A method and system for automatic power generation control based on secondary distribution strategy
By adopting an automated power generation control method based on secondary distribution strategy in the AGC system, the problem of maximum unit under long-term load pressure in traditional AGC systems is solved, and the balanced distribution of unit load is achieved, which extends the equipment life and improves the power system. efficiency.
Patent Information
- Application Number
- CN202410264586.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-03-08
AI Technical Summary
When traditional AGC systems are distributed, the maximum unit is subjected to load pressure for a long time, resulting in a shortened equipment life and an increase in operation and maintenance cycle, and the inability to obtain optimal resource allocation, resulting in poor efficiency of the power system.
The automatic power generation control method based on the secondary distribution strategy is adopted. By obtaining the power set value and current actual value issued by the AGC system, it is determined whether the difference exceeds the small load threshold value. If it exceeds the secondary distribution strategy, it is used for processing. It includes proportional allocation and incremental allocation strategies. If it is not exceeded, a small load adjustment mode will be adopted.
It realizes that each unit is subjected to load pressure equally, reduces operation and maintenance cycles, extends equipment life, saves maintenance costs, and improves the efficiency of the power system.
Smart Images

Figure CN118137583B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system automation control, and in particular to an automatic power generation control method and system based on a secondary distribution strategy. Background Art
[0002] When receiving a new power setting value, the traditional AGC system will compare the difference between the setting value and the actual power generation with the preset small load threshold value to determine the load distribution method. When the difference exceeds the threshold value, the large load is distributed, that is, the load is distributed in proportion to the adjustable capacity of each unit. When the difference does not exceed the threshold value, the largest unit within the adjustable range will be selected for adjustment.
[0003] Although this method can allocate adjustable capacity, it will also cause the largest unit to be under load pressure for a long time, which will have a serious impact on the life of the equipment and increase the operation and maintenance cycle. In some cases, it is impossible to obtain the optimal resource allocation, resulting in poor power system efficiency. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] In view of the above existing problems, the present invention is proposed. Therefore, the present invention provides an automatic power generation control method based on a secondary allocation strategy to solve the problems mentioned in the background technology.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] In a first aspect, the present invention provides an automatic power generation control method based on a secondary allocation strategy, comprising:
[0008] Obtain the power setting value issued by the AGC system and the actual value generated by the current AGC system, and determine whether the power setting value is valid;
[0009] If the power setting value is valid, the difference between the power setting value and the actual value of the current AGC system is obtained according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and it is determined whether the difference exceeds the small load threshold value, otherwise it is marked that the power setting value issued by the AGC system is abnormal and needs to be reset;
[0010] When the difference exceeds the small load threshold, a secondary allocation strategy is used for processing; if it does not exceed the small load regulation mode, a primary allocation is used for processing.
[0011] As a preferred solution of the automatic power generation control method based on the secondary allocation strategy described in the present invention, the secondary allocation strategy includes: a proportional allocation strategy and an incremental allocation strategy.
[0012] As a preferred solution of the automatic power generation control method based on the secondary allocation strategy described in the present invention, the proportional allocation strategy includes:
[0013] Assume that the load is adjusted by a generator set Ai, the adjustable intervals of the generator set Ai are Ri, the current actual values are Pi, and the load states of the generator set are obtained, which are -1, 0, and 1 respectively;
[0014] Compare the current load state with the adjustable range of the generator set;
[0015] If the current load state is -1, the adjustable interval is expressed as: Ri{1}; if the current load state is 0, the adjustable interval is expressed as: Ri{1or-1}; if the current load state is 1, the adjustable interval is expressed as: Ri{-1};
[0016] Among them, -1 means full load, 0 means no load, and 1 means partial load;
[0017] Calculate the adjusted load and distribute it proportionally.
[0018] As a preferred solution of the automatic power generation control method based on the secondary distribution strategy described in the present invention, the calculation of the adjusted load includes:
[0019] The formula for adjusting the load is:
[0020] Pset=Ai / (R1+R2)*L+Pi
[0021] Among them, L is the total load, and Pset represents the adjusted load;
[0022] According to the result obtained by Pset, an adjustment signal is sent through the control system of the generator set Ai to adjust the load of each generator.
[0023] As a preferred solution of the automatic power generation control method based on the secondary allocation strategy described in the present invention, the incremental allocation strategy includes:
[0024] Allocate the remaining load in equal proportion as the current incrementally allocated load, and calculate the difference between the current incrementally allocated load and the load of the generator set;
[0025] Select the generator set to be allocated and set the adjustable capacity of the generator set Adjust to meet the load difference, and the adjustable capacity S needs to be greater than the load difference.
[0026] As a preferred solution of the automatic power generation control method based on the secondary allocation strategy described in the present invention, it also includes:
[0027] The generator sets selected for allocation are sorted so that the generator set with the smallest load is at the head of the queue and the generator set with the largest load is at the tail of the queue, and the adjustable capacity is allocated cyclically according to the increasing formula;
[0028] When the load difference is 0, the allocation is completed, otherwise it is necessary to reselect the generator sets participating in the allocation and readjust the load difference.
[0029] As a preferred solution of the automatic power generation control method based on the secondary allocation strategy described in the present invention, the cyclic allocation according to the increasing formula includes:
[0030] Assuming the increasing ratio is d, the i-th cycle allocation is expressed as:
[0031] Q i =L*R+r i
[0032] r i =LQ i
[0033] For the i+1th time, the cyclic allocation is expressed as:
[0034] r i+1 =r i +(1-d)
[0035] Among them, L r is the current load, R is the difference between the current incrementally allocated load and the load of the generator set; r i is the load remaining after each cycle.
[0036] In a second aspect, the present invention provides an automatic power generation control system based on a secondary allocation strategy, comprising:
[0037] The power system control center obtains the power setting value issued by the AGC system and the actual value generated by the current AGC system, and determines whether the power setting value is valid;
[0038] The power judgment module, if the power setting value is valid, obtains the difference between the power setting value and the actual value of the current AGC system according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and judges whether the difference exceeds the small load threshold value, otherwise it marks that the power setting value issued by the AGC system is abnormal and needs to be reset;
[0039] The load distribution module adopts a secondary distribution strategy to process when the difference exceeds the small load threshold value; if it does not exceed the small load regulation mode, the primary distribution strategy is used for processing.
[0040] In a third aspect, the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: the processor implements any step of the above method when executing the computer program.
[0041] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: the computer program implements any step of the above method when executed by a processor.
[0042] Compared with the prior art, the beneficial effects of the invention are as follows: the present invention sets a small load threshold value through a secondary distribution mechanism, calculates the difference between the power setting value and the actual value of the current AGC system, and when the difference exceeds the small load threshold value, a secondary distribution strategy is used for processing; if it does not exceed the small load threshold value, a small load adjustment mode is used, and primary distribution is used for processing; the present invention can make each unit bear the load pressure evenly while allocating traditional adjustable capacity, thereby reducing the operation and maintenance cycle of some or a single unit, indirectly increasing the equipment life, and saving maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0044] Figure 1 The present invention is an overall flow chart of an automatic power generation control method based on a secondary allocation strategy according to an embodiment of the present invention. DETAILED DESCRIPTION
[0045] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0046] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0047] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0048] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0049] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0050] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] Example 1
[0052] Reference Figure 1, which is the first embodiment of the present invention, and provides an automatic power generation control method based on a secondary allocation strategy, comprising:
[0053] S1. Obtain the power setting value issued by the AGC system and the actual value generated by the current AGC system to determine whether the power setting value is valid;
[0054] Furthermore, the power setting value issued by the AGC system is transmitted to the generator set. The transmission process performs data interaction according to the communication protocol. At the same time, the real-time frequency sent by the AGC system is monitored and the actual value of the current AGC system is obtained.
[0055] Preferably, the communication protocol in the AGC system is selected as version 104 in the IEC 60870-5 series;
[0056] It should be noted that IEC 60870-5-104 has excellent flexibility and reliability compared to traditional power monitoring and control, and has better security and performance than version 101;
[0057] S2. If the power setting value is valid, the difference between the power setting value and the actual value of the current AGC system is obtained according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and it is determined whether the difference exceeds the small load threshold value. Otherwise, it is marked that the power setting value issued by the AGC system is abnormal and needs to be reset;
[0058] Furthermore, the power setting value sent by the AGC system is marked as abnormal, triggering the abnormal value alarm mechanism, forcibly ending the current data transmission process through IEC60870-5-104, and uploading the result to the AGC system;
[0059] It should be noted that the AGC system will save each uploaded abnormal value result and generate an abnormal value log, which will be recorded by professionals at regular intervals;
[0060] S3. When the difference exceeds the small load threshold, the secondary allocation strategy is used for processing. If it does not exceed, the small load regulation mode is used and the primary allocation is used for processing;
[0061] Specifically, the secondary allocation strategy is divided into proportional allocation strategy and incremental allocation strategy;
[0062] Furthermore, the proportional allocation strategy steps are as follows:
[0063] Assume that the load is adjusted by a generator set Ai, the adjustable intervals of the generator set Ai are Ri, the current actual values are Pi, and the load states of the generator set are obtained, which are -1, 0, and 1 respectively;
[0064] Furthermore, the current load state is compared with the adjustable range of the generator set;
[0065] Specifically, the comparison process is: if the current load state is -1, the adjustable interval is expressed as: Ri{1}; if the current load state is 0, the adjustable interval is expressed as: Ri{1or-1}; if the current load state is 1, the adjustable interval is expressed as: Ri{-1};
[0066] Among them, -1 means full load, 0 means no load, and 1 means partial load;
[0067] It should be noted that the meaning of the adjustable interval Ri{1} is that when the generator set is in a full load state, it can be adjusted to a partial load state; the meaning of the adjustable interval Ri{1or-1} is that when the generator set is in a no-load state, it can be adjusted to a partial load or full load state; the meaning of the adjustable interval Ri{-1} is that when the generator set is in a partial load state, it can be adjusted to a full load state;
[0068] Furthermore, the adjusted load is calculated and proportionally distributed;
[0069] Specifically, the formula for calculating the adjusted load is as follows:
[0070] Pset=Ai / (R1+R2)*L+Pi
[0071] Among them, L is the total load, and Pset represents the adjusted load;
[0072] Furthermore, according to the result obtained by Pset, an adjustment signal is sent through the control system of the generator set Ai to adjust the load of each generator;
[0073] It should be noted that each generator adjusts the load after receiving the adjustment signal, and transmits the adjusted load to the generator set, and the generator set updates the current load and transmits it to the AGC system for storage;
[0074] Further, the incremental allocation strategy, the steps are as follows:
[0075] The remaining load amount distributed in equal proportion is used as the current incrementally distributed load amount, and the difference between the current incrementally distributed load amount and the load of the generator set is calculated;
[0076] It should be noted that usually there will be no remaining load after proportional distribution, but it is not excluded that the AGC system calls generators in different areas or adds generators to the generators, so the remaining load in proportional proportion needs to be used as the current transfer and distribution load;
[0077] Furthermore, the generator sets participating in the allocation are selected to adjust the adjustable capacity of the generator sets. Adjust to meet the load difference, and the adjustable capacity S must be greater than the load difference;
[0078] Specifically, the load difference formula is expressed as:
[0079]
[0080] Among them, R is the difference between the current incrementally allocated load and the load of the generator set, and Preal is the load of the generator set;
[0081] Furthermore, the generators selected for allocation are sorted so that the generators with the smallest load are at the head of the queue and the generators with the largest load are at the tail of the queue, and the adjustable capacity is allocated cyclically according to the increasing formula;
[0082] It should be noted that the generators included in the generator set are also load-distributed in the same manner as the generator set. The generator set can be regarded as the outermost loop, and the generators included are the innermost loop;
[0083] Specifically, when the cycle of generator set 1 is completed, the generators contained therein are also allocated; then generator set 2 is started, and so on;
[0084] Specifically, the incremental formula is expressed as:
[0085] Assuming the increasing ratio is d, the i-th cycle allocation is expressed as:
[0086] Q i =L*R+r i
[0087] r i =LQ i
[0088] For the i+1th time, the cyclic allocation is expressed as:
[0089] r i+1 =r i +(1-d)
[0090] Among them, L r is the current load, R is the difference between the current incrementally allocated load and the load of the generator set; r i is the load remaining after each cycle;
[0091] Furthermore, when the load difference is 0, the allocation is completed, otherwise it is necessary to reselect the generator sets participating in the allocation and readjust the load difference;
[0092] Specifically, in one allocation, that is, allocation according to a fixed load, if there are two generator sets that need to adjust the load, their adjustable ranges are 200MW and 300MW respectively. If the load to be adjusted is 40MW, it can be allocated according to a fixed ratio of 20:30, that is, 16MW is allocated to the first generator set and 24MW is allocated to the second generator set.
[0093] Furthermore, this embodiment also provides an automatic power generation control system based on a secondary allocation strategy, comprising:
[0094] The power system control center obtains the power setting value issued by the AGC system and the actual value generated by the current AGC system, and determines whether the power setting value is valid;
[0095] The power judgment module, if the power setting value is valid, obtains the difference between the power setting value and the actual value of the current AGC system according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and judges whether the difference exceeds the small load threshold value, otherwise it marks that the power setting value issued by the AGC system is abnormal and needs to be reset;
[0096] The load distribution module adopts a secondary distribution strategy to process when the difference exceeds the small load threshold value; if it does not exceed the small load regulation mode, the primary distribution strategy is used for processing.
[0097] This embodiment further provides a computer device, which is applicable to the case of an automatic power generation control method based on a secondary allocation strategy, and includes:
[0098] Memory and processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement the automatic power generation control method based on the secondary distribution strategy proposed in the above embodiment.
[0099] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0100] This embodiment further provides a storage medium on which a computer program is stored. When the program is executed by a processor, the automatic power generation control method based on the secondary allocation strategy proposed in the above embodiment is implemented.
[0101] The storage medium proposed in this embodiment and the data storage method proposed in the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be found in the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.
[0102] Example 2
[0103] Referring to Table 1, which is a second embodiment of the present invention, the embodiment provides an automatic power generation control method based on a secondary allocation strategy, including: scientifically verifying the scheme of the present invention to prove the beneficial effects of the present invention;
[0104] Table 1
[0105]
[0106]
[0107] It can be seen from Table 1 that after distributing the load in the same load change interval, the present invention significantly reduces the failure rate of the generator set by 5.2% compared with the traditional method, and the corresponding operation and maintenance cycle is significantly increased by 0.5 years; it can also be foreseen that the interval operation efficiency of the unit is greatly improved, reaching double;
[0108] In summary, the solution of the present invention can not only reduce the operation and maintenance cycle of part or a single generator set, increase equipment life and save maintenance costs, but also greatly improve the interval operation efficiency of the unit.
[0109] Those skilled in the art will appreciate that the embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program codes. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0110] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0111] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0112] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0113] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0114] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. An automatic power generation control method based on a secondary allocation strategy, characterized in that: include: Obtain the power setting value issued by the AGC system and the actual value generated by the current AGC system, and determine whether the power setting value is valid; If the power setting value is valid, the difference between the power setting value and the actual value of the current AGC system is obtained according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and it is determined whether the difference exceeds the small load threshold value, otherwise it is marked that the power setting value issued by the AGC system is abnormal and needs to be reset; When the difference exceeds the small load threshold, a secondary allocation strategy is used for processing; if it does not exceed, a small load regulation mode is used and primary allocation is used for processing; One-time allocation, that is, allocation according to fixed load; The secondary allocation strategy includes a proportional allocation strategy and an incremental allocation strategy; The incremental allocation strategy includes: Allocate the remaining load in equal proportion as the current incrementally allocated load, and calculate the difference between the current incrementally allocated load and the load of the generator set; Select the generator set to be allocated and set the adjustable capacity of the generator set Adjust to meet the load difference, and the adjustable capacity S needs to be greater than the load difference.
2. The automatic power generation control method based on the secondary allocation strategy according to claim 1, characterized in that: The proportional allocation strategy includes: Assume that the load is adjusted by a generator set Ai, the adjustable intervals of the generator set Ai are Ri, the current actual values are Pi, and the load states of the generator set are obtained, which are -1, 0, and 1 respectively; Compare the current load state with the adjustable range of the generator set; If the current load state is -1, the adjustable interval is expressed as: Ri{1}; if the current load state is 0, the adjustable interval is expressed as: Ri{1or-1}; if the current load state is 1, the adjustable interval is expressed as: Ri{-1}; Among them, -1 means full load, 0 means no load, and 1 means partial load; Calculate the adjusted load and distribute it proportionally.
3. The automatic power generation control method based on the secondary allocation strategy according to claim 2, characterized in that: Calculate the adjusted load, including: The formula for adjusting the load is: Pset=Ai / (R1+R2)*L+Pi Among them, L is the total load, and Pset represents the adjusted load; According to the result obtained by Pset, an adjustment signal is sent through the control system of the generator set Ai to adjust the load of each generator.
4. The automatic power generation control method based on the secondary allocation strategy according to claim 1, characterized in that: Participation in the allocation includes: The generator sets selected for allocation are sorted so that the generator set with the smallest load is at the head of the queue and the generator set with the largest load is at the tail of the queue, and the adjustable capacity is allocated cyclically according to the increasing formula; When the load difference is 0, the allocation is completed, otherwise it is necessary to reselect the generator sets participating in the allocation and readjust the load difference.
5. The automatic power generation control method based on the secondary allocation strategy according to claim 4, characterized in that: The cyclic allocation according to the increasing formula includes: Assuming the increasing ratio is d, the i-th cycle allocation is expressed as: Q i =L*R+r i r i =L-Q i For the i+1th time, the cyclic allocation is expressed as: r i+1 =r i +(1-d) Where R represents the difference between the current incremental load and the load of the generator set; r i is the load remaining after each cycle.
6. An automatic power generation control system based on a secondary allocation strategy, based on the automatic power generation control method based on a secondary allocation strategy according to any one of claims 1 to 5, characterized in that: include: The power system control center obtains the power setting value issued by the AGC system and the actual value generated by the current AGC system, and determines whether the power setting value is valid; The power judgment module, if the power setting value is valid, obtains the difference between the power setting value and the actual value of the current AGC system according to the power setting value issued by the AGC system and the actual value generated by the current AGC system, and judges whether the difference exceeds the small load threshold value, otherwise it marks that the power setting value issued by the AGC system is abnormal and needs to be reset; The load distribution module adopts a secondary distribution strategy to process when the difference exceeds the small load threshold value; if it does not exceed the small load regulation mode, the primary distribution strategy is used for processing.
7. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of any one of the methods of claims 1 to 5 are implemented.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of any one of the methods of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Method for optimizing wind power plant AGC active small load distribution based on energy storage device
CN114899848A
Distribution system and method for optimizing AGC regulation quality of wind power plant
CN115001050A