Intelligent monitoring method and system for photovoltaic power storage system in charging and swapping station
By acquiring real-time parameters of the photovoltaic system and battery usage information at the charging and swapping station, and using photovoltaic power generation for direct charging and scheduling analysis, the battery charging sequence and guidance are generated, solving the problem of high battery scheduling and transfer costs, and achieving more efficient battery charging and scheduling.
Patent Information
- Application Number
- CN202410457622.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-04-16
AI Technical Summary
The existing battery dispatch and transfer costs of charging and swapping stations are relatively high, and photovoltaic energy storage has not effectively reduced the battery dispatch demand in actual operation.
By acquiring real-time operating parameters of the photovoltaic system and battery usage information, direct charging and scheduling analysis are performed using photovoltaic power generation. Scheduling instructions are output to reduce the number of batteries to be scheduled. Combined with the navigation platform and the battery loading and unloading time, the battery charging amount is estimated, and charging sequence and guidance are generated.
This reduces the number of battery scheduling tasks, lowers battery scheduling costs, and improves battery charging efficiency and the accuracy of scheduling analysis.
Smart Images

Figure CN118263981B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of charging and swapping stations, and in particular to an intelligent monitoring method and system for a photovoltaic power storage system in a charging and swapping station. Background Art
[0002] At present, the market of new energy vehicles (electric vehicles and hybrid vehicles) is in a stage of rapid development, and the number of users is increasing rapidly, which has also increased the demand for supporting facilities such as charging and swapping stations. The main functions of charging and swapping stations include charging the power batteries of electric vehicles and replacing the exhausted batteries of vehicles with fully charged batteries.
[0003] Most charging and battery swap stations on the market operate in this way: a large number of batteries are centrally stored and charged through centralized charging stations, and then uniformly distributed to various battery swap stations; the battery swap stations are also responsible for charging and replacing batteries for new energy vehicles.
[0004] Although the above can meet the charging and swapping needs of new energy vehicles, the battery dispatching and transportation costs are relatively high. Therefore, relevant enterprises and institutions have proposed to use charging and swapping sites for photovoltaic energy storage to supplement part of the electricity and reduce the demand for battery transportation; however, after actual operation, it was found that the transported batteries still need to continue to be transported, at least the cycle is shortened, which can reduce the total number of batteries maintaining the entire dispatching system. Therefore, it is necessary to propose a new technical solution. Summary of the invention
[0005] In order to save battery scheduling costs, the present application provides an intelligent monitoring method and system for a photovoltaic power storage system in a charging and swapping station.
[0006] In the first aspect, the present application provides an intelligent monitoring method for a photovoltaic power storage system in a charging and swapping station, which adopts the following technical solution:
[0007] An intelligent monitoring method for a photovoltaic power storage system of a charging and swapping station, comprising:
[0008] Acquire the real-time operating parameters of the photovoltaic system of the site, the power of the photovoltaic energy storage battery and the battery usage information of the site; wherein the real-time operating parameters include the photovoltaic power generation power;
[0009] When the site battery usage information shows that the number of batteries to be charged is greater than 1, and the photovoltaic power generation power meets the preset charging conditions, the pre-stored photovoltaic direct charging instruction is called and output;
[0010] When the battery usage information of the site is: n1 / m1>b1, the preset scheduling analysis is performed; where n1 is the sum of the batteries to be charged and the batteries being charged, m1 is the total rated available batteries of the site, and b1 is the preset minimum scheduling trigger ratio;
[0011] The scheduling analysis includes:
[0012] Obtain the scheduling time t1 for battery scheduling between the centralized charging station and the site;
[0013] Estimate the rechargeable capacity of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1;
[0014] If the sum of the current power of a rechargeable battery and the rechargeable power reaches a preset full-charge condition, an instruction to stop scheduling the battery is output.
[0015] Optionally, the method for obtaining the scheduling time t1 includes:
[0016] Import the pre-stored station locations and centralized charging station locations into the navigation platform, and obtain the estimated time t2 of the navigation platform;
[0017] Get the pre-stored average time t3 for each battery to get on and off the bus and the total number of currently scheduled batteries n2, and calculate the total time t4 for the battery to get on and off the bus, t4=t3*n2;
[0018] The update schedule takes time t1, and t1=t2+t4.
[0019] Optionally, the estimating the rechargeable power of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1 includes:
[0020] If the photovoltaic power generation power is a predicted value of the photovoltaic system, then based on the time axis, a power change curve corresponding to when the photovoltaic power generation power is higher than a preset direct charging power threshold is generated;
[0021] Determine the duration t5 corresponding to the power variation curve;
[0022] If t5>t1, the charging amount d1 corresponding to t1 is calculated according to the power change curve;
[0023] If t5≤t1, the charging amount d2 corresponding to t5 is calculated according to the power change curve, and the charging amount d3 of the photovoltaic energy storage battery during the duration t6 is calculated; where t6=t1-t5;
[0024] The charging amounts d1 and d4 are estimated chargeable amounts; wherein d4=d2+d3.
[0025] Optionally, the estimating the rechargeable power of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1 includes:
[0026] If the photovoltaic power generation is a real-time value, the real-time weather and time of the site location are obtained;
[0027] If the weather meets the preset adverse weather conditions or temporary sunset time conditions, the charging amount d5 of the photovoltaic energy storage battery during the duration t1 is calculated, and a reminder to switch to energy storage charging is output after the scheduling starts;
[0028] The charge amount d5 is the estimated chargeable amount.
[0029] Optionally, the full-charge condition includes: at the moment corresponding to the current cumulative scheduling time t1, the battery power is greater than a preset full-charge threshold.
[0030] Optionally, the full power condition further includes:
[0031] If the battery power is less than the preset full-power threshold, then at the time determined by the accumulated remaining replaceable battery exhaustion time and the scheduling time t1, the battery power is greater than the preset full-power threshold and is considered fully charged;
[0032] Among them, the remaining replaceable battery depletion time is calculated based on the historical consumption rate and the remaining number of replaceable batteries.
[0033] Optional, including:
[0034] Get the battery power parameters of the incoming battery;
[0035] Compare the power levels of the replaced batteries and generate a ranking table;
[0036] Generate a charging sequence according to the sorting table and output charging instructions.
[0037] In the second aspect, the present application provides an intelligent monitoring system for photovoltaic power storage systems in charging and swapping stations, which adopts the following technical solutions:
[0038] An intelligent monitoring system for a photovoltaic power storage system of a charging and swapping station comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and execute any of the above-mentioned intelligent monitoring methods for a photovoltaic power storage system of a charging and swapping station.
[0039] In summary, the present application includes at least one of the following beneficial technical effects: in addition to using the electric energy converted by the photovoltaic system to charge the replaced batteries, the present application will also analyze whether this time can fully charge certain batteries based on the scheduling time t1, and give a prompt to stop scheduling some batteries based on the analysis results, so as to reduce the number of scheduled batteries and reduce the battery scheduling cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 is a schematic flow chart of the method of the present application;
[0041] Figure 2 It is a schematic diagram of the power curve of this application. DETAILED DESCRIPTION
[0042] The following is combined with Figure 1-2 This application is described in further detail.
[0043] The embodiment of the present application discloses an intelligent monitoring method for a photovoltaic power storage system in a charging and swapping station.
[0044] Reference Figure 1 , the intelligent monitoring method of photovoltaic power storage system in charging and swapping station includes:
[0045] Obtain the real-time operating parameters of the site's photovoltaic system, the power of the photovoltaic energy storage battery, and the site's battery usage information.
[0046] It can be understood that the station is a new energy vehicle charging and swapping station; photovoltaic power generation technology and its system are existing technologies, and the charging and swapping station in this application should have a supporting photovoltaic system to meet the use requirements. The maintenance of the station should be equipped with at least one staff member, and the work content of the staff member includes: when the driver does not put the replaced battery into the pre-installed battery charging device, and there is an idle battery charging device, the staff will move the battery to the battery charging device. Photovoltaic energy storage battery, that is, a battery pack used to store the electrical energy converted from photovoltaics.
[0047] Among them, real-time working parameters include real-time voltage, current, and photovoltaic power generation; voltage and current are used as the basis for evaluating whether the photovoltaic system is generating electricity and outputting normally, and photovoltaic power generation refers to the output power of the photovoltaic system in actual operation, and the commonly used units are watts (W), kilowatts (KW) or megawatts (MW). Site battery usage information, that is, the number of batteries that can be replaced and the number of batteries to be charged at the site.
[0048] When the site battery usage information shows that the number of batteries to be charged is greater than 1, and the photovoltaic power generation power meets the preset charging conditions, for example: the power generation in 4 hours meets the demand for 5 batteries to be fully charged, the pre-stored photovoltaic direct charging instruction is called and output.
[0049] The above-mentioned photovoltaic direct charging, that is, the electric energy output by the photovoltaic unit is preferentially distributed to the corresponding battery charging circuit; the photovoltaic output is connected to the grid and stored, and the voltage is stabilized and boosted to be used by the load electrical equipment. This is an existing technology and will not be described in detail.
[0050] It should be noted that when the power level of the photovoltaic energy storage battery is too low, for example, below 10%, the photovoltaic system should give priority to charging the photovoltaic energy storage battery, and then use it to meet the photovoltaic direct charging demand after it reaches more than 30%. This setting, on the one hand, guarantees the emergency response capability of the charging and swapping station; on the other hand, it can reduce the loss of battery power loss.
[0051] Based on the above, as long as a battery is replaced at a site and the power level of the photovoltaic energy storage battery is greater than 10%, if the photovoltaic system can work normally, the electricity converted from photovoltaics will be used to charge the battery to be charged, so as to reduce the loss of electricity stored in the photovoltaic energy storage battery and then transferred out.
[0052] The method further includes: when the site battery usage information is: n1 / m1>b1, performing a preset scheduling analysis.
[0053] Among them, n1 is the sum of batteries to be charged and batteries being charged, that is, the total number of batteries replaced from the vehicle, m1 is the rated total number of available batteries at the site, and b1 is the preset minimum scheduling trigger ratio, such as: 3 / 5.
[0054] It is understandable that when a site already has a large number of batteries that have been used to swap with batteries in cars, considering the photovoltaic power supply capacity, most of the batteries need to be transferred to centralized charging stations for charging, and the battery swap function of the site can be guaranteed through battery scheduling.
[0055] The above scheduling analysis includes:
[0056] Obtain the scheduling time t1 for battery scheduling between the centralized charging station and the site;
[0057] Estimate the rechargeable capacity of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1;
[0058] If the sum of the current power of a rechargeable battery and the rechargeable power reaches a preset full-charge condition, an instruction to stop scheduling the battery is output.
[0059] Based on the above, in addition to using the electric energy converted by the photovoltaic system to charge the replaced batteries, the present application will also analyze whether this time can fully charge certain batteries based on the scheduling time t1, and give a prompt to stop scheduling some batteries based on the analysis results, so as to reduce the number of scheduled batteries and reduce the battery scheduling cost.
[0060] The above-mentioned method for obtaining the scheduling time t1 includes:
[0061] 1) Import the pre-stored site locations and centralized charging station locations into the navigation platform (such as Deutsche Navigation and Baidu Navigation), and obtain the estimated time t2 of the navigation platform;
[0062] 2) Obtain the pre-stored average time t3 for each battery to get on and off the bus, which is determined by the staff's experience test; also obtain the total number of currently scheduled batteries n2, that is, n1-the number of batteries that have stopped scheduling, and calculate the total time t4 for the battery to get on and off the bus, t4=t3*n2;
[0063] 3) The update schedule takes time t1, and t1=t2+t4.
[0064] From the above, it can be seen that in this application, the scheduling time t1 is not a fixed value, but a value determined based on the real-time road conditions and real-time battery usage. Therefore, the obtained scheduling time t1 is relatively more real, and after being used for scheduling analysis, the analysis result is more accurate.
[0065] The above estimation of the rechargeable power of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1 is divided into two cases in this embodiment:
[0066] The first one:
[0067] It is understandable that some photovoltaic systems can already predict the active power of power stations based on meteorological conditions and statistical laws. Therefore, if the photovoltaic system selected in this application can provide a predicted value, that is, the photovoltaic power generation power is the predicted value of the photovoltaic system, then:
[0068] 1) Based on the time axis, generate the corresponding power change curve when the photovoltaic power generation power is higher than the preset direct charging power threshold; that is, establish a two-dimensional coordinate system with time as the horizontal axis and power generation power as the vertical axis and draw the corresponding curve, such as Figure 2 shown.
[0069] 2) Determine the duration t5 corresponding to the power change curve.
[0070] 3) If t5>t1, that is, the photovoltaic power generation power can always meet the direct charging demand, the charging amount d1 corresponding to t1 is calculated according to the power change curve.
[0071] Calculation example: Assuming that the photovoltaic power generation power is 1000w, it normally provides 5 batteries for charging, and the normal charging rate at each charging location is 30% of the power per hour;
[0072] Then if the photovoltaic power generation power is 700w, it is considered that it can provide charging for 3 batteries; after t1 is converted into hours*30% power / hour, the rechargeable power d1 corresponding to the three batteries can be obtained.
[0073] If t5≤t1, that is, the photovoltaic power generation power decays too quickly and cannot meet the full direct charging demand, the charging amount d2 corresponding to t5 is calculated according to the power change curve; the above calculation is similar.
[0074] Calculate the charge capacity d3 of the photovoltaic energy storage battery during the duration t6; where t6=t1-t5; Example: Assuming that each charging position is 40% power / hour when the photovoltaic energy storage battery is powered, t6 is converted to hours*40% power / hour, which is the power that each battery can charge.
[0075] 4) The charging capacity d1 and d4 are the estimated chargeable capacities; where d4=d2+d3.
[0076] Second type:
[0077] 1) If the photovoltaic power generation power is a real-time value, that is, the real value fed back by the photovoltaic system in real time, the real-time weather and time of the site location are obtained.
[0078] 2) If the weather meets the preset adverse weather conditions or temporary sunset time conditions, for example, cloudy or rainy days, and the time before sunset is less than 3 hours, the charging amount d5 of the photovoltaic energy storage battery during the duration t1 is calculated, and a reminder to switch to energy storage charging is output after the scheduling starts.
[0079] Calculation of d5: Example: Assuming that when the photovoltaic energy storage battery is powered, each charging position is 40% power / hour, t1 is converted to hours*40% power / hour, which is the amount of power that each battery can charge.
[0080] 3) The charging capacity d5 is the estimated chargeable capacity.
[0081] According to the above settings, the present application can more accurately estimate the amount of electricity that can be replenished for the battery during the scheduling time t1, so as to help the staff determine whether to transport the battery.
[0082] Regarding the full power condition in the method, it includes:
[0083] At the moment corresponding to the current cumulative scheduling time t1, the battery power is greater than the preset full-power threshold, such as 90% power.
[0084] The above full charge calculation is relatively simple. During the site operation, there are other batteries that can be replaced during scheduling. Batteries that are already charged before these batteries are consumed can continue to be charged. Therefore, the full charge condition also includes:
[0085] If the battery power is less than the preset full-power threshold, such as 90%, then at the time determined by the cumulative remaining replaceable battery exhaustion time and the scheduling time t1, the battery power is greater than the preset full-power threshold and is considered fully charged;
[0086] Among them, the remaining replaceable battery depletion time is calculated based on the historical consumption rate and the remaining number of replaceable batteries.
[0087] Calculation example: Historical consumption rate: Assume that the average battery consumption rate in the first two hours is calculated to be 3 batteries / hour; the number of remaining replaceable batteries is 12, then the battery depletion time is 12 / 3=4 hours.
[0088] Based on the above, when judging whether the battery is fully charged, this method will also consider the number of batteries remaining at the site that can be used for replacement, so that the analysis is more accurate.
[0089] In order to reduce the number of batteries that need to be transported, the method further:
[0090] Get the battery power parameters of the incoming battery;
[0091] Compare the power of the replaced batteries and generate a ranking table from largest to smallest;
[0092] The charging sequence is generated according to the sorting table. The larger the power, the earlier the charging sequence. A charging guide is also output, indicating which battery to charge first.
[0093] The above power parameters can be uploaded by the driver when the battery is replaced, or by the staff when the new battery enters the station; it is understandable that each battery should be assigned an identification code to distinguish it.
[0094] According to the above settings, it can be prevented that battery A can be fully charged before scheduling is completed, but battery B cannot be fully charged. However, battery B is charged, resulting in both batteries A and B needing to be transported, thereby reducing the battery scheduling cost.
[0095] The embodiment of the present application also discloses an intelligent monitoring system for a photovoltaic power storage system of a charging and swapping station.
[0096] The invention discloses an intelligent monitoring system for a photovoltaic power storage system of a charging and swapping station, comprising a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and execute any of the above-mentioned intelligent monitoring methods for a photovoltaic power storage system of a charging and swapping station.
[0097] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An intelligent monitoring method for photovoltaic power storage system of charging and swapping station, characterized in that: include: Acquire the real-time operating parameters of the photovoltaic system of the site, the power of the photovoltaic energy storage battery and the battery usage information of the site; wherein the real-time operating parameters include the photovoltaic power generation power; When the site battery usage information shows that the number of batteries to be charged is greater than 1, and the photovoltaic power generation power meets the preset charging conditions, the pre-stored photovoltaic direct charging instruction is called and output; When the battery usage information of the site is: n1 / m1>b1, the preset scheduling analysis is performed; where n1 is the sum of the batteries to be charged and the batteries being charged, m1 is the total rated available batteries of the site, and b1 is the preset minimum scheduling trigger ratio; The scheduling analysis includes: Obtain the scheduling time t1 for battery scheduling between the centralized charging station and the site; Estimate the rechargeable capacity of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1; If the sum of the current power of a rechargeable battery and the rechargeable power reaches the preset full-charge condition, an instruction to stop scheduling the battery is output; The method for obtaining the scheduling time t1 includes: Import the pre-stored station locations and centralized charging station locations into the navigation platform, and obtain the estimated time t2 of the navigation platform; Get the pre-stored average time t3 for each battery to get on and off the bus and the total number of currently scheduled batteries n2, and calculate the total time t4 for the battery to get on and off the bus, t4=t3*n2; The update schedule takes time t1, and t1=t2+t4; The method of estimating the chargeable amount of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1 includes: If the photovoltaic power generation power is a predicted value of the photovoltaic system, then based on the time axis, a power change curve corresponding to when the photovoltaic power generation power is higher than a preset direct charging power threshold is generated; Determine the duration t5 corresponding to the power variation curve; If t5>t1, the charging amount d1 corresponding to t1 is calculated according to the power change curve; If t5≤t1, the charging amount d2 corresponding to t5 is calculated according to the power change curve, and the charging amount d3 of the photovoltaic energy storage battery during the duration t6 is calculated; where t6=t1-t5; The charging amounts d1 and d4 are estimated chargeable amounts; where d4=d2+d3; The method of estimating the chargeable amount of each rechargeable battery based on the photovoltaic power generation power and the scheduling time t1 includes: If the photovoltaic power generation is a real-time value, the real-time weather and time of the site location are obtained; If the weather meets the preset adverse weather conditions or temporary sunset time conditions, the charging amount d5 of the photovoltaic energy storage battery during the duration t1 is calculated, and a reminder to switch to energy storage charging is output after the scheduling starts; The charge amount d5 is the estimated chargeable amount.
2. The intelligent monitoring method for photovoltaic power storage system of charging and swapping station according to claim 1 is characterized in that: The full-charge condition includes: at the moment corresponding to the current accumulated scheduling time t1, the battery power is greater than a preset full-charge threshold.
3. The intelligent monitoring method for photovoltaic power storage system of charging and swapping station according to claim 2 is characterized in that: The fully charged condition further includes: If the battery power is less than the preset full-power threshold, then at the time determined by the accumulated remaining replaceable battery exhaustion time and the scheduling time t1, the battery power is greater than the preset full-power threshold and is considered fully charged; Among them, the remaining replaceable battery depletion time is calculated based on the historical consumption rate and the remaining number of replaceable batteries.
4. The intelligent monitoring method for photovoltaic power storage system of charging and swapping station according to claim 1 is characterized in that: include: Get the battery power parameters of the incoming battery; Compare the power levels of the replaced batteries and generate a ranking table; Generate a charging sequence according to the sorting table and output charging instructions.
5. An intelligent monitoring system for photovoltaic power storage systems in charging and swapping stations, characterized in that: It comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes the intelligent monitoring method for a photovoltaic power storage system of a charging and swapping station as claimed in any one of claims 1 to 4.