A pull-out water-stop steel plate and a station waterproof structure and its construction method
By using a combination of pull-out waterstop steel plates, sealant, and expansion waterstop strips at the post-cast strip location in underground stations, the problems of high waterproofing costs and poor effectiveness in existing technologies have been solved, achieving low-cost and high-efficiency waterproofing.
Patent Information
- Application Number
- CN202410228863.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-02-29
AI Technical Summary
Existing technologies for waterproofing the post-cast strip at the connection point of underground stations are costly and have poor waterproofing effects, making it difficult to meet the requirements of Class I waterproofing.
A pull-out waterstop steel plate is used, including a first plate and a second plate. The first plate is embedded in the bottom slab of the first station, and the second plate is embedded in the post-cast strip. It is fixed by welding at the opening and partially bent, combined with sealant and expansion waterstop strip to form an effective waterproof structure.
It achieves low-cost waterproofing, effectively prevents groundwater leakage, meets the waterproofing requirements of underground stations, and has a simple and highly flexible structure.
Smart Images

Figure CN118065438B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of subway waterproofing technology, and in particular to a pull-out water-stop steel plate and a station waterproofing structure and its construction method. Background Technology
[0002] Currently, as urban subway construction becomes more and more mature, more and more transfer stations have been built in recent years, especially underground stations with abundant groundwater. The connection between two stations is the location of the post-cast strip, which is often the main leakage and seepage point of the station.
[0003] In existing technologies, due to the presence of the retaining structure, waterproofing measures at the post-cast strip often involve high-penetration epoxy waterproofing coatings and water-swellable sealant, with the concrete grade being one level higher than that on both sides, plus a micro-expansion agent. Subsequent leak sealing at the station requires a significant investment of manpower and financial resources to meet the Class I waterproofing requirements, resulting in excessive costs. Summary of the Invention
[0004] The purpose of this invention is to provide a pull-out water-stop steel plate and a station waterproof structure and its construction method that can meet the waterproof requirements of the station and reduce construction costs.
[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0006] The first aspect of the present invention provides a pull-out waterstop steel plate, including a first plate and a second plate. The first plate includes a main body and a first bent portion disposed on one side of the main body. The main body has a receiving cavity inside. An opening is provided on the side of the main body away from the first bent portion. The receiving cavity communicates with the opening. The second plate is slidably inserted into the receiving cavity through the opening.
[0007] Further, the main body includes a first plate, a second plate, and two third plates. One side edge of the first plate is connected to one side edge of the second plate. The first bend is disposed at the junction of the side edges of the first plate and the second plate. The two third plates are respectively disposed on the two side edges of the first plate adjacent to the first bend. Both third plates are connected to the side edges of the first plate and the second plate. The side edge of the first plate away from the first bend, the side edge of the second plate away from the first bend, and the two third plates enclose and define the opening. The first plate, the second plate, and the two third plates enclose and define the receiving cavity.
[0008] Furthermore, the first plate has a first protrusion on the end face opposite to the second plate, and the second plate has a second protrusion on the end face opposite to the first plate.
[0009] A second aspect of the present invention provides a station waterproofing structure, the station including a first station base plate and a second station base plate arranged at intervals, the station waterproofing structure including a post-pouring strip, a water-stop steel plate and the pull-out water-stop steel plate;
[0010] The first station base slab and the second station base slab are separated by the post-cast strip. There is a first construction joint between the first station base slab and the post-cast strip, and a second construction joint between the second station base slab and the post-cast strip. The first plate of the pull-out waterstop steel plate is embedded in the first station base slab, and the second plate is embedded in the post-cast strip. The opening is set directly opposite the first construction joint. Part of the waterstop steel plate is embedded in the second station base slab, and the rest is embedded in the post-cast strip.
[0011] Furthermore, the pre-embedded height of the pull-out waterstop steel plate and the waterstop steel plate are respectively half the height of the first station base plate and the second station base plate.
[0012] A third aspect of the present invention provides a method for constructing a waterproof structure for a railway station, comprising the following steps:
[0013] S1. At the location of the post-pouring strip as specified in the drawings, an enclosure structure shall be installed close to the bottom slab of the first station.
[0014] S2. Reinforcing bars are tied at the position of the first station floor slab to form a first reinforcing steel frame. The first slab is pre-embedded in the first reinforcing steel frame and concrete is poured to form the first station floor slab.
[0015] S3. Install a waterstop at the location of the second construction joint;
[0016] S4. Reinforcing bars are tied at the position of the second station floor to form a second reinforcing steel frame. The water-stop steel plate is pre-embedded in the second reinforcing steel frame, and concrete is poured to form the second station floor.
[0017] S5. Remove the aforementioned enclosure structure;
[0018] S6. Seal the first construction joint with sealant;
[0019] S7. The second plate is pulled out from the accommodating cavity, and the section of the second plate away from the first plate is bent to form a second bent part. The first plate and the second plate are welded at the opening.
[0020] S8. Concrete is poured into the post-cast strip.
[0021] Furthermore, in S6, after the retaining structure is removed, the end faces of the first station base plate and the second station base plate near the post-cast strip are roughened.
[0022] Furthermore, in S7, MIG welding is used.
[0023] Furthermore, after S6, an expansion waterstop strip is fixedly installed on the end face of the first station base plate near the post-cast strip, above the pull-out waterstop steel plate.
[0024] Furthermore, after S6, the first station base plate and the second station base plate are protected as finished products, and measurements are taken and laid out.
[0025] Compared with the prior art, the present invention discloses a pull-out water-stop steel plate and a station waterproof structure and its construction method. The advantages of these methods are as follows: a first plate is embedded in the first station base plate, and a second plate is pulled out from the main body and partially bent. The main body and the second plate are welded at the opening. After the concrete is poured, groundwater leakage at the first construction joint can be prevented. Only some basic waterproof measures are needed to meet the waterproof requirements of the underground station. The structure is simple, highly flexible, and has low construction cost. Attached Figure Description
[0026] Figure 1 This is an overall structural diagram of the pull-out waterstop steel plate according to an embodiment of the present invention;
[0027] Figure 2 These are structural cross-sectional views of S1-S5 in the station waterproof structure construction method of this invention embodiment;
[0028] Figure 3 These are structural cross-sectional views of S6-S8 in the construction method of the station waterproof structure according to an embodiment of the present invention;
[0029] Figure 4 This is a flowchart of the construction method for the station waterproof structure according to an embodiment of the present invention.
[0030] In the diagram, 1 is the first plate; 101 is the main body; 1011 is the first plate body; 10111 is the first protrusion; 1012 is the second plate body; 10121 is the second protrusion; 1013 is the third plate body; and 102 is the first bend.
[0031] 2. Second plate; 201. Second bend;
[0032] 3. Station; 301. First station floor slab; 302. Second station floor slab;
[0033] 4. Post-pouring strip;
[0034] 5. Enclosure structure;
[0035] 6. Sealant;
[0036] 7. Waterstop strip;
[0037] 8. Expansion seal strip;
[0038] 9. Water-stop steel plate. Detailed Implementation
[0039] The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and are not intended to limit the scope of the invention.
[0040] In the description of this invention, the terms "upper," "lower," "left," "right," "front," "rear," "inner," "outer," "lateral," and "longitudinal," etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings and are used only for the convenience of describing the invention and simplifying the description. They are not intended to limit the indicated devices, elements, or components to having a specific orientation, or to be constructed and operated in a specific orientation, and therefore should not be construed as limiting this utility model. Those skilled in the art can understand the specific meaning of these terms in this invention according to the specific circumstances.
[0041] In the description of this invention, the terms "provided with," "set up," "connected," and "placed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral structure; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium, or an internal connection between two devices, elements, or components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0042] Furthermore, the terms "first," "second," etc., are primarily used to distinguish different devices, elements, or components (which may be the same or different in specific type and construction), and are not intended to indicate or imply the relative importance or quantity of the indicated devices, elements, or components. Unless otherwise stated, "a plurality of" means two or more.
[0043] The technical solution of the present invention will be further described below with reference to the embodiments and accompanying drawings.
[0044] The first aspect of this invention provides a pull-out waterstop steel plate, such as... Figure 1 As shown, it includes a first plate 1 and a second plate 2. The first plate 1 includes a main body 101 and a first bent portion 102 disposed on one side of the main body 101. The main body 101 has a receiving cavity inside. An opening is provided on the side of the main body 101 away from the first bent portion 102. The receiving cavity is connected to the opening. The second plate 2 is slidably inserted into the receiving cavity through the opening.
[0045] Based on the above technical solution, the second plate 2 can be slidably inserted into the accommodating cavity through the opening. After the second plate 2 is pulled out and fixed by welding and partially bent, its waterproof performance is consistent with that of a general waterstop steel plate 9. When the second plate 2 is housed in the accommodating cavity, the pull-out waterstop steel plate occupies little space and can be applied to different waterproof constructions, avoiding the situation of construction difficulties due to insufficient space. The structure is simple and highly flexible.
[0046] Preferably, the main body 101 includes a first plate 1011, a second plate 1012, and two third plates 1013. One side edge of the first plate 1011 is connected to one side edge of the second plate 1012. A first bending portion 102 is disposed at the junction of the side edges of the first plate 1011 and the second plate 1012. The two third plates 1013 are respectively disposed on the two side edges of the first plate 1011 adjacent to the first bending portion 102. The two third plates 1013 are connected to the side edges of the first plate 1011 and the second plate 1012. The side edge of the first plate 1011 away from the first bending portion 102, the side edge of the second plate 1012 away from the first bending portion 102, and the two third plates 1013 enclose and define an opening. The first plate 1011, the second plate 1012, and the two third plates 1013 enclose and define an accommodating cavity.
[0047] More preferably, the first plate 1011 has a first protrusion 10111 on the end face opposite to the second plate 1012, and the second plate 1012 has a second protrusion 10121 on the end face opposite to the first plate 1011.
[0048] In a preferred embodiment, the first plate 1011 has a plurality of first protrusions 10111, and the second plate 1012 has a plurality of second protrusions 10121.
[0049] The first protrusion 10111 and the second protrusion 10121 increase the contact area between the main body 101 and the concrete of the first station base 301, making the first slab 1 more solid within the first station base 301 after pouring.
[0050] The second aspect of the present invention provides a station waterproof structure. The station 3 includes a first station base plate 301 and a second station base plate 302 arranged at intervals. The station waterproof structure includes a post-pouring strip 4, a water-stop steel plate 9 and a pull-out water-stop steel plate.
[0051] The first station base slab 301 and the second station base slab 302 are separated by a post-cast strip 4. There is a first construction joint between the first station base slab 301 and the post-cast strip 4. There is a second construction joint between the second station slab 3 and the post-cast strip 4. The first plate 1 of the pull-out waterstop steel plate is embedded in the first station base slab 301, and the second plate 2 is embedded in the post-cast strip 4. The opening is set directly opposite the first construction joint. The waterstop steel plate 9 is partially embedded in the second station base slab 302, and the rest is embedded in the post-cast strip 4.
[0052] The pull-out water-stop steel plate is embedded in the first station base slab 301 and the post-pouring strip 4, and the water-stop steel plate 9 is embedded in the second station base slab 302 and the post-pouring strip 4. It can prevent groundwater from leaking out from the first construction joint and the second construction joint, and has a good waterproof effect.
[0053] Preferably, the pre-embedded heights of the pull-out waterstop steel plate and the waterstop steel plate 9 are half the heights of the first station floor 301 and the second station floor 302, respectively.
[0054] A third aspect of the present invention provides a method for constructing a waterproof structure for a railway station, comprising the following steps:
[0055] S1. At the location of the post-pouring strip 4 as specified in the drawings, an enclosure structure 5 shall be installed near the bottom slab 301 of the first station.
[0056] S2. Reinforcing bars are tied at the position of the first station base plate 301 to form the first reinforcing steel frame. The first plate 1 is pre-embedded in the first reinforcing steel frame and concrete is poured to form the first station base plate 301.
[0057] S3. Install a waterstop 7 at the location of the second construction joint;
[0058] S4. Reinforcing bars are tied at the position of the second station floor 302 to form a second reinforcing steel frame. Waterstop steel plate 9 is pre-embedded in the second reinforcing steel frame and concrete is poured to form the second station floor 302.
[0059] S5. Remove the retaining structure 5;
[0060] S6. Seal the first construction joint with sealant 6.
[0061] S7. Pull out the second plate 2 from the accommodating cavity, bend the section of the second plate 2 away from the first plate 1 to form the second bent part 201, and weld the first plate 1 and the second plate 2 at the opening.
[0062] S8. Concrete is poured into the post-cast strip 4.
[0063] Based on the above technical solution, in the early stage of waterproof structure construction, since the post-pouring strip 4 is located near the first station floor 301 and requires the installation of an enclosure structure 5, the end face of the first station floor 301 near the post-pouring strip 4 cannot be partially pre-embedded with a general water-stop steel plate 9. Therefore, the first station floor 301 and the post-pouring strip 4 can only meet the waterproof requirements by setting other waterproof measures, resulting in poor waterproof effect and high construction cost. By embedding the first plate 1 in the first station floor 301, and pulling the second plate 2 out of the main body 101 and partially bending the second plate 2, the first plate 1 and the second plate 2 are welded at the opening. After the concrete is poured, groundwater leakage at the first construction joint can be prevented. Only some basic waterproof measures need to be set to meet the waterproof requirements of the underground station 3, resulting in low construction cost.
[0064] Preferably, in step S6, after the retaining structure 5 is removed, the end faces of the first station base slab 301 and the second station base slab 302 near the post-pouring strip 4 are roughened. Roughening increases the end face area of the first station base slab 301 and the second station base slab 302 near the post-pouring strip 4, resulting in better adhesion between the first and second poured concrete during the pouring of the post-pouring strip 4, and a stronger bond between the post-pouring strip 4 and the first and second station base slabs 301 and 302.
[0065] Preferably, in S7, MIG welding is used. Using MIG welding results in less deformation and less welding spatter after welding, facilitating cleaning after the welding process.
[0066] Preferably, after S6, an expansion waterstop strip 8 is fixedly installed above the pull-out waterstop steel plate on the end face of the first station base plate 301 near the post-cast strip 4. The expansion waterstop strip 8 expands when it comes into contact with water, sealing the first construction joint and performing preliminary water stopping.
[0067] The system consists of an expansion waterstop strip (8), a pull-out waterstop steel plate, and sealant (6) to provide three layers of water stoppage, thereby enhancing the water stoppage effect.
[0068] Preferably, after step S6, the first station floor slab 301 and the second station floor slab 302 are protected as finished products, and measurements are taken and laid out. This is to prevent unnecessary damage to the first station floor slab 301 and the second station floor slab 302 after the retaining structure 5 is removed.
[0069] In summary, the embodiments of the present invention provide a pull-out water-stop steel plate and a station waterproof structure and its construction method. A first plate 1 is embedded in the first station base slab 301. After the second plate 2 is pulled out from the main body 101, it is partially bent. The first plate 1 and the second plate 2 are welded at the opening. After the second plate 2 is pulled out, welded, and partially bent, its waterproof performance is consistent with that of a general water-stop steel plate 9. When the second plate 2 is housed in the receiving cavity, the pull-out water-stop steel plate occupies little space, making it suitable for different waterproof construction methods. It avoids construction difficulties due to insufficient space. The structure is simple and highly flexible. After the concrete pouring is completed, it can prevent groundwater leakage at the first construction joint. Only some basic waterproof measures are needed to meet the waterproof requirements of the underground station 3, resulting in low construction costs.
[0070] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be considered within the scope of protection of the present invention.
Claims
1. A pull-out waterstop steel plate, characterized in that, The system includes a first plate (1) and a second plate (2). The first plate (1) includes a main body (101) and a first bent portion (102) disposed on one side of the main body (101). The main body (101) has a receiving cavity inside. An opening is provided on the side of the main body (101) away from the first bent portion (102). The receiving cavity communicates with the opening. The second plate (2) is slidably inserted into the receiving cavity through the opening. The main body (101) includes a first plate (1011), a second plate (1012), and two third plates (1013). One side edge of the first plate (1011) is connected to one side edge of the second plate (1012). The first bending portion (102) is disposed at the junction of the side edges of the first plate (1011) and the second plate (1012). The two third plates (1013) are respectively disposed on the two side edges of the first plate (1011) adjacent to the first bending portion (102). The third plate (1013) is connected to the side edge of the first plate (1011) and the side edge of the second plate (1012). The first plate (1011) is separated from the side edge of the first bend (102), the second plate (1012) is separated from the side edge of the first bend (102), and the two third plates (1013) together form the opening. The first plate (1011), the second plate (1012), and the two third plates (1013) together form the accommodating cavity.
2. The pull-out waterstop steel plate according to claim 1, characterized in that, The first plate (1011) has a first protrusion (10111) on the end face away from the second plate (1012), and the second plate (1012) has a second protrusion (10121) on the end face away from the first plate (1011).
3. A waterproof structure for a station, wherein the station (3) comprises a first station base plate (301) and a second station base plate (302) spaced apart, characterized in that, Includes post-pouring strip (4), waterstop steel plate (9), and pull-out waterstop steel plate as described in any one of claims 1-2; The first station base plate (301) and the second station base plate (302) are separated by the post-pouring strip (4). There is a first construction joint between the first station base plate (301) and the post-pouring strip (4), and there is a second construction joint between the second station base plate (302) and the post-pouring strip (4). The first plate (1) of the pull-out water-stop steel plate is embedded in the first station base plate (301), and the second plate (2) is embedded in the post-pouring strip (4). The opening is set directly opposite the first construction joint. The water-stop steel plate (9) is partially embedded in the second station base plate (302), and the remaining part is embedded in the post-pouring strip (4).
4. The station waterproof structure according to claim 3, characterized in that, The pre-embedded heights of the pull-out waterstop steel plate and the waterstop steel plate (9) are half the heights of the first station base plate (301) and the second station base plate (302), respectively.
5. A construction method for a station waterproof structure based on claim 3, characterized in that, Includes the following steps: S1. At the location of the post-cast strip (4) set in the drawing, a retaining structure (5) is set close to the first station floor slab (301). S2. Reinforcing bars are tied at the position of the first station base plate (301) to form a first reinforcing frame. The first plate (1) is pre-embedded in the first reinforcing frame and concrete is poured to form the first station base plate (301). S3. Install a waterstop at the second construction joint location (7); S4. Reinforcing bars are tied at the position of the second station base plate (302) to form a second reinforcing frame. Waterstop steel plate (9) is partially embedded in the second reinforcing frame and concrete is poured to form the second station base plate (302). S5. Remove the enclosure structure (5); S6. Seal the first construction joint with sealant (6); S7. The second plate (2) is pulled out from the cavity, and the section of the second plate (2) away from the first plate (1) is bent to form a second bent part (201). The first plate (1) and the second plate (2) are welded at the opening. S8. Concrete is poured into the post-cast strip (4).
6. The construction method for the station waterproof structure according to claim 5, characterized in that, In S5, after the enclosure structure (5) is removed, the end faces of the first station base plate (301) and the second station base plate (302) near the post-cast strip (4) are roughened.
7. The construction method for the station waterproof structure according to claim 5, characterized in that, In S7, welding is performed using MIG / MAG welding.
8. The construction method for the station waterproof structure according to claim 5, characterized in that, After S6, an expansion waterstop strip (8) is fixedly installed on the end face of the first station base plate (301) near the post-cast strip (4), above the pull-out waterstop steel plate.
9. The construction method for the station waterproof structure according to claim 5, characterized in that, After S6, the first station base plate (301) and the second station base plate (302) are protected as finished products, and the measurements are taken and laid out.