A steeply inclined thin vein mining method suitable for broken rock mass

By using foam concrete to construct artificial false bottoms and layered false bottoms in the mining of steeply inclined thin veins in broken rock mass, combined with bolt support and central ventilation pedestrian slide mines, the problems of roof safety and ground pressure control have been solved, and an efficient, Safe mining of mineral deposits.

CN118309427BActive Publication Date: 2024-10-18CHANGCHUN GOLD RES INST
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410736530.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-18
Estimated Expiration
2044-06-07

Smart Images

  • Figure CN118309427B_ABST
    Figure CN118309427B_ABST
Patent Text Reader

Abstract

The present invention provides a method for mining steeply inclined thin veins suitable for broken rock masses. The method divides the mine rooms along the strike direction, mines in layers from top to bottom, and completes ventilation, pedestrians, and ore extraction through a central ventilation pedestrian chute. Foam concrete is used as a filling material for an artificial false bottom and a layered false bottom. Due to the characteristics of light energy absorption, high toughness, and easy construction of foam concrete, the shortcomings of the concrete false bottom that is easy to crack due to blasting disturbance, has a large deadweight load, and is complex to construct are solved, thereby achieving safe and efficient mining of steeply inclined thin veins in broken rock masses.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground mining of metal ore deposits, and in particular to a steeply inclined thin vein mining method suitable for broken rock bodies. Background Art

[0002] The mining of steeply inclined thin veins in broken rock masses is a difficult problem in mining engineering. During the construction process of conventional ore-retaining mining method, upward horizontal layered filling method and upward approach filling method, due to the influence of ore rock crushing, many problems such as roof safety, depletion index control and ground pressure control are often difficult to solve, and the loss rate is high. In order to ensure the maximum recovery of ore resources, the downward approach filling mining method is often used to mine this type of ore body.

[0003] However, in the process of mining with downward filling, the artificial false bottom is constructed with concrete, which is brittle and easy to crack when disturbed by blasting. The preparation process is complicated and requires manual mixing. The strength is difficult to control and the maintenance time is long, resulting in low mining efficiency, high labor intensity, unsatisfactory economic and technical indicators, difficulty in connecting the tops between layers, and low connection rate. Therefore, how to break through the limitations of the above-mentioned steeply inclined thin vein mining of broken rock mass and achieve precise mining, low loss mining, green, safe and efficient mining has always been the unremitting pursuit of the mining industry.

[0004] The invention patent with the publication number CN118008304A provides a method for mining with natural-induced collapse and subsequent filling of altered, broken, steeply inclined thin ore veins. It includes the following steps: Step 1: Complete the mining work of the stope; Step 2: The top of the stope is divided into the first layer false top, the second layer working space, and the third layer false bottom from top to bottom. The bottom of the stope is the ore-falling space formed by natural fall with the transportation of loose ore and rock. The ore vein to be naturally-induced fall is between the third layer false bottom and the ore-falling space; Step 3: With the first layer false top at the top of the stope as a cover and the third layer false bottom as a construction platform, the ore-falling drilling hole, observation exhaust hole and filling drilling hole are constructed in the second layer working space to the lower part of the stope; Step 4: Complete the recovery of ore blocks; Step 5: Construct the retaining wall of the vein and the mine-exit roadway at the bottom of the stope and complete the filling of the goaf, and finally construct the retaining wall of the second layer working space and fill it. However, the above method has the problems of difficult control of ore falling intensity, undominated caving area, and excessive depletion rate. Especially for thin ore veins with severe complex inclination and thickness, it is impossible to enter the mining site for groove sampling and detailed understanding of the ore body occurrence, resulting in the inability to mine parallel veins and the inability to finely control the ore veins of the current ore block, which leads to ore loss and excessive loss rate. In addition, too much waste rock is mixed in during the mining process, making it impossible to achieve fine mining.

[0005] In view of this, it is necessary to design an improved steeply inclined thin vein mining method suitable for broken rock mass to solve the above problems. Summary of the invention

[0006] The purpose of the present invention is to provide a steeply inclined thin vein mining method suitable for broken rock bodies, so as to solve the technical problems that the steeply inclined thin vein resources are difficult to recover, the recovery efficiency is low, and the recovery operation is unsafe due to the broken ore rock.

[0007] To achieve the above-mentioned object of the invention, the present invention provides a steeply inclined thin vein mining method suitable for broken rock mass, which comprises the following steps:

[0008] S1, Mining: The stope is arranged along the strike, with a segment height of 40~50m, a stope length of 40~80m, and a layer height of 2~3m; the mining project includes a central ventilation pedestrian chute, pedestrian ventilation shafts at both ends, and upper / lower middle transport lanes;

[0009] S2, mining: adopting the road excavation mining technology, mining in layers from top to bottom;

[0010] S3, support: anchor rods are used to support the surrounding rock of the upper and lower plates;

[0011] S4, void area treatment: The ground pressure is controlled and the void area is treated by filling with foam concrete. High-strength foam concrete is used to construct an artificial false bottom as the top plate for the lower layer mining, and low-strength foam concrete is used to connect the tops and fill the gaps between the false bottom layers.

[0012] As a further improvement of the present invention, in step S4, the process flow of constructing an artificial false bottom with foam concrete includes:

[0013] S41, reserve a crushed ore cushion and lay a plastic film;

[0014] S42, laying steel mesh;

[0015] S43, foam concrete filling.

[0016] As a further improvement of the present invention, the specific process of reserving a crushed ore cushion layer and laying a plastic film in step S41 is as follows: a crushed ore cushion layer with a thickness of 400 to 500 mm is left after each layer of mining is completed, the floor is leveled to make the bottom plate flat in the vertical and horizontal directions, a layer of plastic film is laid on the crushed ore cushion layer, anti-seepage measures are taken between the rock wall and the plastic sheet, between the plastic sheet and the pedestrian well, and between the material discharge well, and cement is used in advance to seal the places where slurry may leak, to prevent slurry from leaking when the foam concrete is filled.

[0017] As a further improvement of the present invention, the specific process of laying the reinforcement mesh in step S42 is: placing wood blocks or gravel on the plastic film, and then laying the reinforcement mesh, so that the reinforcement mesh is raised by 50-100 mm and is completely wrapped by the filling slurry.

[0018] As a further improvement of the present invention, in the steel mesh, the diameter of the main reinforcement and the secondary reinforcement is 10-20 mm, the spacing is 150-500 mm, the mesh size is between 20-50 cm, and the intersections are reinforced or welded; the two ends of the main reinforcement and the secondary reinforcement are suspended in the rock mass by anchoring to round steel in the rock mass.

[0019] As a further improvement of the present invention, round steel is embedded in the bottom plate at intervals of 0.8 to 1.5 m, and the steel mesh is fixedly connected to the round steel, and hangers are arranged in the middle of the access road. The hangers are spaced 1.5 to 2.0 m apart, and the upper ends are connected to the top plate steel mesh, and the lower ends are connected to the bottom plate steel mesh.

[0020] As a further improvement of the present invention, the specific process of foam concrete filling in step S43 is: before filling, filling retaining walls are erected at both ends of the mining area, and high-strength foam concrete artificial false bottom is filled between each layer; after the high-strength foam concrete artificial false bottom is cured, low-strength foam concrete is filled between the layered false bottoms, and after the filling and curing are completed, the next layer can be mined.

[0021] As a further improvement of the present invention, the bulk density of the foamed concrete in the high-strength foamed concrete artificial false bottom is not less than 700kg / m³, and the filling height is not less than 0.5m; the bulk density of the low-strength foamed concrete is controlled within 500kg / m³.

[0022] As a further improvement of the present invention, the support mesh in step S3 is 0.8~1.5m×0.8~1.5m, and the steel mesh in the artificial false bottom is suspended on the anchor rod by steel wire.

[0023] As a further improvement of the present invention, the specific process flow of the road excavation mining process in step S2 is: pedestrians enter the mining area through the central ventilation pedestrian chute and the pedestrian ventilation shafts at both ends, drill blast holes and detonate them, and the collapsed ore is transported to the central ventilation pedestrian chute, poured into the lower middle section transportation tunnel and transported to the surface in a concentrated manner.

[0024] The beneficial effects of the present invention are:

[0025] 1. The invention provides a method for mining steeply inclined thin veins in broken rock masses. The method divides the mine rooms along the strike direction, mines in layers from top to bottom, and completes ventilation, pedestrians, and ore extraction through a central ventilation pedestrian chute. Foam concrete is used as a filling material for artificial false bottoms and layered false bottoms. Due to the characteristics of lightweight energy absorption, high toughness, and easy construction of foam concrete, the shortcomings of concrete false bottoms that are prone to cracking due to blasting disturbance, have a large deadweight load, and are complex to construct are solved, thereby achieving safe and efficient mining of steeply inclined thin veins in broken rock masses.

[0026] 2. The steeply inclined thin vein mining method suitable for broken rock mass provided by the present invention controls ground pressure and processes empty areas through foam concrete filling, uses high-strength foam concrete to construct an artificial false bottom as the roof for lower layer mining, and uses low-strength foam concrete for top connection and filling between the layered false bottoms. The high-strength foam concrete and the low-strength foam concrete are composited to construct an artificial layered false bottom and a false bottom intermediate layer with a strength gradient setting. The composite structure with a strength gradient setting is not easy to crack under blasting disturbance, has a small deadweight load, and has excellent buffering performance. The foam concrete does not shrink or ooze water, and has a high top connection rate after filling, so as to significantly enhance the stability of the false bottom, achieve better ground pressure control effect in the mining area, and ensure the technical efficacy of the safety of the mining operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of the stope structure of the steeply inclined thin vein mining method suitable for broken rock mass provided by the present invention.

[0028] Figure 2 A schematic diagram of the construction of an artificial false bottom in the steeply inclined thin vein mining method suitable for broken rock mass provided by the present invention.

[0029] Figure 3 A schematic diagram of artificial false bottom reinforcement of foam concrete in a steeply inclined thin vein mining method suitable for broken rock mass provided by the present invention.

[0030] Description of reference numerals:

[0031] 1-high-strength foam concrete artificial bottom; 2-low-strength foam concrete; 3-mining body to be mined; 4-upper middle section transport tunnel; 5-lower middle section transport tunnel; 6-central ventilation pedestrian chute; 7-passenger chute for ventilation along the way; 8-hanging rod; 9-resin anchor rod; 10-round steel; 11-crushed ore cushion; 12-steel mesh; 13-secondary reinforcement; 14-main reinforcement; 15-steel wire. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0033] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the scheme of the present invention are shown in the drawings, while other details that are not closely related to the present invention are omitted.

[0034] In addition, it should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0035] The present invention provides a steeply inclined thin vein mining method applicable to broken rock mass, which comprises the following steps:

[0036] S1, Mining: The stope is arranged along the strike, with a segment height of 40~50m, a stope length of 40~80m, and a layer height of 2~3m; the mining project includes a central ventilation pedestrian chute, pedestrian ventilation shafts at both ends, and upper / lower middle section along-vein transportation lanes;

[0037] S2, mining: adopting the road excavation mining technology, mining in layers from top to bottom;

[0038] S3, support: anchor rods are used to support the surrounding rock of the upper and lower plates;

[0039] S4, void area treatment: The ground pressure is controlled and the void area is treated by filling with foam concrete. High-strength foam concrete is used to construct an artificial false bottom as the top plate for the lower layer mining, and low-strength foam concrete is used to connect the tops and fill the gaps between the false bottom layers.

[0040] Preferably, in step S4, the process flow of constructing an artificial false bottom with foam concrete includes:

[0041] S41, reserve a crushed ore cushion and lay a plastic film;

[0042] S42, laying steel mesh;

[0043] S43, foam concrete filling.

[0044] Preferably, the specific process of reserving a crushed ore cushion and laying a plastic film in step S41 is as follows: a crushed ore cushion layer of 400 to 500 mm thick is left after each layer of mining is completed, the floor is leveled to make the bottom plate flat in the vertical and horizontal directions, a layer of plastic film is laid on the crushed ore cushion layer, anti-seepage measures are taken between the rock wall and the plastic sheet, between the plastic sheet and the pedestrian well, and between the material discharge well, and cement is used in advance to seal the places where slurry may leak to prevent slurry from leaking when the foam concrete is filled.

[0045] Preferably, the specific process of laying the reinforcement mesh in step S42 is: placing wood blocks or gravel on the plastic film, and then laying the reinforcement mesh, so that the reinforcement mesh is raised by 50-100 mm and is completely wrapped by the filling slurry.

[0046] Preferably, the mesh size of the steel mesh is between 20 and 50 cm, wherein the diameter of the main reinforcement and the secondary reinforcement is 10 to 20 mm, the spacing is 150 to 500 mm, and the intersections are reinforced or welded; the two ends of the main reinforcement and the secondary reinforcement are suspended in the rock mass by anchoring round steel in the rock mass.

[0047] Preferably, round steel is embedded in the bottom plate at intervals of 0.8 to 1.5 m, and the steel mesh is fixedly connected to the round steel. Hanging rods are arranged in the middle of the access road, with intervals of 1.5 m to .0 m. The upper ends of the hangers are connected to the top plate steel mesh, and the lower ends are connected to the bottom plate steel mesh.

[0048] Preferably, the specific process of the foam concrete filling in step S43 is: before filling, filling retaining walls are erected at both ends of the mining area, and high-strength foam concrete artificial false bottom is filled between each layer; after the high-strength foam concrete artificial false bottom is cured, low-strength foam concrete is filled between the layered false bottoms, and after the filling and curing are completed, the next layer can be mined.

[0049] Preferably, the bulk density of the foamed concrete in the high-strength foamed concrete artificial false bottom is not less than 700kg / m³, and the filling height is not less than 0.5m; the bulk density of the low-strength foamed concrete is controlled at 500kg / m³ and above.

[0050] Preferably, the support mesh in step S3 is 0.8~1.5m×0.8~1.5m, and the steel mesh in the artificial false bottom is suspended on the anchor rod by steel wire.

[0051] Preferably, the specific process flow of the road excavation mining process in step S2 is: pedestrians enter the mining area through the central ventilation pedestrian chute and the pedestrian ventilation shafts at both ends, drill blastholes and detonate them, and the collapsed ore is transported to the central ventilation pedestrian chute, poured into the lower middle section transportation tunnel and transported to the surface in a concentrated manner.

[0052] Example 1

[0053] See also Figure 1 As shown, Embodiment 1 of the present invention provides a steeply inclined thin vein mining method suitable for broken rock mass, and the main process flow includes: mining, mining, support and empty area treatment, and the specific steps are as follows:

[0054] S1, Mining: Divide the ore body 3 to be mined into mining units, i.e., stopes, along the direction of the ore deposit. The stope is located between the upper middle section transport tunnel 4 and the lower middle section transport tunnel 5. The stope is 40~80m long, 40~50m high, and the layered mining height is 2~3m. The ore body 3 to be mined is mined layer by layer from top to bottom. A central ventilated pedestrian chute 6 is arranged in the middle of the stope. Workers can enter the stope from the upper middle section transport tunnel 4. The mined ore is raked into the central ventilated pedestrian chute 6 by an electric rake, and then loaded into a mine car through the lower middle section transport tunnel 5 for centralized transportation to the surface. A pedestrian ventilated shaft 7 is arranged at each end of the stope. As the ore body 3 to be mined is continuously mined downward, the pedestrian ventilated shaft 7 is extended layer by layer.

[0055] S2, mining: adopting the road excavation type mining technology, drilling blastholes by air-leg rock drills, and filling rolled emulsion explosives in the blastholes. The detonators are detonated, and the collapsed ore is raked into the central chute by electric rakes and poured into the mine cars in the lower middle section transport tunnel 5 for centralized transportation to the surface.

[0056] S3, Support: The upper and lower plates of the stope are supported by resin anchor rods 9, and the support mesh is preferably 0.8~1.5m×0.8~1.5m. The upper and lower plates of the stope need to be supported by anchor rods, and the steel mesh 12 in the artificial false bottom is suspended on the anchor rods through steel wires 15.

[0057] S4, empty area treatment: Control the ground pressure and empty area treatment by filling with foam concrete. After each layer of mining is completed, a high-strength foam concrete artificial false bottom 1 is constructed on the bottom plate, and low-strength foam concrete 2 is used to connect and fill the layers of high-strength foam concrete artificial false bottom 1. Main reinforcement and secondary reinforcement need to be arranged in the high-strength foam concrete false bottom, with a mesh size of 20~50cm. The main and secondary reinforcement are connected by binding or welding, and the two ends are suspended in the stable rock mass by round steel anchored in the rock mass.

[0058] See also Figure 2 and Figure 3 As shown in the figure, the main process of constructing an artificial false bottom of foam concrete includes: reserving a crushed ore cushion layer and laying a plastic film, laying a steel mesh, and filling with foam concrete. The specific steps are as follows:

[0059] S41, reserve the crushed ore cushion and lay the plastic film:

[0060] After each layer of mining is completed, a 400~500mm thick crushed ore cushion layer is left, and an electric rake is used to level the ground to make the bottom plate flat in the vertical and horizontal directions. A layer of plastic film is laid on the crushed ore cushion layer. Anti-seepage measures should be taken between the rock wall and the plastic sheet, and between the plastic sheet and the pedestrian well and the material well. Cement should be used in advance to seal possible slurry leakage in order to prevent slurry leakage during foam concrete filling.

[0061] The crushed ore cushion layer can ensure the distance between the lower layer mining blasthole and the high-strength foam concrete artificial false bottom 1, and has a good absorption and weakening effect on the blasting shock wave, reducing the damage to the high-strength foam concrete artificial false bottom 1 caused by rock drilling and blasting, and also preventing the high-strength foam concrete artificial false bottom 1 from falling and causing ore depletion. The laid plastic film can prevent the crushed ore from cementing when the false bottom is filled, avoiding ore loss, and making the lower layer mining false top flat, smooth and dense, without the need to process the top plate, simplifying the process.

[0062] S42, laying of steel mesh:

[0063] Place wood blocks or gravel on the plastic film, and then lay the steel mesh 12, so that the steel mesh 12 is raised by 50~100mm, so that the steel mesh 12 can be completely wrapped by the filling slurry to increase the overall strength. The diameter of the main reinforcement 14 and the secondary reinforcement 13 in the steel mesh 12 is 10~20mm, and the spacing is 150~500mm. The intersection is reinforced or welded with 24# iron wire. Drill holes in the rock mass 1.5m high from the bottom plate and insert resin anchor rods 9. The steel mesh 12 is suspended on the resin anchor rods 9 through steel wires 15 to enhance stability. In addition, round steel 10 should be embedded on the bottom plate at a distance of 0.8~1.5m, and the steel mesh 12 is tied and connected with the round steel. The hanging rod 8 is arranged in the middle of the access road. The hanging rod 8 uses Φ10mm steel bars, with a spacing of 1.5m~2.0m, and the upper end is connected to the top plate steel mesh 12, and the lower end is connected to the bottom plate steel mesh 12, which further enhances stability and ensures the safety of mining operations.

[0064] S43, Foam concrete filling:

[0065] Before filling, the filling retaining walls are set up at both ends of the mining site, and the high-strength foam concrete artificial false bottom 1 is filled first. The bulk density of the foam concrete in the high-strength foam concrete artificial false bottom 1 is not less than 700kg / m³, and the filling height is not less than 0.5m. After the high-strength foam concrete artificial false bottom 1 has been cured for 7 days, the low-strength foam concrete 2 is filled. The bulk density of the foam concrete is controlled at about 500kg / m³. During the curing of the foam concrete, it is forbidden to move the blasting gun. After the filling and curing are completed, the next layered mining can be carried out. High-strength foam concrete and low-strength foam concrete are used in combination to construct an artificial layered false bottom and a false bottom intermediate layer with a strength gradient setting. The composite structure is not easy to crack under blasting disturbance, has a large self-load capacity, and has excellent buffering performance, which is used to significantly enhance the stability of the false bottom and ensure the technical effect of the safety of the mining operation.

[0066] In summary, the present invention provides a method for mining steeply inclined thin veins suitable for broken rock masses, which divides the mine rooms along the strike, mines in layers from top to bottom, and completes ventilation, pedestrians, and ore extraction through a central ventilation pedestrian chute. Foam concrete is used as a filling material for artificial false bottoms and layered false bottoms. Due to the characteristics of lightweight energy absorption, high toughness, and easy construction of foam concrete, the shortcomings of concrete false bottoms that are prone to cracking due to blasting disturbance, have a large deadweight load, and are complex to construct are solved, thereby achieving safe and efficient mining of steeply inclined thin veins in broken rock masses.

[0067] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A steeply inclined thin vein mining method suitable for broken rock mass, characterized by: The steps include: S1, Mining: The stope is arranged along the strike; the mining project includes the central ventilation pedestrian chute, the pedestrian ventilation shafts at both ends and the upper / lower middle transport tunnel; S2, mining: adopting the road excavation mining technology, mining in layers from top to bottom; S3, support: anchor rods are used to support the surrounding rock of the upper and lower plates; S4, void area treatment: The ground pressure is controlled and the void area is treated by filling with foam concrete. High-strength foam concrete is used to build an artificial false bottom as the top plate of the lower layer mining, and low-strength foam concrete is used to connect the false bottom layers. In step S4, the process of using foam concrete to fill and construct an artificial false bottom includes: S41, reserve a crushed ore cushion and lay a plastic film; S42, laying steel mesh; S43, foam concrete filling; The specific process of the foam concrete filling in step S43 is as follows: before filling, the filling retaining walls are set up at both ends of the stope, and high-strength foam concrete artificial false bottom is filled between each layer; after the high-strength foam concrete artificial false bottom is cured, low-strength foam concrete is filled between the layered false bottoms, and after the filling and curing are completed, the next layer can be mined; The bulk density of the foamed concrete in the high-strength foamed concrete artificial false bottom is not less than 700kg / m³, and the filling height is not less than 0.5m; the bulk density of the low-strength foamed concrete is controlled at 500kg / m 3 and within; The support mesh in step S3 is 0.8~1.5m×0.8~1.5m, and the steel mesh in the artificial false bottom is suspended on the anchor rod by steel wire; The specific process flow of the road excavation mining process in step S2 is: pedestrians enter the mining area through the central ventilation pedestrian chute and the pedestrian ventilation shafts at both ends, drill blastholes and detonate them, and the collapsed ore is transported to the central ventilation pedestrian chute, poured into the lower middle section transportation tunnel and transported to the surface in a centralized manner.

2. A steeply inclined thin vein mining method suitable for broken rock mass according to claim 1, characterized in that: The specific process of reserving a crushed ore cushion and laying a plastic film in step S41 is as follows: after each layer of mining is completed, a 400-500mm thick crushed ore cushion is reserved, the floor is leveled to make the bottom plate flat in the vertical and horizontal directions, a layer of plastic film is laid on the crushed ore cushion, anti-seepage measures are taken between the rock wall and the plastic sheet, between the plastic sheet and the pedestrian well and the discharge well, and places where slurry may leak are sealed in advance to prevent slurry from leaking when the foam concrete is filled.

3. A steeply inclined thin vein mining method suitable for broken rock mass according to claim 1, characterized in that: The specific process of laying the steel mesh in step S42 is: placing wood blocks or gravel on the plastic film, and then laying the steel mesh, so that the steel mesh is raised by 50-100 mm and the steel mesh is completely wrapped by the filling slurry; the mesh size of the steel mesh is between 20-50 cm, wherein the diameter of the main reinforcement and the secondary reinforcement is 10-20 mm, the spacing is 150-500 mm, and the intersection is reinforced; the two ends of the main reinforcement and the secondary reinforcement are suspended in the rock mass by round steel anchored in the rock mass.

4. A steeply inclined thin vein mining method suitable for broken rock mass according to claim 3, characterized in that: Round steels are embedded on the bottom plate at intervals of 0.8 to 1.5 m, and the steel mesh is fixedly connected to the round steels. Hangers are arranged in the middle of the access road with intervals of 1.5 to 2.0 m. The upper ends of the hangers are connected to the top plate steel mesh, and the lower ends are connected to the bottom plate steel mesh.

5. A steeply inclined thin vein mining method suitable for broken rock mass according to claim 1, characterized in that: In step S1, the segment height of the stope is 40-50 m, the stope length is 40-80 m, and the layer height is 2-3 m.

Citation Information

Patent Citations

  • Natural-induced caving subsequent filling mining method for alteration broken steeply inclined thin vein

    CN118008304A

  • Medium thick heavy-pitch crushed ore body frame type artificial top downward segmenting cemented filling method

    CN102606159A

  • Artificial false bottom of thin vein stope and manufacturing method of artificial false bottom

    CN114776373A