A method for quickly assembling step-by-step and directly entering a tunnel for a full-face tunnel boring machine in an inclined shaft
By generating three-dimensional image models of tunnel boring machine parts and mine inclined shafts, combined with laser and infrared data, precise navigation of the full-section tunnel boring machine in inclined shafts is achieved, solving the problems of low accuracy and environmental dependence in the existing technology, and improving tunneling efficiency. and security.
Patent Information
- Application Number
- CN202410764445.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-14
AI Technical Summary
The existing inclined shaft full-section boring machine control technology has problems such as low accuracy and dependence on the external environment, making it difficult to achieve efficient and safe tunneling operations under complex geological conditions.
A three-dimensional image model is generated by scanning the tunnel boring machine parts, and the laser scanner and infrared camera are combined to collect mine inclined shaft data, generate a three-dimensional spatial image model, mark the full section position of the inclined shaft, and set up a laser signal device inside the tunnel boring machine to achieve real-time positioning and navigation.
It improves the working efficiency and safety of the tunnel boring machine, enables precise navigation according to geological conditions, and ensures the accuracy of the tunneling trajectory.
Smart Images

Figure CN118361245B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel boring machine control, in particular to a method for quickly assembling stepping and directly entering a tunnel for a full-face tunnel boring machine in an inclined shaft. Background Art
[0002] Inclined shaft full-section tunnel boring machine is a kind of tunneling equipment specially used in inclined shaft engineering, which can carry out tunneling operations in a smaller space. It usually includes a tunneling head, a propulsion system, a support system, a power supply system and other parts, which can realize the excavation of inclined shafts quickly, efficiently and safely. This kind of equipment is widely used in mining, tunneling, underground engineering and other fields, which can improve construction efficiency, reduce construction costs and ensure project safety. Therefore, the update and advancement of the control technology of inclined shaft full-section tunnel boring machine is the key point to improve the work efficiency of inclined shaft full-section tunnel boring machine;
[0003] The existing inclined shaft full-face tunnel boring machine control technology has the following defects:
[0004] Low control accuracy: Due to the complex environment of the inclined shaft and changeable geological conditions, the tunnel boring machine may be affected by geological factors, equipment operating conditions, etc. when using control technology, resulting in low control accuracy and difficulty in achieving the expected tunneling trajectory.
[0005] Dependence on external conditions: During use, the control technology may be restricted by external environmental conditions, such as geological conditions, which may affect the working efficiency and safety of the tunnel boring machine.
[0006] Therefore, how to improve the working efficiency and safety of the tunnel boring machine while conducting mining navigation according to geological conditions is a difficulty in the prior art. For this purpose, a method for rapid assembly, stepping and direct entry of a full-section tunnel boring machine in an inclined shaft is provided. Summary of the invention
[0007] In order to solve the above technical problems, the purpose of the present invention is to provide a method for rapid assembly, stepping and direct tunneling of a full-face tunnel boring machine in an inclined shaft.
[0008] In order to achieve the above object, the present invention provides the following technical solutions:
[0009] A method for quickly assembling a step-by-step and direct tunneling machine for a full-face inclined shaft includes the following steps:
[0010] Step S1, scanning the tunnel boring machine parts to obtain a number of tunnel boring machine parts image data, and then generating a corresponding part three-dimensional image model according to the tunnel boring machine parts image data;
[0011] Step S2, collecting laser video data and infrared video data inside the mine inclined shaft by means of a laser scanner and an infrared camera, thereby generating a three-dimensional spatial image model of the mine inclined shaft, and marking the distribution position of the entire cross section of the inclined shaft;
[0012] Step S3, matching the three-dimensional image model of the part with the full cross-section of the inclined shaft in the three-dimensional spatial image model of the mine inclined shaft, selecting the corresponding three-dimensional image model of the part according to the matching result, and then physically installing the roadheader according to the selected three-dimensional image model of the part;
[0013] Step S4, marking the excavation destination on the three-dimensional spatial image model of the mine inclined shaft, and setting laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine. When the tunnel boring machine enters the mine inclined shaft, the laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine simultaneously send laser signals, and the tunnel boring machine is positioned in real time on the three-dimensional spatial image model of the mine inclined shaft according to the laser signals received by the laser signal devices until the tunnel boring machine reaches the excavation destination.
[0014] Furthermore, the process of generating the three-dimensional image model of the part includes:
[0015] The tunnel boring machine parts are scanned by a camera to generate a number of tunnel boring machine part image data, a corresponding part three-dimensional image model is generated based on the tunnel boring machine part image data, and each part three-dimensional image model is labeled with the corresponding tunnel boring machine part name.
[0016] Furthermore, the collection process of the laser video data and the infrared video data includes:
[0017] Setting up an inspection robot, and installing multiple data acquisition units and laser signal devices on the inspection robot, each data acquisition unit is provided with a laser scanner and an infrared camera, and each data acquisition unit is numbered;
[0018] Set multiple data collection periods of equal length, and set a laser signal device at the entrance of the mine shaft. When the data collection period starts, the inspection robot enters the mine shaft along the mine shaft section, and calls the laser scanner and infrared camera of each data collection unit to collect laser video data and infrared video data inside the mine shaft along a fixed data collection angle;
[0019] The laser signal device at the mine shaft entrance continuously sends laser signals along the mine shaft section, and then the laser signal device on the inspection robot receives the laser signal and generates a corresponding laser signal spectrum;
[0020] Whenever a data collection period ends, the inspection robot marks the corresponding collection time for the laser video data and infrared video data generated by each data collection unit;
[0021] When the inspection robot reaches the bottom of the mine inclined shaft, the data collection angles of the laser scanner and infrared camera of each data collection unit are simultaneously adjusted to the current inclination angle of the mine inclined shaft, and then each laser scanner and infrared camera simultaneously collects laser video data and infrared video data for a data collection period along the current inclination angle of the mine inclined shaft.
[0022] Furthermore, the generation process of the three-dimensional spatial image model of the mine inclined shaft includes:
[0023] A corresponding three-dimensional image model of the rock formation in the mine inclined shaft is established according to the laser video data of each data acquisition unit at different data acquisition periods, and the corresponding rock formation thickness is marked at the corresponding position of the three-dimensional image model of the rock formation in the mine inclined shaft according to the different color depths corresponding to each rock formation;
[0024] At the same time, a three-dimensional image model of the inner surface of the mine inclined shaft is established based on the infrared video data, and then the three-dimensional image model of the inner surface of the mine inclined shaft and the three-dimensional image model of the rock layer of the mine inclined shaft generated by the same data acquisition unit are sequentially spliced according to the acquisition time period, so as to obtain a three-dimensional spatial image model of the regional mine inclined shaft;
[0025] The three-dimensional spatial image models of regional mine inclined shafts generated by data acquisition units with the same number are overlapped and spliced. The same parts in the three-dimensional spatial image models of two regional mine inclined shafts are directly overlapped and covered, and the different parts are retained, thereby obtaining the three-dimensional spatial image model of the mine inclined shaft.
[0026] Furthermore, the process of marking the distribution position of the entire section of the inclined shaft includes:
[0027] According to the phase value of the laser signal spectrum in each time segment and the distance between the bottom and the top of the mine inclined shaft at each position of the three-dimensional spatial image model of the mine inclined shaft, the inclination angle of each position relative to the mine inclined shaft mouth is obtained, and then the distribution position of the entire section of the inclined shaft is marked on the three-dimensional spatial image model of the mine inclined shaft.
[0028] Furthermore, the matching process of the three-dimensional image model of the parts and the full cross-section of the inclined shaft in the three-dimensional spatial image model of the inclined shaft of the mine includes:
[0029] Obtain the size of the corresponding mine shaft opening in the three-dimensional spatial image model of the mine shaft, and match the size with the three-dimensional image model of the corresponding drill bit part, and record the corresponding part three-dimensional image model as the head part three-dimensional image model according to the matching result;
[0030] Obtaining a tunnel boring machine design drawing, and generating a component chain of the tunnel boring machine according to the tunnel boring machine design drawing, wherein the component chain is composed of a plurality of component nodes connected in a tree-like manner, and each component node is labeled with a name of a tunnel boring machine part;
[0031] The joint size marked on the 3D image model of the head part is used as the initial joint size, and the 3D image model of the head part is mapped onto the part composition chain, and then the 3D image models of parts that match the initial joint size are selected in sequence from the 3D image model of the head part until the last part node of the part composition chain is reached, thereby generating a roadheader composition plan;
[0032] The tunnel boring machine assembly plan includes the names, sizes and splicing order of the required tunnel boring machine parts, and then the corresponding tunnel boring machine parts are selected according to the tunnel boring machine assembly plan to physically install the tunnel boring machine, and a model positioning device is built into the tunnel boring machine.
[0033] Furthermore, the process of marking the excavation destination in the three-dimensional spatial image model of the mine inclined shaft includes:
[0034] The excavation destination is marked on the three-dimensional spatial image model of the mine inclined shaft, and laser signal devices are set at the mouth of the mine inclined shaft and inside the tunnel boring machine. The three-dimensional spatial image model of the mine inclined shaft is input into the model positioning device, and the model positioning device establishes a three-dimensional rectangular coordinate system. The three-dimensional spatial image model of the mine inclined shaft is mapped on the three-dimensional rectangular coordinate system, wherein the direction from the bottom of the three-dimensional spatial image model of the mine inclined shaft to the mouth of the mine inclined shaft is aligned with the y-axis of the three-dimensional rectangular coordinate system, and the horizontal direction of the three-dimensional spatial image model of the mine inclined shaft is aligned with the x-axis of the three-dimensional rectangular coordinate system. At the same time, the excavation destination is marked on the three-dimensional rectangular coordinate system.
[0035] Furthermore, the process of real-time positioning of the tunnel boring machine includes:
[0036] When the tunnel boring machine enters the mine inclined shaft, the laser signal device at the mine inclined shaft mouth continuously sends laser signals in the direction where the tunnel boring machine enters the mine inclined shaft, and the laser signal device on the tunnel boring machine receives the laser signals;
[0037] The angle between the current position of the roadheader and the entrance of the mine shaft along the y-axis is marked in real time on the three-dimensional spatial image model of the mine shaft. At the same time, the laser signal device on the roadheader sends laser signals to both sides, and then the model positioning device marks the angle of the current position of the roadheader along the x-axis on the three-dimensional spatial image model of the mine shaft according to the laser reflection signal received by the laser signal device.
[0038] Before the roadheader reaches the bottom of the mine shaft, the drill angle of the roadheader is adjusted in real time according to the current angle of the roadheader along the y and x axes and the distribution of the entire section of the inclined shaft in the three-dimensional spatial image model of the mine shaft, so that the roadheader travels along the distribution of the entire section of the inclined shaft until the roadheader reaches the bottom of the mine shaft;
[0039] When the tunnel boring machine reaches the bottom of the mine inclined shaft, the excavation destination is taken as the end point, and a method of navigating the tunnel boring machine into the bottom of the mine inclined shaft is adopted so that the tunnel boring machine reaches the excavation destination in a straight line.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] The present invention generates a three-dimensional spatial image model of the mine inclined shaft according to the laser video data and infrared video data inside the mine inclined shaft, marks the excavation destination on the three-dimensional spatial image model of the mine inclined shaft, and sets a laser signal device at the mine inclined shaft mouth and inside the tunnel boring machine. When the tunnel boring machine enters the mine inclined shaft, the laser signal devices at the mine inclined shaft mouth and inside the tunnel boring machine simultaneously send laser signals, and the tunnel boring machine is positioned in real time on the three-dimensional spatial image model of the mine inclined shaft according to the laser signal received by the laser signal device, thereby achieving the improvement of the working efficiency and safety of the tunnel boring machine while performing mining navigation for the tunnel boring machine according to the geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention.
[0043] Figure 1 The present invention is a flow chart of the method. DETAILED DESCRIPTION
[0044] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0045] Example 1
[0046] like Figure 1 As shown, a method for quickly assembling a full-face tunnel boring machine for an inclined shaft and directly entering the tunnel comprises the following steps:
[0047] Step S1, scanning the tunnel boring machine parts to obtain a number of tunnel boring machine parts image data, and then generating a corresponding part three-dimensional image model according to the tunnel boring machine parts image data;
[0048] Step S2, collecting laser video data and infrared video data inside the mine inclined shaft by means of a laser scanner and an infrared camera, thereby generating a three-dimensional spatial image model of the mine inclined shaft, and marking the distribution position of the entire cross section of the inclined shaft;
[0049] Step S3, matching the three-dimensional image model of the part with the full cross-section of the inclined shaft in the three-dimensional spatial image model of the mine inclined shaft, selecting the corresponding three-dimensional image model of the part according to the matching result, and then physically installing the roadheader according to the selected three-dimensional image model of the part;
[0050] Step S4, marking the excavation destination on the three-dimensional spatial image model of the mine inclined shaft, and setting laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine. When the tunnel boring machine enters the mine inclined shaft, the laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine simultaneously send laser signals, and the tunnel boring machine is positioned in real time on the three-dimensional spatial image model of the mine inclined shaft according to the laser signals received by the laser signal devices until the tunnel boring machine reaches the excavation destination.
[0051] Example 2
[0052] This embodiment is a further limitation of Embodiment 1, and Step S1 is implemented by the following process:
[0053] Scan the parts of the tunnel boring machine through the camera, and then generate a number of image data of the parts of the tunnel boring machine, where the parts of the tunnel boring machine include the drill bit, cutter head, electric motor, steering shaft, etc.;
[0054] Then, a corresponding three-dimensional image model of the parts is generated according to the image data of the roadheader parts, and the corresponding name of the roadheader parts is marked on each three-dimensional image model of the parts;
[0055] At the same time, multiple connection ports are marked on the three-dimensional image model of the part, and the connection size is marked for each connection port. It should be noted that the connection port includes a connection groove and a connection slot.
[0056] Example 3
[0057] This embodiment is a further limitation of Embodiment 1, and Step S2 is implemented by the following process:
[0058] Set up a patrol robot, and install multiple data acquisition units and laser signal devices on the patrol robot. Each data acquisition unit is equipped with a laser scanner and an infrared camera. Set a number a1, a2, a3, ..., a n , where n is a natural number greater than 0;
[0059] Set multiple data collection periods of equal length, and set a laser signal device at the entrance of the mine shaft. When the data collection period starts, the inspection robot enters the mine shaft along the mine shaft section, and calls the laser scanner and infrared camera of each data collection unit to collect laser video data and infrared video data inside the mine shaft along a fixed data collection angle;
[0060] At the same time, the laser signal device at the mine shaft entrance continuously sends laser signals along the mine shaft section, and then the laser signal device on the inspection robot receives the laser signal and generates a corresponding laser signal spectrum;
[0061] It should be noted that the data collection angles of different data collection units are different;
[0062] Whenever a data collection period ends, the inspection robot marks the corresponding collection time for the laser video data and infrared video data generated by each data collection unit;
[0063] When the inspection robot reaches the bottom of the mine inclined shaft, the data collection angles of the laser scanner and infrared camera of each data collection unit are simultaneously adjusted to the current inclination angle of the mine inclined shaft, and then each laser scanner and infrared camera simultaneously collects laser video data and infrared video data for a data collection period along the current inclination angle of the mine inclined shaft.
[0064] Furthermore, since different rock layers have different penetration of laser signals, there are several rock layers of different color depths on the corresponding laser video data, and then the corresponding three-dimensional image model of the rock layer of the mine inclined shaft is established according to the laser video data of each data acquisition unit at different data acquisition time periods, and the corresponding rock layer thickness is marked at the corresponding position of the three-dimensional image model of the rock layer of the mine inclined shaft according to the different color depths corresponding to each rock layer;
[0065] At the same time, a three-dimensional image model of the inner surface of the mine inclined shaft is established based on the infrared video data, and then the three-dimensional image model of the inner surface of the mine inclined shaft and the three-dimensional image model of the rock layer of the mine inclined shaft generated by the same data acquisition unit are sequentially spliced according to the acquisition time period, so as to obtain a three-dimensional spatial image model of the regional mine inclined shaft;
[0066] Since the data collection angle of each data collection unit is fixed before the inspection robot reaches the bottom of the mine inclined shaft, the three-dimensional spatial image models of the regional mine inclined shaft generated by the data collection units with the same number are overlapped and spliced, and the same parts in the three-dimensional spatial image models of the two regional mine inclined shafts are directly overlapped and covered, and the different parts are retained, thereby obtaining the three-dimensional spatial image model of the mine inclined shaft;
[0067] As the inspection robot gradually moves away during the process of generating the laser signal spectrum, the phase value represented by the laser signal spectrum on the corresponding laser signal spectrum gradually decreases. Then, based on the phase value of the laser signal spectrum in each time segment and the distance between the bottom and the top of the mine inclined shaft at each position in the three-dimensional spatial image model of the mine inclined shaft, the inclination angle of each position relative to the mouth of the mine inclined shaft is obtained, and then the distribution position of the entire cross-section of the inclined shaft is marked on the three-dimensional spatial image model of the mine inclined shaft.
[0068] Example 4
[0069] This embodiment is a further limitation of Embodiment 1, and step S3 is implemented by the following process:
[0070] Obtain the size of the corresponding mine shaft opening in the three-dimensional spatial image model of the mine shaft, and match the size with the three-dimensional image model of the corresponding drill bit part, and record the corresponding part three-dimensional image model as the head part three-dimensional image model according to the matching result;
[0071] Obtaining a tunnel boring machine design drawing, and generating a component chain of the tunnel boring machine according to the tunnel boring machine design drawing, wherein the component chain is composed of a plurality of component nodes connected in a tree-like manner, and each component node is labeled with a name of a tunnel boring machine part;
[0072] The joint size marked on the 3D image model of the head part is used as the initial joint size, and the 3D image model of the head part is mapped onto the part composition chain, and then the 3D image models of parts that match the initial joint size are selected in sequence from the 3D image model of the head part until the last part node of the part composition chain is reached, thereby generating a roadheader composition plan;
[0073] The tunnel boring machine assembly plan includes the names, sizes and splicing order of the required tunnel boring machine parts, and then the corresponding tunnel boring machine parts are selected according to the tunnel boring machine assembly plan to physically install the tunnel boring machine, and a model positioning device is built into the tunnel boring machine.
[0074] Example 5
[0075] This embodiment is a further limitation of Embodiment 1, and step S4 is implemented by the following process:
[0076] Marking the excavation destination on the three-dimensional spatial image model of the mine inclined shaft, setting up laser signal devices at the mine inclined shaft mouth and inside the tunneling machine, and inputting the three-dimensional spatial image model of the mine inclined shaft into the model positioning device, the model positioning device establishes a three-dimensional rectangular coordinate system, and mapping the three-dimensional spatial image model of the mine inclined shaft on the three-dimensional rectangular coordinate system, wherein the direction from the bottom of the three-dimensional spatial image model of the mine inclined shaft to the mine inclined shaft mouth is aligned with the y-axis of the three-dimensional rectangular coordinate system, and the horizontal direction of the three-dimensional spatial image model of the mine inclined shaft is aligned with the x-axis of the three-dimensional rectangular coordinate system, and at the same time marking the excavation destination on the three-dimensional rectangular coordinate system;
[0077] When the tunnel boring machine enters the mine shaft, the laser signal device at the mine shaft mouth continuously sends laser signals in the direction where the tunnel boring machine enters the mine shaft, and at the same time, the laser signal device on the tunnel boring machine receives the laser signals;
[0078] Since the laser signal propagates in a straight line along the emission angle, the model positioning device marks the angle between the current position of the roadheader and the opening of the mine shaft along the y-axis in real time on the three-dimensional spatial image model of the mine shaft according to the angle of the received laser signal;
[0079] At the same time, the laser signal device on the roadheader sends laser signals to both sides, and then the model positioning device marks the angle of the current position of the roadheader along the x-axis in real time on the three-dimensional spatial image model of the mine inclined shaft according to the laser reflection signal received by the laser signal device;
[0080] Before the roadheader reaches the bottom of the mine shaft, the drill angle of the roadheader is adjusted in real time according to the current angle of the roadheader along the y and x axes and the distribution of the entire section of the inclined shaft in the three-dimensional spatial image model of the mine shaft, so that the roadheader travels along the distribution of the entire section of the inclined shaft until the roadheader reaches the bottom of the mine shaft;
[0081] When the tunnel boring machine reaches the bottom of the mine inclined shaft, the excavation destination is taken as the end point, and a method of navigating the tunnel boring machine into the bottom of the mine inclined shaft is adopted so that the tunnel boring machine reaches the excavation destination in a straight line.
[0082] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. A method for rapid assembly of a full-face tunnel boring machine in an inclined shaft and direct tunneling, characterized in that: The following steps are involved: Step S1, scanning the tunnel boring machine parts to obtain a number of tunnel boring machine parts image data, and then generating a corresponding part three-dimensional image model according to the tunnel boring machine parts image data; The generation process of the three-dimensional image model of the part includes: Scan the tunnel boring machine parts through a camera to generate a number of tunnel boring machine parts image data, generate corresponding parts three-dimensional image models according to the tunnel boring machine parts image data, and annotate the corresponding tunnel boring machine parts name on each parts three-dimensional image model; Step S2, collecting laser video data and infrared video data inside the mine inclined shaft by means of a laser scanner and an infrared camera, thereby generating a three-dimensional spatial image model of the mine inclined shaft, and marking the distribution position of the entire cross section of the inclined shaft; The acquisition process of the laser video data and the infrared video data includes: Setting up an inspection robot, and installing multiple data acquisition units and laser signal devices on the inspection robot, each data acquisition unit is provided with a laser scanner and an infrared camera, and each data acquisition unit is numbered; Set multiple data collection periods of equal length, and set a laser signal device at the entrance of the mine shaft. When the data collection period starts, the inspection robot enters the mine shaft along the mine shaft section, and calls the laser scanner and infrared camera of each data collection unit to collect laser video data and infrared video data inside the mine shaft along a fixed data collection angle; The laser signal device at the mine shaft entrance continuously sends laser signals along the mine shaft section, and then the laser signal device on the inspection robot receives the laser signal and generates a corresponding laser signal spectrum; Whenever a data collection period ends, the inspection robot marks the corresponding collection time for the laser video data and infrared video data generated by each data collection unit; When the inspection robot reaches the bottom of the mine shaft, the data collection angles of the laser scanners and infrared cameras of each data collection unit are simultaneously adjusted to the current inclination angle of the mine shaft, and then each laser scanner and infrared camera simultaneously collects laser video data and infrared video data of a data collection period along the current inclination angle of the mine shaft; The generation process of the three-dimensional spatial image model of the mine inclined shaft includes: A corresponding three-dimensional image model of the rock formation in the mine inclined shaft is established according to the laser video data of each data acquisition unit at different data acquisition periods, and the corresponding rock formation thickness is marked at the corresponding position of the three-dimensional image model of the rock formation in the mine inclined shaft according to the different color depths corresponding to each rock formation; At the same time, a three-dimensional image model of the inner surface of the mine inclined shaft is established based on the infrared video data, and then the three-dimensional image model of the inner surface of the mine inclined shaft and the three-dimensional image model of the rock layer of the mine inclined shaft generated by the same data acquisition unit are sequentially spliced according to the acquisition time period, so as to obtain a three-dimensional spatial image model of the regional mine inclined shaft; The three-dimensional spatial image models of the regional mine inclined shaft generated by the data acquisition units with the same number are overlapped and spliced, and the same parts in the three-dimensional spatial image models of the two regional mine inclined shafts are directly overlapped and covered, and the different parts are retained, so as to obtain the three-dimensional spatial image model of the mine inclined shaft; Step S3, matching the three-dimensional image model of the part with the full cross-section of the inclined shaft in the three-dimensional spatial image model of the mine inclined shaft, selecting the corresponding three-dimensional image model of the part according to the matching result, and then physically installing the roadheader according to the selected three-dimensional image model of the part; The matching process of the three-dimensional image model of the parts and the full cross-section of the inclined shaft in the three-dimensional spatial image model of the inclined shaft of the mine includes: Obtain the size of the corresponding mine shaft opening in the three-dimensional spatial image model of the mine shaft, and match the size with the three-dimensional image model of the corresponding drill bit part, and record the corresponding part three-dimensional image model as the head part three-dimensional image model according to the matching result; Obtaining a tunnel boring machine design drawing, and generating a component chain of the tunnel boring machine according to the tunnel boring machine design drawing, wherein the component chain is composed of a plurality of component nodes connected in a tree-like manner, and each component node is labeled with a name of a tunnel boring machine part; The joint size marked on the 3D image model of the head part is used as the initial joint size, and the 3D image model of the head part is mapped onto the part composition chain, and then the 3D image models of parts that match the initial joint size are selected in sequence from the 3D image model of the head part until the last part node of the part composition chain is reached, thereby generating a roadheader composition plan; The tunnel boring machine assembly scheme includes the names, sizes and assembly order of the required tunnel boring machine parts, and then the corresponding tunnel boring machine parts are selected according to the tunnel boring machine assembly scheme to physically install the tunnel boring machine, and a model positioning device is built into the tunnel boring machine; Step S4, marking the excavation destination on the three-dimensional spatial image model of the mine inclined shaft, and setting laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine. When the tunnel boring machine enters the mine inclined shaft, the laser signal devices at the mine inclined shaft entrance and inside the tunnel boring machine simultaneously send laser signals, and the tunnel boring machine is positioned in real time on the three-dimensional spatial image model of the mine inclined shaft according to the laser signals received by the laser signal devices until the tunnel boring machine reaches the excavation destination.
2. The method for rapid assembly of a full-face tunnel boring machine in an inclined shaft and direct tunneling according to claim 1, characterized in that: The process of marking the distribution position of the whole section of the inclined shaft includes: According to the phase value of the laser signal spectrum in each time segment and the distance between the bottom and the top of the mine inclined shaft at each position of the three-dimensional spatial image model of the mine inclined shaft, the inclination angle of each position relative to the mine inclined shaft mouth is obtained, and then the distribution position of the entire section of the inclined shaft is marked on the three-dimensional spatial image model of the mine inclined shaft.
3. The method for rapidly assembling step-by-step and direct tunneling of a full-face tunnel boring machine in an inclined shaft according to claim 2, characterized in that: The process of marking the excavation destination in the 3D spatial image model of the mine shaft includes: The excavation destination is marked on the three-dimensional spatial image model of the mine inclined shaft, and laser signal devices are set at the mine inclined shaft mouth and inside the tunnel boring machine. The three-dimensional spatial image model of the mine inclined shaft is input into the model positioning device, and the model positioning device establishes a three-dimensional rectangular coordinate system. The three-dimensional spatial image model of the mine inclined shaft is mapped on the three-dimensional rectangular coordinate system. The direction from the bottom of the three-dimensional spatial image model of the mine inclined shaft to the mine inclined shaft mouth is aligned with the y-axis of the three-dimensional rectangular coordinate system, and the horizontal direction of the three-dimensional spatial image model of the mine inclined shaft is aligned with the x-axis of the three-dimensional rectangular coordinate system. At the same time, the excavation destination is marked on the three-dimensional rectangular coordinate system.
4. The method for rapidly assembling step-by-step and direct tunneling of a full-face tunnel boring machine in an inclined shaft according to claim 3, characterized in that: The process of real-time positioning of the roadheader includes: When the tunnel boring machine enters the mine inclined shaft, the laser signal device at the mine inclined shaft mouth continuously sends laser signals in the direction where the tunnel boring machine enters the mine inclined shaft, and the laser signal device on the tunnel boring machine receives the laser signals; The angle between the current position of the roadheader and the entrance of the mine shaft along the y-axis is marked in real time on the three-dimensional spatial image model of the mine shaft. At the same time, the laser signal device on the roadheader sends laser signals to both sides, and then the model positioning device marks the angle of the current position of the roadheader along the x-axis on the three-dimensional spatial image model of the mine shaft according to the laser reflection signal received by the laser signal device. Before the roadheader reaches the bottom of the mine shaft, the drill angle of the roadheader is adjusted in real time according to the current angle of the roadheader along the y and x axes and the distribution of the entire section of the inclined shaft in the three-dimensional spatial image model of the mine shaft, so that the roadheader travels along the distribution of the entire section of the inclined shaft until the roadheader reaches the bottom of the mine shaft; When the tunnel boring machine reaches the bottom of the mine inclined shaft, the excavation destination is taken as the end point, and a method of navigating the tunnel boring machine into the bottom of the mine inclined shaft is adopted so that the tunnel boring machine reaches the excavation destination in a straight line.
Citation Information
Patent Citations
Real-time positioning method and system for roadway operation machinery and operation machinery
CN115075828A
Temporary assembly method for tunnel boring machine
JP6833095B1