A construction method for simultaneously replacing the entire anchorage section of the overhead contact line on a passenger dedicated line.

By employing constant tension for installing the contact wire and low tension for installing the catenary wire during the construction of the electrified railway overhead contact system, the catenary wire can be replaced simultaneously within a single maintenance window. This solves the problems of low construction efficiency and safety hazards, ensuring construction quality and safety.

CN118288857BActive Publication Date: 2026-11-10ELECTRIC ENG CO LTD OF CHINA RAILWAY NO 9 GRP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410333980.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2026-11-10
Estimated Expiration
2044-03-22

AI Technical Summary

Technical Problem

Existing technologies for the construction of overhead contact lines in electrified railways result in low efficiency in replacing conductors and pose safety hazards due to overloading of support pillars and guy wire foundations. They also fail to meet the quality requirements for constant tension wire laying, leading to quality problems such as contact wire twisting and scratch damage.

Method used

The method of constant tension for erecting contact wires and low tension for erecting catenary cables is adopted. The catenary wires, droppers, and electrical connection wires are replaced simultaneously within a single skylight. The tension of the old wires is transferred by auxiliary cables. Special S-hooks and line-laying pulleys are used to ensure the smoothness of the wires. The construction steps are optimized to avoid overloading. Reasonably designed process steps are used to keep the supports and guy wire foundations within the load range.

Benefits of technology

This improved construction efficiency, ensured the quality of the contact wire and catenary, avoided the safety hazards of overloading the support and guy wire foundations, and ensured the safety and quality of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118288857B_ABST
    Figure CN118288857B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of electrified railway catenary construction, specifically relating to a construction method for simultaneously replacing the conductor of an entire anchor section of the catenary on a passenger dedicated line. The method includes the following steps: pre-construction preparation, anchoring and stringing, replacement of compensation devices, anchoring the conductor, dismantling the old conductor and droppers, electrical connection installation, and catenary adjustment. This invention employs a construction method that first erects the new contact wire, followed immediately by the erection of the new catenary cable. Furthermore, through rationally designed process steps, the existing supports and guy wire foundations are always kept under tension within their load range, improving construction efficiency, saving construction windows, and ensuring the safety of the line replacement construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of electrified railway catenary construction technology, specifically relating to a construction method for simultaneously replacing the conductor of the entire anchor section of the catenary on a passenger dedicated line. Background Technology

[0002] my country's electrified railways have developed rapidly, with continuous improvement in technology. However, the technical standards of the electrified railways built in the early stages are relatively outdated, and the equipment is aging and has entered a period of major overhaul. Among these, the major overhaul of the overhead contact system mainly involves the replacement of cables to improve the standards of the catenary and contact wires.

[0003] Common replacement methods include single-wire replacement and simultaneous replacement of the contact wire. Single-wire replacement involves replacing the catenary wire in one maintenance window and the contact wire in the next, requiring two maintenance windows to complete the replacement of one anchor section, resulting in low construction efficiency. Simultaneous replacement of the catenary wire and contact wire typically involves simultaneously laying the contact wire, removing the old contact wire before anchoring, and then anchoring the new wire. While this allows for simultaneous replacement of both the catenary wire and contact wire within one maintenance window, it does not utilize the constant tension laying technique. According to the "Quality Acceptance Standards for High-Speed ​​Railway Electric Traction Power Supply Engineering" and the requirements of relevant equipment management units, constant tension laying is currently required for all contact wire installations. Failure to use constant tension laying cannot guarantee the quality of the contact wire laying, easily leading to quality problems such as contact wire twisting, hard spots, and surface scratches.

[0004] Cables are under tension. During the installation of conductors, the simultaneous presence of old and new conductors can cause the support pole to break due to overload. Guy wires are installed to stabilize the support pole, balancing the tensile forces in all directions and preventing bending and toppling. During conductor replacement, auxiliary cables are often used to reinforce the support pole to protect it from increased tension. However, fixing additional guy wires to the existing guy wire foundation poses a safety hazard of overloading the guy wire foundation.

[0005] Therefore, there is a need to provide an improved technical solution that addresses the shortcomings of the existing technology. Summary of the Invention

[0006] The purpose of this invention is to overcome the shortcomings of the prior art and provide a construction method for simultaneously replacing the entire anchor section of the contact wire of a passenger dedicated line. The contact wire is erected with constant tension, and the catenary is erected with low tension. The catenary, droppers, electrical connection wires, and compensation devices can be replaced simultaneously within one skylight window. At the same time, it can avoid the safety hazard of overloading the guy wire foundation during the line replacement construction.

[0007] To achieve the above objectives, the present invention provides the following technical solution:

[0008] A construction method for simultaneously replacing the conductor of an entire anchorage section of the overhead contact line on a passenger dedicated railway line includes the following steps:

[0009] S1. Pre-construction preparation: Railcar assembly, and placement of catenary wire reels and contact wire reels on the assembled railcar assemblies;

[0010] S2, Anchoring Line:

[0011] On the anchoring side, first install two sets of auxiliary cables, and then lower the old contact wire to the guy wire foundation and fix it through the auxiliary cables. Use the auxiliary cables to tighten the old contact wire, so that the old contact wire compensation device is loosened. At the same time, use a lever hoist to first lift the contact wire weight string, and then remove the old contact wire weight string. The anchoring side is carried out simultaneously with the anchoring side, and the construction method is the same as the anchoring side. If necessary, hang a line laying pulley below the catenary support cable seat to prepare for the deployment and suspension of the catenary cable.

[0012] The new contact line is anchored using a temporary hard anchor from a railcar unit. The new contact line is then deployed and suspended from the old catenary using a specially designed S-hook. The new catenary is then anchored using the same method as the old contact line. The new catenary is then deployed and suspended from the catenary seat on the flat cantilever arm using a line-laying pulley.

[0013] S3. Replacement of compensation device:

[0014] After the conductor is anchored, during the laying process, the old compensation device, anchor angle steel and limiting frame that have been unloaded of tension are removed on both sides of the anchor. The new conductor anchor angle steel, limiting frame, compensation pulley and weight string are installed. On the anchoring side, the new contact wire is first laid onto the new compensation device to complete the formal anchoring, and then the new catenary cable is laid onto the new compensation device to complete the formal anchoring.

[0015] S4. Anchoring of the conductor:

[0016] After the new compensation device is replaced, the new contact wire is anchored first. Before anchoring, the tension of the old contact wire is unloaded by the hand lever on the auxiliary cable. The track car group adjusts the tension of the anchoring wire to 15KN. The new contact wire is anchored and connected to the new compensation device. Then the new catenary is anchored. After the new catenary is anchored, the new catenary is poured in, and the special S-hook that suspends the new contact wire is poured onto the new catenary.

[0017] S5. Dismantle the old cable: After the new cable is anchored, the old cable breaks at the middle anchor and the old cable is slowly lowered to the ground using a large rope.

[0018] S6. Installation of droppers and electrical connections, and adjustment of the contact network.

[0019] Furthermore, in step S1, the railcars are assembled according to the principle of first laying the contact wire and then laying the catenary. The assembly is as follows: constant tension wire laying car (head car) + work car + catenary wire laying car + work car (tail car).

[0020] Furthermore, in step S2, when installing the auxiliary cables, a guide pulley is installed on each side of the old conductor anchor angle steel. One end of each of the two auxiliary cables passes through the two guide pulleys and is connected to the lever hoist. The other end of the lever hoist is connected to the guy wire foundation. The other end of the auxiliary cable is connected to the old conductor using a tensioner.

[0021] Furthermore, in step S2, the new contact wire is anchored and the tension is 7KN, and the stringing speed is 5km / h; the new catenary is anchored and the tension is 3KN-5KN, and the stringing speed is 3-5km / h; and the constant tension laying vehicle for laying the contact wire is in front, while the catenary laying vehicle is behind, maintaining a safe distance of at least 100 meters.

[0022] Furthermore, in step S2, during the contact wire deployment process, a designated person on the railcar will hang the upper end of the prefabricated special S-hook on the old catenary cable and drag the lower end of the new contact wire to ensure the smoothness of the new contact wire during deployment. A 1-meter special S-hook is used on both sides of each support, and two 0.8-meter special S-hooks are evenly arranged in the middle of the span, with four special S-hooks arranged in each span. During the catenary cable deployment process, a designated person on the railcar will pour the deployed catenary cable into the line-laying pulley that is pre-installed below the flat cantilever arm.

[0023] Furthermore, in step S3, the new weight string is lifted to the height of the design value b plus the initial elongation of the new bearing cable using a lever hoist, the pulley spacing is adjusted to the design value a and sealed to prevent changes in the pulley spacing; after the new bearing cable is anchored and before the new bearing cable is poured in, the compensation values ​​a and b are re-measured and adjusted.

[0024] Furthermore, the values ​​of a and b may change during the installation of the new compensation system. After the new conductor and compensation system are connected to form the formal anchor, the value of b can be adjusted to meet the design requirements by adjusting the length of the compensation rope. The pulley spacing value of a can be adjusted first, and the two compensation ropes at the top between the moving and fixed pulleys can be clamped and fixed with steel wire clips to ensure that the value of a remains unchanged. After the new conductor and compensation system are connected, the steel wire clips can be removed to ensure that the pulleys move flexibly. Alternatively, adjustments can be made in other ways to ensure that the compensation pulley parameters are in place at once after the formal anchor is formed.

[0025] Furthermore, in step 2, after the auxiliary cables on both sides of the lifting and lowering anchor are simultaneously stressed, in addition to removing the old weight string, the existing middle anchor is also removed and a new middle anchor is installed.

[0026] Furthermore, in step S2, ① when the anchoring is open, the contact line is anchored, the constant tension line laying vehicle stops at the transition post near the anchor post, the contact line passes through the working support contact line near the support post, the constant tension line laying vehicle loosens the line, and the contact line is manually pulled to the anchoring point, and a temporary hard anchor is used to start the line erection; when the catenary is anchored, the line laying vehicle moves to the transition post away from the anchor post, and the line is manually pulled through the special pulley pre-installed on the flat cantilever arm, and a temporary hard anchor is used to start the line erection; when the anchoring is closed, both the constant tension line laying vehicle and the catenary line laying vehicle stop at the transition post near the anchor post, the contact line is manually pulled through the working support contact line, and a temporary hard anchor is used to start the anchoring point, the catenary passes through the working support catenary, and a temporary hard anchor is used to start the anchoring point.

[0027] Further, in step S2, ③ when the anchoring is open, the constant tension cable laying vehicle stops 10 meters past the anchor post. The tension of the new contact wire is adjusted to 15KN by the constant tension cable laying vehicle. The tension of the old contact wire is loosened manually using a lever hoist. The terminal clamp is installed on the work platform and connected to the new compensation for anchoring. The catenary cable laying vehicle moves to a point where the anchoring is far from the conversion post and stops. The new catenary cable is manually passed through the special pulley pre-installed above the flat cantilever arm suspending the old catenary cable. The tension of the old catenary cable is loosened manually using a lever hoist. After the new catenary cable is manually tightened into place, it is connected to the anchoring compensation for anchoring and anchoring is completed. ④ When the anchoring is closed. The constant tension cable laying vehicle stops 10 meters past the anchor post. The tension of the new contact wire is adjusted to 15KN by the constant tension cable laying vehicle. The tension of the old contact wire is loosened manually using a lever hoist. The terminal clamp is installed and connected to the new compensation cable on the work platform for anchoring. The catenary cable laying vehicle stops 10 meters past the anchor post. The catenary cable is broken from the reel. The catenary cable is manually passed over the working support cable and pulled to the anchor compensation point. The cable is manually tightened. The weight on the anchoring side experiences a lifting motion due to force. The tightening on the anchoring side stops. The anchoring connection is completed and the anchoring is completed. Before anchoring, the tension of the old catenary cable is loosened first, and then the new catenary cable is anchored. The beneficial effects of this invention are:

[0028] This invention provides a construction method for overhauling the overhead contact system of a high-speed railway, in which new lines are erected first and old lines are dismantled, and the catenary and contact wires are replaced within the same construction window. The contact wire is erected using a constant tension overhead line erecting vehicle, while the catenary is erected using a low tension. The new contact wire is erected first, followed immediately by the new catenary. Furthermore, through a rationally designed process, the existing supports and guy wire foundations can always be kept under tension within their load range during the erection process, improving construction efficiency, saving construction windows, and ensuring the safety of the line replacement construction. Attached Figure Description

[0029] The accompanying drawings, which form part of this application, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. Wherein:

[0030] Figure 1 This is a flowchart of the construction process.

[0031] Figure 2 This is a plan view of the clue replacement arrangement according to an embodiment of the present invention.

[0032] Figure 3 This is a schematic diagram of a railcar formation according to an embodiment of the present invention.

[0033] Figure 4 This is a schematic diagram illustrating the connection between the auxiliary cable and the existing conductor in an embodiment of the present invention.

[0034] Figure 5 This is a schematic diagram of the structure of the specially designed S-hook according to an embodiment of the present invention.

[0035] In the diagram: 1-Auxiliary cable, 2-Old conductor cable, 3-Guide pulley, 4-Tightener, 5-Weighting weight string, 6-Support, 7-Special S-hook. Detailed Implementation

[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art are within the scope of protection of the present invention.

[0037] In the description of this invention, the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," and "bottom," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and do not require the invention to be constructed and operated in a specific orientation; therefore, they should not be construed as limitations on the invention. The terms "connected" and "linked" used in this invention should be interpreted broadly. For example, they can refer to a fixed connection or a detachable connection; they can refer to a direct connection or an indirect connection through intermediate components. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0038] The present invention will now be described in detail with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described herein can be combined with each other.

[0039] First, it should be noted that "conducting wire" is a common term used in this field to refer to both the catenary and the contact wire. When there is no need to distinguish between the catenary and the contact wire, this article also uses "conducting wire" to refer to both the catenary and the contact wire.

[0040] like Figure 1 As shown, a construction method for simultaneously replacing the entire anchorage section of the overhead contact line on a passenger dedicated line includes the following steps:

[0041] S1. Pre-construction preparations: including site survey, measurement of prefabricated dropper data, confirmation of anchor opening and closing, clarification of the wiring scheme, railcar assembly, and line reel inspection; and placing the catenary wire reel and contact wire reel on the assembled railcar assembly; wherein, the railcar assembly follows the principle of erecting the contact wire first and then the catenary wire, and the assembly configuration is: constant tension wire laying car (car head) + work car + catenary wire laying car + work car (car tail). Figure 3 A schematic diagram of the railcar formation;

[0042] S2, Anchoring Line:

[0043] like Figure 4 As shown, two sets of auxiliary cables 1 are first installed on the anchoring side. The old contact wire 2 is then lowered to the guy wire foundation and fixed via the auxiliary cables 1. The old contact wire is tightened using the auxiliary cables 1, which loosens the old contact wire compensation device. At the same time, a hand-operated winch is used to first lift the contact wire weight string 5, and then the old contact wire weight string 5 is removed. Figure 4 The 5th weight string in the middle indicates the old weight string (existing weight string); the anchoring side and the anchoring side are carried out simultaneously, and the construction method is the same as the anchoring side; at the same time, a line laying pulley is hung below the flat cantilever support cable seat to prepare for the deployment and suspension of the support cable;

[0044] The new contact line is anchored using a temporary hard anchor of the railcar. After the new contact line is anchored, the constant tension wire-laying vehicle slowly moves forward to lay out the new contact line. The anchoring and wire-laying tension of the new contact line is 7KN and the wire-laying speed is 5km / h. The new contact line is suspended on the old catenary using a special S-hook 7.

[0045] Following this, the new catenary is anchored, using the same method as the contact wire anchoring. The tension for anchoring the new catenary is 3KN-5KN, and the stringing speed is 3-5km / h. The new catenary is suspended below the catenary seat on the flat cantilever arm using a stringing pulley. The constant tension stringing vehicle for laying the contact wire is in front, and the catenary stringing vehicle is behind, maintaining a safe distance of at least 100 meters.

[0046] This invention reduces the stress on the guy wire foundations corresponding to the anchoring and lowering anchors by first removing the old contact wire weight string 5 and the old catenary weight string 5; at the same time, the new contact wire is temporarily suspended at multiple points on the old catenary, and the new catenary is temporarily suspended at multiple points on the laying pulley, which disperses the stress on the anchoring anchor.

[0047] S3. Replacement of compensation device:

[0048] After the conductor is anchored, during the laying process, the old compensation device, anchor angle steel, and limiting frame that have been unloaded of tension are simultaneously removed on both sides of the anchor. The new conductor anchor angle steel, limiting frame, compensation pulley, and weight string are then installed. The new weight string is lifted to the height of the design value b plus the initial elongation of the new conductor using a lever hoist. The pulley spacing is adjusted to the design value a and sealed to prevent changes in the pulley spacing. On the anchoring side, the new contact wire is first laid onto the new compensation device to complete the formal anchoring, and then the new catenary cable is laid onto the new compensation device to complete the formal anchoring.

[0049] S4. Anchoring the contact wire: After the new compensation device is replaced, the new contact wire is anchored first. Before anchoring, the old contact wire is unloaded by the tension of the hand-operated hoist on the auxiliary cable 1. The constant tension cable laying vehicle is adjusted to tighten the anchoring tension to 15KN. The new contact wire is anchored and connected to the new compensation device. Then the new catenary cable is anchored. After the new contact wire is anchored, the compensation values ​​a and b are re-measured and adjusted. The new catenary cable is poured in, and the special S-hook 7 that suspends the new contact wire is poured onto the new catenary cable.

[0050] S5. Removal of old wires: After the new conductor is anchored, the old wires are broken at the middle anchor. The old conductor 2 is slowly lowered to the ground using a large rope. The removal of the old conductor 2 includes the removal of the old catenary, contact wire, dropper, and electrical connection wire. The break point is set at the middle anchor position. After the wires are lowered to the ground, they are broken in sections and transported out of the net using a trolley.

[0051] S6. Install droppers and electrical connections, and adjust the contact network; remove the special S-hook 7 after installing the droppers;

[0052] Specifically, regarding the installation location of the droppers, after the construction closure begins and personnel enter the network, a designated person will use a measuring tape to measure the location according to the dropper layout table and mark it on the rail or sleeper with a marker pen for easy reference by the upper dropper installation personnel. After the dropper installation is completed, two adjustment teams will be set up to push and check from the center anchor position towards the anchoring directions on both sides. New electrical connection lines will be installed at the joints where both anchor sections are new contact networks, and the newly erected contact network will be adjusted to meet the design parameter requirements.

[0053] Furthermore, in step S2, when installing the auxiliary cable 1, a 1.5T guide pulley 3 is installed on each of the anchor angle steel fields of the old conductor 2. One end of each of the two auxiliary cables 1 is passed through the two guide pulleys 3 and connected to a lever hoist. The other end of the lever hoist is connected to the guy wire foundation. The other end of the auxiliary cable 1 is connected to the old conductor 2 using a tensioner 4. When in use, the lever hoist on the guy wire foundation side is used to tighten the auxiliary cable 1, so that the auxiliary cable 1 is under force and the compensating pulley sags. At this time, the tension of the old conductor has been transferred to the auxiliary cable 1, and the existing conductor weight string 5, compensating pulley and insulator can be removed.

[0054] Further, in step S2, during the contact wire deployment process, a designated person on the railcar will hang the upper end of the prefabricated special S-hooks 7 onto the old catenary cable, while the lower end will support the new contact wire to ensure the smoothness of the new contact wire during deployment. Each support has a positioning point, and each support has two 1-meter special S-hooks 7. Two 0.8-meter special S-hooks 7 are evenly distributed in the middle of the span, that is, four special S-hooks 7 are arranged in each span (between two supports). The special S-hooks 7 are made of 8mm diameter plain round steel bars, and the upper and lower bends are covered with rubber or nylon heat-shrink sleeves to prevent wear on the wire. The upper end of the special S-hooks 7 is short spiral to prevent it from falling off, and the lower end of the special S-hooks 7 is hook-shaped. The special S-hooks 7 are removed after the droppers are installed.

[0055] Furthermore, in step 2, after the auxiliary cables 1 on both sides of the lifting and lowering anchor are simultaneously stressed, in addition to removing the old weight string 5, the existing middle anchor can also be removed; in addition, the new bearing conductor adopts the hard anchor method for anchoring, which can be done by installing two more auxiliary cables 1 on the other side of the support 6, or by using the existing bearing anchor angle steel for temporary anchoring, or other methods of anchoring, just to facilitate the replacement of the compensation device and meet the load requirements of the guy wire foundation.

[0056] Furthermore, in step 3, the values ​​of a and b may change during the installation of the new compensation. After the new bearing conductor and the compensation are connected to form the formal anchor, the value of b can be adjusted to meet the design requirements by adjusting the length of the compensation rope. The pulley spacing value of a can be adjusted first, and the two compensation ropes at the top between the moving and fixed pulleys can be clamped and fixed with steel wire clips to ensure that the value of a remains unchanged. After the new bearing conductor and the compensation are connected, the steel wire clips can be removed to ensure that the pulleys move flexibly. Alternatively, other methods can be used to adjust the parameters of the compensation pulleys to ensure that they are in place at once after the formal anchor is formed.

[0057] Furthermore, in step 4, the new contact wire is anchored using a constant tension wire laying vehicle to adjust the tension value to the design value, while the catenary is anchored manually.

[0058] Furthermore, in step S2, ① when the anchoring is open, the contact wire is anchored, the constant tension wire laying vehicle stops at the transition post near the anchor post, the contact wire passes through the working support contact wire near the support post 6, the constant tension wire laying vehicle releases the line, and the contact wire is manually pulled to the anchoring point, and the temporary hard anchor is used to start the line erection; the catenary is anchored, the wire laying vehicle moves to the transition post away from the anchoring post, and the line is manually pulled from the special pulley (the special pulley is the special wire laying for catenary erection in CN220332517U) that is pre-installed on the flat cantilever arm. The contact wire passes through the pulley system and is temporarily anchored at the anchoring point using a hard anchor to begin wire erection; when the anchoring is closed, both the constant tension wire laying vehicle and the catenary wire laying vehicle stop at the conversion column near the anchoring column. The contact wire is manually pulled, passing above the working support contact wire, and temporarily anchored at the anchoring point using a hard anchor. The catenary wire passes above the working support catenary wire and is temporarily anchored at the anchoring point using a hard anchor; ③ when the anchoring is open, the constant tension wire laying vehicle stops 10 meters past the anchoring column. The tension of the new contact wire is adjusted by the constant tension wire laying vehicle to the tension of the anchoring. 15KN, manually loosen the tension of the old contact wire using a lever hoist, and use the work platform to install the terminal clamp and connect it to the new compensation for anchoring; the catenary cable laying vehicle moves to the anchoring point away from the conversion post and stops, and the new catenary cable is manually passed through the special pulley pre-installed above the flat cantilever arm suspending the old catenary cable, and the tension of the old catenary cable is manually loosened using a lever hoist. After the new catenary cable is manually tightened into place, it is connected to the anchoring compensation for anchoring and anchoring is completed; ④ When the anchoring is closed, the constant tension laying vehicle stops 10 meters past the anchor post, and the tension of the new contact wire passes through the constant tension The cable laying vehicle adjusts the tension of the anchoring cable to 15KN. The tension of the old contact wire is loosened manually using a lever hoist. The terminal clamp is installed and connected to the new compensation cable on the work platform for anchoring. The catenary cable laying vehicle stops 10 meters from the anchor post. The catenary cable breaks off from the reel. The catenary cable is manually passed over the working support cable and pulled to the anchor compensation point. The cable is manually tightened. The weight on the anchoring side has a lifting action under force. The tightening on the anchoring side stops. The anchoring connection is completed and the anchoring is completed. Before anchoring, the tension of the old catenary cable is loosened first, and then the new catenary cable is anchored.

[0059] The following example, a major overhaul project of the overhead contact system of a passenger dedicated line, illustrates the specific construction method of this invention:

[0060] The construction work includes: replacement of the conductor, droppers, and compensation device; the design tension of the new conductor is 15KN+15KN; the existing conductor tension is 15KN+15KN; the anchoring device is a compensation pulley; the transmission ratio of the conductor and the conductor is 1:3; the existing guy wire foundation is designed to withstand a maximum tension of 45KN; the specific construction process of this invention is as follows: Figure 1 As shown:

[0061] S1. Pre-construction preparations: mainly include:

[0062] Data measurement includes data such as the height of the catenary positioning point, the superelevation of the outer rail, and the distance between each positioning point; the dropper calculation uses dedicated catenary calculation software, and the prefabrication is completed using a dedicated prefabrication platform for droppers; during the construction of the catenary, a dedicated person marks the installation position of the dropper on the rail with a marker pen.

[0063] On-site investigation, and replacement of the floor plan based on clues. Figure 2 Both the lifting and lowering anchors are closed, thus determining the path for threading the clues;

[0064] After inspecting the reel and confirming that the length of the reel is correct, it is hoisted onto the constant tension wire laying vehicle and the catenary wire laying vehicle. Steel wire rope, flower wheel bolts, and steel wire clips are used to secure it to the four sides of the wire laying frame in a figure-eight fastening method.

[0065] The railcars are assembled according to the principle of first installing the contact wire and then the catenary wire. The assembly details are as follows: Figure 3 As shown: Constant tension wire laying vehicle (front) + work vehicle + catenary wire laying vehicle + work vehicle (rear);

[0066] S2, Anchoring Line:

[0067] S2.1 Preparations before weighing anchor:

[0068] After the power outage order is issued and the site supervisor announces that work can proceed on the pole, personnel are deployed at each positioning point. A line-laying pulley is hung below the catenary support to prepare for the catenary deployment and suspension. The reverse positioning tube is raised and tied to the inclined scaffold tube with iron wire to prevent the line-laying post from scraping against it when the constant tension line-laying vehicle is deploying the line. Depending on the line conditions, when anchoring within the area, a special type of pulley (a special line-laying pulley device for catenary erection as described in patent CN220332517U) needs to be installed above the non-supported flat scaffold head to facilitate the anchoring and erection of the catenary.

[0069] Install a 1.5T pulley on each side of the existing anchor angle steel. Pass the two auxiliary cables 1 through the two pulleys respectively and connect them to the lever hoist. Connect the other side of the lever hoist to the wire rope loop, and connect the wire rope loop to the U-shaped ring to complete the connection between the auxiliary cables 1 and the guy wire foundation. Figure 4 On the other side of the auxiliary cable 1, the tensioner 4 is connected to the existing cable. The hand lever on the base side of the cable is used to tighten the auxiliary cable 1, so that the auxiliary cable 1 is under force and the compensating pulley droops. At this time, the tension of the old cable has been transferred to the auxiliary cable 1. At the same time, another hand lever is used to lift the contact wire weight string 5, and the existing bearing weight string 5, compensating pulley and insulator are removed. After the auxiliary cables 1 on both sides of the lifting and lowering anchor are under force at the same time, in addition to removing the old weight string 5, the existing middle anchor is also removed and a new middle anchor is installed. That is, the large middle anchor can be replaced after the old bearing conductor 2 is lowered to the auxiliary cable 1. At the same time, the old contact wire is taken out from the positioning clamp of the existing middle anchor and fixed with iron wire. The old bearing cable is pulled out from the bearing cable seat and temporarily suspended on the side of the flat bracket near the support 6.

[0070] S2.2, Formal anchor erection line;

[0071] First, anchor the contact wire, then change the plan view according to the clues. Figure 2 It is known that the anchoring side is closed. The constant tension wire laying vehicle stops near the anchoring conversion post, the tension disc rotates to bring out the contact wire, the contact wire surface is manually checked, and after confirming that it is correct, the straightener and the wire-pulling post are aligned. The contact wire is then passed through the straightener and the wire-pulling post, passing above the working support contact wire; it is pulled to the anchoring point, the new contact wire end is connected to the existing double ring rod with a terminal clamp, and a temporary hard anchor is used to lift the anchor; the constant tension wire laying vehicle adjusts the tension through the tension disc, increasing the tension to 7KN, and travels at a constant speed of 5KM / h towards the anchoring side. The wire-pulling post is controlled by a dedicated person, and the horizontal adjustment of the wire-pulling post is adjusted according to the wire's travel path. The direction, position, and height of the line; after the constant tension cable laying vehicle leaves the joint, the catenary cable laying vehicle stops near the anchor conversion post, and the manual cable is pulled through the working support cable to the anchor point for temporary anchoring. The connection method is the same as that for temporary anchoring of the contact wire. If the catenary cable needs to be anchored in a bend, the manual cable is first passed through a special pulley and then connected to the insulator to complete the anchoring. During the laying of the catenary cable, a ladder truck follows behind the cable laying vehicle. The personnel in the ladder truck pour the laid catenary cable into the pulley that is pre-installed below the flat cantilever arm to prevent the catenary cable from touching the ground and rubbing against the rail hooks, which could cause damage to the cable.

[0072] S3. Replacement of compensation device:

[0073] First, install the anchor angle steel. The installation height of the anchor angle steel is 7500mm above the rail surface, and the installation height of the line anchor angle steel is 6200mm above the rail surface. After adjusting the a value of the compensating pulley, use steel wire clips to hold the two compensating ropes on the upper part of the moving and stationary pulleys to prevent the pulleys from sliding and to prevent changes in the distance between the moving and stationary pulleys during the installation process. Install the compensating pulley, the screed rod, and the insulator. Ground workers stack the 5 weight strings on the weight rod, connect the weight rod to the compensating rope, and use a hand-operated hoist to lift the weight string 5 to a height of b value + the initial elongation of the new line.

[0074] After the compensating pulley and weight string 5 are installed, the new conductor is lowered onto the new compensator. First, the new contact wire is connected, and a wire sleeve is placed on the support post 6. A lever hoist is then connected, and the lever hoist is connected to the tensioner 4 and the new contact wire. The new contact wire is tightened by the lever hoist. After the existing double-ring rod droops, the tightening is stopped. The connection between the new line terminal clamp and the existing double-ring rod is opened, and the new contact wire is aligned with the single ear at the end of the new compensating insulator. A mark is made on the new contact wire, leaving room for a return length. The wire is cut and the terminal clamp is reinstalled. The connection with the new insulator is completed to officially start the anchoring. At the same time, the wire clips between the moving and stationary pulleys are opened to make the pulley transmission flexible. The operation of lowering the new catenary cable onto the new compensator is the same as that of the new contact wire.

[0075] S4. Anchoring of the conductor:

[0076] Replace the floor plan based on the clues. Figure 2 The anchoring side is closed, so the contact wire is anchored first. The constant tension wire laying vehicle moves to the anchoring post and stops. On both sides of the anchoring, the old contact wire is loosened using the lever hoist on the wire base to unload the tension of the old contact wire. The tension of the constant tension wire laying vehicle is increased to the design value of 15KN. The contact wire is moved closer to the anchoring side using the wire pulling post. The personnel on the work platform mark the alignment of the contact wire with the end single ear of the insulator, leaving a 500mm length for later use. The wire is then cut and the terminal clamp is installed. After connecting with the new insulator, the steel wire clamp between the moving and stationary pulleys is opened to make the pulley transmission flexible. The lever hoist that fixes the new contact wire weight string 5 is loosened to make the new weight string 5 bear force. The constant tension wire laying vehicle moves forward with reduced tension. After the contact wire is anchored, the anchoring values ​​a and b are adjusted. After the parameters meet the requirements, the contact wire is poured into the positioning clamp and the center anchor rope of the contact wire is installed.

[0077] After the contact wire is anchored, the tension of the old catenary cable is loosened on both sides. The catenary cable laying vehicle stops and cuts the cable 10 meters behind the anchor post. A pulley is hung on the field side of the top of the anchor post, and a large rope is passed through the pulley and connected to the tensioner 4. The other side of the tensioner 4 is attached to the cut new catenary cable. The catenary cable is tightened manually by pulling the cable. After the catenary cable weight string 5 is raised 200mm on the anchoring side, the pulling of the cable is stopped on the anchoring side. People on the work platform install the terminal clamps on the alignment marks of the catenary cable and the insulator, and connect them to the insulator to complete the anchoring. At the same time, the steel wire clamps between the moving and stationary pulleys are opened to make the pulley transmission flexible. The hand lever that fixes the new catenary cable weight string 5 is loosened so that the new weight string 5 is under force. After the catenary cable is anchored, the special S-hooks 7 at each positioning point are lowered onto the new catenary cable, the catenary cable compensation values ​​a and b are adjusted, and the catenary cable is lowered into the catenary cable seat.

[0078] S5. Remove the old cable: After the new cable is anchored, the old cable 2 that has been unloaded can be removed. Use the tensioner 4 and a hand-operated hoist to tighten the cable on both sides of the break point at the middle anchor position. After the cable breaks, use a large rope to slowly lower the cable to the ground.

[0079] S6. Installation of droppers and electrical connection wires, and adjustment of the contact wire; after installation of the droppers, remove the special S-hook 7;

[0080] After the old line was dismantled, the droppers were installed according to the positions marked on the rails. After the droppers were installed, the surveyors re-measured the contact network, adjusted the contact network, and recorded the data. The two adjacent anchor sections at the joint were both newly replaced contact networks. New electrical connection wires were installed at this joint. Finally, a cold-slip test was conducted, the site was cleaned, and the conditions for commissioning were confirmed with the equipment management unit.

[0081] The traditional method of replacing the conductor wire by replacing the catenary wire in one skylight window and the contact wire in the next skylight window typically takes 120 minutes per skylight window, with an effective construction time of about 90 minutes. The total effective construction time for two skylight windows is about 180 minutes, resulting in a waste of about 60 minutes. This invention replaces the catenary wire simultaneously in one skylight window. Although the skylight window time is slightly longer, about 240 minutes, the effective construction time is 210 minutes, making the skylight window utilization efficiency higher than the single-wire replacement method. Furthermore, this invention uses constant tension laying to improve the quality of the conductor wire laying, and the optimized process design ensures the safety of the support 6 and the guy wire foundation during the wire replacement process, effectively avoiding safety hazards such as overload.

[0082] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention shall be within the scope of protection of the pending claims of the present invention.

Claims

1. A construction method for simultaneously replacing the conductor of an entire anchorage section of the overhead contact line on a passenger dedicated line, characterized in that, Includes the following steps: S1. Pre-construction preparation: Railcar assembly, and placing the catenary wire reel and contact wire reel on the assembled railcar assembly; the railcar assembly follows the principle of erecting the contact wire first and then the catenary wire, and the assembly configuration is: constant tension wire laying car at the front + work car + catenary wire laying car + work car at the rear. S2, Anchoring Line: On the anchoring side, two sets of auxiliary cables are first installed, and the old contact wire is lowered to the guy wire foundation and fixed through the auxiliary cables. The old contact wire is tightened using the auxiliary cables to loosen the old contact wire compensation device. At the same time, a lever hoist is used to first lift the old contact wire weight string, and then remove the old contact wire weight string. The anchoring side is carried out simultaneously with the anchoring side, and the construction method is the same as the anchoring side. A line-laying pulley is hung below the catenary support cable seat to prepare for the deployment and suspension of the catenary cable. When installing the auxiliary cables, install a guide pulley on each side of the old conductor anchor angle steel. Pass one end of each of the two auxiliary cables through the two guide pulleys and connect them to the lever hoist. Connect the other end of the lever hoist to the guy wire foundation. Connect the other end of the auxiliary cables to the old conductor using a tensioner. The new contact line is anchored using a temporary rigid anchor on a railcar unit. The new contact line is then deployed and suspended from the old catenary cable using a specially designed S-hook. The new catenary cable is then anchored using the same method as the old contact line anchoring. The new catenary cable is then deployed, suspended below the catenary cable seat using a laying pulley. The tension for anchoring and stringing the new contact line is 7 kN, and the stringing speed is 5 km / h. The tension for anchoring and stringing the new catenary cable is 3-5 kN, and the stringing speed is 3-5 km / h. The constant tension laying car for the old contact line is in front, and the catenary cable laying car is behind, maintaining a safe distance of at least 100 meters. ① When anchoring is open, the contact wire is anchored, and the constant tension wire laying vehicle stops at the transition post near the anchor post. The contact wire passes through the working support contact wire near the support post. The constant tension wire laying vehicle releases the wire, and the contact wire is manually pulled to the anchoring point. A temporary rigid anchor is used for anchoring to begin wire laying. When anchoring the catenary, the wire laying vehicle moves to the transition post away from the anchor post, and the wire is manually pulled through a special pulley pre-installed on the flat cantilever arm to the anchoring point. A temporary rigid anchor is used for anchoring to begin wire laying. ② When anchoring is closed, the constant tension wire laying vehicle and the catenary wire laying vehicle... All stops are located near the conversion post of the anchoring post. The contact wire is manually pulled through the working support contact wire and temporarily anchored at the anchoring point. The catenary is passed through the working support catenary and temporarily anchored at the anchoring point. ③ When the anchoring is open or closed, the constant tension cable laying vehicle stops 10 meters past the anchor post. The tension of the new contact wire is adjusted to 15kN by the constant tension cable laying vehicle. The tension of the old contact wire is loosened manually using a hand lever. The terminal clamp is installed and connected to the new compensation for anchoring using the work platform. S3. Replacement of compensation device: After the conductor is anchored, during the laying process, the old compensation device, anchor angle steel and limiting frame that have been unloaded of tension are removed on both sides of the anchor. The new conductor anchor angle steel, limiting frame, compensation pulley and weight string are installed. On the anchoring side, the new contact wire is first laid onto the new compensation device to complete the formal anchoring, and then the new catenary cable is laid onto the new compensation device to complete the formal anchoring. S4. Anchoring of the conductor: After the new compensation device is replaced, the new contact wire is anchored first. Before anchoring, the tension of the old contact wire is unloaded by the hand lever on the auxiliary cable. The track car group adjusts the tension of the anchoring wire to 15kN. The new contact wire is anchored and connected to the new compensation device. Then the new catenary is anchored. After the new catenary is anchored, the new catenary is poured in, and the special S-hook that suspends the new contact wire is poured onto the new catenary. S5. Dismantle the old cable: After the new cable is anchored, the old cable breaks at the middle anchor and the old cable is slowly lowered to the ground using a large rope. S6. Installation of droppers and electrical connections, and adjustment of the contact network.

2. The construction method for simultaneously replacing the entire anchorage section of the overhead contact line of a passenger dedicated line according to claim 1, characterized in that: In step S2, during the contact wire deployment process, a designated person on the railcar will hang the upper end of the prefabricated special S-hook on the old catenary cable and drag the lower end of the new contact wire to ensure the smoothness of the new contact wire during deployment. A 1-meter special S-hook is used on both sides of each support, and two 0.8-meter special S-hooks are evenly arranged in the middle of the span, with four special S-hooks arranged in each span. During the catenary cable deployment process, a designated person on the railcar will pour the deployed new catenary cable into the line-laying pulley that is pre-installed below the flat cantilever arm.

3. The construction method for simultaneously replacing the entire anchorage section of the overhead contact line of a passenger dedicated line according to claim 1, characterized in that: In step S3, the new weight string is lifted to the height of the design value b plus the initial elongation of the new bearing cable using a lever hoist. The pulley spacing is adjusted to the design value a and then sealed to prevent changes in the pulley spacing. After the new bearing cable is anchored and before the new bearing cable is poured in, the compensation values ​​a and b are re-measured and adjusted.

4. The construction method for simultaneously replacing the entire anchorage section of the overhead contact line of a passenger dedicated line according to claim 3, characterized in that: During the installation of the new compensation system, the values ​​of a and b may change. After the new conductor and the compensation system are connected to form the formal lifting anchor, the value of b is adjusted to meet the design requirements by adjusting the length of the compensation rope. The pulley spacing value of a is adjusted first. The two compensation ropes at the top between the moving and fixed pulleys are then clamped and fixed with steel wire clips to ensure that the value of a remains unchanged. The steel wire clips are removed after the new conductor and the compensation system are connected to ensure that the pulleys move flexibly.

5. The construction method for simultaneously replacing the entire anchorage section of the overhead contact line of a passenger dedicated line according to claim 1, characterized in that: In step S2, after the auxiliary cables on both sides of the lifting and lowering anchor are simultaneously stressed, in addition to removing the old weight string, the existing middle anchor is also removed and a new middle anchor is installed.

6. The construction method for simultaneously replacing the entire anchorage section of the overhead contact line of a passenger dedicated line according to claim 1, characterized in that: In step S2, when the anchor is open, the catenary cable laying vehicle moves to the anchor position away from the conversion column and stops. The new catenary cable is manually passed through the special pulley installed in advance above the flat cantilever arm that suspends the old catenary cable. The tension of the old catenary cable is loosened by manually using a hand lever. After the new catenary cable is manually tightened into place, it is connected to the anchor compensation and the anchoring is completed. When the anchor is closed, the catenary cable laying vehicle stops 10 meters past the anchor post, the catenary cable breaks off from the reel, and the manual person passes the catenary cable over the working support cable and pulls it to the anchor compensation point. The manual person tightens the cable, and the weight on the anchoring side has a lifting action under force. The tightening on the anchoring side stops, and the anchoring is completed by connecting with the compensation. Before anchoring, the tension of the old catenary cable is loosened first, and then the new catenary cable is anchored.

Citation Information

Patent Citations

  • Special-shaped paying-off pulley device for carrier cable stringing

    CN220332517U

  • Modern tramcar contact network small tension setting-out method

    CN106882083A

  • Method of mounting contact system at preset tension of wires

    RU2097219C1