Active load control method for refrigeration unit
By obtaining the COP load value and interval determination in the refrigeration unit, the water flow is adjusted using the evaporation side electric regulating valve to realize active load reduction, which solves the problem that the refrigeration unit cannot operate stably in the set load range, and provides a load regulation time The estimates have improved the information function.
Patent Information
- Application Number
- CN202410736878.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-06-07
AI Technical Summary
The existing refrigeration units cannot realize active loading and deduction, resulting in the inability to operate stably within the set load range, and the lack of effective data support to estimate the time taken for each load adjustment.
By obtaining the COP load value of the current refrigeration unit, making interval judgments, and using the evaporation side electric regulating valve to adjust the water flow, the active loading and deduction of the refrigeration unit is realized, recording and analyzing the operating time and efficiency of the regulating valve, and achieving the target is estimated to be achieved. Time required for load value.
The stable operation of the refrigeration unit within the set load range is achieved, and the efficiency analysis of the electric control valve is analyzed, providing an estimate of the load adjustment time, improving the comprehensiveness of the information function.
Smart Images

Figure CN118361883B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of refrigeration unit load regulation, and in particular to a refrigeration unit load active control method. Background Art
[0002] A refrigeration unit is a device specially used to generate or provide cooling capacity. It is widely used in various occasions that require a cooling process, such as air conditioning, refrigeration, freezing, industrial production, data center cooling, etc. It is usually composed of the following main components: compressor: responsible for compressing the refrigerant into a high-pressure and high-temperature gas to increase its energy, and then converting it into a liquid through a cooling process. Evaporator: In a low-temperature environment, the refrigerant changes from liquid to gas in the evaporator, absorbing heat from the surrounding environment to achieve a cooling effect. Condenser: When the refrigerant at the compressor outlet passes through the condenser, it is cooled and condensed from gas to liquid. In actual use, the load output of the refrigeration unit depends on the load demand of the air-conditioning terminal. The refrigeration unit increases or decreases the load by setting the inlet and outlet water temperatures, such as by setting the chilled water supply. The water temperature is 7°C. When the load demand at the air-conditioning terminal increases, the water temperature returning to the refrigeration unit through the air-conditioning terminal will increase. Since the host load has not changed at this time, the water supply temperature after cooling down the refrigeration unit will be greater than 7°C. After deviating from the set value of 7°C, the host will be loaded, thereby increasing the output of cooling capacity to ensure the constant supply temperature of chilled water. When the load demand at the air-conditioning terminal decreases, the water temperature returning to the refrigeration unit through the air-conditioning terminal will decrease, causing the water supply temperature to be less than 7°C. At this time, the host will reduce the load. During the operation of the entire refrigeration unit, it is impossible to actively increase or decrease the load of the refrigeration unit, that is, it is impossible to make it operate stably within the set load range, and due to the lack of effective data to support analysis, it is impossible to estimate the time required for each load adjustment. Summary of the invention
[0003] The purpose of the present invention is to solve the problem mentioned in the above background that the entire refrigeration unit cannot actively increase or decrease the load during operation, and to propose a method for actively controlling the load of a refrigeration unit.
[0004] The object of the present invention can be achieved by the following technical solution: A method for actively controlling the load of a refrigeration unit comprises the following steps:
[0005] Step 1: Obtain the current COP load values of different refrigeration units. Different refrigeration units are set with corresponding COP load interval standards, which are the optimal intervals of COP. The corresponding total load standard is marked as Y;
[0006] Step 2: Determine the interval of COP load values of different refrigeration units. If the current COP load value D of A1 refrigeration unit is within the COP load interval of A1 refrigeration unit, and the current COP load value of B1 refrigeration unit is not within the corresponding load interval standard, then the final COP load value of B1 refrigeration unit is obtained by formula YD, and the deviation value is obtained by subtracting the final COP load value of B1 refrigeration unit from the current COP load value of B1 refrigeration unit. If the deviation value is a positive number, the water flow rate on the evaporation side of the refrigeration unit is increased through the evaporation side electric regulating valve, and the cooling output of the refrigeration unit is increased until the current COP load value of B1 refrigeration unit is aligned with the final COP load value of B1 refrigeration unit. If the deviation value is a negative number, the chilled water flow rate is reduced through the evaporation side electric regulating valve, and the cooling output is reduced until the current COP load value of B1 refrigeration unit is aligned with the final COP load value of B1 refrigeration unit.
[0007] If the current COP load value D of the A1 refrigeration unit is not within the COP load interval of the A1 refrigeration unit, the COP load value interval of the B1 refrigeration unit is determined. If the current COP load value K of the B1 refrigeration unit is within the corresponding interval standard, the COP load final value of the A1 refrigeration unit is obtained through formula YK, and the adjustment method is the same as the above content;
[0008] If the current COP load value D of the A1 refrigeration unit is within the COP load range of the A1 refrigeration unit, and the B1 refrigeration unit is also within the COP load range standard of the B1 refrigeration unit, no adjustment will be made;
[0009] If both the A1 refrigeration unit and the B1 refrigeration unit are not in their respective corresponding COP load standard intervals, one unit is randomly selected for adjustment first. If the refrigeration unit A1 is adjusted, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the A1 refrigeration unit is completed, the COP load value of the A1 refrigeration unit after adjustment is used as the basic value T. According to the formula, YT obtains the COP load final value of the B1 refrigeration unit, and the adjustment method is the same as the above content;
[0010] If the refrigeration unit B1 is adjusted, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the refrigeration unit B1 is completed, the COP load value of the refrigeration unit B1 after adjustment is taken as the basic value H. According to the formula, YH obtains the final COP load value of the refrigeration unit A1. The adjustment method is the same as above.
[0011] Step 3: When the electric regulating valve on the evaporation side of the A1 refrigeration unit or the B1 refrigeration unit is opened, its start time and closing time are recorded, the COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time are recorded, and the current operation time of the electric regulating valve is calculated based on the closing time and the start time. The COP load adjustment value of the unit is calculated based on the recorded COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time. The adjustment efficiency of the COP load value is obtained by dividing the adjustment value by the current operation time of the electric regulating valve. In the above manner, the corresponding adjustment efficiency parameter will be calculated each time the electric regulating valve is opened.
[0012] Step 4: Generate a line graph based on the most recent ten adjustment efficiency parameters, and add the most recent ten adjustment efficiency parameters and divide by 10 to get the average value of the last ten times. By dividing the deviation value by the average value, the time required to reach the final COP load value of the unit can be estimated.
[0013] Through the above method, the refrigeration unit can be actively loaded and unloaded to make it operate stably within the set load range. At the same time, each opening of the electric control valve will have a corresponding adjustment efficiency analysis and processing, and the time consumption can be estimated based on the deviation value, so that users can understand the time taken for each COP load adjustment of the unit, and the information function is more comprehensive.
[0014] Furthermore, the A1 refrigeration unit COP load range standard, the B1 refrigeration unit COP load range standard, and the total load standard can be customized and preset.
[0015] Furthermore, in the step 2, the final COP load value of the B1 refrigeration unit is a target value of the COP load of the B1 refrigeration unit.
[0016] Furthermore, in the step 2, the final COP load value of the A1 refrigeration unit is a target value of the COP load of the A1 refrigeration unit.
[0017] Furthermore, in step 2, the deviation value is the difference between the COP load final value and the COP load current value. When the difference is not 0, the flow rate of the chilled water is adjusted by the electric regulating valve.
[0018] Furthermore, the COP load value of the B1 refrigeration unit and the COP load value of the A1 refrigeration unit are both adjusted by an electric regulating valve.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] Get the current COP load values of different refrigeration units, and judge the COP load values of different refrigeration units. If the current COP load value D of the water-cooled variable frequency centrifugal unit is within the COP load range of the water-cooled variable frequency centrifugal unit, and the current COP load value of the water-cooled fixed frequency centrifugal unit is not within the corresponding load range standard, then according to the formula, get the COP load final value of the water-cooled fixed frequency centrifugal unit. If the current COP load value D of the water-cooled variable frequency centrifugal unit is not within the COP load range of the water-cooled variable frequency centrifugal unit, and the current COP load value K of the water-cooled fixed frequency centrifugal unit is within the corresponding range standard, the formula is used to get the COP load final value of the water-cooled variable frequency centrifugal unit. If both the water-cooled variable frequency centrifugal unit and the water-cooled fixed frequency centrifugal unit are not within their respective corresponding COP load standard ranges, then A unit is selected for adjustment first. If the unit to be adjusted is a water-cooled variable frequency centrifugal unit, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the water-cooled variable frequency centrifugal unit is completed, the COP load final value of the water-cooled fixed frequency centrifugal unit is obtained according to the formula. If the unit to be adjusted is a water-cooled fixed frequency centrifugal unit, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the water-cooled fixed frequency centrifugal unit is completed, the COP load final value of the water-cooled variable frequency centrifugal unit is obtained according to the formula. The COP load value of the water-cooled fixed frequency centrifugal unit and the COP load value of the water-cooled variable frequency centrifugal unit are both adjusted by the electric control valve. Through the analysis of the COP load value of the refrigeration unit and the coordinated processing of the electric control valve, the active load increase and decrease of the refrigeration unit is realized, so that it can stably operate within the set load range;
[0021] When the electric regulating valve on the evaporation side of the water-cooled variable frequency centrifugal unit or the water-cooled fixed frequency centrifugal unit is opened, its start time and closing time are recorded, the COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time are recorded, and the current operation time of the electric regulating valve is calculated based on the closing time and the start time. The COP load adjustment value of the unit this time is calculated based on the recorded COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time. The adjustment efficiency of the COP load value this time is obtained by dividing the adjustment value by the current operation time of the electric regulating valve. Each opening of the electric regulating valve will have corresponding adjustment efficiency analysis and processing, so as to provide users with intuitive data and facilitate users to understand the opening time of the electric regulating valve according to the deviation value. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0023] Figure 1 The figure is a flow chart of the active load control method of the refrigeration unit of the present invention. DETAILED DESCRIPTION
[0024] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1 As shown, the active control method of the refrigeration unit load includes the following steps:
[0026] Step 1: Obtain the current COP load values of different refrigeration units. Different refrigeration units are provided with corresponding COP load interval standards, which are the optimal intervals of COP. The corresponding total load standard is marked as Y. Here, a water-cooled variable frequency centrifugal unit and a water-cooled fixed frequency centrifugal unit are used as examples. The COP load interval standard of the water-cooled variable frequency centrifugal unit and the COP load interval standard and the total load standard of the water-cooled fixed frequency centrifugal unit can be customized and preset;
[0027] Step 2: Here we take the water-cooled variable frequency centrifugal unit and the water-cooled fixed frequency centrifugal unit as examples. The A1 refrigeration unit is a water-cooled variable frequency centrifugal unit, and the B1 refrigeration unit is a water-cooled fixed frequency centrifugal unit. The COP load values of different refrigeration units are determined in the range. If the current COP load value D of the water-cooled variable frequency centrifugal unit is within the COP load range of the water-cooled variable frequency centrifugal unit, and the current COP load value of the water-cooled fixed frequency centrifugal unit is not within the corresponding load range standard, then the COP load final value of the water-cooled fixed frequency centrifugal unit is obtained through formula YD. The water-cooled fixed frequency centrifugal unit COP load final value - water-cooled fixed frequency centrifugal unit CO The current value of the P load obtains a deviation value. If the deviation value is positive, the water flow rate on the evaporation side of the refrigeration unit is increased through the evaporation side electric regulating valve, and the cooling output of the refrigeration unit is increased until the current value of the COP load of the water-cooled fixed-frequency centrifugal unit is aligned with the final value of the COP load of the water-cooled fixed-frequency centrifugal unit. If the deviation value is negative, the chilled water flow rate is reduced through the evaporation side electric regulating valve, and the cooling output is reduced until the current value of the COP load of the water-cooled fixed-frequency centrifugal unit is aligned with the final value of the COP load of the water-cooled fixed-frequency centrifugal unit. The above-mentioned final value of the COP load of the water-cooled fixed-frequency centrifugal unit is the target value of the COP load of the water-cooled fixed-frequency centrifugal unit;
[0028] If the current COP load value D of the water-cooled variable frequency centrifugal unit is not within the COP load interval of the water-cooled variable frequency centrifugal unit, the COP load value interval of the water-cooled fixed frequency centrifugal unit is determined. If the current COP load value K of the water-cooled fixed frequency centrifugal unit is within the corresponding interval standard, the COP load final value of the water-cooled variable frequency centrifugal unit is obtained by formula YK. The adjustment method is the same as the above content. The COP load final value of the water-cooled variable frequency centrifugal unit is the target value of the COP load of the water-cooled variable frequency centrifugal unit.
[0029] If the current COP load value D of the water-cooled variable frequency centrifugal unit is within the COP load range of the water-cooled variable frequency centrifugal unit, and the water-cooled fixed frequency centrifugal unit is also within the COP load range standard of the water-cooled fixed frequency centrifugal unit, no adjustment is performed;
[0030] If the water-cooled variable frequency centrifugal unit and the water-cooled fixed frequency centrifugal unit are not in their respective corresponding COP load standard intervals, one unit is randomly selected for adjustment first. If the unit to be adjusted is a water-cooled variable frequency centrifugal unit, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the water-cooled variable frequency centrifugal unit is completed, the COP load value of the water-cooled variable frequency centrifugal unit after the adjustment is completed is used as the basic value T. According to the formula, YT obtains the COP load final value of the water-cooled fixed frequency centrifugal unit, and the adjustment method is the same as the above content;
[0031] If the unit to be adjusted is a water-cooled fixed-frequency centrifugal unit, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the water-cooled fixed-frequency centrifugal unit is completed, the COP load value of the water-cooled fixed-frequency centrifugal unit after adjustment is taken as the basic value H. According to the formula, YH obtains the COP load final value of the water-cooled variable-frequency centrifugal unit. The adjustment method is the same as the above content.
[0032] Step 3: When the electric regulating valve on the evaporation side of the water-cooled variable frequency centrifugal unit or the water-cooled fixed frequency centrifugal unit is opened, record its start-up time and closing time, record the COP load value of the unit corresponding to the start-up time point and the COP load value of the unit corresponding to the closing time, calculate the current operation time of the electric regulating valve based on the closing time and the start-up time, calculate the COP load adjustment value of the unit based on the COP load value of the unit corresponding to the start-up time point and the COP load value of the unit corresponding to the closing time, and obtain the adjustment efficiency of the COP load value this time by dividing the adjustment value by the current operation time of the electric regulating valve. In the above manner, each time the electric regulating valve is opened, the corresponding adjustment efficiency parameter will be calculated. The above-mentioned deviation value is the difference between the COP load final value and the COP load current value. When the difference is not 0, the flow rate of chilled water is adjusted by the electric regulating valve. The COP load value of the water-cooled fixed frequency centrifugal unit and the COP load value of the water-cooled variable frequency centrifugal unit are both adjusted by the electric regulating valve;
[0033] Step 4: Generate a line graph based on the most recent ten adjustment efficiency parameters, and add the most recent ten adjustment efficiency parameters and divide by 10 to get the average value of the last ten times. By dividing the deviation value by the average value, the time required to reach the final COP load value of the unit can be estimated.
[0034] When used specifically, different refrigeration units have different maximum COP load ranges. The maximum COP load range of water-cooled fixed-frequency centrifugal units is 80-90%, while the maximum COP load range of water-cooled variable-frequency centrifugal units is 60-70%. The maximum energy efficiency ranges of the two units are different. When the two models are connected in parallel in the same refrigeration system, the water pressure drop of the evaporators of the two models is considered to be equal, that is, the resistance is the same. When the two units are operated in parallel, their water flow distribution is balanced, and the resulting flow is distributed in proportion. In conventional refrigeration systems, since the load output of the refrigeration unit cannot be actively controlled, the load output of the refrigeration unit is completely determined by the water flow obtained by the two refrigeration units. When the two units are operated in parallel, their water flow distribution is balanced, and the resulting flow is distributed in proportion. The proportional distribution of flow means that the actual load range of the two refrigeration units is the same when they are running.
[0035] If there are two refrigeration units, one is a water-cooled fixed-frequency unit with a total cooling capacity of 300RT, the water flow rate is 180m3 / h when the evaporation side is fully loaded, the unit interface pipe diameter is DN200, and the flow rate is 1.486m / s when it is fully loaded. At this time, the water pressure drop on the evaporation side is 60kPa, the chilled water temperature is 7℃, and the cooling water temperature is 30℃. Its highest energy efficiency point is the 90% load point; the other is a water-cooled variable-frequency unit with a total cooling capacity of 300RT, the water flow rate is 180m3 / h when the evaporation side is fully loaded, the unit interface pipe diameter is DN200, and the flow rate is 1.486m / s when it is fully loaded. At this time, the water pressure drop on the evaporation side is 60kPa, the chilled water temperature is 7℃, and the cooling water temperature is 30℃. Its highest energy efficiency point is the 60% load point;
[0036] If the total cooling capacity of the system is 450RT at this time, and the chilled water temperature difference is maintained unchanged, the total chilled water flow of the system is 270m3 / h. Since the water pressure drop of the two refrigeration units is the same, the water flow obtained by their allocation is the same, both 135m3 / h. At this time, the actual load percentage of the two refrigeration units is 75%, and neither of them has reached the highest energy efficiency point of the units. The total input power of the two refrigeration units is not at the optimal value. Since the existing technology cannot actively adjust the load output of the refrigeration unit, it is also impossible to achieve a lower total input power.
[0037] The load percentage of the refrigeration unit mainly depends on the water flow rate of the evaporator. When the water flow rate of the evaporator of the host changes, its cooling capacity output will be passively changed. This method can be used to control the load range of the refrigeration unit. In order to change the water flow rate on the evaporation side of the refrigeration unit, an electric regulating valve is added on the evaporation side to reduce its chilled water flow rate and cooling capacity output, or increase the water flow rate and increase the cooling capacity output of the refrigeration unit.
[0038] The highest energy efficiency point of the water-cooled fixed-frequency unit is at the 90% load point, and the highest energy efficiency point of the water-cooled variable-frequency unit is at the 60% load point. The total system load is 150%. Therefore, the water-cooled variable-frequency unit should be operated at the load point, and the water-cooled fixed-frequency unit should be operated at the high load point. In other words, by reducing the chilled water flow of the water-cooled variable-frequency unit and increasing the chilled water flow of the water-cooled fixed-frequency unit, both can be placed in the high energy efficiency range, thereby improving the energy efficiency of the system. To this end, an electric regulating valve can be added to the evaporation side of the water-cooled variable-frequency unit;
[0039] In the actual control process, the load percentage composition of each refrigeration unit is determined according to the total load of the system and the load percentage of the highest energy efficiency range of each refrigeration unit, that is, the operating load point of each refrigeration unit is clarified, and then the electric regulating valve is used to adjust and control according to the specific load percentage of the lower load point, so that the refrigeration unit with the lowest load point operates at its predetermined load point. At the same time, the load percentage of the remaining units will also change due to the change of the hydraulic balance point, so that different refrigeration units can operate in their optimal load ranges respectively;
[0040] The highest energy efficiency point of the water-cooled fixed-frequency unit is at the 90% load point, and the highest energy efficiency point of the water-cooled variable-frequency unit is at the 60% load point. The total system load is 150%. An electric regulating valve is added to the evaporation side of the water-cooled variable-frequency unit, because the total system load is 150% at this time. On this load basis, when the water-cooled variable-frequency unit is at the 60% load point and the water-cooled fixed-frequency unit is at the 90% point, the total power consumption of the two is the lowest. Therefore, the 60% load point of the water-cooled variable-frequency unit can be used as the control basis for the opening of the electric valve. By adjusting the opening of the electric regulating valve, the water-cooled variable-frequency unit can be operated at the 60% load point. At this time, due to the change in the hydraulic balance point, the main unit of the water-cooled fixed-frequency unit also runs at the 90% load point, thereby achieving the lowest input power of all refrigeration units under this total load;
[0041] Based on the above content, through the analysis of the COP load value of the refrigeration unit and the coordinated processing of the electric control valve, the active increase and decrease of the load of the refrigeration unit can be achieved, so that it can operate stably within the set load range. At the same time, each opening of the electric control valve will have a corresponding adjustment efficiency analysis and processing, and the time consumption can be estimated based on the deviation value, so that users can understand the duration of each COP load adjustment of the unit, and the information function is more comprehensive.
[0042] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for actively controlling the load of a refrigeration unit, characterized in that: The steps include: Step 1: Obtain the current COP load values of different refrigeration units. Different refrigeration units are set with corresponding COP load interval standards, which are the optimal intervals of COP. The corresponding total load standard is marked as Y; Step 2: Perform interval judgment on the COP load values of different refrigeration units. If the current COP load value D of the A1 refrigeration unit is within the COP load interval of the A1 refrigeration unit, and the current COP load value of the B1 refrigeration unit is not within the corresponding load interval standard, then the final COP load value of the B1 refrigeration unit is obtained by formula YD, and the deviation value is obtained by subtracting the final COP load value of the B1 refrigeration unit from the current COP load value of the B1 refrigeration unit. If the deviation value is a positive number, the water flow rate on the evaporation side of the refrigeration unit is increased through the evaporation side electric regulating valve, and the cooling output of the refrigeration unit is increased until the current COP load value of the B1 refrigeration unit is aligned with the final COP load value of the B1 refrigeration unit. If the deviation value is a negative number, the chilled water flow rate is reduced through the evaporation side electric regulating valve, and the cooling output is reduced until the current COP load value of the B1 refrigeration unit is aligned with the final COP load value of the B1 refrigeration unit. If the current COP load value D of the A1 refrigeration unit is not within the COP load interval of the A1 refrigeration unit, the COP load value interval of the B1 refrigeration unit is determined. If the current COP load value K of the B1 refrigeration unit is within the corresponding interval standard, the COP load final value of the A1 refrigeration unit is obtained through formula YK, and the adjustment method is the same as the above content; If the current COP load value D of the A1 refrigeration unit is within the COP load range of the A1 refrigeration unit, and the B1 refrigeration unit is also within the COP load range standard of the B1 refrigeration unit, no adjustment will be made; If both the A1 refrigeration unit and the B1 refrigeration unit are not in their respective corresponding COP load standard intervals, one unit is randomly selected for adjustment first. If the refrigeration unit A1 is adjusted, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the A1 refrigeration unit is completed, the COP load value of the A1 refrigeration unit after adjustment is used as the basic value T. According to the formula, YT obtains the COP load final value of the B1 refrigeration unit, and the adjustment method is the same as the above content; If the refrigeration unit B1 is adjusted, the adjustment range is randomly selected from the corresponding interval. After the COP load adjustment of the refrigeration unit B1 is completed, the COP load value of the refrigeration unit B1 after adjustment is taken as the basic value H. According to the formula, YH obtains the final COP load value of the refrigeration unit A1. The adjustment method is the same as above. Step 3: When the electric regulating valve on the evaporation side of the A1 refrigeration unit or the B1 refrigeration unit is opened, its start time and closing time are recorded, and the COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time are recorded. The current operation time of the electric regulating valve is calculated based on the closing time and the start time. The COP load adjustment value of the unit is calculated based on the COP load value of the unit corresponding to the start time point and the COP load value of the unit corresponding to the closing time. The adjustment efficiency of the COP load value is obtained by dividing the adjustment value by the current operation time of the electric regulating valve. In the above manner, the corresponding adjustment efficiency parameter will be calculated each time the electric regulating valve is opened; Step 4: Generate a line graph based on the most recent ten adjustment efficiency parameters, and add the most recent ten adjustment efficiency parameters and divide by 10 to get the average value of the last ten times. By dividing the deviation value by the average value, the time required to reach the final COP load value of the unit can be estimated.
2. The method for active control of refrigeration unit load according to claim 1, characterized in that: The A1 refrigeration unit COP load range standard, the B1 refrigeration unit COP load range standard, and the total load standard can be customized and preset.
3. The method for active load control of a refrigeration unit according to claim 1, characterized in that: In the step 2, the final COP load value of the B1 refrigeration unit is the target COP load value of the B1 refrigeration unit.
4. The method for active control of refrigeration unit load according to claim 1, characterized in that: In the step 2, the final COP load value of the A1 refrigeration unit is the target COP load value of the A1 refrigeration unit.
5. The method for active control of refrigeration unit load according to claim 1, characterized in that: The deviation value in step 2 is the difference between the final COP load value and the current COP load value. When the difference is not 0, the flow rate of the chilled water is adjusted by the electric regulating valve.
6. The method for active control of refrigeration unit load according to claim 1, characterized in that: The COP load value of the B1 refrigeration unit and the COP load value of the A1 refrigeration unit are both adjusted by electric regulating valves.