An integrated energy management system

By monitoring and evaluating the characteristic data of the energy prediction model in the energy management system, generating a prediction hazard assessment index, and determining the model repair plan, the problem of stability hazards of the prediction model in the existing technology is solved, and the accuracy of prediction and energy utilization are improved. efficiency.

CN118071168BActive Publication Date: 2024-10-01JIANGSU XINBO ENERGY TECH CO LTD

Patent Information

Application Number
CN202410131713.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-10-01
Estimated Expiration
2044-01-31

AI Technical Summary

Technical Problem

The stability of existing energy prediction models may have hidden dangers during long-term use, resulting in inaccurate prediction results and difficulty in judging their contingency, resulting in excessive time and resources spent on diagnosis, repair, and remodeling.

Method used

Design a comprehensive energy management system, including a prediction model monitoring module, a central processing module, an analysis module and a comparison module. By monitoring the prediction process of the energy prediction model, multiple feature data are extracted to generate a prediction hazard assessment index, and determine the risk based on the index. Model repair plan to ensure the stability and accuracy of the predictive model.

Benefits of technology

It improves the stability and accuracy of energy prediction, avoids energy waste and decision-making errors caused by model instability, identifies energy-saving potential, develops more effective energy-saving strategies, and improves energy utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118071168B_ABST
    Figure CN118071168B_ABST
Patent Text Reader

Abstract

The present invention discloses an integrated energy management system, which specifically relates to the technical field of energy management, and includes a prediction model monitoring module, a central processing module, an analysis module, and a comparison module. The modules are connected by signals, and the prediction process of the energy prediction model is monitored, and multiple feature data related to the prediction process of the energy prediction model are extracted from the monitored data to generate a prediction hidden danger assessment index, and the prediction process of this energy prediction model is evaluated, and the prediction process with greater hidden dangers is marked, and a data analysis set is established according to the marking results, and the data analysis set is analyzed to determine a repair plan for the prediction model. When there is an obvious abnormal risk in the stability of the energy prediction model, an early warning signal is issued, which helps to improve the stability and accuracy of the prediction, avoid energy waste and decision-making errors caused by model instability, and help identify energy-saving potential, thereby improving energy utilization efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy management, and more specifically, to an integrated energy management system. Background Art

[0002] The integrated energy management system adopts a layered distributed system architecture to collect and process the building's electricity, gas, water and other energy consumption data, analyze the building's energy consumption status, realize building energy-saving applications, etc. It uses data from multiple angles such as energy supply, energy management, load management, energy consumption analysis and prediction, energy operation and maintenance, etc. to complete energy management.

[0003] In the energy consumption analysis and prediction stage, prediction models are usually used to predict future energy demand in order to timely adjust and optimize energy supply and distribution. However, since the stability of the prediction model may be hidden dangers during long-term use, the prediction results are not accurate enough, and it is impossible to judge whether this inaccuracy is accidental, resulting in excessive time and resources being spent on diagnosis, repair and re-modeling.

[0004] In order to solve the above defects, a technical solution is now provided. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides an integrated energy management system to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] An integrated energy management system includes a prediction model monitoring module, a central processing module, an analysis module, and a comparison module, wherein each module is connected via signals;

[0008] The prediction model monitoring module is used to monitor the prediction process of the energy prediction model, pre-process the monitored data, obtain multiple characteristic data of the prediction process, and transmit the multiple characteristic data to the central processing module;

[0009] The central processing module establishes a data processing model based on multiple feature data, generates a predicted hidden danger assessment index, marks the current predicted hidden danger assessment index, and transmits the marked predicted hidden danger assessment index to the analysis module;

[0010] The analysis module establishes a data analysis set according to the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set, generates a steady-state index, and transmits the steady-state index to the comparison module;

[0011] The comparison module compares the steady-state index with the preset steady-state index threshold to determine the repair plan of the prediction model.

[0012] In a preferred embodiment, multiple feature data include prediction interval error data and prediction process data. The prediction interval error data includes a confidence interval deviation coefficient. The prediction process data includes a prediction load performance coefficient and a jamming abnormal time coefficient. The confidence interval deviation coefficient, the prediction load performance coefficient, and the jamming abnormal time coefficient are marked as ZX, FX, and KD, respectively.

[0013] In a preferred embodiment, the logic for obtaining the confidence interval deviation coefficient is as follows:

[0014] Calculate the confidence interval, the expression is as follows ZXQ = YU ± α * SE, where ZXQ represents the confidence interval, that is, ZXQ = [ZXQ1, ZXQ2], YU represents the predicted value, α represents the confidence coefficient, and SE represents the prediction standard error. Where MSE represents mean square error, x represents the input value of the energy prediction model, represents the average value of the input value of the energy forecast model, i is the number of predictions of the energy forecast model, and n is a positive integer;

[0015] Compare the actual observed value with the confidence interval of the predicted result. When the actual observed value exceeds the confidence interval of the predicted result, calculate the confidence interval deviation coefficient, which is expressed as follows Where PC represents the deviation value between the actual observation value and the confidence interval of the predicted result, and SJ represents the actual observation value.

[0016] In a preferred embodiment, the logic for obtaining the predicted load performance coefficient is as follows:

[0017] The expression for calculating the load performance value is as follows Where YC represents the deviation between the actual observed value and the predicted value, FU represents different load states, which can be quantified by the amount of data predicted this time, and β represents a constant, which is used to adjust or standardize the calculation results;

[0018] Compare the load performance value with the preset load performance value threshold. When the load performance value is greater than or equal to the load performance value threshold, mark it as an abnormal load performance value. Calculate the predicted load performance coefficient based on the abnormal load performance value. Where j represents the predicted number of abnormal load performance values, and m is a positive integer;

[0019] The logic for obtaining the abnormal time coefficient of jamming is as follows:

[0020] Calculate the percentage of stuck time in a single prediction. The calculation expression is as follows Where KD represents the freeze time of a single prediction process, and ZH represents the execution time of a single prediction;

[0021] Compare the jam time ratio with the preset jam time ratio threshold. When the jam time ratio is greater than or equal to the jam time ratio threshold, it is marked as an abnormal jam time ratio. The jam time coefficient is calculated based on the abnormal jam time ratio. The expression is as follows: AK represents the percentage of abnormal freezing time, and ZC represents the total number of predictions by the energy prediction model.

[0022] In a preferred embodiment, the predicted hidden danger assessment index is calculated by a formula according to the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient;

[0023] comparing the predicted hidden danger assessment index with a preset predicted hidden danger assessment index threshold;

[0024] If the predicted hidden danger assessment index is greater than or equal to the predicted hidden danger assessment index threshold, the predicted hidden danger assessment index generated this time is marked as an abnormal predicted hidden danger assessment index, and the abnormal predicted hidden danger assessment index is transmitted to the analysis module;

[0025] If the predicted hidden danger assessment index is less than the predicted hidden danger assessment index threshold, no other operation is required.

[0026] In a preferred embodiment, a data analysis set is established based on the abnormal prediction hidden danger assessment indexes received in sequence, and is marked as in represents the abnormal prediction hidden danger assessment index received in sequence, v represents the sequence number of the abnormal prediction hidden danger assessment index received in sequence, and u is a positive integer;

[0027] The outlier information and interval time information of the existing abnormal prediction hidden danger assessment index in the data analysis set are obtained, wherein the outlier information includes the abnormal prediction hidden danger assessment index outlier value, and the interval time information includes the interval time difference; the abnormal prediction hidden danger assessment index outlier value and the interval time difference are marked as QA and NP respectively.

[0028] In a preferred embodiment, the calculation expression of the abnormal prediction hidden danger assessment index outlier value is as follows: represents the abnormal prediction hidden danger assessment index numbered u in the data analysis set, PZ represents the average value of the existing abnormal prediction hidden danger assessment index in the data analysis set, and ZB represents the standard deviation of the existing abnormal prediction hidden danger assessment index in the data analysis set;

[0029] The calculation expression of the interval time difference is as follows: NP = |t δ -t γ|, where t δ Indicates the time when the abnormal prediction hidden danger assessment index numbered u is received, t γ Indicates the time when the abnormal prediction hidden danger assessment index numbered u-1 is received.

[0030] In a preferred embodiment, the steady-state index is calculated by a formula based on the outlier value and the interval time difference of the abnormal prediction hidden danger assessment index;

[0031] comparing the homeostasis index with a preset homeostasis index threshold;

[0032] If the steady-state index is greater than or equal to the steady-state index threshold, an early warning signal is issued, and the model is repaired and retrained after the energy forecast model is completed;

[0033] If the steady-state index is less than the steady-state index threshold, there is no need to issue a warning signal, and regular repairs and other operations can be performed.

[0034] Technical effects and advantages of the present invention:

[0035] 1. The present invention monitors the prediction process of the energy prediction model and pre-processes the monitored data to extract multiple feature data related to the prediction process of the energy prediction model, establishes a data processing model based on the multiple feature data, generates a prediction hidden danger assessment index, evaluates the prediction process of this energy prediction model, marks the prediction process with greater hidden dangers, and establishes a data analysis set based on the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set to generate a steady-state index, compares the steady-state index with a preset steady-state index threshold, determines a repair plan for the prediction model, and issues an early warning signal when there is an obvious abnormal risk in the stability of the energy prediction model. After the prediction of this energy prediction model is completed, the model is repaired and retrained, etc., which helps to improve the stability and accuracy of the prediction, avoid energy waste and decision-making errors caused by model instability, improve the accuracy of the prediction, help identify energy-saving potential, and formulate more effective energy-saving strategies, thereby improving energy utilization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;

[0037] Figure 1 This is a schematic diagram of the structure of Example 1 of the present invention. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] Example 1

[0040] The present invention provides Figure 1 An integrated energy management system shown includes a prediction model monitoring module, a central processing module, an analysis module, and a comparison module, and each module is connected through signals;

[0041] The prediction model monitoring module is used to monitor the prediction process of the energy prediction model, pre-process the monitored data, obtain multiple characteristic data of the prediction process, and transmit the multiple characteristic data to the central processing module;

[0042] The central processing module establishes a data processing model based on multiple feature data, generates a predicted hidden danger assessment index, marks the current predicted hidden danger assessment index, and transmits the marked predicted hidden danger assessment index to the analysis module;

[0043] The analysis module establishes a data analysis set according to the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set, generates a steady-state index, and transmits the steady-state index to the comparison module;

[0044] A comparison module compares the steady-state index with a preset steady-state index threshold to determine a repair plan for the prediction model;

[0045] The prediction model monitoring module is used to monitor the prediction process of the energy prediction model, pre-process the monitored data, obtain multiple characteristic data of the prediction process, and transmit the multiple characteristic data to the central processing module;

[0046] Prediction model monitoring module, including a monitoring unit and a preprocessing unit;

[0047] A monitoring unit, used for monitoring the prediction process of the energy prediction model and storing the monitored raw data;

[0048] The preprocessing unit is used to preprocess the monitored raw data, which includes the following steps:

[0049] Missing value processing detects and processes missing values ​​in the original data. Missing original data can be processed by filling, deleting or interpolating to ensure the integrity of the original data.

[0050] Outlier handling, detects and handles outliers. Statistical methods or threshold-based techniques can be used to identify outliers and correct or delete them.

[0051] Data cleaning, cleaning up raw data and ensuring the quality of raw data, including removing duplicate data, correcting incorrect data formats or data entry errors, etc.

[0052] Data conversion, standardize or normalize the original data to eliminate the scale differences between different original data. Commonly used data conversion methods include Z-score standardization and Min-Max normalization;

[0053] Feature extraction: extracting multiple feature data related to the prediction process of the energy prediction model from the original data. The multiple feature data include prediction interval error data and prediction process data. The prediction interval error data includes the confidence interval deviation coefficient. The prediction process data includes the prediction load performance coefficient and the jamming abnormal time coefficient.

[0054] The central processing module establishes a data processing model based on multiple feature data, generates a predicted hidden danger assessment index, marks the current predicted hidden danger assessment index, and transmits the marked predicted hidden danger assessment index to the analysis module;

[0055] The confidence interval deviation coefficient, predicted load performance coefficient, and jam abnormal time coefficient are marked as ZX, FX, and KD respectively;

[0056] A data processing model is established based on the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient to generate a predicted hidden danger assessment index. The formula is as follows: YP = a1*ZX+a2*FX+a3*KD, where YP is the predicted hidden danger assessment index, ZX is the confidence interval deviation coefficient, FX is the predicted load performance coefficient, KD is the jam abnormal time coefficient, and a1, a2, and a3 are the proportional coefficients of the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient, respectively, where a1>a2>a3>0;

[0057] Among them, the confidence interval deviation coefficient is used to measure the degree of deviation between the actual observation value and the confidence interval of the prediction result. The larger the confidence interval deviation coefficient, the greater the uncertainty of the energy prediction model, and the higher the probability of hidden dangers that may exist in the actual use of the energy prediction model. If the actual observation value exceeds the confidence interval, it means that the energy prediction model has a high degree of uncertainty in the prediction, which may be due to the energy prediction model's inaccurate processing of the data, resulting in poor data quality, thus affecting the prediction results.

[0058] The logic for obtaining the confidence interval deviation coefficient is as follows:

[0059] Calculate the confidence interval, the expression is as follows ZXQ = YU ± α * SE, where ZXQ represents the confidence interval, that is, ZXQ = [ZXQ1, ZXQ2], YU represents the predicted value, α represents the confidence coefficient, which can be set according to the actual situation, such as 95% or 99%, SE represents the prediction standard error, where SE = Where MSE represents mean square error, x represents the input value of the energy prediction model, represents the average value of the input value of the energy forecast model, i is the number of predictions of the energy forecast model, and n is a positive integer;

[0060] Compare the actual observed value with the confidence interval of the predicted result. When the actual observed value exceeds the confidence interval of the predicted result, calculate the confidence interval deviation coefficient, which is expressed as follows Where PC represents the deviation value between the actual observation value and the confidence interval of the predicted result, and SJ represents the actual observation value;

[0061] The predicted load performance coefficient refers to the degree of measurement of the prediction accuracy of the energy prediction model under different load conditions. The higher the predicted load performance coefficient, the more likely it is to affect the stability of the energy prediction model, resulting in a decline in the performance of the energy prediction model and difficulty in processing large or complex model calculations, resulting in a decline in prediction accuracy. When the system load increases, the model may be more likely to overfit the existing data, resulting in a decline in the model's generalization ability on new data, and increasing the probability of potential risks in the actual use of the energy prediction model.

[0062] The logic for obtaining the predicted load performance coefficient is as follows:

[0063] The expression for calculating the load performance value is as follows Where YC represents the deviation between the actual observed value and the predicted value, FU represents different load states, which can be quantified by the amount of data predicted this time, and β represents a constant, which is used to adjust or standardize the calculation results and can be set according to the actual situation;

[0064] Compare the load performance value with the preset load performance value threshold. When the load performance value is greater than or equal to the load performance value threshold, mark it as an abnormal load performance value. Calculate the predicted load performance coefficient based on the abnormal load performance value. Where j represents the predicted number of abnormal load performance values, and m is a positive integer.

[0065] The jam time coefficient is used to measure the ratio of the jam time of the energy forecasting model prediction process to the single prediction execution time. The higher the ratio and the number of predictions with multiple abnormal ratios, the lower the stability of the energy forecasting model may be, and the prediction may not be completed within the expected time, which may miss potential energy-saving opportunities and energy use adjustment opportunities. If the abnormal ratio of abnormal jam time exists for a long time, it may further increase the probability of hidden dangers in the actual use of the energy forecasting model.

[0066] The logic for obtaining the abnormal time coefficient of jamming is as follows:

[0067] Calculate the percentage of stuck time in a single prediction. The calculation expression is as follows Where KD represents the freeze time of a single prediction process, and ZH represents the execution time of a single prediction;

[0068] Compare the jam time ratio with the preset jam time ratio threshold. When the jam time ratio is greater than or equal to the jam time ratio threshold, it means that the jam time ratio of this prediction process is at an abnormal level, which exceeds the acceptable range of the energy prediction model. It is marked as abnormal jam time ratio. When the jam time ratio is less than the jam time ratio threshold, it means that the jam time ratio of this prediction process is at a normal level. Calculate the jam time coefficient according to the abnormal jam time ratio. Its expression is as follows: Among them, AK represents the percentage of abnormal jamming time, and ZC represents the total number of times predicted by the energy prediction model;

[0069] From the above calculation, it can be seen that the larger the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient, that is, the larger the predicted hidden danger assessment index, the higher the degree of operating hidden danger in the energy prediction model; on the contrary, the smaller the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient, that is, the smaller the predicted hidden danger assessment index, the lower the degree of operating hidden danger in the energy prediction model.

[0070] Compare the prediction hidden danger assessment index with the preset prediction hidden danger assessment index threshold, evaluate the prediction process of this energy prediction model, and mark the prediction process with greater hidden dangers;

[0071] If the prediction hidden danger assessment index is greater than or equal to the prediction hidden danger assessment index threshold, it means that there are hidden dangers in the prediction process of the energy prediction model this time, and the energy prediction model itself may have the risk of instability. The prediction hidden danger assessment index generated this time is marked as an abnormal prediction hidden danger assessment index, and the abnormal prediction hidden danger assessment index is transmitted to the analysis module;

[0072] If the prediction hidden danger assessment index is less than the prediction hidden danger assessment index threshold, it means that the energy prediction model has not found any operation hidden danger in the prediction process, and no other operation is required;

[0073] The analysis module establishes a data analysis set according to the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set, generates a steady-state index, and transmits the steady-state index to the comparison module;

[0074] According to the abnormal prediction hidden danger assessment index received in sequence, a data analysis set is established and marked as in represents the abnormal prediction hidden danger assessment index received in sequence, v represents the sequence number of the abnormal prediction hidden danger assessment index received in sequence, and u is a positive integer;

[0075] Obtain outlier information and interval time information of the existing abnormal prediction hidden danger assessment index in the data analysis set, the outlier information includes the abnormal prediction hidden danger assessment index outlier value, and the interval time information includes the interval time difference; mark the abnormal prediction hidden danger assessment index outlier value and the interval time difference as QA and NP respectively;

[0076] The outlier value of the abnormal prediction hidden danger assessment index is used to measure the difference between the abnormal prediction hidden danger assessment index received in sequence and the existing abnormal prediction hidden danger assessment index in the data analysis set. The higher the outlier value of the abnormal prediction hidden danger assessment index is, the more hidden dangers in the energy prediction model are increasing, and the instability risk of the energy prediction model itself is getting bigger and bigger. The model should be repaired immediately to avoid the continuous deterioration of the instability of the model and miss the potential energy-saving opportunities.

[0077] The calculation expression of the outlier value of the abnormal prediction hidden danger assessment index is as follows represents the abnormal prediction hidden danger assessment index numbered u in the data analysis set, PZ represents the average value of the existing abnormal prediction hidden danger assessment index in the data analysis set, and ZB represents the standard deviation of the existing abnormal prediction hidden danger assessment index in the data analysis set;

[0078] The interval time difference is used to measure the time difference between two existing abnormal prediction hidden danger assessment indices in the data analysis set. The larger the interval time difference, the more likely the hidden dangers in the energy prediction model are accidental. The lower the probability that the energy prediction model itself has an instability risk, the smaller the interval time difference, and the closer the situation is to be assessed as having abnormal hidden dangers.

[0079] The calculation expression of the interval time difference is as follows: NP = |t δ -t γ |, where t δIndicates the time when the abnormal prediction hidden danger assessment index numbered u is received, t γ Indicates the time when the abnormal prediction hidden danger assessment index numbered u-1 is received;

[0080] A steady-state evaluation model is established based on the outlier value and interval time difference of the abnormal prediction hidden danger assessment index, and a steady-state index is generated to evaluate the stability of the energy prediction model. The steady-state evaluation model is established based on the outlier value and interval time difference of the abnormal prediction hidden danger assessment index. The formula is as follows: WT = b1*QA+b2*NP, where WT represents the steady-state index, b1 and b2 represent the weight factors of the outlier value and interval time difference of the abnormal prediction hidden danger assessment index, respectively. The specific values ​​can be set according to the actual situation;

[0081] passing the generated homeostatic index to a comparison module;

[0082] A comparison module compares the steady-state index with a preset steady-state index threshold to determine a repair plan for the prediction model;

[0083] If the steady-state index is greater than or equal to the steady-state index threshold, it indicates that the hidden dangers of the energy forecast model continue to increase, and its stability shows obvious abnormal risks, and an early warning signal is issued. After the energy forecast model is predicted, the model is repaired and retrained, which helps to improve the stability and accuracy of the prediction and avoid missing potential energy-saving opportunities.

[0084] If the steady-state index is less than the steady-state index threshold, it indicates that the hidden dangers in the energy forecast model may be accidental events, and there is no need to issue an early warning signal. It can be repaired regularly.

[0085] The present invention monitors the prediction process of the energy prediction model and pre-processes the monitored data, extracts multiple feature data related to the prediction process of the energy prediction model, establishes a data processing model according to the multiple feature data, generates a prediction hidden danger assessment index, evaluates the prediction process of this energy prediction model, marks the prediction process with greater hidden dangers, and establishes a data analysis set according to the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set, generates a steady-state index, compares the steady-state index with a preset steady-state index threshold, determines a repair plan for the prediction model, issues an early warning signal when there is an obvious abnormal risk in the stability of the energy prediction model, and performs model repair and retraining after the prediction of this energy prediction model is completed, which helps to improve the stability and accuracy of the prediction, avoid energy waste and decision-making errors caused by model instability, improve the accuracy of the prediction, help identify energy-saving potential, and formulate more effective energy-saving strategies, thereby improving energy utilization efficiency.

[0086] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0087] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0088] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0089] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0090] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0091] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0092] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An integrated energy management system, characterized in that: It includes a prediction model monitoring module, a central processing module, an analysis module, and a comparison module, and each module is connected through signals; The prediction model monitoring module is used to monitor the prediction process of the energy prediction model, pre-process the monitored data, obtain multiple characteristic data of the prediction process, and transmit the multiple characteristic data to the central processing module; The central processing module establishes a data processing model based on multiple feature data, generates a predicted hidden danger assessment index, marks the current predicted hidden danger assessment index, and transmits the marked predicted hidden danger assessment index to the analysis module; The analysis module establishes a data analysis set according to the marked prediction hidden danger assessment index, analyzes the existing prediction hidden danger assessment index in the data analysis set, generates a steady-state index, and transmits the steady-state index to the comparison module; A comparison module compares the steady-state index with a preset steady-state index threshold to determine a repair plan for the prediction model; The multiple feature data include prediction interval error data and prediction process data. The prediction interval error data includes a confidence interval deviation coefficient. The prediction process data includes a prediction load performance coefficient and a jamming abnormal time coefficient. The confidence interval deviation coefficient, the prediction load performance coefficient, and the jamming abnormal time coefficient are marked as ZX, FX, and KD, respectively. A data processing model is established based on the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient to generate a predicted hidden danger assessment index. The formula is as follows: YP = a1*ZX+a2*FX+a3*KD, where YP is the predicted hidden danger assessment index, ZX is the confidence interval deviation coefficient, FX is the predicted load performance coefficient, KD is the jam abnormal time coefficient, and a1, a2, and a3 are the proportional coefficients of the confidence interval deviation coefficient, the predicted load performance coefficient, and the jam abnormal time coefficient, respectively, where a1>a2>a3>0; According to the abnormal prediction hidden danger assessment index received in sequence, a data analysis set is established and marked as in represents the abnormal prediction hidden danger assessment index received in sequence, v represents the sequence number of the abnormal prediction hidden danger assessment index received in sequence, and u is a positive integer; Obtain outlier information and interval time information of the existing abnormal prediction hidden danger assessment index in the data analysis set, the outlier information includes the abnormal prediction hidden danger assessment index outlier value, and the interval time information includes the interval time difference; mark the abnormal prediction hidden danger assessment index outlier value and the interval time difference as QA and NP respectively; A steady-state assessment model is established based on the outliers and interval time difference of the abnormal prediction hidden danger assessment index to generate a steady-state index, and the stability of the energy prediction model is evaluated. The steady-state assessment model is established based on the outliers and interval time difference of the abnormal prediction hidden danger assessment index, and the formula is as follows WT=b1*QA+b2*NP, where WT represents the steady-state index, b1 and b2 represent the weight factors of the outliers and interval time difference of the abnormal prediction hidden danger assessment index, respectively.

2. The integrated energy management system according to claim 1, characterized in that: The logic for obtaining the confidence interval deviation coefficient is as follows: Calculate the confidence interval, the expression is as follows ZXQ = YU ± α * SE, where ZXQ represents the confidence interval, that is, ZXQ = [ZXQ1, ZXQ2], YU represents the predicted value, α represents the confidence coefficient, and SE represents the prediction standard error. Where MSE represents mean square error, x represents the input value of the energy prediction model, represents the average value of the input value of the energy prediction model, i represents the number of predictions of the energy prediction model, and n is a positive integer; Compare the actual observed value with the confidence interval of the predicted result. When the actual observed value exceeds the confidence interval of the predicted result, calculate the confidence interval deviation coefficient, which is expressed as follows Where PC represents the deviation value between the actual observation value and the confidence interval of the predicted result, and SJ represents the actual observation value.

3. The integrated energy management system according to claim 1, characterized in that: The logic for obtaining the predicted load performance coefficient is as follows: The expression for calculating the load performance value is as follows Where YC represents the deviation between the actual observed value and the predicted value, FU represents different load states, which can be quantified by the amount of data predicted this time, and β represents a constant, which is used to adjust or standardize the calculation results; Compare the load performance value with the preset load performance value threshold. When the load performance value is greater than or equal to the load performance value threshold, mark it as an abnormal load performance value. Calculate the predicted load performance coefficient based on the abnormal load performance value. Where j represents the predicted number of abnormal load performance values, and m is a positive integer; The logic for obtaining the abnormal time coefficient of jamming is as follows: Calculate the percentage of stuck time in a single prediction. The calculation expression is as follows Where KD represents the freeze time of a single prediction process, and ZH represents the execution time of a single prediction; Compare the jam time ratio with the preset jam time ratio threshold. When the jam time ratio is greater than or equal to the jam time ratio threshold, it is marked as an abnormal jam time ratio. The jam time coefficient is calculated based on the abnormal jam time ratio. The expression is as follows: AK represents the percentage of abnormal freezing time, and ZC represents the total number of predictions by the energy prediction model.

4. The integrated energy management system according to claim 1, characterized in that: The predicted hidden danger assessment index is calculated by formula based on the confidence interval deviation coefficient, predicted load performance coefficient, and jam abnormal time coefficient; comparing the predicted hidden danger assessment index with a preset predicted hidden danger assessment index threshold; If the predicted hidden danger assessment index is greater than or equal to the predicted hidden danger assessment index threshold, the predicted hidden danger assessment index generated this time is marked as an abnormal predicted hidden danger assessment index, and the abnormal predicted hidden danger assessment index is transmitted to the analysis module; If the predicted hidden danger assessment index is less than the predicted hidden danger assessment index threshold, no other operation is required.

5. The integrated energy management system according to claim 1, characterized in that: The calculation expression of the outlier value of the abnormal prediction hidden danger assessment index is as follows represents the abnormal prediction hidden danger assessment index numbered u in the data analysis set, PZ represents the average value of the existing abnormal prediction hidden danger assessment index in the data analysis set, and ZB represents the standard deviation of the existing abnormal prediction hidden danger assessment index in the data analysis set; The calculation expression of the interval time difference is as follows: NP = |t δ -t γ |, where t δ Indicates the time when the abnormal prediction hidden danger assessment index numbered u is received, t γ Indicates the time when the abnormal prediction hidden danger assessment index numbered u-1 is received.

6. The integrated energy management system according to claim 5, characterized in that: The steady-state index is calculated by formula based on the outlier value and interval time difference of the abnormal prediction hidden danger assessment index; comparing the homeostasis index with a preset homeostasis index threshold; If the steady-state index is greater than or equal to the steady-state index threshold, an early warning signal is issued, and the model is repaired and retrained after the energy forecast model is completed; If the steady-state index is less than the steady-state index threshold, there is no need to issue a warning signal, and repair operations can be performed regularly.

Citation Information

Patent Citations

  • New energy management platform anomaly monitoring system and method based on cloud computing

    CN116466168A

  • Chemical safety production patrol control system

    CN116645010A

  • Sanhuang chicken breeding system and method based on animal model

    CN116863997A

  • Anchoring ship dragging monitoring system based on target radar

    CN117192502A

  • Power system information processing system based on power big data

    CN117422405A

Cited By

  • Multi-energy integrated real-time monitoring system based on big data

    CN120508839A