An intelligent jet grouting pile construction method, system and medium
Through CPTU static touch detection test and Robertson soil classification method, a construction database was established to realize intelligent control of rotary spray pile construction, solving the problem of difficult construction parameters matching caused by inconsistent formation distribution, and improving pile quality and construction efficiency.
Patent Information
- Application Number
- CN202410463353.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-04-17
AI Technical Summary
During the reinforcement of existing rotary spray pile foundations, the inconsistent distribution of the strata results in difficulty in matching construction parameters, uneven pile quality, low degree of intelligence, and difficult to achieve automated and standardized construction parameter optimization.
The CPTU static touch detection test is used to obtain soil categories, combine with Robertson soil classification method to establish a construction database, and match the optimal process parameters in real time, including water-cement ratio, cement dosage, spraying pressure, rotation speed, etc., to realize rotary spray piles Intelligent control of construction.
It improves the reliability of formation identification and the matching accuracy of construction parameters, reduces the impact of human operations, can effectively identify weak formations, and improves the consistency of pile quality and construction efficiency.
Smart Images

Figure CN118110163B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of foundation treatment, and in particular to an intelligent jet grouting pile construction method, system and medium. Background Art
[0002] With the rapid development of modern engineering technology, various advanced construction techniques are gradually used in the construction of foundation treatment. As one of the advanced foundation treatment technologies, the rotary jet pile foundation treatment technology uses a drilling rig to drill or send a special high-pressure jet nozzle to a predetermined depth, and then uses a rotating grouting pipe to spray a high-pressure jet fluid to cut the soil. The high-pressure jet fluid is slowly pulled up while rotating, so that the cement slurry is fully mixed with the cut and broken soil. After the pile is formed, a series of physical and chemical reactions are performed to form cement soil with high strength, low permeability and low compressibility, achieving the purpose of soil improvement. According to the different conveying media for jet grouting to cut the soil, it is divided into three types: single-tube method, double-tube method and triple-tube method. The single-tube method is to use rotary jet high-pressure cement slurry to cut the soil and mix it with the cut and broken soil; the double-tube method is to use annular compressed air and high-pressure cement slurry to coaxially spray and cut the soil; the three-tube method is to use annular compressed air and high-pressure clean water jet to coaxially spray and cut the soil, and at the same time, to transport the mortgage cement slurry to mix with the cut and broken soil.
[0003] The existing rotary jet grouting pile foundation reinforcement process mainly selects appropriate construction process parameters for construction based on the empirical parameters tested in the test area. The process parameters mainly include injection method, number of nozzles, nozzle diameter, injection pressure (select appropriate air injection, water injection, and grouting pressure according to different processes), grouting volume, rotation speed, lifting speed, etc.
[0004] However, in the actual construction process, the distribution of the strata is usually inconsistent with the strata in the test area. Even in different locations of the same site, the thickness distribution of the strata is often inconsistent. The stratum interface is ups and downs, resulting in the mismatch between the process parameters used in the actual construction process and the stratum, resulting in uneven pile quality and difficulty in meeting the design requirements. In addition, the existing rotary jet pile construction equipment has a low degree of intelligence. The conventional rotary jet pile construction control system generally monitors in real time based on single indicators such as the current value, torque or output power of the drilling rig power head to assist in judging the stratum distribution, and then adjusts the appropriate process parameters according to the stratum changes. However, these single indicators are not only affected by stratum factors, but also by other factors such as human and equipment. Moreover, these indicators have poor sensitivity to soil layers with similar penetration resistance, such as soft clay and silty soil, and the reliability of stratum interface division is poor. Stratum judgment and process parameter adjustment are mostly manually operated based on manual experience, which cannot be well standardized and adapted to different construction environments and sites. However, due to the difficulty and long time span in collecting samples of test parameters, it is also difficult to use machine learning algorithms to replace manual data optimization of construction parameters. Summary of the invention
[0005] In order to overcome the above problems, the present invention provides an intelligent jet grouting pile construction method, system and medium.
[0006] The present invention provides an intelligent jet grouting pile construction method, comprising:
[0007] A test area is selected in the construction site, and before the jet grouting pile construction is carried out in the test area, a CPTU static penetration test is first carried out on the test area to obtain test data; wherein the test data includes the cone tip resistance and the side wall friction resistance corrected by the pore pressure;
[0008] According to the modified Robertson soil classification method, the soil type of the test area according to the depth change is obtained according to the test data;
[0009] Carry out at least one jet grouting pile construction in the test area. In each construction process, different process parameters are used for each soil type to obtain the pile forming parameters of various soil types under different process parameters, and store the corresponding soil types, process parameters and pile forming parameters in the construction database; wherein the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter;
[0010] Before starting the jet grouting pile construction at one of the points on the construction site, first insert a jet grouting pile drill with CPTU static penetration test function at that point to obtain the soil type at that point that varies according to the depth;
[0011] According to the soil type that changes with depth at the point and the pile parameters required by the construction design, the process parameters that change with depth are matched in the construction database as the construction data of the point;
[0012] Complete the rotary jet grouting pile construction at this location based on the construction data.
[0013] Preferably, the step of selecting a test area in the construction site specifically includes the following steps:
[0014] Obtain geological survey data of the entire construction site and obtain all soil types contained in the construction site;
[0015] At least one test area is selected, and the construction depth range of each test area includes all soil types of the entire construction site.
[0016] Preferably, the CPTU static penetration test is first performed on the test area to obtain test data, specifically:
[0017] Through the CPTU test system integrated with the construction drilling rig, a CPTU static penetration test is carried out on the test area to obtain test data.
[0018] Preferably, the modified Robertson soil classification method is specifically:
[0019] Obtaining the sidewall friction f of different formations through CPTU static penetration test s , and the cone tip resistance q corrected by pore pressure t ;
[0020] According to the side wall friction f s (MPa) and modified cone tip resistance q t (MPa), calculate the corrected normalized cone tip resistance Q tn and normalized friction F r , the calculation formula is as follows:
[0021] Q tn =[q t -σ vo ) / p a ](p a / σ′ vo ) m
[0022] F r =(f s / (q t -σ vo ))×100%
[0023] m=0.381(I c )+0.05(σ′ vo / p a )-0.15
[0024] I c =[(3.47-logQ t ) 2 +(logF r +1.22) 2 ] 0.5
[0025] Q t =(q t -σ vo ) / σ′ vo
[0026] Among them, σ vo is the total stress of the overlying strata (MPa), calculated according to the soil depth; σ′ vo is the total effective overlying stratum stress (MPa), calculated according to the soil depth; P ais 1 standard atmosphere, i.e. 0.1 MPa; m is the stress correction factor related to soil type; Q t is the normalized cone tip resistance;
[0027] According to the modified normalized cone tip resistance Q tn and normalized friction F r , according to the coordinate point (F r , Q tn ) In the distribution area of the soil classification map based on CPTU, the corresponding soil categories are obtained; among them, the soil categories are divided into seven categories, namely: shrinkage-sensitive clay, shrinkage clay, expansive clay, shrinkage intermediate soil, expansive intermediate soil, shrinkage sand and expansive sand.
[0028] Preferably, the soil type that varies according to the depth of the construction location and the pile forming parameters required by the construction design are matched with the process parameters that vary according to the depth in the construction big database as the construction data. This step also includes the following sub-steps:
[0029] In the construction database, match the process parameters whose pile compressive strength and pile diameter are greater than or equal to the pile forming parameters required by the construction design.
[0030] Preferably, the soil type that varies according to the depth of the construction location and the pile forming parameters required by the construction design are matched with the process parameters that vary according to the depth in the construction big database as the construction data. This step also includes the following sub-steps:
[0031] When the same set of soil type and pile parameters are matched with multiple process parameters, the set of process parameters with the highest cement content is selected first;
[0032] If multiple process parameters with the same cement content are matched, the set of process parameters with the lowest rotation speed is preferred;
[0033] If multiple process parameters with the same cement content and rotation speed are matched, the set of process parameters with the smallest shotcrete pressure is preferred;
[0034] If multiple process parameters with the same cement content, rotation speed and shotcrete pressure are matched, one of the process parameters will be matched randomly.
[0035] Preferably, the method of completing the jet grouting pile construction at the point according to the construction data further includes the following steps:
[0036] During the construction of the jet grouting piles, the construction big database is updated in real time to automatically store the current soil type, process parameters and pile formation parameters.
[0037] The present invention also provides an intelligent rotary jet pile construction system, comprising: a perception layer, a decision layer and an execution layer;
[0038] The perception layer is used to select a test area in the construction site, and before the jet grouting pile construction is carried out in the test area, the CPTU static penetration test is first carried out on the test area to obtain test data; according to the modified Robertson soil classification method, the soil category of the test area according to the depth change is obtained according to the test data; and before the jet grouting pile construction is started at one of the points in the construction site, a jet grouting pile drilling rig with a CPTU static penetration test function is first penetrated at the point to obtain the soil category of the point according to the depth change; wherein the test data includes the cone tip resistance and side wall friction resistance corrected by the pore pressure;
[0039] The decision layer is used to carry out at least one jet grouting pile construction in the test area. During each construction process, different process parameters are used for each soil type, and the pile forming parameters of various soil types under different process parameters are obtained, and the corresponding soil types, process parameters and pile forming parameters are stored in the construction big database; when the jet grouting pile construction of one of the points starts at the construction site, the process parameters that change according to the depth are matched in the construction big database according to the soil type that changes according to the depth of the point and the pile forming parameters required by the construction design, as the construction data of the point; wherein the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter;
[0040] The execution layer is used to complete the jet grouting pile construction at the point according to the construction data.
[0041] The present invention provides a terminal device, comprising a processor and a storage device, wherein the storage device is used to store one or more programs; when the one or more programs are executed by the processor, the processor implements the above-mentioned intelligent jet grouting pile construction method.
[0042] The present invention provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the above-mentioned intelligent jet grouting pile construction method. The beneficial effects of the present invention are:
[0043] (1) Compared with the traditional single indicator based on drilling process feedback, the soil layer identification method based on CPTU is more reliable in terms of the formation data information obtained, less affected by human operation and external environment, highly repeatable, and sensitive to soft formations. It can effectively identify soft soil, clay soil, sandy soil and other foundations.
[0044] (2) The process parameters of the traditional pile-making process are selected based on engineering experience, and it is difficult to determine the process parameters using qualitative methods. The present invention provides an intelligent decision-making system and method for jet grouting piles, which can quickly and automatically match the optimal process parameters according to certain target principles based on the real data of engineering cases stored in the database. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The present invention will be further described below in conjunction with the accompanying drawings, wherein:
[0046] Figure 1 This is a flow chart of a method according to Embodiment 1 of the present invention;
[0047] Figure 2 A soil classification diagram based on CPTU according to the first embodiment of the present invention;
[0048] Figure 3 The pore pressure static penetration test result curve of the second embodiment of the present invention;
[0049] Figure 4 An intelligent rotary jet grouting pile construction control system according to the second embodiment of the present invention;
[0050] In the figure: 1. control host; 2. first controller; 3. second controller; 4. third controller; 5. fourth controller; 6. fifth controller; 7. sixth controller; 8. air compressor; 9. high-pressure water pump; 10. pore pressure static penetration equipment; 11. jet jet pile drilling rig; 12. mud pump; 13. slurry barrel. DETAILED DESCRIPTION
[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] See also Figure 1 and Figure 2 As the first embodiment of the present invention, in view of the shortcomings of the existing rotary jet grouting pile reinforcement technology, this embodiment aims to solve the problem that the rotary jet grouting pile construction process can accurately judge the stratum type in real time and realize the construction control system that automatically matches the appropriate construction process parameters according to the stratum changes, thereby realizing the intelligent control of the rotary jet grouting pile construction process.
[0053] This embodiment specifically discloses an intelligent jet grouting pile construction method, which includes the following steps:
[0054] S1. Select a test area in the construction site, and before performing jet grouting pile construction in the test area, perform a CPTU static penetration test on the test area to obtain test data; wherein the test data includes the cone tip resistance and side wall friction resistance corrected by pore pressure;
[0055] S2. According to the modified Robertson soil classification method, the soil type of the test area according to the depth change is obtained according to the test data;
[0056] S3. Carry out at least one jet grouting pile construction in the test area. In each construction process, different process parameters are used for each soil type, and pile forming parameters of various soil types under different process parameters are obtained, and the corresponding soil types, process parameters and pile forming parameters are stored in the construction big database; wherein, the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter;
[0057] S4, before starting the jet grouting construction at one of the points on the construction site, first penetrate the jet grouting drilling rig 11 with CPTU static penetration test function at the point to obtain the soil type of the point according to the depth change;
[0058] S5. According to the soil type that varies with depth at the point and the pile forming parameters required by the construction design, the process parameters that vary with depth are matched in the construction big database as the construction data of the point;
[0059] S6. Complete the jet grouting pile construction at the location according to the construction data. After the construction is completed, the construction equipment is automatically cleaned and moved to the next location.
[0060] This embodiment also discloses an intelligent rotary jet pile construction system, comprising: a perception layer, a decision layer and an execution layer;
[0061] The sensing layer is used to select a test area in the construction site. Before the jet grouting pile construction is carried out in the test area, the CPTU static penetration test is first carried out on the test area to obtain test data; according to the modified Robertson soil classification method, the soil category of the test area according to the depth change is obtained according to the test data; and before the jet grouting pile construction is started at one of the points in the construction site, a jet grouting pile drilling rig 11 with a CPTU static penetration test function is first penetrated at the point to obtain the soil category of the point according to the depth change; wherein the test data includes the cone tip resistance and side wall friction resistance corrected by the pore pressure;
[0062] The decision layer is used to carry out at least one jet grouting pile construction in the test area. During each construction process, different process parameters are used for each soil type, and the pile forming parameters of various soil types under different process parameters are obtained, and the corresponding soil types, process parameters and pile forming parameters are stored in the construction big database; when the jet grouting pile construction of one of the points starts at the construction site, the process parameters that change according to the depth are matched in the construction big database according to the soil type that changes according to the depth of the point and the pile forming parameters required by the construction design, as the construction data of the point; wherein the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter;
[0063] The execution layer is used to complete the jet grouting pile construction at the point according to the construction data.
[0064] This embodiment uses a soil layer identification method based on pore pressure static penetration test (CPTU). Compared with the traditional single indicator that uses feedback from the drilling process, the formation data information obtained by the method is reliable, less affected by human operation and external environmental factors, highly repeatable, and sensitive to soft formations. It can effectively identify foundations such as soft soil, clay, and sandy soil.
[0065] Compared with the traditional pile-making process, the process parameters of this embodiment are selected according to engineering experience, and it is difficult to determine the process parameters by qualitative methods. The present invention provides an intelligent decision-making system and method for jet grouting piles, which can quickly and automatically match the optimal process parameters according to certain target principles based on the real data of engineering cases stored in the database.
[0066] In step S2 of this embodiment, the modified Robertson soil classification method is specifically:
[0067] Obtaining the sidewall friction f of different formations through CPTU static penetration test s , and the cone tip resistance q corrected by pore pressure t ;
[0068] According to the side wall friction f s (MPa) and modified cone tip resistance q t (MPa), calculate the corrected normalized cone tip resistance Q tn and normalized friction F r , the calculation formula is as follows:
[0069] Q tn =[q t -σ vo ) / p a ](p a / σ′ vo ) m
[0070] F r =(f s / (q t -σ vo ))×100%
[0071] m=0.381(I c )+0.05(σ′ vo / p a )-0.15
[0072] I c =[(3.47-logQ t ) 2 +(logF r +1.22) 2 ] 0.5
[0073] Q t =(q t -σ vo ) / σ′ vo
[0074] Among them, σ vo is the total stress of the overlying strata (MPa), calculated according to the soil depth; σ′ vo is the total effective overlying stratum stress (MPa), calculated according to the soil depth; P a is 1 standard atmosphere, i.e. 0.1 MPa; m is the stress correction factor related to soil type; Q t is the normalized cone tip resistance;
[0075] According to the modified normalized cone tip resistance Q tn and normalized friction F r , according to the coordinate point (F r , Q tn ) In the distribution area of the soil classification map based on CPTU, the corresponding soil categories are obtained; among them, the soil categories are divided into seven categories, namely: shrinkage-sensitive clay, shrinkage clay, expansive clay, shrinkage intermediate soil, expansive intermediate soil, shrinkage sand and expansive sand.
[0076] See also Figure 2 In this embodiment, the soil types are divided into 7 categories based on the soil classification diagram of CPTU, namely: Category 1 - shrinkage-sensitive clay, Category 2 - shrinkage clay, Category 3 - expansive clay, Category 4 - shrinkage intermediate soil, Category 5 - expansive intermediate soil, Category 6 - shrinkage sand, and Category 7 - expansive sand.
[0077] Figure 2 The expression of the Middle-earth category boundary DEFG is as follows:
[0078] Q tn =70 / (1+0.06F r ) 17 +11
[0079] Figure 2 The Chinese-Earth category boundary KEM adopts the following expression:
[0080] Q tn =0.32 / (70+Q tn F r )-10
[0081] Figure 2 The Chinese-Earth category boundary JFB uses the following expression:
[0082] Q tn =0.22 / (70+Q tn F r )-10
[0083] The soil classification areas and corresponding coordinate ranges are shown in Table 1 below:
[0084]
[0085]
[0086] Table 1
[0087] See also Figure 3 and Figure 4 As a second implementation of the present invention, the difference between this embodiment and the first embodiment is that in step S1 of this embodiment, the step of selecting a test area in the construction site specifically includes the following steps:
[0088] S11. Obtain geological survey data of the entire construction site and obtain all soil types contained in the construction site;
[0089] S12. Select at least one test area, and the construction depth range of each test area includes all soil types of the entire construction site.
[0090] Preferably, in step S1, the CPTU static penetration test is first performed on the test area to obtain test data, specifically:
[0091] S13. Perform a CPTU static penetration test on the test area through a CPTU test system integrated with a construction drilling rig to obtain test data.
[0092] Preferably, in step S5, the soil type that varies according to the depth of the construction location and the pile forming parameters required by the construction design are matched with the process parameters that vary according to the depth in the construction big database as the construction data. This step also includes the following sub-steps:
[0093] S51. In the construction big data database, match the process parameters whose pile compressive strength and pile diameter are greater than or equal to the pile forming parameters required by the construction design.
[0094] S52, when the same set of soil type and pile forming parameters are matched with multiple process parameters, firstly select a set of process parameters with the highest cement content;
[0095] S53, if multiple process parameters with the same cement content are matched, a set of process parameters with the lowest rotation speed is preferred;
[0096] S54, if multiple process parameters with the same cement content and rotation speed are matched, a set of process parameters with the minimum shotcrete pressure is preferably selected;
[0097] S55. If multiple process parameters with the same cement content, rotation speed and shotcrete pressure are matched, one of the process parameters is randomly matched.
[0098] Preferably, in step S6, completing the jet grouting pile construction at the point according to the construction data also includes the following sub-steps:
[0099] S61. During the construction of the jet grouting piles, the construction big database is updated in real time to automatically store the current soil type, process parameters and pile formation parameters.
[0100] Steps S1 to S3 of this embodiment obtain soil layer parameters, and the specific steps are as follows:
[0101] A1. Conduct pore pressure static penetration test. Before construction, use pore pressure static penetration test CPTU to penetrate the pile position. It is preferred to use the CPTU test system integrated with the construction drilling rig to obtain the pore pressure corrected cone tip resistance q t and side wall friction f s With the depth relationship curve, such as Figure 3 (b) (c);
[0102] A2. Obtain soil layer classification. The soil layer identification system generates a curve chart of soil layer classification and depth based on the CPTU collection information. The soil layer identification system uses the modified Roberson soil classification method, that is, the modified cone tip resistance q of different strata is obtained through CPTU testing. t (corrected by pore pressure) and sidewall friction f s , and then calculate the corrected normalized cone tip resistance Q tn , normalized friction F rThe two parameters are used as x and y coordinates, and the soil layer category is identified according to the distribution range of the coordinate points.
[0103] The above calculation process is realized through computer programming, and the soil type and depth curve can be displayed in real time, such as Figure 3 (a) shown.
[0104] The intelligent rotary jet pile construction system of this embodiment is mainly composed of three parts: perception layer, decision layer and execution layer. The perception layer mainly includes CPTU acquisition equipment and soil layer identification system; the decision layer mainly includes intelligent decision-making system; and the execution layer mainly includes intelligent control system and intelligent controller module.
[0105] The further intelligent controller module mainly includes the fourth controller 5, the fifth controller 6, the first controller 2, and the second controller 3. Each controller can receive instructions from the intelligent control module to achieve precise control of the shotcrete pressure, jet pressure, rotation speed and lifting speed. The jet pressure mainly selects the appropriate jet, water jet and shotcrete pressure according to different processes.
[0106] Furthermore, the intelligent control system can display the curve of process parameters changing with depth in real time, and at the same time has various command operation buttons, which makes it convenient for the operator to take measures to switch to manual operation mode according to abnormal conditions of the displayed intelligent construction process parameters.
[0107] The following is a specific description of the construction process of this embodiment:
[0108] 1) Obtain the most favorable process parameters; the intelligent decision-making system automatically matches the most favorable process parameters corresponding to the soil layer type based on the information stored in the database;
[0109] 2) Implementing intelligent control of pile formation; the intelligent pile formation control system is connected to the slurry barrel 13, the drilling rig motor, the high-pressure grouting pump motor, the water pump motor, and the motor of the air compressor 8 through the intelligent controller module according to the obtained optimal construction process parameters, namely, water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, and lifting speed, to realize the configuration of cement slurry, and accurately control the shotcrete pressure, jet pressure, rotation speed, and lifting speed according to the optimal matching process parameters;
[0110] 3) Prepare cement slurry according to the optimal matching parameters;
[0111] Based on the optimal construction process parameters, water is first added to the slurry barrel 13, and then the required cement is calculated according to the water-cement ratio, and appropriate admixtures are added according to the admixture ratio determined by the indoor mix ratio test, and the mixer is turned on for 10 to 20 minutes. The valve at the bottom of the slurry barrel 13 is opened, and the slurry flows into the slurry pool after filtering through the first screen (pore size of 0.8 mm), and then pumped into the second filter (pore size of 0.8 mm) through the mud pump 12, and flows into the slurry barrel after the second filtering, and is ready for use when grouting;
[0112] 4) Drilling: Use geological drilling rig to drill holes to the designed elevation. Generally, a 150mm drill bit can be used for pre-drilling hole diameter;
[0113] 5) Insert the pipe; if the single-pipe method or double-pipe method is used, there is no need to insert the pipe separately. If the three-pipe method is used, after drilling the hole, pull out the drill rod and insert the jet pipe. During the insertion process, in order to prevent mud and sand from clogging the nozzle, a small pressure (0.5-1.0MPa) can be used to inject water while lowering the pipe;
[0114] 6) Pile formation; after reaching the designed depth, connect the high-pressure water pipe and air pressure pipe, start the high-pressure clean water pump, mud pump 12, air compressor 8 and drilling rig; the intelligent control system for pile formation is based on the obtained optimal construction process parameters, namely, injection pressure, grouting flow, rotation speed, and lifting speed, and connects the motor of the drilling rig, the motor of the high-pressure grouting pump, the motor of the water pump, and the motor of the air compressor 8 through the intelligent controller module, and outputs the optimal matching injection pressure, grouting flow, rotation speed, and lifting speed in real time; for the bottom treatment of the borehole, first rotate and spray for 30s-60s, and then slowly lift it at the beginning according to the controlled lifting speed; when the pile top elevation is reached, set to re-penetrate 1m, and then slowly lift it again to form a secondary treatment;
[0115] 7) Clean and move; turn off the mud pump 12 through the intelligent pile control system, turn on the high-pressure water pump, and clean the remaining cement slurry in all pipelines until they are basically clean; and clean the soil adhering to the spraying pipe head.
[0116] Traditional construction processes generally use manual operation methods and perform operations according to pre-set process parameters, with a low degree of automation. The intelligent construction system provided by the present invention can realize intelligent control of the entire process of jet grouting pile construction. The intelligent control system receives the optimal construction process parameters fed back by the jet grouting pile construction analysis system, and realizes precise control of parameters such as injection pressure, jet pressure, rotation speed, and lifting speed through the intelligent controller module.
[0117] This embodiment further illustrates the process of obtaining the optimal process parameters of the jet grouting pile with respect to step S4.
[0118] By inputting soil layer type and depth information into the jet grouting pile construction analysis system, and at the same time inputting pile quality design requirements, namely pile diameter, pile compressive strength, and pile length design values, the intelligent decision-making system matches the optimal process parameters for soil layers of different depths. The specific implementation cases are as follows:
[0119] (1) Collect engineering cases and organize them into a database of jet grouting pile construction. Each group of engineering cases in the database is regarded as a group of data. The group of data mainly contains three types of information. The first type is soil layer category; the second type is process parameters, mainly including water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles, and nozzle diameter; the third type of pile parameters mainly includes pile compressive strength and pile diameter. Ten typical groups of engineering case data are selected as examples, as shown in Table 2 below.
[0120]
[0121] Table 2
[0122] (2) Obtain the most favorable process parameters. According to the relationship curve between soil layer type and depth, the data group that is suitable for the soil layer type is selected. Secondly, according to the pile design value requirements, that is, the pile compressive strength and pile diameter are greater than the design value data group. Finally, according to the highest cement content in the process parameters, the data group corresponding to the cement content is selected. If the cement content is the same, the rotation speed is compared, and the data group with a lower rotation speed is selected. If the cement content and the rotation speed are the same, the data group with a smaller shotcrete pressure is selected. If the above three data are the same, a set of parameters can be randomly matched.
[0123] See also Figure 4 The intelligent jet grouting pile construction system of this embodiment is composed of three parts: a perception layer, a decision layer and an execution layer, wherein:
[0124] The sensing layer mainly includes pore pressure static penetration equipment 10 and soil layer identification system;
[0125] The decision-making layer mainly includes the jet grouting pile construction analysis system;
[0126] The execution layer mainly includes the pile intelligent control system and intelligent controller module.
[0127] The soil layer identification system, the jet grouting pile construction analysis system, and the pile forming intelligent control system are all integrated in the control host 1.
[0128] The sensing layer mainly obtains the cone tip resistance, side wall resistance, and pore pressure distribution curve of the stratum with depth through the pore pressure static penetration device 10, and obtains the distribution of stratum soil type with depth through the soil layer identification system;
[0129] The decision-making layer is mainly an intelligent decision-making system, which outputs the most favorable construction process parameters by inputting the soil layer type obtained by the perception layer, as well as the design values of the jet grouting pile diameter, pile length, and pile compressive strength.
[0130] The execution layer mainly receives the most favorable process parameters from the decision-making layer, including the pile-forming intelligent control system and the intelligent controller module, which can realize the precise control of the construction process parameters.
[0131] The intelligent controller module mainly includes a first controller 2 (for controlling an air compressor 8), a second controller 3 (for controlling a high-pressure water pump 9), a third controller 4 (for controlling a pore pressure static penetration device 10), a fourth controller 5 (for controlling a rotary jet pile drilling rig 11), a fifth controller 6 (for controlling a mud pump 12), and a sixth controller 7 (for controlling a slurry barrel 13). The controller can accept instructions from the intelligent control module to achieve precise control of cement slurry production, shotcrete pressure, jet pressure, rotation speed, and lifting speed.
[0132] The intelligent control system can display the curve of process parameters changing with depth in real time, and has various command operation buttons, so that the operator can take measures to switch to manual operation mode according to abnormal conditions of intelligent construction process parameters, such as drill jamming when pulling out the rotary jet pile or the matching optimal process parameters exceeding the normal value range.
[0133] The present invention also discloses a terminal device, including a processor and a storage device, wherein the storage device is used to store one or more programs; when the one or more programs are executed by the processor, the processor implements the above-mentioned intelligent rotary jet pile construction method. The processor can be a central processing unit (CPU), or other general processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The processor is the control center of the test equipment, and various interfaces and lines are used to connect various parts of the entire test equipment.
[0134] The storage device can be used to store computer programs and / or modules. The processor realizes various functions of the terminal device by running or executing the computer programs and / or modules stored in the storage device and calling the data stored in the storage device. The storage device can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the terminal device, etc. In addition, the storage device can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0135] Wherein, if the module / unit integrated in the intelligent rotary jet pile construction equipment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in at least one computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in the form of source code, object code, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.
[0136] It should be noted that the embodiments of the devices and apparatuses described above are only illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place, or may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0137] In addition, in the drawings of the device embodiments provided by the present invention, the connection relationship between modules indicates that there is a communication connection between them, which can be specifically implemented as one or more communication buses or signal lines. Those skilled in the art can understand and implement it without creative work.
Claims
1. An intelligent jet grouting pile construction method, characterized in that: include: A test area is selected in the construction site, and before the jet grouting pile construction is carried out in the test area, a CPTU static penetration test is first carried out on the test area to obtain test data; wherein the test data includes the cone tip resistance and the side wall friction resistance corrected by the pore pressure; According to the modified Robertson soil classification method, the soil type of the test area according to the depth change is obtained according to the test data; Carry out at least one jet grouting pile construction in the test area. In each construction process, different process parameters are used for each soil type to obtain the pile forming parameters of various soil types under different process parameters, and store the corresponding soil types, process parameters and pile forming parameters in the construction database; wherein the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter; Before starting the jet grouting pile construction at one of the points on the construction site, first insert a jet grouting pile drill with CPTU static penetration test function at that point to obtain the soil type at that point that varies according to the depth; According to the soil type that changes with depth at the point and the pile parameters required by the construction design, the process parameters that change with depth are matched in the construction database as the construction data of the point; Complete the jet grouting pile construction at this point according to the construction data; Among them, the soil type that changes according to the depth of the point and the pile parameters required by the construction design are matched in the construction big database with the process parameters that change according to the depth as the construction data of the point, which are specifically: In the construction database, match the process parameters of pile compressive strength and pile diameter that are greater than or equal to the pile parameters required by the construction design; Specifically, when the same set of soil types and pile parameters are matched to multiple process parameters, the set of process parameters with the highest cement content is selected first; If multiple process parameters with the same cement content are matched, the set of process parameters with the lowest rotation speed is selected; If multiple process parameters with the same cement content and rotation speed are matched, a set of process parameters with the smallest shotcrete pressure is selected; If multiple process parameters with the same cement content, rotation speed and shotcrete pressure are matched, one of the process parameters will be matched randomly.
2. An intelligent jet grouting pile construction method according to claim 1, characterized in that: The selection of the test area in the construction site specifically includes the following steps: Obtain geological survey data of the entire construction site and obtain all soil types contained in the construction site; At least one test area is selected, and the construction depth range of each test area includes all soil types of the entire construction site.
3. An intelligent jet grouting pile construction method according to claim 1, characterized in that: The CPTU static penetration test is first performed on the test area to obtain test data, specifically: Through the CPTU test system integrated with the construction drilling rig, a CPTU static penetration test is carried out on the test area to obtain test data.
4. The intelligent jet grouting pile construction method according to claim 1, characterized in that: The modified Robertson soil classification method is specifically: Obtaining the sidewall friction f of different formations through CPTU static penetration test s , and the cone tip resistance q corrected by pore pressure t ; According to the side wall friction f s and the modified cone tip resistance q t , calculate the corrected normalized cone tip resistance Q tn and normalized friction F r , the calculation formula is as follows: Q tn =[(q t -σ vo ) / p a ](p a / σ′ vo ) m F r =(f s / (q t -σ vo ))×100% m=0.381(I c )+0.05(σ′ vo / p a )-0.15 I c =[(3.47-logQ t ) 2 +(1og F r +1.22) 2 ] 0.5 Q t =(q t -s vo ) / s vo ′ Among them, σ vo is the total stress of the overlying strata, calculated according to the soil depth; σ′ vo is the total stress of the effective overlying strata, calculated according to the soil depth; P a is 1 standard atmosphere, i.e. 0.1 MPa; m is the stress correction factor related to soil type; Q t is the normalized cone tip resistance; According to the modified normalized cone tip resistance Q tn and normalized friction F r , according to the coordinate point (F r , Q tn ) In the distribution area of the soil classification map based on CPTU, the corresponding soil categories are obtained; among them, the soil categories are divided into seven categories, namely: shrinkage-sensitive clay, shrinkage clay, expansive clay, shrinkage intermediate soil, expansive intermediate soil, shrinkage sand and expansive sand.
5. The intelligent jet grouting pile construction method according to claim 1 is characterized in that: The method of completing the jet grouting pile construction at the point according to the construction data also includes the following steps: During the construction of the jet grouting piles, the construction big database is updated in real time to automatically store the current soil type, process parameters and pile formation parameters.
6. An intelligent jet grouting pile construction system, characterized in that: include: Perception layer, decision layer and execution layer; The perception layer is used to select a test area in the construction site, and before the jet grouting pile construction is carried out in the test area, the CPTU static penetration test is first carried out on the test area to obtain test data; according to the modified Robertson soil classification method, the soil category of the test area according to the depth change is obtained according to the test data; and before the jet grouting pile construction is started at one of the points in the construction site, a jet grouting pile drilling rig with a CPTU static penetration test function is first penetrated at the point to obtain the soil category of the point according to the depth change; wherein the test data includes the cone tip resistance and side wall friction resistance corrected by the pore pressure; The decision layer is used to carry out at least one jet grouting pile construction in the test area. During each construction process, different process parameters are used for each soil type, and the pile forming parameters of various soil types under different process parameters are obtained, and the corresponding soil types, process parameters and pile forming parameters are stored in the construction big database; when the jet grouting pile construction of one of the points starts at the construction site, the process parameters that change according to the depth are matched in the construction big database according to the soil type that changes according to the depth of the point and the pile forming parameters required by the construction design, as the construction data of the point; wherein the process parameters include water-cement ratio, cement content, shotcrete pressure, jet pressure, rotation speed, lifting speed, number of nozzles and nozzle diameter; the pile forming parameters include pile compressive strength and pile diameter; Among them, the soil type that changes according to the depth of the point and the pile parameters required by the construction design are matched in the construction big database with the process parameters that change according to the depth as the construction data of the point, which are specifically: In the construction database, match the process parameters of pile compressive strength and pile diameter that are greater than or equal to the pile parameters required by the construction design; Specifically, when the same set of soil type and pile parameters are matched to multiple process parameters, the set of process parameters with the highest cement content is selected first; if multiple process parameters with the same cement content are matched, the set of process parameters with the lowest rotation speed is selected; if multiple process parameters with the same cement content and rotation speed are matched, the set of process parameters with the lowest shotcrete pressure is selected; if multiple process parameters with the same cement content, rotation speed and shotcrete pressure are matched, one of the process parameters is randomly matched. The execution layer is used to complete the jet grouting pile construction at the point according to the construction data.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the intelligent jet grouting pile construction method as described in any one of claims 1 to 5.