Shear keys for composite slabs, composite slabs and their prefabrication methods, sandwich panels and their applications
By setting shear key structures on the precast base plate of the composite slab, and combining fiber concrete panels and high-performance concrete panels, the problems of difficult installation and large steel consumption in the construction process of composite slabs and sandwich wall panels are solved, achieving the effects of lightweighting, simplified installation and improved shear and tensile strength.
Patent Information
- Application Number
- CN202410538995.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-04-29
AI Technical Summary
Existing composite slabs have problems such as difficulty in installing steel trusses, large steel consumption, low construction efficiency, complex processes, and high installation precision of sandwich wall panels during construction, making it difficult to meet the needs of floor slabs and wall panels with small spans.
The structure employs a shear key structure, including the main body, legs, and tie-fitting components. By setting multiple legs and tie-fitting components on the precast base plate, an anchor claw structure is formed, achieving reverse tie-fitting and fixing of the main body and legs. Combined with the use of fiber concrete panels and high-performance concrete panels, the installation process is simplified and the shear and tensile strength is improved.
It achieves lightweighting, simplified installation, reduced steel consumption, improved construction efficiency and shear and tensile strength of composite slabs, and is suitable for floor slabs and wall panels with small spans, reducing construction costs and technical requirements.
Smart Images

Figure CN118407545B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of prefabricated buildings, and particularly relates to a shear key for composite slabs, composite slabs and their prefabrication methods, sandwich panels and their applications. Background Technology
[0002] Floor slabs and wall panels are important components of building structures. Floor slab systems mainly include cast-in-place reinforced concrete slabs, profiled steel sheet-concrete composite slabs, and composite slabs. While cast-in-place reinforced concrete slabs offer good overall integrity, the large amount of on-site formwork required leads to low construction efficiency and a long construction period. Profiled steel sheet-concrete composite slabs, although eliminating the need for formwork, consume a large amount of steel, have poor adhesion to concrete, and often have uneven surfaces requiring suspended ceilings. Composite slabs combine the advantages of both types and are therefore widely used.
[0003] Composite slabs are monolithic slabs that combine precast assembly and cast-in-place concrete. They consist of precast and cast-in-place components that are stacked together to form a unified whole. During on-site construction, the precast components serve as formwork for the cast-in-place components, eliminating the need for on-site formwork and improving efficiency.
[0004] However, traditional composite panels also have many unavoidable drawbacks:
[0005] In reinforced concrete composite floor slabs, there is only about 2.5 cm of space between the reinforced truss and the concrete base slab for pipe installation, making it difficult to lay out pipes on site.
[0006] The thickness of the precast base plate of ordinary composite slabs is mostly 6 cm, and it cannot be thinner, as it is prone to cracking if it is too thin.
[0007] The steel truss is set up to eliminate the need for bracing for a certain span, but in actual construction sites, it is mostly supported by full-span scaffolding, so the steel truss does not play a significant role.
[0008] Traditional composite slabs have reinforcing bars, making on-site installation difficult;
[0009] The components are relatively heavy, resulting in high transportation costs;
[0010] Factory production requires maintenance, resulting in high amortization costs for factory buildings and overall high expenses!
[0011] Precast concrete is only used as the bottom formwork and cannot be stressed synchronously with the cast-in-place layer, thus increasing the slab thickness.
[0012] The steel truss sheet metal base plate construction method is relatively complex because it does not meet fire protection requirements. Therefore, the upper concrete layer needs to be removed or fireproofed after pouring, making the process more complicated.
[0013] Wall panels, especially sandwich wall panels in the field of prefabricated buildings, are installed by connecting tie rods through each other. The installation of the tie rods requires high precision and high technical skills from the construction workers, which increases costs and reduces efficiency.
[0014] Therefore, it is necessary to propose a composite slab with strong shear and tensile strength, low steel consumption, and simple manufacturing process to meet the needs of floor slab systems with small spans.
[0015] Furthermore, it provides a sandwich wall panel that is easy to install and has a high tolerance for errors, serving as a standard for promoting wall panels in the field of prefabricated buildings.
[0016] It should be noted that the information disclosed in the background section of this invention is intended only to enhance the understanding of the general background of this invention, and should not be construed as an admission or in any way implying that the information constitutes prior art known to those skilled in the art. Summary of the Invention
[0017] One objective of this invention is to provide a shear-resistant key for composite plates;
[0018] The second objective of this invention is to provide a composite board with strong shear and tensile strength;
[0019] The third objective of this invention is to provide a method for prefabricating composite slabs;
[0020] The fourth objective of this invention is to provide a way to promote the application of the aforementioned composite slab and to form a sandwich panel that is easy to prefabricate and has a strong structure.
[0021] To achieve one of the above objectives, the present invention first provides a shear key for composite slabs, which is installed on a precast base plate of the composite slab. The key is characterized by comprising a main body, a support leg, and a tie-fitting mounting component; the support leg is installed on the main body, one end of the tie-fitting mounting component is installed through a hole in the precast base plate, and the other end is tied to the main body in the opposite direction; the support leg is supported on the precast base plate.
[0022] Preferably, there are multiple legs, which are installed on the main body to form an anchor claw shape and are supported by the tie-fitting mounting member on the precast base plate.
[0023] Preferably, the tie-fitting mounting component is a tie-fitting screw, and the main body is provided with a main body threaded hole; the prefabricated base plate is provided with a base plate mounting hole, and the threaded section of the tie-fitting screw is installed in the main body threaded hole and tied and fixed through the base plate mounting hole.
[0024] Preferably, the tie rod includes a tie rod and two mounting parts. The main body is provided with a main body mounting hole, and the precast base plate is provided with a base plate mounting hole. The tie rod passes through the main body mounting hole and the base plate mounting hole. Mounting parts are installed at both ends of the tie rod, and the two mounting parts are respectively pressed against the main body and the precast base plate.
[0025] Preferably, the bottom of the support leg has a steel bar limiting groove for limiting the installation of the structural steel bars of the cast-in-place layer in the composite slab.
[0026] Preferably, the number of the support legs is four, arranged in a longitudinal and transverse manner; wherein two of the support legs form a group, which are respectively arranged on both sides of the main body along the longitudinal direction, and the longitudinal structural reinforcement in the structural reinforcement is limited and installed in the reinforcement limiting groove; wherein two of the support legs form a group, which are respectively arranged on both sides of the main body along the transverse direction, and the transverse structural reinforcement in the structural reinforcement is limited and installed in the reinforcement limiting groove.
[0027] Preferably, a pad is provided between the structural reinforcement and the precast base plate.
[0028] The technical effects of the above-mentioned technical solutions of the present invention arise from one or more of the following combinations:
[0029] When the shear key of this solution is used in composite slabs, the structure is simple and the installation is convenient; the main body and the support legs can be tied and fixed to the composite slab in the opposite direction by means of tie-fit installation parts.
[0030] The shear key anchor claw structure ensures stable support and allows for full contact and bonding with the concrete in the post-cast concrete; the arched support structure of each leg provides better stress support.
[0031] The anchor-claw structure creates ample space for concrete pouring between the main body and the mounting holes in the base plate. This allows the cast-in-place concrete to fully fill the gaps in the mounting holes, sealing any remaining gaps with concrete mortar. In contrast, the traditional "screw + nut" shear structure requires nuts on both sides of the mounting holes in the base plate, which blocks the precast mounting holes and prevents gap filling.
[0032] The anchor claw-type barb, like a ship's anchor, has a pull-out force in the opposite direction after the cast-in-place concrete layer is poured, which is much greater than that of the traditional "screw + nut" type shear structure.
[0033] To achieve the above two objectives, the present invention provides a composite slab, characterized in that it includes at least a precast base slab and a plurality of the aforementioned composite slab shear keys; a cast-in-place layer is formed on the precast base slab, and the plurality of composite slab shear keys are installed on the precast base slab to form a precast portion, wherein the composite slab shear keys and the structural reinforcement are located in the cast-in-place layer.
[0034] Preferably, the precast base plate is provided with base plate mounting holes, which are countersunk holes, and the tie rod is installed through the countersunk holes without protruding from the surface of the precast base plate.
[0035] Preferably, the side of the precast base plate facing the cast-in-place layer has a rough surface; the rough surface is implemented as a grid of protrusions.
[0036] Preferably, the precast base plate has a bevel at its edge; the bevels of adjacent composite plates are joined to form a joint filling groove.
[0037] The technical effects of the above-mentioned technical solutions of the present invention arise from one or more of the following combinations:
[0038] This application increases the shear and tensile strength of the precast base slab and cast-in-place layer by setting shear keys on the precast base slab; the main body and the support legs can be tied and fixed to the composite slab in reverse by tie-fitting installation parts, which is simple in structure and easy to install.
[0039] The shear key anchor claw structure ensures stable support and allows for full contact and bonding with the concrete in the post-cast concrete; the arched support structure of each leg provides better stress support.
[0040] The countersunk holes facilitate the concealment of the tie rods and installation components, resulting in a flat surface on the precast base plate and making subsequent processes such as plastering easier.
[0041] The precast base plate has a bevel (beveled structure) at the edge. When multiple composite slabs are spliced together, the bevels of adjacent composite slabs are spliced together to form a joint filling groove, which makes it easy to cover the gaps when applying putty later.
[0042] Compared to traditional reinforced concrete slabs, this design uses less steel. Given the current advancements in new materials, the strength of precast slabs and cast-in-place layers has significantly increased. Combined with the shear keys in this application, the strength requirements allow for the elimination of the reinforced concrete truss, thus saving on steel consumption.
[0043] Using fiber-reinforced concrete panels can reduce panel thickness; thinner panels without truss reinforcement allow for unobstructed wiring and save labor.
[0044] Both the precast base plate and the shear structure can be produced in a standardized manner and then assembled.
[0045] No truss reinforcement, saving steel content
[0046] Because the precast base plate has shear keys and a rough surface, and has high strength, it can participate in the structural stress at the same time.
[0047] The installation is convenient on the construction site and can be closely assembled. The precast base plates of this scheme are mostly less than 2 cm thick, and the cast-in-place layer is thick. The joints of the closely assembled grouting grooves will not crack.
[0048] To achieve the above three objectives, the present invention provides a method for prefabricating composite slabs, characterized by comprising the following steps:
[0049] A precast base plate is formed, and mounting holes for the base plate are provided on the precast base plate;
[0050] Install anti-shear keys for composite slabs, install one end of the anti-shear key's tie-fitting component through a hole into the precast base plate, and tie the other end to the main body, so that the support leg is supported on the precast base plate;
[0051] Cast-in-place molding involves pouring concrete into the cast-in-place layer on the precast base slab until it covers the shear key.
[0052] Preferably, in the precast base plate forming step, before the precast base plate has solidified, a mesh is laid and pressed down on the side of the precast base plate facing the cast-in-place layer to form a rough surface.
[0053] Preferably, the precast base slab includes, but is not limited to, fiber concrete slabs, high-performance concrete slabs, prestressed concrete slabs, or high-polymer insulation boards; the cast-in-place layer includes, but is not limited to, fiber concrete or high-performance concrete.
[0054] The technical effects of the above-mentioned technical solutions of the present invention arise from one or more of the following combinations:
[0055] In this solution, the shear keys are installed on the precast base plate by reverse tie-in. Compared with the traditional embedding method, the shear keys can be disassembled and assembled at any time, which is convenient for transportation; at the same time, the installation is also convenient.
[0056] The shear key is supported on the precast base plate through an anchor claw structure, which allows the shear key itself to also serve as a hoisting point for lifting, making the structure stable and not easily damaged.
[0057] To achieve the above four objectives, the present invention provides a sandwich panel, characterized in that it comprises two prefabricated portions of the aforementioned composite panels; the shear keys and / or the structural ribs of the two prefabricated portions are tensioned by tie rods.
[0058] Preferably, the tie member includes a tie body and two tie portions, the two tie portions being located at both ends of the tie body, and the two tie portions being respectively tied to the structural ribs of the two composite plates.
[0059] Preferably, the pull portion is implemented as a loop and / or a hook.
[0060] Preferably, a sandwich layer is formed between the two composite plates, and the structural ribs and the shear keys are located within the sandwich layer; the outer perimeter of the sandwich layer is defined as the outer perimeter region, and the middle region of the sandwich layer is defined as the middle region; the collars at both ends of the tie members in the outer perimeter region are respectively fitted onto the structural ribs on the two composite plates; the hooks at both ends of the tie members in the middle region are respectively hooked onto the structural ribs on the two composite plates.
[0061] Preferably, at least in the double-layered slab of the outer perimeter region, there are also diagonal bracing members between the structural ribs; the diagonal bracing members, the tie members, and the structural ribs form a triangular stable structure.
[0062] The technical effects of the above-mentioned technical solutions of the present invention arise from one or more of the following combinations:
[0063] This application connects two prefabricated composite slabs together with tie rods, forming a panel from two prefabricated base plates and a sandwich layer from the middle, which forms the core layer of the sandwich slab. This allows the entire slab to be prefabricated in the factory or the prefabricated parts to be transported to the site for on-site casting, making the process simple and convenient.
[0064] By setting shear keys on the precast base plate, the shear and tensile strength of the precast base plate and the sandwich layer is increased; the main body and the support legs can be tied and fixed to the precast base plate in the opposite direction by tie-fitting installation parts, which is simple in structure and easy to install.
[0065] The shear key anchor claw structure ensures stable support and allows for full contact and bonding with the concrete in the post-cast concrete; the arched support structure of each leg provides better stress support.
[0066] The countersunk holes facilitate the concealment of the tie rods and installation components, resulting in a flat surface on the precast base plate and making subsequent processes such as plastering easier.
[0067] Compared to traditional steel truss sandwich panels, this solution uses less steel. Given the current development of new materials, the strength of precast base slabs and cast-in-place layers has significantly increased. Combined with the shear keys in this application, the strength requirements can eliminate the need for steel trusses, thus saving steel. More importantly, this technology, when used as wall panels, offers simple installation, high tolerance for error (unlike traditional tie rods which require high precision), and high factory production efficiency.
[0068] Using fiber-reinforced concrete panels can reduce panel thickness; thinner panels without truss reinforcement allow for unobstructed wiring and save labor.
[0069] Both the precast base plate and the shear structure can be produced in a standardized manner and then assembled.
[0070] No truss reinforcement, saving steel content
[0071] Because the precast base plate has shear keys and a rough surface, and has high strength, it can participate in the structural stress at the same time.
[0072] The installation is convenient on the construction site and can be closely assembled. The precast base plates of this scheme are mostly less than 2 cm thick, and the cast-in-place layer is thick. The joints of the closely assembled grouting grooves will not crack.
[0073] To achieve the above four objectives, the present invention also provides an application of sandwich panels, characterized in that the sandwich panels are applied to wall panels, and sandwich concrete is poured after the sandwich layer between the two prefabricated parts. Attached Figure Description
[0074] Figure 1 This diagram illustrates the structure of the anti-shear key used in the composite plate of the present invention.
[0075] Figure 2 This diagram illustrates another structural schematic of the anti-shear key used in the composite plate of the present invention.
[0076] Figure 3 A schematic diagram illustrating the structure of the composite plate in this invention is shown.
[0077] Figure 4 This diagram illustrates another perspective of the composite plate structure in this invention.
[0078] Figure 5 This shows a side view of the composite plate in the present invention.
[0079] Figure 6 This diagram illustrates the assembly of the composite plates in this invention.
[0080] Figure 7 This diagram illustrates the assembly of the composite slab and structural reinforcement in this invention.
[0081] Figure 8 This shows a side view of the sandwich panel in this invention.
[0082] Figure 9 This diagram illustrates the sandwich layer structure of the sandwich panel in this invention. Detailed Implementation
[0083] The following description is provided to enable those skilled in the art to implement and use the invention and adapt it to specific application contexts. Various modifications and uses in different applications will be readily apparent to those skilled in the art, and the general principles defined herein are applicable to a wide range of embodiments. Therefore, the invention is not limited to the embodiments given herein, but should be granted the broadest scope consistent with the principles and novel features disclosed herein.
[0084] In the following detailed description, numerous specific details are set forth to provide a more thorough understanding of the invention. However, it will be apparent to those skilled in the art that practice of the invention is not necessarily limited to these specific details. In other words, well-known structures and devices are shown in block diagram form without being depicted in detail to avoid obscuring the invention.
[0085] Readers should note all documents and references submitted concurrently with this specification and open to public inspection, the contents of which are incorporated herein by reference. Unless otherwise expressly stated, all features disclosed in this specification (including any appended claims, abstracts, and drawings) may be replaced by alternative features for the same, equivalent, or similar purposes. Therefore, unless explicitly stated otherwise, each disclosed feature is merely one example of a set of equivalent or similar features.
[0086] Note that, where used, the markings left, right, front, back, top, bottom, front, back, clockwise, and counterclockwise are merely for convenience and do not imply any specific fixed direction. In fact, they are used to reflect the relative position and / or orientation between different parts of an object. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0087] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0088] Note that, in practice, "further," "preferably," "even further," and "more preferably" are simply starting points for describing another embodiment based on the foregoing embodiments. The combination of the content following "further," "preferably," "even further," or "more preferably" with the foregoing embodiments constitutes the complete configuration of another embodiment. Any combination of several "further," "preferably," "even further," or "more preferably" settings following the same embodiment can form yet another embodiment.
[0089] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. It should be noted that the aspects described below with reference to the accompanying drawings and specific embodiments are merely exemplary and should not be construed as limiting the scope of protection of the present invention in any way.
[0090] Example 1:
[0091] Please see Figures 1-6This embodiment provides a shear key 1 for composite slabs, which is installed on the prefabricated base plate 2 of the composite slab. Its structure includes a main body 11, a support leg 12, and a tie-fit mounting component 13. For details, please refer to... Figure 3 and Figure 4 The support leg 12 is installed on the main body 11. One end of the tie-mount component 13 is installed through a hole in the precast base plate 2, and the other end is tied to the main body 11. The support leg 12 is supported on the precast base plate 2.
[0092] In this embodiment, the main body 11 serves as a structural mounting carrier for the support leg 12 and the tie-down mounting component 13. It can be an independent component or an integrally formed component of the support leg 12, and is not necessarily limited to a specific shape. Preferably, the main body 11 can be block-shaped, column-shaped, etc. In subsequent embodiments of this embodiment, the main body 11 is implemented as a sleeve shape to cooperate with the installation of the tie-down mounting component 13.
[0093] Furthermore, to improve the installation stability of the shear keys and the uniformity of the force applied to the precast base slab 2, in a preferred embodiment of this invention, multiple support legs 12 are installed on the main body 11 to form anchor claws, and are supported by the tie-in mounting members 13 to the precast base slab 2. Preferably, the support legs 12 are arched supports. On the one hand, the arched structure of the bending moment can increase the contact area with the cast-in-place concrete layer; on the other hand, the arched support can also provide better shear resistance.
[0094] In this embodiment, the tie-fitting mounting member 13 is intended to tie and fix the main body 11 and the support leg 12 in opposite directions to the precast base plate 2. This embodiment provides the following two preferred forms:
[0095] 1. The tie-fit mounting component 13 is a tie rod, with a main body threaded hole on the main body 11. The precast base plate 2 has a base plate mounting hole 20. The threaded section of the tie rod is installed in the main body threaded hole and is tied and fixed through the base plate mounting hole 20. The nut of the tie rod is located in the base plate mounting hole 20. Please refer to [link / reference]. Figure 1 , Figure 3 and Figure 4 .
[0096] II. The tie-up mounting component 13 includes a tie rod and two mounting components. The main body 11 has a main body mounting hole, and the precast base plate 2 has a base plate mounting hole 20. The tie rod passes through the main body mounting hole and the base plate mounting hole 20. Mounting components are installed at both ends of the tie rod, and the two mounting components abut against the main body 11 and the precast base plate 2 respectively. Although this embodiment is not illustrated, those skilled in the art should know that, preferably, the mounting components can be mounting nuts. The two ends of the tie rod have threaded sections, and the mounting nuts are installed on the threaded sections and abut against the main body 11 and the precast base plate 2, thereby achieving the tie-up function.
[0097] Furthermore, please combine Figure 2 and Figure 7 To facilitate the fixing of the structural reinforcement bars of the cast-in-place layer (later implemented as longitudinal structural reinforcement bars 32 and transverse structural reinforcement bars 31), a reinforcement limiting groove 120 is formed at the bottom of the support 12 for limiting the installation of the structural reinforcement bars of the cast-in-place layer in the composite slab. Specifically, there are four supports 12, arranged in a longitudinal and transverse pattern. Two supports 12 form a group, which are respectively located on both sides of the main body along the longitudinal direction, and the longitudinal structural reinforcement bars 32 are limited and installed in the reinforcement limiting groove 120; two supports 12 form a group, which are respectively located on both sides of the main body 11 along the transverse direction, and the transverse structural reinforcement bars 31 are limited and installed in the reinforcement limiting groove 120. Preferably, the reinforcement limiting groove 120 can be a closed groove or an open groove. As a preferred embodiment of this example, the reinforcement limiting groove 120 in this example is an open groove.
[0098] Furthermore, spacers (not shown) are provided between the structural reinforcement and the precast base slab 2. This facilitates the integral embedding of the structural reinforcement in the cast-in-place layer; spacers are not required when using closed grooves.
[0099] The beneficial effects of this embodiment:
[0100] When the shear key of this solution is used in composite slabs, the structure is simple and the installation is convenient; the main body 11 and the support leg 12 can be tied and fixed to the composite slab in opposite directions by means of the tie-fit mounting part 13.
[0101] The shear key anchor claw structure ensures stable support and allows for full contact and gripping with the concrete in the post-cast concrete; the arched support structure of each leg 12 provides better stress support.
[0102] The anchor-claw structure creates ample space for concrete pouring between the main body and the mounting holes in the base plate. This allows the cast-in-place concrete to fully fill the gaps in the mounting holes, sealing any remaining gaps with concrete mortar. In contrast, the traditional "screw + nut" shear structure requires nuts on both sides of the mounting holes in the base plate, which blocks the precast mounting holes and prevents gap filling.
[0103] The anchor claw-type barb, like a ship's anchor, has a pull-out force in the opposite direction after the cast-in-place concrete layer is poured, which is much greater than that of the traditional "screw + nut" type shear structure.
[0104] Setting up a rebar limiting groove can eliminate the need for processes such as tying and installing the rebar in the cast-in-place layer. The rebar can be directly fixed to the precast base plate by shear keys, which is simple, convenient, and saves materials and labor.
[0105] Example 2:
[0106] Please see Figures 1-6This embodiment provides a composite slab, which includes at least a precast base slab 2 and a plurality of shear keys 1 for composite slabs. A cast-in-place layer is formed on the precast base slab 2, and the plurality of shear keys 1 for composite slabs are installed on the precast base slab 2 to form a precast portion. The shear keys 1 and structural reinforcement of this precast portion are located in the cast-in-place layer.
[0107] The anti-shear key 1 for composite slabs includes a main body 11, a support leg 12, and a tie-fit mounting member 13. Specifically, the support leg 12 is installed on the main body 11, one end of the tie-fit mounting member 13 is installed through a hole in the precast base plate 2, and the other end is tied to the main body 11. The support leg 12 is supported on the precast base plate 2.
[0108] In this embodiment, the main body 11 serves as a structural mounting carrier for the support leg 12 and the tie-down mounting component 13. It can be an independent component or an integrally formed component of the support leg 12, and is not necessarily limited to a specific shape. Preferably, the main body 11 can be block-shaped, column-shaped, etc. In subsequent embodiments of this embodiment, the main body 11 is implemented as a sleeve shape to cooperate with the installation of the tie-down mounting component 13.
[0109] Furthermore, to improve the installation stability of the shear keys and the uniformity of the force applied to the precast base slab 2, in a preferred embodiment of this invention, multiple support legs 12 are installed on the main body 11 to form anchor claws, and are supported by the tie-in mounting members 13 to the precast base slab 2. Preferably, the support legs 12 are arched supports. On the one hand, the arched structure of the bending moment can increase the contact area with the cast-in-place concrete layer; on the other hand, the arched support can also provide better shear resistance.
[0110] In this embodiment, the tie-fitting mounting member 13 is intended to tie and fix the main body 11 and the support leg 12 in opposite directions to the precast base plate 2. This embodiment provides the following two preferred forms:
[0111] 1. The tie-fit mounting component 13 is a tie rod, with a main body threaded hole on the main body 11. The precast base plate 2 has a base plate mounting hole 20. The threaded section of the tie rod is installed in the main body threaded hole and is tied and fixed through the base plate mounting hole 20. The nut of the tie rod is located in the base plate mounting hole 20. Please refer to [link / reference]. Figure 1 , Figure 3 and Figure 4 .
[0112] II. The tie-up mounting component 13 includes a tie rod and two mounting components. The main body 11 has a main body mounting hole, and the precast base plate 2 has a base plate mounting hole 20. The tie rod passes through the main body mounting hole and the base plate mounting hole 20. Mounting components are installed at both ends of the tie rod, and the two mounting components abut against the main body 11 and the precast base plate 2 respectively. Although this embodiment is not illustrated, those skilled in the art should know that, preferably, the mounting components can be mounting nuts. The two ends of the tie rod have threaded sections, and the mounting nuts are installed on the threaded sections and abut against the main body 11 and the precast base plate 2, thereby achieving the tie-up function.
[0113] Furthermore, please combine Figure 2 and Figure 7 To facilitate the fixing of the structural reinforcement bars of the cast-in-place layer (later implemented as longitudinal structural reinforcement bars 32 and transverse structural reinforcement bars 31), a reinforcement limiting groove 120 is formed at the bottom of the support 12 for limiting the installation of the structural reinforcement bars of the cast-in-place layer in the composite slab. Specifically, there are four supports 12, arranged in a longitudinal and transverse pattern. Two supports 12 form a group, which are respectively located on both sides of the main body along the longitudinal direction, and the longitudinal structural reinforcement bars 32 are limited and installed in the reinforcement limiting groove 120; two supports 12 form a group, which are respectively located on both sides of the main body 11 along the transverse direction, and the transverse structural reinforcement bars 31 are limited and installed in the reinforcement limiting groove 120. Preferably, the reinforcement limiting groove 120 can be a closed groove or an open groove. As a preferred embodiment of this example, the reinforcement limiting groove 120 in this example is an open groove.
[0114] Furthermore, spacers (not shown) are provided between the structural reinforcement and the precast base slab 2. This facilitates the integral embedding of the structural reinforcement in the cast-in-place layer; spacers are not required when using closed grooves.
[0115] As described above, the precast base plate 2 is provided with base plate mounting holes 20. These mounting holes 20 are countersunk holes, through which the tie rod 13 is installed without protruding from the surface of the precast base plate 2. Please refer to... Figure 1 and Figure 4 When the tie-fitting mounting component 13 is a tie rod, the nut portion is located within the countersunk hole and flush with the surface of the precast base plate 2; when the tie-fitting mounting component 13 includes a tie rod and two mounting nuts, the mounting nuts that abut against the precast base plate 2 are located within the countersunk hole (see [reference]). Figure 4 )Inside.
[0116] For further details, please refer to Figure 3 and Figure 5 The precast base slab 2 has a rough surface 21 on the side facing the cast-in-place layer. This facilitates the bonding between the cast-in-place concrete and the precast base slab 2. Traditional composite slabs are created by raking grooves with a rake, while the rough surface 21 in this application is implemented as a grid-shaped protrusion, which can be formed by laying a mesh and pressing it down.
[0117] For further details, please refer to Figure 6 To accommodate the installation of multiple composite slabs with large spans, bevels 22 are provided at the edges of the precast base slab 2. The bevels 22 of adjacent composite slabs are joined to form a joint filling groove 220, which facilitates the subsequent application of putty in the joint filling groove 220 to form a smooth and joined edge and fill the gaps.
[0118] The beneficial effects of this embodiment:
[0119] This application increases the shear and tensile strength of the precast base slab 2 and the cast-in-place layer by setting shear keys on the precast base slab 2; the main body 11 and the support leg 12 can be tied and fixed to the composite slab in opposite directions by the tie-fit installation part 13, which is simple in structure and easy to install.
[0120] The shear key anchor claw structure ensures stable support and allows for full contact and bonding with the concrete in the post-cast concrete; the arched support structure of each leg 12 provides better stress support.
[0121] The countersunk holes are designed to conceal the tie rod 13, ensuring a flat surface on the precast base plate 2 and facilitating subsequent processes such as applying putty.
[0122] A bevel 22 (beveled structure) is provided at the edge of the precast base plate 2. When multiple composite plates are spliced together, the bevels 22 of adjacent composite plates are spliced together to form a joint filling groove 220, which is convenient to cover the gaps of the splicing when applying putty later.
[0123] The precast base slab 2 can be made of high-performance concrete, fiber-reinforced concrete, or prestressed concrete. In actual construction, a strength grade of not less than C30 should be used. Alternatively, high-polymer insulation boards can be used, which provide structural strength while also offering thermal insulation.
[0124] Compared to traditional reinforced concrete slabs, this design uses less steel. Given the current advancements in new materials, the strength of precast slabs and cast-in-place layers has significantly increased. Combined with the shear keys in this application, the strength requirements allow for the elimination of the reinforced concrete truss, thus saving on steel consumption.
[0125] Using fiber-reinforced concrete panels can reduce panel thickness; thinner panels without truss reinforcement allow for unobstructed wiring and save labor.
[0126] Both the precast base plate and the shear structure can be produced in a standardized manner and then assembled.
[0127] No truss reinforcement, saving steel content
[0128] Because the precast base plate has shear keys and a rough surface, and has high strength, it can participate in the structural stress at the same time.
[0129] The installation is convenient on the construction site and can be closely assembled. The precast base plates of this scheme are mostly less than 2 cm thick, and the cast-in-place layer is thick. The joints of the closely assembled grouting grooves will not crack.
[0130] Example 3:
[0131] This embodiment provides a method for prefabricating composite slabs, including:
[0132] S1 precast base plate 2 forming:
[0133] Specifically, mounting holes 20 are provided on the precast base slab 2. The precast base slab 2 can be made of high-performance concrete, fiber-reinforced concrete, or prestressed concrete. In actual construction, a strength of not less than C30 is required. Alternatively, high-polymer insulation boards can be used, which provide structural strength while also offering insulation.
[0134] The mounting hole 20 on the base plate is a countersunk hole, and its size is related to the size of the subsequent tie-in mounting component 13.
[0135] Furthermore, in the precast base slab 2 forming step, before the precast base slab 2 has solidified, a mesh is laid and pressed down on the side of the precast base slab 2 facing the cast-in-place layer to form a rough surface 21. Traditional composite slabs are grooved by rake, while the rough surface 21 of this application is implemented as a mesh-shaped protrusion, which can be formed by laying and pressing down the mesh.
[0136] Furthermore, to accommodate the installation of multiple composite slabs with large spans, bevels 22 are provided at the edges of the precast base slab 2. The bevels 22 of adjacent composite slabs are joined to form a joint filling groove 220, which facilitates the subsequent application of putty in the joint filling groove 220 to form a smooth, joined edge and fill the gaps.
[0137] S2 uses shear key 1 to form a prefabricated section for installing the composite slab:
[0138] Specifically, one end of the shear key tie-mount 13 is installed through a hole in the precast base plate 2, and the other end is tied to the main body 11, so that the support leg 12 is supported on the precast base plate 2.
[0139] The anti-shear key 1 for composite slabs includes a main body 11, a support leg 12, and a tie-fit mounting member 13. Specifically, the support leg 12 is installed on the main body 11, one end of the tie-fit mounting member 13 is installed through a hole in the precast base plate 2, and the other end is tied to the main body 11. The support leg 12 is supported on the precast base plate 2.
[0140] In this embodiment, the main body 11 serves as a structural mounting carrier for the support leg 12 and the tie-down mounting component 13. It can be an independent component or an integrally formed component of the support leg 12, and is not necessarily limited to a specific shape. Preferably, the main body 11 can be block-shaped, column-shaped, etc. In subsequent embodiments of this embodiment, the main body 11 is implemented as a sleeve shape to cooperate with the installation of the tie-down mounting component 13.
[0141] Furthermore, to improve the installation stability of the shear keys and the uniformity of the force applied to the precast base slab 2, in a preferred embodiment of this invention, multiple supports 12 are provided. These supports 12 are installed on the main body 11 to form anchor claws and are supported by the tie-in mounting members 13 to the precast base slab 2. Preferably, the supports 12 are arched supports. On the one hand, the arched structure of the bending moment can increase the contact area with the cast-in-place concrete layer; on the other hand, the arched support can also provide some shear resistance.
[0142] In this embodiment, the tie-fitting mounting member 13 is intended to tie and fix the main body 11 and the support leg 12 in opposite directions to the precast base plate 2. This embodiment provides the following two preferred forms:
[0143] 1. The tie-fit mounting component 13 is a tie rod, and the main body 11 has a main body threaded hole. The precast base plate 2 has a base plate mounting hole 20. The threaded section of the tie rod is installed in the main body threaded hole and is tied and fixed through the base plate mounting hole 20. Please refer to [link to relevant documentation]. Figure 1 , Figure 3 and Figure 4 .
[0144] II. The tie-up mounting component 13 includes a tie rod and two mounting components. The main body 11 has a main body mounting hole, and the precast base plate 2 has a base plate mounting hole 20. The tie rod passes through the main body mounting hole and the base plate mounting hole 20. Mounting components are installed at both ends of the tie rod, and the two mounting components abut against the main body 11 and the precast base plate 2 respectively. Although this embodiment is not illustrated, those skilled in the art should know that, preferably, the mounting components can be mounting nuts. The two ends of the tie rod have threaded sections, and the mounting nuts are installed on the threaded sections and abut against the main body 11 and the precast base plate 2, thereby achieving the tie-up function.
[0145] Furthermore, please combine Figure 7 and Figure 2To facilitate the fixing of the structural reinforcement of the cast-in-place layer, a reinforcement limiting groove 120 is formed at the bottom of the support foot for limiting the installation of the structural reinforcement of the cast-in-place layer in the composite slab. Specifically, there are four supports 12, arranged longitudinally and transversely. Two supports 12 form a group, which are arranged longitudinally on both sides of the main body, and the longitudinal structural reinforcement 32 is limited and installed in the reinforcement limiting groove 120; two supports 12 form a group, which are arranged transversely on both sides of the main body 11, and the transverse structural reinforcement 31 is limited and installed in the reinforcement limiting groove 120. Preferably, the reinforcement limiting groove 120 can be a closed groove or an open groove. As a preferred embodiment of this example, the reinforcement limiting groove 120 in this example is an open groove.
[0146] Furthermore, spacers (not shown) are provided between the structural reinforcement and the precast base slab 2. This facilitates the integral embedding of the structural reinforcement in the cast-in-place layer; spacers are not required when using closed grooves.
[0147] The longitudinal structural bars 32 and the transverse structural bars 31 are combined to form a steel mesh, creating a cross-shaped structure at the joints. The steel bar limiting groove 120, which mates with the shear key, allows for convenient installation. Preferably, the steel mesh is welded and fixed at the joints; alternatively, the main threaded hole or main mounting hole of the shear key (depending on which of the above embodiments is adopted) can be eccentrically positioned to avoid the cross-shaped joint.
[0148] As described above, the precast base plate 2 is provided with base plate mounting holes 20. These mounting holes 20 are countersunk holes, through which the tie rod 13 is installed without protruding from the surface of the precast base plate 2. Please refer to... Figure 1 and Figure 4 When the tie-up mounting component 13 is a tie rod, the nut part is located in the countersunk hole and is flush with the surface of the precast base plate 2; when the tie-up mounting component 13 includes a tie rod and two mounting nuts, the mounting nuts that abut against the precast base plate 2 are located in the countersunk hole.
[0149] S3 Cast-in-place molding:
[0150] Specifically, the cast-in-place layer of concrete on the precast base slab 2 should be poured until it covers the shear keys and structural reinforcement, and a protective layer should be reserved on top (this is common knowledge and will not be elaborated further). The concrete for this cast-in-place layer can be fiber-reinforced concrete or high-performance concrete, and its strength grade should not be lower than C30.
[0151] The beneficial effects of this embodiment:
[0152] In this embodiment, the anti-shear key is installed on the prefabricated base plate 2 by reverse tie-in. Compared with the traditional embedding method, the anti-shear key can be disassembled and assembled at any time, which is convenient for transportation; at the same time, the installation is also convenient.
[0153] The shear key is supported on the precast base plate 2 through the anchor claw structure, so that the shear key itself can also be used as a hoisting point for hoisting, and the structure is stable and not easily damaged.
[0154] Example 4:
[0155] This embodiment provides a sandwich panel, comprising two prefabricated portions of the composite slabs from Embodiment 2; the composite slabs are connected by shear keys 1 and / or structural reinforcements via tie rods 4. Specifically, the shear keys 1, the prefabricated base plate 2, and the structural reinforcements are connected in opposite directions to form a whole. Therefore, the two composite slabs are arranged opposite each other and can be connected by the shear keys 1 between them; or by the structural reinforcements (later implemented as longitudinal structural reinforcements 32 and transverse structural reinforcements 31) between them; or by adaptively selecting the shear keys 1 and structural reinforcements (since tie rods 4 are usually set in multiples). This embodiment uses the form of structural reinforcement tie rods in a detailed description to consider the convenience of structural installation; however, this implementation method is not limited to this one in actual construction.
[0156] Please see Figures 1-6 and combined Figure 7 and Figure 8 The aforementioned composite slab includes at least a precast base slab 2 and multiple shear keys 1 for the composite slab. The multiple shear keys 1 for the composite slab are installed on the precast base slab 2 to form precast sections; a sandwich layer (cast concrete) is formed between two precast sections.
[0157] The anti-shear key 1 for composite slabs includes a main body 11, a support leg 12, and a tie-fit mounting member 13. Specifically, the support leg 12 is installed on the main body 11, one end of the tie-fit mounting member 13 is installed through a hole in the precast base plate 2, and the other end is tied to the main body 11. The support leg 12 is supported on the precast base plate 2.
[0158] In this embodiment, the main body 11 serves as a structural mounting carrier for the support leg 12 and the tie-down mounting component 13. It can be an independent component or an integrally formed component of the support leg 12, and is not necessarily limited to a specific shape. Preferably, the main body 11 can be block-shaped, column-shaped, etc. In subsequent embodiments of this embodiment, the main body 11 is implemented as a sleeve shape to cooperate with the installation of the tie-down mounting component 13.
[0159] Furthermore, to improve the installation stability of the shear keys and the uniformity of the force applied to the precast base slab 2, in a preferred embodiment of this invention, multiple supports 12 are provided. These supports 12 are installed on the main body 11 to form anchor claws and are supported by the tie-in mounting members 13 to the precast base slab 2. Preferably, the supports 12 are arched supports. On the one hand, the arched structure of the bending moment can increase the contact area with the cast-in-place concrete layer; on the other hand, the arched support can also provide some prestress.
[0160] In this embodiment, the tie-fitting mounting member 13 is intended to tie and fix the main body 11 and the support leg 12 in opposite directions to the precast base plate 2. This embodiment provides the following two preferred forms:
[0161] 1. The tie-fit mounting component 13 is a tie rod, and the main body 11 has a main body threaded hole. The precast base plate 2 has a base plate mounting hole 20. The threaded section of the tie rod is installed in the main body threaded hole and is tied and fixed through the base plate mounting hole 20. Please refer to [link to relevant documentation]. Figure 1 , Figure 3 and Figure 4 .
[0162] II. The tie-up mounting component 13 includes a tie rod and two mounting components. The main body 11 has a main body mounting hole, and the precast base plate 2 has a base plate mounting hole 20. The tie rod passes through the main body mounting hole and the base plate mounting hole 20. Mounting components are installed at both ends of the tie rod, and the two mounting components abut against the main body 11 and the precast base plate 2 respectively. Although this embodiment is not illustrated, those skilled in the art should know that, preferably, the mounting components can be mounting nuts. The two ends of the tie rod have threaded sections, and the mounting nuts are installed on the threaded sections and abut against the main body 11 and the precast base plate 2, thereby achieving the tie-up function.
[0163] Furthermore, please combine Figure 2 and Figure 7 To facilitate the fixing of the structural reinforcement of the cast-in-place layer, a reinforcement limiting groove 120 is formed at the bottom of the support foot for limiting the installation of the structural reinforcement of the cast-in-place layer in the composite slab. Specifically, there are four supports 12, arranged longitudinally and transversely. Two supports 12 form a group, which are arranged longitudinally on both sides of the main body, and the longitudinal structural reinforcement 32 is limited and installed in the reinforcement limiting groove 120; two supports 12 form a group, which are arranged transversely on both sides of the main body 11, and the transverse structural reinforcement 31 is limited and installed in the reinforcement limiting groove 120. Preferably, the reinforcement limiting groove 120 can be a closed groove or an open groove. As a preferred embodiment of this example, the reinforcement limiting groove 120 in this example is an open groove.
[0164] Furthermore, spacers (not shown) are provided between the structural reinforcement and the precast base slab 2. This facilitates the integral embedding of the structural reinforcement in the cast-in-place layer; spacers are not required when using closed grooves.
[0165] As described above, the precast base plate 2 is provided with base plate mounting holes 20. These mounting holes 20 are countersunk holes, through which the tie rod 13 is installed without protruding from the surface of the precast base plate 2. Please refer to... Figure 1 and Figure 4When the tie-fitting mounting component 13 is a tie rod, the nut portion is located within the countersunk hole and flush with the surface of the precast base plate 2; when the tie-fitting mounting component 13 includes a tie rod and two mounting nuts, the mounting nuts that abut against the precast base plate 2 are located within the countersunk hole (see [reference]). Figure 4 )Inside.
[0166] For further details, please refer to Figure 5 The precast base slab 2 has a rough surface 21 on the side facing the cast-in-place layer. This facilitates the bonding between the cast-in-place concrete and the precast base slab 2. Traditional composite slabs are created by raking grooves with a rake, while the rough surface 21 in this application is implemented as a grid-shaped protrusion, which can be formed by laying a mesh and pressing it down.
[0167] For further details, please refer to Figure 6 To accommodate the installation of multiple sandwich panels for large spans, bevels 22 are provided at the edges of the precast base slab 2. The bevels 22 of adjacent sandwich panels fit together to form a joint groove 220, facilitating subsequent application of putty to the joint groove 220 to create a smooth, joined edge and fill the gaps. When the sandwich panel is used as a wall, the side of the bottom panel that contacts the foundation structure can omit the bevel 22, as it does not need to be spliced with the adjacent structure.
[0168] The tie member 4 serves as an mounting component for the two prefabricated composite slab sections. Specifically, the tie member 4 includes a tie body and two tie sections located at both ends of the tie body. The two tie sections are preferably connected to the structural ribs of the two composite slabs. Further, the tie sections are implemented as collars and / or hooks.
[0169] Please combine Figure 9 In a preferred embodiment of this invention, a sandwich layer is formed between the prefabricated portions of the two composite slabs, with structural reinforcement and shear keys 1 located within the sandwich layer. The outer perimeter of the sandwich layer is defined as the outer perimeter region, and the middle region of the sandwich layer is defined as the middle region. The collars at both ends of the tie members 41 in the outer perimeter region are respectively fitted onto the structural reinforcement (longitudinal structural reinforcement 32 or transverse structural reinforcement 31) on the two composite slabs. The hooks at both ends of the tie members 42 in the middle region are respectively hooked onto the structural reinforcement (longitudinal structural reinforcement 32 or transverse structural reinforcement 31) on the two prefabricated portions. Furthermore, at least in the two prefabricated portions of the outer perimeter region, a diagonal tie member 5 is provided between the structural reinforcements; the diagonal tie member 5, the tie member 4, and the structural reinforcement form a triangular stable structure.
[0170] In actual implementation, the tie rods 41 in the outer area have collars at both ends for easy and stable installation. In the middle area, the tie rods 42 have hooks at both ends, which can be installed manually by inserting them into the sandwich layer. Multiple tie rods are evenly distributed to prevent bulging of the mold during the casting of the sandwich layer.
[0171] The beneficial effects of this embodiment:
[0172] This application connects two prefabricated composite slabs together with tie rods, forming a panel from two prefabricated base plates and a sandwich layer from the middle, which forms the core layer of the sandwich slab. This allows the entire slab to be prefabricated in the factory or the prefabricated parts to be transported to the site for on-site casting, making the process simple and convenient.
[0173] By setting shear keys on the precast base plate, the shear and tensile strength of the precast base plate and the sandwich layer is increased; the main body and the support legs can be tied and fixed to the precast base plate in the opposite direction by tie-fitting installation parts, which is simple in structure and easy to install.
[0174] The shear key anchor claw structure ensures stable support and allows for full contact and bonding with the concrete in the post-cast concrete; the arched support structure of each leg provides better stress support.
[0175] The countersunk holes facilitate the concealment of the tie rods and installation components, resulting in a flat surface on the precast base plate and making subsequent processes such as plastering easier.
[0176] Compared to traditional steel truss sandwich panels, this design uses less steel. Given the current development in new materials, the strength of precast slabs and cast-in-place layers has significantly increased. Combined with the shear keys in this application, the strength requirements allow for the elimination of steel trusses, thus saving on steel consumption.
[0177] Using fiber-reinforced concrete panels can reduce panel thickness; thinner panels without truss reinforcement allow for unobstructed wiring and save labor.
[0178] Both the precast base plate and the shear structure can be produced in a standardized manner and then assembled.
[0179] No truss reinforcement, saving steel content
[0180] Because the precast base plate has shear keys and a rough surface, and has high strength, it can participate in the structural stress at the same time.
[0181] The installation is convenient on the construction site and can be closely assembled. The precast base plates of this scheme are mostly less than 2 cm thick, and the cast-in-place layer is thick. The joints of the closely assembled grouting grooves will not crack.
[0182] Example 5:
[0183] This embodiment also provides an application of sandwich panels, which can be mainly used as wall panels. The panels are prefabricated throughout the entire process in a factory; or, prefabricated portions of the composite slab are prefabricated in a factory, and then assembled on-site before the sandwich layer is cast. The structure of the prefabricated portions of the composite slab has been described in detail in Embodiment 3, and therefore will not be repeated in this embodiment. The sandwich layer between the two prefabricated portions is then filled with sandwich concrete.
[0184] Furthermore, the present invention has been described in detail above with reference to the accompanying drawings and embodiments. Those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details in the embodiments should not be construed as limiting the present invention, and the scope of protection of the present invention shall be defined by the appended claims.
Claims
1. A shear key for a composite slab, installed on a precast base plate of the composite slab, characterized in that, It includes a main body, legs, and tie-down mounting components; the legs are installed on the main body, one end of the tie-down mounting component is installed through a hole in the precast base plate, and the other end is tied to the main body in the opposite direction, and the legs are supported on the precast base plate; there are multiple legs, and the multiple legs are installed on the main body to form an anchor claw shape, and are tied to and supported on the precast base plate in the opposite direction by the tie-down mounting components.
2. The shear key for composite plates as described in claim 1, characterized in that: The tie-fitting installation component is a tie-fitting screw, and the main body is provided with a main body threaded hole; the prefabricated base plate is provided with a base plate mounting hole, and the threaded section of the tie-fitting screw is installed in the main body threaded hole and tied and fixed through the base plate mounting hole.
3. The shear key for composite plates as described in claim 1, characterized in that: The tie rod includes a tie rod and two mounting parts. The main body is provided with a main body mounting hole, and the precast base plate is provided with a base plate mounting hole. The tie rod passes through the main body mounting hole and the base plate mounting hole. Mounting parts are installed at both ends of the tie rod, and the two mounting parts are respectively pressed against the main body and the precast base plate.
4. The shear key for laminated plates as described in claim 1, characterized in that: The bottom of the support leg has a steel bar limiting groove, which is used to limit the installation of the structural steel bars of the cast-in-place layer in the composite slab.
5. The shear key for composite plates as described in claim 4, characterized in that: The number of legs is four, arranged in a longitudinal and transverse pattern; two legs form a group, which are respectively located on both sides of the main body along the longitudinal direction, and the longitudinal structural bars of the structural reinforcement are limited and installed in the steel bar limiting groove; two legs form a group, which are respectively located on both sides of the main body along the transverse direction, and the transverse structural bars of the structural reinforcement are limited and installed in the steel bar limiting groove.
6. The shear key for laminated plates as described in claim 4 or 5, characterized in that: A spacer block is provided between the structural reinforcement and the precast base plate.
7. A composite plate, characterized in that, It includes at least a precast base slab and a plurality of shear keys for composite slabs as described in claim 5 or 6 above; a cast-in-place layer is formed on the precast base slab, and a plurality of the shear keys for composite slabs are installed on the precast base slab to form a precast portion, wherein the shear keys for composite slabs and the structural reinforcement are located in the cast-in-place layer.
8. The laminated plate as described in claim 7, characterized in that: The precast base plate is provided with base plate mounting holes, which are countersunk holes. The tie-up mounting component is installed through the countersunk holes and does not protrude from the surface of the precast base plate.
9. The laminated plate as described in claim 7, characterized in that: The precast base plate has a bevel at its edge; the bevels of adjacent composite plates are joined together to form a joint filling groove.
10. The method for prefabricating the composite slab according to any one of claims 7 to 9, characterized in that, Includes the following steps: A precast base plate is formed, and mounting holes for the base plate are provided on the precast base plate; Install anti-shear keys for composite slabs, install one end of the anti-shear key's tie-fitting component through a hole into the precast base plate, and tie the other end to the main body, so that the support leg is supported on the precast base plate; Cast-in-place molding involves pouring concrete into the cast-in-place layer on the precast base slab until it covers the shear key.
11. The prefabrication method as described in claim 10, characterized in that: The precast base slab is made of fiber concrete, high-performance concrete, prestressed concrete, or high-polymer insulation board; the cast-in-place layer is made of fiber concrete or high-performance concrete.
12. A sandwich panel, characterized in that, It includes two prefabricated portions of the composite slab as described in any one of claims 7 to 9; the shear keys and / or the structural reinforcements of the two prefabricated portions are connected by tie rods.
13. The sandwich panel as described in claim 12, characterized in that: The tie member includes a tie body and two tie portions. The two tie portions are located at both ends of the tie body, and the two tie portions are respectively tied to the structural ribs of the two composite plates.
14. The sandwich panel as described in claim 13, characterized in that: The pull section is implemented as a loop and / or a hook.
15. The sandwich panel as described in claim 13, characterized in that: A sandwich layer is formed between the prefabricated portions of the two composite slabs, and the structural ribs and shear keys are located within the sandwich layer; the outer perimeter of the sandwich layer is defined as the outer perimeter region, and the middle region of the sandwich layer is defined as the middle region; the collars at both ends of the tie members in the outer perimeter region are respectively fitted onto the structural ribs on the two composite slabs; the hooks at both ends of the tie members in the middle region are respectively hooked onto the structural ribs on the two composite slabs.
16. The sandwich panel as described in claim 15, characterized in that: At least two composite plates in the outer perimeter area are provided with diagonal bracing members between the structural ribs; the diagonal bracing members, the tie members, and the structural ribs form a triangular stable structure.
Citation Information
Patent Citations
Laminated slab capable of being quickly disassembled and assembled and free of leveling layer
CN116005869A
Shear key for laminated plate, laminated plate and sandwich plate
CN222595275U