A human-computer interaction control experimental system based on the Internet of Things
Through the Internet of Things-based human-computer interaction control experimental system, the matching, training and monitoring modules are used to adjust the training plan in real time based on the patient's physical data and electromyography signals, solving the problem that the existing system cannot fit the patient's situation and strength. Improves the fun and experience of training.
Patent Information
- Application Number
- CN202410261385.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-03-07
AI Technical Summary
The existing human-computer interaction system is difficult to set training plans in line with the patient's situation during physical training. It is single and lacks fun, and cannot effectively deal with special situations, resulting in the inability to meet the patient's training needs.
Design a human-computer interaction control experimental system based on the Internet of Things. The port information is obtained through the matching module, the training module conducts limb training and monitors the electromyography signal. The monitoring module adjusts the training plan according to the special constraint information to provide personalized training stiffness and time The program ensures variability and smoothness of the training process.
It is realized that personalized training plans are formulated based on the patient's physical comprehensive data to improve the fun and experience of the training, avoid discomfort caused by stiffness switching, and ensure the safety and effectiveness of the training process.
Smart Images

Figure CN118151752B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of human-computer interaction, and in particular to a human-computer interaction control experimental system based on the Internet of Things. Background Art
[0002] With the development of science and technology, human beings are conducting more and more in-depth research on human-computer interaction. In the medical industry, stroke and other diseases can lead to problems such as limb incoordination and muscle atrophy. Nursing for people requires more energy and physical strength. Using robots to train patients' limbs is a long-term and beneficial research topic. At present, when conducting limb training through human-computer interaction, it is difficult to set up a training plan that fits the patient's situation, and the intensity of the training is single and boring, which makes it difficult to improve the patient's experience during the training process. In addition, there is no good response to special situations, and it is difficult to meet the patient's training needs. Summary of the invention
[0003] The purpose of the present invention is to provide a human-computer interaction control experimental system based on the Internet of Things to solve the deficiencies in the background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a human-computer interaction control experimental system based on the Internet of Things, comprising:
[0005] A matching module, used for obtaining port information based on the port, and matching corresponding training scheme information based on the port information as current training scheme information, wherein the training scheme information includes training stiffness information, time information corresponding to the training stiffness information, and training stage information;
[0006] The training module is connected to the matching module and is used to perform limb training based on the corresponding port information of the current training program information, and to monitor the electromyographic signal information of the port during the limb training process in real time;
[0007] The monitoring module is connected to the training module and is used to obtain the special constraint information of the port limb based on the electromyographic signal information, and adjust the current training program information based on the special constraint information to obtain the modified training program information.
[0008] In a preferred embodiment, the matching module includes:
[0009] A registration unit, used to obtain personnel information, wherein the personnel information includes personnel identity information and limb condition information, obtain a port based on the personnel information registration, and use the personnel information as port information;
[0010] A formulation unit is used to obtain existing limb condition information based on big data, set training stiffness information, time information corresponding to the training stiffness information, and training stage information as training program information corresponding to the existing limb condition information, and store the training program information corresponding to the existing limb condition information;
[0011] The matching unit is used to obtain the port information based on the port and match the corresponding training scheme information as the current training scheme information.
[0012] In a preferred embodiment, the formulation unit includes:
[0013] A data acquisition unit, used to extract existing limb condition information through big data, wherein the existing limb condition information includes limb names and limb health states corresponding to the limb names;
[0014] An information formulation unit is used to formulate a plurality of personnel status information corresponding to the existing limb condition information, wherein the personnel status information includes basic health information of the personnel and age information of the personnel, set corresponding preset conditions corresponding to the personnel status information, and bind the personnel status information with the corresponding existing limb condition information;
[0015] The program formulation unit is used to formulate training stiffness information, time information corresponding to the training stiffness information and training stage information as training program information based on preset conditions corresponding to personnel status information, and store the training program information corresponding to limb condition information.
[0016] In a preferred embodiment, the matching unit includes:
[0017] An information matching unit, used for acquiring port information based on the port, and matching the limb condition information in the port information with the corresponding existing limb condition information as matching limb condition information;
[0018] A corresponding unit is used to match multiple preset conditions corresponding to the corresponding personnel status information based on the port information in the port information, obtain multiple corresponding training program information based on the multiple preset conditions, obtain the limit information in the multiple training program information and combine them to obtain the corresponding training stiffness information, the time information corresponding to the training stiffness information and the training stage information as the current training program information.
[0019] In a preferred embodiment, the training module includes:
[0020] A training unit, used for determining port information corresponding to the port, and performing limb training based on current training program information corresponding to the port;
[0021] The corresponding unit is used to obtain the electromyographic signal information of the limbs during the limb training process, and obtain the correspondence between the electromyographic signal information and the current training program.
[0022] In a preferred embodiment, the training unit comprises:
[0023] An information acquisition unit, used for acquiring the stiffness in the training stiffness information in the current training program information, setting a relaxation stiffness lower than the stiffness corresponding to the stiffness, and inserting the relaxation stiffness into the training stiffness information to obtain a stiffness change line;
[0024] A switching unit, used to obtain a point where stiffness changes in the stiffness change line as a switching point, set switching information based on the switching point, wherein the switching information includes a switching time and switching stiffness difference data, and obtain stiffness switching degree information of the switching point based on the switching information;
[0025] The limb training unit is used to perform limb training on the personnel at the corresponding port of the current training program information that obtains the stiffness switching degree information.
[0026] In a preferred embodiment, the monitoring module includes:
[0027] An information setting unit, used to set myoelectric preset conditions, perform state judgment on myoelectric signal information based on the myoelectric preset conditions, use myoelectric signal information that does not meet the myoelectric preset conditions as special constraint information, and mark the position of the special constraint information;
[0028] The modification unit is used to terminate the training of the current training scheme information based on the special constraint information and reduce the training stiffness information in the current training scheme information or the time information corresponding to the training stiffness information to obtain the modified training scheme information.
[0029] In a preferred embodiment, the information setting unit includes:
[0030] A judgment unit, used for treating the myoelectric signal information that does not meet the myoelectric preset condition as special constraint information as an abnormal point;
[0031] A marking unit is used to distribute the current training program information according to the training time to obtain a progress bar, mark the training time corresponding to the abnormal point in the current training program information in the progress bar to obtain the abnormal position, and obtain characteristic information of the abnormal position, wherein the characteristic information includes the training stiffness information where the abnormal point is located, the time information corresponding to the training stiffness information where the abnormal point is located, and the previous corresponding training stiffness information of the training stiffness information where the abnormal point is located.
[0032] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0033] The present invention can carry out training according to the comprehensive physical data of the port personnel, can ensure the training purpose while also ensuring the physical health stability of the trainees, and has the function of accurately recommending training program information to the trainees; the training intensity is variable, which improves the interest of the training, and also makes the stiffness switching smoother, which can better train the limbs, avoid the discomfort caused by the stiffness change of the limbs due to the stiffness switching during the training process, and improve the experience during the training process. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0035] Figure 1 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] Example 1, please refer to Figure 1 As shown, the human-computer interaction control experimental system based on the Internet of Things described in this embodiment includes:
[0038] A matching module, used for obtaining port information based on the port, and matching corresponding training scheme information based on the port information as current training scheme information, wherein the training scheme information includes training stiffness information, time information corresponding to the training stiffness information, and training stage information;
[0039] The training module is connected to the matching module and is used to perform limb training based on the corresponding port information of the current training program information, and to monitor the electromyographic signal information of the port during the limb training process in real time;
[0040] The monitoring module is connected to the training module and is used to obtain the special constraint information of the port limb based on the electromyographic signal information, and adjust the current training program information based on the special constraint information to obtain the modified training program information;
[0041] It is further explained that with the development of science and technology, human beings are conducting more and more in-depth research on human-computer interaction. Among them, in the medical industry, stroke and other diseases can cause problems such as muscle atrophy such as limb incoordination, and it takes more energy and physical strength to care for people. It is a long-term and beneficial research topic to perform limb training on patients through robots. At present, when performing limb training through human-computer interaction, it is difficult to set a training program that fits the patient's situation, and the intensity is single and boring during the training process, which makes it difficult to improve the patient's experience during the training process, and there is no good response to special situations, which makes it difficult to meet the patient's training needs; and in this application, training can be carried out according to the comprehensive physical data of the port personnel, which can ensure the health and stability of the trainees while ensuring the training purpose, and has the function of accurately recommending training program information to the trainees; the training intensity is varied, which improves the fun of the training, and also makes the stiffness switching smoother, which can better train the limbs, avoid the discomfort caused by the stiffness switching of the limbs during the training process, and improve the experience during the training process;
[0042] In one embodiment, the matching module includes:
[0043] A registration unit, used to obtain personnel information, wherein the personnel information includes personnel identity information and limb condition information, obtain a port based on the personnel information registration, and use the personnel information as port information;
[0044] A formulation unit is used to obtain existing limb condition information based on big data, set training stiffness information, time information corresponding to the training stiffness information, and training stage information as training program information corresponding to the existing limb condition information, and store the training program information corresponding to the existing limb condition information;
[0045] A matching unit, configured to obtain port information based on the port and match the corresponding training scheme information as the current training scheme information;
[0046] In one embodiment, the formulation unit includes:
[0047] A data acquisition unit, used to extract existing limb condition information through big data, wherein the existing limb condition information includes limb names and limb health states corresponding to the limb names;
[0048] An information formulation unit is used to formulate a plurality of personnel status information corresponding to the existing limb condition information, wherein the personnel status information includes basic health information of the personnel and age information of the personnel, set corresponding preset conditions corresponding to the personnel status information, and bind the personnel status information with the corresponding existing limb condition information;
[0049] A program formulation unit, used to formulate training stiffness information, time information corresponding to the training stiffness information, and training stage information as training program information based on preset conditions corresponding to the personnel status information, and store the training program information corresponding to the limb condition information;
[0050] In one embodiment, the matching unit comprises:
[0051] An information matching unit, used for acquiring port information based on the port, and matching the limb condition information in the port information with the corresponding existing limb condition information as matching limb condition information;
[0052] A corresponding unit, used for matching a plurality of preset conditions corresponding to the corresponding personnel status information based on the port information in the port information, obtaining a plurality of corresponding training program information based on the plurality of preset conditions, obtaining the limit information in the plurality of training program information, combining them to obtain the corresponding training stiffness information, the time information corresponding to the training stiffness information, and the training stage information as the current training program information;
[0053] To further explain, it is necessary to collect personnel information based on the personnel who are training the limbs, and then register to obtain the port, and use the personnel information as the port information, and then obtain the existing limb condition information based on big data. The existing limb condition information here is the limb condition data currently existing in the society, for example, the different conditions of the left and right limbs of stroke patients and the different limb condition data of stroke severity. All limb condition information that may exist in the society is covered here, and then the training stiffness information is set corresponding to the limb condition information. The training stiffness information here is the information corresponding to the limb name and the limb health status corresponding to the limb name. The existing limb condition information and limb condition information here both identify the limb name and the limb corresponding to the limb name. The limb health status here refers to the data of rehabilitation training required for limb stroke or other muscle diseases. Then, multiple personnel status information are formulated corresponding to the existing limb status information. The personnel status information here includes basic health information and age information of the personnel. For example, the basic health information of the personnel is other basic physical health data of the personnel, such as blood pressure, heart condition information and other physical data of the personnel. Then, preset conditions can be set according to the basic health information of the personnel. The preset conditions here are the extreme training intensity corresponding to the personnel status information. The extreme training intensity here includes extreme training stiffness and the extreme training time corresponding to the extreme training stiffness. Then, training stiffness information is formulated based on the preset conditions corresponding to the personnel status information. The information, time information corresponding to the training stiffness information and the training stage information are used as the training plan information, and the limb condition information corresponding to the training plan information is stored. Later, when the training plan information of the person corresponding to the port is actually matched, it is necessary to match the corresponding existing limb condition information through the limb condition information in the port information as the matching limb condition information, and then the port information in the port information matches the corresponding multiple preset conditions corresponding to the personnel status information, and the corresponding multiple training plan information is obtained based on the multiple preset conditions, and the limit information in the multiple training plan information is obtained and combined to obtain the corresponding training stiffness information, the time information corresponding to the training stiffness information and the training stage information as the current training plan information, where the limit information is the obtained multiple The training program information corresponds to the most extreme information of the port personnel. For example, three training program information are obtained, wherein the corresponding training stiffnesses in the three training program information are 900, 800 and 700 respectively. Here, the training limit allowed by the port personnel's physical condition is 700. Then, during the training process, the training stiffness cannot exceed 700. Other training times are selected in this way, and the value with the least time is selected. Then, the corresponding training stiffness information, the time information corresponding to the training stiffness information, and the training stage information can be obtained to obtain their respective information. They can be combined and spliced into a training program information suitable for port personnel training as the current training program information, and training can be carried out according to the comprehensive physical data of the port personnel.It can ensure the health and stability of trainees while ensuring the training objectives, and can provide accurate training program information recommendations to trainees;
[0054] In one embodiment, the training module includes:
[0055] A training unit, used for determining port information corresponding to the port, and performing limb training based on current training program information corresponding to the port;
[0056] The corresponding unit is used to obtain the electromyographic signal information of the limbs during the limb training process, and obtain the correspondence between the electromyographic signal information and the current training program;
[0057] Further explanation: here, the port information needs to be determined, and then the corresponding current training program information is obtained according to the determined port information to start limb training. During the training process, the electromyographic signal information needs to be monitored and obtained, and at the same time, a progress bar for the degree of the current training program information is established, and the electromyographic signal information is matched with the progress bar for the degree of the current training program information. The electromyographic signal information can be matched with the current training program information, and the correspondence between the electromyographic signal information and the training stiffness can be understood, so as to better understand the training situation of the port personnel;
[0058] In one embodiment, the training unit comprises:
[0059] An information acquisition unit, used for acquiring the stiffness in the training stiffness information in the current training program information, setting a relaxation stiffness lower than the stiffness corresponding to the stiffness, and inserting the relaxation stiffness into the training stiffness information to obtain a stiffness change line;
[0060] A switching unit, used to obtain a point where stiffness changes in the stiffness change line as a switching point, set switching information based on the switching point, wherein the switching information includes a switching time and switching stiffness difference data, and obtain stiffness switching degree information of the switching point based on the switching information;
[0061] A limb training unit, used for performing limb training on a person at a corresponding port of the current training program information that obtains the stiffness switching degree information;
[0062] To further explain, the current training plan here is a current training plan that has not been switched by stiffness. The stiffness in the current training plan here is the limit stiffness. Therefore, when conducting limb training, the stiffness needs to be switched and changed in size, so that the port personnel can experience the exertion of strength to fight, the robotic arm is defeated, continue to fight, the robotic arm is defeated, continue to fight, the robotic arm is defeated more, ..., such a sense of fun will make the experimenter happy. When changing the stiffness value, a value smaller than the limit stiffness is selected. In order to adapt to the physical condition of the port personnel, the corresponding stiffness is then set to a relaxation stiffness lower than the stiffness. The relaxation stiffness is interspersed in the training stiffness information to obtain the stiffness change line, and the stiffness change line with stiffness changes is obtained. The point is taken as the switching point, and the switching information is set based on the switching point, wherein the switching information includes the switching time and the switching stiffness difference data. The stiffness switching degree information of the switching point is obtained based on the switching information. Here, the stiffness switching degree information is the switching speed. After knowing the switching time and the switching stiffness difference data, the switching stiffness difference data is divided by the switching time to obtain the switching speed, which is the stiffness switching degree information. There, a switching process between different stiffnesses is completed, the training intensity is varied, and the interest of the training is improved. At the same time, the stiffness switching is smoother, which can better train the limbs, avoid the discomfort caused by the stiffness change of the limbs due to the stiffness switching during the training process, and improve the experience during the training process;
[0063] In one embodiment, the monitoring module includes:
[0064] An information setting unit, used to set myoelectric preset conditions, perform state judgment on myoelectric signal information based on the myoelectric preset conditions, use myoelectric signal information that does not meet the myoelectric preset conditions as special constraint information, and mark the position of the special constraint information;
[0065] A modification unit, configured to terminate the training of the current training scheme information based on the special constraint information and reduce the training stiffness information in the current training scheme information or the time information corresponding to the training stiffness information to obtain the modified training scheme information;
[0066] Further explanation, it is necessary to set electromyographic preset conditions here, wherein the electromyographic preset conditions here are electromyographic signal data corresponding to various special situations such as cramps. Normal electromyographic signal information will be within the range of the electromyographic preset conditions. Exceeding the electromyographic preset conditions means that the port personnel have abnormal conditions. Here, it is used as special constraint information. After the special constraint information appears, it is necessary to terminate the current training plan information and reduce the training stiffness information in the current training plan information or the time information corresponding to the training stiffness information to obtain the modified training plan information. The current training plan information can be modified, and the current training plan information currently in progress can be terminated in time. It can respond quickly. After obtaining the modified training plan information, it can avoid the situation where the port personnel have special constraint information in subsequent training, and can be trained in accordance with the status of the port personnel, with good adaptability.
[0067] In one embodiment, the information setting unit includes:
[0068] A judgment unit, used for treating the myoelectric signal information that does not meet the myoelectric preset condition as special constraint information as an abnormal point;
[0069] A marking unit, used to distribute the current training program information according to the training time to obtain a progress bar, mark the training time corresponding to the abnormal point in the current training program information in the progress bar to obtain the abnormal position, and obtain characteristic information of the abnormal position, wherein the characteristic information includes the training stiffness information where the abnormal point is located, the time information corresponding to the training stiffness information where the abnormal point is located, and the previous corresponding training stiffness information of the training stiffness information where the abnormal point is located;
[0070] Further explanation, here the electromyographic signal information that does not meet the preset electromyographic conditions is taken as special constraint information as an abnormal point. The abnormal point here can be marked in the progress bar by the training time in the current training program information to obtain the abnormal position, and obtain the characteristic information of the abnormal position, wherein the characteristic information includes the training stiffness information where the abnormal point is located, the time information corresponding to the training stiffness information where the abnormal point is located, and the previous corresponding training stiffness information of the training stiffness information where the abnormal point is located. Here, it is used to obtain the cause information that leads to the special constraint information. The cause information can be obtained to avoid the same thing from happening in subsequent training. Here, it can be used as a data for reference, which can improve the training experience of port personnel and have a better training effect.
[0071] In summary, in the training phase information, each training session has at least four processes (with known total training time): 1. Time and intensity of warm-up exercises (fixed stiffness training with small values); 2. Transition process (stiffness increase); 3. Time and intensity of formal training (stiffness matches muscle state, refer to the matching table); 4. Time and intensity of relaxation and final training (stiffness decrease); the whole process covers sudden special restraint events such as muscle spasms and muscle tension, as well as special restraint events such as the need for someone to accompany. Special circumstances cannot be allowed to occur repeatedly during design. For example, if the experiment If the patient gets cramps, other measures must be taken, and the patient should not be treated again after the cramps occur for the second time; when changing the training stiffness, it can be 1 900, 1 800, 1 900, 1 800, 1 900, 2 700, and a similar arrangement. In this way, the port personnel can experience the exertion of force to fight, the robotic arm is defeated, continue to fight, the robotic arm is defeated, continue to fight, the robotic arm is defeated more, ..., such a sense of fun will make the experimenters happy; in addition, during the recovery process of the entire training process, the port personnel can set it as the interactive stage, muscle reorganization period, exercise period and consolidation period.
[0072] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A human-computer interaction control experimental system based on the Internet of Things, characterized in that: include: A matching module, used for obtaining port information based on the port, and matching corresponding training scheme information based on the port information as current training scheme information, wherein the training scheme information includes training stiffness information, time information corresponding to the training stiffness information, and training stage information; The training module is connected to the matching module and is used to perform limb training based on the corresponding port information of the current training program information, and to monitor the electromyographic signal information of the port during the limb training process in real time; The monitoring module is connected to the training module and is used to obtain the special constraint information of the port limb based on the electromyographic signal information, and adjust the current training program information based on the special constraint information to obtain the modified training program information; The monitoring module comprises: An information setting unit, used to set myoelectric preset conditions, perform state judgment on myoelectric signal information based on the myoelectric preset conditions, use myoelectric signal information that does not meet the myoelectric preset conditions as special constraint information, and mark the position of the special constraint information; A modification unit, configured to terminate the training of the current training scheme information based on the special constraint information and reduce the training stiffness information in the current training scheme information or the time information corresponding to the training stiffness information to obtain the modified training scheme information; The information setting unit includes: A judgment unit, used for treating the myoelectric signal information that does not meet the myoelectric preset condition as special constraint information as an abnormal point; A marking unit is used to distribute the current training program information according to the training time to obtain a progress bar, mark the training time corresponding to the abnormal point in the current training program information in the progress bar to obtain the abnormal position, and obtain characteristic information of the abnormal position, wherein the characteristic information includes the training stiffness information where the abnormal point is located, the time information corresponding to the training stiffness information where the abnormal point is located, and the previous corresponding training stiffness information of the training stiffness information where the abnormal point is located.
2. According to the human-computer interaction control experimental system based on the Internet of Things according to claim 1, it is characterized by: The matching module comprises: A registration unit, used to obtain personnel information, wherein the personnel information includes personnel identity information and limb condition information, obtain a port based on the personnel information registration, and use the personnel information as port information; A formulation unit is used to obtain existing limb condition information based on big data, set training stiffness information, time information corresponding to the training stiffness information, and training stage information as training program information corresponding to the existing limb condition information, and store the training program information corresponding to the existing limb condition information; The matching unit is used to obtain the port information based on the port and match the corresponding training scheme information as the current training scheme information.
3. The human-computer interaction control experimental system based on the Internet of Things according to claim 2 is characterized in that: The formulation unit comprises: A data acquisition unit, used to extract existing limb condition information through big data, wherein the existing limb condition information includes limb names and limb health states corresponding to the limb names; An information formulation unit is used to formulate a plurality of personnel status information corresponding to the existing limb condition information, wherein the personnel status information includes basic health information of the personnel and age information of the personnel, set corresponding preset conditions corresponding to the personnel status information, and bind the personnel status information with the corresponding existing limb condition information; The program formulation unit is used to formulate training stiffness information, time information corresponding to the training stiffness information and training stage information as training program information based on preset conditions corresponding to personnel status information, and store the training program information corresponding to limb condition information.
4. The human-computer interaction control experimental system based on the Internet of Things according to claim 3 is characterized in that: The matching unit comprises: An information matching unit, used for acquiring port information based on the port, and matching the limb condition information in the port information with the corresponding existing limb condition information as matching limb condition information; A corresponding unit is used to match multiple preset conditions corresponding to the corresponding personnel status information based on the port information in the port information, obtain multiple corresponding training program information based on the multiple preset conditions, obtain the limit information in the multiple training program information and combine them to obtain the corresponding training stiffness information, the time information corresponding to the training stiffness information and the training stage information as the current training program information.
5. The human-computer interaction control experimental system based on the Internet of Things according to claim 1 is characterized in that: The training module includes: A training unit, used for determining port information corresponding to the port, and performing limb training based on current training program information corresponding to the port; The corresponding unit is used to obtain the electromyographic signal information of the limbs during the limb training process, and obtain the correspondence between the electromyographic signal information and the current training program.
6. The human-computer interaction control experimental system based on the Internet of Things according to claim 5 is characterized by: The training unit comprises: An information acquisition unit, used for acquiring the stiffness in the training stiffness information in the current training program information, setting a relaxation stiffness lower than the stiffness corresponding to the stiffness, and inserting the relaxation stiffness into the training stiffness information to obtain a stiffness change line; A switching unit, used to obtain a point where stiffness changes in the stiffness change line as a switching point, set switching information based on the switching point, wherein the switching information includes a switching time and switching stiffness difference data, and obtain stiffness switching degree information of the switching point based on the switching information; The limb training unit is used to perform limb training on the personnel at the corresponding port of the current training program information that obtains the stiffness switching degree information.
