A method and device for multi-point linkage calculation and analysis of arch dam arch deformation

Data is collected through the arch dam deformation monitoring system, and an analysis model for coordinated displacement and displacement of the arch ring is established. The time series prediction model is used to perform automated analysis of arch direction deformation of arch dam, which solves the problem of difficulty in judging arch dam deformation in a timely manner. Improve monitoring efficiency and accuracy.

CN117932746BActive Publication Date: 2024-11-22HUANENG LANCANG RIVER HYDROPOWER CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410101713.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-11-22
Estimated Expiration
2044-01-24

AI Technical Summary

Technical Problem

It is difficult for the existing technology to promptly and comprehensively judge the arch deformation of the arch dam through manual analysis methods. With the increase in the order of magnitude and update rate of monitoring data, traditional methods are difficult to meet the safety monitoring needs of the operation of the arch dam.

Method used

A multi-point linkage calculation and analysis method for arch dam arch deformation is proposed. Data is collected through the arch dam deformation monitoring system, and a diachronous comparison analysis model for coordinated displacement and displacement of the arch dam plane is established. A time series prediction model is used to perform deformation and coordination of arch dam deformation and coordination of arch dam The prediction and analysis of degrees are combined with the Euclidean distance and Pearson correlation coefficient for data correlation and prediction.

Benefits of technology

It realizes automatic analysis of arch deformation of arch dam, has the ability to automatically collect, store, and real-time calculation and analysis of data, and can promptly detect deformation sudden changes or exceed the threshold, improving the efficiency and accuracy of arch dam operation safety monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117932746B_ABST
    Figure CN117932746B_ABST
Patent Text Reader

Abstract

This application proposes a method and equipment for calculating and analyzing the deformation of the arch dam arch direction at multiple points. The method is based on the automatically collected monitoring data of the arch dam deformation, combined with the experience and judgment of the on-site operation and maintenance personnel and hydraulic technical experts, and is monitored by monitoring equipment such as the vertical lines of the arch rings at each elevation of the arch dam body and the surface deformation monitoring points of the bridge behind the dam. The deformation of the arch direction mainly focuses on the plane displacement of each typical arch ring and the coordination degree of the displacement of the left and right banks. Therefore, the deformation monitoring data of the arch rings at the corresponding parts are used to carry out the calculation and analysis of the deformation of the arch dam arch ring at multiple points. The present invention can be applied to the automatic analysis of the overall deformation of the arch direction at multiple points according to the load characteristics and structural characteristics of the arch dam, and has the ability to automatically collect and store data and calculate and analyze data in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data analysis technology, and in particular to a method, device, electronic equipment and storage medium for calculating and analyzing the multi-point linkage deformation of an arch dam. Background Art

[0002] Deformation is the most concerned monitoring item for arch dam operation safety, and a large-scale deformation monitoring system is arranged on the arch dam. Especially in the upper dam body of the arch dam, the arch dam is mainly subjected to arch load, so more attention is paid to arch deformation. With the application of various monitoring methods and the popularization of automated monitoring technology, the magnitude and update rate of monitoring data have been greatly improved. It is difficult to make timely and comprehensive judgments on the arch deformation of the arch dam operation only through traditional manual analysis methods. Summary of the invention

[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, the first purpose of this application is to propose a multi-point linkage calculation and analysis method for the arch deformation of an arch dam, aiming to construct a multi-point linkage automatic analysis method for the overall arch deformation suitable for the load characteristics and structural properties of the arch dam.

[0005] The second objective of the present application is to provide a multi-point linkage calculation and analysis device for arch dam arch deformation.

[0006] The third objective of the present application is to provide an electronic device.

[0007] A fourth objective of the present application is to provide a computer-readable storage medium.

[0008] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a multi-point linkage calculation and analysis method for arch dam arch deformation, comprising:

[0009] The deformation monitoring data of the arch dam is collected through the arch dam deformation monitoring system;

[0010] Based on the deformation monitoring data, the results of the comparative analysis of the arch ring plane displacement and the coordination degree of the arch ring displacement of the arch dam are determined;

[0011] Based on the time-comparative analysis results of the arch ring plane displacement and the coordination degree of the arch ring displacement, the deformation analysis of the arch dam was carried out.

[0012] Among them, based on the deformation monitoring data, the plane displacement of the arch ring of the arch dam is determined, including:

[0013] Establish the correlation curve of radial and tangential deformation of single-layer arch ring during the monitoring period;

[0014] The overall plane displacement of the single-layer arch ring is analyzed by the distribution probability of the correlation coefficient of the multi-period curve.

[0015] Among them, the overall plane displacement of the single-layer arch ring is analyzed by the distribution probability of the correlation coefficient of the multi-period curve, including:

[0016] According to the spatial plane coordinates of the representative dam section perpendicular line or the deformation monitoring point behind the dam bridge surface at the same elevation, a spatial correlation model is established to reflect the plane displacement of the arch ring;

[0017] The Euclidean distance is used to calculate the similarity of the spatial correlation model of the past monitoring data of the arch ring deformation, and the similarity of the spatial correlation curves of the two adjacent arch ring deformations in the past is obtained.

[0018] Fitting the similarity coefficient of the spatial correlation curve of the plane displacement of the arch ring to construct a first time series prediction model; wherein the first time series prediction model is used to predict the similarity coefficient of the latest period of the spatial correlation curve of the plane displacement of the arch ring;

[0019] The similarity coefficient prediction value of the new period is calculated by the first time series prediction model, and is compared with the similarity coefficient calculated by actual measurement of the new period. It is quantitatively analyzed whether the overall deformation of the arch ring in the current period has a sudden change compared with the previous period or exceeds the first preset threshold value, so as to evaluate the overall plane displacement of the single-layer arch ring.

[0020] Among them, based on the deformation monitoring data, the arch ring displacement coordination of the arch dam is determined, including:

[0021] According to the monitoring data of the tangential deformation of the arch dam, the spatial correlation model of the current deformation monitoring value increment of the left and right bank arch rings is established respectively;

[0022] The tangential deformation monitoring data of the arch dam is defined as positive toward the left bank and negative toward the right bank, and the radial deformation monitoring data of the arch dam is defined as positive toward the downstream and negative toward the upstream;

[0023] The right bank deformation monitoring value increment spatial correlation curve is transformed to the first quadrant of the Cartesian coordinate system and compared with the left bank deformation monitoring value increment spatial correlation curve;

[0024] The deformation coordination degree of the left and right banks of the arch ring is described by the probability of correlation coefficient distribution.

[0025] Among them, according to the tangential deformation monitoring data of the arch dam, the spatial correlation models of the current deformation monitoring value increments of the left and right bank arch rings are established respectively, the arch ring center line of the preset level is set as the X-axis, and according to the spatial plane coordinate measurements of the deformation monitoring points of the representative dam section at the same elevation, the spatial correlation model of the arch ring on the left bank and the spatial correlation model of the arch ring on the right bank of the arch dam section are established as the spatial correlation models of the current deformation monitoring value increments of the left and right bank arch rings.

[0026] Among them, the deformation coordination degree of the left and right banks of the arch ring in this layer is described by the probability of correlation coefficient distribution, including:

[0027] Transform the spatial correlation curve of the right bank deformation monitoring value to the first quadrant of the Cartesian coordinate system;

[0028] The Pearson correlation coefficient is used to calculate the correlation of the spatial correlation model of the current monitoring values ​​of the left and right bank deformations, and the correlation is used to describe the coordination degree of the current left and right bank arch deformations.

[0029] Fitting the previous coordination degrees of the deformation curves of the arch rings on the left and right banks to construct a second time series prediction model; wherein the second time series prediction model is used to predict the latest coordination degree of the deformation curves of the arch rings on the left and right banks;

[0030] The coordination degree prediction value of the new period is calculated by the second time series prediction model, and is compared with the coordination degree calculated based on the actual measurement of the latest period. It is quantitatively analyzed whether the deformation coordination degree of the arch ring in the current period has a sudden change compared with the previous period or exceeds the second preset coordination degree threshold, so as to evaluate the displacement coordination degree of the arch ring.

[0031] Among them, when comparing the current forecast value with the latest coordination calculated based on actual measurements, the Rhineda criterion is used to determine the size of the difference.

[0032] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a multi-point linkage calculation and analysis device for arch dam arch deformation, comprising:

[0033] A data acquisition module is used to arrange a deformation monitoring system on the arch dam to collect deformation monitoring data of the arch dam;

[0034] The data analysis module is used to determine the time-comparative analysis results of the arch ring plane displacement and the arch ring displacement coordination of the arch dam based on the deformation monitoring data;

[0035] The deformation analysis module is used to perform deformation analysis on the arch dam based on the time-comparative analysis results of the arch ring plane displacement and the arch ring displacement coordination.

[0036] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;

[0037] Memory stores computer-executable instructions;

[0038] The processor executes the computer-executable instructions stored in the memory to implement the method of the aforementioned technical solution.

[0039] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer execution instructions are stored. When the computer execution instructions are executed by a processor, they are used to implement the method as the aforementioned technical solution.

[0040] Different from the prior art, the present invention provides a method, device, electronic device and storage medium for calculating and analyzing the arch deformation of an arch dam at multiple points. Based on the automatically collected dam deformation monitoring data, combined with the experience and judgment of on-site operation and maintenance personnel and hydraulic technical experts, the present invention monitors the arch deformation by using monitoring equipment such as the vertical line of each elevation arch ring and the surface deformation monitoring point of the bridge behind the dam. The arch deformation mainly focuses on the plane displacement of each typical arch ring and the coordination degree of the displacement of the left and right banks. Therefore, the arch deformation monitoring data of the corresponding parts are used to carry out the calculation and analysis of the arch deformation at multiple points. The present invention can be applied to the automatic analysis of the overall deformation of the arch direction of the arch dam based on the load characteristics and structural characteristics, and has the ability to automatically collect and store data and to calculate and analyze data in real time.

[0041] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a flow chart of a multi-point linkage calculation and analysis method for arch dam arch deformation provided by the present invention.

[0043] Figure 2 The present invention provides a schematic structural diagram of a multi-point linkage calculation and analysis device for arch dam arch deformation. DETAILED DESCRIPTION

[0044] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0045] The following describes a method and device for multi-point linkage calculation and analysis of arch dam arch deformation according to an embodiment of the present application with reference to the accompanying drawings.

[0046] Figure 1 A schematic flow chart of a multi-point linkage calculation and analysis method for arch dam arch deformation provided in an embodiment of the present application. The method comprises the following steps:

[0047] S110: Collecting deformation monitoring data of the arch dam through the arch dam deformation monitoring system.

[0048] S120: Based on the deformation monitoring data, determine the time-comparative analysis results of the arch ring plane displacement and the arch ring displacement coordination of the arch dam.

[0049] S130: Based on the time-comparative analysis results of the arch ring plane displacement and the arch ring displacement coordination, deformation analysis of the arch dam is performed.

[0050] The arch deformation of the arch dam is mainly monitored by monitoring equipment such as the perpendicular lines of the arch rings at various elevations of the arch dam body and the surface deformation monitoring points of the bridge behind the dam. The arch deformation mainly focuses on the plane displacement of each typical arch ring and the coordination of the displacement of the left and right banks. Therefore, the arch deformation monitoring data of the corresponding parts are used to carry out multi-point linkage calculation and analysis of the arch ring deformation of the arch dam.

[0051] In an embodiment of the present invention, the deformation monitoring data comes from a deformation monitoring system deployed in the arch dam.

[0052] Based on the deformation monitoring data, the plane displacement of the arch ring of the arch dam is determined, including the following steps:

[0053] Establish the correlation curve of radial and tangential deformation of single-layer arch ring during the monitoring period;

[0054] The overall plane displacement of the single-layer arch ring is analyzed by the distribution probability of the correlation coefficient of the multi-period curve.

[0055] According to the load-sharing structure of arch and beam, when the arch dam is subjected to loads such as reservoir water, the load at the upper elevation of the dam body is mainly borne in the arch direction. This paper studies the calculation method of the overall deformation of the representative arch ring of the arch dam, and uses it to analyze the plane displacement of the arch rings of each layer of the arch dam.

[0056] In this embodiment, when monitoring the plane displacement of the arch ring, the vertical lines arranged in representative dam sections such as the arch crown, 1 / 2 arch, and 1 / 4 arch are selected; at the same time, the surface deformation monitoring points arranged on the rear bridge of the arch ring of each layer of the arch dam are selected to further verify the vertical line monitoring results and improve the monitoring coverage density.

[0057] Specifically, in order to analyze the overall plane displacement of a single-layer arch ring through the distribution probability of the correlation coefficient of the multi-period curve, the following steps are included:

[0058] According to the spatial plane coordinates of the representative dam section perpendicular line or the deformation monitoring point behind the dam bridge surface at the same elevation, a spatial correlation model is established to reflect the plane displacement of the arch ring;

[0059] The Euclidean distance is used to calculate the similarity of the spatial correlation model of the past monitoring data of the arch ring deformation, and the similarity of the spatial correlation curves of the two adjacent arch ring deformations in the past is obtained.

[0060] Fitting the similarity coefficient of the spatial correlation curve of the plane displacement of the arch ring to construct a first time series prediction model; wherein the first time series prediction model is used to predict the similarity coefficient of the latest period of the spatial correlation curve of the plane displacement of the arch ring;

[0061] The similarity coefficient prediction value of the new period is calculated by the first time series prediction model, and is compared with the similarity coefficient calculated by actual measurement of the new period, and a quantitative analysis is performed to determine whether the overall deformation of the arch ring in the current period has a sudden change compared with the previous period or exceeds the first preset threshold value, so as to evaluate the overall plane displacement of the single-layer arch ring. The first preset threshold value is the maximum acceptable difference between the similarity coefficient prediction value of the new period and the similarity coefficient calculated by actual measurement of the new period.

[0062] Specifically, according to the spatial plane coordinate measurement value A of the representative dam section perpendicular line or the surface deformation monitoring point behind the dam bridge at the same elevation 1n (x 1n ,y 1n ), A 2n (x 2n ,y 2n ), …, A mn (x mn ,y mn ) Establish spatial correlation model t (x mn ,y mn ), which reflects the plane displacement of the arch ring. Among them: x mn and mn They are respectively the spatial plane coordinate monitoring values ​​of the n-layer perpendicular line of the m-th dam section or the surface deformation monitoring point of the bridge behind the dam.

[0063] Using Euclidean distance, the spatial correlation model of the past monitoring data of the arch deformation is calculated by formula (1): t-k With f t-(k-1) Similarity, the similarity r of the spatial correlation curves of the two adjacent arch ring deformations in the past is obtained t .

[0064]

[0065] The similarity coefficient r of the spatial correlation curve of the plane displacement of the fitting arch ring t , r t-1 ,…,r t-k , build the first time series prediction model. The similarity coefficient prediction value r of the latest arch ring plane displacement time-space correlation curve is obtained through the first time series prediction model. t ', and compare it with the correlation coefficient r calculated by the new period actual measurement tThe comparison is made and the Rhineda criterion is used to quantify whether the overall deformation of the arch ring in the current period has a sudden change compared with the previous period or exceeds the first preset threshold. The first preset threshold involved in this embodiment is an acceptable, latest period correlation coefficient prediction value r t 'The correlation coefficient r calculated with the latest actual measurement t The maximum value of the difference.

[0066] In addition, based on the deformation monitoring data, the arch ring displacement coordination of the arch dam is determined, including:

[0067] According to the monitoring data of the tangential deformation of the arch dam, the spatial correlation model of the current deformation monitoring value increment of the left and right bank arch rings is established respectively;

[0068] The tangential deformation monitoring data of the arch dam is defined as positive toward the left bank and negative toward the right bank, and the radial deformation monitoring data of the arch dam is defined as positive toward the downstream and negative toward the upstream;

[0069] The right bank deformation monitoring value increment spatial correlation curve is transformed to the first quadrant of the Cartesian coordinate system and compared with the left bank deformation monitoring value increment spatial correlation curve;

[0070] The deformation coordination degree of the left and right banks of the arch ring is described by the probability of correlation coefficient distribution.

[0071] To achieve the above technical objectives, based on the tangential deformation monitoring data of the arch dam, spatial correlation models of the current deformation monitoring value increments of the left and right bank arch rings are established respectively, the arch ring center line of the preset level is set as the X-axis, and based on the spatial plane coordinate measurements of the deformation monitoring points of the representative dam section at the same elevation, the spatial correlation model of the arch ring on the left bank and the spatial correlation model of the arch ring on the right bank of the arch dam section are established as the spatial correlation models of the current deformation monitoring value increments of the left and right bank arch rings.

[0072] Transform the spatial correlation curve of the right bank deformation monitoring value to the first quadrant of the Cartesian coordinate system;

[0073] The Pearson correlation coefficient is used to calculate the correlation of the spatial correlation model of the current monitoring values ​​of the left and right bank deformations, and the correlation is used to describe the coordination degree of the current left and right bank arch deformations.

[0074] Fitting the previous coordination degrees of the deformation curves of the arch rings on the left and right banks to construct a second time series prediction model; wherein the second time series prediction model is used to predict the latest coordination degree of the deformation curves of the arch rings on the left and right banks;

[0075] The predicted value of the coordination degree for the new period is obtained by calculating through the second time series prediction model, which is compared with the coordination degree calculated based on the actual measurement for the latest period. It is quantitatively analyzed whether the deformation coordination degree of the arch ring in the current period has a sudden change compared with the previous period or exceeds the second preset coordination degree threshold, so as to evaluate the displacement coordination degree of the arch ring.

[0076] Specifically, according to the spatial plane coordinate measurement value A of the representative dam section perpendicular line or the surface deformation monitoring point behind the dam bridge at the same elevation 1n (x 1n ,y 1n ), A 2n (x 2n ,y 2n ), …, A mn (x mn ,y mn ) Establish the spatial correlation model of the arch ring on the left bank of the arch dam section Z (x mn ,y mn ) and the spatial correlation model of the right bank arch Y (x mn , -y mn ). Where: x mn and mn They are respectively the spatial plane coordinate monitoring values ​​of the n-layer perpendicular line of the m-th dam section or the surface deformation monitoring point of the bridge behind the dam.

[0077] The right bank deformation monitoring value spatial correlation curve is transformed into coordinates by formula (2): Y (x mn , -y mn )→f Y '(x',y'), to the first quadrant of the Cartesian coordinate system.

[0078]

[0079] The Pearson correlation coefficient is used to calculate the spatial correlation model of the current monitoring values ​​of the left and right bank deformations: Z With f Y Correlation is used to describe the coordination degree of the deformation of the left and right bank arch rings. 1 t .

[0080] The coordination degree r of the deformation curves of the left and right bank arch rings 1 t , r 1 t-1 ,…,r 1 t-k Fitting is performed to construct the second time series prediction model. 1 t 'Compared to the latest period calculated based on actual measurements1 t The second preset coordination threshold is an acceptable, new coordination prediction value r. 1 t 'The coordination degree r calculated based on the latest measurement 1 t The maximum value of the difference.

[0081] In order to implement the above-mentioned embodiment, the present application also proposes a multi-point linkage calculation and analysis device for arch dam arch deformation.

[0082] Figure 2 A schematic diagram of the structure of a multi-point linkage calculation and analysis device for arch dam arch deformation provided in an embodiment of the present application.

[0083] like Figure 2 As shown, the device 300 includes:

[0084] The data acquisition module 310 is used to collect deformation monitoring data of the arch dam through the arch dam deformation monitoring system;

[0085] The data analysis module 320 is used to determine the time-comparison analysis results of the arch ring plane displacement and the arch ring displacement coordination degree of the arch dam based on the deformation monitoring data;

[0086] The deformation analysis module 330 is used to perform deformation analysis on the arch dam based on the time-comparison analysis results of the arch ring plane displacement and the arch ring displacement coordination degree.

[0087] In order to implement the above embodiments, the present application also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.

[0088] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.

[0089] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.

[0090] The collection, storage, use, processing, transmission, provision and disclosure of user personal information involved in this application are in compliance with relevant laws and regulations and do not violate public order and good morals.

[0091] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.

[0092] The present application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, the present disclosure is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, the risk can be minimized by limiting data collection and deleting the data. In addition, when applicable, such personal information is de-identified to protect the privacy of the user.

[0093] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0094] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0095] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0096] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0097] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0098] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0099] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0100] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A multi-point linkage calculation and analysis method for arch dam arch deformation, characterized in that: include: In the arch dam deformation monitoring system, deformation monitoring data of the arch dam is collected through the arch dam deformation monitoring system; Based on the deformation monitoring data, determining the time-comparison analysis results of the arch ring plane displacement and the arch ring displacement coordination degree of the arch dam; Based on the time-comparison analysis results of the arch ring plane displacement and the arch ring displacement coordination degree, deformation analysis of the arch dam is performed; The step of determining the plane displacement of the arch ring of the arch dam based on the deformation monitoring data comprises: Establish the correlation curve of radial and tangential deformation of single-layer arch ring during the monitoring period; The overall plane displacement of the single-layer arch ring is analyzed through the distribution probability of the correlation coefficient of the multi-period curve; The step of determining the arch ring displacement coordination degree of the arch dam based on the deformation monitoring data includes: According to the monitoring data of the tangential deformation of the arch dam, the spatial correlation model of the current deformation monitoring value increment of the left and right bank arch rings is established respectively; The tangential deformation monitoring data of the arch dam is defined as positive toward the left bank and negative toward the right bank, and the radial deformation monitoring data of the arch dam is defined as positive toward the downstream and negative toward the upstream; The right bank deformation monitoring value increment spatial correlation curve is transformed to the first quadrant of the Cartesian coordinate system and compared with the left bank deformation monitoring value increment spatial correlation curve; The deformation coordination degree of the left and right banks of the arch ring is described by the probability of correlation coefficient distribution.

2. The multi-point linkage calculation and analysis method for arch dam arch deformation according to claim 1 is characterized in that: The overall plane displacement of the single-layer arch ring is analyzed by the distribution probability of the correlation coefficient of the multi-period curve, including: According to the spatial plane coordinates of the representative dam section perpendicular line or the deformation monitoring point behind the dam bridge surface at the same elevation, a spatial correlation model is established to reflect the plane displacement of the arch ring; The Euclidean distance is used to calculate the similarity of the spatial correlation model of the past monitoring data of the arch ring deformation, and the similarity of the spatial correlation curves of the two adjacent arch ring deformations in the past is obtained. Fitting the similarity coefficient of the spatial correlation curve of the plane displacement of the arch ring to construct a first time series prediction model; wherein the first time series prediction model is used to predict the similarity coefficient of the latest period of the spatial correlation curve of the plane displacement of the arch ring; The similarity coefficient prediction value of the new period is calculated by the first time series prediction model, and is compared with the similarity coefficient calculated by actual measurement of the new period. It is quantitatively analyzed whether the overall deformation of the arch ring in the current period has a sudden change compared with the previous period or exceeds the first preset threshold value, so as to evaluate the overall plane displacement of the single-layer arch ring.

3. The multi-point linkage calculation and analysis method for arch dam arch deformation according to claim 1 is characterized in that: According to the monitoring data of the tangential deformation of the arch dam, spatial correlation models of the current deformation monitoring value increments of the left and right bank arch rings are established respectively, the center line of the arch ring at a preset level is set as the X-axis, and according to the spatial plane coordinate measurements of the positive vertical line of the representative dam section at the same elevation or the surface deformation monitoring points of the bridge behind the dam, the spatial correlation model of the arch ring on the left bank of the arch dam section and the spatial correlation model of the arch ring on the right bank of the arch dam section are established as the spatial correlation models of the current deformation monitoring value increments of the arch ring planes on the left and right banks.

4. The multi-point linkage calculation and analysis method for arch dam arch deformation according to claim 1 is characterized in that: The description of the deformation coordination degree of the left and right banks of the arch ring of this layer by the probability of correlation coefficient distribution includes: Transform the spatial correlation curve of the right bank deformation monitoring value to the first quadrant of the Cartesian coordinate system; The Pearson correlation coefficient is used to calculate the correlation of the spatial correlation model of the current monitoring values ​​of the left and right bank deformations, and the correlation is used to describe the coordination degree of the current left and right bank arch deformations. Fitting the previous coordination degrees of the deformation curves of the arch rings on the left and right banks to construct a second time series prediction model; wherein the second time series prediction model is used to predict the latest coordination degree of the deformation curves of the arch rings on the left and right banks; The coordination degree prediction value of the new period is calculated by the second time series prediction model, and is compared with the coordination degree calculated based on the actual measurement of the latest period. It is quantitatively analyzed whether the deformation coordination degree of the arch ring in the current period has a sudden change compared with the previous period or exceeds the second preset coordination degree threshold, so as to evaluate the displacement coordination degree of the arch ring.

5. The multi-point linkage calculation and analysis method for arch dam arch deformation according to claim 4 is characterized in that: When comparing the current forecast value with the latest coordination calculated based on actual measurements, the Rhineda criterion is used to determine the size of the difference.

6. A multi-point linkage calculation and analysis device for arch dam arch deformation, characterized in that: include: A data acquisition module, used to arrange a deformation monitoring system on the arch dam to collect deformation monitoring data of the arch dam; A data analysis module, used to determine the time-comparative analysis results of the arch ring plane displacement and the arch ring displacement coordination degree of the arch dam based on the deformation monitoring data; A deformation analysis module, used for performing deformation analysis on the arch dam based on the time-comparison analysis results of the arch ring plane displacement and the arch ring displacement coordination degree; The data analysis module is also used to establish a correlation curve of the radial and tangential deformation of the single-layer arch ring during the monitoring period; The overall plane displacement of the single-layer arch ring is analyzed through the distribution probability of the correlation coefficient of the multi-period curve; According to the monitoring data of the tangential deformation of the arch dam, the spatial correlation model of the current deformation monitoring value increment of the left and right bank arch rings is established respectively; The tangential deformation monitoring data of the arch dam is defined as positive toward the left bank and negative toward the right bank, and the radial deformation monitoring data of the arch dam is defined as positive toward the downstream and negative toward the upstream; The right bank deformation monitoring value increment spatial correlation curve is transformed to the first quadrant of the Cartesian coordinate system and compared with the left bank deformation monitoring value increment spatial correlation curve; The deformation coordination degree of the left and right banks of the arch ring is described by the probability of correlation coefficient distribution.

7. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 5.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 5 when executed by a processor.