Optimization Methods for Pre-Performance Energy Supplementation in Shale Oil Infill Horizontal Wells
By optimizing the energy replenishment methods of infill horizontal wells and original horizontal wells through differentiated energy replenishment design, the problem of reasonable energy replenishment for shale oil infill horizontal wells was solved, the production of single wells and the stable production time were improved, and the remaining oil fluids were fully utilized.
Patent Information
- Application Number
- CN202211683695.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-27
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-12-27
AI Technical Summary
In existing technologies, it is difficult to implement reasonable energy replenishment in shale oil infill horizontal wells, resulting in poor energy replenishment effects. This leads to ineffective fracturing in shale oil wells with poor reservoir properties after infill, short stable production time, and difficulty in utilizing the remaining oil.
By collecting data and designing differentiated energy replenishment, the energy replenishment methods and parameters of infill horizontal wells and original horizontal wells are optimized, resulting in changes in the local stress field. This increases the complexity of the fracturing fractures in the infill horizontal wells, thereby improving single-well production and stable production time.
It has enabled effective energy replenishment of infiltrated horizontal wells, avoided ineffective fracturing, increased single-well production, extended stable production time, and made full use of remaining oil fluids.
Abstract
Description
Technical Field
[0001] This invention belongs to the field of oil production engineering technology and relates to an optimization method for pre-pressure energy replenishment in shale oil infill horizontal wells. Background Technology
[0002] In the field of oil production engineering, shale oil is a self-generated and self-storing reservoir. It has gone through stages of development, including directional well water injection development, short horizontal well water injection development, and long horizontal well (horizontal section length greater than 1000m) natural energy development. Due to poor reservoir properties (permeability less than 0.3mD), the water drive effect of development methods such as synchronous water injection or advanced water injection is poor. Therefore, the current mainstream development method is long horizontal well (horizontal section length greater than 1000m) natural energy development. As the development time is extended, the well spacing of the horizontal wells deployed in the early development stage is large (well spacing is 1200m), and the crude oil recovery rate is only about 3%, which requires infill adjustment. The main infill adjustment method is to add 1 or 3 horizontal wells between the two originally deployed horizontal wells (the deployment orientation is the same as the original horizontal wells, that is, the horizontal section of the infill horizontal well is parallel to the original horizontal wells).
[0003] The primary reservoir stimulation method for infill horizontal wells is subdivided volumetric fracturing. Production practice shows that this method easily leads to communication between the fracturing fractures and the original horizontal well fractures, resulting in ineffective fracturing and a short stable production time. The main reason is that the original horizontal wells utilize natural energy for development, and the formation energy gradually decreases, reaching only 34% at the time of infill drilling, making it a low-pressure area. The fracturing fractures in the infill horizontal well then propagate unidirectionally towards this low-energy region, leaving a large amount of residual oil between the infill horizontal well and the original horizontal well that remains unutilized.
[0004] To address this, it is urgent to create localized changes in the geostress field and form complex fractures by pre-filling energy in the infill horizontal wells and pre-filling energy in the original horizontal wells, thereby fully utilizing the remaining oil fluid in the area between the infill horizontal wells and the original old wells. Summary of the Invention
[0005] The purpose of this invention is to provide an optimized method for pre-pressure energy replenishment in shale oil infill horizontal wells, which solves the problem that existing technologies struggle to implement reasonable energy replenishment in shale oil infill horizontal wells and result in poor energy replenishment effects.
[0006] The technical solution adopted in this invention is a method for optimizing energy replenishment before pressure reduction in shale oil infill horizontal wells, implemented according to the following steps:
[0007] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells.
[0008] Step 2: Collect encryption parameters for the encrypted horizontal wells. Encryption parameters refer to the number of encrypted wells between the original horizontal wells and the encrypted well spacing.
[0009] Step 3: Collect rock mechanical parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone.
[0010] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions; reservoir physical properties mainly refer to permeability.
[0011] Step 4: Conduct overall energy replenishment design based on the well group;
[0012] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0013] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well;
[0014] Step 7: Produce the well in a sealed manner, and the process is complete.
[0015] The beneficial effects of this invention are that, in order to avoid the excessive extension of horizontal wells into low-pressure areas after infilling, resulting in ineffective fracturing, by taking the original horizontal well and the infilled horizontal well as a whole into consideration, the energy replenishment method, energy replenishment degree and energy replenishment sequence are optimized in a differentiated manner, thereby changing the local stress field, promoting the complexity of the fracturing fractures in the infilled horizontal well, achieving full utilization of the remaining oil fluid, increasing the production of a single well and achieving extended stable production. Detailed Implementation
[0016] The present invention will now be described in detail with reference to specific embodiments.
[0017] The method of the present invention is implemented according to the following steps:
[0018] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells, to provide a basis for energy replenishment of the original horizontal wells;
[0019] 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment.
[0020] Remove the sucker rod, pump, and tubing from the original horizontal wellbore. If the sucker rod or tubing is severely coated with wax, scale, or produces sand, dewaxing, descaling, and sand removal are necessary before refueling. This serves two purposes: firstly, to avoid damaging the old well during refueling; and secondly, to prevent blockage of some perforated sections of the original horizontal well, leading to uneven fluid injection and insufficient refueling.
[0021] After the wellbore is treated, a pressure test must be conducted on the section above the perforation to prevent leakage, which could prevent the replenished energy from reaching the target formation. The optimal test pressure is 1.2 times the design wellhead pressure for energy replenishment (usually designed to be 15 MPa), with no pressure drop after 30 minutes. Energy replenishment can only proceed after the pressure test is passed; otherwise, the wellbore must be treated to meet the requirements first.
[0022] 1.2) Formation energy coefficient refers to the percentage of the current formation energy relative to the original formation energy. It can also be measured by the cumulative fluid production of the original horizontal well. For example, if the cumulative fluid production is 10,000 cubic meters, the value can be used as a reference for subsequent energy replenishment.
[0023] 1.3) The produced water type needs to be tested for mineral composition to provide a basis for the compatibility of the replenishing fluid, that is, the replenishing fluid should not cause scaling or other undesirable reactions with the reservoir fluid.
[0024] Step 2: Collect the encryption parameters of the encrypted horizontal wells to provide a design basis for the differentiated energy replenishment methods and energy replenishment levels of the encrypted horizontal wells;
[0025] The encryption parameter mainly refers to the number of encrypted wells between the original horizontal wells, which can be set to 1, 2 or 3 wells depending on the specific situation; the distance between the encrypted wells can be set to 600m, 400m or 300m respectively.
[0026] Step 3: Collect rock mechanics parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone to provide a theoretical basis for the formation of complex fractures during the energy replenishment process and to improve the production of a single well.
[0027] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions.
[0028] Reservoir physical properties mainly refer to permeability.
[0029] Step 4: Conduct overall energy replenishment design based on the well group;
[0030] The overall energy replenishment design considers both the original horizontal wells and the infill horizontal wells together for comprehensive energy replenishment.
[0031] The specific process involves first replenishing the original horizontal well with energy to form a pressure barrier, then shutting in the well with a high-pressure wellhead (corresponding to the fracturing wellhead level of the infiltrated horizontal well), and then replenishing the infiltrated horizontal well with high-flow-rate pre-pressure energy to promote the formation of complex fractures.
[0032] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0033] The energy replenishment method for original horizontal wells is carried out after wellbore treatment. Original horizontal well energy replenishment employs a low-flow rate at a pressure lower than the reservoir fracture pressure. The low flow rate is to avoid reopening the fractures, creating a high-pressure zone only around the original fractures. Therefore, the designed energy replenishment flow rate is lower than the flow rate at fracture opening, generally less than 2.0m. 3 / min.
[0034] The initial horizontal well energy replenishment is a continuous process. Based on the energy replenishment level designed in steps 1 and 4, the replenished fluid volume is approximately 80% of the formation pressure coefficient, or designed to be 80% of the cumulative produced volume.
[0035] In the original horizontal well network, the original horizontal wells on both sides of the infill horizontal well are required to be synchronously recharged. After recharge, the original horizontal wells on both sides are synchronously shut in with high-pressure wellheads. This is because when the infill horizontal well is fracturing, the pressure will be transmitted to the original horizontal well. Shutting in the well can ensure the pressure barrier formed after recharge and avoid excessive extension of fractures during the fracturing process of the infill horizontal well.
[0036] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well.
[0037] 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed to be the amount of energy replenishment fluid. In other words, energy replenishment is carried out before each fracturing section, and the fracturing operation of each section is completed normally after energy replenishment.
[0038] The replenishment of energy in the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, followed by fracturing construction.
[0039] 6.2) The energy replenishment parameters for infill horizontal wells mainly refer to the energy replenishment discharge rate and the energy replenishment fluid volume.
[0040] The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal stress difference between the two phases. The replenishment of horizontal wells in infill drilling mainly involves high-capacity replenishment, with the aim of opening all perforation clusters and forming complex fractures under the combined effect of the replenishment of the original horizontal well.
[0041] The minimum net pressure required for the formation of complex fractures is determined based on the horizontal stress difference between the two phases. The minimum discharge rate for energy replenishment is determined based on reservoir permeability, the fluid efficiency of the replenishment fluid, and the number of perforation clusters. This can be calculated using the flow restriction method; generally, the discharge rate for 3 replenishment clusters is 6 m³ / s. 3 / min, 4-cluster supplementary power displacement is 8m 3 / min, 5-cluster supplementary power displacement is 10m 3 / min.
[0042] The amount of replenishing fluid is related to the method of infill horizontal well drilling, including the following three situations:
[0043] A) If one horizontal well is drilled, the total replenishment fluid volume is 120% of the formation coefficient (theoretical studies have shown that this replenishment coefficient is the most economical parameter for forming complex fractures). The total replenishment fluid volume is then designed differently based on the permeability of the replenishment section. The permeability of all replenishment sections is weighted and summed. The permeability of each replenishment section is then divided by the sum and multiplied by the total fluid volume to obtain the replenishment fluid volume for each section.
[0044] B) If two horizontal wells are drilled, the total replenishment fluid volume for each horizontal well should be designed to be 120% of the formation coefficient, and the replenishment fluid volume for each section should be the same as above; it is also recommended that simultaneous fracturing will have a better effect.
[0045] C) If three horizontal wells are drilled, the total replenishment fluid volume of the middle drilled horizontal well should be designed to be 120% of the formation coefficient, and the total replenishment fluid volume of the two outer drilled horizontal wells should be designed to be 100% of the formation coefficient. The replenishment fluid volume of each section is the same as above. It is required that the middle drilled horizontal well be fractured first, and then the two outer drilled horizontal wells be fractured.
[0046] Step 7: Proceed with well-sealing production.
[0047] Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero.
[0048] When starting production, the original horizontal well is started first. The high-pressure zone formed by the rapid replenishment of energy at high flow rates in the infill horizontal well is conducive to the displacement of the remaining oil. At the same time, pressure control production is required. When the original horizontal well can no longer flow on its own, the infill horizontal well is started for production, and the process is complete.
[0049] Example 1
[0050] The method of this invention is implemented according to the following steps:
[0051] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells, to provide a basis for energy replenishment of the original horizontal wells;
[0052] 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment.
[0053] After removing the sucker rod, pump, and tubing from the original horizontal wellbore, it was found that the sucker rod and tubing were heavily coated with wax, necessitating dewaxing before energy replenishment. After wellbore treatment, a pressure test must be conducted on the wellbore above the perforated section. The preferred test pressure value is 1.2 times the design wellhead pressure for energy replenishment (designed at 15 MPa), with no pressure drop after 30 minutes. If the pressure test passes, energy replenishment can proceed.
[0054] 1.2) Formation energy coefficient refers to the percentage of the current formation energy that is equal to the original formation energy.
[0055] 1.3) Mineral composition testing is required for the produced water type.
[0056] Step 2: Collect the encryption parameters of the encrypted horizontal wells to provide a design basis for the differentiated energy replenishment methods and energy replenishment levels of the encrypted horizontal wells;
[0057] The encryption parameter mainly refers to the number of encrypted wells between the original horizontal wells. In this embodiment, it is set to 1 well, and the distance between the encrypted wells is 600m.
[0058] Step 3: Collect rock mechanics parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone to provide a theoretical basis for the formation of complex fractures during the energy replenishment process and to improve the production of a single well.
[0059] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions.
[0060] Reservoir physical properties mainly refer to permeability.
[0061] Step 4: Conduct overall energy replenishment design based on the well group;
[0062] The overall energy replenishment design considers both the original horizontal wells and the infill horizontal wells together for comprehensive energy replenishment.
[0063] The specific process involves first replenishing the original horizontal well with energy to form a pressure barrier, then replacing it with a high-pressure wellhead for shut-in, and finally replenishing the infill horizontal well with high-flow-rate pre-pressure energy to promote the formation of complex fractures.
[0064] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0065] The original horizontal well recharging method was carried out after the wellbore treatment was completed. Original horizontal well recharging employed a small-volume recharging method at a pressure lower than the reservoir fracture pressure; the small-volume recharging was less than 2.0 m³ / h. 3 / min.
[0066] The initial horizontal well energy replenishment is a continuous process. Based on the energy replenishment level designed in steps 1 and 4, the amount of fluid replenished is up to 80% of the formation pressure coefficient.
[0067] In the original horizontal well network, the original horizontal wells on both sides of the densified horizontal well are required to be synchronously replenished with energy; after replenishment, the original horizontal wells on both sides are synchronously replaced with high-pressure wellheads and shut off.
[0068] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well.
[0069] 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed to be the amount of energy replenishment fluid. In other words, energy replenishment is carried out before each fracturing section, and the fracturing operation of each section is completed normally after energy replenishment.
[0070] The replenishment of energy in the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, followed by fracturing construction.
[0071] 6.2) The energy replenishment parameters for infill horizontal wells mainly refer to the energy replenishment discharge rate and the energy replenishment fluid volume.
[0072] The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal stress difference between the two phases. The replenishment of horizontal wells with infill drilling mainly uses high-capacity replenishment.
[0073] The minimum net pressure required for the formation of complex fractures is determined based on the horizontal stress difference between the two phases. The minimum discharge rate for energy replenishment is determined based on reservoir permeability, the fluid efficiency of the replenishment fluid, and the number of perforation clusters. Calculated using the flow restriction method, the discharge rate for 3 clusters of energy replenishment is 6 m³ / s. 3 / min.
[0074] If one horizontal well is densified, the total replenishment fluid volume is 120% of the formation coefficient. The total replenishment fluid volume is then designed differently based on the permeability of the replenishment section. The permeability of all replenishment sections is weighted and summed. The permeability of each replenishment section is then divided by the sum and multiplied by the total fluid volume to obtain the replenishment fluid volume of each section.
[0075] Step 7: Proceed with well-sealing production.
[0076] Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero.
[0077] When starting production, the original horizontal well is started first. The high-pressure zone formed by the rapid replenishment of energy at high flow rates in the infill horizontal well is conducive to the displacement of the remaining oil. At the same time, pressure control production is required. When the original horizontal well can no longer flow on its own, the infill horizontal well is started for production, and the process is complete.
[0078] Example 2
[0079] The method of this invention is implemented according to the following steps:
[0080] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells.
[0081] 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment.
[0082] The sucker rod, pump, and tubing were removed from the original horizontal wellbore without any issues.
[0083] After the wellbore is treated, a pressure test should be conducted on the wellbore above the perforated section. The test pressure value is preferably 1.2 times the design wellhead value for energy replenishment (designed as 15MPa), and the pressure value should not drop after 30 minutes.
[0084] 1.2) Formation energy coefficient refers to the percentage of the current formation energy that is equal to the original formation energy.
[0085] 1.3) Mineral composition testing is required for the produced water type.
[0086] Step 2: Collect the encryption parameters of the encrypted horizontal wells to provide a design basis for the differentiated energy replenishment methods and energy replenishment levels of the encrypted horizontal wells;
[0087] The encryption parameter mainly refers to the number of encrypted wells between the original horizontal wells. In this embodiment, it is set to 2 wells, and the distance between the encrypted wells is 400m.
[0088] Step 3: Collect rock mechanical parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone;
[0089] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions.
[0090] Reservoir physical properties mainly refer to permeability.
[0091] Step 4: Conduct overall energy replenishment design based on the well group;
[0092] The overall energy replenishment design considers both the original horizontal wells and the infill horizontal wells together for comprehensive energy replenishment.
[0093] The specific process involves first replenishing the original horizontal well with energy to form a pressure barrier, then shutting in the well with a high-pressure wellhead (corresponding to the fracturing wellhead level of the infiltrated horizontal well), and then replenishing the infiltrated horizontal well with high-flow-rate pre-pressure energy to promote the formation of complex fractures.
[0094] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0095] The original horizontal well recharging method was carried out after the wellbore treatment was completed. Original horizontal well recharging employed a small-volume recharging method at a pressure lower than the reservoir fracture pressure; the small-volume recharging was less than 2.0 m³ / h. 3 / min.
[0096] The initial horizontal well refueling is a continuous process. Based on the refueling level designed in steps 1 and 4, the refueling volume is 80% of the cumulative produced volume.
[0097] In the original horizontal well network, the original horizontal wells on both sides of the densified horizontal well are required to be synchronously replenished with energy; after replenishment, the original horizontal wells on both sides are synchronously replaced with high-pressure wellheads and shut off.
[0098] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well.
[0099] 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed to be the amount of energy replenishment fluid. In other words, energy replenishment is carried out before each fracturing section, and the fracturing operation of each section is completed normally after energy replenishment.
[0100] The replenishment of energy in the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, followed by fracturing construction.
[0101] 6.2) The energy replenishment parameters for infill horizontal wells mainly refer to the energy replenishment discharge rate and the energy replenishment fluid volume.
[0102] The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal stress difference between the two phases. The replenishment of horizontal wells with infill drilling mainly uses high-capacity replenishment.
[0103] The minimum net pressure required for the formation of complex fractures is determined based on the horizontal stress difference between the two phases. The minimum discharge rate for energy replenishment is determined based on reservoir permeability, the fluid efficiency of the replenishment fluid, and the number of perforation clusters. Calculated using the flow restriction method, the discharge rate for 4 replenishment clusters is 8 m³ / s. 3 / min.
[0104] Two horizontal wells were reinforced, with the total replenishment fluid volume for each horizontal well designed to be 120% of the formation coefficient, and the replenishment fluid volume for each section also being the same; it is also recommended that simultaneous fracturing will yield better results.
[0105] Step 7: Proceed with well-sealing production.
[0106] Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero.
[0107] When starting production, the original horizontal well is started first. The high-pressure zone formed by the rapid replenishment of energy at high flow rates in the infill horizontal well is conducive to the displacement of the remaining oil. At the same time, pressure control production is required. When the original horizontal well can no longer flow on its own, the infill horizontal well is started for production, and the process is complete.
[0108] Example 3
[0109] The method of this invention is implemented according to the following steps:
[0110] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells, to provide a basis for energy replenishment of the original horizontal wells;
[0111] 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment.
[0112] If the sucker rod, pump, and tubing are found to be severely scaled when removed from the original horizontal wellbore, descaling is required before refueling.
[0113] After the wellbore is treated, a pressure test should be conducted on the wellbore above the perforated section. The test pressure value is preferably 1.2 times the design wellhead value for energy replenishment (designed as 15MPa), and the pressure value should not drop after 30 minutes.
[0114] 1.2) Formation energy coefficient refers to the percentage of the current formation energy that is equal to the original formation energy.
[0115] 1.3) Mineral composition testing is required for the produced water type.
[0116] Step 2: Collect the encryption parameters of the encrypted horizontal wells to provide a design basis for the differentiated energy replenishment methods and energy replenishment levels of the encrypted horizontal wells;
[0117] The encryption parameter mainly refers to the number of encrypted wells between the original horizontal wells. In this embodiment, it is set to 3 wells, and the distance between the encrypted wells is 300m.
[0118] Step 3: Collect rock mechanical parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone;
[0119] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions.
[0120] Reservoir physical properties mainly refer to permeability.
[0121] Step 4: Conduct overall energy replenishment design based on the well group;
[0122] The overall energy replenishment design considers both the original horizontal wells and the infill horizontal wells together for comprehensive energy replenishment.
[0123] The specific process involves first replenishing the original horizontal well with energy to form a pressure barrier, then shutting in the well with a high-pressure wellhead (corresponding to the fracturing wellhead level of the infiltrated horizontal well), and then replenishing the infiltrated horizontal well with high-flow-rate pre-pressure energy to promote the formation of complex fractures.
[0124] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0125] The original horizontal well recharging method was carried out after the wellbore treatment was completed. Original horizontal well recharging employed a small-volume recharging method at a pressure lower than the reservoir fracture pressure; the small-volume recharging was less than 2.0 m³ / h. 3 / min.
[0126] The initial horizontal well energy replenishment is a continuous process. Based on the energy replenishment level designed in steps 1 and 4, the amount of fluid replenished is up to 80% of the formation pressure coefficient.
[0127] In the original horizontal well network, the original horizontal wells on both sides of the densified horizontal well are required to be synchronously replenished with energy; after replenishment, the original horizontal wells on both sides are synchronously replaced with high-pressure wellheads and shut off.
[0128] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well.
[0129] 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed to be the amount of energy replenishment fluid. In other words, energy replenishment is carried out before each fracturing section, and the fracturing operation of each section is completed normally after energy replenishment.
[0130] The replenishment of energy in the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, followed by fracturing construction.
[0131] 6.2) The energy replenishment parameters for infill horizontal wells mainly refer to the energy replenishment discharge rate and the energy replenishment fluid volume.
[0132] The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal stress difference between the two phases. The replenishment of horizontal wells with infill drilling mainly uses high-capacity replenishment.
[0133] The minimum net pressure required for the formation of complex fractures is determined based on the horizontal stress difference between the two phases. The minimum discharge rate for energy replenishment is determined based on reservoir permeability, the fluid efficiency of the replenishment fluid, and the number of perforation clusters. This can be calculated using the flow restriction method; for 5 clusters of replenishment fluid, the discharge rate is 10 m³ / s. 3 / min.
[0134] If three horizontal wells are reinforced, the total fluid replenishment volume of the middle reinforced horizontal well is designed to be 120% of the formation coefficient, and the total fluid replenishment volume of the two outer reinforced horizontal wells is designed to be 100% of the formation coefficient. The fluid replenishment volume of each section is the same as above. It is also required that the middle reinforced horizontal well be fractured first, and then the two outer reinforced horizontal wells be fractured.
[0135] Step 7: Proceed with well-sealing production.
[0136] Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero.
[0137] When starting production, the original horizontal well is started first. The high-pressure zone formed by the rapid replenishment of energy at high flow rates in the infill horizontal well is conducive to the displacement of the remaining oil. At the same time, pressure control production is required. When the original horizontal well can no longer flow on its own, the infill horizontal well is started for production, and the process is complete.
[0138] Example 4
[0139] The method of this invention is implemented according to the following steps:
[0140] Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells, to provide a basis for energy replenishment of the original horizontal wells;
[0141] 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment.
[0142] If the sucker rod, pump, and tubing are removed from the original horizontal wellbore, and severe sand production is found in the sucker rod or tubing, sand removal is required before energy replenishment.
[0143] After the wellbore is treated, a pressure test should be conducted on the wellbore above the perforated section. The test pressure value is preferably 1.2 times the design wellhead value for energy replenishment (designed as 15MPa), and the pressure value should not drop after 30 minutes.
[0144] 1.2) Formation energy coefficient refers to the percentage of the current formation energy that is equal to the original formation energy.
[0145] 1.3) Mineral composition testing is required for the produced water type.
[0146] Step 2: Collect the encryption parameters of the encrypted horizontal wells to provide a design basis for the differentiated energy replenishment methods and energy replenishment levels of the encrypted horizontal wells;
[0147] The encryption parameter mainly refers to the number of encrypted wells between the original horizontal wells. In this embodiment, it is set to 3 wells, and the distance between the encrypted wells is 300m.
[0148] Step 3: Collect rock mechanics parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone to provide a theoretical basis for the formation of complex fractures during the energy replenishment process and to improve the production of a single well.
[0149] Rock mechanics parameters mainly refer to the horizontal biaxial stress difference and brittleness index under in-situ stress conditions.
[0150] Reservoir physical properties mainly refer to permeability.
[0151] Step 4: Conduct overall energy replenishment design based on the well group;
[0152] The overall energy replenishment design considers both the original horizontal wells and the infill horizontal wells together for comprehensive energy replenishment.
[0153] The specific process involves first replenishing the original horizontal well with energy to form a pressure barrier, then shutting in the well with a high-pressure wellhead (corresponding to the fracturing wellhead level of the infiltrated horizontal well), and then replenishing the infiltrated horizontal well with high-flow-rate pre-pressure energy to promote the formation of complex fractures.
[0154] Step 5: Conduct differentiated energy replenishment design to determine the energy replenishment method and parameters of the original horizontal well;
[0155] The original horizontal well recharging method was carried out after the wellbore treatment was completed. Original horizontal well recharging employed a small displacement rate below the reservoir fracture pressure; the displacement rate was less than 1.8m. 3 / min.
[0156] The initial horizontal well refueling is a continuous process. Based on the refueling level designed in steps 1 and 4, the refueling volume is 80% of the cumulative produced volume.
[0157] In the original horizontal well network, the original horizontal wells on both sides of the densified horizontal well are required to be synchronously replenished with energy; after replenishment, the original horizontal wells on both sides are synchronously replaced with high-pressure wellheads and shut off.
[0158] Step 6: Determine the energy replenishment method and parameters for the infill horizontal well.
[0159] 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed to be the amount of energy replenishment fluid. In other words, energy replenishment is carried out before each fracturing section, and the fracturing operation of each section is completed normally after energy replenishment.
[0160] The replenishment of energy in the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, followed by fracturing construction.
[0161] 6.2) The energy replenishment parameters for infill horizontal wells mainly refer to the energy replenishment discharge rate and the energy replenishment fluid volume.
[0162] The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal stress difference between the two phases. The replenishment of horizontal wells with infill drilling mainly uses high-capacity replenishment.
[0163] The minimum net pressure required for the formation of complex fractures is determined based on the horizontal stress difference between the two phases. The minimum discharge rate for energy replenishment is determined based on reservoir permeability, the fluid efficiency of the replenishment fluid, and the number of perforation clusters. Calculated using the flow restriction method, the discharge rate for 4 replenishment clusters is 8 m³ / s. 3 / min.
[0164] If three horizontal wells are reinforced, the total fluid replenishment volume of the middle reinforced horizontal well is designed to be 120% of the formation coefficient, and the total fluid replenishment volume of the two outer reinforced horizontal wells is designed to be 100% of the formation coefficient. The fluid replenishment volume of each section is the same as above. It is also required that the middle reinforced horizontal well be fractured first, and then the two outer reinforced horizontal wells be fractured.
[0165] Step 7: Proceed with well-sealing production.
[0166] Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero.
[0167] When starting production, the original horizontal well is started first. The high-pressure zone formed by the rapid replenishment of energy at high flow rates in the infill horizontal well is conducive to the displacement of the remaining oil. At the same time, pressure control production is required. When the original horizontal well can no longer flow on its own, the infill horizontal well is started for production, and the process is complete.
[0168] Based on the statistical data of the above four embodiments, 21 horizontal wells were tested in the An83 well area of the Ordos Basin. The initial production of the horizontal wells after pressure was 11t / d. After one year of experimental production, the annual production reached 9.8t / d, with an average annual production of 3450t per well. Compared with the previous test wells, the decline rate was delayed by more than 30% in the first year.
[0169] It is evident that the pre-pressure energy replenishment optimization method for shale oil infill horizontal wells of this invention provides a new approach for obtaining more crude oil from reservoirs through energy replenishment in shale oil infill horizontal wells. As oil fields are developed and the proportion of shale oil increases year by year, its application prospects will become increasingly broad.
Claims
1. A method for optimizing energy replenishment before pressure reduction in shale oil infill horizontal wells, characterized in that, Follow these steps: Step 1: Collect data, including the current wellbore status, formation energy coefficient, and produced water type of the horizontal wells in the original horizontal well network corresponding to the shale oil infill horizontal wells. Step 2: Collect encryption parameters for the encrypted horizontal wells. Encryption parameters refer to the number of encrypted wells between the original horizontal wells and the encrypted well spacing. Step 3: Collect rock mechanical parameters and reservoir physical property parameters under in-situ stress conditions in the infill zone. Rock mechanics parameters include the horizontal biaxial stress difference under in-situ stress conditions and the brittleness index; Reservoir physical properties include reservoir permeability; Step 4: Conduct overall energy replenishment design based on the well group. The specific process is as follows: First, the original horizontal well is recharged to form a pressure barrier, and then the high-pressure wellhead is shut in. Next, the high-displacement horizontal well is recharged with energy before pressure to promote the formation of complex fractures. Step 5: Conduct differentiated energy replenishment design, determine the energy replenishment method and parameters for the original horizontal well. The specific process is as follows: The original horizontal well energy replenishment method is carried out after the wellbore treatment is completed. The original horizontal well energy replenishment adopts a small displacement energy replenishment at a pressure lower than the fracture pressure of the reservoir. In the original horizontal well network, the original horizontal wells on both sides of the densified horizontal well are required to be synchronously replenished with energy; after replenishment, the original horizontal wells on both sides are synchronously replaced with high-pressure wellheads and shut off. Step 6: Determine the energy replenishment method and parameters for the infill horizontal well; Step 7: Produce the well in a sealed manner, and the process is complete.
2. The method for optimizing energy replenishment before pressure reduction in shale oil infill horizontal wells according to claim 1, characterized in that: The specific process of step 1 is as follows: 1.1) The current state of the original horizontal well refers to the integrity of the original horizontal well casing and whether it has the conditions for energy replenishment. Remove the sucker rod, pump, and tubing from the original horizontal wellbore. If the sucker rod or tubing is severely waxed, scaled, or producing sand, dewaxing, descaling, and sand removal are required before refueling. After the wellbore is treated, the wellbore above the perforation section must be pressure tested. Refueling can only be carried out after the pressure test is passed; otherwise, the wellbore must be treated to meet the requirements first. 1.2) Formation energy coefficient refers to the percentage of the current formation energy relative to the original formation energy, or it can be measured by the cumulative produced fluid volume of the original horizontal well. 1.3) Mineral composition testing is required for the produced water type.
3. The shale oil infill horizontal well pre-pressure energy replenishment optimization method according to claim 2, characterized in that: In step 1.1), when performing the pressure test, the pressure value is 1.2 times the design wellhead value for energy replenishment and the pressure value does not drop within 30 minutes.
4. The method for optimizing energy replenishment before pressure reduction in shale oil infill horizontal wells according to claim 1, characterized in that: The specific process of step 6 is as follows: 6.1) The energy replenishment method for infill horizontal wells refers to replenishing energy using pre-fracturing fluid before fracturing operations. That is, the amount of pre-fracturing fluid is designed as the energy replenishment fluid amount. Before each fracturing section, energy replenishment is performed first, and the fracturing operation of each section is completed normally after energy replenishment. The energy replenishment of the infill horizontal well is carried out after the original horizontal well is completed, and it is required to be continuous. That is, after the energy replenishment of the original horizontal well is completed and the wellhead is finished, the first stage of pre-fracturing energy replenishment of the infill horizontal well should be completed within 8 hours, and fracturing construction should be carried out. 6.2) The energy replenishment parameters for infill horizontal wells are energy replenishment discharge rate and energy replenishment fluid volume. The replenishment capacity is determined by the number of perforation clusters in the replenishment section, reservoir permeability, and horizontal biaxial stress difference. The replenishment of infill horizontal wells is mainly based on high-capacity replenishment, and complex fractures are formed under the combined effect of the replenishment of the original horizontal well. The minimum net pressure required to form complex fractures is determined based on the horizontal biaxial stress difference. The minimum discharge rate for energy replenishment is determined based on the reservoir permeability, the liquid efficiency of the replenishment fluid, and the number of perforation clusters.
5. The shale oil infill horizontal well pre-pressure energy replenishment optimization method according to claim 4, characterized in that: In step 6.2), the minimum discharge rate for energy replenishment is determined. Based on the current limiting method, the discharge rate for the three energy replenishment clusters is 6m³. 3 / min, 4-cluster supplementary power displacement is 8m 3 / min, 5-cluster supplementary power displacement is 10m 3 / min.
6. The method for optimizing energy replenishment before pressure reduction in shale oil infill horizontal wells according to claim 1, characterized in that: The specific process of step 7 is as follows: Well shut-in production refers to shutting in the well after fracturing is completed and allowing the replenished fluid to fully play its role before resuming production. The well is started to resume production when the wellhead pressure of the infill horizontal well drops to a stable value or the wellhead pressure is zero. When starting production, the original horizontal well is started first; at the same time, pressure control is required. When the original horizontal well stops flowing, the densified horizontal well is started for production.
Citation Information
Patent Citations
Low pressure dense oil reservoir supplementary energy fracturing method
CN110469309A
Method for determining hydraulic fracture liquid injection amount of old well of shale oil horizontal well network
CN112836442A