FLNG intermediate cold box operation adjustment method, device, computer equipment, and storage medium
By constructing a first-order pure lag model and automatically adjusting the refrigerant flow rate, the problem of strong coupling and lag in the FLNG cold box is solved, and the safe and stable operation of the cold box and its adaptability to load changes are achieved.
Patent Information
- Application Number
- CN202410897153.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-05
AI Technical Summary
There is a strong coupling and lagging heat exchange phenomenon in the FLNG cold box, which causes the cold box to need to frequently manually adjust the refrigerant flow when the ambient temperature and natural gas load change. The operation is intensive and prone to misoperation, which affects the safe and stable production of the device.
By identifying the operating variables, interference variables and controlled variables of the cold box, a first-order pure lag model is constructed. Based on the model, the refrigerant flow is adjusted to stabilize the cold box outlet temperature, and the refrigerant flow is automatically adjusted under variable load conditions to ensure cooling. The box operates within the preset interval.
It achieves safe and stable operation of the cold box, reduces the operator's adjustment frequency, avoids misoperation, improves the adaptability of the cold box to load changes, and ensures the stability of the cold box outlet temperature.
Smart Images

Figure CN118426319B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of industrial automation technology, and in particular to a method, device, computer equipment, storage medium and computer program product for regulating the operation of a cold box in an FLNG. Background Art
[0002] The cold box is the core equipment in the FLNG (Floating Liquefied Natural Gas) device. The safe and stable operation of the cold box unit is the top priority of the entire device.
[0003] In practical applications, the cooling medium used in the cold box is a mixed refrigerant with multiple streams and components. After the multiple streams (generally four streams) of refrigerants have completed heat exchange with natural gas respectively, they are gathered together and enter the mixed refrigerant compressor, resulting in mutual coupling between the four refrigerants. After each refrigerant is adjusted, there is a lag in the heat exchange between the hot medium natural gas and the cold medium refrigerant, and the temperature takes a long time to stabilize. Therefore, the heat exchange process in the cold box has strong coupling and large lag.
[0004] The conventional PID (Proportional-Integral-Derivative Controller) control cannot solve the above-mentioned problems of strong coupling and large lag. Specifically, when the disturbance variables such as ambient temperature and natural gas composition change, especially when the natural gas load changes, the operator needs to frequently manually adjust the flow of the four refrigerants. The operation intensity is high and it is easy to cause problems such as refrigerant compressor shutdown due to misoperation, which poses a threat to the safe and stable production of the device. Summary of the invention
[0005] Based on this, it is necessary to provide a method, device, computer equipment, storage medium and computer program product that can ensure safe and stable operation and regulation of the FLNG intermediate cold box in response to the above technical problems.
[0006] In a first aspect, the present application provides a method for regulating the operation of a cold box in an FLNG. The method comprises:
[0007] Identify the operating variables, disturbance variables, and controlled variables of cold box operation in FLNG;
[0008] Acquire controlled variable response data generated corresponding to a step test of the manipulated variable and the disturbance variable;
[0009] Based on the response data of the controlled variable, construct a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable;
[0010] If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval;
[0011] When the FLNG intermediate cold box enters a variable load condition, identifying a variable load range corresponding to the variable load condition;
[0012] If the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the flow rate through the JT valve is used to adjust the cold box outlet temperature; if the variable load range is within the preset second load range, the flow rate of the refrigerant is adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0013] In one embodiment, if the variable load range is within the preset second load range, adjusting the flow rate of the refrigerant based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature includes:
[0014] If the variable load range is within the preset second load range, the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation between the current value and the set value of the cold box outlet temperature are obtained;
[0015] The refrigerant flow rate is adjusted according to the pressure difference before and after the JT valve in the current adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature.
[0016] In one embodiment, adjusting the refrigerant flow rate according to the pressure difference before and after the JT valve in the current adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature includes:
[0017] Obtaining a preset fixed value of refrigerant flow and a change value of natural gas load between the current adjustment cycle and the previous adjustment cycle;
[0018] Calculate the pressure difference change value between the pressure difference before and after the JT valve in the current adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle;
[0019] Calculate the product of the preset refrigerant flow fixed value, the natural gas load change value, the temperature deviation and the pressure difference change value to obtain the refrigerant flow adjustment amount;
[0020] The refrigerant flow rate is adjusted according to the refrigerant flow rate adjustment amount to adjust the cold box outlet temperature.
[0021] In one embodiment, the operating variables include the flow rate of the JT valve in the FLNG and the LNG flow rate; the interference variables include the natural gas flow rate, the natural gas temperature, the natural gas composition, the liquefied gas flow rate and the liquefied gas temperature; the controlled variables include the cold box surface temperature, the cold box outlet temperature, the refrigerant ratio and the refrigerant separator tank liquid level.
[0022] In one embodiment, the step of obtaining the controlled variable response data generated by performing a step test on the manipulated variable and the disturbance variable comprises:
[0023] Acquire a first response relationship between the controlled variable and the manipulated variable, and a second response relationship between the controlled variable and the disturbance variable;
[0024] A step test is performed on the manipulated variable based on the first response relationship, and a step test is performed on the disturbance variable based on the second response relationship to generate corresponding controlled variable response data.
[0025] In one embodiment, if the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval includes:
[0026] If the disturbance variable changes, then based on the first-order pure lag model, the model gain between the controlled variable deviation and different disturbance variables and different operating variables is obtained;
[0027] Generating a functional relationship between a controlled variable deviation and different disturbance variable adjustment amounts and different manipulated variable adjustment amounts according to the model gain;
[0028] The manipulated variable is adjusted based on the functional relationship so that the controlled variable is stabilized within a corresponding preset interval.
[0029] In a second aspect, the present application also provides an FLNG intermediate cold box operation adjustment device. The device comprises:
[0030] Parameter identification module, used to identify the operating variables, disturbance variables and controlled variables of the cold box operation in FLNG;
[0031] A data acquisition module, used for acquiring controlled variable response data generated corresponding to a step test on the manipulated variable and the disturbance variable;
[0032] A model building module, used for building a first-order pure lag model between the controlled variable, the operating variable and the disturbance variable based on the response data of the controlled variable;
[0033] A first control module, configured to adjust the manipulated variable based on the first-order pure lag model when the disturbance variable changes, so as to stabilize the controlled variable within a corresponding preset interval;
[0034] The second control module is used to identify the variable load range corresponding to the variable load condition when the cold box in the FLNG enters the variable load condition; if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the cold box outlet temperature is adjusted through the flow rate of the JT valve; if the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0035] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0036] Identify the operating variables, disturbance variables, and controlled variables of cold box operation in FLNG;
[0037] Acquire controlled variable response data generated corresponding to a step test of the manipulated variable and the disturbance variable;
[0038] Based on the response data of the controlled variable, construct a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable;
[0039] If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval;
[0040] When the cold box in the FLNG enters a variable load condition, a variable load range corresponding to the variable load condition is identified; if the variable load range is within a preset first load range, the cold box outlet temperature is adjusted using the natural gas flow rate as an interference variable and the flow rate through the JT valve; if the variable load range is within a preset second load range, the refrigerant flow rate is adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0041] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0042] Identify the operating variables, disturbance variables, and controlled variables of cold box operation in FLNG;
[0043] Acquire controlled variable response data generated corresponding to a step test of the manipulated variable and the disturbance variable;
[0044] Based on the response data of the controlled variable, construct a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable;
[0045] If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval;
[0046] When the cold box in the FLNG enters a variable load condition, a variable load range corresponding to the variable load condition is identified; if the variable load range is within a preset first load range, the cold box outlet temperature is adjusted using the natural gas flow rate as an interference variable and the flow rate through the JT valve; if the variable load range is within a preset second load range, the refrigerant flow rate is adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0047] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0048] Identify the operating variables, disturbance variables, and controlled variables of cold box operation in FLNG;
[0049] Acquire controlled variable response data generated corresponding to a step test of the manipulated variable and the disturbance variable;
[0050] Based on the response data of the controlled variable, construct a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable;
[0051] If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval;
[0052] When the cold box in the FLNG enters a variable load condition, a variable load range corresponding to the variable load condition is identified; if the variable load range is within a preset first load range, the cold box outlet temperature is adjusted using the natural gas flow rate as an interference variable and the flow rate through the JT valve; if the variable load range is within a preset second load range, the refrigerant flow rate is adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0053] The above-mentioned FLNG intermediate cold box operation adjustment method, device, computer equipment, storage medium and computer program product identify the operating variables, interference variables and controlled variables of the FLNG intermediate cold box operation; obtain the controlled variable response data corresponding to the step test of the operating variable and the interference variable; based on the response data of the controlled variable, construct a first-order pure lag model between the controlled variable, the operating variable and the interference variable; if the interference variable changes, adjust the operating variable based on the first-order pure lag model to stabilize the controlled variable within the corresponding preset interval; when the FLNG intermediate cold box enters the variable load condition, identify the variable load range corresponding to the variable load condition; if the variable load range is within the preset first load range, use the natural gas flow rate as the interference variable and adjust the outlet temperature of the cold box through the flow rate of the JT valve; if the variable load range is within the preset second load range, adjust the flow rate of the refrigerant based on the change value of the pressure difference before and after the JT valve to adjust the outlet temperature of the cold box. During the whole process, when the interference variable changes, the operating variable is adjusted based on the first-order pure lag model between the controlled variable, the operating variable and the interference variable to stabilize the controlled variable within the corresponding preset range to ensure stable operation. In addition, automatic control of variable load conditions is also performed to ensure the stability of the cold box outlet temperature. The whole solution can ensure the safe and stable operation of the cold box in FLNG. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 This is an application environment diagram of a cold box operation adjustment method in FLNG in one embodiment;
[0055] Figure 2 It is a schematic flow chart of a method for adjusting the operation of a cold box in FLNG in one embodiment;
[0056] Figure 3 It is a schematic flow chart of a method for adjusting the operation of a cold box in FLNG in another embodiment;
[0057] Figure 4 It is a structural block diagram of a cold box operation regulating device in FLNG in one embodiment;
[0058] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0059] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0060] The FLNG intermediate cold box operation adjustment method provided in the embodiment of the present application can be applied to the application environment of the FLNG intermediate cold box 102, specifically as follows Figure 1As shown, it is specifically applied to the controller 104 of the cold box operation in FLNG, and the controller 104 is used to control the flow of the JT valve in the cold box to ensure that the outlet temperature of the cold box is maintained within a stable range. Specifically, the controller identifies the operating variables, interference variables and controlled variables of the cold box operation in FLNG; obtains the controlled variable response data corresponding to the step test of the operating variables and the interference variables; based on the response data of the controlled variables, a first-order pure lag model between the controlled variables, the operating variables and the interference variables is constructed; if the interference variable changes, the operating variable is adjusted based on the first-order pure lag model to stabilize the controlled variable within the corresponding preset range; when the cold box in FLNG enters the variable load condition, the variable load range corresponding to the variable load condition is identified; if the variable load range is within the preset first load range, the natural gas flow is used as the interference variable and the flow of the JT valve is used to adjust the outlet temperature of the cold box; if the variable load range is within the preset second load range, the flow of the refrigerant is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the outlet temperature of the cold box. In practical applications, the controller 104 may specifically be a central controller, a host computer, an industrial computer, etc.
[0061] In one embodiment, Figure 2 As shown, a method for regulating the operation of a cold box in FLNG is provided, and the method is applied to Figure 1 The controller 104 in the embodiment is taken as an example to illustrate, and the following steps are included:
[0062] S100: Identify operating variables, disturbance variables, and controlled variables of cold box operation in FLNG.
[0063] In the FLNG system, the cold box is a key device used to liquefy natural gas through cryogenic treatment. During the operation of the cold box, identifying the operating variables, interference variables, and controlled variables is crucial to optimizing the operation and ensuring the safe and stable operation of the system. Specifically, the corresponding operating variables, interference variables, and controlled variables can be identified by analyzing the historical data of the cold box operation in the FLNG.
[0064] Specifically, the manipulated variable is a variable that can be directly adjusted or controlled by the operator to affect or control the value of the controlled variable. In cold box operation, the manipulated variables mainly include the flow of the JT valve in the FLNG and the LNG flow. Interference variables are factors that affect the controlled variables but cannot be directly controlled. In cold box operation, common interference variables include: natural gas flow, natural gas temperature, natural gas composition, liquefied gas flow, and liquefied gas temperature. The controlled variable is a key parameter that needs to be maintained within a set range, which is achieved by adjusting the manipulated variable. In cold box operation, common controlled variables include cold box surface temperature, cold box outlet temperature, refrigerant ratio, and refrigerant separator tank level.
[0065] S200: Acquire controlled variable response data generated corresponding to a step test on the manipulated variable and the disturbance variable.
[0066] Controlled variable response data can be the data obtained after a step test of the operating variable and the disturbance variable. When the operating variables and disturbance variables of the cold box in FLNG are step tested, the generated controlled variable response data will show how the cold box system responds and adjusts when these variables change. Step testing usually involves changing a variable (operating variable or disturbance variable) from a stable state to another state quickly in a short period of time, and then observing and recording the response of the controlled variable.
[0067] The operating variable step test includes: 1. Refrigerant flow step; when increasing or decreasing the refrigerant flow, the temperature inside the cold box (including the cold box surface temperature, cold box outlet temperature, etc.) should decrease or increase accordingly. The production and purity of liquefied natural gas may also be affected. By monitoring and recording the changes in these controlled variables, the impact of refrigerant flow on system performance can be evaluated. 2. Valve opening step; when adjusting the opening of a valve in the cold box, the flow and pressure of refrigerant, natural gas or other fluids may change. This will cause changes in the temperature, pressure and liquefied natural gas production in the cold box. Recording the response data of these controlled variables helps to understand the impact of valve opening on system performance.
[0068] The disturbance variable step test includes: 1. Natural gas inlet flow and pressure steps; when the natural gas inlet flow or pressure changes, the temperature and pressure in the cold box will also be affected. The production and purity of liquefied natural gas may fluctuate as a result. By performing step tests and recording the response data of the controlled variables, the sensitivity and adaptability of the system to changes in natural gas inlet conditions can be evaluated. 2. Ambient temperature steps; in extreme weather conditions, the ambient temperature may change rapidly. This will affect the operation of the cold box, causing changes in the temperature and refrigerant consumption in the cold box. Recording the response data of these controlled variables helps to understand the performance of the system at different ambient temperatures.
[0069] S300: Based on the response data of the controlled variable, a first-order pure lag model between the controlled variable, the operating variable and the disturbance variable is constructed.
[0070] The first-order pure lag model is usually used to describe the lag effect of the output relative to the input in the system due to transmission delay or processing time. In the case of cold box operation in FLNG, if the first-order pure lag relationship between the operating variable, the disturbance variable and the controlled variable needs to be considered, a first-order pure lag model containing these variables can be constructed. In the scenario of FLNG cold box operation, the operating variable can be used as the input of the model, the disturbance variable can be used as the external disturbance of the model, and the controlled variable can be used as the output of the model. In order to build such a model, it is necessary to collect actual operating data, including time series data of the operating variable, the disturbance variable and the controlled variable. Once the model parameters are determined, this first-order pure lag model can be used to predict the value of the controlled variable at a future time point, or to analyze the influence of the operating variable and the disturbance variable on the controlled variable. In addition, the model can also be used to design a control system to optimize the operating performance of the cold box. Specifically, the first-order pure lag model relationship between the controlled variable and the operating variable and the disturbance variable is shown in Table 1 below:
[0071] Table 1 is the multivariate model relationship matrix diagram
[0072]
[0073] In the above Table 1, there is a "model" at the intersection of the horizontal and vertical lines, which means that there is a response relationship between the two variables.
[0074] S400: If the disturbance variable changes, the manipulated variable is adjusted based on the first-order pure lag model to stabilize the controlled variable within a corresponding preset range.
[0075] When the disturbance variable changes, in order to stabilize the controlled variable within a relatively stable range, the above-mentioned first-order pure lag model is used to adjust the operating variable. Taking the cold box outlet temperature D as an example, the deviation of the cold box outlet temperature D △T = model gain 1*△MV1+model gain 2*△MV2+model gain 3*△MV3+model gain 4*△MV4+model gain 5*△MV5; here, model gain 1, model gain 2, model gain 3, model gain 4, and model gain 5 refer to the model gains corresponding to the five variables △MV1, △MV2, △MV3, △MV4, and △MV5, respectively. By reasonably adjusting these operating variables, the deviation of the cold box outlet temperature D is finally maintained within a certain range, for example, within the range of ±1°C.
[0076] S500: When the cold box in the FLNG enters the variable load condition, the variable load range corresponding to the variable load condition is identified; if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the flow rate through the JT valve is used to adjust the outlet temperature of the cold box; if the variable load range is within the preset second load range, the flow rate of the refrigerant is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the outlet temperature of the cold box, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0077] After adjustment based on S400, the entire FLNG intermediate cold box enters normal operation. In subsequent operations, if it is detected that it has entered a variable load condition, the processing of S500 will be executed. Variable load conditions refer to conditions corresponding to large changes in natural gas flow. The flow of natural gas is determined according to production scheduling. For example, if the scheduling requires the load to increase from about 130T / H to about 150T / H, at this time, the adjustment method of adjusting the outlet temperature of the cold box according to the natural gas flow is suspended, and the outlet temperature of the cold box is adjusted with the natural gas flow as the interference variable and the flow through the JT valve; to avoid large fluctuations in the outlet temperature of the cold box under variable load conditions; and when the FLNG intermediate cold box exits the variable load condition, the adjustment of the outlet temperature of the cold box by adjusting the natural gas flow is restarted. Specifically, when entering the variable load condition, the variable load range corresponding to the variable load condition is identified; if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the flow rate of the JT valve is used to adjust the cold box outlet temperature; if the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature.
[0078] During the load change process, the natural gas flow cannot be used as a means of regulating the outlet temperature of the cold box. The outlet temperature can only be adjusted by the refrigerant flow. At this time, the natural gas flow is used as an interference variable, which can allow the refrigerant flow (JT valve flow) to be adjusted in advance, thereby achieving the purpose of smoothly controlling the outlet temperature of the cold box. When the load change ends, the natural gas flow and the refrigerant flow (JT valve flow) can be used as means of regulating the outlet temperature of the cold box at the same time. The natural gas flow is adjusted from the previous 130T / H±1T / H to 150T / H±1T / H.
[0079] Specifically, when the cold box in FLNG enters a variable load condition, the preset cold box outlet temperature is adjusted according to the natural gas flow rate, and the preset cold box outlet temperature is adjusted according to the natural gas flow rate when the current value of the natural gas flow is detected to have reached the preset target value. Here, when the cold box enters a variable load condition, the preset cold box outlet temperature is adjusted according to the natural gas flow rate. The model is restarted. This is to avoid excessive adjustment or system instability caused by the flow-based temperature adjustment model when the flow changes rapidly. When it is detected that the current value of the natural gas flow has reached the preset target value, the preset cold box outlet temperature is adjusted according to the natural gas flow rate. The model is restarted. At this time, since the flow has stabilized or is close to being stable, the flow-based temperature adjustment model can work more effectively to help maintain the cold box outlet temperature within the target range.
[0080] Furthermore, since the cold box is a huge heat exchange equipment, there is a large lag problem in the change of temperature. If the refrigerant flow is not adjusted in advance when the load changes, and the refrigerant flow is adjusted only when the temperature begins to change, it will cause a large deviation in the outlet temperature of the cold box. When the load is increased, the temperature will be high, a large amount of non-condensable gas will be generated, and product waste will be caused. Even if there is BOG (Boil-Off Gas, flash gas) compressor recovery, the cycle will also cause energy waste. When the load is reduced, the temperature will be low, causing energy waste. In addition, there are differences in the adjustment methods adopted in different variable load ranges. This is mainly because the cold box variables have a good linear relationship only within a certain variable load range. Secondly, they can be adjusted in advance and linearly, but there is no good linear relationship in other variable load ranges. At this time, other methods need to be adopted for adjustment. Specifically, the preset first load range refers to the variable load range corresponding to the linear relationship of variable adjustment in the cold box; the preset second load range refers to the variable load range corresponding to the non-linear relationship of variable adjustment in the cold box. In actual applications, the preset first load range is 90%~110%; the preset second load range is 80%~90%. Here, if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the cold box outlet temperature is adjusted through the flow rate of the JT valve, that is, it is adjusted in a linear relationship. Specifically, the natural gas flow rate can be used as an interference variable in the first-order pure lag model constructed above, and the cold box outlet temperature is adjusted by adjusting the flow rate of the JT valve. If the variable load range is within the preset second load range, it is impossible to use the model to adopt a linear adjustment method. At this time, it is necessary to use the preset expert control rules to handle it. Specifically, the flow rate of the refrigerant can be adjusted based on the change in the pressure difference before and after the JT valve to adjust the cold box outlet temperature.
[0081] The above-mentioned FLNG intermediate cold box operation adjustment method identifies the operating variables, interference variables and controlled variables of the FLNG intermediate cold box operation; obtains the controlled variable response data corresponding to the step test of the operating variables and the interference variables; based on the response data of the controlled variables, constructs a first-order pure lag model between the controlled variables, the operating variables and the interference variables; if the interference variable changes, the operating variable is adjusted based on the first-order pure lag model to stabilize the controlled variable within the corresponding preset range; when the FLNG intermediate cold box enters the variable load condition, the adjustment method of adjusting the outlet temperature of the cold box according to the natural gas flow is suspended, and the outlet temperature of the cold box is adjusted by taking the natural gas flow as the interference variable and the flow through the JT valve; when the FLNG intermediate cold box exits the variable load condition, the adjustment method of adjusting the outlet temperature of the cold box according to the natural gas flow is restarted. During the whole process, when the interference variable changes, the operating variable is adjusted based on the first-order pure lag model between the controlled variable, the operating variable and the interference variable to stabilize the controlled variable within the corresponding preset range to ensure stable operation. In addition, automatic control of variable load conditions is also performed to ensure the constancy of the cold box outlet temperature. The whole solution can ensure the safe and stable operation of the cold box in FLNG.
[0082] In one embodiment, if the variable load range is within the preset second load range, adjusting the flow rate of the refrigerant based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature includes:
[0083] If the variable load range is within the preset second load range, obtain the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation between the current value of the cold box outlet temperature and the set value; adjust the refrigerant flow rate according to the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature.
[0084] When the variable load range is within the preset second load range, it indicates that this time the linear model cannot be used for adjustment. Specifically, when the variable load range is within the preset second load range, the anti-surge valve needs to be opened on one side of the refrigerant compressor to ensure the safe operation of the refrigerant compressor. The opening and closing of the anti-surge valve will cause fluctuations in the compressor inlet and outlet pressures and several refrigerant flows. The cold box generates cold air through the JT valve. The pressure and flow before and after the JT valve are crucial parameters. At this time, the multivariable controller will not be adjusted in time and such nonlinear problems cannot be handled through a fixed linear model. Therefore, the expert control rule is used to deal with it. The change value of the differential pressure before and after the JT valve is adjusted by a certain proportion to adjust the refrigerant flow. This proportion is obtained based on the deviation of the cold box outlet temperature (that is, the difference between the current value and the set value).
[0085] Based on the above principle, in this embodiment, the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle and the deviation of the cold box outlet temperature are first obtained, and then the expert control rule is adopted to adjust the refrigerant flow rate according to the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle and the temperature deviation to adjust the cold box outlet temperature.
[0086] In one embodiment, adjusting the refrigerant flow rate according to the pressure difference before and after the JT valve in the current adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature includes:
[0087] Obtain a preset fixed value of refrigerant flow and a change value of natural gas load between this adjustment cycle and the previous adjustment cycle; calculate a change value of the pressure difference between the pressure difference before and after the JT valve in this adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle; calculate the product of the preset fixed value of refrigerant flow, the change value of natural gas load, the temperature deviation and the change value of pressure difference to obtain a refrigerant flow adjustment amount; adjust the refrigerant flow according to the refrigerant flow adjustment amount to adjust the cold box outlet temperature.
[0088] The fixed value of the refrigerant flow is a pre-calibrated value, which can be obtained through multiple debugging tests. In the specific calculation, the natural gas load change value of the current adjustment cycle and the previous adjustment cycle is calculated first, and then the pressure difference change value between the pressure difference before and after the JT valve in the current adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle is calculated, and then the product of the preset refrigerant flow fixed value, the natural gas load change value, the temperature deviation and the pressure difference change value is calculated to obtain the refrigerant flow adjustment amount, and finally the refrigerant flow is adjusted according to the calculated refrigerant flow to finally adjust the cold box outlet temperature. To explain the above process in detail, a specific example will be used to introduce it. Assuming that the current cold box outlet temperature deviation from the set value is -0.8℃, the differential pressure before and after the JT valve in this adjustment cycle is 0.5MPa, and the differential pressure before and after the previous adjustment cycle is 0.4MPa, the refrigerant flow adjustment amount is △MV=(0.5-0.4)*(-0.8)*(natural gas load in this adjustment cycle-natural gas load in the previous adjustment cycle)*fixed value of refrigerant flow. Further, the adjustment cycle here can be adjusted once every 5 minutes.
[0089] like Figure 3 As shown, in one embodiment, S200 includes:
[0090] S220: Acquire a first response relationship between the controlled variable and the manipulated variable, and a second response relationship between the controlled variable and the disturbance variable;
[0091] S240: Performing a step test on the manipulated variable based on the first response relationship and performing a step test on the disturbance variable based on the second response relationship to generate corresponding controlled variable response data.
[0092] Analyze the first response relationship between the controlled variable and the manipulated variable, and the second response relationship between the controlled variable and the disturbance variable. On the basis of these two response relationships, adjust the manipulated variable / disturbance variable to perform step test, observe the change of the corresponding controlled variable, and generate the corresponding controlled variable response data. In practical applications, taking the step test of the manipulated variable as an example, a 5%-15% change can be input for each manipulated variable under steady state conditions, observe the change of the corresponding controlled variable, and record the relevant data after the controlled variable recovers the steady state; the step test of the disturbance variable is similar to the above, and will not be repeated. After performing step tests on the manipulated variable and the disturbance variable, the corresponding controlled variable response data is finally obtained.
[0093] like Figure 3 As shown, in one embodiment, S400 includes:
[0094] S420: If the disturbance variable changes, then based on the first-order pure lag model, obtain the model gain between the controlled variable deviation and different disturbance variables and different operating variables.
[0095] When the disturbance variable changes, the manipulated variable is adjusted based on the first-order pure lag model to stabilize the controlled variable within the preset range. It is indeed necessary to first determine the model gain and generate a control strategy based on these gains. Based on the first-order pure lag model, the model gain between the controlled variable deviation and different disturbance variables and different manipulated variables is determined through system identification or experimental data.
[0096] S440: Generate a functional relationship between the controlled variable deviation and different disturbance variable adjustment amounts and different manipulated variable adjustment amounts according to the model gain.
[0097] According to the model gain, the functional relationship between the controlled variable deviation and the different interference variable adjustment amounts and the different operating variable adjustment amounts is generated. For example, the deviation △T of the cold box outlet temperature D mentioned above = model gain 1*△MV1+model gain 2*△MV2+model gain 3*△MV3+model gain 4*△MV4+model gain 5*△MV5.
[0098] S460: Adjust the manipulated variable based on the functional relationship to stabilize the controlled variable within a corresponding preset range.
[0099] Based on the generated functional relationship (control strategy), when the disturbance variable changes, the manipulated variable is adjusted to reduce the deviation of the controlled variable so that it is stable within the preset range.
[0100] In one embodiment, the above-mentioned FLNG cold box operation adjustment method further includes:
[0101] Step 1: Collect the target value and current value of natural gas flow in FLNG, load transition time, current value and target value of cold box outlet temperature, and variable load switch status.
[0102] Step 2: When it is detected that the variable load switch status indication is turned on and the load transition time is not 0, it is determined that the FLNG intermediate cold box enters the variable load condition.
[0103] When the system detects that the variable load switch state is open and the load transition time is not 0, it can be determined that the cold box in the FLNG is entering a variable load condition.
[0104] Step 3: According to the load transition time, the natural gas flow rate is uniformly adjusted from the current natural gas flow rate value to the natural gas flow rate target value.
[0105] According to the load transition time, the natural gas flow rate is evenly adjusted from the current value to the target value. This process needs to ensure the smoothness of the flow change to avoid excessive impact on the entire device.
[0106] Step 4: If the difference between the current value and the target value of the cold box outlet temperature is greater than the preset deviation threshold during the natural gas flow uniform adjustment process, the natural gas flow adjustment is suspended until the difference between the current value and the target value of the cold box outlet temperature is no greater than the preset deviation threshold.
[0107] During the process of uniform adjustment of the natural gas flow, the difference between the current value and the target value of the cold box outlet temperature is continuously monitored. If this difference exceeds the preset deviation threshold, the system will suspend the adjustment of the natural gas flow. This is to prevent excessive temperature deviation from affecting liquefaction efficiency and product quality. When the difference between the current value and the target value of the cold box outlet temperature returns to within the preset deviation threshold, the system can continue to adjust the natural gas flow.
[0108] In actual applications, the controller can collect the target value and current value of natural gas load, load transition time, current value and target value of cold box outlet temperature, and variable load switch; when it is detected that the variable load switch is turned on and the load transition time is not 0, the program will close the model that adjusts the cold box outlet temperature according to the natural gas flow, and the natural gas flow will change the current value to the target value evenly according to the collected load transition time. The upper and lower limits of the natural gas flow change at the same time; during the change process, if it is detected that the deviation of the cold box outlet temperature exceeds a certain value (±1°C), the change of the natural gas flow is suspended and continued after recovery; when it is detected that the current value of natural gas has reached the target value, the variable load switch is automatically closed, the load change ends, and the model that adjusts the cold box outlet temperature according to the natural gas flow is turned on at the same time, and normal regulation is restored. The cold box outlet temperature is adjusted by the natural gas flow and refrigerant at the same time.
[0109] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0110] Based on the same inventive concept, the embodiment of the present application also provides an FLNG intermediate cold box operation adjustment device for implementing the FLNG intermediate cold box operation adjustment method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more FLNG intermediate cold box operation adjustment device embodiments provided below can refer to the above limitations on the FLNG intermediate cold box operation adjustment method, and will not be repeated here.
[0111] In one embodiment, Figure 4 As shown, a FLNG intermediate cold box operation regulating device is provided, comprising:
[0112] A parameter identification module 100 is used to identify operating variables, interference variables and controlled variables of cold box operation in FLNG;
[0113] The data acquisition module 200 is used to acquire the controlled variable response data generated by performing step tests on the manipulated variables and the disturbance variables;
[0114] A model building module 300 is used to build a first-order pure lag model between a controlled variable, an operating variable and a disturbance variable based on the response data of the controlled variable;
[0115] The first control module 400 is used to adjust the manipulated variable based on the first-order pure lag model when the disturbance variable changes, so that the controlled variable is stabilized within the corresponding preset range;
[0116] The second control module 500 is used to identify the variable load range corresponding to the variable load condition when the cold box in the FLNG enters the variable load condition; if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the cold box outlet temperature is adjusted through the flow rate of the JT valve; if the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range.
[0117] In one of the embodiments, the second control module 500 is also used to obtain the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation between the current value and the set value of the cold box outlet temperature if the variable load range is within the preset second load range; adjust the refrigerant flow rate according to the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle and the temperature deviation to adjust the cold box outlet temperature.
[0118] In one embodiment, the second control module 500 is also used to obtain a preset fixed refrigerant flow rate and a natural gas load change value between the current adjustment cycle and the previous adjustment cycle; calculate the pressure difference change value between the pressure difference before and after the JT valve in the current adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle; calculate the product of the preset fixed refrigerant flow rate, the natural gas load change value, the temperature deviation and the pressure difference change value to obtain the refrigerant flow rate adjustment amount; adjust the refrigerant flow rate according to the refrigerant flow rate adjustment amount to adjust the cold box outlet temperature.
[0119] In one embodiment, the operating variables include the flow rate of the JT valve in the FLNG and the LNG flow rate; the interference variables include the natural gas flow rate, the natural gas temperature, the natural gas composition, the liquefied gas flow rate and the liquefied gas temperature; the controlled variables include the cold box surface temperature, the cold box outlet temperature, the refrigerant ratio and the refrigerant separator tank liquid level.
[0120] In one embodiment, the data acquisition module 200 is also used to obtain a first response relationship between the controlled variable and the operating variable, and a second response relationship between the controlled variable and the interference variable; perform a step test on the operating variable based on the first response relationship, and perform a step test on the interference variable based on the second response relationship to generate corresponding controlled variable response data.
[0121] In one embodiment, the first control module 400 is also used to obtain the model gain between the controlled variable deviation and different interference variables and different operating variables based on the first-order pure lag model when the interference variable changes; generate the functional relationship between the controlled variable deviation and different interference variable adjustment amounts and different operating variable adjustment amounts according to the model gain; and adjust the operating variable based on the functional relationship so that the controlled variable is stable within the corresponding preset range.
[0122] Each module in the above-mentioned FLNG cold box operation adjustment device can be implemented in whole or in part by software, hardware and their combination. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.
[0123] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a method for adjusting the operation of a cold box in FLNG is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the housing of the computer device, or an external keyboard, touchpad or mouse.
[0124] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0125] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the above-mentioned FLNG cold box operation adjustment method when executing the computer program.
[0126] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned FLNG cold box operation adjustment method is implemented.
[0127] In one embodiment, a computer program product is provided, including a computer program, which implements the above-mentioned FLNG cold box operation adjustment method when executed by a processor.
[0128] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0129] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0130] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for regulating the operation of a cold box in FLNG, characterized in that: The method comprises: Identify the operating variables, disturbance variables, and controlled variables of cold box operation in FLNG; Acquire controlled variable response data generated corresponding to a step test of the manipulated variable and the disturbance variable; Based on the response data of the controlled variable, a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable is constructed; wherein the manipulated variable is used as the model input, the disturbance variable is used as the model external disturbance, and the controlled variable is used as the model output; If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset interval; When the cold box in the FLNG enters a variable load condition, a variable load range corresponding to the variable load condition is identified; if the variable load range is within a preset first load range, the cold box outlet temperature is adjusted by using the natural gas flow rate as an interference variable and the flow rate through the JT valve; if the variable load range is within a preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range; If the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the cold box outlet temperature is adjusted by adjusting the flow rate of the JT valve, including: if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and based on the first-order pure lag model, the cold box outlet temperature is adjusted by adjusting the flow rate of the JT valve; If the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, including: if the variable load range is within the preset second load range, the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation between the current value of the cold box outlet temperature and the set value are obtained; the refrigerant flow rate is adjusted according to the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature.
2. The method according to claim 1, characterized in that Adjusting the refrigerant flow rate according to the pressure difference before and after the JT valve in the current adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature includes: Obtaining a preset fixed value of refrigerant flow and a change value of natural gas load between the current adjustment cycle and the previous adjustment cycle; Calculate the pressure difference change value between the pressure difference before and after the JT valve in the current adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle; Calculate the product of the preset refrigerant flow fixed value, the natural gas load change value, the temperature deviation and the pressure difference change value to obtain the refrigerant flow adjustment amount; The refrigerant flow rate is adjusted according to the refrigerant flow rate adjustment amount to adjust the cold box outlet temperature.
3. The method according to claim 1, characterized in that The operating variables include the flow of the JT valve in the FLNG and the LNG flow; the interference variables include the natural gas flow, the natural gas temperature, the natural gas composition, the liquefied gas flow and the liquefied gas temperature; the controlled variables include the cold box surface temperature, the cold box outlet temperature, the refrigerant ratio and the refrigerant separator tank liquid level.
4. The method according to claim 1, characterized in that: The step of obtaining the controlled variable response data generated by performing a step test on the manipulated variable and the disturbance variable comprises: Acquire a first response relationship between the controlled variable and the manipulated variable, and a second response relationship between the controlled variable and the disturbance variable; A step test is performed on the manipulated variable based on the first response relationship, and a step test is performed on the disturbance variable based on the second response relationship to generate corresponding controlled variable response data.
5. The method according to claim 1, characterized in that If the disturbance variable changes, adjusting the manipulated variable based on the first-order pure lag model so that the controlled variable is stabilized within a corresponding preset range includes: If the disturbance variable changes, then based on the first-order pure lag model, the model gain between the controlled variable deviation and different disturbance variables and different operating variables is obtained; Generating a functional relationship between a controlled variable deviation and different disturbance variable adjustment amounts and different manipulated variable adjustment amounts according to the model gain; The manipulated variable is adjusted based on the functional relationship so that the controlled variable is stabilized within a corresponding preset interval.
6. An FLNG intercooler operation adjustment device, characterized in that: The device comprises: Parameter identification module, used to identify the operating variables, disturbance variables and controlled variables of the cold box operation in FLNG; A data acquisition module, used for acquiring controlled variable response data generated corresponding to a step test on the manipulated variable and the disturbance variable; A model building module, used to build a first-order pure lag model between the controlled variable, the manipulated variable and the disturbance variable based on the response data of the controlled variable; wherein the manipulated variable is used as the model input, the disturbance variable is used as the external disturbance of the model, and the controlled variable is used as the model output; A first control module, configured to adjust the manipulated variable based on the first-order pure lag model when the disturbance variable changes, so as to stabilize the controlled variable within a corresponding preset interval; The second control module is used to identify the variable load range corresponding to the variable load condition when the cold box in the FLNG enters the variable load condition; if the variable load range is within the preset first load range, the cold box outlet temperature is adjusted by taking the natural gas flow rate as the interference variable and the flow rate through the JT valve; if the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, and the load value corresponding to the preset first load range is greater than the load value corresponding to the preset second load range; If the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and the cold box outlet temperature is adjusted by adjusting the flow rate of the JT valve, including: if the variable load range is within the preset first load range, the natural gas flow rate is used as the interference variable, and based on the first-order pure lag model, the cold box outlet temperature is adjusted by adjusting the flow rate of the JT valve; If the variable load range is within the preset second load range, the refrigerant flow rate is adjusted based on the change value of the pressure difference before and after the JT valve to adjust the cold box outlet temperature, including: if the variable load range is within the preset second load range, the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation between the current value of the cold box outlet temperature and the set value are obtained; the refrigerant flow rate is adjusted according to the pressure difference before and after the JT valve in this adjustment cycle, the pressure difference before and after the JT valve in the previous adjustment cycle, and the temperature deviation to adjust the cold box outlet temperature.
7. The device according to claim 6, characterized in that The second control module is also used to obtain a preset refrigerant flow fixed value and a natural gas load change value between the current adjustment cycle and the previous adjustment cycle; calculate a pressure difference change value between the pressure difference before and after the JT valve in the current adjustment cycle and the pressure difference before and after the JT valve in the previous adjustment cycle; The product of the preset refrigerant flow fixed value, the natural gas load change value, the temperature deviation and the pressure difference change value is calculated to obtain the refrigerant flow adjustment amount; the refrigerant flow is adjusted according to the refrigerant flow adjustment amount to adjust the cold box outlet temperature.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.