A waste incinerator biogas direct combustion heating system and induced draft air preheating method
By using vortex tubes and corrugated sheet arrays to process biogas in a waste incinerator, combined with the multiple mixing combustion technology of linear burners, the problems of moisture and hydrogen sulfide in direct combustion of biogas are solved, the combustion efficiency and stability are improved, and the cost is reduced. Energy consumption and pollution.
Patent Information
- Application Number
- CN202410747180.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-11
AI Technical Summary
The existing biogas direct-fired air preheating method in waste incinerators has problems such as high moisture and hydrogen sulfide content, which results in reduced calorific value, unstable combustion, and difficulty in controlling oxygen supplementation.
A vortex tube is used to pressurize the biogas, which is divided into cold biogas and hot biogas, and is moisture-absorbed and desulfurized through the corrugated sheet array. It is then mixed and burned with air multiple times, and a linear burner is used to achieve rapid compression ignition heating.
It improves the biogas combustion efficiency and air preheating effect, reduces energy consumption, enhances the stability and combustion control of the incinerator, and reduces pollutant emissions.
Smart Images

Figure CN118310023B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of garbage disposal, and in particular to a garbage incinerator methane direct combustion heating system and an induced draft air preheating method. Background Art
[0002] Waste incineration can achieve the effects of waste reduction, harmlessness and resource utilization. In general, waste incineration power plants will pile up garbage in different areas in a garbage pit for fermentation for 5-7 days before burning it in the furnace. After the fermentation period, a large amount of volatile matter will be precipitated from the garbage, and the water contained in the garbage will evaporate or seep out (i.e., permeate or leachate). Therefore, the garbage at the bottom of the garbage pool will be soaked in the leachate, resulting in too much water to be conducive to combustion, and the garbage at the top will be exposed to the air, resulting in incomplete fermentation and not conducive to combustion.
[0003] In the waste incinerator, the main air volume comes from the primary fan, and the secondary fan plays the role of auxiliary air supply. The total amount of primary air in the waste incinerator under rated conditions is higher than the total amount of secondary air. The wind pressure at the primary air outlet must be maintained above a certain value to ensure that there is enough wind pressure to penetrate the waste material layer. The opening of the primary air damper in the combustion area is 50%-60% to ensure that sufficient oxygen can be provided for combustion.
[0004] The primary and secondary air of the existing garbage incinerator are mainly introduced through the pipeline of saturated steam or air preheater of the site air, because the temperature of the primary and secondary air is increased to maintain the temperature in the furnace and improve the thermal efficiency. The heat exchange efficiency of the steam heat transfer wall is low, so some studies, such as the "A biogas direct-fired air preheater heating system and incineration system for garbage incinerators" with Chinese patent publication number CN 114562727A, use biogas direct combustion to directly heat the air, use high-temperature open flames to directly heat the air, and provide a new application platform for biogas.
[0005] However, the biogas direct-fired air preheating method also encounters the following problems when applied:
[0006] 1) Biogas contains a lot of water and hydrogen sulfide, which will reduce the calorific value of biogas, and produce sulfur compounds (such as sulfur dioxide) during the internal combustion process, increasing the pollution of incineration exhaust gas;
[0007] 2) The direct combustion of biogas and air actually consumes the oxygen content in the air. Therefore, during the open flame combustion and heating process, it is difficult to control the temperature and pressure of the burner, and there is no definite method to supplement the combustion oxygen consumption.
[0008] Therefore, when applying direct combustion of biogas in practice, it is often encountered that the air intake volume of the incinerator is the same as that of the steam heat transfer method, but the garbage incineration state is different. This actually brings a lot of problems to the direct application and still needs to be improved and studied. Summary of the invention
[0009] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a garbage incinerator biogas direct combustion heating system and an induced draft air preheating method.
[0010] In order to achieve the above object, the present invention adopts the following technical solutions:
[0011] A garbage incinerator biogas direct combustion heating system comprises a garbage incinerator, an air preheater for supplying gas to the garbage incinerator, and a linear burner arranged in the air preheater, wherein the linear burner is connected to a biogas supply mechanism through a pipeline, and the biogas supply mechanism comprises a vortex tube, a decompression chamber, a filter chamber, a mixing tank I and a mixing tank II;
[0012] The vortex tube is provided with a biogas inlet, a cold biogas outlet and a hot biogas outlet. The biogas inlet directly introduces the biogas obtained from the closed fermentation of the biogas tank into the vortex tube through a pressure pump pipeline for pressurization and separation of heating and cooling.
[0013] A cold biogas inlet is provided on the top of the decompression chamber, and the cold biogas inlet is connected to the cold biogas outlet through a pipeline. The filter chamber is arranged on one side wall of the decompression chamber, and a primary air inlet is provided on the other side wall of the decompression chamber. The primary air inlet introduces normal pressure air through a pump to mix with the cold biogas and decompress the cold biogas, cooling it down and condensing it.
[0014] A corrugated sheet array is provided at the top of the filter chamber. The corrugated sheet array consists of multiple corrugated sheets placed horizontally. The gap between adjacent corrugated sheets is 5-10mm to form a ventilation gap. A liquid collecting bin is provided at the bottom of the filter chamber. The top of the liquid collecting bin is connected to the corrugated sheet array, and the bottom of the liquid collecting bin is connected to the bottom of the decompression bin, which is used to collect the coolant formed by decompression cooling.
[0015] One side of the corrugated sheet array is connected to the decompression chamber, and the other side of the corrugated sheet array is connected to a reducer, the diameter of the reducer decreases from one end of the corrugated sheet array to one end of the delivery pump, and the end of the reducer away from the corrugated sheet array is connected to the air inlet end of the delivery pump, and the air outlet end of the delivery pump is connected to the mixing tank I through a pipeline, and a one-way valve is provided on the pipeline between the delivery pump and the mixing tank I, and the one-way valve allows ventilation in the direction from the delivery pump to the mixing tank I;
[0016] The mixing tank I is provided with a hot biogas inlet and a mixed gas outlet I, the hot biogas inlet is connected with the hot biogas outlet through a pipeline, the mixed gas outlet I is connected with the mixed gas inlet of the mixing tank II through a pipeline, the mixing tank II is also provided with a secondary air inlet and a mixed gas outlet II, the secondary air inlet introduces normal pressure air through a pump to mix with the mixed gas for secondary mixing and appropriately reduce the pressure, and the mixed gas outlet II is connected with the internal combustion chamber of the linear burner through a pipeline;
[0017] The linear burner of the present invention adopts a MAXON type internal mixing linear burner. An air inlet is provided at the bottom of the internal combustion chamber of the linear burner. The air inlet is connected to a combustion-supporting fan through a pipeline. The combustion-supporting fan introduces normal pressure air and the mixed gas for three times mixing and burning to increase the air temperature and cool the ignition burner, UV ultraviolet flame detection and flame observation hole of the linear burner. The ignition burner of the linear burner is arranged in an air preheater.
[0018] The air preheater is a cylindrical cavity with openings at both ends. One end of the air preheater is opened for introducing normal pressure air, and the other end of the air preheater is connected to the air inlet end of the furnace air pump through a pipe. The air outlet end of the furnace air pump is connected to the fuel inlet of the waste incinerator through a pipe. The waste incinerator is also provided with a waste feed bin for filling waste for incineration.
[0019] Preferably, the biogas supply mechanism adopts a plurality of vortex tubes arranged in parallel, that is, the biogas is divided and intakes from a plurality of vortex tubes, the cold biogas from the plurality of vortex tubes is merged and enters the decompression chamber, and the hot biogas from the plurality of vortex tubes is merged and enters the mixing tank I.
[0020] Preferably, the intake temperature of the biogas inlet is not limited, the intake pressure of the biogas inlet is 0.4-0.5 MPa, and the cold biogas outlet is provided with a valve for adjusting and controlling the cold flow rate of the vortex tube within the range of 0.4-0.5.
[0021] Preferably, the corrugated sheets in the corrugated sheet array are pressed from recycled paper into W-shaped corrugated paper sheets with a thickness of 0.7-0.8 cm. The corrugated sheets are pre-impregnated with a 10% by weight NaOH aqueous solution, dried, and installed inside the filter chamber. After absorbing moisture in the cold biogas, they have the function of absorbing H2S in the biogas.
[0022] Preferably, a coolant outlet is also provided at the bottom of the liquid collecting bin for conveying the coolant to the garbage pool to merge with the leaked liquid, thereby reducing the water content in the biogas and increasing the calorific value of garbage incineration.
[0023] Preferably, the waste incinerator is also provided with exhaust gas detection equipment for detecting the content of CH4, CO2, CO, O2, N2 and sulfur-containing compounds in the flue gas, so as to verify whether the waste incineration is complete and what kind of pollution is generated.
[0024] The present invention also proposes a method for preheating induced draft air in a garbage incinerator, which adopts the above-mentioned biogas direct combustion heating system and includes the following steps:
[0025] 1) Parameter setting and monitoring:
[0026] Vortex tube: The gas pressure at the biogas inlet is P0 and the gas temperature is T0, where P0 is 0.4-0.5MPa, the gas pressure at the cold biogas outlet is P1 and the gas temperature is T1, and the gas pressure at the hot biogas outlet is P2 and the gas temperature is T2;
[0027] Decompression chamber: The internal air pressure of the decompression chamber is P3, the gas temperature is T3, and the ratio of the air flow v1 of the cold biogas inlet to the air flow v2 of the primary air inlet is v1:v2=3:1;
[0028] Mixing tank Ⅰ: the ratio of the air flow v3 at the hot biogas inlet and the air flow v4 at the pipeline where the one-way valve is located is v3:v4=2-3:1, the air pressure at the mixed gas outlet Ⅰ is P4, and the gas temperature is T4;
[0029] Mixing tank II: The ratio of the air flow rate v5 at the mixed gas inlet and the air flow rate v6 at the secondary air inlet is v5:v6=5:1, the air pressure at the mixed gas outlet I is P5, and the gas temperature is T5;
[0030] Linear burner: The ratio of the mixed gas intake flow v7 to the air intake flow v8 at the air inlet is v7:v8=0.3-0.4:1, the gas pressure at the mixed gas outlet Ⅰ is P5, and the gas temperature is T5;
[0031] Air preheater and incinerator: The air pressure at the air inlet of the furnace air pump is P6 and the gas temperature is T6; the air pressure at the air outlet of the furnace air pump is P7 and the gas temperature is T7;
[0032] Waste incinerator tail gas: When the volume percentage concentration of each component in the tail gas is as follows: CH4 <1%, carbon monoxide <5mg / m³, sulfur compounds <1mg / m³, it proves that the waste is fully burned;
[0033] 2) Pressure control:
[0034] By adjusting the valves at various pumps, pipelines and interfaces, control P0>P2>P1>P3. No new pump is needed for pressurization except for the delivery pump, and P3<P1<2P3 is required to avoid back suction and temperature drop caused by too low pressure; control P4>P5, and P5 meets the pressure requirements of the internal combustion chamber of the linear burner, so there is no need to add new pumps for pressurized delivery; control P7>P6 through the furnace air pump and the corresponding valve, and P7 meets the conditions for full combustion of garbage;
[0035] 3) Temperature control:
[0036] Regardless of T0, T5 should not be lower than 20℃ to ensure the compression combustion efficiency of the linear burner, and T6 and T7 should not be lower than 75℃ to ensure the primary air inlet temperature of the waste incinerator;
[0037] By pressurizing and heating with vortex tubes, the temperature and pressure of biogas and part of the required air are increased at the same time, reducing the load requirements of the air preheater, that is, reducing the temperature difference and pressure difference to reduce energy consumption and improve stability. More importantly, it is to cope with the ultra-low temperature of air and biogas in cold weather;
[0038] 4) Biogas pretreatment:
[0039] According to the above setting standards, the flow and pressure control parameters of the biogas supply mechanism are adjusted according to P6, T6, P7 and T7, and v1-v8 are adjusted according to the report of whether the garbage is fully burned by the exhaust gas detection of the garbage incinerator to ensure sufficient air for incineration and supplement part of the biogas fuel;
[0040] The pressurized biogas is divided into cold biogas and hot biogas through the vortex tube. The cold biogas is mixed with air for the first time, and then the pressure is reduced. It is dehumidified and desulfurized by the corrugated sheet array. The coolant produced by condensation is discharged to remove part of the water in the biogas. At the same time, it can absorb part of the CO2, thereby increasing the calorific value of the biogas in disguise. The filtered biogas is combined with the hot biogas through the delivery pump, and then mixed with air for the second time, and then enters the linear burner for combustion.
[0041] 5) Air preheating and transportation:
[0042] The mixed gas obtained in mixing tank II is mixed for the third time in the linear burner and the air at the air inlet to ensure that the biogas and the air are fully in contact to achieve rapid compression combustion. The high-temperature combustion flame ejected from the ignition burner of the linear burner is mixed with the air for the fourth time to heat the air with an open flame. The obtained mixed gas is discharged into the waste incinerator for waste incineration, and the incineration situation and exhaust gas detection are monitored. At the same time, according to the flow ratio, the amount of air introduced in the first three mixings completely exceeds the amount of air consumed by the biogas combustion, avoiding the problem of insufficient oxygen content after the air is preheated with an open flame.
[0043] Compared with the prior art, the present invention has the following beneficial effects:
[0044] 1. The present invention introduces a vortex tube into the biogas supply mechanism for the first time to pressurize and heat the biogas, and the pressurized biogas is divided into cold biogas and hot biogas through the vortex tube. The cold biogas is mixed with air for the first time and then depressurized. It is dehumidified and desulfurized by the corrugated sheet array. The coolant generated by condensation is discharged to remove part of the water in the biogas, and at the same time, part of the CO2 can be absorbed, thereby increasing the calorific value of the biogas in disguised form.
[0045] 2. The present invention combines partially desulfurized and dehydrated cold biogas with hot biogas, and then mixes them with air for a second time, and then mixes them with air at the air inlet of the linear burner for a third time to ensure that the biogas and air are fully in contact with each other to achieve rapid compression combustion. The high-temperature combustion flame ejected from the ignition nozzle of the linear burner is mixed with the air for a fourth time, and the air is heated by open flame. The resulting mixed gas is discharged into a waste incinerator for waste incineration, and the incineration situation and exhaust gas detection are monitored. According to the flow ratio setting, the amount of air introduced in the first three mixings completely exceeds the amount of air consumed by biogas combustion, thereby avoiding the problem of insufficient oxygen content after air open flame preheating.
[0046] 3. In summary, the present invention can make the linear burner intake air reach about 30°C or even higher from below zero through vortex tube preheating and pressurization treatment, and at the same time contain pressure and part of air, thereby improving the biogas combustion efficiency, greatly improving the air preheating effect, and at the same time greatly reducing the power difference for regulating the inlet air temperature of the incinerator in winter and summer, thereby improving the operating stability of the incinerator; at the same time, increasing the pressure of the temperature of biogas and part of the required air, reducing the load requirement of the air preheater, that is, reducing the temperature difference and pressure difference, reducing energy consumption and improving stability, and more importantly, coping with the ultra-low temperature of air and biogas in cold weather. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is a schematic diagram of the structure of a biogas direct combustion heating system for a garbage incinerator proposed by the present invention;
[0048] Figure 2 The present invention provides a schematic diagram of the process flow and parameter control of a method for preheating induced draft air in a waste incinerator.
[0049] In the figure: garbage incinerator 1, fuel inlet 101, garbage feed bin 102, air preheater 2, linear burner 3, air inlet 301, combustion-supporting fan 302, vortex tube 4, biogas inlet 401, cold biogas outlet 402, hot biogas outlet 403, pressure reduction chamber 5, cold biogas inlet 501, primary air inlet 502, filter chamber 6, corrugated sheet array 601, liquid collection bin 602, coolant outlet 603, reducer 604, delivery pump 605, non-return valve 606, mixing tank I 7, hot biogas inlet 701, mixed gas outlet I 702, mixing tank II 8, mixed gas inlet 801, secondary air inlet 802, mixed gas outlet II 803. DETAILED DESCRIPTION
[0050] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0051] Embodiment 1:
[0052] Reference Figure 1 A waste incinerator biogas direct combustion heating system comprises a waste incinerator 1, an air preheater 2 for supplying gas to the waste incinerator 1, and a linear burner 3 arranged in the air preheater 2, the linear burner 3 is connected to a biogas supply mechanism through a pipeline, and the biogas supply mechanism comprises a vortex tube 4, a decompression chamber 5, a filter chamber 6, a mixing tank I 7 and a mixing tank II 8;
[0053] The vortex tube 4 is provided with a biogas inlet 401, a cold biogas outlet 402 and a hot biogas outlet 403. The biogas inlet 401 directly introduces the biogas obtained from the closed fermentation of the biogas tank into the vortex tube 4 through a pressure pump pipeline for pressurization and separation of heating and cooling.
[0054] A cold biogas inlet 501 is provided on the top of the decompression chamber 5, and the cold biogas inlet 501 is connected to the cold biogas outlet 402 through a pipeline. The filter chamber 6 is arranged on one side wall of the decompression chamber 5, and a primary air inlet 502 is provided on the other side wall of the decompression chamber 5. The primary air inlet 502 introduces normal pressure air through a pump to mix with the cold biogas and reduce the pressure, cool down and condense the cold biogas.
[0055] A corrugated sheet array 601 is provided at the top of the filter chamber 6. The corrugated sheet array 601 consists of a plurality of corrugated sheets placed horizontally. The gap between adjacent corrugated sheets is 5-10 mm to form a ventilation gap. A liquid collecting bin 602 is provided at the bottom of the filter chamber 6. The top of the liquid collecting bin 602 is connected to the corrugated sheet array 601. The bottom of the liquid collecting bin 602 is connected to the bottom of the decompression bin 5, and is used to collect the coolant formed by decompression cooling.
[0056] One side of the corrugated sheet array 601 is connected to the decompression chamber 5, and the other side of the corrugated sheet array 601 is connected to a reducer 604, the diameter of the reducer 604 decreases from one end of the corrugated sheet array 601 to one end of the delivery pump 605, and the end of the reducer 604 away from the corrugated sheet array 601 is connected to the air inlet end of the delivery pump 605, and the air outlet end of the delivery pump 605 is connected to the mixing tank Ⅰ7 through a pipeline, and a one-way valve 606 is provided on the pipeline between the delivery pump 605 and the mixing tank Ⅰ7, and the one-way valve 606 allows ventilation in the direction from the delivery pump 605 to the mixing tank Ⅰ7;
[0057] The mixing tank I7 is provided with a hot biogas inlet 701 and a mixed gas outlet I702. The hot biogas inlet 701 is connected to the hot biogas outlet 403 through a pipeline. The mixed gas outlet I702 is connected to the mixed gas inlet 801 of the mixing tank II8 through a pipeline. The mixing tank II8 is also provided with a secondary air inlet 802 and a mixed gas outlet II803. The secondary air inlet 802 introduces normal pressure air through a pump to mix the mixed gas for secondary mixing and appropriately reduce its pressure. The mixed gas outlet II803 is connected to the internal combustion chamber of the linear burner 3 through a pipeline.
[0058] The linear burner 3 of the present invention adopts a MAXON type internal mixing linear burner. An air inlet 301 is provided at the bottom of the internal combustion chamber of the linear burner 3. The air inlet 301 is connected to a combustion-supporting fan 302 through a pipeline. The combustion-supporting fan 302 introduces normal pressure air for the third time to mix the air with the mixed gas for the third time and burn it to increase the air temperature and cool the ignition burner, UV ultraviolet flame detection, and flame observation hole of the linear burner 3. The ignition burner of the linear burner 3 is arranged in the air preheater 2.
[0059] The air preheater 2 is a cylindrical cavity with openings at both ends. One end of the air preheater 2 is opened for introducing atmospheric pressure air for the fourth air intake. The other end of the air preheater 2 is opened and connected to the air inlet end of the furnace air pump 9 through a pipeline. The air outlet end of the furnace air pump 9 is connected to the fuel inlet 101 of the waste incinerator 1 through a pipeline. The waste incinerator 1 is also provided with a waste feed bin 102 for filling waste for incineration.
[0060] Among them, the biogas supply mechanism adopts multiple vortex tubes 4 arranged in parallel, that is, the biogas is divided and intakes from multiple vortex tubes 4, the cold biogas of multiple vortex tubes 4 is combined and enters the pressure reducing chamber 5, and the hot biogas of multiple vortex tubes 4 is combined and enters the mixing tank Ⅰ7.
[0061] Among them, the intake temperature of the biogas inlet 401 is not limited. According to previous studies, the intake temperature has almost no effect on the cooling or heating efficiency. The intake pressure of the biogas inlet 401 is 0.4-0.5MPa (the pressure should not be too high or too low. If it is too high, such as 0.7MPa, the biogas temperature will be less than -20°C, and a small amount of water will condense rapidly, which is not conducive to the subsequent water settling on the surface of the corrugated sheet array 601, and the effect of dewatering and desulfurization cannot be achieved; if it is too low, such as 0.3MPa, the temperature rise is small, and the biogas and the introduction before ignition cannot be achieved. The cold biogas outlet 402 is provided with a valve for adjusting and controlling the cold flow rate of the vortex tube 4 within the range of 0.4-0.5. The vortex tube 4 of the present invention adopts the VAIR vortex tube produced by Shanghai Jiya Electromechanical Mould Technology Co., Ltd., specifically the large vortex tube of model VC60099, and multiple vortex tubes 4 are arranged in parallel to supply gas to the pressure reducing chamber 5 and the mixing tank Ⅰ7 at the same time to ensure the fuel supply of the waste incinerator 1.
[0062] Among them, the corrugated sheets in the corrugated sheet array 601 are pressed from recycled paper into W-shaped corrugated paper sheets with a thickness of 0.7-0.8 cm. The corrugated sheets are pre-impregnated with a NaOH aqueous solution with a weight concentration of 10%, and then placed inside the filter chamber 6 for installation after drying. After absorbing moisture in the cold biogas, they have the function of absorbing H2S in the biogas.
[0063] A coolant outlet 603 is also provided at the bottom of the liquid collecting bin 602 for conveying the coolant to the garbage pool to merge with the leaked liquid, thereby reducing the water content in the biogas and increasing the calorific value of garbage incineration.
[0064] Among them, the waste incinerator 1 is also equipped with exhaust gas detection equipment for detecting the content of CH4, CO2, CO, O2, N2 and sulfur-containing compounds in the flue gas, so as to verify whether the waste incineration is complete and what kind of pollution is generated.
[0065] Embodiment 2:
[0066] Reference Figure 1-2 , under the support of the equipment of the biogas direct combustion heating system in Example 1, a method for preheating induced draft air of a garbage incinerator is proposed, comprising the following steps:
[0067] 1) Parameter setting and monitoring:
[0068] Vortex tube 4: the gas pressure of the biogas inlet 401 is P0, the gas temperature is T0, wherein P0 is 0.4-0.5 MPa, the gas pressure of the cold biogas outlet 402 is P1, the gas temperature is T1, the gas pressure of the hot biogas outlet 403 is P2, the gas temperature is T2;
[0069] Decompression chamber 5: the internal air pressure of the decompression chamber 5 is P3, the gas temperature is T3, and the ratio of the air flow v1 of the cold biogas inlet 501 to the air flow v2 of the primary air inlet 502 is v1:v2=3:1;
[0070] Mixing tank I7: the ratio of the air flow v3 of the hot biogas inlet 701 and the air flow v4 of the pipeline where the one-way valve 606 is located is v3:v4=2-3:1, the air pressure of the mixed gas outlet I702 is P4, and the gas temperature is T4;
[0071] Mixing tank II8: the ratio of the intake air flow v5 of the mixed gas inlet 801 and the intake air flow v6 of the secondary air inlet 802 is v5:v6=5:1, the gas pressure of the mixed gas outlet I702 is P5, and the gas temperature is T5;
[0072] Linear burner 3: the ratio of the mixed gas intake flow v7 to the intake flow v8 of the air inlet 301 is v7:v8=0.3-0.4:1, the gas pressure of the mixed gas outlet Ⅰ702 is P5, and the gas temperature is T5;
[0073] Air preheater 2 and incinerator 1: the air pressure at the air inlet end of the air pump 9 is P6 and the gas temperature is T6, and the air pressure at the air outlet end of the air pump 9 is P7 and the gas temperature is T7;
[0074] Waste incinerator 1 tail gas: When the volume percentage concentration of each component in the tail gas is as follows: CH4 <1%, carbon monoxide <5mg / m³, sulfur compounds <1mg / m³, it proves that the waste is fully burned;
[0075] 2) Pressure control:
[0076] By adjusting the valves at various pumps, pipelines and interfaces, control P0>P2>P1>P3, no new pump is needed for pressurization except for the delivery pump 605, and P3<P1<2P3, to avoid back suction and temperature drop caused by too low pressure; control P4>P5, and P5 meets the pressure requirement of the internal combustion chamber of the linear burner, so there is no need to add a new pump for pressurized delivery; through the furnace air pump 9 and the corresponding valve, P7>P6, and P7 meets the conditions for full combustion of garbage;
[0077] 3) Temperature control:
[0078] Regardless of T0, T5 is not less than 20°C to ensure the compression combustion efficiency of the linear burner 3, and T6 and T7 are not less than 75°C to ensure the primary air inlet temperature of the waste incinerator 1;
[0079] By pressurizing and heating with a vortex tube, the temperature and pressure of the biogas and part of the required air are increased at the same time, reducing the load requirement of the air preheater 2, that is, reducing the temperature difference and pressure difference to reduce energy consumption and improve stability. More importantly, it is to cope with the ultra-low temperature of air and biogas in cold weather, such as the following autumn and winter temperature collection results:
[0080] Autumn: T0 (15.3℃), T1 (-19.7℃), T2 (58.5℃), the average temperature of the air introduced four times was 18.6℃, T3 (-7.7℃), T4 (47.6℃), T5 (42.4℃), T6 (92.5℃), T7 (95.3℃);
[0081] Winter: T0 (-7.5), T1 (-29.8℃), T2 (39.5℃), the average temperature of the air introduced four times is -8.7℃, T3 (-18.7℃), T4 (34.1℃), T5 (29.5℃), T6 (79.5℃), T7 (84.6℃);
[0082] The results show that the vortex tube preheating and pressurization treatment can make the linear burner (3) intake air reach about 30°C or even higher from below zero, and at the same time contain pressure and some air, which improves the biogas combustion efficiency and greatly improves the air preheating effect. At the same time, it greatly reduces the power difference of the incinerator inlet temperature control in winter and summer, and improves the operation stability of the incinerator.
[0083] 4) Biogas pretreatment:
[0084] According to the above setting standards, the flow and pressure control parameters of the biogas supply mechanism are adjusted according to P6, T6, P7 and T7, and v1-v8 are adjusted according to the report of whether the garbage is fully burned by the tail gas detection of the garbage incinerator 1 (that is, only the size of each flow is adjusted as a whole, and the ratio between each flow is not adjusted) to ensure sufficient air for incineration and to supplement part of the biogas fuel;
[0085] The pressurized biogas is divided into cold biogas and hot biogas through the vortex tube 4. The cold biogas is mixed with air for the first time, and then the pressure is reduced. The cold biogas passes through the corrugated sheet array 601 for moisture absorption and desulfurization. The coolant produced by condensation is discharged to remove part of the water in the biogas, and can absorb part of CO2, thereby increasing the calorific value of the biogas in disguised form. The filtered biogas passes through the delivery pump 605 to merge with the hot biogas, and then is mixed with air for the second time, and then enters the linear burner 3 for combustion.
[0086] 5) Air preheating and transportation:
[0087] The mixed gas obtained in the mixing tank II 8 is mixed for the third time in the linear burner 3 with the air of the air inlet 301 to ensure that the biogas and the air are fully in contact to achieve rapid compression combustion. The high-temperature combustion flame ejected from the ignition burner of the linear burner 3 is mixed with the air for the fourth time to heat the air with an open flame. The obtained mixed gas is discharged into the garbage incinerator 1 for garbage incineration, and the incineration conditions (such as smoke volume, flame color, etc.) and exhaust gas detection are monitored. At the same time, according to the flow ratio, the amount of air introduced by the first three mixings completely exceeds the amount of air consumed by the biogas combustion, avoiding the problem of insufficient oxygen content after the air is preheated with an open flame.
[0088] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A waste incinerator biogas direct combustion heating system, comprising a waste incinerator (1), an air preheater (2) for supplying air to the waste incinerator (1), and a linear burner (3) arranged in the air preheater (2), characterized in that: The linear burner (3) is connected to a biogas supply mechanism via a pipeline, and the biogas supply mechanism comprises a vortex tube (4), a pressure reducing chamber (5), a filter chamber (6), a mixing tank I (7) and a mixing tank II (8); The vortex tube (4) is provided with a biogas inlet (401), a cold biogas outlet (402) and a hot biogas outlet (403); the biogas inlet (401) directly introduces the biogas obtained by the closed fermentation of the biogas tank into the vortex tube (4) through a pressure pump pipeline; The top of the decompression chamber (5) is provided with a cold biogas inlet (501), the cold biogas inlet (501) is connected to the cold biogas outlet (402) via a pipeline, the filter chamber (6) is arranged on a side wall of the decompression chamber (5), and the other side wall of the decompression chamber (5) is provided with a primary air inlet (502); A corrugated sheet array (601) is provided at the top of the filter chamber (6), the corrugated sheet array (601) is composed of a plurality of corrugated sheets placed horizontally, and the gap between adjacent corrugated sheets is 5-10 mm to form a ventilation gap; a liquid collecting bin (602) is provided at the bottom of the filter chamber (6), and the top of the liquid collecting bin (602) is connected to the corrugated sheet array (601), and the bottom of the liquid collecting bin (602) is connected to the bottom of the decompression bin (5); One side of the corrugated sheet array (601) is connected to the decompression chamber (5), and the other side of the corrugated sheet array (601) is connected to a reducer (604), the diameter of the reducer (604) gradually decreases from one end of the corrugated sheet array (601) to one end of the delivery pump (605), the end of the reducer (604) away from the corrugated sheet array (601) is connected to the air inlet end of the delivery pump (605), the air outlet end of the delivery pump (605) is connected to the mixing tank I (7) through a pipeline, and a one-way valve (606) is provided on the pipeline between the delivery pump (605) and the mixing tank I (7), and the one-way valve (606) allows ventilation in the direction from the delivery pump (605) to the mixing tank I (7); The mixing tank I (7) is provided with a hot biogas inlet (701) and a mixed gas outlet I (702), the hot biogas inlet (701) is connected to the hot biogas outlet (403) through a pipeline, the mixed gas outlet I (702) is connected to the mixed gas inlet (801) of the mixing tank II (8) through a pipeline, the mixing tank II (8) is further provided with a secondary air inlet (802) and a mixed gas outlet II (803), the mixed gas outlet II (803) is connected to the internal combustion chamber of the linear burner (3) through a pipeline; An air inlet (301) is provided at the bottom of the internal combustion chamber of the linear burner (3); the air inlet (301) is connected to a combustion-supporting fan (302) via a pipeline; and an ignition burner of the linear burner (3) is arranged in the air preheater (2); The air preheater (2) is a columnar cavity with openings at both ends. One end of the air preheater (2) is open for introducing atmospheric pressure air. The other end of the air preheater (2) is open and connected to the air inlet end of the furnace air pump (9) through a pipeline. The air outlet end of the furnace air pump (9) is connected to the fuel inlet (101) of the waste incinerator (1) through a pipeline. The waste incinerator (1) is also provided with a waste feed bin (102).
2. A waste incinerator biogas direct combustion heating system according to claim 1, characterized in that: The biogas supply mechanism adopts a plurality of vortex tubes (4) arranged in parallel, that is, the biogas is divided and taken in from the plurality of vortex tubes (4), the cold biogas from the plurality of vortex tubes (4) is combined and enters the pressure reducing chamber (5), and the hot biogas from the plurality of vortex tubes (4) is combined and enters the mixing tank I (7).
3. The waste incinerator biogas direct combustion heating system according to claim 1, characterized in that: The intake pressure of the biogas inlet (401) is 0.4-0.5 MPa, and the cold biogas outlet (402) is provided with a valve for adjusting and controlling the cold flow rate of the vortex tube (4) within the range of 0.4-0.
5.
4. The waste incinerator biogas direct combustion heating system according to claim 1, characterized in that: The corrugated sheets in the corrugated sheet array (601) are made of recycled paper pressed into W-shaped corrugated paper sheets with a thickness of 0.7-0.8 cm. The corrugated sheets are pre-impregnated with a NaOH aqueous solution with a weight concentration of 10%, dried, and then placed inside the filter chamber (6) for installation.
5. The waste incinerator biogas direct combustion heating system according to claim 1, characterized in that: The bottom of the liquid collecting bin (602) is also provided with a coolant outlet (603) for conveying the coolant to the garbage pool to merge with the leaked liquid.
6. The waste incinerator biogas direct combustion heating system according to claim 1, characterized in that: The waste incinerator (1) is also provided with tail gas detection equipment for detecting the content of CH4, CO2, CO, O2, N2 and sulfur-containing compounds in the flue gas.
7. A method for preheating induced draft air in a garbage incinerator, using a garbage incinerator biogas direct combustion heating system as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: 1) Parameter setting and monitoring: Vortex tube (4): the gas pressure at the biogas inlet (401) is P0 and the gas temperature is T0, wherein P0 is 0.4-0.5 MPa, the gas pressure at the cold biogas outlet (402) is P1 and the gas temperature is T1, and the gas pressure at the hot biogas outlet (403) is P2 and the gas temperature is T2; Decompression chamber (5): the internal air pressure of the decompression chamber (5) is P3, the gas temperature is T3, and the ratio of the air flow rate v1 of the cold biogas inlet (501) to the air flow rate v2 of the primary air inlet (502) is v1:v2=3:1; Mixing tank I (7): the ratio of the air flow v3 of the hot biogas inlet (701) to the air flow v4 of the pipeline where the one-way valve (606) is located is v3:v4=2-3:1, and the gas pressure of the mixed gas outlet I (702) is P4 and the gas temperature is T4; Mixing tank II (8): the ratio of the air flow rate v5 of the mixed gas inlet (801) to the air flow rate v6 of the secondary air inlet (802) is v5:v6=5:1, the air pressure of the mixed gas outlet I (702) is P5, and the gas temperature is T5; Linear burner (3): the ratio of the mixed gas intake flow v7 to the air intake flow v8 of the air inlet (301) is v7:v8=0.3-0.4:1, the gas pressure at the mixed gas outlet I (702) is P5, and the gas temperature is T5; Air preheater (2) and incinerator (1): the air pressure at the air inlet end of the air pump (9) is P6 and the air temperature is T6, and the air pressure at the air outlet end of the air pump (9) is P7 and the air temperature is T7; Waste incinerator (1) Tail gas: When the volume percentage concentration of each component in the tail gas is as follows: CH4 <1%, carbon monoxide <5mg / m³, sulfur compounds <1mg / m³, it proves that the waste is fully burned; 2) Pressure control: By adjusting the valves at various pumps, pipelines and interfaces, control P0>P2>P1>P3, and P3<P1<2P3; control P4>P5, and P5 meets the pressure requirement of the internal combustion chamber of the linear burner; and control P7>P6 through the furnace air pump (9) and the corresponding valve, and P7 meets the conditions for full combustion of garbage; 3) Temperature control: Regardless of T0, T5 is not less than 20°C to ensure the compression combustion efficiency of the linear burner (3), and T6 and T7 are not less than 75°C to ensure the primary air inlet temperature of the waste incinerator (1); 4) Biogas pretreatment: According to the above setting standards, the flow and pressure control parameters of the biogas supply mechanism are adjusted according to P6, T6, P7 and T7, and v1-v8 are adjusted according to the report of whether the garbage is fully burned by the tail gas detection of the garbage incinerator (1) to ensure sufficient air for incineration and to supplement part of the biogas fuel; The pressurized biogas is divided into cold biogas and hot biogas through a vortex tube (4), the cold biogas is mixed with air for the first time, the pressure is reduced after mixing, and the cold biogas passes through a corrugated sheet array (601) for moisture absorption and desulfurization. The coolant generated by condensation is discharged to remove part of the water in the biogas and absorb part of the CO2, thereby increasing the calorific value of the biogas in disguised form. The filtered biogas passes through a delivery pump (605) to merge with the hot biogas, and then is mixed with air for the second time, and then enters the linear burner (3) for combustion; 5) Air preheating and transportation: The mixed gas obtained in the mixing tank II (8) is mixed for the third time with the air in the air inlet (301) in the linear burner (3) to ensure that the biogas and the air are fully in contact with each other to achieve rapid compression combustion. The high-temperature combustion flame ejected from the ignition burner of the linear burner (3) is mixed with the air for the fourth time to heat the air with an open flame. The mixed gas obtained is discharged into the garbage incinerator (1) to incinerate the garbage, and the incineration situation and exhaust gas detection are monitored.
