Ground anchor for power construction
By designing side anchoring components and adjustment mechanisms in ground anchors for electric power construction, the problems of low plug-in and pull-out efficiency and poor anchoring effect of existing ground anchors are solved, achieving higher firmness and construction efficiency, and ensuring that the ground anchors are secure under extreme weather conditions. stability.
Patent Information
- Application Number
- CN202410896686.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-05
AI Technical Summary
Existing power construction ground anchors have low insertion and extraction efficiency and poor anchoring effect, especially under extreme weather conditions. They cannot effectively fix transmission towers and equipment.
A ground anchor for electric power construction is designed, which adopts a combined structure of main pole, top plate, side anchor components and adjustment mechanism. The side anchor components extend around the main pole and are inserted into the soil layer to increase the stress area, and are inserted into the ground through the adjustment mechanism. Keep the main rod stationary during the pulling process to avoid the formation of gaps and improve the anchoring effect.
By increasing the stress area and reducing friction, the firmness and construction efficiency of the ground anchor are improved, ensuring the stability of the transmission line under extreme weather conditions.
Smart Images

Figure CN118422677B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ground anchors, in particular to a ground anchor for electric power construction. Background Art
[0002] Ground anchor is an important structural component, mainly composed of anchor plate and anchor rod. Anchor plate is usually made of steel bar or steel plate, connected to the building to prevent the building from shifting. The anchor rod is the part that connects the anchor plate to the foundation, generally made of reinforced concrete rod or galvanized pipe and other materials. In the construction of power transmission lines, ground anchors are widely used to fix transmission towers, guy wires and other equipment to ensure that the transmission lines will not tilt or collapse under extreme weather conditions such as strong winds, rain and snow. The correct selection and use of ground anchors is of great significance to ensure the normal operation of the power system.
[0003] Existing ground anchors for power construction are usually pre-buried, such as the stone-based embedded ground anchor disclosed in the Chinese patent publication number CN107653883A. The pre-buried ground anchor does not have the function of quick plugging and unplugging and convenient temporary anchoring. For this reason, there are plug-in ground anchors in the related art, such as a ground anchor enlarged head anchor rod disclosed in the Chinese patent document publication number CN113338806A and a tree root-shaped ground anchor enlarged head anchor rod disclosed in the Chinese patent document publication number CN113309094A. Usually, side rods are arranged around the main rod, but the extension of the side rods often requires the main rod to be pulled back. In the process of pulling back the main rod, the anchoring effect cannot be achieved, and after the main rod is pulled back, there is a gap between the lower end of the main rod and the soil layer, and the anchoring effect is poor. Summary of the invention
[0004] According to the deficiencies of the prior art, the present invention proposes a ground anchor for electric power construction, which solves the problems of low insertion and extraction efficiency and poor anchoring effect of the prior art ground anchors.
[0005] The ground anchor for power construction of the present invention adopts the following technical scheme, including:
[0006] A main rod extends in a vertical direction, and two ends of the main rod are a connecting end and a tapered insertion end;
[0007] A top plate is fixedly connected to the connecting end of the main rod and is perpendicular to the main rod, and a connecting ring is fixedly connected to the top plate;
[0008] The side anchor assembly is installed at a position close to the insertion end of the main rod, including a retracted state and an anchored state; a receiving groove for receiving the side anchor assembly is provided on the main rod; when the side anchor assembly is in the retracted state, it is located in the receiving groove; when the side anchor assembly is in the anchored state, it extends from the periphery of the main rod and is inserted into the soil layer;
[0009] The adjusting mechanism is used to switch the state of the anchor block.
[0010] Optionally, a plurality of side anchoring assemblies are provided, and the plurality of side anchoring assemblies are spaced apart along the axial direction of the main rod.
[0011] Optionally, the side anchor assembly includes multiple anchor blocks evenly distributed around the axis of the main rod; the anchor blocks are semi-cylindrical, and the anchor blocks can be installed on the main rod rotatably around the axis; the rotation axes of the multiple anchor blocks in a side anchor assembly are located in the same plane, which is perpendicular to the axis of the main rod; the adjustment mechanism is used to switch the state of the anchor block, and the rotation direction of the anchor block is that the end of the anchor block close to the insertion end is inserted into the soil layer and then approaches the ground surface.
[0012] Optionally, the main rod is in the shape of a quadrangular prism; two groups of side anchoring assemblies are provided, and one side anchoring assembly includes four anchoring blocks; the thickness of the anchoring blocks is less than half of the side length of the main rod, and the four anchoring blocks of each group of side anchoring assemblies are evenly distributed on the four surfaces of the main rod, and the two anchoring blocks on the same surface of the main rod are staggered along the axial and circumferential directions of the main rod, that is, the projections of all the anchoring blocks of the two groups of side anchoring assemblies on the horizontal plane are evenly distributed along the circumference of the main rod.
[0013] Optionally, the adjustment mechanism includes a first worm gear, a second worm gear and a drive assembly, the first worm gear and the second worm gear are coaxially arranged, the length of the first worm gear is greater than that of the second worm gear, and the second worm gear is sleeved on the outside of the first worm gear; a first turbine gear is arranged on the arc surface of the anchor block of the side anchor assembly located at the bottom; a second turbine gear is arranged on the arc surface of the anchor block of the side anchor assembly located at the top; the first turbine gear is meshed with the first worm gear; the second turbine gear is meshed with the second worm gear; the drive assembly is used to drive the first worm gear and the second worm gear to rotate.
[0014] Optionally, a mounting plate is fixedly connected to the top of the top plate; the driving assembly includes a first hand wheel and a second hand wheel; the first hand wheel and the second hand wheel can be rotatably mounted on the mounting plate around their own axes; the lower end of the first hand wheel is fixedly connected to the first gear; the lower end of the second hand wheel is fixedly connected to the second gear; the upper end of the first worm is fixedly connected to the first gear ring; the upper end of the second worm is fixedly connected to the second gear ring; the first gear is meshed with the first gear ring; the second gear is meshed with the second gear ring.
[0015] Optionally, among the four anchor blocks in a side anchor assembly, one side of two anchor blocks facing away from the axis of the main pole is an arc-shaped concave gathering surface, and the other two anchor blocks have one side facing away from the axis of the main pole including a straight surface and a pushing inclined surface. The anchor block with the concave gathering surface is the first anchor block, and the anchor block with the pushing inclined surface is the second anchor block; the connecting ring is located on one side of the left and right direction of the axis of the main pole, and the two first anchor blocks and the two second anchor blocks in each side anchor assembly are alternately distributed along the circumference of the main pole and are respectively installed on the four side surfaces of the main pole; the two anchor blocks on the same side surface have the same structure; the first anchor block is arranged on the left and right sides of the main pole; the pushing inclined surface is inclined from one side to the other side in the left and right direction, and the two second anchor blocks are symmetrically distributed about the axis of the main pole.
[0016] Optionally, a first shielding assembly and a second shielding assembly are also provided in the main rod, and both the first shielding assembly and the second shielding assembly can move along the axis of the main rod; the first shielding assembly includes four first baffles; the second shielding assembly includes four second baffles; the first shielding assembly is used to block the accommodating groove located below, and the second shielding assembly is used to block the accommodating groove located above; the first shielding assembly and the second shielding assembly are both connected with a height adjustment assembly for adjusting their heights.
[0017] Optionally, the height adjusting assembly includes a limiting structure, at least two first height adjusting rods and at least two second height adjusting rods; the upper ends of the four first baffles are fixedly connected to the first support ring; the first height adjusting rod is connected to the first support ring; the upper ends of the four second baffles are fixedly connected to the second support ring; the second height adjusting rod is connected to the second support ring; the first height adjusting rod and the first height adjusting rod are alternately distributed around the axis of the main rod; the first height adjusting rod passes through the second support ring; the limiting structure includes a plurality of limiting columns and a plurality of clamping blocks, the number of the limiting columns is equal to the number of the clamping blocks, and the number of the two is equal to the sum of the number of the first height adjusting rod and the second height adjusting rod; a limiting slot is provided on the limiting column; the upper ends of the first height adjusting rod and the second height adjusting rod are fixedly connected to the clamping blocks, and the clamping blocks can be clamped in the limiting slot.
[0018] Optionally, each limit column is provided with three limit slots, which are spaced apart in the upper and lower directions; when the card block at the upper end of the first height adjusting rod is connected to the three limit slots from top to bottom, the blocking relationship between the first shielding component and the corresponding accommodating slot is respectively unblocked, semi-blocked and fully blocked; when the card block at the upper end of the second height adjusting rod is connected to the three limit slots from top to bottom, the blocking relationship between the second shielding component and the corresponding accommodating slot is respectively unblocked, semi-blocked and fully blocked.
[0019] The beneficial effects of the present invention are as follows: the ground anchor for power construction of the present invention increases the volume of the lower part of the main pole by setting up the side anchor assembly, thereby increasing the force-bearing area, further strengthening the fixation, and improving the firmness of the ground anchor. At the same time, the state of the side anchor assembly is adjusted by the adjustment mechanism. In the present invention, when the side anchor assembly is adjusted from the retracted state to the anchored state, the main pole remains stationary and does not need to move upward, so in the process of adjusting the side anchor assembly, the ground anchor can still play an anchoring role. Since the main pole does not need to move upward, there is no gap between the lower end of the main pole and the soil layer, which has a better anchoring effect compared with the prior art.
[0020] Furthermore, multiple groups of side anchoring assemblies are arranged at intervals along the axis direction of the main rod, further increasing the contact area between the ground anchor and the soil layer, thereby increasing the force-bearing area and further enhancing the anchoring effect. A side anchoring assembly includes a first anchoring block provided with a gathering concave surface and a second anchoring block provided with a pushing inclined surface, so that when the side anchoring assembly changes from a retracted state to an anchoring state, the soil is pushed upward and gathered in the left and right directions, thereby increasing the resistance of the soil layer to the first anchoring block, thereby offsetting the left and right components of the tension, and further enhancing the anchoring effect.
[0021] Furthermore, by providing a first baffle and a second baffle for blocking the receiving groove, and by adjusting the shielding state of the first baffle and the second baffle and the corresponding receiving groove, the friction between the soil layer and the ground anchor during insertion and extraction can be reduced, thereby improving the efficiency of the insertion and extraction of the ground anchor, and further improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0024] Figure 2 It is a front view of the present invention;
[0025] Figure 3 is a cross-sectional view of the present invention;
[0026] Figure 4 for Figure 3 Enlarged view of point A in the middle;
[0027] Figure 5 for Figure 3 Enlarged view of point B in the middle;
[0028] Figure 6 It is an explosion schematic diagram of the present invention;
[0029] Figure 7 It is a structural schematic diagram of the main rod and the top plate in the present invention;
[0030] Figure 8 It is a structural schematic diagram of the first anchoring block in the present invention;
[0031] Fig. 9 is a schematic structural diagram of the second anchor block in the present invention;
[0032] Fig.10 A schematic diagram of the first baffle and the second baffle in the present invention when the corresponding receiving grooves are in a semi-blocking state respectively;
[0033] Fig.11 It is a schematic diagram of the first baffle and the second baffle in the present invention when the corresponding receiving grooves are in an unblocked state.
[0034] In the figure: 110, main rod; 111, insertion end; 112, connection end; 113, receiving groove; 120, top plate; 121, connection ring; 122, indicator ball; 130, mounting plate; 210, first anchor block; 211, first turbine tooth; 212, guide bar; 213, gathering concave surface; 220, second anchor block; 221, second turbine tooth; 222, straight surface; 223, pushing inclined surface; 310, first worm ; 320, second worm gear; 331, first hand wheel; 332, first gear; 333, first ring gear; 334, second hand wheel; 335, second gear; 336, second ring gear; 411, first baffle; 421, second baffle; 510, first height adjustment rod; 511, first support ring; 520, second height adjustment rod; 521, second support ring; 531, limit column; 532, limit groove; 540, block. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0036] like Figures 1 to 11 As shown, the ground anchor for power construction provided by the embodiment of the present invention includes a main rod 110, a top plate 120, a side anchoring assembly and an adjustment mechanism;
[0037] The main rod 110 extends in a vertical direction, and two ends of the main rod 110 are a connecting end 112 and a tapered insertion end 111;
[0038] The top plate 120 is fixedly connected to the connecting end 112 and is perpendicular to the main pole 110. A connecting ring 121 and an indicator ball 122 are fixedly connected to the top plate 120. The connecting ring 121 and the indicator ball 122 are located on the same side of the axis of the main pole 110 along the left-right direction; the connecting ring 121 is connected to the building through a connecting rope, and the indicator ball 122 is used to indicate the direction when the anchor is inserted into the soil layer. The side anchor assembly is installed at the lower part of the main pole 110, including a retracted state and an anchored state; a receiving groove 113 for accommodating the side anchor assembly is provided on the main pole 110; when the side anchor assembly is in the retracted state, it is located in the receiving groove 113; when the side anchor assembly is in the anchored state, it extends from the four sides of the main pole 110 and is inserted into the soil layer;
[0039] The adjusting mechanism is used to switch the state of the anchor block.
[0040] In the present invention, reference is made to Figure 2 The upper end of the main rod 110 is the connecting end 112 , and the lower end of the main rod 110 is the inserting end 111 .
[0041] When in use, the two ends of the connecting rope are connected to the building and the connecting ring 121 respectively, and then the insertion end 111 of the main rod 110 is vertically inserted into the soil layer. In the initial state, the side anchor assembly is in a retracted state. When the main rod 110 is inserted into the soil layer, the connecting ring 121 and the indicator ball 122 need to be directed toward the object to be fixed, so that the axis of the main rod 110, the connecting ring 121, the indicator ball 122 and the projection of the connecting rope on the horizontal plane are collinear. After the ground anchor is inserted into the soil layer to a preset length, the adjustment mechanism is started to adjust the side anchor assembly to the anchoring state. When the ground anchor is subjected to an upward pulling force, the ground anchor tends to move upward, but at this time, since the side anchor assembly extends from the surrounding of the main rod 110 to the soil layer, the force-bearing area increases, and when the side anchor assembly moves upward synchronously with the main rod 110, it is subject to the resistance of the upper soil layer and cannot move upward. This further strengthens the fixation and improves the firmness of the ground anchor.
[0042] Compared with the ground anchor in the prior art, the side anchor assembly is provided to increase the volume of the lower part of the main rod 110, thereby increasing the force-bearing area, further strengthening the fixation, and improving the firmness of the ground anchor. At the same time, the state of the side anchor assembly is switched by the adjustment mechanism. In the present invention, when the side anchor assembly is adjusted from the retracted state to the anchored state, the main rod 110 remains stationary and does not need to move upward, so the ground anchor can still play an anchoring role during the adjustment of the side anchor assembly. Since the main rod 110 does not need to move upward, there is no gap between the lower end of the main rod 110 and the soil layer, which has a better anchoring effect.
[0043] In a further embodiment, Figure 3 , Figure 5 , Figure 6 , Fig.10As shown, there are multiple groups of side anchoring assemblies, and the multiple groups of side anchoring assemblies are arranged at intervals along the axial direction of the main rod 110.
[0044] After the ground anchor is inserted into the soil layer to a preset length, the state of multiple sets of side anchor assemblies is switched through the adjustment mechanism, so that the multiple sets of side anchor assemblies are all turned into the anchoring state, further increasing the contact area between the ground anchor and the soil layer, thereby increasing the force-bearing area and further enhancing the anchoring effect.
[0045] In a further embodiment, Figure 3 , Figure 5 , Figure 6 , Figure 8 , Fig. 9 As shown, the main rod 110 extends in the vertical direction, and the insertion end 111 is located below the connection end 112; the side anchor assembly includes a plurality of anchor blocks evenly distributed around the axis of the main rod 110; the anchor blocks are all semi-cylindrical, and an arc-shaped guide bar 212 is fixedly connected to the anchor block, and an arc-shaped guide groove is provided in the corresponding receiving groove 113; the axis of the guide bar 212 is colinear with the axis of the anchor block, and the guide bar 212 is installed in the guide groove, so that the anchor block can be rotatably installed on the main rod around the axis. 110; the rotation axes of multiple anchor blocks in a side anchor assembly are located in the same plane, which is perpendicular to the axis of the main rod 110; the adjustment mechanism is used to switch the state of the anchor block from the retracted state to the anchored state; in the retracted state, the arc surface of the anchor block faces the axis of the main rod 110; in the anchored state, the arc surface of the anchor block faces the insertion end 111; the rotation direction of the anchor block is that the end of the anchor block close to the insertion end 111 is inserted into the soil layer and then approaches the ground surface.
[0046] After the ground anchor is inserted into the soil layer to a preset length, the anchor block is driven to rotate around the rotation axis through the adjustment mechanism and switched to the anchoring state. During the switching process of the side anchor assembly, the soil around the main rod 110 is pushed upwards of the side anchor assembly, making the soil layer above the anchor block more compact, further enhancing the anchoring effect.
[0047] In a further embodiment, Figure 2 , Figure 6 , Figure 7 , Fig.10 , Fig.11As shown, the main rod 110 is in the shape of a quadrangular prism; there are two groups of side anchoring assemblies, and one side anchoring assembly includes four anchoring blocks; the thickness of the anchoring blocks is less than half of the side length of the main rod 110, and the four anchoring blocks of each group of side anchoring assemblies are evenly distributed on the four faces of the main rod 110, and the two anchoring blocks located on the same face of the main rod 110 are staggered along the axial and circumferential directions of the main rod 110, that is, the projections of all the anchoring blocks of the two groups of side anchoring assemblies on the horizontal plane are evenly distributed along the circumference of the main rod 110; thereby, while increasing the force-bearing area, due to the staggered arrangement of the upper and lower anchoring blocks, the soil above the anchoring blocks will only become more compact, thereby ensuring the anchoring effect.
[0048] In a further embodiment, Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 8 , Fig. 9 As shown, the adjustment mechanism includes a first worm 310, a second worm 320 and a driving assembly, the first worm 310 and the second worm 320 are coaxially arranged, the length of the first worm 310 is greater than that of the second worm 320, and the second worm 320 is sleeved on the outside of the first worm 310; the arc surface of the anchor block of the side anchor assembly located at the bottom is provided with a first turbine tooth 211; the arc surface of the anchor block of the side anchor assembly located at the top is provided with a second turbine tooth 221; the first turbine tooth 211 is meshed with the first worm 310; the second turbine tooth 221 is meshed with the second worm 320; the driving assembly is used to drive the first worm 310 and the second worm 320 to rotate.
[0049] Start the driving assembly, which drives the first worm 310 and the second worm 320 to rotate. The rotation of the first worm 310 drives the first turbine tooth 211 to rotate, thereby rotating the four anchor blocks located below from the retracted state to the anchored state; the rotation of the second worm 320 drives the second turbine tooth 221 to rotate, thereby rotating the four anchor blocks located above from the retracted state to the anchored state.
[0050] In a further embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 6 , Figure 7As shown, a mounting plate 130 is fixedly connected to the top of the top plate 120; the driving assembly includes a first hand wheel 331 and a second hand wheel 334; the first hand wheel 331 and the second hand wheel 334 can be rotatably mounted on the mounting plate 130 around their own axes; the lower end of the first hand wheel 331 is fixedly connected to the first gear 332; the lower end of the second hand wheel 334 is fixedly connected to the second gear 335; the upper end of the first worm 310 is fixedly connected to the first ring gear 333; the upper end of the second worm 320 is fixedly connected to the second ring gear 336; the first gear 332 is meshed with the first ring gear 333; the second gear 335 is meshed with the second ring gear 336.
[0051] When the first hand wheel 331 is rotated, the first gear 332 rotates synchronously with the first hand wheel 331, and the first gear 332 drives the first gear ring 333 to rotate, thereby rotating the first worm 310. When the first worm 310 rotates, the first turbine gear 211 is driven to rotate, thereby rotating the four anchor blocks located below, changing from the retracted state to the anchored state;
[0052] When the second hand wheel 334 is rotated, the second gear 335 rotates synchronously with the second hand wheel 334, and the second gear 335 drives the second gear ring 336 to rotate, thereby rotating the second worm 320. When the second worm 320 rotates, it drives the second turbine tooth 221 to rotate, thereby rotating the four anchor blocks located above, changing from the retracted state to the anchored state.
[0053] In a further embodiment, Figure 6 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 As shown, among the four anchor blocks in a side anchor assembly, one side of two anchor blocks facing away from the axis of the main rod 110 is an arc-shaped gathering concave surface 213, and the other two anchor blocks have one side facing away from the axis of the main rod 110 including a straight surface 222 and a pushing inclined surface 223. The anchor block with the gathering concave surface 213 is the first anchor block 210, and the anchor block with the pushing inclined surface 223 is the second anchor block 220; the two first anchor blocks 210 and the two second anchor blocks 220 in each side anchor assembly are alternately distributed along the circumference of the main rod 110 and are respectively installed on the four side surfaces of the main rod 110; the two anchor blocks on the same side surface have the same structure, and of the two adjacent side surfaces of the main rod 110, the two on one side surface are both the first anchor blocks 210, and the two on the other side surface are both the second anchor blocks 220. The first anchoring blocks 210 are arranged on the left and right sides of the main rod 110 ; the pushing slope 223 is inclined from one side to the other side in the left-right direction, and the two second anchoring blocks 220 are axially symmetrically distributed about the axis of the main rod 110 .
[0054] During anchoring, the connecting ring 121 is located on the right side of the axis of the main rod 110, and the tension on the ground anchor can be decomposed into a vertical upward component and a rightward component; when the first anchor block 210 is adjusted from the retracted state to the anchored state, the arc-shaped gathering concave surface 213 pushes the soil below upward and gathers it toward the middle of the gathering concave surface 213, thereby making the soil above the first anchor block 210 more compact; when the second anchor block 220 is adjusted from the retracted state to the anchored state, the straight surface 222 and the pushing inclined surface 223 push the soil from bottom to top, while the pushing inclined surface 223 moves the pushed soil to the left and right directions. The cooperation between the pushing inclined surface 223 and the gathering concave surface 213 makes the soil above the first anchor block 210 in the left and right directions more compact, thereby further increasing the resistance of the soil layer to the first anchor block 210, thereby offsetting the rightward component of the tension, and further enhancing the anchoring effect.
[0055] In a further embodiment, Figure 1 , Figure 6 , Fig.10 , Fig.11 As shown, a first shielding assembly and a second shielding assembly are also provided in the main rod 110, and both the first shielding assembly and the second shielding assembly can move along the axis of the main rod 110; the first shielding assembly includes four first baffles 411; the second shielding assembly includes four second baffles 421; the first shielding assembly is used to block the accommodating groove 113 located below, and the second shielding assembly is used to block the accommodating groove 113 located above; the first shielding assembly and the second shielding assembly are both connected with a height adjustment assembly for adjusting their heights.
[0056] In the initial state, the first shielding assembly and the second shielding assembly respectively block the receiving grooves 113 located below and above, thereby reducing the contact area between the ground anchor and the soil layer when the main rod 110 is inserted into the soil layer, making it more convenient to insert into the soil layer. When the main rod 110 is inserted into the soil layer for a sufficient length and the side anchor assembly needs to be turned into an anchoring state, the first shielding assembly and the second shielding assembly are first driven upward by the height adjustment assembly to open the receiving groove 113, and then the state of the side anchor assembly is switched.
[0057] In a further embodiment, Figure 1 , Figure 2 , Figure 4 , Figure 6As shown, the height adjustment assembly includes a limiting structure, at least two first height adjustment rods 510 and at least two second height adjustment rods 520; the upper ends of the four first baffles 411 are fixedly connected to the first support ring 511; the first support ring 511 is connected to at least two first height adjustment rods 510; the upper ends of the four second baffles 421 are fixedly connected to the second support ring 521; the second support ring 521 is connected to at least two second height adjustment rods 520; the first height adjustment rod 510 and the first height adjustment rod 510 are connected around the main rod 110 The axes are distributed alternately; the first height adjustment rod 510 passes through the second support ring 521; the limiting structure includes a plurality of limiting columns 531 and a plurality of blocking blocks 540, the number of the limiting columns 531 is equal to the number of blocking blocks 540, and the number of the limiting columns 531 is equal to the number of blocking blocks 540, and the number of the two is equal to the sum of the number of the first height adjustment rod 510 and the second height adjustment rod 520; a limiting groove 532 is provided on the limiting column 531; the upper ends of the first height adjustment rod 510 and the second height adjustment rod 520 are fixedly connected with the blocking blocks 540, and the blocking blocks 540 can be clamped in the limiting groove 532.
[0058] By adjusting the height of the first height-adjusting rod 510 and the second height-adjusting rod 520, the shielding state of the first baffle plate 411 and the second baffle plate 421 on the receiving groove 113 is changed; when starting to work, the height of the first height-adjusting rod 510 and the second height-adjusting rod 520 are adjusted so that the first baffle plate 411 blocks the receiving groove 113 below and the second baffle plate 421 blocks the receiving groove 113 above; so that the anchor is in a position as shown in FIG. Figure 2 The state shown; then the ground anchor is hammered into the soil layer at the position where it is required to be anchored. After the required length is hammered in, the first baffle 411 and the second baffle 421 are moved up through the height of the first height adjustment rod 510 and the second height adjustment rod 520, so that the relationship between the first baffle 411 and the corresponding receiving groove 113 and the relationship between the second baffle 421 and the corresponding receiving groove 113 are adjusted to an unobstructed state. Subsequently, the first anchor block 210 and the second anchor block 220 are driven to rotate around their own rotation axes through the adjustment mechanism and converted into an anchoring state. During the process of the first anchor block 210 and the second anchor block 220 rotating around their own rotation axes, they gradually extend from the side of the main rod 110 and extend toward the soil layer, thereby squeezing the soil layer to make the soil layer around the main rod 110 tighter, thereby playing an anchoring role. Moreover, since the first anchor block 210 and the second anchor block 220 squeeze the soil layer upward, when the main rod 110 is subjected to tension, the first anchor block 210 and the second anchor block 220 are subjected to greater resistance, thereby making the ground anchor better able to resist vertical pulling force.
[0059] When the ground anchor is pulled out of the soil layer, the height of the first height-adjusting rod 510 and the second height-adjusting rod 520 are adjusted so that the shielding relationship between the first baffle plate 411 and the corresponding receiving groove 113 and the second baffle plate 421 and the corresponding receiving groove 113 are changed to an unshielded state. Then the first anchor block 210 and the second anchor block 220 are driven to rotate in the opposite direction, and the ends of the first anchor block 210 and the second anchor block 220 close to the connection end 112 extend out of the main rod 110, insert into the soil layer and move downward, thereby pushing the soil layer around the main rod 110 downward, thereby reducing the friction force of pulling out the ground anchor. Then the first anchor block 210 and the second anchor block 220 are restored to their initial state. Move the first height adjustment rod 510 and the second height adjustment rod 520 downward to change the shielding relationship between the first baffle plate 411 and the corresponding receiving groove 113 and the shielding relationship between the second baffle plate 421 and the corresponding receiving groove 113 into a fully shielding state, pull the ground anchor upward, and after the main rod 110 moves upward by the length of a receiving groove 113, repeat the above steps, and by pushing the soil layer around the main rod 110, reduce the resistance of the main rod 110 when pulling out of the soil layer, improve the efficiency of pulling the ground anchor out of the soil layer, and thus improve the construction efficiency.
[0060] In a further embodiment, Figure 1 , Figure 3 , Figure 6 As shown, each limiting column 531 is provided with three limiting grooves 532, and the three limiting grooves 532 are distributed at intervals along the upper and lower sides; when the block 540 at the upper end of the first height adjustment rod 510 is engaged with the three limiting grooves 532 from top to bottom, the blocking relationship between the first shielding component and the corresponding receiving groove 113 is respectively unblocked, semi-blocked and fully blocked; when the block 540 at the upper end of the second height adjustment rod 520 is engaged with the three limiting grooves 532 from top to bottom, the blocking relationship between the second shielding component and the corresponding receiving groove 113 is respectively unblocked, semi-blocked and fully blocked.
[0061] When the ground anchor is inserted into the soil layer, after the main rod 110 moves downward by the length of the receiving groove 113, the height of the first height adjustment rod 510 and the second height adjustment rod 520 are adjusted so that the block 540 at the upper end thereof is clamped in the middle limiting groove 532 on the limiting column 531, so that the shielding relationship between the first baffle 411 and the corresponding receiving groove 113 and the second baffle 421 and the corresponding receiving groove 113 is changed to a semi-shielding state. Then the first anchor block 210 and the second anchor block 220 are driven to rotate slightly, and the soil layer around the main rod 110 is pushed to the surrounding by a small distance, so that there is a small gap between the main rod 110 and the surrounding soil layer, thereby reducing the friction force when the soil layer is inserted next time. By setting the limiting groove 532 in the middle, when the block 540 is clamped in the limiting groove 532 in the middle, the first anchor block 210 and the second anchor block 220 can rotate slightly around their own rotation axis, and ensure that the pushed soil will not enter the inside of the main rod 110. Then, the first anchor block 210 and the second anchor block 220 are restored to their initial states. The first height adjustment rod 510 and the second height adjustment rod 520 are moved downward so that the block 540 at the upper end thereof is engaged in the lower limit groove 532 on the limit column 531, thereby changing the shielding relationship between the first baffle plate 411 and the corresponding receiving groove 113 and the second baffle plate 421 and the corresponding receiving groove 113 into a fully shielding state, further reducing the friction force when inserting into the soil layer next time. Thereafter, the above steps are repeated, and the soil layer around the main rod 110 is pushed slightly, thereby reducing the resistance when the main rod 110 is inserted into the soil layer, improving the efficiency of the ground anchor inserted into the soil layer, and thus improving the construction efficiency. After the ground anchor is inserted to a sufficient length, the first anchor block 210 and the second anchor block 220 are driven to rotate forward, so that the side anchor assembly becomes an anchored state, thereby squeezing the surrounding soil layer upward to enhance the anchoring effect.
[0062] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Ground anchor for power construction, characterized in that: include: A main rod extends in a vertical direction, and two ends of the main rod are a connecting end and a tapered insertion end; The top plate is fixedly connected to the connecting end of the main rod and is perpendicular to the main rod. A connecting ring is fixedly connected to the top plate. A mounting plate is fixedly connected above the top plate. The side anchor assembly is installed at a position close to the insertion end of the main rod, including a retracted state and an anchored state; the main rod is provided with a receiving groove for receiving the side anchor assembly; When the side anchor assembly is in the retracted state, it is located in the receiving groove; When the side anchor assembly is in the anchoring state, it extends from the periphery of the main rod and is inserted into the soil layer; There are two groups of side anchoring assemblies, and the two groups of side anchoring assemblies are arranged at intervals along the axis direction of the main rod; each side anchoring assembly includes four anchoring blocks evenly distributed around the axis of the main rod; the anchoring blocks are all semi-cylindrical, and the thickness of the anchoring blocks is less than half of the side length of the main rod. The four anchoring blocks of each group of side anchoring assemblies are evenly distributed on the four faces of the main rod, and the anchoring blocks can be rotatably installed on the main rod around the axis; The rotation axes of the four anchor blocks in one side anchor assembly are located in the same plane, which is perpendicular to the axis of the main rod; the two anchor blocks located on the same plane of the main rod are staggered along the axial and circumferential directions of the main rod, that is, the projections of all the anchor blocks of the two sets of side anchor assemblies on the horizontal plane are evenly distributed along the circumference of the main rod; An adjusting mechanism, the adjusting mechanism is used to switch the state of the anchor block, and the rotation direction of the anchor block is that the end of the anchor block close to the insertion end is inserted into the soil layer and then approaches the ground surface; the adjusting mechanism includes a first worm, a second worm and a driving assembly, the first worm and the second worm are coaxially arranged, the length of the first worm is greater than that of the second worm, and the second worm is sleeved on the outside of the first worm; a first turbine tooth is provided on the arc surface of the anchor block of the side anchor assembly located at the bottom; a second turbine tooth is provided on the arc surface of the anchor block of the side anchor assembly located at the top; the first turbine tooth is meshed with the first worm; the second turbine tooth is meshed with the second worm; the driving assembly is used to drive the first worm and the second worm to rotate; The driving assembly includes a first hand wheel and a second hand wheel; the first hand wheel and the second hand wheel can be installed on the mounting plate so as to rotate around their own axes; the lower end of the first hand wheel is fixedly connected to the first gear; the lower end of the second hand wheel is fixedly connected to the second gear; the upper end of the first worm is fixedly connected to the first gear ring; the upper end of the second worm is fixedly connected to the second gear ring; the first gear is meshed with the first gear ring; the second gear is meshed with the second gear ring.
2. The ground anchor for power construction according to claim 1, characterized in that: Among the four anchor blocks in a side anchor assembly, one side of two anchor blocks away from the axis of the main rod is an arc-shaped concave surface, and the other two anchor blocks away from the axis of the main rod include a straight surface and a pushing inclined surface. The anchor block with the concave surface is the first anchor block, and the anchor block with the pushing inclined surface is the second anchor block; the connecting ring is located on one side of the left and right direction of the axis of the main rod, and the two first anchor blocks and the two second anchor blocks in each side anchor assembly are alternately distributed along the circumference of the main rod and are respectively installed on the four side surfaces of the main rod; the two anchor blocks on the same side have the same structure; the first anchor block is arranged on the left and right sides of the main rod; the pushing inclined surface is inclined from one side to the other side in the left and right direction, and the two second anchor blocks are symmetrically distributed about the axis of the main rod.
3. The ground anchor for power construction according to claim 2, characterized in that: A first shielding assembly and a second shielding assembly are also provided in the main rod, and both the first shielding assembly and the second shielding assembly can move along the axis of the main rod; the first shielding assembly includes four first baffles; the second shielding assembly includes four second baffles; the first shielding assembly is used to block the accommodating groove located below, and the second shielding assembly is used to block the accommodating groove located above; the first shielding assembly and the second shielding assembly are both connected with a height adjustment assembly for adjusting their heights.
4. The ground anchor for power construction according to claim 3, characterized in that: The height adjusting assembly includes a limiting structure, at least two first height adjusting rods and at least two second height adjusting rods; the upper ends of the four first baffles are fixedly connected with a first support ring; the first height adjusting rod is connected to the first support ring; the upper ends of the four second baffles are fixedly connected with a second support ring; the second height adjusting rod is connected to the second support ring; the first height adjusting rod and the first height adjusting rod are alternately distributed around the axis of the main rod; the first height adjusting rod passes through the second support ring; the limiting structure includes a plurality of limiting columns and a plurality of clamping blocks, the number of the limiting columns is equal to the number of the clamping blocks, and the number of the two is equal to the sum of the number of the first height adjusting rod and the second height adjusting rod; a limiting slot is provided on the limiting column; the upper ends of the first height adjusting rod and the second height adjusting rod are fixedly connected with a clamping block, and the clamping block can be clamped in the limiting slot.
5. The ground anchor for power construction according to claim 4, characterized in that: Each limit column is provided with three limit slots, which are spaced apart from each other in the upper and lower directions; when the block at the upper end of the first height adjusting rod is connected to the three limit slots from top to bottom, the blocking relationship between the first shielding component and the corresponding accommodating slot is respectively unblocked, semi-blocked and fully blocked; when the block at the upper end of the second height adjusting rod is connected to the three limit slots from top to bottom, the blocking relationship between the second shielding component and the corresponding accommodating slot is respectively unblocked, semi-blocked and fully blocked.
Citation Information
Patent Citations
Stone base embedded type ground anchor
CN107653883A
Tree-root-shaped ground anchor expanded-head anchor rod
CN113309094A
Anchor rod with ground anchor expanded head
CN113338806A
Electric ground anchor equipment
CN115045275A
Ground anchor pile device for electric power construction
CN209652924U