Steel-concrete building structure and its construction method based on BIM technology

By using the combination of roof plate, support plate and elastic support in steel-concrete building structures, the expansion and contraction of the elastic support frame is solved, and the problem of reset spring failure in the prior art is realized, and the repositioning and disassembly of elastic support after assembly is realized. The lifting and lowering of the support plate during the process improves the self-resetting ability of the building structure.

CN118166961BActive Publication Date: 2024-11-05ZHEJIANG XIANGHONG ECOLOGICAL CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410453834.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-16
Publication Date
2024-11-05
Estimated Expiration
2044-04-16

AI Technical Summary

Technical Problem

The reset springs of existing steel-concrete building structures lose elasticity after long compression, and cannot provide the proper self-resetting effect, affecting service life.

Method used

By using a combination of top plate, support plate and elastic support in steel-concrete building structures, the expansion and contraction of the elastic support frame is controlled, ensuring that the elastic support is reset after assembly, avoiding long-term compression state, and using connecting components and lifting components to realize the support plate The lifting function is suitable for assembly and disassembly processes.

Benefits of technology

It effectively avoids the loss of elasticity caused by long-term compression of elastic support, realizes the reset effect of elastic support after assembly, and controls the support plate to move upward during disassembly, improving the self-resetting ability of steel-concrete building structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118166961B_ABST
    Figure CN118166961B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of energy-saving building structures, and specifically relates to a steel-concrete building structure based on BIM technology and a construction method thereof, wherein the steel-concrete building structure based on BIM technology comprises a prefabricated reinforced concrete slab and an I-shaped steel beam, and the I-shaped steel beam is provided with a jacking mechanism for lifting the prefabricated reinforced concrete slab, and the jacking mechanism comprises a top plate, a support plate, and an elastic support member connecting the top plate and the support plate, and the top plate and the support plate can slide in a vertical direction; when connecting the prefabricated reinforced concrete slab and the I-shaped steel beam, the support plate is controlled to move downward, and the elastic support member is in a reset state; when disassembling the prefabricated reinforced concrete slab, the support plate is controlled to move upward, and the elastic support member is in a compressed state. The present invention realizes the function of controlling the extension and contraction of the elastic support frame, and achieves the effect of controlling the reset of the elastic support member after assembling the prefabricated reinforced concrete slab and the I-shaped steel beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy-saving building structures, and in particular relates to a steel-concrete building structure based on BIM technology and a construction method thereof. Background Art

[0002] BIM technology, or building information modeling technology, uses advanced three-dimensional digital technology to create, simulate, and deeply analyze various key information of construction projects. The introduction of this technology makes the simulation of construction projects more accurate and efficient. Especially in the context of the widespread application of steel-concrete structures, in order to improve the construction and maintenance efficiency of steel-concrete structures, in-depth simulation can be carried out with the help of BIM technology. Through simulation analysis, it was found that the existing composite beams were severely damaged after the earthquake, and it was difficult to repair them, which could not meet the current construction project's pursuit of economic benefits.

[0003] To this end, a Chinese invention patent application with application publication number CN114941398A and application publication date 2022.08.26 discloses a detachable steel-concrete composite beam with a self-reset device, wherein a self-reset spring device is provided inside the mounting hole of the prefabricated reinforced concrete slab between the upper surface of the I-shaped steel beam and the lower surface of the concrete plug, and the reset spring device can form an elastic connection between the upper surface of the I-shaped steel beam and the lower surface of the concrete plug, and when the locking nut is used to lock the connecting bolt, the elastic force generated by the reset spring device can increase the axial locking force between the locking nut and the connecting bolt, and can effectively prevent the locking nut and the connecting bolt from loosening, and when the locking nut is loosened, the elastic force generated by the reset spring device can act on the lower surface of the concrete plug to push the concrete plug upward, so that the concrete plug can be quickly pushed out during the disassembly process. However, after the composite beam is installed, the reset spring is in a compressed state for a long time, which will cause the spring to produce plastic deformation and lose elasticity, thereby affecting the service life of the reset spring and failing to achieve the desired self-reset effect. Summary of the invention

[0004] In view of the above-mentioned problems existing in the prior art, the present invention provides a steel-concrete building structure and a construction method thereof based on BIM technology. The present invention realizes the function of controlling the extension and retraction of the elastic support frame through a top plate, a support plate and an elastic support member, thereby solving the problem that the return spring of the existing steel-concrete building structure loses its elasticity and cannot provide elastic force after being compressed for a long time.

[0005] This solution is achieved through the following technical measures: a steel-concrete building structure based on BIM technology, including precast reinforced concrete slabs and I-shaped steel beams. The I-shaped steel beams are provided with a jacking mechanism for lifting the precast reinforced concrete slabs. The jacking mechanism includes a top plate, a support plate and an elastic support member connecting the top plate and the support plate. The top plate and the support plate can slide in the vertical direction; when connecting the precast reinforced concrete slabs and the I-shaped steel beams, the support plate is controlled to move downward and the elastic support member is in a reset state; when disassembling the precast reinforced concrete slabs, the support plate is controlled to move upward and the elastic support member is in a compressed state.

[0006] Preferably, an auxiliary control mechanism is provided on the I-shaped steel beam, and the auxiliary control mechanism includes a connecting component for connecting the prefabricated reinforced concrete slab and the I-shaped steel beam, and a lifting component for controlling the lifting of the support plate; the main shaft is rotatably arranged on the I-shaped steel beam, and the connecting component and the lifting component are both connected to the main shaft transmission.

[0007] Preferably, the connecting assembly includes a first screw rod, a lifting nut and a locking nut; the first screw rod is slidably arranged on the I-shaped steel beam in a vertical direction, the lifting nut and the locking nut are respectively installed on the I-shaped steel beam and the precast concrete slab, the lifting nut is threadedly connected to the first screw rod, and the locking nut is threadedly connected to the first screw rod in a separable manner.

[0008] Preferably, the lifting assembly includes a second screw and an internally threaded sleeve; the second screw is rotatably arranged on the I-shaped steel beam, the internally threaded sleeve is movably arranged on the support plate, and the internally threaded sleeve is threadedly connected to the second screw.

[0009] Preferably, an abutment ring is provided on the internal threaded sleeve, a docking ring is provided on the support plate, and a lifting assembly for lifting the abutment ring is provided on the support plate. When the abutment ring is tightly matched with the docking ring, the docking ring limits the rotation of the abutment ring.

[0010] Preferably, a top column is slidably mounted on the abutment ring, a third elastic member is provided at the end of the top column, two ends of the third elastic member are respectively connected to the top column and the abutment ring, and a docking hole cooperating with the top column is provided on the docking ring.

[0011] Preferably, the lifting assembly includes a base plate, a gasket and a second elastic member; the base plate is installed on the support plate, the gasket is slidably installed on the support plate, the two ends of the second elastic member are respectively connected to the gasket and the base plate, and the gasket abuts against the abutment ring under the elastic force of the second elastic member.

[0012] Preferably, a one-way limiting assembly is also provided on the support plate for limiting the rotation direction of the internal threaded sleeve; the one-way limiting assembly includes a mounting ring, a ratchet and a stop pawl, the mounting ring is installed on the support ring, the ratchet is rotatably arranged on the support ring, and the ratchet is slidably sleeved on the internal threaded sleeve, the stop pawl is installed on the mounting ring, and the stop pawl is unidirectionally meshed with the ratchet.

[0013] Preferably, at least four groups of connection components are provided, the multiple groups of connection components are distributed along a rectangular array, and the multiple first screw rods are connected through pulleys and synchronous belt transmissions.

[0014] The present invention also provides a construction method of the steel-concrete building structure based on the BIM technology, comprising the following steps:

[0015] S1. Place the prefabricated reinforced concrete slab on the I-shaped steel beam;

[0016] S2. Connect the prefabricated reinforced concrete slab and the I-shaped steel beam by bolts, and control the support plate to move downward to release the elastic potential energy of the elastic support.

[0017] Beneficial effects of the present invention:

[0018] 1. The present invention realizes the function of controlling the expansion and contraction of the elastic support frame through the top plate, the support plate and the elastic support member, and achieves the effect of controlling the elastic support member to reset after assembling the prefabricated reinforced concrete slab and the I-shaped steel beam, thereby preventing the elastic support member from being in a compressed state for a long time, and solving the problem that the reset spring of the existing steel-concrete building structure loses its elasticity and cannot provide elastic force after being compressed for a long time;

[0019] 2. The present invention realizes the function of controlling the lifting and lowering of the support plate while disassembling and assembling the prefabricated reinforced concrete slab through the connecting assembly, the lifting assembly and the main shaft, thereby achieving the effect of controlling the upward movement of the support plate while disassembling the reinforced concrete slab. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a three-dimensional schematic diagram of a steel-concrete building structure based on BIM technology in the present invention.

[0021] Figure 2 It is a three-dimensional schematic diagram of a jacking mechanism in a steel-concrete building structure based on BIM technology of the present invention.

[0022] Figure 3 It is a three-dimensional decomposition schematic diagram of a steel-concrete building structure based on BIM technology of the present invention.

[0023] Figure 4 It is a three-dimensional schematic diagram of an I-shaped steel beam and a connection component in a steel-concrete building structure based on BIM technology of the present invention.

[0024] Figure 5 It is a three-dimensional schematic diagram of connection components in a steel-concrete building structure based on BIM technology of the present invention.

[0025] Figure 6 It is a three-dimensional schematic diagram of a jacking mechanism and an auxiliary control mechanism in a steel-concrete building structure based on BIM technology of the present invention.

[0026] Figure 7 It is a three-dimensional schematic diagram of a docking ring, a lifting assembly and an internal threaded sleeve in a steel-concrete building structure based on BIM technology of the present invention.

[0027] Figure 8 It is a three-dimensional exploded schematic diagram of an internal threaded sleeve and a docking ring in a steel-concrete building structure based on BIM technology of the present invention.

[0028] Fig. 9 It is a three-dimensional schematic diagram of an internal threaded sleeve and a one-way restriction component in a steel-concrete building structure based on BIM technology of the present invention.

[0029] Fig.10 It is a three-dimensional schematic diagram of an auxiliary control mechanism in a steel-concrete building structure based on BIM technology of the present invention.

[0030] The numbers in the figure are:

[0031] 1. Prefabricated reinforced concrete slab; 11. Honeycomb core; 2. I-shaped steel beam; 21. Bracket; 22. Mounting belt; 3. Lifting mechanism; 31. Top plate; 32. Support plate; 321. Docking ring; 3211. Docking hole; 33. Elastic support member; 331. Telescopic rod; 332. First elastic member; 34. Lifting assembly; 341. Bottom plate; 342. Gasket; 343. Second elastic member; 35. One-way restriction assembly; 351. Mounting ring; 352. Ratchet; 353. Stop pawl; 4. Auxiliary control mechanism; 41. Connecting assembly; 411. First screw; 412. Lifting nut; 413. Locking nut; 42. Lifting assembly; 421. Second screw; 422. Internally threaded sleeve; 4221. Abutment ring; 4222. Top column; 4223. Third elastic member; 43. Spindle. DETAILED DESCRIPTION

[0032] In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0033] Reference Figure 1 and Figure 2 The steel-concrete building structure based on BIM technology includes a precast reinforced concrete slab 1 and an I-shaped steel beam 2. The I-shaped steel beam 2 is provided with a lifting mechanism 3 for lifting the precast reinforced concrete slab 1. The lifting mechanism 3 includes a top plate 31, a support plate 32 and an elastic support member 33 connecting the top plate 31 and the support plate 32. The top plate 31 and the support plate 32 can slide in a vertical direction; when the precast reinforced concrete slab 1 and the I-shaped steel beam are connected, the support plate 32 is controlled to move downward, and the elastic support member 33 is in a reset state; when the precast reinforced concrete slab 1 is disassembled, the support plate 32 is controlled to move upward, and the elastic support member 33 is in a compressed state.

[0034] The present invention realizes the function of controlling the expansion and contraction of the elastic support frame through the top plate 31, the support plate 32 and the elastic support member 33, so as to achieve the effect of controlling the resetting of the elastic support member 33 after assembling the prefabricated reinforced concrete slab 1 and the I-shaped steel beam 2, thereby preventing the elastic support member 33 from being in a compressed state for a long time, and solving the problem that the reset spring of the existing steel-concrete building structure loses its elasticity and cannot provide elastic force after being compressed for a long time. The elastic support member 33 includes a telescopic rod 331 and a first elastic member 332, the two ends of the telescopic rod 331 are respectively connected to the top plate 31 and the support plate 32, and the two ends of the first elastic member 332 are respectively connected to the two ends of the telescopic rod 331; after connecting the prefabricated reinforced concrete slab 1 and the I-shaped steel beam 2, the operator controls the support plate 32 to move downward through a tool, so that the elastic support member 33 is extended, and the elastic potential energy is released, thereby preventing the elastic support member 33 from being in a compressed state for a long time. When the steel-concrete building structure is damaged by vibration, the operator disconnects the precast reinforced concrete slab 1 and the I-shaped steel beam 2, and controls the support plate 32 to move upward. After the top plate 31 contacts the precast reinforced concrete slab 1, its movement is restricted, and the elastic support member 33 contracts. After the connection between the precast reinforced concrete slab 1 and the I-shaped steel beam 2 is completely disconnected, the top plate 31 lifts the precast reinforced concrete slab 1 under the elastic force of the elastic support member 33. When the precast reinforced concrete slab 1 is damaged by vibration and is connected to the adjacent precast reinforced concrete slab 1, the support of the top plate 31 facilitates the operator to remove the precast reinforced concrete slab 1. Through simulation with BIM technology, the elastic force and compression state of the elastic support member 33 can be controlled relatively accurately.

[0035] Reference Figure 1 and Figure 3 An auxiliary control mechanism 4 is provided on the I-shaped steel beam 2, and the auxiliary control mechanism 4 includes a connecting component 41 for connecting the prefabricated reinforced concrete slab 1 and the I-shaped steel beam 2, and a lifting component 42 for controlling the lifting of the support plate 32; a main shaft 43 is rotatably arranged on the I-shaped steel beam 2, and the connecting component 41 and the lifting component 42 are both transmission-connected to the main shaft 43.

[0036] The present invention realizes the function of controlling the lifting and lowering of the support plate 32 while disassembling and assembling the prefabricated reinforced concrete slab 1 through the connecting assembly 41, the lifting assembly 42 and the main shaft 43, so as to achieve the effect of controlling the upward movement of the support plate 32 while disassembling the reinforced concrete slab. An octagonal countersunk hole is provided at the top of the main shaft 43; when disassembling the precast reinforced concrete slab 1, the operator drives the main shaft 43 to rotate by using an octagonal wrench or other tools, and the main shaft 43 drives the connecting assembly 41 and the lifting assembly 42 connected to it, thereby controlling the separation of the precast reinforced concrete slab 1 from the I-shaped steel beam 2, and at the same time driving the support plate 32 to move upward to compress the elastic support member 33. When the precast reinforced concrete slab 1 is disconnected from the I-shaped steel beam 2, the precast reinforced concrete slab 1 is lifted up by the top plate 31 under the elastic force of the elastic support member 33. After the operator replaces the new precast reinforced concrete slab 1, the precast reinforced concrete slab 1 is pressed again, and the elastic support member 33 contracts. Then the main shaft 43 is rotated to connect the precast reinforced concrete slab 1 and the I-shaped steel beam 2, and at the same time controlling the support plate 32 to move downward, thereby releasing the elastic potential energy of the elastic support member 33.

[0037] Reference Figure 3-Figure 5 The connecting assembly 41 includes a first screw rod 411, a lifting nut 412 and a locking nut 413; the first screw rod 411 is slidably arranged on the I-shaped steel beam 2 in the vertical direction, the lifting nut 412 and the locking nut 413 are respectively installed on the I-shaped steel beam 2 and the precast concrete slab, the lifting nut 412 is threadedly connected to the first screw rod 411, and the locking nut 413 is detachably threadedly connected to the first screw rod 411.

[0038] The present invention realizes the function of connecting the prefabricated reinforced concrete slab 1 and the I-shaped steel beam 2 through the first screw rod 411, the lifting nut 412 and the locking nut 413. The axis of the first screw rod 411 is vertically arranged, and the first screw rod 411 is transmission-connected to the main shaft 43 through a pulley and a synchronous belt. The I-shaped steel beam 2 is provided with a mounting belt 22 for receiving the lifting nut 412, and the mounting belt 22 limits the rotation of the lifting nut 412. A bracket 21 is provided on the I-shaped steel beam 2, and the first screw 411 is slidably installed on the bracket 21, and the pulley is rotatably connected with the bracket 21 through the frame body. A straight long groove is opened on the first screw 411, and a sliding key is provided on the inner ring of the sleeve. The sleeve cooperates through the keyway, so that the sleeve drives the first screw 411 to rotate synchronously without limiting the lifting of the first screw 411; when disassembling the prefabricated reinforced concrete slab 1, the operator rotates the main shaft 43, and the main shaft 43 drives the first screw 411 to rotate synchronously through the pulley and the synchronous belt, and the lifting nut 412 is installed on the installation belt 2 2, the first screw rod 411 will control itself to move downward when it rotates, and at the same time, the main shaft 43 drives the lifting assembly 42, and the lifting assembly 42 controls the support plate 32 to move upward, and the locking nut 413 is installed on the precast concrete slab. As the first screw rod 411 rotates and moves downward, the first screw rod 411 is separated from the locking nut 413, thereby disconnecting the connection between the precast reinforced concrete slab 1 and the I-shaped steel beam 2, and as the support plate 32 moves upward, the elastic support member 33 contracts, and the elastic force of the elastic support member 33 drives the top plate 31 to move upward, so as to lift the precast reinforced concrete slab 1.

[0039] Reference Figure 6 The lifting assembly 42 includes a second screw rod 421 and an internal threaded sleeve 422 ; the second screw rod 421 is rotatably disposed on the I-shaped steel beam 2 , the internal threaded sleeve 422 is movably disposed on the support plate 32 , and the internal threaded sleeve 422 is threadedly connected to the second screw rod 421 .

[0040] The present invention realizes the function of controlling the lifting and lowering of the support plate 32 through the second screw 421 and the internal threaded sleeve 422. The second screw 421 is connected to the main shaft 43 through the pulley and the synchronous belt; when disassembling the precast reinforced concrete slab 1, the operator rotates the main shaft 43, and the main shaft 43 drives the first screw 411 to rotate synchronously through the pulley and the synchronous belt, and the lifting nut 412 is installed on the installation belt 22. When the first screw 411 rotates, it controls itself to move downward. At the same time, the main shaft 43 drives the second screw 421 to rotate through the pulley and the synchronous belt, and limits the rotation of the internal threaded sleeve 422. The internal threaded sleeve 422 threadedly connected to the second screw 421 is driven to move upward, and the internal threaded sleeve 422 drives the support plate 32 to move upward, and the locking nut 413 is installed on the precast concrete slab. As the first screw 411 rotates and moves downward, the first screw 411 is separated from the locking nut 413, and the connection between the precast reinforced concrete slab 1 and the I-shaped steel beam 2 is disconnected.

[0041] Reference Figure 6 and Figure 7 Abutment ring 4221 is provided on the internal threaded sleeve 422, a docking ring 321 is provided on the support plate 32, and a lifting assembly 34 for lifting the abutment ring 4221 is provided on the support plate 32. When the abutment ring 4221 is tightly matched with the docking ring 321, the docking ring 321 limits the rotation of the abutment ring.

[0042] The present invention realizes the function of limiting the rotation of the internal threaded sleeve 422 through the abutment ring 4221, the docking ring 321 and the lifting assembly 34. When installing the precast reinforced concrete slab 1, when the operator rotates the main shaft 43, the main shaft 43 drives the second screw 421 to rotate through the pulley and the synchronous belt, and the abutment ring 4221 is tightly matched with the docking ring 321 under the drive of the lifting assembly 34, and then the rotation of the abutment ring 4221 is limited by the docking ring 321. The rotation of the second screw 421 drives the internal threaded sleeve 422 threadedly connected thereto to move downward, and the support plate 32 has a tendency to move downward under the combined force of gravity and the elastic force of the elastic support member 33, further causing the abutment ring 4221 and the docking ring 321 to move downward. The abutment stability of the connecting ring 321, the internal threaded sleeve 422 drives the support plate 32 to move downward, releasing the elastic potential energy of the elastic support member 33. After the support plate 32 contacts the I-shaped steel beam 2, it stops moving downward due to the restriction of the I-shaped steel beam 2. At this time, the internal threaded sleeve 422 continues to move downward under the drive of the second screw 421 until the docking ring 321 and the abutment ring 4221 are separated, and the second screw 421 and the internal threaded sleeve 422 idle, thereby avoiding the rotation of the first screw 411 being restricted and affecting the stable connection between the first screw 411 and the locking nut 413.

[0043] Reference Figure 7 and Figure 8 A top column 4222 is slidably mounted on the abutting ring 4221, a third elastic member 4223 is provided at the end of the top column 4222, two ends of the third elastic member 4223 are respectively connected to the top column 4222 and the abutting ring 4221, and a docking hole 3211 matching with the top column 4222 is opened on the docking ring 321.

[0044] The present invention realizes the function of stably connecting the abutting ring 4221 and the docking ring 321 when the abutting ring 4221 and the docking ring 321 are tightly matched through the top column 4222, the third elastic member 4223 and the docking hole 3211. When the abutting ring 4221 and the docking ring 321 are tightly matched, the top column 4222 is squeezed by the docking ring 321, and the third elastic member 4223 contracts. With the rotation of the abutting ring 4221, when the top column 4222 is aligned with the docking hole 3211, the top column 4222 is engaged with the docking hole 3211 under the elastic force of the third elastic member 4223, and then the rotation of the abutting ring 4221 and the internal threaded sleeve 422 is limited by the plug-in match between the top column 4222 and the docking hole 3211.

[0045] Reference Figure 6 and Figure 7 The lifting assembly 34 includes a base plate 341, a gasket 342 and a second elastic member 343; the base plate 341 is installed on the support plate 32, the gasket 342 is slidably installed on the support plate 32, the two ends of the second elastic member 343 are respectively connected to the gasket 342 and the base plate 341, and the gasket 342 abuts against the abutment ring 4221 under the elastic force of the second elastic member 343.

[0046] The present invention realizes the function of driving the abutment ring 4221 to move upward through the bottom plate 341, the gasket 342 and the second elastic member 343. A graphite layer is provided above the gasket 342, and when the gasket 342 contacts the abutment ring 4221, the friction between the gasket 342 and the abutment ring 4221 is reduced. The gasket 342 is lifted up by the elastic force of the third elastic member 4223, and the abutment ring 4221 and the internal threaded sleeve 422 are driven to move upward through the gasket 342, so that the abutment ring 4221 and the docking ring 321 are tightly matched, and the rotation of the internal threaded sleeve 422 is limited. After the support plate 32 moves downward and contacts the I-shaped steel beam 2, the internal threaded sleeve 422 is locked to move further downward, and the internal threaded sleeve 422 and the second screw 421 will be idle, and the wear of the parts is reduced through the graphite layer on the gasket 342.

[0047] Reference Figure 7 and Fig. 9 The support plate 32 is also provided with a one-way limiting component 35 for limiting the rotation direction of the internal threaded sleeve 422; the one-way limiting component 35 includes a mounting ring 351, a ratchet 352 and a stop pawl 353, the mounting ring 351 is mounted on the support ring, the ratchet 352 is rotatably set on the support ring, and the ratchet 352 is slidably sleeved on the internal threaded sleeve 422, the stop pawl 353 is mounted on the mounting ring 351, and the stop pawl 353 is unidirectionally meshed with the ratchet 352.

[0048] The present invention realizes the function of limiting the rotation direction of the internal thread sleeve 422 through the mounting ring 351 , the ratchet wheel 352 and the stopping pawl 353 . When the second screw rod 421 rotates forwardly, it can drive the internal threaded sleeve 422 to rotate forwardly, and the internal threaded sleeve 422 drives the ratchet wheel 352 to rotate forwardly. At this time, the stopping pawl 353 will not limit the rotation of the ratchet wheel 352, and only when the abutment ring 4221 is tightly matched with the docking ring 321, the forward rotation of the abutment ring 4221 and the internal threaded sleeve 422 is limited by the docking ring 321. Therefore, after the support plate 32 contacts the I-shaped steel beam 2, the internal threaded sleeve 422 and the second screw rod 421 can rotate forwardly. When the second screw rod 421 rotates reversely, the stopping pawl 353 hinders the direction of rotation of the ratchet wheel 352, thereby preventing the internal threaded sleeve 422 from rotating in the direction of rotation. Even if the abutment ring 4221 and the docking ring 321 are in a separated state, the second screw rod 421 can still drive the internal threaded sleeve 422 threadedly connected thereto to move upward, and the internal threaded sleeve 422 pushes the support plate 32 to move upward and compress the elastic support member 33.

[0049] Reference Figure 5 and Fig.10 At least four groups of connection components 41 are provided, and the multiple groups of connection components 41 are distributed along a rectangular array, and the multiple first screw rods 411 are connected through pulleys and synchronous belt transmission.

[0050] The present invention achieves the effect of facilitating operators to disassemble the precast reinforced concrete slab 1 by synchronously driving multiple first screws 411 to rotate through pulleys and synchronous belts. In order to improve the seismic performance of the precast reinforced concrete slab 1, a honeycomb core 11 for sound insulation and shock absorption is provided at the bottom of the groove. The sound insulation and heat insulation effects of the honeycomb core 11 improve the energy saving of the building structure, while saving the amount of steel bars, concrete and formwork, and reducing the project cost. When disassembling and assembling the precast reinforced concrete slab 1, it is only necessary to rotate the main shaft 43 to drive multiple first screws 411 to rotate at the same time, and before disconnecting the first screw 411 and then tightening the nut 413, the elastic support frame can be compressed, so that the precast reinforced concrete slab 1 can be quickly disassembled after disconnecting.

[0051] The present invention also provides a construction method of the steel-concrete building structure based on the BIM technology, comprising the following steps:

[0052] S1, placing the prefabricated reinforced concrete slab 1 on the I-shaped steel beam 2;

[0053] S2. Connect the prefabricated reinforced concrete slab 1 and the I-shaped steel beam 2 by bolts, and control the support plate 32 to move downward to release the elastic potential energy of the elastic support member 33.

[0054] The above embodiments only express one or several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. A steel-concrete building structure based on BIM technology, including prefabricated reinforced concrete slabs (1) and I-shaped steel beams (2). It is characterized in that A lifting mechanism (3) for lifting the prefabricated reinforced concrete slab (1) is provided on the I-shaped steel beam (2); the lifting mechanism (3) comprises a top plate (31), a support plate (32), and an elastic support member (33) connecting the top plate (31) and the support plate (32); the top plate (31) and the support plate (32) are capable of sliding in a vertical direction; When the prefabricated reinforced concrete slab (1) and the I-shaped steel beam are connected, the support plate (32) is controlled to move downward, and the elastic support member (33) is in a reset state; When the prefabricated reinforced concrete slab (1) is disassembled, the support plate (32) is controlled to move upward, and the elastic support member (33) is in a compressed state; An auxiliary control mechanism (4) is provided on the I-shaped steel beam (2), and the auxiliary control mechanism (4) comprises a connection component (41) for connecting the prefabricated reinforced concrete slab (1) and the I-shaped steel beam (2), and a lifting component (42) for controlling the lifting of the support plate (32); The main shaft (43) is rotatably arranged on the I-shaped steel beam (2), and the connecting assembly (41) and the lifting assembly (42) are both drivingly connected to the main shaft (43); The connecting assembly (41) comprises a first screw rod (411), a lifting nut (412) and a locking nut (413); The first screw rod (411) is slidably arranged on the I-shaped steel beam (2) in a vertical direction, the lifting nut (412) and the locking nut (413) are respectively installed on the I-shaped steel beam (2) and the precast concrete slab, the lifting nut (412) is threadedly connected to the first screw rod (411), and the locking nut (413) is detachably threadedly connected to the first screw rod (411); The lifting assembly (42) comprises a second screw rod (421) and an internally threaded sleeve (422); The second screw rod (421) is rotatably disposed on the I-shaped steel beam (2), the internal thread sleeve (422) is movably disposed on the support plate (32), and the internal thread sleeve (422) is threadedly connected to the second screw rod (421); An abutment ring (4221) is provided on the internal threaded sleeve (422), a docking ring (321) is provided on the support plate (32), and a lifting assembly (34) for lifting the abutment ring (4221) is provided on the support plate (32); when the abutment ring and the docking ring (321) are tightly matched, the docking ring (321) restricts the rotation of the abutment ring; A top column (4222) is slidably mounted on the abutment ring (4221); a third elastic member (4223) is provided at the end of the top column (4222); two ends of the third elastic member (4223) are respectively connected to the top column (4222) and the abutment ring (4221); and a docking hole (3211) is provided on the docking ring (321) for matching with the top column (4222); The lifting assembly (34) comprises a bottom plate (341), a gasket (342) and a second elastic member (343); The bottom plate (341) is mounted on the support plate (32), the gasket (342) is slidably mounted on the support plate (32), the two ends of the second elastic member (343) are respectively connected to the gasket (342) and the bottom plate (341), and the gasket (342) abuts against the abutment ring (4221) under the elastic force of the second elastic member (343).

2. The steel-concrete building structure based on BIM technology according to claim 1, It is characterized in that A one-way limiting component (35) for limiting the rotation direction of the internal thread sleeve (422) is also provided on the support plate (32); The one-way limiting assembly (35) comprises a mounting ring (351), a ratchet (352) and a stop pawl (353); the mounting ring (351) is mounted on the support ring; the ratchet (352) is rotatably disposed on the support ring, and the ratchet (352) is slidably sleeved on the internal threaded sleeve (422); the stop pawl (353) is mounted on the mounting ring (351), and the stop pawl (353) is one-way meshedly connected to the ratchet (352).

3. The steel-concrete building structure based on BIM technology according to claim 2, It is characterized in that At least four groups of connection components (41) are provided, the multiple groups of connection components (41) are distributed along a rectangular array, and the multiple first screw rods (411) are connected through pulleys and synchronous belt transmission.

4. A construction method for a steel-concrete building structure based on BIM technology according to any one of claims 1 to 3, It is characterized in that The following steps are involved: S1, placing a prefabricated reinforced concrete slab (1) on an I-shaped steel beam (2); S2. Connecting the prefabricated reinforced concrete slab (1) and the I-shaped steel beam (2) by means of bolts, while controlling the support plate (32) to move downward to release the elastic potential energy of the elastic support member (33).