dynamic positioning. In addition to using the information received by the receiver, it also uses the information of the differential base station. The differential station is a high-precision receiver with a precisely known position. It can receive GNSS information similar to that of the user receiver. After receiving the GNSS signal, the differential station transmits it to the user receiver through the network. The user receiver can completely eliminate the influence of clock errors, satellite orbits and other parameters by subtracting the signal received by itself from the information received by the differential station. It can also weaken the influence of the ionosphere and troposphere. Why is it weakened instead of eliminated? Because here we assume that the characteristics of the ionosphere and troposphere in the propagation path from the satellite to the user receiver are consistent with the characteristics of the ionosphere and troposphere in the propagation path from the satellite to the differential station receiver. However, in actual scenarios, the two are inconsistent, but relatively close, so the influence of the ionosphere and troposphere can be weakened.
[0073] The RTK algorithm is the most commonly used GNSS altitude positioning technology. In open scenes, the positioning accuracy reaches the centimeter level and can be completed within a few seconds.
[0074] The traditional surveying and collection method refers to the method of using manual methods to survey and collect geographic coordinate points (i.e. determine the specific location) in the fields of engineering construction, surveying and mapping, land planning, etc.
[0075] Generally, the target of stakeout and collection is determined according to the design drawings or planning requirements. Measuring tools, such as steel rulers and rangefinders, are used to carry out linear stakeout and coordinate collection on site. Ground markers, such as measuring point piles and spray marks, are set at the target point so that the point can be accurately found and confirmed in subsequent work.
[0076] Traditional layout and data collection methods mainly rely on manual measurement and calculation, which has disadvantages such as accumulation of measurement errors and high labor intensity. In modern surveying and mapping and engineering construction, more and more technologies such as global satellite positioning systems are used for layout and coordinate collection.
[0077] For the global satellite positioning system and other technologies, the layout and coordinate collection are usually carried out by a satellite navigation positioning terminal, a handheld controller, and a single person to complete the coordinate collection and calculation of the layout collection target. The operation is divided into two stages: on-site data collection and internal processing. This operation method requires the operator to have certain professional technical knowledge and be familiar with the relevant principles.
[0078] For the cross-line layout stage of the overhead line project, the layout method of pulling the steel ruler is generally adopted. Multiple personnel work at the same time. One end determines the position of one side to meet the limit requirements. In the middle, multiple people hold the steel ruler to prevent the steel ruler from overlapping the rail. The other measured position meets the limit requirements, and the direction of the ruler is visually checked to ensure verticality with the main line. In the inspection stage, the same operation or optical measurement verification is generally adopted by the total station method.
[0079] The overhead line span is generally large, and the two poles must have angle and distance requirements with the center line of the relevant track, that is, they must be perpendicular to the relevant driving line, the foundation center connection is perpendicular to the station main line, and the deviation angle is not greater than 2°; and the outermost track meets the limit requirements, etc. For this reason, it is not very meaningful to collect the coordinates of a single pole position in practical applications. Generally, the pole position coordinates are required to be collected at multiple points to meet the relevant requirements of the railway.
[0080] The application of railway overhead contact network engineering requires high positioning accuracy, rapid response, a wide range of field operations, poor on-site support conditions, and as little reliance on external support conditions as possible.
[0081] In order to ensure that the layout and collection of cross-contact network pillars meet the requirements of the specifications, Beidou high-precision positioning technology should be used to complete the coordinate collection of the contact network pillars and the related track lines. The spatial position relationship between the pillars and each track line can be obtained by calculation. Once the requirements of the specifications are met, the layout and collection of the pillars are completed.
[0082] To this end, the Beidou single-base station RTK positioning method should be adopted, which enables the equipment to be quickly deployed on site and quickly achieve high-precision positioning conditions, and the positioning accuracy meets the usage requirements of 2 cm level accuracy.
[0083] Step S20, a plurality of the integrated contact network spanning Beidou layout acquisition devices combine the differential data and the acquired satellite signals to calculate and obtain the corresponding preliminary pole position positioning results.
[0084] Using Beidou high-precision positioning technology, there are several sources of error:
[0085] (1) Errors in BeiDou high-precision positioning technology itself;
[0086] (2) Errors caused by on-site use;
[0087] (3) Errors in the calculation method itself.
[0088] The above error sources can be improved in the following ways:
[0089] (1) Errors of Beidou high-precision positioning technology itself:
[0090] The single-base station RTK positioning method has two errors: one is the positioning accuracy of the ground satellite positioning receiver itself, and the other is the error caused by the distance between the ground satellite positioning receiver and the Beidou positioning base station.
[0091] When the distance between the ground satellite positioning receiver and the Beidou positioning base station is 0, the positioning accuracy of the ground satellite positioning receiver is related to the chip used. Generally, receivers with multiple constellations and multiple frequencies have higher positioning accuracy and faster positioning speed. Currently, the absolute positioning accuracy of most receivers is 2.5 cm, and some are even higher.
[0092] When using a single base station positioning method, the farther the distance between the ground satellite positioning receiver and the ground positioning base station is, the greater the positioning error of the ground receiver will be. The indicator is 1ppm, which means that if the baseline distance between the two increases by 1 km, the positioning error will increase by 1mm. Therefore, during use, the distance between the positioning base station and the receiver should not be too far, and the base station should be carried by the operator and deployed and configured at the operation site.
[0093] To this end, the positioning accuracy of this error can be controlled at 2.5 cm or higher.
[0094] (2) Errors caused by on-site use:
[0095] On-site workers use satellite positioning equipment to perform cross-pole measurements. The errors in use are caused by the position matching error between the satellite positioning equipment and the target being measured, the size error of the target being measured, the error in the on-site collection method, etc.
[0096] To compensate for the position matching error between the satellite positioning device and the target being measured, a centering pole is generally used. The positioning device is installed on the centering pole, and the bottom tip of the centering pole is aligned with the point being measured. The centering pole is kept vertical to obtain the coordinate data of the target point being measured. Currently, the positioning device supports the tilt measurement function, that is, when the centering pole is tilted, the coordinates of the bottom tip of the centering pole can also be calculated. The accuracy of the tilt measurement is generally the measurement error of the device itself, which can be controlled within millimeters.
[0097] Measured target size error: The types of contact network pillars include rectangular banner plate reinforced concrete pillars, equal diameter circular concrete pillars, H-shaped, equal diameter circular steel pillars, and rectangular lattice steel pillars. For this purpose, it is necessary to make special contact network pillar measurement structures to obtain accurate "center coordinates". The size error of the contact network pillar shape processing can be millimeters. However, considering that the upper and lower dimensions of the pillar change with the height, when measuring after the pillar is erected, the high accuracy should be as consistent as possible. The satellite positioning equipment can output the height value, which can be used as a spanning layout and acquisition parameter to participate in the measurement.
[0098] Error in field acquisition method: The cross-contamination network requires that the vertical angle with the main line cannot be greater than 2°, and the limit meets the requirements. When the coordinates of two pillars are collected, real-time dynamic display and calculation of whether the pillars meet the requirements are required. To this end, multiple satellite positioning devices can be used for field acquisition and layout at the same time, and the real-time coordinate data can be transmitted to the software platform. Each satellite positioning device meets the real-time positioning centimeter level.
[0099] (3) Error in the calculation method itself:
[0100] After the software platform receives the data transmitted by all positioning devices, it uses dedicated processing software to calculate various indicators across the pillars in real time. On the one hand, it ensures that the calculation error is minimized, and on the other hand, it also has the function of identifying erroneous data and performing timely dynamic updates on site.
[0101] The railway overhead contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention is based on Beidou high-precision positioning technology. In principle, it is preferred to work under the Beidou satellite constellation, but it can also be compatible with GPS, GLONASS, Galileo and other constellations;
[0102] The railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, its Beidou positioning reference station refers to the differential base station, reference station, etc. mentioned in the technical path, and its function is to provide differential information for various satellite navigation and positioning terminals.
[0103] The railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, its Beidou layout and collection equipment refers to the satellite positioning equipment mentioned in the technical path, and the Beidou layout equipment is proposed here, indicating that the equipment in principle preferably works under the Beidou satellite navigation constellation, but can also be compatible with GPS, GLONASS, Galileo and other constellations, and the equipment is used for cross-coordinate collection and layout.
[0104] Step S30, performing error optimization on the preliminary pole position positioning result by using a mapping point pair error optimization method based on a rotation model and a phase center compensation optimization method based on a standard rail space structure, to obtain a final pole position positioning result.
[0105] Although the real-time positioning accuracy and speed of the integrated Beidou surveying and acquisition equipment are basically the same as those of traditional surveying and mapping equipment, the phase center of its antenna does not coincide with the top of the centering pole. In this application mode, two errors will be generated, which need to be controlled and optimized.
[0106] (1) Tilt error when using the centering rod;
[0107] Generally, the centering pole has a small bull's eye bubble level, and its measurement accuracy is about 0.05°, which is about 1.2 meters according to the height surface. Due to its low accuracy, some traditional Beidou positioning equipment has built-in tilt measurement devices. Even if the centering pole is tilted at a large angle, the real-time positioning accuracy of the output positioning result reaches 2 cm. The implementation method is to perform data fusion processing at the hardware bottom layer, and the output data result is directly the real result.
[0108] The integrated Beidou layout measurement and acquisition equipment is based on the Android or Hongmeng mobile phone architecture. It can have a built-in gyroscope to realize the inclination measurement function and display it graphically on the software. The advantage of graphics is that on-site personnel can intuitively display the working status of the equipment. In addition to the "position confirmation" scenario, continuous observation within a certain period of time can also be achieved. That is, when spanning the layout measurement, it is placed at the "reference point" position in a fixed installation manner. The built-in inclination measurement function can intuitively show whether the equipment is placed stably and reliably.
[0109] By adopting this compensation method, the error caused by the tilt of the centering rod during use can be basically eliminated, and this error can be ignored.
[0110] (2) Phase center misalignment error of the integrated Beidou sheep collection equipment antenna;
[0111] Compared with traditional surveying and layout equipment, the antenna phase center of the positioning device falls on the axis of the centering pole. The height of the centering pole is a standard part with consistent height and the retractable part also has scale information. Therefore, when the handbook is connected to the positioning device via Bluetooth, the height information of the centering pole is entered into the software of the handbook, and the latitude, longitude and elevation data of the corresponding point on the ground can be obtained by subtracting the height of the centering pole.
[0112] Integrated Beidou layout acquisition equipment; clamped in the handbook position. The centerline position of the antenna of the integrated device itself does not overlap with the centerline of the centering pole, which leads to errors between the position obtained by the centering pole and the position data output by the device itself, including the distance error between the antenna phase center point and the axis of the centering pole, and the azimuth error of the antenna phase center point during use, such as Figure 2 As shown, this is the tilt error model used for the centering pole in the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention, taking into account the equipment width and the diameter of the centering pole, which is generally 3 cm, the width of the mobile phone is 7.2 cm, the arrangement on one side of the antenna, and the installation structure distance of about 4 cm. The distance between the phase center of the measured antenna and the axis of the centering pole is in the range of about 7 cm to 12 cm.
[0113] (3) Errors in the results caused by the installation structure of the equipment
[0114] Pillar limit measurement: The pillar limit is generally between 3.5 meters and 5 meters, and the requirements are relatively strict, generally required to be greater than the minimum parameter value. If the measurement is carried out in a mobile manner, the operator needs to consider factors such as the direction of the equipment, which can easily cause a large error in the positioning data. Considering the double error, it may cause an error of at least 20 centimeters, which is a large error.
[0115] Line direction measurement: According to the arc length calculation formula, if the structural deviation of the mobile mode is taken into account, the positioning accuracy is calculated according to 15 cm. Two points are selected for direction measurement. When the distance between the two points is 1 meter, the calculated direction angle error is 17.2 degrees, which is a large error.
[0116] According to the specifications, the angle between the crossbar and the main line of the line must be perpendicular, and the error cannot be greater than 2°.
[0117] The overhead line spans across multiple lines, and the distance is generally more than 10 meters. The direction measurement error using this method will be less than 2°. If the main line length exceeds 50 meters, one line can be selected for the main line direction measurement. Roughly according to the distance of one span, the measured direction error is about 0.34°. As a baseline, only the span distance can be considered.
[0118] Therefore, this method is suitable for situations with large spans and long straight main lines, which span a large area, such as the non-throat area of a large railway station.
[0119] When the line direction cannot be measured with a long baseline in the line throat area and other line areas, the error needs to be corrected when using this method to eliminate or reduce the structural installation error.
[0120] In order to eliminate structural errors, the following two methods are used for improvement:
[0121] (1) Structural improvement: Design special structural parts to ensure that the phase center of the integrated Beidou layout and acquisition equipment antenna is reliably aligned with the axis of the centering rod. The phase center of the integrated equipment is calibrated before leaving the factory and the reference point is marked on the equipment.
[0122] (2) The error of the preliminary positioning result of the pole position is optimized by a mapping point pair error optimization method based on a rotation model and a phase center compensation optimization method based on a standard spatial structure of rails.
[0123] Step S31, a method for optimizing mapping point pair errors based on a rotation model, comprising:
[0124] The integrated Beidou surveying and acquisition equipment has a tilt measurement function, so the real-time output data can be converted into longitude and latitude coordinates of the same altitude plane, such as Figure 3 As shown, this is the data plane coordinate model of the integrated Beidou layout and measurement equipment of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention. In order to convert the coordinates of the integrated equipment to the coordinates of the axis of the centering pole, it is necessary to "translate" the coordinates output by the integrated equipment to the axis of the centering pole, and then subtract the corresponding height to obtain the spatial position of the corresponding point.
[0125] In order to achieve coordinate translation, the translation direction must be determined first. The method for determining the direction is: place the centering rod on the corresponding target point, rotate it multiple times, and the real-time positioning data output by the integrated Beidou layout measurement and acquisition equipment forms a "ring" around the axis of the centering rod. Data matching is performed in the output data. According to the error model, a certain coordinate data has a "mapping point" passing through the axis. The "mapping point" and the coordinate point pass through the axis to form a "mapping point pair". Then, the distance between the two points is the largest and a set of "mapping point pairs" coordinate pairs that are perpendicular to them can be found.
[0126] After rotation, multiple groups of "mapping point pairs" can be obtained. There is a certain probability that some data cannot find suitable mapping point pairs. For this reason, according to the maximum likelihood ratio principle, the data with large distance and vertical "mapping point pairs" can be selected.
[0127] After forming a "mapping point pair", the corresponding reverse movement of each point can be calculated, and the translation of multiple sets of coordinate points can be achieved.
[0128] After translation, multiple sets of data are smoothed according to the "error averaging" method and the corresponding plane coordinate data are output.
[0129] According to its model diagram, if the number of “mapping point pairs” is large enough, the calculation will be more accurate until the structural installation error is completely eliminated.
[0130] In order to generate more data, the method of increasing the frequency of data output is adopted. The integrated device does not need Bluetooth, WiFi, 4G / 5G and other transmission methods to obtain spatial location data. The positioning chip is built into the device, and the processing chip can directly obtain the data output results of the positioning chip. In normal mode, the spatial location data output frequency of the positioning chip is 1Hz. The integrated device mode can directly obtain the positioning chip data output frequency, which can be increased to at least 20Hz.
[0131] The integrated Beidou layout, measurement and collection equipment should be able to rotate for more than 5 seconds, so that at least 100 sets of data can be obtained.
[0132] The specific calculation process is as follows:
[0133] Step S311, place the centering rod on the corresponding target point and rotate it for multiple circles, and output the circular positioning data around the centering rod through the integrated Beidou layout measurement and acquisition equipment.
[0134] The circular positioning data is:
[0135]
[0136] Among them, p(i) represents the i-th data in the circular positioning data, N represents the number of circular positioning data, lon(i) and lat(i) represent the longitude and latitude of the i-th data respectively.
[0137] Step S312, traverse each data in the circular positioning data, calculate the distance and direction between the data and other data respectively, and select the data with a large distance and a vertical mapping point pair as the matching point of the current data based on the maximum likelihood ratio principle, and obtain the mapping point pair corresponding to the circular positioning data.
[0138] Step S3121, refer to Figure 3 , taking p1 as the benchmark, the mature Vincenty algorithm is used to calculate the distance and direction values between the 2nd to Nth position points and p1. The calculation function is set to Vincent(), the input data is the spatial longitude and latitude coordinates of the two positions, and the output parameters are the distance and the initial azimuth.
[0139]
[0140]
[0141] Among them, d i and α i Respectively represent the distance and direction between the i-th data and other data, p1(lon(1)), lat(1) represents the longitude and latitude of the first data, pi((lon(i)), lat(i)) represents the longitude and latitude of the i-th data, vincent d Represents the distance between the points corresponding to the i-th data and the first data solved by the Vincenty algorithm, Vincent α Represents the direction of the point corresponding to the i-th data and the first data solved by the Vincenty algorithm.
[0142] Step S3122, search d i and α i Relatively large value, relatively large value meets the condition α i The average value within the ±5° range is greater than the distance average value within the other delivery ranges. The set of data with the largest distance forms a "mapping point pair" [d_p1,α_p1] with p1.
[0143] Taking p2 as the reference, repeat the calculation according to step S3121 until N, then continue the calculation and stop at p1; in the obtained data, follow step S3122 to obtain the "mapping point pair" [d_p2, α_p2] corresponding to p2.
[0144] Repeat the above calculation steps from p3 to pN to obtain the "mapping point pair" for each corresponding point, [d_ p3 ,α_p3 ],……,[d_ pN ,α_ pN ].
[0145] In the "mapping point pair" step, the search condition is |α_ pi –α_ pj |For that data set within the range of π / 2±0.0796, filter out the "mapping point pairs" with a vertical relationship to match the data set, and after matching, get the direction angle of each corresponding spatial position point after filtering:
[0146]
[0147] Step S313, based on the mapping point pair, the moving direction corresponding to each point is calculated, the coordinate points of multiple sets of data are translated, and the translated multiple sets of data are smoothed based on the error averaging method to complete the elimination of errors caused by the inclination of the centering pole used in pole position layout and collection.
[0148] Determine the distance between the centering rod axis and the antenna phase center as d t , combined with the moving direction and longitude and latitude coordinates of each point, the coordinates of the translated points are calculated by the Vincenty algorithm. The coordinates of the kth point after translation are:
[0149]
[0150] Among them, lon k and lat k Represent the longitude and latitude of the kth data respectively;
[0151] Smoothing of multiple sets of data after translation based on error averaging method:
[0152]
[0153] Among them, O out are the latitude and longitude coordinates of the data smoothed by the error averaging method.
[0154] This method does not require specialized structural parts and is simple to use. It is suitable for scenarios where the centering rod can rotate relatively vertically, that is, it is suitable for collecting and acquiring coordinates without obstructions around the ground, such as the limit setting out and collection of cross-pillars, collection of reference points, etc.
[0155] The clamping height of the integrated equipment has no effect during distance application, and it is convenient for operators to quickly view the positioning results, and can also quickly view the operation status of other locations and the overall operation status. The appropriate height also facilitates on-site personnel to talk, take photos and record videos.
[0156] Step S32, a phase center compensation optimization method based on a standard rail spatial structure, comprises:
[0157] In order to ensure the comfort of railway driving, the rails are smooth and the sleepers are prefabricated in the factory. The space ratio of rail buckles is good. In some existing line reconstruction sites, the same type of structural parts formed by the rails and sleepers can be used as "calibration reference points" as a reference for direction correction, such as Figure 4 As shown, it is a schematic diagram of the track, sleepers and fasteners of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention.
[0158] like Figure 5 As shown, the antenna phase center misalignment error model of the railway contact network cross-pole positioning method based on Beidou high-precision positioning of the present invention is taken as an example of a device. Set the measured point as point "1", align the centering pole with a certain part of the fastener, and keep the direction of the handbook fixture roughly horizontal with the rail. Generally, the angle error can be controlled within 2°. Move a certain distance along the rail to point "2" and measure in the same way. After the measurement, move the device to point "3" to continue measuring. After obtaining the data of the three points, the "direction value" of the positioning coordinate data at point "1" is obtained through the algorithm, thereby calculating the coordinate value of point "1".
[0159] The direction error accuracy of this method is as follows:
[0160] Rail direction: Set the maximum deviation of the hand controller angle to 2°, the distance between the hand controller and the centering rod is 10 cm, the rail direction moves 1 meter, the direction angle calculation error is 3.86 degrees, and the position output error increases by 0.67 cm after translation. If the translation distance increases, the error decreases. When the translation distance is 3 meters, the direction angle calculation error is 1.29 degrees, and the position output error increases by 0.22 cm after translation.
[0161] Sleeper direction: Set the maximum angle deviation of the hand controller to 2°, the distance between the hand controller and the axis of the centering rod to 10 cm, and the sleeper distance to 1.435 meters. The measured direction angle error is 2 degrees, and the position output error increases by 0.35 cm after translation.
[0162] The positioning accuracy of the equipment is 2.5 cm. Regardless of the direction of the rail or the sleeper, the error can basically be controlled within 0.5 cm, that is, the positioning error correction accuracy is 3 cm.
[0163] When optimizing the error, the output frequency of the original positioning data can also be increased to 20Hz, as described in the previous method. As time accumulates, the error accuracy can be higher. When accumulated to 1 hour, after processing, the positioning accuracy can reach 2.5 mm. However, it is sometimes difficult to achieve long-term fixed position for cross-measurement operations, so it is necessary to speed up the operation.
[0164] The advantage is that elevation data is not affected by changes in installation methods, so the error optimization is only calculated for the plane.
[0165] The specific calculation process is as follows:
[0166] Step S321, determine the spatial position point p1 to be measured, and collect N1 data within the set time t1.
[0167] In a practical application of the present invention, N1=t1×20, and the collected N1 data are expressed as:
[0168]
[0169] Step S322, move the device along the direction of the rail, collect the corresponding longitude and latitude coordinates at the first target point p2, and collect N2 data within the set time t2.
[0170] In a practical application of the present invention, N2=t2×20, and the collected N2 data are expressed as:
[0171]
[0172] Step S323, move the device along the direction of the sleeper, collect the corresponding longitude and latitude coordinates at the second target point p3, and collect N3 data within the set time t3.
[0173] In a practical application of the present invention, N3=t3×20, and the collected N3 data are expressed as:
[0174]
[0175] Step S324: Based on the collected data, the Vincenty algorithm is used to calculate the direction angle θ from p2 to p1. 21 and the angle θ from p3 to p1 31 , based on the direction angle θ 21 and direction angle θ 31 Calculate the average direction angle θ:
[0176]
[0177] Step S325, determine the distance between the centering rod axis and the antenna phase center as d t , combined with the moving direction and longitude and latitude coordinates of each point, the coordinate points after translation are calculated through the Vincenty algorithm to complete the phase center compensation optimization based on the standard spatial structure of the rail.
[0178] The spatial position point p1 to be measured, the direction angle θ, and the distance between the axis of the centering rod and the phase center of the antenna are known to be d. t, use the Vincenty algorithm to translate the p1 coordinate along the direction angle θ by d t , and get the optimized coordinates:
[0179] O=(lon o ,lat o ).
[0180] The above two error optimization methods can reduce the positioning error caused by installation. The advantage is that the integrated equipment comes in various forms, the position of the antenna phase center also deteriorates greatly, and most of the equipment is not calibrated for the phase center before leaving the factory, so the parameter value cannot be accurately obtained. At this time, the above algorithm needs to be used for correction.
[0181] When the phase center of the integrated equipment antenna can overlap with the axis of the centering pole without installation deviation, the above correction method can be no longer used, but its correction scheme is still applicable to measuring the axis of some structural parts to obtain accurate target axis coordinates. For example, if the contact network pillar has a cylindrical structure, the center coordinates can be obtained when the first algorithm is used.
[0182] There are many types of cross-pillars. When the integrated equipment is called standard equipment, fixed structural parts can be made, and the measurement parts of the installed pillars and the measurement points of the rail fasteners can be obtained to obtain the center coordinates of the pillars and perform "reference point" calibration.
[0183] There are many specific structural methods. This plan proposes that the specific installation structure should have higher-precision inclination measurement, laser or structural alignment functions, and the accuracy should reach millimeter accuracy.
[0184] Although the various steps in the above embodiment are described in the above-mentioned order, those skilled in the art can understand that in order to achieve the effect of this embodiment, different steps do not have to be executed in such an order. They can be executed simultaneously (in parallel) or in a reverse order. These simple changes are within the scope of protection of the present invention.
[0185] A railway overhead contact network cross-pole positioning system based on Beidou high-precision positioning according to a second embodiment of the present invention comprises:
[0186] The contact network soft-span rapid acquisition and layout algorithm platform is used to receive the real-time coordinate and elevation data sent by the contact network cross-span Beidou layout and acquisition equipment, distinguish the data according to the ID number, and screen, correct, calculate and comprehensively display the data of the track center line, the outermost line and the cross-pillar data. According to the cross-pillar measurement specifications, the positioning results are given in real time and distributed to on-site personnel, back-end management personnel, quality inspection personnel, etc., for real-time verification and confirmation according to the business.
[0187] The contact network spans the Beidou layout and collection equipment, which is used to layout and collect coordinates of the spanning pillars. The contact network spanning pillars meet the requirements of verticality, limit and elevation with the main line.
[0188] Beidou layout measurement and acquisition equipment is a device for on-site coordinate layout and acquisition of cross-pillars. The cross-pillars of the overhead contact network must meet a series of requirements such as verticality with the main line, limit, elevation, etc. During the measurement process, it is easy to be disturbed by related factors such as line storage and skylight time.
[0189] The method of multi-member networking, real-time dynamic collection and calculation, and automatic error correction of the present invention uses multiple Beidou layout devices to collect the "reference points" and pillar coordinates on site in real time, and transmit them to the same software platform for display and calculation.
[0190] The number of devices depends on the on-site operation requirements, actual on-site conditions, etc. In the most ideal case, the devices that need to be configured are:
[0191] Beidou stakeout and collection equipment for the “reference point” of the main line: calibrate the direction and elevation of the main line. Generally speaking, at least two devices are required simultaneously and in real time.
[0192] Beidou stakeout collection equipment for the outermost line reference point: calibrate the direction and elevation of the outermost lines on both sides. Generally speaking, at least two devices are required on each side simultaneously and in real time;
[0193] Beidou layout and collection equipment for contact network pillars: calibrate the vertical angle, limit, etc. of the contact network. At least one unit is required for each pillar. If multiple pillars are measured at the same time, additional units can be added as needed.
[0194] All Beidou layout and acquisition devices will send the acquired coordinates to the same software platform simultaneously and in real time for subsequent processing.
[0195] The contact network spans the Beidou positioning base station, which is used to provide differential data for positioning for the contact network spanning the Beidou layout and collection equipment.
[0196] The role of the Beidou positioning base station is to provide differential data for the Beidou layout acquisition equipment. This method uses a single base station RTK positioning method, that is, one Beidou positioning base station is used on site, and the base station sends differential data to the Beidou layout acquisition equipment. The Beidou layout acquisition equipment receives the differential data and satellite signals, and after solving, it can achieve high-precision positioning with a positioning accuracy of 2.5 cm.
[0197] Beidou positioning base station (including control point calibration device) can be used under the condition of ground communication network, and can also use radio and satellite communication to provide differential data for Beidou layout acquisition equipment without ground communication network. The base station has a unified coordinate system control point calibration device, which can ensure the uniformity of coordinates under long and long lines through calibration, that is, different base stations and different Beidou layout acquisition equipment output consistent coordinate data under the same working conditions.
[0198] When there is a ground communication network, the system can also work under the third-party Beidou service platform.
[0199] The railway overhead contact network cross-pole positioning system based on Beidou high-precision positioning of the present invention is aimed at the industry status of the overhead contact network crossing the area with a large number of tracks, complex site, and joint operation of multiple devices. It has many application scenarios and usage functions, and the usage functions are as follows:
[0200] Coordinate layout of cross-pillars during the electrification renovation and construction phase of existing lines; Coordinate measurement and inspection of cross-pillars during the electrification renovation and construction phase of existing lines; Coordinate layout of cross-pillars during the construction phase of new lines; Coordinate measurement and inspection of cross-pillars during the construction phase of new lines; Regular inspection of cross-pillars of operating lines and professional line regulation of engineering works; Coordinate acquisition and on-site pre-layout of pillars in front of the line; Other scenarios that require regular inspection of the spatial position relationship between cross-pillars, main lines, and outermost lines.
[0201] The system indicators are: horizontal coordinate layout and collection accuracy is better than 2.5 cm; vertical coordinate layout and collection accuracy is better than 5 cm; the contact network cross-coordinate collection and layout requirements meet the contact network engineering specifications and related design requirements.
[0202] The usage is as follows: the operator determines the on-site work plan and prepares the equipment according to the task requirements and the actual situation on site. After arriving at the site, the equipment is deployed, and the Beidou layout measurement equipment is used to perform on-site layout or data collection according to the task requirements, and the software platform display is used to determine whether the requirements are met. After completion, the equipment is withdrawn.
[0203] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process and related instructions of the system described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0204] It should be noted that the railway contact network cross-pole positioning system based on Beidou high-precision positioning provided in the above embodiment is only illustrated by the division of the above functional modules. In practical applications, the above functions can be assigned to different functional modules as needed, that is, the modules or steps in the embodiments of the present invention can be decomposed or combined. For example, the modules in the above embodiments can be combined into one module, or further divided into multiple sub-modules to complete all or part of the functions described above. The names of the modules and steps involved in the embodiments of the present invention are only for distinguishing the modules or steps, and are not regarded as improper limitations of the present invention.
[0205] Based on the above algorithm, the integrated Beidou layout measurement and acquisition equipment can accurately obtain the spatial coordinate information of the corresponding points. For cross-contamination applications, in addition to ensuring the accuracy of the spatial coordinates of each point, it is also necessary to ensure that the contact network pillars and the line maintain a stable spatial position relationship.
[0206] In order to accurately, quickly and completely determine this spatial position relationship and ensure cross-position preparation, a method of multi-member networking, real-time dynamic collection and calculation, and automatic error correction is proposed. It is based on Internet thinking, abandoning the single-person single-device operation mode, and using multiple devices to simultaneously collect spatial coordinates and transmit them to the platform in real time for unified calculation.
[0207] The core of integration is to display the spatial position relationship between the cross-pillars and track lines in real time, and determine whether the regulatory requirements are met.
[0208] Taking the cross-spanning layout in the existing line reconstruction construction stage as an example, the layout process diagram of the railway contact network cross-spanning pole positioning method based on Beidou high-precision positioning of the present invention is as follows: Figure 6 As shown, the application methods are slightly different in different usage scenarios. Regardless of the scenario, multiple devices are required to display the spatial position relationship between the span pillar and the main line and the outermost line. In order to accurately calculate the spatial position relationship between the span pillar and the track line, calculate the technical indicators required by the specification in real time, and optimize and improve the technical indicators required by the specification, it is necessary to perform relevant optimization calculations on the selection of reference points, and monitor in real time the influence of reference point selection and reference point errors on the error of the final specification requirements. There are many span indicators required by the specification. Here, relevant optimization algorithms are proposed for the two indicators that the span requires that the center connection of the pillar foundation is perpendicular to the station main line with an angle of no more than 2°, and the limit is not less than the minimum value required by the specification. Other indicators such as span elevation are not elaborated here.
[0209] The algorithm considers application scenarios spanning the following line shapes:
[0210] The main line is a straight line and the outermost line is a straight line parallel to the main line; the main line is a straight line and the outermost line is a straight line or a curve that is not parallel to the main line; the main line is a curve and the outermost line is a curve, and the curve parameters are similar.
[0211] The “reference point” selection and error optimization method for the above line shape is as follows:
[0212] The reference point selection and error optimization method is as follows: the main line is a straight line and the outermost line is a straight line parallel to the main line. Figure 7 and Figure 8 As shown: the 4 or 6 dots in the middle represent the "reference points", and the 2 dots above and below represent the cross-pillars. This scene is usually the central area of the station yard of the line, where there are many parallel straight lines and the station yard is relatively wide.
[0213] First, according to the approximate position of the cross-pillar on one side, select the main line "reference points" 1 and 2, and the outermost limit "reference points" 3 and 4;
[0214] Then determine the span pillar 1 according to the limit;
[0215] Then, based on the perpendicular relationship with the main line, determine the cross-pillar 2 on the other side.
[0216] For the outermost limit "reference points" 3 and 4, it is difficult to completely overlap with pillars 1 and 2 on a straight line at the same time in reality. Here, a non-strictly restricted sampling method is proposed, that is, the selection of "reference points" 3 and 4 is the same as that of "reference points" 1 and 2, which not only determines the limit boundary, but also serves as a correction for "reference points" 1 and 2. Therefore, a method based on the "equivalent 6-point model" is proposed to ensure that the points across the pillars meet the requirements of the specification. Among them, "reference points" 3-1 and 3-2 are used to determine the limit across pillar 1, and "reference points" 4-1 and 4-2 are used to determine the limit across pillar 1.
[0217] For the case where the outermost line is parallel to the main line, the line directions of reference points 1 and 2, reference points 3-1 and 3-2, and reference points 4-1 and 4-2 are the same. For this reason, the equivalent 6-point model only needs to meet the requirement that the number of reference points is greater than any 4, and the distance of the "reference points" of the same line meets the direction accuracy requirements, and its spatial position is determined by spanning pillars 1 and 2, and meets the index requirements.
[0218] The application advantage of the equivalent 6-point model is that the three lines are not affected by line obstruction or vehicle occupancy, and can be operated simultaneously. For example, only the outermost line needs to be operated, and two groups can operate simultaneously without crossing the line, which improves work efficiency and safety. When a station with a long line has the same type of continuous span, the line direction and line limit reference point can be determined at one time, and the spatial position of the other span pillars can be confirmed at both ends of the pillars, so that the fast operation of the span pillars can be completed quickly.
[0219] This method can be used by multiple members to calculate at the same time. When 6 devices are used for simultaneous operation, the devices are placed on pillars 1 and 2, reference points 3-1 and 3-2, reference points 4-1 and 4-2, or pillars 1 and 2, reference points 3-1 and 4-2, reference points 1 and 2 and other components. The software platform calculates the angle, angle error, limit distance, limit error, etc. in real time. Each member can refer to the position result through the screen and move the position according to the adjustment suggestions given by the software platform to quickly complete the confirmation of the spatial position of the pillar. Compared with the traditional steel ruler and ruler setting out, single-person single-machine single-handbook setting out, the efficiency is greatly improved.
[0220] The maximum positioning error accuracy of "Method 1", "Method 2" and other methods used above is 3 cm. A straight line is determined by two points. If the calculated error of the two points' directions is less than 1°, the distance between the two reference points should be no less than 3.44 meters.
[0221] Generally speaking, the span usually spans at least 3 tracks, with a distance greater than 10 cm. The directional error after two-point positioning is very small. Therefore, it is only necessary to meet the requirement on the line that the distance between the two reference points is greater than 3.44 meters. This distance is very close on the railway and can meet the operation requirements in most cases.
[0222] For cross-operation, the traditional angle error is mainly visually observed due to the long working distance. In order to ensure a more accurate angle error, the "equivalent 6-point model" proposes a "fast method for multi-member joint operation". The calculation process is as follows:
[0223] Step 1: Take 6 devices working simultaneously to find the spatial position points of pillars 1 and 2, reference points 3-1 and 3-2, and reference points 4-1 and 4-2 as an example. The real-time parameters obtained are p1, p2, p3-1, p3-2, p4-1, and p4-2. For each test stay time t, N=t×20 data can be obtained.
[0224] Step 2: Monitor the direction angle, angle error, limit distance, and limit error of p3-1 and p3-2, p4-1 and p4-2, and p1 and p2 in real time.
[0225] Step 3: When the sum of the angle errors is less than 2 degrees and the limit error meets the minimum limit requirement, all spatial positions can be determined.
[0226] The basic formula for distance and direction angle calculation can be Vincenty algorithm. "Equivalent 6-point model" and multiple members can also use single, 2, 4, 8 operation modes.
[0227] The main line is a straight line, the outermost line is not parallel to the main line, and the reference point is selected as follows Fig. 9As shown, the four dots in the middle represent reference points, and the dots on both sides represent cross-pillars. This scenario is usually the throat area of the line, where there are many curves and straight lines.
[0228] Generally speaking, the span here is relatively short, and the operation can be carried out according to the following model. It is recommended to use 2, 4, and 6 operation modes. The single operation mode can also complete the operation, but it requires repeated confirmation of each point, and the speed is slower.
[0229] The "fast method for multi-member joint operation" of the "equivalent 6-point model" takes 6 devices as an example. Multiple members perform calculations on the launch platform at the same time to ensure that the spatial position of the cross-pillar meets the specification requirements. The calculation process of the method is as follows:
[0230] Step 1: Take 6 devices working simultaneously to find the spatial position points of pillars 1 and 2, reference points 3-1 and 3-2, and reference points 4-1 and 4-2 as an example. The real-time parameters obtained are p1, p2, p3-1, p3-2, p4-1, and p4-2. For each test stay time t, N=t×20 data can be obtained.
[0231] Step 2: Monitor the direction angle, angle error, limit distance, and limit error of p3-1 and p3-2, p4-1 and p4-2, and p1 and p2 in real time.
[0232] Step 3: When the sum of the angle errors is less than 2 degrees and the limit error meets the minimum limit requirement, all spatial positions can be determined.
[0233] The basic formula for distance and direction angle calculation can be Vincenty algorithm. "Equivalent 6-point model" and multiple members can also use single, 2, 4, 8 operation modes.
[0234] The main line is a curve, the outermost line is a curve, and the curve parameters are similar. The reference point is selected as follows Fig.10 As shown in the figure, small dots represent reference points and large dots represent cross-pillars. This scenario is usually the throat area of the line or the middle part of a super-large station.
[0235] The "fast method for multi-member joint operation" of the "equivalent 6-point model" takes 6 devices as an example. Multiple members perform calculations on the launch platform at the same time to ensure that the spatial position across the pillars meets the regulatory requirements. The calculation method is the same as above, mainly to determine the spatial position relationship.
[0236] In this scene mode, the vertical relationship between the horizontal line and the main line is different from the previous two scenes.
[0237] When the main line is a straight line, you can ignore the "intersection points" across the main line and roughly select two "reference points" that meet the direction error distance. These two reference points can be used to calculate the line direction.
[0238] However, for lines with curved main lines, the two selected "reference points" must ensure that they represent the perpendicular direction between the main line and the cross-line. This requires consideration of the curve length and curve radius factors, and calculation to determine whether the minimum spacing distance of the "reference points" on the same line represents the line direction at the location of the cross-line.
[0239] If the wrong selection is made, the direction error will become larger.
[0240] In order to quickly determine the appropriateness of the reference point selection, an algorithm for real-time monitoring of the reference point verification across the main line is proposed. The algorithm is based on the "symmetry principle" principle for optimization planning. Figure 11-Figure 15 , the error model principle is:
[0241] When the crossbar is perpendicular to the main line, the distances between the pillars and the reference points symmetrical on both sides of the intersection are close. If there is an angle deviation, there is a distance difference between the pillars and the reference points symmetrical on both sides of the intersection.
[0242] The calculation process for determining the correct intersection point and symmetric reference point (without considering the elevation parameters) is as follows:
[0243] Step 1: Input the coordinates of one side support p0 (lon, lat) and preliminarily determine the limit parameters
[0244] Step 2: Select two reference points p1 (lon1, lat1), p2 (lon2, lat2), and p3 (lon3, lat3) on the main line in sequence. The two reference points roughly cross the correct intersection.
[0245] If the curve is a circular curve and the parameters such as the radius of the curve are known, the coordinates of the center of the circle can be calculated through P1 and P2, and the cross direction can be determined through the coordinates of the center of the circle and the pillar. The method for P1 and P2 to calculate the coordinates of the center of the circle is to use the Vincenty algorithm to first calculate the center points of the two points and the directions of the two points, and then calculate the coordinates of the center of the circle according to the center points of the two points, the perpendicular direction of the directions of the two points, and the radius of the curve.
[0246] If the curve is a transition curve, the coordinates of the center of the circle cannot be calculated by p1, p2, p3, p4, ... The transition curve can be simulated by using the formula of the Bledsoe curve, quadratic curve, and hyperbola. To simplify the processing, this method uses the quadratic curve for simulation.
[0247] The calculation process of the quadratic curve algorithm is as follows:
[0248] Sub-step 1: Select sample points p1(lon1,lat1), p2(lon2,lat2), p3(lon3,lat3), where the intersection point is in the range [p1,p3]
[0249] Sub-step 2: Convert the longitude and latitude coordinates into plane coordinates to obtain the parameters of the three points p1(x1,y1), p2(x2,y2), and p3(x3,y3)
[0250] Sub-step 3: Use the Vincenty algorithm to calculate the directions of p1 and p3 and select the "x" parameter. Assuming that the line is roughly east-west, solve the transition curve parameters according to the formula:
[0251]
[0252] The curve coefficients a, b, and c are obtained through calculation.
[0253] If the line direction is biased towards the north-south direction, swap x and y, with the x-axis being the one with the larger step span.
[0254] Sub-step 4: Derivative the curve to obtain the tangent function, θ(y) = 2ax + b
[0255] Sub-step 5: The x-axis step length is 50 cm. Calculate the y value and the direction value θ to obtain (xi, yi) and θi, where i = D / 0.5-1, where D is the distance between the 1 and 3 spatial coordinate points, and i is the number of calculation samples added.
[0256] Sub-step 6: (xi, yi) and the direction αi across pillar 1, if |αi–θi|≧π / 2-ξ, ξ is the angular error, calculated according to the positioning deviation of 3 cm, ξ takes the value of 0.038
[0257] Sub-step 7: Re-determine the correct intersection range based on i, and recalculate the intersection coordinate range in the order of steps 5 and 6 with a step length of 1 cm, and select the point coordinates (xmax, ymax) with the maximum value of |αi–θi|
[0258] Sub-step 8: Convert the plane coordinates into longitude and latitude coordinates, confirm the spatial position on site, and you can get the actual intersection coordinates.
[0259] Repeat the iteration with a step size of 10 cm, select the minimum error value, and obtain the correct intersection coordinates.
[0260] Step 3: Perform limit measurement in the same way.
[0261] An electronic device according to a third embodiment of the present invention includes:
[0262] at least one processor;
[0263] and a memory communicatively coupled to at least one of the processors;
[0264] Among them, the memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the above-mentioned railway contact network cross-pole positioning method based on Beidou high-precision positioning.
[0265] A computer-readable storage medium according to a fourth embodiment of the present invention stores computer instructions, and the computer instructions are used to be executed by the computer to implement the above-mentioned method for positioning railway contact network across poles based on Beidou high-precision positioning.
[0266] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process and related instructions of the storage device and processing device described above can refer to the corresponding process in the aforementioned method embodiment and will not be repeated here.
[0267] Those skilled in the art should be able to appreciate that the modules and method steps of each example described in conjunction with the embodiments disclosed herein can be implemented with electronic hardware, computer software or a combination of the two, and the programs corresponding to the software modules and method steps can be placed in random access memory (RAM), internal memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disks, removable disks, CD-ROMs, or any other form of storage medium known in the technical field. In order to clearly illustrate the interchangeability of electronic hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are performed in electronic hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the present invention.
[0268] The terms "first", "second", etc. are used to distinguish similar objects rather than to describe or indicate a particular order or sequence.
[0269] The term "comprise" or any other similar term is intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus / device.
[0270] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning, characterized in that: The positioning method comprises: Set up a contact network across Beidou positioning base station to send differential data to multiple integrated contact network across Beidou layout and collection devices; A plurality of said integrated contact network spanning Beidou layout acquisition devices combine said differential data with the acquired satellite signals to calculate and acquire the corresponding preliminary positioning results of the pole positions; The error of the preliminary pole position positioning result includes: Errors caused by the tilt of the center pole used in pole staking and acquisition; The error caused by the misalignment of the phase centers of the integrated overhead line across the Beidou layout and acquisition equipment antennas; Errors caused by the movement of integrated overhead contact network across Beidou stakeout and collection equipment during pole position stakeout and collection; The error of the preliminary pole position positioning result is optimized by a mapping point pair error optimization method based on a rotation model and a phase center compensation optimization method based on a standard rail space structure, so as to obtain a final pole position positioning result; The mapping point pair error optimization method based on the rotation model is: Place the centering rod on the corresponding target point and rotate it for multiple circles, and output the circular positioning data around the centering rod through the integrated Beidou layout measurement and acquisition equipment; Traversing each data in the circular positioning data, respectively calculating the distance and direction between the data and other data, and selecting data with a large distance and a vertical mapping point pair as the matching point of the current data based on the maximum likelihood ratio principle, to obtain the mapping point pair corresponding to the circular positioning data; Based on the mapping point pair, the moving direction corresponding to each matching point is calculated, the coordinate point translation of multiple sets of data is performed, and the multiple sets of data after translation are smoothed based on the error averaging method, so as to eliminate the error caused by the tilt of the centering pole used in pole position setting and acquisition; The phase center compensation optimization method based on the standard spatial structure of rails is: Determine the spatial position point p1 to be measured, and collect N1 data within the set time t1; Move the device along the rail direction, collect the corresponding longitude and latitude coordinates at the first target point p2, and collect N2 data within the set time t2; Move the device along the direction of the sleeper, collect the corresponding longitude and latitude coordinates at the second target point p3, and collect N3 data within the set time t3; Based on the collected data, the Vincenty algorithm is used to calculate the direction angle θ from p2 to p1 21 and the angle θ from p3 to p1 31 , based on the direction angle θ 21 and direction angle θ 31 Calculate the average direction angle θ; Determine the distance between the centering rod axis and the antenna phase center as d t , combined with the moving direction and longitude and latitude coordinates corresponding to each matching point, the coordinate points after translation are calculated through the Vincenty algorithm to complete the phase center compensation optimization based on the standard spatial structure of the rail.
2. The method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to claim 1 is characterized in that: The annular positioning data is: Among them, p(i) represents the i-th data in the circular positioning data, N represents the number of circular positioning data, lon(i) and lat(i) represent the longitude and latitude of the i-th data respectively.
3. The method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to claim 2 is characterized in that: The calculating of the distance and direction between the data and other data includes: Among them, d i and α i Respectively represent the distance and direction between the i-th data and other data, p1(lon(1)), lat(1) represents the longitude and latitude of the first data, pi((lon(i)), lat(i)) represents the longitude and latitude of the i-th data, vincent d Represents the distance between the points corresponding to the i-th data and the first data solved by the Vincenty algorithm, Vincent α Represents the direction of the point corresponding to the i-th data and the first data solved by the Vincenty algorithm.
4. The method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to claim 3 is characterized in that: The step of translating the coordinate points of the multiple sets of data and smoothing the translated multiple sets of data based on an error averaging method includes: Determine the distance between the centering rod axis and the antenna phase center as d t , combined with the moving direction and longitude and latitude coordinates of each matching point, the coordinate points after translation are calculated by the Vincenty algorithm. The coordinate points after translation of the kth point are: Among them, lon k and lat k Represent the longitude and latitude of the kth data respectively; Smoothing of multiple sets of data after translation based on error averaging method: Among them, O out are the latitude and longitude coordinates of the data smoothed by the error averaging method.
5. The method for positioning a railway overhead contact network across a pole based on Beidou high-precision positioning according to claim 4 is characterized in that: The average direction angle θ is:
6. A railway contact network cross-pole positioning system based on Beidou high-precision positioning, characterized in that: The positioning system is used to implement the railway contact network cross-pole positioning method based on Beidou high-precision positioning as described in any one of claims 1 to 5, and the positioning system includes: The overhead line soft cross-span rapid acquisition and layout algorithm platform is used to receive the real-time coordinate and elevation data sent by the overhead line cross-span Beidou layout acquisition equipment, distinguish the data according to the ID number, and screen, correct, calculate and comprehensively display the data of the track center line, the outermost line and the cross-pillar data. According to the cross-pillar measurement specification requirements, the positioning results are given in real time and distributed to the on-site personnel, back-end management personnel, and quality inspection personnel for real-time verification and confirmation according to the business; The overhead line spanning Beidou layout and collection equipment is used to layout and collect coordinates of spanning pillars. The overhead line spanning pillars are perpendicular to the main line, and meet the limit and elevation requirements; The contact network spans the Beidou positioning base station, which is used to provide differential data for positioning for the contact network spanning the Beidou layout and collection equipment.
7. The railway overhead contact network cross-pole positioning system based on Beidou high-precision positioning according to claim 6 is characterized in that: The contact network soft-span fast acquisition and layout algorithm platform and the contact network span Beidou layout acquisition device, as well as the contact network span Beidou layout acquisition device and the contact network span Beidou positioning base station respectively transmit data through wireless communication; The wireless communication includes one or more of 4G communication, 5G communication, and satellite communication.
Citation Information
Patent Citations
Railway overhead line system soft crossing data processing method and device and storage medium
CN115455551A
Beidou positioning technology-based railway overhead line system line and rod position positioning and measuring system
CN209803339U
Position coordinate real-time dynamic combination measuring device and method based on GNSS (Global Navigation Satellite System)
CN101806906A
Network RTK resolving method based on Beidou ground-based augmentation and storage medium
CN114236587A
Centering rod error determination method and device, equipment and storage medium
CN114910095A