A monitoring system for the utilization efficiency of waste materials in thermal power generation based on machine vision
Using machine vision technology to monitor the stacking structure and details of thermal power plant waste, analyze fuel utilization, and design waste recycling solutions, the problem of insufficient pulverized coal combustion is solved, fuel utilization is improved, costs are reduced, and fly ash is ensured. secondary use quality.
Patent Information
- Application Number
- CN202410232630.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-03-01
Smart Images

Figure CN118247528B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of thermal power plants, and in particular to a thermal power generation waste utilization efficiency monitoring system based on machine vision. Background Art
[0002] A thermal power plant is a factory that uses the heat energy generated by the combustion of combustibles and converts it into electrical energy through a power generation device. Its main working process is that the fuel burns in the boiler to heat water to make it steam, the steam drives the turbine to rotate, and then the turbine drives the generator to generate electricity.
[0003] At present, the combustible materials used in most thermal power plants are mostly coal. In order to ensure that the coal can be fully burned, the coal blocks are often ground into powder and then burned to obtain heat energy and further realize electrical energy conversion. The combustion of coal powder obtains fly ash. Although this fly ash can be used as a secondary building material, the incomplete combustion of coal powder will increase the cost of thermal power generation and is not conducive to its secondary use as a building material. Summary of the invention
[0004] In view of the above-mentioned shortcomings of the prior art, the present invention provides a machine vision-based monitoring system for the utilization efficiency of waste in thermal power generation, which solves the technical problems raised in the above-mentioned background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0006] A machine vision-based monitoring system for the utilization efficiency of waste in thermal power generation, comprising: a collection layer, an analysis layer and a configuration layer;
[0007] The waste image data generated by the combustion of the thermal power plant is collected through the collection layer. The collection layer identifies the waste stacking structure irregularity rate based on the collected waste image data, further designs the waste detail image data collection logic based on the waste stacking structure irregularity rate, collects the waste detail image data based on the waste detail image data collection logic, the analysis layer receives the waste detail image data collected in the collection layer, analyzes the fuel complete utilization probability based on the waste detail image data, the configuration layer obtains the fuel complete utilization probability analysis result analyzed in the analysis layer, and configures the waste recycling plan based on the fuel complete utilization probability analysis result;
[0008] The analysis layer includes a receiving module, an optimization module and an analysis module. The receiving module is used to receive the waste detail image data collected in the collection layer. The optimization module is used to obtain the waste detail image data received in the receiving module and optimize the waste detail image data. The analysis module is used to receive the waste detail image data that has been optimized in the optimization module and analyze the probability of full fuel utilization based on the waste detail image data.
[0009] The probability of full fuel utilization in the analysis module is obtained by the following formula:
[0010]
[0011] Where: K is the probability of complete fuel utilization; u is the set of waste detail image data; sim(v, v+1) is the similarity between the vth group of waste detail image data and the v+1th group of waste detail image data; sim(v, v+2) is the similarity between the vth group of waste detail image data and the v+2th group of waste detail image data; m u is the total amount of waste detail image data in set u; χ is the normalization factor;
[0012] The greater the probability of full fuel utilization K, the higher the fuel combustion efficiency in the thermal power plant. Conversely, the lower the fuel combustion efficiency in the thermal power plant. The normalization factor χ is not less than 1 and not greater than m. u integer, and is proportional to the calculated value.
[0013] Furthermore, the acquisition layer includes a shooting module, a recognition module and a design module, the shooting module is used to collect waste image data, the recognition module is used to receive the waste image data collected by the shooting module, and identify the waste stacking structure irregularity rate based on the waste image data, and the design module is used to obtain the waste stacking structure irregularity rate identified in the recognition module, and design the waste detail image data acquisition logic according to the waste stacking structure irregularity rate;
[0014] Among them, the shooting module is integrated with a drone and a camera. When the shooting module collects waste image data, the waste image data is collected based on a bird's-eye view state, and the waste image boundary in the waste image data does not overlap with the boundary of the waste image data. The shooting module collects no less than three groups of waste image data. The waste detail image data collection logic designed in the design module is fed back to the shooting module in real time. The shooting module runs again based on the received waste detail image data collection logic to complete the collection of the waste detail image data.
[0015] Furthermore, the recognition logic of the waste stacking structure irregularity rate in the recognition module is expressed as:
[0016]
[0017] Where: θ is the structural irregularity rate of the waste stacking structure identified based on the waste image data; n is the set of edges and corners formed by the waste stacking in the waste image data; m n is the total amount of edges and corners in set n; d(h i ,h i+1 ) is the straight-line distance between the vertices of the i-th group of corners and its adjacent i+1-th group of corners; C(hi ,h i+1 ,h i+2 ) is the curvature of the arc formed by connecting the i-th group of edges and the adjacent i+1-th and i+2-th groups of edges; θ′ is the waste stacking structure irregularity rate; θ1 is the waste stacking structure irregularity rate identified based on the first group of waste image data; θ2 is the waste stacking structure irregularity rate identified based on the second group of waste image data; θ3 is the waste stacking structure irregularity rate identified based on the third group of waste image data; ω1, ω2, ω3, ... are weights;
[0018] Among them, ω1+ω2+ω3+...=1, and it obeys the setting logic that the larger the θ multiplied by the weight is, the larger the weight value is.
[0019] Furthermore, during the operation phase of the design module, the waste stacking structure irregularity rate and the waste detail image data collection ratio are set, and the waste stacking structure irregularity rate is further obtained. The waste detail image data collection quantity is designed based on the set collection ratio and the waste stacking structure irregularity rate, and the collection quantity of the waste detail image data is not less than twice the collected waste image data;
[0020] Among them, when the number of waste detail image data collected based on the collection ratio and the irregularity rate of the waste stacking structure is not an integer, it is rounded up. When each group of waste detail image data is collected, the distance between the camera end of the camera in the shooting module and the surface of the stacked waste is equal. There are no identical areas in each group of collected waste detail image data, and there are no sharp edges in each group of collected waste detail image data.
[0021] Furthermore, the optimization processing logic of the waste detail image data in the optimization module is expressed as:
[0022]
[0023] Where: J(x) is the optimized waste detail image data; J(d) is the attenuation process of the incident light; A ∞ is the ambient light value at infinity of the waste pile background; β is the distance between the camera end and the waste pile surface when collecting the waste detail image data; d is the scattering coefficient of the transmission medium; t(x) is the transmittance; A is the atmospheric light intensity; J(d)+A ∞ *(1-e β*d )=I(x) represents the waste material detail image data before optimization;
[0024] Among them, based on the above logic formula, each group of waste detail image data received by the receiving module is optimized in sequence, and the optimization processing of the waste detail image data in the optimization module is the defogging and dehazing processing of the waste detail image data.
[0025] Furthermore, during the operation phase of the analysis module, the fuel consumption and electricity conversion ratio of the thermal power plant are obtained in real time in synchronization with the power generation management background of the thermal power plant. After continuously obtaining no less than three groups of fuel consumption and electricity conversion ratios of the thermal power plants, the fuel consumption and electricity conversion ratios of each group of thermal power plants are compared based on the acquisition order: the obtained fuel consumption and electricity conversion ratios of the thermal power plants are recorded as g1, g2, g3, ..., and the three groups of fuel consumption and electricity conversion ratios of the thermal power plants obtained continuously are represented by g1, g2, and g3. When g1>g2>g3 or g1>g2, g1>g3, the configuration layer is triggered to run. Otherwise, another pile of waste generated by combustion in the thermal power plant is used as the system processing target, and the system operation is refreshed.
[0026] Furthermore, the similarity between the two groups of waste material detail image data is calculated by the following formula:
[0027]
[0028] Where: sim(a,b) is the similarity between waste detail image data a and waste detail image data b; M and N are the rows and columns of the image; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data a; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data b;
[0029] The larger the value of sim(a, b), the higher the similarity between the two groups of waste material detail image data; otherwise, the smaller the value of sim(a, b), the lower the similarity between the two groups of waste material detail image data.
[0030] Furthermore, the configuration layer includes a logic module, a configuration module and a verification module. The logic module is used to receive the fuel complete utilization probability K analyzed by the analysis module in the analysis layer, and set the waste recovery logic based on the fuel complete utilization probability K and the total mass of the waste from the fuel complete utilization probability K. The configuration module is used to receive the waste recovery ratio set in the logic module, and configure the mass of the waste doped in the fuel transported during the thermal power generation process of the thermal power plant based on the waste recovery ratio. The verification module is used to verify whether the waste recovery plan is effective;
[0031] Among them, the total mass of waste from the source of the probability K of complete fuel utilization is obtained from the power generation management background of the thermal power plant. The waste recycling logic set in the logic module is: the number of waste recycling times and the single mass of waste recycling; the number of waste recycling obeys: not less than three times, and the single mass of waste recycling obeys: the mass of each waste recycling is equal, and the single waste recycling mass is less than one-fifth of the single mass of fuel transported during the thermal power generation process of the thermal power plant. The waste recycling logic set in the logic module is the waste recycling plan, and the waste recycling operation is based on the waste recycling ratio and the operation of mixing waste into the fuel transported during the thermal power generation process of the thermal power plant.
[0032] Furthermore, the logic of verifying whether the waste recycling scheme is effective in the verification module is:
[0033] Logic1: Obtain the amount of electric energy conversion and fuel delivery completed by the fuel during the thermal power generation process of the thermal power plant in the most recent state without the participation of the waste recovery logic in the power generation management background of the thermal power plant;
[0034] Logic2: Obtain the amount of electric energy conversion completed by the fuel transportation during the thermal power generation process of the thermal power plant and the amount of fuel in the fuel transportation amount in the most recent state where the waste recycling logic is involved in the thermal power plant power generation management background;
[0035] Logic3: compare the ratio of the fuel quantity to the electric energy conversion quantity in Logic2, recorded as ratio 1, and the ratio of the fuel delivery quantity to the electric energy conversion quantity in Logic1, recorded as ratio 2;
[0036] Logic 4: If ratio 1 is less than or equal to ratio 2, the waste recycling scheme is valid; if ratio 1 is greater than ratio 2, the waste recycling scheme is invalid;
[0037] Among them, when Logic4 determines that the waste recycling plan is invalid, it uses the waste generated by combustion in another thermal power plant as the system processing target and refreshes the system operation.
[0038] Furthermore, the receiving module is interactively connected to the optimization module and the analysis module through a wireless network, the receiving module is interactively connected to the design module through a wireless network, the design module is interactively connected to the identification module and the shooting module through a wireless network, the analysis module is interactively connected to the logic module through a wireless network, and the logic module is interactively connected to the configuration module and the verification module through a wireless network.
[0039] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects:
[0040] The present invention provides a machine vision-based monitoring system for the utilization efficiency of waste in thermal power generation. During operation, the system collects image data of waste generated by combustion in a thermal power plant, analyzes the probability of complete fuel utilization of the waste, and further designs a waste recovery plan based on the analysis result, thereby realizing intelligent fuel transportation during the power generation process of the thermal power plant, ensuring a better utilization rate of fuel used in thermal power generation in the thermal power plant, thereby controlling the thermal power generation cost of the thermal power plant to a certain extent;
[0041] When the system is running, it can adaptively configure the collection logic of the waste image data generated by the combustion of thermal power plants, ensuring that the collected waste image data generated by the combustion of thermal power plants can be stably and accurately applied by the system, further ensuring that the system's final analysis results on the probability of full utilization of fuel used for thermal power generation in thermal power plants are accurate;
[0042] At the same time, based on the system operation, the present invention can conduct availability assessment on waste generated by thermal power generation in thermal power plants, and further use the assessment results as data reference to ensure that the combustion waste used as building materials has better quality and more stable performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0044] Figure 1 It is a structural schematic diagram of a thermal power generation waste utilization efficiency monitoring system based on machine vision;
[0045] Figure 2 This is a schematic diagram of the system operation logic of the present invention. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0047] The present invention will be further described below in conjunction with the embodiments.
[0048] Embodiment 1:
[0049] A machine vision-based thermal power generation waste utilization efficiency monitoring system of this embodiment, such as Figure 1 As shown, it includes a collection layer, an analysis layer and a configuration layer;
[0050] The waste image data generated by the combustion of the thermal power plant is collected through the collection layer. The collection layer identifies the waste stacking structure irregularity rate based on the collected waste image data, further designs the waste detail image data collection logic based on the waste stacking structure irregularity rate, collects the waste detail image data based on the waste detail image data collection logic, the analysis layer receives the waste detail image data collected in the collection layer, analyzes the fuel complete utilization probability based on the waste detail image data, the configuration layer obtains the fuel complete utilization probability analysis result analyzed in the analysis layer, and configures the waste recycling plan based on the fuel complete utilization probability analysis result;
[0051] The acquisition layer includes a shooting module, a recognition module and a design module. The shooting module is used to collect waste image data. The recognition module is used to receive the waste image data collected by the shooting module and recognize the waste stacking structure irregularity rate based on the waste image data. The design module is used to obtain the waste stacking structure irregularity rate identified in the recognition module and design the waste detail image data acquisition logic according to the waste stacking structure irregularity rate.
[0052] The shooting module is integrated with a drone and a camera. When the shooting module collects waste image data, the waste image data is collected based on a bird's-eye view state, and the waste image boundary in the waste image data does not overlap with the boundary of the waste image data. The shooting module collects no less than three groups of waste image data. The waste detail image data collection logic designed in the design module is fed back to the shooting module in real time. The shooting module runs again based on the received waste detail image data collection logic to complete the collection of waste detail image data.
[0053] The analysis layer includes a receiving module, an optimization module and an analysis module. The receiving module is used to receive the waste detail image data collected in the collection layer. The optimization module is used to obtain the waste detail image data received in the receiving module and optimize the waste detail image data. The analysis module is used to receive the waste detail image data that has been optimized in the optimization module and analyze the probability of full fuel utilization based on the waste detail image data.
[0054] The probability of full fuel utilization in the analysis module is calculated using the following formula:
[0055]
[0056] Where: K is the probability of complete fuel utilization; u is the set of waste detail image data; sim(v, v+1) is the similarity between the vth group of waste detail image data and the v+1th group of waste detail image data; sim(v, v+2) is the similarity between the vth group of waste detail image data and the v+2th group of waste detail image data; m u is the total amount of waste detail image data in set u; χ is the normalization factor;
[0057] The greater the probability of full fuel utilization K, the higher the fuel combustion efficiency in the thermal power plant. Conversely, the lower the fuel combustion efficiency in the thermal power plant. The normalization factor χ is not less than 1 and not greater than m. u integer, and is proportional to the calculated value of;
[0058] The configuration layer includes a logic module, a configuration module and a verification module. The logic module is used to receive the fuel complete utilization probability K analyzed by the analysis module in the analysis layer, and set the waste recovery logic based on the fuel complete utilization probability K and the total mass of the waste source of the fuel complete utilization probability K. The configuration module is used to receive the waste recovery ratio set in the logic module, and configure the mass of the waste mixed in the fuel transported during the thermal power generation process of the thermal power plant based on the waste recovery ratio. The verification module is used to verify whether the waste recovery plan is effective;
[0059] Among them, the total mass of waste from the source of the probability K of complete fuel utilization is obtained from the power generation management background of the thermal power plant. The waste recycling logic set in the logic module is: the number of waste recycling and the single mass of waste recycling; the number of waste recycling is subject to: not less than three times, and the single mass of waste recycling is subject to: the mass of each waste recycling is equal, and the single waste recycling mass is less than one-fifth of the single fuel mass transported during the thermal power generation process of the thermal power plant. The waste recycling logic set in the logic module is the waste recycling plan, and the waste recycling operation is based on the waste recycling ratio and the operation of mixing waste into the fuel transported during the thermal power generation process of the thermal power plant;
[0060] The receiving module is interactively connected to the optimization module and the analysis module through a wireless network, the receiving module is interactively connected to the design module through a wireless network, the design module is interactively connected to the recognition module and the shooting module through a wireless network, the analysis module is interactively connected to the logic module through a wireless network, and the logic module is interactively connected to the configuration module and the verification module through a wireless network.
[0061] In this embodiment, the shooting module runs to collect waste image data, the recognition module synchronously receives the waste image data collected by the shooting module, identifies the waste stacking structure irregularity rate based on the waste image data, the design module further obtains the waste stacking structure irregularity rate identified in the recognition module, and designs the waste detail image data collection logic according to the waste stacking structure irregularity rate, the receiving module post-operates to receive the waste detail image data collected in the collection layer, the optimization module simultaneously obtains the waste detail image data received in the receiving module, optimizes the waste detail image data, and then the analysis module receives the waste detail image data optimized in the optimization module, analyzes the fuel complete utilization probability based on the waste detail image data, and finally receives the fuel complete utilization probability K analyzed by the analysis module in the analysis layer through the logic module, sets the waste recovery logic based on the fuel complete utilization probability K and the total mass of the waste source of the fuel complete utilization probability K, the configuration module runs to receive the waste recovery ratio set in the logic module, configures the mass of the waste doped in the fuel transported during the thermal power generation process of the thermal power plant based on the waste recovery ratio, and the verification module synchronously verifies whether the waste recovery plan is effective;
[0062] Through the operation of the system in the above embodiment, the utilization efficiency of combustion waste is monitored in real time for the thermal power plant, ensuring that the fuel used in the operation of the thermal power plant is fully utilized and maintaining the daily operation cost of the thermal power plant.
[0063] Embodiment 2:
[0064] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The following is a further detailed description of a machine vision-based thermal power generation waste utilization efficiency monitoring system in Example 1:
[0065] The recognition logic of the waste stacking structure irregularity rate in the recognition module is expressed as:
[0066]
[0067] Where: θ is the structural irregularity rate of the waste stacking structure identified based on the waste image data; n is the set of edges and corners formed by the waste stacking in the waste image data; m n is the total amount of edges and corners in set n; d(h i ,h i+1 ) is the straight-line distance between the vertices of the i-th group of corners and its adjacent i+1-th group of corners; C(h i ,h i+1 ,h i+2) is the curvature of the arc formed by connecting the i-th group of edges and the adjacent i+1-th and i+2-th groups of edges; θ′ is the waste stacking structure irregularity rate; θ1 is the waste stacking structure irregularity rate identified based on the first group of waste image data; θ2 is the waste stacking structure irregularity rate identified based on the second group of waste image data; θ3 is the waste stacking structure irregularity rate identified based on the third group of waste image data; ω1, ω2, ω3, ... are weights;
[0068] Among them, ω1+ω2+ω3+...=1, and it obeys the setting logic that the larger the θ multiplied by the weight is, the larger the weight value is.
[0069] Through the setting of the above-mentioned waste stacking structure irregularity rate recognition logic, necessary operation data support is provided for the operation of the design module, ensuring that the design module stably operates the design waste detail image data acquisition logic.
[0070] like Figure 1 As shown, during the design module operation phase, the waste stacking structure irregularity rate and the waste detail image data collection ratio are set, and the waste stacking structure irregularity rate is further obtained. The waste detail image data collection quantity is designed based on the set collection ratio and the waste stacking structure irregularity rate, and the collection quantity of the waste detail image data is not less than twice the collected waste image data;
[0071] Among them, when the number of waste detail image data collected based on the collection ratio and the irregularity rate of the waste stacking structure is not an integer, it is rounded up. When each group of waste detail image data is collected, the distance between the camera end of the camera in the shooting module and the surface of the stacked waste is equal. There are no identical areas in each group of collected waste detail image data, and there are no sharp edges in each group of collected waste detail image data.
[0072] Through the above settings, the operation logic of the design module is further limited, ensuring that the design module runs more stably and collects detailed image data of waste materials.
[0073] Embodiment 3:
[0074] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The following is a further detailed description of a machine vision-based thermal power generation waste utilization efficiency monitoring system in Example 1:
[0075] The optimization processing logic of waste detail image data in the optimization module is expressed as:
[0076]
[0077] Where: J(x) is the optimized waste detail image data; J(d) is the attenuation process of the incident light; A ∞is the ambient light value at infinity of the waste pile background; β is the distance between the camera end and the waste pile surface when collecting the waste detail image data; d is the scattering coefficient of the transmission medium; t(x) is the transmittance; A is the atmospheric light intensity; J(d)+A ∞ *(1-e β*d )=I(x) represents the waste material detail image data before optimization;
[0078] Among them, based on the above logic formula, each group of waste detail image data received by the receiving module is optimized in sequence, and the optimization processing of the waste detail image data in the optimization module is the defogging and dehazing processing of the waste detail image data.
[0079] By setting the above-mentioned optimization processing logic of the waste detail image data, an image optimization processing effect is brought to the waste detail image data, so that the waste detail image data applied by the system for further operation can highlight the image features and make the system operation output results more accurate.
[0080] like Figure 1 As shown, during the operation phase of the analysis module, the fuel consumption and electricity conversion ratio of the thermal power plant are obtained in real time in synchronization with the power generation management background of the thermal power plant. After continuously obtaining no less than three groups of fuel consumption and electricity conversion ratios of the thermal power plants, the fuel consumption and electricity conversion ratios of each group of thermal power plants are compared based on the acquisition order: the obtained fuel consumption and electricity conversion ratios of the thermal power plants are recorded as g1, g2, g3, ..., and the three groups of fuel consumption and electricity conversion ratios of the thermal power plants obtained continuously are represented by g1, g2, and g3. When g1>g2>g3 or g1>g2, g1>g3, the configuration layer is triggered to run. Otherwise, another pile of waste generated by combustion in the thermal power plant is used as the system processing target, and the system operation is refreshed.
[0081] Through the above settings, a further continuous operation logic is provided for the system operation, thereby improving the system's autonomous operation capability and reducing the manual demand for system operation and management.
[0082] Embodiment 4:
[0083] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The following is a further detailed description of a machine vision-based thermal power generation waste utilization efficiency monitoring system in Example 1:
[0084] The similarity of two sets of waste detail image data is calculated using the following formula:
[0085]
[0086] Where: sim(a,b) is the similarity between waste detail image data a and waste detail image data b; M and N are the rows and columns of the image; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data a; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data b;
[0087] The larger the value of sim(a, b), the higher the similarity between the two groups of waste material detail image data; otherwise, the smaller the value of sim(a, b), the lower the similarity between the two groups of waste material detail image data.
[0088] Through the above similarity calculation formula, the method and value of obtaining the similarity of each waste material detail image data used in the fuel complete utilization probability calculation formula are further limited.
[0089] like Figure 1 As shown, the logic of verifying whether the waste recycling scheme is effective in the verification module is:
[0090] Logic1: Obtain the amount of electric energy conversion and fuel delivery completed by the fuel during the thermal power generation process of the thermal power plant in the most recent state without the participation of the waste recovery logic in the power generation management background of the thermal power plant;
[0091] Logic2: Obtain the amount of electric energy conversion completed by the fuel transportation during the thermal power generation process of the thermal power plant and the amount of fuel in the fuel transportation amount in the most recent state where the waste recycling logic is involved in the thermal power plant power generation management background;
[0092] Logic3: compare the ratio of the fuel quantity to the electric energy conversion quantity in Logic2, recorded as ratio 1, and the ratio of the fuel delivery quantity to the electric energy conversion quantity in Logic1, recorded as ratio 2;
[0093] Logic 4: If ratio 1 is less than or equal to ratio 2, the waste recycling scheme is valid; if ratio 1 is greater than ratio 2, the waste recycling scheme is invalid;
[0094] Among them, when Logic4 determines that the waste recycling plan is invalid, it uses the waste generated by combustion in another thermal power plant as the system processing target and refreshes the system operation.
[0095] Through the above settings, the system operation logic is finally improved, the output of the final operation results of the system is realized, and the system continuous operation logic is provided to ensure that the system can continuously operate to monitor the utilization efficiency of combustion waste in thermal power plants.
[0096] In summary, in the above embodiment, during operation, the system collects image data of waste generated by combustion in thermal power plants, analyzes the probability of complete fuel utilization of the waste, and further designs a waste recovery plan based on the analysis results, thereby realizing intelligent fuel transportation during the power generation process of thermal power plants, ensuring better fuel utilization for thermal power generation in thermal power plants, thereby controlling the thermal power generation cost of thermal power plants to a certain extent. When the system is running, it can adaptively configure the collection logic of image data of waste generated by combustion in thermal power plants, ensuring that the collected image data of waste generated by combustion in thermal power plants can be stably and accurately applied by the system operation, further ensuring that the system's final analysis results on the probability of complete utilization of fuel used for thermal power generation in thermal power plants are accurate. At the same time, based on the operation of the system, the present invention can evaluate the availability of waste generated by thermal power generation in thermal power plants, and further use the evaluation results as data reference, so that the quality of combustion waste used for secondary use as building materials is better and the performance is more stable.
[0097] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A machine vision-based monitoring system for the utilization efficiency of thermal power generation waste. It is characterized in that include: Collection layer, analysis layer and configuration layer; The waste image data generated by the combustion of the thermal power plant is collected through the collection layer. The collection layer identifies the waste stacking structure irregularity rate based on the collected waste image data, further designs the waste detail image data collection logic based on the waste stacking structure irregularity rate, collects the waste detail image data based on the waste detail image data collection logic, the analysis layer receives the waste detail image data collected in the collection layer, analyzes the fuel complete utilization probability based on the waste detail image data, the configuration layer obtains the fuel complete utilization probability analysis result analyzed in the analysis layer, and configures the waste recycling plan based on the fuel complete utilization probability analysis result; The analysis layer includes a receiving module, an optimization module and an analysis module. The receiving module is used to receive the waste detail image data collected in the collection layer. The optimization module is used to obtain the waste detail image data received in the receiving module and optimize the waste detail image data. The analysis module is used to receive the waste detail image data that has been optimized in the optimization module and analyze the probability of full fuel utilization based on the waste detail image data. The probability of full fuel utilization in the analysis module is obtained by the following formula: Where: K is the probability of complete fuel utilization; u is the set of waste detail image data; sim(v, v+1) is the similarity between the vth group of waste detail image data and the v+1th group of waste detail image data; sim(v, v+2) is the similarity between the vth group of waste detail image data and the v+2th group of waste detail image data; m u is the total amount of waste detail image data in set u; χ is the normalization factor; The greater the probability of full fuel utilization K, the higher the fuel combustion efficiency in the thermal power plant. Conversely, the lower the fuel combustion efficiency in the thermal power plant. The normalization factor χ is not less than 1 and not greater than m. u integer, and is proportional to the calculated value of; The acquisition layer includes a shooting module, a recognition module and a design module. The shooting module is used to collect waste image data. The recognition module is used to receive the waste image data collected by the shooting module and recognize the waste stacking structure irregularity rate based on the waste image data. The design module is used to obtain the waste stacking structure irregularity rate identified in the recognition module and design the waste detail image data acquisition logic according to the waste stacking structure irregularity rate. The shooting module is integrated with a drone and a camera. When the shooting module collects waste image data, the waste image data is collected based on a bird's-eye view state. The shooting module collects no less than three groups of waste image data. The waste detail image data collection logic designed in the design module is fed back to the shooting module in real time. The shooting module runs again based on the received waste detail image data collection logic to complete the collection of waste detail image data. The recognition logic of the waste stacking structure irregularity rate in the recognition module is expressed as follows: Where: θ is the structural irregularity rate of the waste stacking structure identified based on the waste image data; n is the set of edges and corners formed by the waste stacking in the waste image data; m n is the total amount of edges and corners in set n; d(h i ,h i+1 ) is the straight-line distance between the vertices of the i-th group of corners and its adjacent i+1-th group of corners; C(h i ,h i+1 ,h i+2 ) is the curvature of the arc connecting the i-th group of edges and the adjacent i+1-th and i+2-th groups of edges; θ′ is the structural irregularity rate of the waste stacking; θ 1 is the waste stacking structure irregularity rate identified based on the first set of waste image data; θ 2 is the waste stacking structure irregularity rate identified based on the second set of waste image data; θ 3 is the waste stacking structure irregularity rate identified based on the third set of waste image data; ω 1 ,ω 2 ,ω 3 , ... are weights; Among them, ω 1 +ω 2 +ω 3 +...=1, and the larger the θ multiplied by the weight is, the larger the weight value is; The design module sets the waste stacking structure irregularity rate and the waste detail image data collection ratio during the operation phase, further obtains the waste stacking structure irregularity rate, designs the waste detail image data collection quantity based on the set collection ratio and the waste stacking structure irregularity rate, and the waste detail image data collection quantity is not less than twice the collected waste image data; Among them, when the number of waste detail image data collected based on the collection ratio and the irregularity rate of the waste stacking structure is not an integer, it is rounded up. When each group of waste detail image data is collected, the distance between the camera end of the camera in the shooting module and the surface of the stacked waste is equal. There are no identical areas in each group of collected waste detail image data, and there are no sharp edges in each group of collected waste detail image data.
2. According to claim 1, a machine vision-based thermal power generation waste utilization efficiency monitoring system, It is characterized in that The optimization processing logic of the waste detail image data in the optimization module is expressed as follows: Where: J(x) is the optimized waste detail image data; J(d) is the attenuation process of the incident light; A∞ is the ambient light value at infinity of the waste pile background; β is the distance between the camera end and the waste pile surface when the waste detail image data is collected; d is the scattering coefficient of the transmission medium; t(x) is the transmittance; A is the atmospheric light intensity; J(d)+A ∞ *(1-e β*d )=I(x) represents the waste material detail image data before optimization; Among them, based on the above logic formula, each group of waste detail image data received by the receiving module is optimized in sequence, and the optimization processing of the waste detail image data in the optimization module is the defogging and dehazing processing of the waste detail image data.
3. According to claim 1, a machine vision-based thermal power generation waste utilization efficiency monitoring system, It is characterized in that During the operation phase of the analysis module, the fuel consumption and power conversion ratio of the thermal power plant are obtained in real time in synchronization with the power generation management background of the thermal power plant. After continuously obtaining no less than three groups of fuel consumption and power conversion ratios of the thermal power plants, the fuel consumption and power conversion ratios of each group of thermal power plants are compared based on the acquisition sequence: the obtained fuel consumption and power conversion ratio of the thermal power plant is recorded as, g 1 , g 2 , g 3 , ..., the three groups of fuel consumption and electricity conversion ratios of thermal power plants obtained continuously are represented by g1, g2, and g3. When g1>g2>g3 or g1>g2, g1>g3, the configuration layer is triggered to run. Otherwise, the waste generated by the combustion of another thermal power plant is taken as the system processing target, and the system operation is refreshed.
4. According to claim 1, a machine vision-based thermal power generation waste utilization efficiency monitoring system, It is characterized in that The similarity of the two groups of waste material detail image data is calculated by the following formula: Where: sim(a,b) is the similarity between waste detail image data a and waste detail image data b; M and N are the rows and columns of the image; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data a; is the angular second-order moment of the image block in the xth row and yth column of the waste detail image data b; The larger the value of sim(a, b), the higher the similarity between the two groups of waste material detail image data; otherwise, the smaller the value of sim(a, b), the lower the similarity between the two groups of waste material detail image data.
5. According to claim 1, a machine vision-based thermal power generation waste utilization efficiency monitoring system, It is characterized in that The configuration layer includes a logic module, a configuration module and a verification module. The logic module is used to receive the fuel complete utilization probability K analyzed by the analysis module in the analysis layer, and set the waste recovery logic based on the fuel complete utilization probability K and the total mass of the waste source of the fuel complete utilization probability K. The configuration module is used to receive the waste recovery ratio set in the logic module, and configure the mass of the waste doped in the fuel transported during the thermal power generation process of the thermal power plant based on the waste recovery ratio. The verification module is used to verify whether the waste recovery plan is effective; Among them, the total mass of waste from the source of the probability K of complete fuel utilization is obtained from the power generation management background of the thermal power plant. The waste recycling logic set in the logic module is: the number of waste recycling times and the single mass of waste recycling; the number of waste recycling obeys: not less than three times, and the single mass of waste recycling obeys: the mass of each waste recycling is equal, and the single waste recycling mass is less than one-fifth of the single mass of fuel transported during the thermal power generation process of the thermal power plant. The waste recycling logic set in the logic module is the waste recycling plan, and the waste recycling operation is based on the waste recycling ratio and the operation of mixing waste into the fuel transported during the thermal power generation process of the thermal power plant.
6. A machine vision-based thermal power generation waste utilization efficiency monitoring system according to claim 5, It is characterized in that The logic of verifying whether the waste recycling scheme is effective in the verification module is: Logic1: Obtain the amount of electric energy conversion and fuel delivery completed by the fuel during the thermal power generation process of the thermal power plant in the most recent state without the participation of the waste recovery logic in the power generation management background of the thermal power plant; Logic2: Obtain the amount of electric energy conversion completed by the fuel transportation during the thermal power generation process of the thermal power plant and the amount of fuel in the fuel transportation amount in the most recent state where the waste recycling logic is involved in the thermal power plant power generation management background; Logic3: compare the ratio of the fuel quantity to the electric energy conversion quantity in Logic2, recorded as ratio 1, and the ratio of the fuel delivery quantity to the electric energy conversion quantity in Logic1, recorded as ratio 2; Logic 4: If ratio 1 is less than or equal to ratio 2, the waste recycling scheme is valid; if ratio 1 is greater than ratio 2, the waste recycling scheme is invalid; Among them, when Logic4 determines that the waste recycling plan is invalid, it uses the waste generated by combustion in another thermal power plant as the system processing target and refreshes the system operation.
7. According to claim 1, a machine vision-based thermal power generation waste utilization efficiency monitoring system, It is characterized in that The receiving module is interactively connected to the optimization module and the analysis module through a wireless network, the receiving module is interactively connected to the design module through a wireless network, the design module is interactively connected to the identification module and the shooting module through a wireless network, the analysis module is interactively connected to the logic module through a wireless network, and the logic module is interactively connected to the configuration module and the verification module through a wireless network.
Citation Information
Patent Citations
Big data regulation and control method and system applied to wet desulphurization system
CN115509189A
Multi-source fuel blending system and method based on gasification slag and solid waste pyrolysis semicoke
CN116832693A
Electric furnace production intelligent control method and system based on 5G technology
CN116984274A
Square tube production quality detection system based on machine vision
CN117250200A
Quality detection system based on thermal power plant fuel processing