A method for evaluating the status quo of community living circle planning based on mobile phone signaling data
By identifying residents' usual activity areas through mobile phone signaling data, and calculating the completeness and facility suitability index of the community living circle, this solves the problem that existing technologies are unable to reflect the needs of residents' daily activities, and enables accurate evaluation and optimized construction of the current status of community living circle planning.
Patent Information
- Application Number
- CN202410544623.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-05-06
AI Technical Summary
Existing community living circle planning techniques are unable to accurately reflect the spatial needs of residents' daily activities, making it difficult to evaluate whether the current state of community living circle planning meets the needs of residents' daily activities.
By using mobile phone signaling data to identify residents' usual activity areas, and by determining residency information and grid unit division, the completeness index and facility adaptability index of the community living circle are calculated to evaluate the current planning status of the community living circle.
Accurately identifying residents' needs for daily activity space provides a reference for the construction of community living circles, improving the accuracy and reliability of planning.
Smart Images

Figure CN118134111B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of urban planning technology, and in particular to a method for evaluating the current status of community life circle planning based on mobile phone signaling data. Background Art
[0002] As urban development moves from incremental expansion to the stock optimization stage, how to meet residents' daily needs and improve their quality of life within limited space units has become the key to achieving people-oriented urban planning and construction. The community life circle is a basic unit that meets the various needs of community residents throughout their life cycle, such as work and life, within a suitable daily walking range. The planning status of the community life circle is closely related to the daily activity needs of residents. The existing community life circle planning technology can only identify the geographical boundaries of the community life circle, but it is difficult to reflect the spatial needs of residents to carry out daily activities around the community, making it difficult to accurately evaluate whether the planning status of the community life circle meets the daily activity needs of residents. Summary of the invention
[0003] In view of this, the present application proposes a method, device, electronic device and storage medium for evaluating the current status of community living circle planning based on mobile phone signaling data, which can accurately identify the spatial scope of residents' daily activities around the community, thereby accurately and reliably evaluating the extent to which the current status of community living circle planning meets the daily activity needs of residents.
[0004] According to one aspect of the present application, a method for evaluating the current status of community life circle planning based on mobile phone signaling data is provided, comprising: obtaining a set of mobile phone signaling data generated by at least one mobile phone user communicating with a communication base station in a study area; the study area includes at least one community; based on the set of mobile phone signaling data, determining at least one permanent user in the study area from the at least one mobile phone user and determining the residence information of each permanent user in the at least one permanent user; the residence information includes the residence location and residence time in the study area; based on the residence information of each permanent user in the at least one permanent user, determining a first usual activity area corresponding to a first community; the first community is any community among the at least one community; based on the first usual activity area corresponding to the first community and the first traffic range corresponding to the first community, evaluating the current status of community life circle planning of the first community; the first traffic range corresponding to the first community is a range that can be reached from the first community by a first traffic mode within a first time period.
[0005] In a possible implementation, the mobile phone signaling data set includes the residence location and residence time of each mobile phone user among the at least one mobile phone user in the study area; the residence time of each mobile phone user in the study area includes the time and / or time period of each mobile phone user's residence at the residence location in the study area; determining at least one permanent user in the study area from the at least one mobile phone user and determining the residence information of each permanent user among the at least one permanent user based on the mobile phone signaling data set includes: determining the number of days that each mobile phone user stays in the study area based on the residence time of each mobile phone user in the study area; determining at least one permanent user from the at least one mobile phone user based on the relationship between the number of days that each mobile phone user stays in the study area and a preset number of days, and extracting the residence information of each permanent user among the at least one permanent user from the mobile phone signaling data set.
[0006] In a possible implementation, determining the first habitual activity area corresponding to the first community based on the residence information of each permanent user among the at least one permanent user includes: determining the first residential user set corresponding to the first community and the habitual activity location corresponding to each resident user in the first residential user set based on the residence information of each permanent user among the at least one permanent user; determining the first habitual activity area based on the total number of resident users in the first residential user set and the habitual activity location corresponding to each resident user in the first residential user set.
[0007] In a possible implementation, determining the first set of resident users corresponding to the first community and the usual activity places corresponding to the respective resident users in the first set of resident users based on the residence information of the respective resident users among the at least one permanent user comprises: determining from a plurality of grid units the grid units in which the respective resident users among the at least one permanent user have resided based on the residence information of the respective resident users among the at least one permanent user, and determining the residence time of the respective resident users among the at least one permanent user in the grid units in which the respective resident users have resided; wherein the plurality of grid units are obtained by dividing the study area based on the density of communication base stations in the study area; determining the residence time of the respective resident users among the at least one permanent user in the grid units in which the respective resident users have resided based on the residence information of the respective resident users among the at least one permanent user According to the residence time of each permanent user in the at least one permanent user, the residence grid unit corresponding to each permanent user in the at least one permanent user is determined from the multiple grid units; according to the positional relationship between the residence grid unit corresponding to each permanent user in the at least one permanent user and the first community, the first residential user set is determined from the at least one permanent user; according to the grid units where each resident user in the first residential user set has resided and the residence time of each resident user in the grid units where the resident users have resided, at least one user habitual activity grid unit corresponding to each resident user in the first residential user set is determined from the multiple grid units; the habitual activity place corresponding to each resident user includes the at least one user habitual activity grid unit corresponding to each resident user.
[0008] In a possible implementation, the determining of the first habitual activity area according to the total number of resident users in the first resident user set and the habitual activity locations corresponding to each resident user in the first resident user set includes: determining the first habitual activity number of people corresponding to each grid unit in the multiple grid units according to at least one user habitual activity grid unit corresponding to each resident user; calculating the first habitual activity intensity corresponding to each grid unit in the multiple grid units according to the first habitual activity number of people corresponding to each grid unit and the total number of resident users in the first resident user set; determining at least one first habitual activity grid unit from the multiple grid units according to the relationship between the first habitual activity intensity corresponding to each grid unit and a preset threshold; the first habitual activity area includes the at least one first habitual activity grid unit.
[0009] In a possible implementation, the present status of community life circle planning of the first community is evaluated based on the first habitual activity area corresponding to the first community and the first traffic range corresponding to the first community, including: calculating a first community life circle completeness index corresponding to the first community based on the area of each first habitual activity grid unit in the at least one first habitual activity grid unit, the number of first habitual activities corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range; and evaluating, based on the first community life circle completeness index, the extent to which the community life circle construction level of the first community meets the daily activity needs of residents.
[0010] In a possible implementation, the first community life circle completeness index corresponding to the first community is calculated based on the areas of each first habitual activity grid unit in the at least one first habitual activity grid unit, the number of first habitual activities corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range, including: calculating the sum of the products of the area and the number of people in the first traffic range based on the areas of each first habitual activity grid unit, the number of first habitual activities corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range; calculating the first sum of the products of the area and the number of people based on the areas of each first habitual activity grid unit and the number of first habitual activities corresponding to each first habitual activity grid unit; and calculating the first community life circle completeness index based on the ratio of the sum of the products of the area and the number of people in the first traffic range to the first sum of the products of the area and the number of people.
[0011] In a possible implementation, the present status of community life circle planning of the first community is evaluated based on the first habitual activity area corresponding to the first community and the first traffic range corresponding to the first community, including: obtaining the number of first facilities in each grid unit among the multiple grid units; calculating the first facility adaptability index corresponding to the first community based on the positional relationship between each grid unit among the multiple grid units and the first traffic range, the number of first facilities in each grid unit, and the number of first facilities in each first habitual activity grid unit among the at least one first habitual activity grid unit; and evaluating, based on the first facility adaptability index, the possibility that the configuration level of the first facility in the community life circle of the first community meets the daily activity needs of residents.
[0012] In a possible implementation, the first facility adaptability index corresponding to the first community is calculated based on the positional relationship between each grid unit in the multiple grid units and the first traffic range, the number of first facilities in each grid unit, and the number of first facilities in each first habitually active grid unit in the at least one first habitually active grid unit, including: calculating the total number of facilities in the first traffic range based on the positional relationship between each grid unit and the first traffic range and the number of first facilities in each grid unit; calculating the total number of facilities in the first habitually active range based on the number of first facilities in each first habitually active grid unit; calculating the first facility adaptability index based on the ratio of the total number of facilities in the first traffic range to the total number of facilities in the first habitually active range.
[0013] According to another aspect of the present application, a device for evaluating the current status of community life circle planning based on mobile phone signaling data is provided, comprising: an acquisition module, used to acquire a set of mobile phone signaling data generated by at least one mobile phone user communicating with a communication base station in a study area; the study area includes at least one community; a permanent user determination module, used to determine at least one permanent user in the study area from the at least one mobile phone user and determine the residence information of each permanent user in the at least one permanent user according to the set of mobile phone signaling data; the residence information includes the residence location and residence time in the study area; a habitual activity area determination module, used to determine a first habitual activity area corresponding to a first community according to the residence information of each permanent user in the at least one permanent user; the first community is any community in the at least one community; an evaluation module, used to evaluate the current status of community life circle planning of the first community according to the first habitual activity area corresponding to the first community and the first traffic range corresponding to the first community; the first traffic range corresponding to the first community is a range that can be reached from the first community by a first traffic mode within a first time period.
[0014] In a possible implementation, the mobile phone signaling data set includes the residence location and residence time of each mobile phone user among the at least one mobile phone user in the study area; the residence time of each mobile phone user in the study area includes the time and / or time period of each mobile phone user's residence at the residence location in the study area; the permanent user determination module is also used to: determine the number of days each mobile phone user stays in the study area based on the residence time of each mobile phone user in the study area; determine at least one permanent user from the at least one mobile phone user based on the relationship between the number of days each mobile phone user stays in the study area and the preset number of days, and extract the residence information of each permanent user among the at least one permanent user from the mobile phone signaling data set.
[0015] In a possible implementation, the habitual activity area determination module is further used to: determine the first residential user set corresponding to the first community and the habitual activity locations corresponding to each resident user in the first residential user set based on the residence information of each permanent user among the at least one permanent user; determine the first habitual activity area based on the total number of resident users in the first residential user set and the habitual activity locations corresponding to each resident user in the first residential user set.
[0016] In a possible implementation, the module for determining the habitual activity area is further used to: determine, from a plurality of grid cells, the grid cells where each of the at least one permanent user has resided, based on the residency information of each of the at least one permanent user, and determine the residency time of each of the at least one permanent user in the grid cells where the user has resided; wherein the plurality of grid cells are obtained by dividing the study area based on the density of communication base stations in the study area; determine, from the plurality of grid cells, the location of the at least one permanent user based on the residency time of each of the at least one permanent user in the grid cells where the user has resided a grid unit of residence corresponding to each permanent user in the at least one permanent user; determining the first residential user set from the at least one permanent user according to the positional relationship between the grid unit of residence corresponding to each permanent user in the at least one permanent user and the first community; determining at least one user habitual activity grid unit corresponding to each resident user in the first residential user set from the multiple grid units according to the grid units where each resident user in the first residential user set has resided and the residency time of each resident user in the grid units where they have resided; the habitual activity places corresponding to each resident user include the at least one user habitual activity grid unit corresponding to each resident user.
[0017] In a possible implementation, the habitual activity area determination module is further used to: determine the first habitual activity number of people corresponding to each of the multiple grid units based on at least one user habitual activity grid unit corresponding to each resident user; calculate the first habitual activity intensity corresponding to each of the multiple grid units based on the first habitual activity number of people corresponding to each grid unit and the total number of resident users in the first resident user set; determine at least one first habitual activity grid unit from the multiple grid units based on the relationship between the first habitual activity intensity corresponding to each grid unit and a preset threshold; the first habitual activity area includes the at least one first habitual activity grid unit.
[0018] In a possible implementation, the evaluation module is further used to: calculate the completeness index of the first community life circle corresponding to the first community based on the area of each first habitual activity grid unit in the at least one first habitual activity grid unit, the number of first habitual activities corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range; and evaluate the extent to which the community life circle construction level of the first community meets the daily activity needs of residents based on the first community life circle completeness index.
[0019] In a possible implementation, the evaluation module is further used to: calculate the sum of the products of the area and the number of people in the first traffic range according to the areas of the first habitual activity grid units, the number of people in the first habitual activities corresponding to the first habitual activity grid units, and the positional relationship between the first habitual activity grid units and the first traffic range; calculate the sum of the first area-people products according to the areas of the first habitual activity grid units and the number of people in the first habitual activities corresponding to the first habitual activity grid units; calculate the completeness index of the first community life circle according to the ratio of the sum of the products of the area and the number of people in the first traffic range to the first sum of the products of the area and the number of people.
[0020] In a possible implementation, the evaluation module is further used to: obtain the number of first facilities in each of the multiple grid units; calculate the first facility adaptability index corresponding to the first community based on the positional relationship between each of the multiple grid units and the first traffic range, the number of first facilities in each grid unit, and the number of first facilities in each of the at least one first habitual activity grid unit; and evaluate the possibility that the configuration level of the first facility in the community life circle of the first community meets the daily activity needs of residents based on the first facility adaptability index.
[0021] In a possible implementation, the evaluation module is further used to: calculate the total number of facilities in the first traffic range based on the positional relationship between each grid unit and the first traffic range and the number of first facilities in each grid unit; calculate the total number of facilities in the first habitual activity range based on the number of first facilities in each first habitual activity grid unit; calculate the first facility adaptability index based on the ratio of the total number of facilities in the first traffic range to the total number of facilities in the first habitual activity range.
[0022] According to another aspect of the present application, an electronic device is provided, comprising: a processor; and a memory for storing processor-executable instructions; wherein the processor is configured to implement the above method when executing the instructions stored in the memory.
[0023] According to another aspect of the present application, a non-volatile computer-readable storage medium is provided, on which computer program instructions are stored, wherein the computer program instructions implement the above method when executed by a processor.
[0024] According to another aspect of the present application, a computer program product is provided, including a computer-readable code, or a non-volatile computer-readable storage medium carrying the computer-readable code. When the computer-readable code runs in a processor of an electronic device, the processor in the electronic device executes the above method.
[0025] The community life circle planning status evaluation method based on mobile phone signaling data provided in this application can use mobile phone signaling data to accurately identify the usual activity areas of residents in each community within the study area, and can more accurately reflect the spatial needs of residents' daily activities in each community, so as to accurately and reliably evaluate the extent to which the current status of community life circle planning meets the daily activity needs of residents, which is helpful to provide a reference basis for the optimization construction of community life circles.
[0026] Other features and aspects of the present application will become apparent from the following detailed description of exemplary embodiments with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments, features, and aspects of the present application and, together with the description, serve to explain the principles of the present application.
[0028] Figure 1 A flowchart of a method for evaluating the status of community living circle planning based on mobile phone signaling data according to an embodiment of the present application is shown.
[0029] Figure 2 A flow chart of determining a first habitual activity area according to an embodiment of the present application is shown.
[0030] Figure 3 A schematic diagram of the structure of a community living circle planning status evaluation device based on mobile phone signaling data according to an embodiment of the present application is shown.
[0031] Figure 4 A block diagram of an electronic device 1900 according to an embodiment of the present application is shown. DETAILED DESCRIPTION
[0032] Various exemplary embodiments, features and aspects of the present application will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.
[0033] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.
[0034] In addition, in order to better illustrate the present application, numerous specific details are given in the following specific embodiments. It should be understood by those skilled in the art that the present application can also be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present application.
[0035] Community life circle planning technology is a people-oriented planning method that comprehensively considers multiple scales and residents' living needs. Community life circle planning emphasizes that the facilities around the community should meet the daily needs of residents as much as possible, and has been widely promoted in urban planning practice. Existing community life circle planning technologies mainly focus on the division of community life circle scope. There are currently two main methods for dividing the scope of community life circle: the first method is to start from the spatial layout of the community surroundings, using planning maps or electronic maps (such as geographic points of interest (POI) data), and taking the service radius of community surrounding facilities as the ideal range of the community life circle; the second method is to start from the spatiotemporal behavior of community residents, using residents' activity logs or location positioning data (such as Global Positioning System (GPS) data), and taking the activity range of community residents within a specific time (such as within 15 minutes) as the actual range of the community life circle.
[0036] The above two methods of dividing the scope of community life circle can only identify the geographical boundaries of the community life circle, but it is difficult to reflect the spatial needs of residents' daily activities, so it is difficult to evaluate whether the planning status of the community life circle (such as the construction level of the community life circle, the level of facility configuration within the community life circle) meets the daily activity needs of residents. In addition, the existing community life circle planning technology generally uses static facility status or planning map data for analysis. Even if dynamic resident activity logs are used for analysis, there are problems such as limited survey sample size and cross-sectional survey time. The existing community life circle planning technology is difficult to accurately reflect the "planning supply-resident demand" status of the community life circle in terms of methods and data. Therefore, the existing community life circle planning technology is difficult to accurately evaluate the degree to which the current status of community life circle planning meets the daily activity needs of residents, so it is difficult to provide accurate support for the construction and optimization of the community life circle. At present, a more accurate and reliable community life circle planning status evaluation method is urgently needed.
[0037] In view of this, the embodiment of the present application proposes a method for evaluating the current status of community living circle planning based on mobile phone signaling data, which can use mobile phone signaling data to accurately identify the spatial scope of residents' daily activities around the community, and more accurately reflect the spatial needs of residents for carrying out daily activities, thereby accurately and reliably evaluating the extent to which the current status of community living circle planning meets the daily activity needs of residents.
[0038] Figure 1 A flowchart of a method for evaluating the status of community life circle planning based on mobile phone signaling data according to an embodiment of the present application is shown. The method can be executed by a device with processing capabilities such as a processor or a server, such as Figure 1 As shown, the method may include:
[0039] S101. Obtain a set of mobile phone signaling data generated by at least one mobile phone user communicating with a communication base station in a study area; the study area includes at least one community.
[0040] When a mobile phone user communicates with a communication base station in the study area, it means that the mobile phone user resides in the study area. The mobile phone signaling data can record the location information and time information of the mobile phone user when communicating with the communication base station, that is, the mobile phone signaling data set may include the residence location and residence time of each mobile phone user in the study area; wherein the residence location corresponds to the residence time, and the residence time of the mobile phone user in the study area may include the moment and / or time period when the mobile phone user resides at the residence location in the study area. According to the mobile phone signaling data, it can be determined at which moment or time period the mobile phone user resided at which location in the study area.
[0041] Exemplarily, the mobile phone signaling data set may be obtained through an operator. It should be noted that the mobile phone signaling data is obtained with the consent of the user.
[0042] Exemplarily, the mobile phone signaling data generated by the mobile phone user communicating with the communication base station in the study area in the first time period can be obtained. For example, the first time period can be from one month before the current day to the current day, and the mobile phone signaling data in the study area for one consecutive month can be obtained.
[0043] For example, the research area may be a province (eg, Hebei Province), a city (eg, Beijing), or a district in a city (eg, Haidian District). Those skilled in the art may determine the research area according to actual needs, and this application does not limit this.
[0044] For example, the two-dimensional plane corresponding to the study area can be divided into multiple grid cells according to the density of communication base stations in the study area, that is, the study area can be divided into multiple two-dimensional grid cells. The greater the density of communication base stations in the study area, the smaller the distance between the center points of two adjacent grid cells can be, that is, the finer the grid cells can be divided. As an example, the distance between the center points of two adjacent grid cells can be 500 meters.
[0045] For example, after obtaining the mobile phone signaling data, the mobile phone signaling can be cleaned, for example, data cleaning can be performed to eliminate problems such as ping-pong errors and instantaneous drifts, and the data cleaning can be implemented with reference to related technologies. In this way, more accurate mobile phone signaling data can be obtained after data cleaning, thereby improving the quality and reliability of the mobile phone signaling data.
[0046] S102. According to the mobile phone signaling data set, determine at least one permanent user in the study area from the at least one mobile phone user and determine the residence information of each permanent user in the at least one permanent user; the residence information includes the residence location and residence time in the study area.
[0047] In a possible implementation, determining at least one resident user in the study area from the at least one mobile phone user and determining the residence information of each resident user in the at least one resident user according to the mobile phone signaling data set may include:
[0048] (1) Determine the number of days each mobile phone user stays in the study area according to the residence time of each mobile phone user in the study area.
[0049] For example, the dates on which the mobile phone user stayed in the study area can be determined based on the residence time of the mobile phone user in the study area, and the number of days corresponding to the dates on which the mobile phone user stayed in the study area is the number of days the mobile phone user stayed in the study area. For example, the mobile phone signaling data between March 1 and March 31 in the study area can be obtained, wherein, based on the mobile phone signaling data corresponding to mobile phone user A, it can be determined that mobile phone user A stayed in the study area from March 1 to March 15, and did not stay in the study area from March 16 to March 31, so the number of days mobile phone user A stayed in the study area is 15 days.
[0050] (2) determining at least one permanent user from the at least one mobile phone user based on a relationship between the number of days each mobile phone user has stayed in the study area and a preset number of days, and extracting the residence information of each permanent user from the at least one permanent user from the mobile phone signaling data set.
[0051] For example, if the number of days a mobile phone user has stayed in the study area is not less than a preset number of days, the mobile phone user can be considered a permanent user in the study area. The preset number of days can be set by those skilled in the art according to actual needs. For example, the preset number of days can be 15 days, and mobile phone users who have stayed in the study area for more than or equal to 15 days can be determined as permanent users in the study area.
[0052] Exemplarily, after determining the permanent users in the study area, the mobile phone signaling data corresponding to each permanent user can be extracted from the mobile phone signaling data set, and the residence location and residence time of each permanent user in the study area (i.e., the residence information of each permanent user) can be determined from the mobile phone signaling data corresponding to each permanent user.
[0053] S103: Determine a first usual activity area corresponding to a first community according to the residence information of each permanent user in the at least one permanent user; the first community is any community in the at least one community.
[0054] Figure 2 FIG. 4 shows a flow chart of determining a first habitual activity area according to an embodiment of the present application. Figure 2 As shown, the step of determining the first usual activity area may include:
[0055] S1031. Determine a first resident user set corresponding to the first community and a usual activity location corresponding to each resident user in the first resident user set according to the residence information of each resident user among the at least one resident user.
[0056] In a possible implementation, determining the first resident user set corresponding to the first community and the usual activity location corresponding to each resident user in the first resident user set according to the residence information of each resident user among the at least one resident user may include:
[0057] (1) According to the residence information of each of the at least one permanent user, determining from a plurality of grid cells the grid cells in which each of the at least one permanent user has resided, and determining the residence time of each of the at least one permanent user in the grid cells in which the each of the at least one permanent user has resided.
[0058] For example, the grid unit to which the resident location belongs can be determined based on the positional relationship between the resident location of the permanent user in the research area and the multiple grid units obtained by dividing the research area. The grid unit to which the resident location belongs is the grid unit where the permanent user has stayed, and the residence time corresponding to the resident location is the residence time of the permanent user in the grid unit to which the resident location belongs. In this way, the grid units where each permanent user has stayed and the residence time of each permanent user in the grid units where the permanent user has stayed can be determined based on the residence location and residence time of each permanent user in the research area.
[0059] (2) Determining, from the plurality of grid cells, a residential grid cell corresponding to each of the at least one permanent user according to the residence time of each of the at least one permanent user in the grid cell where the user has resided.
[0060] For example, the number of night stay days corresponding to each grid unit where the resident user has resided can be determined based on the relationship between the resident user's residence time in the grid unit where the resident user has resided and the preset night time period. The preset night time period can be set by those skilled in the art according to actual needs.
[0061] As an example, the preset night time period can be set as 10 p.m. to 8 a.m. the next day, and the dates on which the permanent user has stayed in the grid unit can be determined based on the residence time of the permanent user in the grid unit where he has stayed; for each date on which the permanent user has stayed, it is determined in turn whether the permanent user has stayed between 10 p.m. and 8 a.m. the next day; if the permanent user has stayed between 10 p.m. and 8 a.m. the next day, the number of nighttime residence days corresponding to the grid unit is increased by 1 day, until all the dates on which the permanent user has stayed in the grid unit are determined, and the number of nighttime residence days corresponding to the grid unit can be determined.
[0062] For example, the dates on which permanent user A stayed in grid cell B are from March 1 to March 15, and starting from March 1, it can be determined in sequence whether permanent user A has stayed in grid cell B between 22:00 on that night and 8:00 on the next morning. If it is determined to be yes, the number of nighttime stay days corresponding to grid cell B will increase by 1 day, until March 15 is determined, and the number of nighttime stay days corresponding to grid cell B can be determined.
[0063] Exemplarily, the number of nighttime stay days corresponding to each grid unit where a resident user has resided can be determined, and the grid units where the resident user has resided can be sorted from high to low according to the number of nighttime stay days. The grid units ranked in the top X in terms of nighttime stay days can be used as potential residential grid units for the resident user. The value of X can be set by a person skilled in the art according to actual needs. For each potential residential grid unit, the total length of time that the resident user has resided in a preset nighttime time period can be counted according to the residence time of the resident user in the potential residential grid unit, as the nighttime residence time corresponding to the potential residential grid unit. The potential residential grid units can be sorted from high to low according to the nighttime residence time, and the potential residential grid unit ranked first in terms of nighttime residence time can be determined as the residential grid unit corresponding to the resident user.
[0064] As an example, X can be 2, and the preset night time period can be from 22:00 at night to 8:00 in the morning of the next day. The grid cells where the permanent user A has resided can be sorted from high to low according to the number of nighttime residence days, and the grid cells ranked first and second in the number of nighttime residence days are used as potential residence grid cells for the permanent user A. For example, the grid cells ranked first and second in the number of nighttime residence days are grid cells B and grid cells C, respectively, and the potential residence grid cells for the permanent user A are grid cells B and grid cells C. According to the residence time of the permanent user A in the grid cell B, the time period in which the permanent user A resided in the grid cell B between 22:00 at night and 8:00 in the morning of the next day can be determined, and the total duration corresponding to these time periods can be counted as the nighttime residence duration corresponding to the grid cell B. Similarly, according to the residence time of the permanent user A in the grid cell C, the nighttime residence duration corresponding to the grid cell C can be counted. The nighttime residence time corresponding to grid cell B and grid cell C can be compared, and the grid cell with the longest nighttime residence time can be determined as the residence grid cell corresponding to resident user A. Assuming that the nighttime residence time corresponding to grid cell B is 40 hours and the nighttime residence time corresponding to grid cell C is 20 hours, grid cell B is determined as the residence grid cell corresponding to resident user A.
[0065] In this way, the embodiment of the present application can obtain the two night-time residence characteristics, namely the number of night-time residence days and the night-time residence duration, based on the mobile phone signaling data. When determining the residential grid unit corresponding to the permanent user, the number of night-time residence days and the night-time residence duration are taken into consideration at the same time, thereby more accurately identifying the residential grid unit corresponding to the permanent user, and thus more accurately determining the community to which the permanent user belongs.
[0066] (3) Determining the first set of resident users from the at least one resident user based on a location relationship between a residential grid unit corresponding to each resident user in the at least one resident user and the first community.
[0067] Exemplarily, the initial first residential user set is an empty set. For each permanent user, it can be determined whether the corresponding residential grid unit is located in the area of the first community. If the residential grid unit is located in the area of the first community, the permanent user is considered to belong to the first community, that is, the permanent user is a resident user of the first community. The permanent user is added to the first resident user set until all permanent users are determined to obtain the first resident user set.
[0068] For example, for each permanent user, it is also possible to determine in which community the residential grid unit is located based on the positional relationship between the corresponding residential grid unit and the communities in the study area, and the community where the residential grid unit is located is the community to which the permanent user belongs. For example, the residential grid unit corresponding to permanent user A is grid unit B, and grid unit B is located in the area of community D, then the community to which permanent user A belongs is community D. In this way, the community to which each permanent user belongs can be determined, and all permanent users belonging to the same community can constitute the residential user set corresponding to the community, so that the residential user set corresponding to each community can be determined.
[0069] (4) Determining at least one user habitual activity grid unit corresponding to each resident user in the first resident user set from the plurality of grid units based on the grid units in which each resident user in the first resident user set has resided and the residency time of each resident user in the grid units in which each resident user has resided; the habitual activity locations corresponding to each resident user include the at least one user habitual activity grid unit corresponding to each resident user.
[0070] Exemplarily, for each resident user in the first set of resident users, the user's habitual activity grid unit corresponding to the resident user can be extracted from the grid units where the resident user has resided based on the resident user's residence frequency and residence duration in the grid units where the resident user has resided, and all the user's habitual activity grid units corresponding to the resident user can constitute the habitual activity location corresponding to the resident user.
[0071] As an example, for each resident user, the grid units where the resident user has stayed at least once a week and each stay time is 5 minutes or more can be extracted from the grid units where the resident user has stayed, and these grid units can be used as the user's usual activity grid units corresponding to the resident user. These user's usual activity grid units are the usual activity locations corresponding to the resident user.
[0072] In this way, the embodiment of the present application can obtain the residence frequency and residence duration of the resident users in the first community in each grid unit based on the mobile phone signaling data, and the corresponding usual activity locations of the resident users can be more accurately identified based on the residence frequency and residence duration.
[0073] S1032. Determine the first habitual activity area according to the total number of resident users in the first resident user set and the habitual activity locations corresponding to the respective resident users in the first resident user set.
[0074] In a possible implementation, determining the first habitual activity area according to the total number of resident users in the first resident user set and the habitual activity locations corresponding to the resident users in the first resident user set may include:
[0075] (1) Determining a first habitual activity number of people corresponding to each grid unit in the plurality of grid units according to at least one user habitual activity grid unit corresponding to each resident user.
[0076] For example, for each grid unit in the study area, it can be first determined whether the grid unit is a user habitual activity grid unit corresponding to a residential user in the first residential user set. If it is determined to be no, the first habitual activity number of people corresponding to the grid unit is 0; if it is determined to be yes, the number of habitual activity grid units corresponding to the number of residential users in the first residential user set is counted, and the number of residential users counted is the first habitual activity number corresponding to the grid unit. For example, if grid unit C is a user habitual activity grid unit corresponding to 10 residential users in the first residential user set, the first habitual activity number corresponding to grid unit C is 10.
[0077] (2) Calculating the first habitual activity intensity corresponding to each grid cell in the plurality of grid cells according to the number of people participating in the first habitual activity corresponding to each grid cell and the total number of resident users in the first resident user set.
[0078] For example, the first habitual activity intensity corresponding to each grid cell in the study area may be calculated according to the following formula:
[0079] (1)
[0080] Among them, I kj represents the habitual activity intensity of the residents of community j (i.e., the first community) in the kth grid unit in the study area (i.e., the first habitual activity intensity corresponding to the kth grid unit), N kj represents the number of residents in community j who usually move around in the kth grid unit (i.e., the first number of residents who usually move around in the kth grid unit), R j represents the total number of residents in community j (ie, the total number of residents in the first set of residents). The first usual activity intensity corresponding to the grid unit may represent the intensity of daily activities carried out by residents in the first community in the grid unit.
[0081] (3) Determining at least one first habitual activity grid unit from the plurality of grid units according to a relationship between the first habitual activity intensity corresponding to each grid unit and a preset threshold; the first habitual activity area includes the at least one first habitual activity grid unit.
[0082] Exemplarily, for each grid unit in the study area, if the first habitual activity intensity corresponding to it is greater than a preset threshold, the grid unit can be determined as the first habitual activity grid unit corresponding to the first community. The preset threshold can be set by a person skilled in the art according to actual needs. For example, the preset threshold can be 1%, and the grid unit with a first habitual activity intensity greater than 1% can be determined as the first habitual activity grid unit, and all the first habitual activity grid units can constitute the first habitual activity area corresponding to the first community.
[0083] The first habitual activity area represents the habitual activity space shared by the resident users of the first community. The first habitual activity area can be regarded as the spatial scope in which the residents of the first community carry out daily activities around the first community, and can reflect the spatial demand of the residents of the first community for carrying out daily activities. In this way, the embodiment of the present application calculates the habitual activity intensity of the resident users of the same community in each grid unit according to the number of habitual activities of the resident users in each grid unit and the total number of resident users in the community, and takes the grid unit with habitual activity intensity greater than a preset threshold as the habitual activity area corresponding to the community, which can more accurately identify the spatial scope in which the residents carry out daily activities around the community, thereby more accurately reflecting the spatial demand of the residents for carrying out daily activities.
[0084] S104. Evaluate the current status of community life circle planning of the first community based on a first usual activity area corresponding to the first community and a first traffic range corresponding to the first community; the first traffic range corresponding to the first community is a range that can be reached from the first community by a first transportation method within a first time period.
[0085] For example, the first traffic mode and the first duration can be set by those skilled in the art according to actual needs. The process of calculating the first traffic range can be implemented with reference to related technologies, and this application does not limit this.
[0086] Preferably, the first mode of transportation can be walking, the first duration can be 15 minutes, and the first transportation range can be the range that residents can reach in 15 minutes walking from the first community. This range can be called the 15-minute walking range corresponding to the first community. In the community life circle planning, basic service functions and public activity spaces required for life such as convenience markets, sports venues, cultural activity centers, community service centers, and medical service agencies are equipped within a 15-minute walking range, which helps to meet the daily activity needs of residents and improve the quality of life of residents. This planning concept is called the 15-minute life circle planning concept. Based on the first usual activity area and the 15-minute walking range corresponding to the first community, the degree to which the current status of the community life circle planning of the first community meets the daily activity needs of residents can be evaluated.
[0087] Optionally, the first transportation mode may be cycling, the first duration may be 10 minutes, and the first transportation range may be a range that residents can reach by cycling from the first community in 10 minutes.
[0088] The embodiments of the present application can use mobile phone signaling data to accurately identify the usual activity areas of residents in various communities within a large-scale research area, thereby more accurately reflecting the spatial needs of residents in each community for daily activities; the planning status of the community life circle of each community is evaluated based on the usual activity areas of residents in each community and the first traffic range corresponding to each community (for example, a 15-minute walking range), and whether the planning status of the community life circle can meet the spatial needs of residents for daily activities can be accurately and reliably evaluated, which helps to provide a reference basis for the optimization construction of the community life circle.
[0089] In a possible implementation, the evaluating the current status of community life circle planning of the first community according to the first usual activity area corresponding to the first community and the first traffic range corresponding to the first community may include:
[0090] (1) Calculating a first community life circle completeness index corresponding to the first community based on the area of each first habitual activity grid unit in the at least one first habitual activity grid unit, the number of first habitual activity people corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range.
[0091] Exemplarily, the process of calculating the completeness index of the first community life circle may include: calculating the sum of the products of the area and the number of people in the first traffic range according to the areas of the first habitual activity grid units, the number of people in the first habitual activities corresponding to the first habitual activity grid units, and the positional relationship between the first habitual activity grid units and the first traffic range; calculating the sum of the first area-people products according to the areas of the first habitual activity grid units and the number of people in the first habitual activities corresponding to the first habitual activity grid units; calculating the completeness index of the first community life circle according to the ratio of the sum of the products of the area and the number of people in the first traffic range to the first sum of the products of the area and the number of people.
[0092] As an example, the first community life circle completeness index can be calculated according to the following formula:
[0093] (2)
[0094] Among them, C j represents the life circle completeness index corresponding to community j (i.e., the first community) (i.e., the life circle completeness index of the first community), n represents the number of first habitual activity grid cells contained in the habitual activity area corresponding to community j (i.e., the first habitual activity area), A ij represents the area of the first habitual activity grid unit in the habitual activity area corresponding to community j, N ij represents the number of people in the first habitual activity corresponding to the i-th first habitual activity grid unit in the habitual activity area corresponding to community j, D ij It is used to determine whether the i-th first habitual activity grid unit in the habitual activity area corresponding to community j is located in the first traffic range corresponding to community j. If the i-th first habitual activity grid unit is located in the first traffic range, then D ij =1; if the i-th first usual activity grid unit is not within the first traffic range, then D ij =0; It represents the product of the area and the number of people in the first traffic range. Represents the sum of the first area and number of people.
[0095] (2) Based on the completeness index of the first community life circle, evaluate the extent to which the construction level of the first community life circle meets the daily activity needs of residents.
[0096] Exemplarily, the first traffic range may be a 15-minute walking range, and the first community life circle completeness index calculated based on the relationship between the first usual activity area corresponding to the first community and the 15-minute walking range may reflect the construction level of the community life circle of the first community, so that the first community life circle completeness index may be used to evaluate whether the construction level of the community life circle of the first community can meet the daily activity needs of the residents of the first community. The higher the first community life circle completeness index, the higher the overlap between the spatial range of the daily activities of the residents of the first community and the 15-minute walking range corresponding to the first community, that is, the construction level of the 15-minute life circle corresponding to the first community can better meet the spatial needs of the residents' daily activities, thus reflecting that the higher the construction level of the community life circle of the first community, the higher the degree to which the construction level of the community life circle of the first community meets the daily activity needs of the residents.
[0097] In this way, the embodiment of the present application can calculate the community life circle completeness index corresponding to each community based on the habitual activity area corresponding to each community and the first traffic range corresponding to each community (for example, a 15-minute walking range). According to the community life circle completeness index, the degree to which the construction level of the community life circle meets the spatial needs of residents' daily activities can be evaluated, thereby providing a more direct reference basis for the optimized construction of the community life circle.
[0098] In a possible implementation, the evaluating the current status of community life circle planning of the first community according to the first usual activity area corresponding to the first community and the first traffic range corresponding to the first community may include:
[0099] (1) Obtaining the number of first facilities in each grid cell among the plurality of grid cells.
[0100] Exemplarily, the first facility may be a certain type of public service facility, such as commercial facilities, leisure and sports facilities, medical and health facilities, public transportation facilities, etc. The type of the first facility may be determined by those skilled in the art according to actual needs.
[0101] For example, POI data in the study area can be obtained through map operators and other channels, and the POI data can include the location of each first facility in the study area. The grid unit where each first facility is located in the study area can be determined based on the POI data, so that the number of first facilities in each grid unit can be counted.
[0102] It should be noted that the present application does not limit the method for obtaining the number of first facilities in each grid unit, as long as the requirements are met.
[0103] (2) Calculating a first facility adaptability index corresponding to the first community based on a positional relationship between each grid unit in the plurality of grid units and the first traffic range, the number of first facilities in each grid unit, and the number of first facilities in each first habitually active grid unit in the at least one first habitually active grid unit.
[0104] Exemplarily, the process of calculating the first facility adaptability index may include: calculating the total number of facilities in the first traffic range based on the positional relationship between each grid unit and the first traffic range and the number of first facilities in each grid unit; calculating the total number of facilities in the first habitual activity range based on the number of first facilities in each first habitual activity grid unit; calculating the first facility adaptability index based on the ratio of the total number of facilities in the first traffic range to the total number of facilities in the first habitual activity range.
[0105] As an example, the first facility suitability index may be calculated according to the following formula:
[0106] (3)
[0107] Among them, S jf represents the adaptability index of the f-type facility (i.e., the first facility) corresponding to community j (i.e., the first community) (i.e., the adaptability index of the first facility corresponding to the first community), n represents the number of first habitual activity grid cells contained in the habitual activity area corresponding to community j, M ijf represents the number of type f facilities in the first habitual activity grid cell of the ith habitual activity area corresponding to community j, N represents the number of grid cells contained in the study area, and L kf represents the number of type f facilities in the kth grid cell in the study area, D kj It is used to determine whether the kth grid cell in the study area is within the first traffic range corresponding to community j. If the kth grid cell is within the first traffic range, then D kj =1; if the kth grid cell is not within the first traffic range, then D kj =0; Indicates the total number of facilities in the first traffic range, Indicates the total number of facilities in the first usual activity area.
[0108] (3) Based on the adaptability index of the first facility, evaluate the possibility that the configuration level of the first facility in the community life circle of the first community can meet the daily activity needs of residents.
[0109] For example, the first traffic range may be a 15-minute walking range, and the first facility adaptability index may reflect the possibility that the configuration level of the first facility in the community life circle of the first community meets the daily activity needs of residents. The higher the first facility adaptability index, the more likely the configuration of the first facility within the 15-minute walking range corresponding to the first community is to meet the daily activity needs of residents, that is, the higher the possibility that the configuration level of the first facility in the community life circle of the first community meets the daily activity needs of residents.
[0110] In this way, the embodiment of the present application can evaluate the possibility that the configuration level of various facilities in the community life circle meets the daily activity needs of residents by calculating the adaptability index of various facilities within the first traffic range (e.g., 15-minute walking range) corresponding to the community. The embodiment of the present application can identify the facility configuration problems in the community life circle based on the degree of matching between the facility supply and the daily activity needs of residents, thereby solving the problem of misalignment between the facility supply and the residents' needs that may exist in the planning and construction of the community life circle.
[0111] As an example, we can first calculate the completeness index of the community life circle corresponding to the community, and evaluate the extent to which the construction level of the community life circle meets the spatial needs of residents' daily activities; further, we can calculate the adaptability index of various facilities within the first traffic range (for example, a 15-minute walking range) corresponding to the community, and evaluate the possibility that the configuration level of various facilities in the community life circle can meet the daily activity needs of residents, and identify the facility configuration problems in the community life circle, thereby providing a more direct reference basis and stronger support for the optimized construction of the community life circle.
[0112] The embodiment of the present application uses mobile phone signaling data to identify the permanent users in the study area and the communities where the permanent users live, identifies the usual activity locations of the permanent users based on their residence information, and on this basis extracts the usual activity areas shared by users in the same community to reflect the spatial needs of residents' daily activities, and then calculates the completeness index of the community life circle to evaluate the extent to which the construction level of the community life circle meets the spatial needs of residents' daily activities, and can calculate the adaptability index of various facilities in the community in combination with POI data to evaluate the possibility that the configuration level of various facilities in the community life circle meets the needs of residents' daily activities. The embodiment of the present application can accurately identify the usual activity areas of residents in each community, and can accurately reflect the spatial needs of residents for carrying out daily activities around the community, so that it can accurately and reliably evaluate whether the construction level and facility configuration level of the community life circle can meet the daily activity needs of residents, and provide a more direct reference basis for the optimization construction of the community life circle.
[0113] Based on the same inventive concept of the above method embodiment, the embodiment of the present application also provides a community life circle planning status evaluation device based on mobile phone signaling data.
[0114] Figure 3 A schematic diagram of the structure of a community life circle planning status evaluation device based on mobile phone signaling data according to an embodiment of the present application is shown. Figure 3 As shown, the device may include: an acquisition module 301, which is used to acquire a set of mobile phone signaling data generated by at least one mobile phone user communicating with a communication base station in a study area; the study area includes at least one community; a permanent user determination module 302, which is used to determine at least one permanent user in the study area from the at least one mobile phone user and determine the residence information of each permanent user in the at least one permanent user according to the mobile phone signaling data set; the residence information includes the residence location and residence time in the study area; a habitual activity area determination module 303, which is used to determine the first habitual activity area corresponding to the first community according to the residence information of each permanent user in the at least one permanent user; the first community is any community in the at least one community; an evaluation module 304, which is used to evaluate the current status of the community life circle planning of the first community according to the first habitual activity area corresponding to the first community and the first traffic range corresponding to the first community; the first traffic range corresponding to the first community is the range that can be reached from the first community by a first traffic mode within a first time period.
[0115] In one possible implementation, the mobile phone signaling data set includes the residence location and residence time of each mobile phone user among the at least one mobile phone user in the study area; the residence time of each mobile phone user in the study area includes the time and / or time period of each mobile phone user's residence at the residence location in the study area; the permanent user determination module 302 is also used to: determine the number of days each mobile phone user stays in the study area based on the residence time of each mobile phone user in the study area; determine at least one permanent user from the at least one mobile phone user based on the relationship between the number of days each mobile phone user stays in the study area and the preset number of days, and extract the residence information of each permanent user among the at least one permanent user from the mobile phone signaling data set.
[0116] In a possible implementation, the habitual activity area determination module 303 is further used to: determine the first residential user set corresponding to the first community and the habitual activity locations corresponding to each resident user in the first residential user set based on the residence information of each permanent user among the at least one permanent user; determine the first habitual activity area based on the total number of resident users in the first residential user set and the habitual activity locations corresponding to each resident user in the first residential user set.
[0117] In a possible implementation, the habitual activity area determination module 303 is further used to: determine, from a plurality of grid cells, the grid cells where each of the at least one permanent user has resided, based on the residency information of each of the at least one permanent user, and determine the residency time of each of the at least one permanent user in the grid cells where the at least one permanent user has resided; wherein the plurality of grid cells are obtained by dividing the study area based on the density of communication base stations in the study area; determine, from the plurality of grid cells, the at least one permanent user, based on the residency time of each of the at least one permanent user in the grid cells where the at least one permanent user has resided. a grid unit of residence corresponding to each permanent user among the users; determining the first set of residential users from the at least one permanent user based on the positional relationship between the grid unit of residence corresponding to each permanent user among the at least one permanent user and the first community; determining at least one user habitual activity grid unit corresponding to each resident user in the first set of residential users from the multiple grid units based on the grid units where each resident user in the first set of residential users has stayed and the stay time of each resident user in the grid units where they have stayed; the habitual activity places corresponding to each resident user include the at least one user habitual activity grid unit corresponding to each resident user.
[0118] In a possible implementation, the habitual activity area determination module 303 is further used to: determine the first habitual activity number of people corresponding to each of the multiple grid units according to at least one user habitual activity grid unit corresponding to each resident user; calculate the first habitual activity intensity corresponding to each of the multiple grid units according to the first habitual activity number of people corresponding to each grid unit and the total number of resident users in the first resident user set; determine at least one first habitual activity grid unit from the multiple grid units according to the relationship between the first habitual activity intensity corresponding to each grid unit and a preset threshold; the first habitual activity area includes the at least one first habitual activity grid unit.
[0119] In a possible implementation, the evaluation module 304 is further used to: calculate the first community life circle completeness index corresponding to the first community based on the area of each first habitual activity grid unit in the at least one first habitual activity grid unit, the number of first habitual activities corresponding to each first habitual activity grid unit, and the positional relationship between each first habitual activity grid unit and the first traffic range; and evaluate the extent to which the community life circle construction level of the first community meets the daily activity needs of residents based on the first community life circle completeness index.
[0120] In a possible implementation, the evaluation module 304 is further used to: calculate the sum of the products of the area and the number of people in the first traffic range according to the areas of the first habitual activity grid units, the number of people in the first habitual activities corresponding to the first habitual activity grid units, and the positional relationship between the first habitual activity grid units and the first traffic range; calculate the sum of the products of the first area and the number of people according to the areas of the first habitual activity grid units and the number of people in the first habitual activities corresponding to the first habitual activity grid units; calculate the completeness index of the first community life circle according to the ratio of the sum of the products of the area and the number of people in the first traffic range to the sum of the products of the first area and the number of people.
[0121] In a possible implementation, the evaluation module 304 is further used to: obtain the number of first facilities in each of the multiple grid units; calculate the first facility adaptability index corresponding to the first community based on the positional relationship between each of the multiple grid units and the first traffic range, the number of first facilities in each grid unit, and the number of first facilities in each of the at least one first habitual activity grid unit; and evaluate the possibility that the configuration level of the first facility in the community life circle of the first community meets the daily activity needs of residents based on the first facility adaptability index.
[0122] In a possible implementation, the evaluation module 304 is further used to: calculate the total number of facilities in the first traffic range based on the positional relationship between each grid unit and the first traffic range and the number of first facilities in each grid unit; calculate the total number of facilities in the first habitual activity range based on the number of first facilities in each first habitual activity grid unit; calculate the first facility adaptability index based on the ratio of the total number of facilities in the first traffic range to the total number of facilities in the first habitual activity range.
[0123] The embodiments of the present application can use mobile phone signaling data to accurately identify the usual activity areas of residents in various communities within a large-scale research area, thereby more accurately reflecting the spatial needs of daily activities of residents in each community; the planning status of the community life circle of each community is evaluated based on the usual activity areas of residents in each community and the first traffic range corresponding to each community, and it is possible to accurately and reliably evaluate whether the planning status of the community life circle can meet the daily activity needs of residents, which helps to provide a reference basis for the optimization construction of the community life circle.
[0124] In some embodiments, the functions or modules included in the device provided in the embodiments of the present application can be used to execute the method described in the above method embodiments. The specific implementation can refer to the description of the above method embodiments. For the sake of brevity, it will not be repeated here.
[0125] The present application also provides a computer-readable storage medium on which computer program instructions are stored, and when the computer program instructions are executed by a processor, the above-mentioned community life circle planning status evaluation method based on mobile phone signaling data is implemented. The computer-readable storage medium can be a volatile or non-volatile computer-readable storage medium.
[0126] An embodiment of the present application also proposes an electronic device, comprising: a processor; a memory for storing instructions executable by the processor; wherein the processor is configured to implement the above-mentioned community living circle planning status evaluation method based on mobile phone signaling data when executing the instructions stored in the memory.
[0127] An embodiment of the present application also provides a computer program product, including a computer-readable code, or a non-volatile computer-readable storage medium carrying the computer-readable code. When the computer-readable code runs in a processor of an electronic device, the processor in the electronic device executes the above-mentioned community living circle planning status evaluation method based on mobile phone signaling data.
[0128] Figure 4 1 is a block diagram of an electronic device 1900 according to an embodiment of the present application. For example, the device 1900 may be provided as a server or a terminal device. Figure 4 , the device 1900 includes a processing component 1922, which further includes one or more processors, and a memory resource represented by a memory 1932 for storing instructions executable by the processing component 1922, such as an application. The application stored in the memory 1932 may include one or more modules, each corresponding to a set of instructions. In addition, the processing component 1922 is configured to execute instructions to perform the above-mentioned community life circle planning status evaluation method based on mobile phone signaling data.
[0129] The device 1900 may also include a power supply component 1926 configured to perform power management of the device 1900, a wired or wireless network interface 1950 configured to connect the device 1900 to a network, and an input / output interface 1958 (I / O interface). The device 1900 may operate based on an operating system stored in the memory 1932, such as Windows Server 2000. TM , MacOS X TM , Unix TM , Linux TM , FreeBSD TM or similar.
[0130] In an exemplary embodiment, a non-volatile computer-readable storage medium is also provided, such as a memory 1932 including computer program instructions. The above-mentioned computer program instructions can be executed by the processing component 1922 of the device 1900 to complete the above-mentioned community life circle planning status evaluation method based on mobile phone signaling data.
[0131] The present application may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present application.
[0132] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the above. More specific examples (a non-exhaustive list) of computer-readable storage media include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the above. The computer-readable storage medium used herein is not to be interpreted as a transient signal itself, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0133] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0134] The computer program instructions for performing the operation of the present application may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. Computer-readable program instructions may be executed entirely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), may be personalized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present application.
[0135] Various aspects of the present application are described herein with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present application. It should be understood that each box in the flowchart and / or block diagram and the combination of boxes in the flowchart and / or block diagram can be implemented by computer-readable program instructions.
[0136] These computer-readable program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, thereby producing a machine, so that when these instructions are executed by the processor of the computer or other programmable data processing device, a device that implements the functions / actions specified in one or more boxes in the flowchart and / or block diagram is generated. These computer-readable program instructions can also be stored in a computer-readable storage medium, and these instructions cause the computer, programmable data processing device, and / or other equipment to work in a specific manner, so that the computer-readable medium storing the instructions includes a manufactured product, which includes instructions for implementing various aspects of the functions / actions specified in one or more boxes in the flowchart and / or block diagram.
[0137] Computer-readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device so that a series of operating steps are performed on the computer, other programmable data processing apparatus, or other device to produce a computer-implemented process, thereby causing the instructions executed on the computer, other programmable data processing apparatus, or other device to implement the functions / actions specified in one or more boxes in the flowchart and / or block diagram.
[0138] The flow chart and block diagram in the accompanying drawings show the possible architecture, function and operation of the system, method and computer program product according to multiple embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a part of a module, program segment or instruction, and a part of the module, program segment or instruction includes one or more executable instructions for realizing the logical function of the specification. In some alternative implementations, the function marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two continuous square boxes can actually be executed substantially in parallel, and they can also be executed in the opposite order sometimes, depending on the function involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be realized by a dedicated hardware-based system that performs the function or action of the specification, or can be realized by a combination of special-purpose hardware and computer instructions.
[0139] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A method for evaluating the planning status of a community life circle based on mobile phone signaling data, which identifies the habitual activity areas of residents based on mobile phone signaling data, and then calculates the community life circle completeness index to evaluate the degree to which the construction level of the 15-minute community life circle meets the daily activity needs of residents, and calculates the facility adaptability index to evaluate the possibility that the facility configuration level of the 15-minute community life circle meets the daily activity needs of residents, characterized in that: include: Obtain a collection of mobile phone signaling data generated by mobile phone users communicating with communication base stations in the study area; The research area includes a plurality of communities; the mobile phone signaling data set includes the residence location and residence time of each mobile phone user in the research area; the residence time of each mobile phone user in the research area includes the time and / or time period when each mobile phone user resides at the residence location in the research area; Determining resident users in the study area from the mobile phone users according to the mobile phone signaling data set, and extracting residence information of each resident user from the mobile phone signaling data set; The residence information includes the residence location where the residence time reaches 5 minutes or more and the residence time at the residence location where the residence time reaches 5 minutes or more; Determining a first usual activity area corresponding to the first community according to the residence information of each permanent user includes: (1) determining, according to the residence information of each resident user, a first resident user set corresponding to the first community and a user habitual activity grid unit corresponding to each resident user in the first resident user set; Among them, the habitual activities are activities that each resident user performs at least once a week and each time lasts for 5 minutes or more; the study area includes multiple grid units, and the size of the grid unit is determined according to the density of communication base stations in the study area; the user habitual activity grid unit corresponding to each resident user is determined from the multiple grid units; the user habitual activity grid unit corresponding to each resident user is a grid unit where each resident user has stayed at least once a week, and each time the stay lasts for 5 minutes or more; the first community is any community among the multiple communities; (2) determining the number of people in a first habitual activity corresponding to each grid unit among the plurality of grid units according to the user habitual activity grid units corresponding to each resident user, and calculating the first habitual activity intensity corresponding to each grid unit, including: According to formula I kj =(N kj R j )*100% calculating a first habitual activity intensity corresponding to a k-th grid unit among the plurality of grid units, which is used to represent the intensity of daily activities carried out by residents of the first community in the k-th grid unit; The number of people in the first usual activity corresponding to each grid unit represents the number of resident users in the first set of resident users who carry out the usual activity in each grid unit; kj represents the first usual activity intensity corresponding to the kth grid cell in the study area; N kj represents the number of people in the first usual activity corresponding to the kth grid unit; R j represents the total number of resident users in the first resident user set; (3) determining the first habitual activity area from the plurality of grid cells according to a relationship between the first habitual activity intensity corresponding to each grid cell and a preset threshold; Wherein, the first habitual activity intensity corresponding to the grid cells in the first habitual activity area is greater than the preset threshold; According to the first usual activity area and the 15-minute community life circle range corresponding to the first community, the construction level of the 15-minute community life circle of the first community is evaluated, including: (1) Based on the spatial relationship between the first habitual activity area and the 15-minute community life circle corresponding to the first community, the formula Calculating a first community life circle completeness index corresponding to the first community; The 15-minute community life circle corresponding to the first community is the range that can be reached within 15 minutes’ walk from the first community; j represents the completeness index of the first community life circle; n represents the number of grid cells contained in the first usual activity area; A ij represents the area of the i-th grid cell in the first usual activity area; N ij represents the number of people who engage in the first usual activity corresponding to the i-th grid unit in the first usual activity area; D ij It is used to determine whether the i-th grid unit in the first habitual activity area is within the 15-minute community life circle corresponding to the first community. If the i-th grid unit in the first habitual activity area is within the 15-minute community life circle corresponding to the first community, D ij =1; if the i-th grid cell in the first usual activity area is not within the 15-minute community life circle corresponding to the first community, D ij =0; (2) Based on the first community life circle completeness index, evaluate the degree to which the construction level of the first community's 15-minute community life circle meets the daily activity needs of residents; According to the first usual activity area and the 15-minute community life circle range corresponding to the first community, the facility configuration level within the 15-minute community life circle of the first community is evaluated, including: (1) obtaining the number of first facilities in each grid unit; (2) Based on the distribution characteristics of facilities within the 15-minute community living circle corresponding to the first habitual activity area and the first community, the formula Calculating a first facility suitability index corresponding to the first community; Among them, S jf represents the first facility adaptability index; n represents the number of grid cells contained in the first usual activity area; M ijf represents the number of first facilities in the i-th grid cell in the first usual activity area; N represents the number of grid cells contained in the study area; L kf represents the number of first facilities in the kth grid cell in the study area; D kj It is used to determine whether the kth grid unit in the study area is within the 15-minute community life circle corresponding to the first community. If the kth grid unit in the study area is within the 15-minute community life circle corresponding to the first community, D kj =1; if the kth grid cell in the study area is not within the 15-minute community life circle corresponding to the first community, D kj =0; (3) Based on the adaptability index of the first facility, evaluate the possibility that the configuration level of the first facility within the 15-minute community life circle of the first community can meet the daily activity needs of residents.
2. The method according to claim 1, characterized in that The step of determining resident users in the study area from the mobile phone users according to the mobile phone signaling data set, and extracting residence information of each resident user from the mobile phone signaling data set includes: Determine the number of days each mobile phone user stays in the study area according to the residence time of each mobile phone user in the study area; According to the relationship between the number of days each mobile phone user stays in the study area and the preset number of days, the permanent users are determined from the mobile phone users, and the residence information of each permanent user is extracted from the mobile phone signaling data set.
3. The method according to claim 1, characterized in that The determining, according to the residence information of each resident user, a first resident user set corresponding to the first community and a user habitual activity grid unit corresponding to each resident user in the first resident user set includes: According to the residence information of each permanent user, determining from the plurality of grid units the grid units in which each permanent user has resided, and determining the residence time of each permanent user in the grid unit in which the permanent user has resided; Determining the residential grid unit corresponding to each resident user from the plurality of grid units according to the residence time of each resident user in the grid unit where the resident user has resided; Determining the first set of resident users from the resident users according to the positional relationship between the residential grid unit corresponding to each resident user and the first community; According to the grid units where each resident user in the first resident user set has resided and the residence time of each resident user in the grid units where the resident user has resided, the user usual activity grid unit corresponding to each resident user is determined from the multiple grid units.
4. A community life circle planning status evaluation device based on mobile phone signaling data, which is used to identify residents' usual activity areas based on mobile phone signaling data, and then calculate the community life circle completeness index to evaluate the degree to which the construction level of the 15-minute community life circle meets the daily activity needs of residents, and calculate the facility adaptability index to evaluate the possibility that the facility configuration level of the 15-minute community life circle meets the daily activity needs of residents, characterized in that: include: A data acquisition module is used to acquire a mobile phone signaling data set generated by mobile phone users communicating with communication base stations in a study area; wherein the study area includes multiple communities; the mobile phone signaling data set includes the residence location and residence time of each mobile phone user in the study area; the residence time of each mobile phone user in the study area includes the time and / or time period when each mobile phone user resides at the residence location in the study area; A module for determining permanent users and extracting residence information, for determining permanent users in the study area from the mobile phone users according to the mobile phone signaling data set, and extracting the residence information of each permanent user from the mobile phone signaling data set; wherein the residence information includes the residence location with a residence time of 5 minutes or more and the residence time at the residence location with a residence time of 5 minutes or more; A module for determining a usual activity area, configured to determine a first usual activity area corresponding to a first community according to the residence information of each resident user; the first community is any one of the at least one community; The usual activity area determination module is further used for: According to the residence information of each permanent user, determine the first residential user set corresponding to the first community and the user habitual activity grid unit corresponding to each residential user in the first residential user set; wherein the habitual activity is an activity performed by each residential user at least once a week and each time lasts for 5 minutes or more; the study area includes a plurality of grid units, the size of the grid unit is determined according to the density of communication base stations in the study area; the user habitual activity grid unit corresponding to each residential user is determined from the plurality of grid units; the user habitual activity grid unit corresponding to each residential user is a grid unit in which each residential user has stayed at least once a week and each time the stay time is 5 minutes or more; Determining the number of people who engage in the first habitual activity corresponding to each grid unit in the plurality of grid units according to the user habitual activity grid units corresponding to each resident user, and calculating the first habitual activity intensity corresponding to each grid unit; Determining the first habitual activity area from the plurality of grid cells according to a relationship between the first habitual activity intensity corresponding to each grid cell and a preset threshold; wherein the first habitual activity intensity corresponding to the grid cells in the first habitual activity area is greater than the preset threshold; The usual activity area determination module is further used for: According to formula I kj =(N kj / R j )*100% calculates the first habitual activity intensity corresponding to the kth grid unit among the multiple grid units, which is used to represent the intensity of daily activities carried out by the resident users of the first community in the kth grid unit; wherein the first habitual activity number corresponding to each grid unit represents the number of resident users in the first resident user set who carry out the habitual activities in each grid unit; I kj represents the first usual activity intensity corresponding to the kth grid cell in the study area; N kj represents the number of people in the first usual activity corresponding to the kth grid unit; R j represents the total number of resident users in the first resident user set; A construction level evaluation module, used to evaluate the construction level of the 15-minute community life circle of the first community according to the first usual activity area and the 15-minute community life circle range corresponding to the first community; The construction level evaluation module is also used to: According to the spatial relationship between the first habitual activity area and the 15-minute community life circle corresponding to the first community, the formula Calculate the first community life circle completeness index corresponding to the first community; wherein the 15-minute community life circle range corresponding to the first community is the range that can be reached by walking from the first community in 15 minutes; C j represents the completeness index of the first community life circle; n represents the number of grid cells contained in the first usual activity area; A ij represents the area of the i-th grid cell in the first usual activity area; N ij represents the number of people who engage in the first usual activity corresponding to the i-th grid unit in the first usual activity area; D ij It is used to determine whether the i-th grid unit in the first habitual activity area is within the 15-minute community life circle corresponding to the first community. If the i-th grid unit in the first habitual activity area is within the 15-minute community life circle corresponding to the first community, D ij =1; if the i-th grid cell in the first usual activity area is not within the 15-minute community life circle corresponding to the first community, D ij =0; According to the completeness index of the first community life circle, the degree to which the construction level of the 15-minute community life circle of the first community meets the daily activity needs of residents is evaluated; A facility configuration level evaluation module, configured to evaluate the facility configuration level within the 15-minute community life circle of the first community according to the first usual activity area and the 15-minute community life circle range corresponding to the first community; The facility configuration level evaluation module is also used to: Obtaining the number of first facilities in each grid unit; According to the distribution characteristics of facilities within the 15-minute community life circle corresponding to the first habitual activity area and the first community, the formula Calculate the first facility suitability index corresponding to the first community; where S jf represents the first facility adaptability index; n represents the number of grid cells contained in the first usual activity area; M ijf represents the number of first facilities in the i-th grid cell in the first usual activity area; N represents the number of grid cells contained in the study area; L kf represents the number of first facilities in the kth grid cell in the study area; D kj It is used to determine whether the kth grid unit in the study area is within the 15-minute community life circle corresponding to the first community. If the kth grid unit in the study area is within the 15-minute community life circle corresponding to the first community, D kj =1; if the kth grid cell in the study area is not within the 15-minute community life circle corresponding to the first community, D kj =0; Based on the adaptability index of the first facility, an evaluation is made on the possibility that the configuration level of the first facility within the 15-minute community life circle of the first community can meet the daily activity needs of residents.
Citation Information
Patent Citations
Method, apparatus, device and medium for determining a resident community of communication user
CN108184207A
Community life circle evaluation method and device
CN108428056A
Information recommendation method and device based on life circle, equipment and medium
CN111966769A
Mobile phone signaling analysis method and device, computer equipment and storage medium
CN112770278A
Planning simulation measurement and evaluation method of community life circle applied to city update
CN113642928A
