Virtual power plant supply and demand regulation and load integrated energy storage method and system

By predicting and optimizing the historical data of the virtual power plant, a comprehensive dispatch plan is generated, which solves the problem of multiple energy resource management in the dispatch control of the virtual power plant, achieves accurate prediction and efficient dispatch, and improves the energy efficiency and market competition of the system. force.

CN118449205BActive Publication Date: 2024-10-01JIANGSU ANSHI COMMERCIAL ENERGY STORAGE SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410890331.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-01
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

Virtual power plants lack a unified and efficient solution in dispatch control to intelligently, dynamically manage and efficiently dispatch multiple energy resources, making supply and demand forecasting difficult and risky, and making it difficult to cope with the complexity of the power market and system.

Method used

By collecting historical data for power generation and load forecasting, generating generation sequences and load sequences, generating load transfer sequences based on load transfer plans, jointly optimizing energy storage plans and power supply plans, using genetic algorithms to generate virtual power plant comprehensive dispatch plans to ensure power supply and demand. balance and profit maximization.

Benefits of technology

It achieves accurate prediction of the power generation and load demand of the virtual power plant, reduces operational uncertainty, improves the accuracy of resource planning, dynamically adjusts power generation and load matching, maximizes the use of renewable energy, reduces reliance on traditional energy, and improves the overall energy efficiency and efficiency of the system. market competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118449205B_ABST
    Figure CN118449205B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of virtual power plants, and discloses a method and system for supply and demand regulation and load integrated energy storage of virtual power plants, the method comprising the following steps: S1: collecting historical data, performing power generation forecasting and load forecasting of virtual power plants, and generating power generation sequences and load sequences; S2: performing load transfer based on the load sequence and a preset load transfer scheme, and generating a load transfer sequence; S3: generating energy storage schemes and power supply schemes based on the power generation sequence and load transfer sequence; S4: performing joint optimization of energy storage schemes, power supply schemes, and load transfer schemes; S5: recommending a comprehensive scheduling scheme for virtual power plants based on the results of the joint optimization. The present invention not only improves the economic performance and operating efficiency of virtual power plants by integrating prediction, optimization, and scheduling, but also has important value in promoting the green development of the energy industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of virtual power plants, and in particular to a method and system for supply and demand regulation and load integrated energy storage of a virtual power plant. Background Art

[0002] In recent years, with the rapid development of renewable energy and the widespread deployment of distributed energy resources, virtual power plants have received extensive attention and research as an important means to integrate distributed energy resources, improve energy efficiency, and optimize the balance of power supply and demand. Load-integrated energy storage is the process of intelligently integrating and managing energy storage equipment with user-side loads (i.e., power demand) under the framework of virtual power plants. Virtual power plants and load-integrated energy storage can not only improve energy efficiency and promote the consumption of renewable energy, but also enhance the flexibility and reliability of the power grid, providing support for building a more intelligent and green modern energy system. However, in practical applications, the dispatching and control of virtual power plants faces many challenges and shortcomings.

[0003] Due to the volatility and uncertainty of renewable energy, it is difficult to accurately predict the future energy supply and demand of virtual power plants, resulting in greater uncertainty and risk in the dispatching and control process of virtual power plants. Virtual power plants need to integrate a variety of different types of energy resources, including renewable energy, energy storage systems, microgrids, and traditional power stations. These energy resources have different characteristics and operating rules, and different dispatching and control strategies and methods are required. However, there is currently a lack of a unified and efficient dispatching and control solution that can achieve intelligent, dynamic management and efficient dispatching of multiple energy resources. In addition, the dispatching and control of virtual power plants also need to consider the needs of the power market and the operation of the power system. The volatility and uncertainty of the power market and the complexity and diversity of the power system have brought great challenges to the dispatching and control of virtual power plants.

[0004] For example, a Chinese patent with authorization announcement number CN111815018B discloses a virtual power plant optimization scheduling method and device, including: obtaining an initial scenario set of a virtual power plant; reducing the initial scenario set to obtain a final scenario set; optimizing the virtual power plant based on the final scenario set and a pre-established virtual power plant optimization model. The application first pre-processes the acquired scenario set, selects a representative scenario set after reduction and optimization, reduces the subsequent amount of calculation, and then considers it from the perspectives of conditional risk value constraints and safe operation constraints, controls risks as much as possible to maximize benefits while ensuring safety, and also adopts the incentive compatibility principle to distribute benefits within the virtual power plant.

[0005] For example, the patent application with publication number CN117350507A discloses a virtual power plant dispatching system. The virtual power plant dispatching system is composed of a data acquisition module, a data processing module, an execution module, a prediction module, a data storage module, a renewable energy management module, an energy storage management module, and an adaptive control module. The output end of the data acquisition module is electrically connected to the input end of the data processing module, the output end of the data processing module is electrically connected to the input end of the data storage module, the output end of the data storage module is electrically connected to the input end of the prediction module, and the output ends of the prediction module, the data processing module, the renewable energy management module, the energy storage management module, and the adaptive control module are all electrically connected to the input end of the execution module. The invention can adjust the dispatch of electricity according to the power generation through the prediction of renewable energy power generation, greatly reducing the power consumption of traditional power generation.

[0006] The above patents all have the problem raised by the background technology: lack of intelligent, dynamic management and efficient scheduling solutions for multiple energy resources.

[0007] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgement or any form of suggestion that the information constitutes the prior art already known to ordinary technicians in this field. Summary of the invention

[0008] The technical problem to be solved by the present invention is to overcome the defects of the prior art and provide a virtual power plant supply and demand regulation and load integrated energy storage method and system, which improves the economic performance and operating efficiency of the virtual power plant by integrating prediction, optimization and scheduling.

[0009] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0010] In one aspect, the present invention provides a virtual power plant supply and demand regulation and load integrated energy storage method, comprising the following steps:

[0011] S1: Collect historical data, conduct virtual power plant power generation forecast and load forecast, and generate power generation sequence and load sequence;

[0012] S2: performing load transfer based on the load sequence and a preset load transfer scheme to generate a load transfer sequence;

[0013] S3: generating an energy storage solution and a power supply solution based on the power generation sequence and the load transfer sequence;

[0014] S4: Jointly optimize the energy storage solution, power supply solution, and load transfer solution;

[0015] S5: Based on the results of the joint optimization, a comprehensive scheduling plan for the virtual power plant is recommended.

[0016] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the method of generating the power generation sequence and the load sequence is as follows:

[0017] Collect historical data, including historical power generation data and historical load data;

[0018] Arrange the historical power generation data into a historical power generation sequence in chronological order; Arrange the historical load data into a historical load sequence in chronological order;

[0019] A power generation prediction model is trained for the historical power generation sequence; a load prediction model is trained for the historical load sequence; the power generation prediction model and the load prediction model are any one of a SARIMA model, a LSTM model, and a GRU model;

[0020] Based on the power generation prediction model, the power generation data within the next 24 hours is predicted, and the data is sorted into a power generation sequence in chronological order; based on the load prediction model, the load data within the next 24 hours is predicted, and the data is sorted into a load sequence in chronological order.

[0021] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the load transfer scheme is the transfer ratio of the load during the peak period; the setting method is as follows: analyze the historical load data, and calculate the average value of the elastic load proportion in the peak load period, which is recorded as ; The interval It is evenly divided into m sub-intervals, where m is a positive integer; the left endpoint of each sub-interval is extracted and used as the load transfer ratio of the peak period in the m load transfer schemes.

[0022] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the method of generating the load transfer sequence is as follows:

[0023] Identifying peak time periods and non-peak time periods in the load sequence; extracting transfer target time periods from non-peak time periods;

[0024] The loads of the peak periods in the load sequence are cut based on the m load transfer schemes respectively, and the load values ​​of the peak periods are updated. The formula is as follows:

[0025] ;

[0026] in, represents the i-th load value in the peak period of the load sequence, the value range of i is 1, 2, ..., n, and n is the number of load values ​​in the peak period of the load sequence; An updated value representing the load value during the peak period; is the load transfer ratio during the peak period in any load transfer scheme;

[0027] The load sequence is loaded and transferred based on m load transfer schemes respectively, and the load value of the transfer target period is updated. The formula is as follows:

[0028] ;

[0029] in, represents the jth load value of the target period of transfer in the load sequence, the value range of j is 1, 2, ..., k, and k is the number of load values ​​of the target period of transfer in the load sequence; Indicates the updated value of the load value in the transfer target period.

[0030] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, wherein: the virtual power plant comprehensive scheduling plan includes the energy storage plan and the power supply plan; the generation method is as follows:

[0031] Generate r energy storage solutions and r power supply solutions for each load transfer sequence, and combine the energy storage solution with the power supply solution to generate r virtual power plant comprehensive dispatching solutions based on each load transfer sequence;

[0032] The energy storage scheme is the distribution method of power generation at the t-th time point in the next 24 hours, including the proportion of power sold to the grid to power generation. and the proportion of energy storage to power generation ; The value range of t is 1, 2, ..., p, where p is the number of time points in the load transfer sequence;

[0033] The power supply plan is the power supply output mode at the tth time point in the next 24 hours, including the proportion of the power supplied to users by the energy storage system to the total load. And the proportion of electricity supplied to users through the power grid to the total load .

[0034] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the constraints when combining the energy storage solution with the power supply solution are as follows:

[0035] ;

[0036] in, represents the load value at the tth time point in the load transfer sequence; Indicates the rated output power of the energy storage system; Indicates the initial capacity of the energy storage system; Represents the safety margin of the energy storage system; Represents the power generation at the tth time point in the power generation sequence.

[0037] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the joint optimization method is as follows:

[0038] S401: Set crossover probability, mutation probability, and Generate a comprehensive dispatch plan for a virtual power plant Individuals constitute the initial population;

[0039] Any individual contains p chromosomes, corresponding to p time points; each chromosome contains 4 genes, corresponding to each time point , , and ;

[0040] S402: Calculate the fitness of each individual;

[0041] S403: performing selection operation, crossover operation, and mutation operation in sequence, and generating the next generation population;

[0042] The crossover operation includes single-point crossover and ordered crossover; the object of the crossover operation is any pair of chromosomes corresponding to the same time point in the two individuals participating in the crossover operation;

[0043] The mutation operation includes exchange mutation, reverse mutation, and adjacent exchange mutation;

[0044] S404: Repeat steps S402-S403 until the highest fitness of all individuals in the population converges;

[0045] S405: Obtain the comprehensive dispatching plan of the virtual power plant corresponding to the individual with the highest fitness as the joint optimization result of the energy storage plan, the power supply plan, and the load transfer plan.

[0046] As a preferred solution of the virtual power plant supply and demand regulation and load integrated energy storage method of the present invention, the calculation formula of the fitness is as follows:

[0047] ;

[0048] Among them, H represents the fitness of any individual; It represents the unit price of electricity sold to the grid at the tth time point in the next 24 hours; It represents the unit electricity price of electricity purchased from the power grid at the tth time point in the next 24 hours; f represents the load transfer cost coefficient.

[0049] In a second aspect, the present invention provides a virtual power plant supply and demand regulation and load integrated energy storage system, including a data acquisition module, a prediction model module, a load transfer module, a scheduling scheme module, a joint optimization module, and a recommendation display module; wherein:

[0050] The data acquisition module is used to collect historical data and generate historical power generation sequences and historical load sequences;

[0051] The prediction model module is used to train the time series prediction model, and perform power generation prediction and load prediction to generate power generation sequence and load sequence;

[0052] The load transfer module is configured with a load transfer scheme for generating a load transfer sequence;

[0053] The scheduling scheme module is used to generate energy storage schemes and power supply schemes;

[0054] The joint optimization module is used to perform joint optimization of energy storage scheme, power supply scheme and load transfer scheme;

[0055] The recommendation and display module is used to recommend a comprehensive scheduling plan for a virtual power plant, and to visually display a load sequence, a load transfer sequence, and a power generation sequence.

[0056] Compared with the prior art, the beneficial effects achieved by the present invention are as follows:

[0057] Through in-depth analysis of historical data, accurate predictions of the power generation and load demand of virtual power plants can be achieved, providing a solid data foundation for subsequent dispatching decisions, reducing uncertainty in operations, and improving the foresight and accuracy of resource planning. Through intelligent load transfer mechanisms and flexible energy storage management, the matching relationship between power generation and load can be dynamically adjusted to ensure a balance between power supply and demand while maximizing the use of renewable energy, reducing dependence on traditional energy, and improving the overall energy efficiency of the system.

[0058] The use of genetic algorithms for joint optimization not only takes into account direct economic benefits and costs, but also takes into account the effective allocation of energy storage resources, achieving profit maximization under complex and changing market conditions and enhancing the market competitiveness of virtual power plants. The proposed scheduling scheme can quickly adapt to changes in the external environment, including fluctuations in electricity prices and sudden changes in load demand. By adjusting energy storage and power supply strategies in real time, it ensures the stability and reliability of power supply and reduces operational risks caused by imbalances in supply and demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0060] Figure 1 A flow chart of the virtual power plant supply and demand regulation and load integrated energy storage method provided by the present invention;

[0061] Figure 2 A flow chart of the joint optimization method of the energy storage solution, power supply solution and load transfer solution provided by the present invention;

[0062] Figure 3 A schematic diagram of the structure of the virtual power plant supply and demand regulation and load integrated energy storage system provided by the present invention;

[0063] Figure 4 A flow chart of a method for generating a load transfer sequence provided by the present invention. DETAILED DESCRIPTION

[0064] The technical solution of the present invention is described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present invention and the specific features in the embodiments are detailed descriptions of the technical solution of the present invention, rather than limitations on the technical solution of the present invention. The embodiments of the present invention and the technical features in the embodiments may be combined with each other unless there is a conflict.

[0065] Example 1

[0066] This embodiment introduces a virtual power plant supply and demand regulation and load integrated energy storage method, referring to Figure 1 , the method comprises the following steps:

[0067] S1: Collect historical data, conduct virtual power plant power generation forecast and load forecast, and generate power generation sequence and load sequence; the method is as follows:

[0068] Collect historical data, including historical power generation data and historical load data;

[0069] Arrange the historical power generation data into a historical power generation sequence in chronological order; Arrange the historical load data into a historical load sequence in chronological order;

[0070] A power generation prediction model is trained for the historical power generation sequence; a load prediction model is trained for the historical load sequence; the power generation prediction model and the load prediction model are any one of a SARIMA model, a LSTM model, and a GRU model;

[0071] Based on the power generation prediction model, the power generation data within the next 24 hours is predicted, and the data is sorted into a power generation sequence in chronological order; based on the load prediction model, the load data within the next 24 hours is predicted, and the data is sorted into a load sequence in chronological order.

[0072] S2: performing load transfer based on the load sequence and a preset load transfer scheme to generate a load transfer sequence;

[0073] The load transfer scheme is the transfer ratio of the load during the peak period. The setting method is as follows: Analyze the historical load data, calculate the average value of the elastic load ratio during the peak load period, and record it as ; The interval It is evenly divided into m sub-intervals, where m is a positive integer; the left endpoint of each sub-interval is extracted and used as the transfer ratio of the load during the peak period in the m load transfer schemes; the elastic load is a non-core load that can be flexibly scheduled in time. For example, some industrial production processes have certain flexibility, such as refrigeration of cold storage facilities, hot water preheating, etc. These loads can be adjusted to the period with lower grid load without affecting the production plan.

[0074] The method for generating a load transfer sequence is as follows: Figure 4 As shown, the steps are as follows:

[0075] Identifying peak time periods and non-peak time periods in the load sequence; extracting transfer target time periods from non-peak time periods;

[0076] The loads of the peak periods in the load sequence are cut based on the m load transfer schemes respectively, and the load values ​​of the peak periods are updated. The formula is as follows:

[0077] ;

[0078] in, represents the i-th load value in the peak period of the load sequence, the value range of i is 1, 2, ..., n, and n is the number of load values ​​in the peak period of the load sequence; An updated value representing the load value during the peak period; is the load transfer ratio during the peak period in any load transfer scheme;

[0079] The load sequence is loaded and transferred based on m load transfer schemes respectively, and the load value of the transfer target period is updated. The formula is as follows:

[0080] ;

[0081] in, represents the jth load value of the target period of transfer in the load sequence, the value range of j is 1, 2, ..., k, and k is the number of load values ​​of the target period of transfer in the load sequence; Indicates the updated value of the load value in the transfer target period.

[0082] S3: generating an energy storage solution and a power supply solution based on the power generation sequence and the load transfer sequence;

[0083] The energy storage scheme is the distribution method of power generation at the t-th time point in the next 24 hours, including the proportion of power sold to the grid to power generation. and the proportion of energy storage to power generation , and The sum is 1; the power generation is the power generation data in the power generation sequence; the value range of t is 1, 2, ..., p, where p is the number of time points in the load transfer sequence; in this embodiment, the load sequence and the power generation sequence both cover data within 24 hours, and are evenly divided into p data segments. The power generation and load values ​​at any time point mentioned in this embodiment are the average values ​​of the data segment at that time point;

[0084] The power supply plan is the power supply output mode at the tth time point in the next 24 hours, including the proportion of the power supplied to users by the energy storage system to the total load. And the proportion of electricity supplied to users through the power grid to the total load , and The sum is 1; the total load is the load value in the load transfer sequence;

[0085] Generate r energy storage solutions and r power supply solutions for each load transfer sequence, and combine the energy storage solution with the power supply solution to generate r virtual power plant comprehensive scheduling solutions based on each load transfer sequence; the constraints for combining the energy storage solution with the power supply solution are as follows:

[0086] ;

[0087] in, represents the load value at the tth time point in the load transfer sequence; Indicates the rated output power of the energy storage system; Indicates the initial capacity of the energy storage system; The safety margin of the energy storage system is the extra capacity reserved during design and operation to ensure that the energy storage system can provide services stably, safely and efficiently under various operating conditions. It is set by technicians in this field based on experience and actual needs. Represents the power generation at the tth time point in the power generation sequence.

[0088] Based on the above constraints, it can be ensured that in the process of supplying power to users, the energy storage system can avoid excessive output power or excessive discharge, which will reduce its lifespan.

[0089] S4: Jointly optimize the energy storage scheme, power supply scheme, and load transfer scheme; the method is to use genetic algorithm for optimization, refer to Figure 2 , the specific steps are as follows:

[0090] S401: Set crossover probability, mutation probability, and Generate a comprehensive dispatch plan for a virtual power plant Individuals constitute the initial population;

[0091] Each load transfer sequence has r virtual power plant comprehensive dispatching schemes, and m load transfer sequences have a total of Virtual power plant comprehensive scheduling schemes, each virtual power plant comprehensive scheduling scheme corresponds to an individual, and the population size is Any individual contains p chromosomes, corresponding to p time points; each chromosome contains 4 genes, corresponding to each time point , , and ;

[0092] S402: Calculate the fitness of each individual; the formula is as follows:

[0093] ;

[0094] Among them, H represents the fitness of any individual; It represents the unit price of electricity sold to the grid at the tth time point in the next 24 hours; represents the unit electricity price of electricity purchased from the power grid at the tth time point in the next 24 hours; f represents the load transfer cost coefficient; the load transfer cost coefficient is the cost required to transfer a unit load, which is determined by technicians in this field after a large amount of data analysis;

[0095] S403: performing selection operation, crossover operation, and mutation operation in sequence, and generating the next generation population;

[0096] The crossover operation includes single-point crossover and ordered crossover; the object of the crossover operation is any pair of chromosomes corresponding to the same time point in the two individuals participating in the crossover operation;

[0097] The method of single-point crossover is as follows: at one or more preset crossover points, partial sequences of the parent chromosome are exchanged to form a daughter chromosome. For example, if there are two chromosomes A and B, and a crossover point p is selected, the daughter chromosome will consist of the first p elements of A plus the last Mp elements of B, and the first p elements of B plus the last Mp elements of A; M represents the number of elements on the chromosome involved in the crossover.

[0098] The method of ordered crossover is as follows: select a subsequence of a pair of parent sequences, keep the order of the elements in the subsequence unchanged, and insert it into the corresponding position of the other parent sequence, so that the crossover subsequence meets the sorting requirements as much as possible. This crossover method can ensure that the crossover subsequence still maintains the original relative order of the parent sequence.

[0099] The mutation operation includes exchange mutation, reverse mutation, and adjacent exchange mutation;

[0100] The exchange mutation is to randomly select two different positions on the chromosome and exchange the elements at these two positions. This may improve the order of the sequence. The reverse mutation is to randomly select a continuous subsequence on the chromosome and then reverse the order of this subsequence. The insertion mutation is to randomly take an element from the chromosome and then reinsert it at a random position afterwards, which is similar to the element jumping and moving in the sequence. The adjacent exchange mutation is to randomly select two adjacent elements in the chromosome and exchange their positions.

[0101] S404: Repeat steps S402-S403 until the highest fitness of all individuals in the population converges;

[0102] S405: Obtain the comprehensive dispatching plan of the virtual power plant corresponding to the individual with the highest fitness as the joint optimization result of the energy storage plan, the power supply plan, and the load transfer plan.

[0103] S5: Based on the results of the joint optimization, a comprehensive scheduling plan for the virtual power plant is recommended.

[0104] The joint optimization method described in steps S401-S405 takes economic benefits as the optimization goal, takes into account the revenue from selling electricity to the power grid, the economic cost of purchasing electricity from the power grid, and the cost of load transfer, and can help users make comprehensive scheduling decisions for virtual power plants with the highest economic benefits.

[0105] Example 2

[0106] This embodiment is the second embodiment of the present invention; it is based on the same inventive concept as embodiment 1, Figure 3This embodiment introduces a virtual power plant supply and demand regulation and load integrated energy storage system, including a data acquisition module, a prediction model module, a load transfer module, a scheduling scheme module, a joint optimization module, and a recommendation display module; wherein:

[0107] The data acquisition module is used to collect historical data, including historical power generation data and historical load data; and to sort the historical data in chronological order to generate a historical power generation sequence and a historical load sequence;

[0108] The prediction model module is used to train the time series prediction model, and perform power generation prediction and load prediction to generate power generation sequence and load sequence;

[0109] The time series prediction model includes: a power generation prediction model, which is trained based on the historical power generation sequence and is used for power generation prediction; a load prediction model, which is trained based on the historical load sequence and is used for load prediction;

[0110] The load transfer module is used to perform load transfer and generate a load transfer sequence; the module is configured with a load transfer scheme, which is set by analyzing the proportion of elastic load in the peak load period;

[0111] The scheduling scheme module is used to generate energy storage schemes and power supply schemes; and combine the energy storage schemes and power supply schemes at each time point in the next 24 hours to generate a comprehensive scheduling scheme for a virtual power plant at each time point based on each load transfer sequence;

[0112] The joint optimization module is used to perform joint optimization of energy storage schemes, power supply schemes, and load transfer schemes; the energy storage schemes and power supply schemes formulated based on each load transfer scheme are optimized by genetic algorithms, thereby achieving joint optimization, taking the comprehensive benefits of electricity sales and purchases from the power grid and load transfer as the optimization target, and obtaining a comprehensive dispatching scheme for a virtual power plant with the highest comprehensive economic benefits;

[0113] The recommendation display module is used to recommend a comprehensive scheduling plan for a virtual power plant, and visually display the load sequence, load transfer sequence, and power generation sequence corresponding to the recommended comprehensive scheduling plan for a virtual power plant in the form of charts, etc.

[0114] The specific functional implementation of each of the above modules refers to the relevant contents of the virtual power plant supply and demand regulation and load integrated energy storage method described in Example 1 and will not be repeated here.

[0115] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0116] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the purpose and scope of protection of the present invention, which are all within the protection of the present invention.

Claims

1. A virtual power plant supply and demand regulation and load integrated energy storage method, characterized by: The following steps are involved: S1: Collect historical data, conduct virtual power plant power generation forecast and load forecast, and generate power generation sequence and load sequence; S2: performing load transfer based on the load sequence and a preset load transfer scheme to generate a load transfer sequence; The load transfer scheme is the load transfer ratio during the peak period; The setting method is as follows: Analyze historical load data, calculate the average value of elastic load proportion in peak load period, and record it as ; The interval Divide it into m sub-intervals evenly, where m is a positive integer; extract the left endpoint of each sub-interval and use it as the load transfer ratio of the peak period in the m load transfer schemes; The method for performing load transfer and generating a load transfer sequence is as follows: Identifying peak periods and off-peak periods in the load sequence; Cut off the transfer target time period from the non-peak time period; The loads of the peak periods in the load sequence are cut based on the m load transfer schemes respectively, and the load values ​​of the peak periods are updated. The formula is as follows: ; in, represents the i-th load value in the peak period of the load sequence, the value range of i is 1, 2, ..., n, and n is the number of load values ​​in the peak period of the load sequence; An updated value representing the load value during the peak period; is the load transfer ratio during the peak period in any load transfer scheme; The load sequence is loaded and transferred based on m load transfer schemes respectively, and the load value of the transfer target period is updated. The formula is as follows: ; in, represents the jth load value of the target period of transfer in the load sequence, the value range of j is 1, 2, ..., k, and k is the number of load values ​​of the target period of transfer in the load sequence; An updated value representing the load value of the transfer target period; S3: Generate an energy storage solution and a power supply solution based on the power generation sequence and the load transfer sequence; the method is as follows: Generate r energy storage solutions and r power supply solutions for each load transfer sequence, and combine the energy storage solution with the power supply solution to generate r virtual power plant comprehensive dispatching solutions based on each load transfer sequence; The energy storage scheme is the distribution method of power generation at the t-th time point in the next 24 hours, including the proportion of power sold to the grid to power generation. and the proportion of energy storage to power generation ; The value range of t is 1, 2, ..., p, where p is the number of time points in the load transfer sequence; The power supply plan is the power supply output mode at the tth time point in the next 24 hours, including the proportion of the power supplied to users by the energy storage system to the total load. And the proportion of electricity supplied to users through the power grid to the total load ; S4: Jointly optimize the energy storage solution, power supply solution, and load transfer solution; the method is as follows: S401: Set crossover probability, mutation probability, and Generate a comprehensive dispatch plan for a virtual power plant Individuals constitute the initial population; Any individual contains p chromosomes, corresponding to p time points; each chromosome contains 4 genes, corresponding to each time point , , and ; S402: Calculate the fitness of each individual; S403: performing selection operation, crossover operation, and mutation operation in sequence, and generating the next generation population; The crossover operation includes single-point crossover and ordered crossover; the object of the crossover operation is any pair of chromosomes corresponding to the same time point in the two individuals participating in the crossover operation; The mutation operation includes exchange mutation, reverse mutation, and adjacent exchange mutation; S404: Repeat steps S402-S403 until the highest fitness of all individuals in the population converges; S405: Obtaining a comprehensive dispatching plan of a virtual power plant corresponding to the individual with the highest fitness as a joint optimization result of an energy storage plan, a power supply plan, and a load transfer plan; S5: Based on the result of the joint optimization, recommend a comprehensive scheduling plan for the virtual power plant; the comprehensive scheduling plan for the virtual power plant includes an energy storage plan and a power supply plan.

2. The virtual power plant supply and demand regulation and load integrated energy storage method according to claim 1, characterized in that: The method for generating the power generation sequence and the load sequence is specifically as follows: Collect historical data, including historical power generation data and historical load data; Arrange the historical power generation data into a historical power generation sequence in chronological order; Arrange the historical load data into a historical load sequence in chronological order; A power generation prediction model is trained for the historical power generation sequence; a load prediction model is trained for the historical load sequence; the power generation prediction model and the load prediction model are any one of a SARIMA model, a LSTM model, and a GRU model; Based on the power generation prediction model, the power generation data within the next 24 hours is predicted, and the data is sorted into a power generation sequence in chronological order; based on the load prediction model, the load data within the next 24 hours is predicted, and the data is sorted into a load sequence in chronological order.

3. The virtual power plant supply and demand regulation and load integrated energy storage method according to claim 2, characterized in that: The constraints for combining the energy storage solution with the power supply solution are as follows: ; in, represents the load value at the tth time point in the load transfer sequence; Indicates the rated output power of the energy storage system; Indicates the initial capacity of the energy storage system; Represents the safety margin of the energy storage system; Represents the power generation at the tth time point in the power generation sequence.

4. The virtual power plant supply and demand regulation and load integrated energy storage method according to claim 3, characterized in that: The calculation formula of the fitness is as follows: ; Among them, H represents the fitness of any individual; It represents the unit price of electricity sold to the grid at the tth time point in the next 24 hours; It represents the unit electricity price of electricity purchased from the power grid at the tth time point in the next 24 hours; f represents the load transfer cost coefficient.

5. A virtual power plant supply and demand regulation and load integrated energy storage system, which is implemented based on the virtual power plant supply and demand regulation and load integrated energy storage method according to any one of claims 1 to 4, characterized in that: It includes data collection module, prediction model module, load transfer module, scheduling scheme module, joint optimization module and recommendation display module; among which: The data acquisition module is used to collect historical data and generate historical power generation sequences and historical load sequences; The prediction model module is used to train the time series prediction model, and perform power generation prediction and load prediction to generate power generation sequence and load sequence; The load transfer module is configured with a load transfer scheme for generating a load transfer sequence; The scheduling scheme module is used to generate energy storage schemes and power supply schemes; The joint optimization module is used to perform joint optimization of energy storage scheme, power supply scheme and load transfer scheme; The recommendation and display module is used to recommend a comprehensive scheduling plan for a virtual power plant, and to visually display a load sequence, a load transfer sequence, and a power generation sequence.