Dynamic flood risk assessment method based on flood inundation simulation
Through the dynamic flood risk assessment method based on flood submersion simulation, the problem of uncertainty in flood risk assessment in the existing technology is solved, real-time and accurate assessment of flood risk is achieved, and emergency management needs are met.
Patent Information
- Application Number
- CN202410512054.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-26
AI Technical Summary
The existing flood risk assessment methods cannot reflect the latest trends of flood events in real time, resulting in great uncertainty in the evaluation results and cannot meet the needs of emergency management and disaster response.
Using dynamic flood risk assessment method based on flood submersion simulation, by obtaining flood submersion depth data, disaster-causing factor risk, environmental exposure of pregnancy and disaster-bearing body vulnerability are established as dynamic flood risk assessment indicators, combined with vertical and horizontal subjective and objective combinations The empowerment method determines the optimal weight, performs horizontal layer-by-layer weighted superposition and vertical time-weighted superposition to determine the risk of flood disasters, and divides the target flood disaster risk levels through clustering.
It improves the accuracy and timeliness of flood risk assessment, can reflect the risk level of flood events in real time, comprehensively consider changes in time and space, and meets the needs of emergency management and disaster response.
Smart Images

Figure CN118469276B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of environmental science and technology, and in particular to a dynamic flood risk assessment method based on flood inundation simulation. Background Art
[0002] Floods are one of the most destructive disasters affecting human livelihoods and global development. In recent years, the global flood risk has further increased due to the increase in the frequency and severity of floods caused by climate change, as well as the growth of population and economic activities vulnerable to disasters.
[0003] Flood risk assessment refers to the evaluation of the potential threats and impacts that flood disasters may cause to humans, property and the environment, which is of great significance for the formulation of emergency plans, optimization of prevention and control strategies, and scientific allocation of flood control resources. In existing technologies, flood risks are usually assessed based on historical climate, hydrological data and future scenario assumptions. However, this traditional flood risk assessment method cannot reflect the latest developments of flood events in real time, nor can it accurately reflect the actual impact and changes of current flood events, resulting in greater uncertainty in the evaluation results. Furthermore, in today's era of frequent extreme climate events, traditional methods cannot meet the needs of emergency management and disaster response.
[0004] Therefore, there is an urgent need in relevant technologies for a method that can improve the accuracy and timeliness of flood risk assessment. Summary of the invention
[0005] Based on this, it is necessary to provide a dynamic flood risk assessment method based on flood inundation simulation that can improve the accuracy and timeliness of flood risk assessment in response to the above technical problems.
[0006] In a first aspect, the present application provides a dynamic flood risk assessment method based on flood inundation simulation. The method comprises:
[0007] Obtain flood inundation depth data;
[0008] A dynamic flood risk assessment index system is established by taking the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies as dynamic flood risk assessment indicators, wherein the hazard of disaster-causing factors is determined according to the flood inundation depth data;
[0009] Based on the dynamic flood risk assessment index system, the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment index are determined by using the vertical and horizontal subjective and objective combination weighting method;
[0010] Based on the optimal horizontal subjective and objective combined weights and the vertical time weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer horizontally and time-weighted and superimposed vertically to determine the vertical and horizontal flood disaster risk levels;
[0011] Based on the longitudinal and transverse flood disaster risk degrees, clustering is performed to determine the target flood disaster risk level classification and evaluate the flood disaster risk.
[0012] Optionally, in one embodiment of the present application, obtaining flood inundation depth data includes:
[0013] Construct flood inundation simulation models;
[0014] The site observed flow data collected by the hydrological station is input into the flood inundation simulation model, and the flood inundation depth data is output.
[0015] Optionally, in one embodiment of the present application, the hazard factor hazard, the exposure of the disaster-prone environment and the vulnerability of the disaster-bearing body are used as dynamic flood risk assessment indicators, and after the dynamic flood risk assessment indicator system is established, it also includes:
[0016] The dynamic flood risk assessment index is normalized to eliminate differences in magnitude or dimension.
[0017] Optionally, in one embodiment of the present application, the method of determining the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment index based on the dynamic flood risk assessment index system by adopting the vertical and horizontal subjective and objective combination weighting method includes:
[0018] The subjective and objective weighting methods are respectively used to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment indicators layer by layer;
[0019] Based on the horizontal subjective and objective weights, an improved game theory combined weighting method is used to determine the optimal horizontal subjective and objective combined weights;
[0020] The nonlinear programming method is used to determine the longitudinal time weight of the dynamic flood risk assessment index.
[0021] Optionally, in one embodiment of the present application, the step of respectively using a subjective weighting method and an objective weighting method to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment index layer by layer includes:
[0022] Construct hierarchical model;
[0023] Constructing a judgment matrix based on the hierarchical structure model;
[0024] Determine a single-layer weight vector and a maximum eigenvalue based on the judgment matrix;
[0025] Performing a consistency check based on the maximum eigenvalue;
[0026] A hierarchical total ordering weight vector is determined based on the single-layer weight vector, and a hierarchical total ordering consistency check is performed.
[0027] Optionally, in one embodiment of the present application, the step of respectively using the subjective weighting method and the objective weighting method to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment index layer by layer further includes:
[0028] Normalizing the dynamic flood risk assessment index;
[0029] Calculating the indicator variability of the dynamic flood risk assessment indicator;
[0030] Performing indicator conflict calculation on the dynamic flood risk assessment indicators;
[0031] The lateral objective weight of the dynamic flood risk assessment index is determined based on the index variability and index conflict.
[0032] Optionally, in one embodiment of the present application, the determining the optimal horizontal subjective and objective combined weights based on the subjective and objective weights by using an improved game theory combined weighting method includes:
[0033] Constructing a basic weight vector set;
[0034] An optimal transverse subjective and objective combined weight is determined based on the basic weight vector set and the transverse subjective and objective weights.
[0035] Optionally, in one embodiment of the present application, the dynamic flood risk assessment index is subjected to horizontal layer-by-layer weighted superposition and vertical time weighted superposition based on the optimal horizontal subjective and objective combined weight and the vertical time weight to determine the vertical and horizontal flood disaster risk, including:
[0036] Based on the optimal horizontal subjective and objective combined weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer to determine the horizontal flood disaster risk degree;
[0037] The longitudinal and transverse flood disaster risk degrees are weighted and superimposed based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk degrees.
[0038] Optionally, in one embodiment of the present application, the longitudinal time weighted superposition of the transverse flood disaster risk based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk includes:
[0039] The TOWA-GA operator is combined with the longitudinal time weight to perform longitudinal time weighted superposition of the transverse flood disaster risk to determine the longitudinal and transverse flood disaster risk.
[0040] Optionally, in an embodiment of the present application, clustering is performed based on the longitudinal and transverse flood disaster risk levels to determine the target flood disaster risk level classification, and evaluating the flood disaster risk includes:
[0041] The Gaussian mixture model is used to cluster the longitudinal and transverse flood disaster risk levels, and the clustering results are evaluated using the Davidson-Botting Index to determine the target flood disaster risk level.
[0042] The above-mentioned dynamic flood risk assessment method based on flood inundation simulation obtains flood inundation depth data; takes the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies as dynamic flood risk assessment indicators to establish a dynamic flood risk assessment index system, wherein the hazard of disaster-causing factors is determined according to the flood inundation depth data; based on the dynamic flood risk assessment index system, the optimal horizontal subjective and objective combination weights and vertical time weights of the dynamic flood risk assessment indicators are determined by using the vertical and horizontal subjective and objective combination weighting method; based on the optimal horizontal subjective and objective combination weights and vertical time weights, the dynamic flood risk assessment indicators are weightedly superimposed layer by layer horizontally and weightedly superimposed vertically to determine the vertical and horizontal flood disaster risk degrees; clustering is performed based on the vertical and horizontal flood disaster risks to determine the target flood disaster risk level classification and evaluate the flood disaster risk. That is to say, when conducting flood risk assessment, a dynamic flood risk assessment system is established with the dangerousness of disaster-causing factors as dynamic evaluation indicators. This can reflect the immediate risk level based on the dynamic and real-time acquired flood inundation depth data. At the same time, when weighting the assessment indicators, the vertical and horizontal subjective and objective combined weighting method is combined to comprehensively consider the changes in time and space, which not only improves the timeliness of the flood risk assessment, but also improves the accuracy of the flood risk assessment. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 is an application environment diagram of a dynamic flood risk assessment method based on flood inundation simulation in one embodiment;
[0044] Figure 2 is a flow chart of a dynamic flood risk assessment method based on flood inundation simulation in one embodiment;
[0045] Figure 3 A schematic diagram of a BTOP-RRI flood inundation model construction in one embodiment;
[0046] Figure 4 A schematic diagram of a dynamic one-way coupling of a hydrological model BTOP and a hydrodynamic model RRI in one embodiment;
[0047] Figure 5 A schematic diagram of a change line of weights of all evaluation factors in an indicator layer obtained by using different methods in one embodiment;
[0048] Figure 6 A schematic diagram of a curve showing a change in the DBI index with the number of cluster centers D in one embodiment;
[0049] Figure 7 A schematic flow chart of specific steps of a dynamic flood risk assessment method based on flood inundation simulation in one embodiment;
[0050] Figure 8 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0052] The dynamic flood risk assessment method based on flood inundation simulation provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. Among them, the terminal 102 can be but is not limited to various personal computers, laptops, smart phones, tablets, Internet of Things devices and portable wearable devices. The Internet of Things devices can be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices can be smart watches, smart bracelets, head-mounted devices, etc. The server 104 can be implemented with an independent server or a server cluster consisting of multiple servers.
[0053] In one embodiment, Figure 2 As shown in the figure, a dynamic flood risk assessment method based on flood inundation simulation is provided. Figure 1 The server in the example is used to illustrate the following steps:
[0054] S201: Obtain flood inundation depth data.
[0055] In the embodiment of the present application, first, the flood inundation depth data is obtained. The flood inundation depth data is the hydrological data obtained by simulating the flow size, precipitation runoff and flood inundation in the basin through the flood inundation simulation model. Optionally, the flood inundation simulation model includes a distributed hydrological model BTOP (Block-wise use of the TOPMODEL) model and a two-dimensional simulation model RRI model, wherein the BTOP (Block-wise use of the TOPMODEL) model is a distributed hydrological model for large-scale basins developed on the basis of the TOPMODEL model. The model consists of three parts: a terrain sub-model, a flow generation sub-model and a flow confluence sub-model, and can reliably simulate the flow generation and confluence process, soil moisture changes and flow size in the basin. The model has a strong physical basis and has been widely used in more than 2,000 basins around the world, involving water resources management, flood forecasting, water environment simulation and other fields. The RRI model is a two-dimensional model developed based on the diffusion wave model that can simultaneously simulate precipitation runoff and flood inundation. Among them, lateral soil flow and vertical infiltration are estimated by considering the flow-hydraulic gradient relationship of saturated underground and surface runoff and the Green-Ampt model respectively. As for the water interaction between the river channel and the slope, the overflow formula is selected according to the slope water level and the levee height. The diffusion wave model takes into account the change of water depth along the way on the basis of the simplified motion wave model, so it is closer to the solution of the classic Saint-Venant equation and has a wider range of application.
[0056] S203: Using the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies as dynamic flood risk assessment indicators, a dynamic flood risk assessment indicator system is established, wherein the hazard of disaster-causing factors is determined based on the flood inundation depth data.
[0057] In the embodiment of the present application, the possible risk sources in the study area are identified according to the characteristics of the flood, and the hazard of the disaster-causing factors, the exposure of the disaster-prone environment and the vulnerability of the disaster-bearing body are used as criteria to determine the dynamic flood risk assessment index and establish a dynamic flood risk assessment index system. Specifically, as the first-level evaluation index of flood risk assessment, the criterion layer of the hazard of the disaster-causing factors mainly includes three criteria: precipitation, underlying surface, and water system. The main evaluation indicators include precipitation, total precipitation in the flood season, slope, terrain index, river network density, flood inundation depth, etc. The main evaluation indicators of the criterion layer of the exposure of the disaster-prone environment include population density, economic density, road density, etc. The criterion layer of the vulnerability of the disaster-bearing body mainly includes three criteria: population, social economy, and land use. The main evaluation indicators include the number of rural population, the number of female population, the disposable income of rural residents, cultivated land, forest land, etc. The established dynamic flood risk assessment index system is shown in Table 1. Among them, the flood inundation depth data is predicted by the flood inundation simulation model, and other data sources are shown in Table 2.
[0058] Table 1 Summary of dynamic flood risk assessment indicators
[0059]
[0060]
[0061] Table 2 Data sources
[0062]
[0063] S205: Based on the dynamic flood risk assessment index system, a longitudinal and transverse subjective and objective combined weighting method is adopted to determine the optimal transverse subjective and objective combined weight and longitudinal time weight of the dynamic flood risk assessment index.
[0064] In the embodiment of the present application, after the dynamic flood risk assessment index system is established, it is necessary to determine the weight of each dynamic flood risk assessment index in the entire system in order to obtain a more accurate flood risk assessment result. By adopting the vertical and horizontal subjective and objective combined weighting method, from the perspective of horizontal and vertical combination, where the horizontal refers to the spatial distribution and the vertical refers to the time distribution, the optimal horizontal subjective and objective combined weights and vertical time weights of each dynamic flood risk assessment index are determined. Specifically, the vertical and horizontal subjective and objective combined weighting method includes subjective weighting method, objective weighting method, improved game theory combined weighting method and nonlinear programming method.
[0065] S207: Based on the optimal horizontal subjective and objective combined weights and the vertical time weights, the dynamic flood risk assessment indicators are weightedly superimposed layer by layer horizontally and weightedly superimposed vertically to determine the vertical and horizontal flood disaster risk levels.
[0066] In the embodiment of the present application, after determining the horizontal and vertical weights of each dynamic flood risk assessment indicator in the entire system, based on the horizontal subjective and objective combined weights, the data layers of each indicator at different times are weighted and superimposed horizontally layer by layer, and the data layers of each indicator at different times in a period are weighted and superimposed vertically based on the vertical time weights to obtain the final vertical and horizontal flood disaster risk that integrates space and time.
[0067] S209: Clustering is performed based on the longitudinal and transverse flood disaster risk levels, a target flood disaster risk level classification is determined, and flood disaster risk is evaluated.
[0068] In the embodiment of the present application, finally, the Davidson Bouldin Index (DBI) is used to obtain the optimal number of cluster centers, and the flood risk of the evaluation units in the study area is clustered based on the maximum membership principle, and the risk level is divided to obtain the target flood disaster risk level classification. Specifically, based on the maximum membership principle, each evaluation unit can be divided into five categories from high to low risk, namely high risk area, second high risk area, medium risk area, second low risk area and low risk area.
[0069] In the above-mentioned dynamic flood risk assessment method based on flood inundation simulation, first, the flood inundation depth data is obtained; then, the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies are used as dynamic flood risk assessment indicators to establish a dynamic flood risk assessment indicator system, wherein the hazard of disaster-causing factors is determined according to the flood inundation depth data; then, based on the dynamic flood risk assessment indicator system, the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment indicator are determined by using the vertical and horizontal subjective and objective combination weighting method; then, based on the optimal horizontal subjective and objective combination weight and vertical time weight, the dynamic flood risk assessment indicator is subjected to horizontal layer-by-layer weighted superposition and vertical time weighted superposition to determine the vertical and horizontal flood disaster risk; finally, clustering is performed based on the vertical and horizontal flood disaster risk to determine the target flood disaster risk level classification and evaluate the flood disaster risk. That is to say, when conducting flood risk assessment, a dynamic flood risk assessment system is established with the dangerousness of disaster-causing factors as dynamic evaluation indicators. This can reflect the immediate risk level based on the dynamic and real-time acquired flood inundation depth data. At the same time, when weighting the assessment indicators, the vertical and horizontal subjective and objective combined weighting method is combined to comprehensively consider the changes in time and space, which not only improves the timeliness of the flood risk assessment, but also improves the accuracy of the flood risk assessment.
[0070] In one embodiment of the present application, obtaining flood inundation depth data includes:
[0071] S301: Construct a flood inundation simulation model.
[0072] S303: inputting the site observed flow data collected by the hydrological station into the flood inundation simulation model, and outputting the flood inundation depth data.
[0073] In one embodiment of the present application, first, a flood inundation simulation model is constructed, and the site observation flow data collected by the hydrological station is input into the flood inundation simulation model, and the flood inundation depth data is output. The flood inundation simulation model includes a distributed hydrological model BTOP (Block-wise use of the TOPMODEL) model and a two-dimensional simulation model RRI model, wherein the BTOP (Block-wise use of the TOPMODEL) model is a distributed hydrological model for large-scale watersheds developed on the basis of the TOPMODEL model. The RRI model is a two-dimensional model developed based on the diffusion wave model that can simulate precipitation runoff and flood inundation at the same time. Figure 3 FIG. 1 is a schematic diagram of constructing a BTOP-RRI flood inundation model in one embodiment. Figure 4 The diagram is a schematic diagram of the dynamic one-way coupling of the hydrological model BTOP and the hydrodynamic model RRI. First, the distributed hydrological model is used to calculate the runoff flow for the entire basin, and then the runoff flow is loaded as a boundary condition on the target section node of the one-dimensional river channel, and a two-dimensional hydrodynamic model is simulated in the local area such as the flooding. The model input data includes static data of the underlying surface, elevation, land cover, soil classification, and hydrological and meteorological data. The model output data includes flow, flood inundation depth, and flooding duration. Among them, the land cover data comes from the global land use data based on the classification standard of the International Geosphere-Biosphere Programme (IGBP). The soil classification data comes from the global 1:5 million soil classification data released by the Food and Agriculture Organization of the United Nations (FAO). This data set divides the soil into 6998 types based on the proportion of sand, clay, and silt in the soil. The hydrological and meteorological data are shown in Table 3.
[0074] Table 3 Hydrometeorological data
[0075]
[0076] In this embodiment, a flood inundation simulation model is constructed, the site observation flow data collected by the hydrological station is screened, the screened site observation flow data is input into the flood inundation simulation model, and the flood inundation depth data is output. The BTOP model and the RRI model are used, combined with the geographic information system (GIS) and machine learning technology, to achieve accurate simulation of the flood inundation range and depth.
[0077] In one embodiment of the present application, the hazard factor danger, the exposure of the disaster-prone environment and the vulnerability of the disaster-bearing body are used as dynamic flood risk assessment indicators, and after establishing the dynamic flood risk assessment indicator system, it also includes:
[0078] The dynamic flood risk assessment index is normalized to eliminate differences in magnitude or dimension.
[0079] In one embodiment of the present application, the dynamic flood risk assessment indicators are complex and diverse, and there are differences in magnitude or dimension. In order to facilitate weighted superposition, the collected raster data needs to be normalized. First, the resolution of each assessment indicator is resampled to 1km×1km. Then, a matrix X is constructed for a assessment units and b assessment indicators. a×b =(x ij ) a×b , and normalize it using the MinMax method to get the normalized matrix X * a×b =(x * ij ) a×b Specifically, for indicators that are positively correlated with flood risk, the calculation formula is as follows.
[0080]
[0081] For indicators that are negatively correlated with flood risk, the calculation formula is as follows.
[0082]
[0083] Among them, x ij is the size of the jth evaluation index in the i-th evaluation unit; x * ij For x ij The normalized value of , and 0≤x * ij ≤1;x max (j), x min (j) are the maximum and minimum values of the jth evaluation index, respectively.
[0084] In this embodiment, the dynamic flood risk assessment index is normalized to eliminate the magnitude or dimension differences, which facilitates the subsequent horizontal and vertical weighted superposition.
[0085] In one embodiment of the present application, the method of determining the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment index based on the dynamic flood risk assessment index system by adopting the vertical and horizontal subjective and objective combination weighting method includes:
[0086] S401: Obtaining the lateral subjective and objective weights of the dynamic flood risk assessment index layer by layer using a subjective weighting method and an objective weighting method respectively.
[0087] S403: Based on the horizontal subjective and objective weights, an improved game theory combined weighting method is used to determine the optimal horizontal subjective and objective combined weights.
[0088] S405: Determine the longitudinal time weight of the dynamic flood risk assessment index using a nonlinear programming method.
[0089] In one embodiment of the present application, first, the commonly used subjective weighting method and the objective weighting method that takes into account data volatility and correlation are respectively used to obtain the horizontal subjective and objective weights of all dynamic flood risk assessment indicators layer by layer to avoid the loss of subjective experience and objective data information. Then, based on the constraint condition of maximizing the deviation, the improved game theory combined weighting method is used to determine the optimal horizontal subjective and objective combined weights. Then, the nonlinear programming method is used to determine the vertical time weights of the dynamic flood risk assessment indicators corresponding to the current and previous N+1 moments. The nonlinear programming method is a commonly used method for solving time weights based on the information entropy index. This method can not only distinguish the importance of different moments in a time period, but also take into account the importance of the evaluation indicators. The entropy index I is set based on the principle of information entropy, and the specific calculation formula is as follows.
[0090]
[0091] Among them, ω' t is the time weight vector at the tth moment, N is the length of the study period, the smaller the difference between the time weight vectors, the larger the I value, and vice versa.
[0092] The time degree λ∈[0,1] is introduced to characterize the difference between time weight vectors to reflect the importance of the examination time series. Specifically, the closer λ is to 0, the more importance the time weighting attaches to recent data; the increasing value of λ means that the importance of recent data gradually decreases. In order to minimize the difference between time weight vectors, the weight calculation is transformed into a nonlinear programming problem based on the calculation principle of time weight. The specific calculation formula is as follows.
[0093]
[0094]
[0095] Among them, ω' t is the time weight vector at the tth moment, and N is the length of the study period.
[0096] In this embodiment, the subjective and objective weights of the dynamic flood risk assessment indicators are obtained layer by layer by using the subjective weighting method and the objective weighting method respectively. Based on the horizontal subjective and objective weights, the improved game theory combined weighting method is used to determine the optimal horizontal subjective and objective combined weights, and the nonlinear programming method is used to determine the vertical time weights. This can comprehensively consider the changes in time and space, thereby optimizing the accuracy and rationality of flood risk assessment.
[0097] In one embodiment of the present application, the step of respectively using the subjective weighting method and the objective weighting method to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment index layer by layer includes:
[0098] S501: Construct a hierarchical model.
[0099] S503: constructing a judgment matrix based on the hierarchical structure model.
[0100] S505: Determine a single-layer weight vector and a maximum eigenvalue based on the judgment matrix.
[0101] S507: Perform a consistency check based on the maximum eigenvalue.
[0102] S509: Determine a hierarchical total ordering weight vector based on the single-layer weight vector, and perform a hierarchical total ordering consistency check.
[0103] In one embodiment of the present application, the subjective weighting method adopts the Analytic Hierarchy Process (AHP), which usually uses expert scoring or questionnaires to determine the importance of each indicator, and the higher the importance score, the greater the indicator weight. First, a hierarchical model is constructed, and the complex target decision problem is regarded as a system, the decision-making goal of the entire system is investigated and analyzed, the nature and correlation of the criteria and decision indicators are considered, and several levels such as goals, criteria and programs are clustered and constructed. Among them, the target layer is the purpose of proposing a decision problem, which is the highest level of the entire hierarchical structure and usually contains only one factor; the criterion layer is also called the middle layer, which usually includes the criteria, measures or policies required to achieve the goal, and can be refined and added according to the complexity of the specific decision problem. The bottom layer is the program layer, which is all the program elements that can be selected to achieve the target layer. In order to facilitate the comparison between the factors of each layer, it is usually recommended that the control factors of each layer do not exceed 9.
[0104] After that, a judgment matrix is constructed based on the hierarchical model. After clarifying the affiliation between two adjacent layers by constructing the hierarchical model, starting from the second layer of the hierarchy, a judgment matrix is constructed for all factors belonging to the previous layer, until the lowest layer, to lay an information foundation for hierarchical analysis. For each factor at each level, the consistent matrix method requires that all factors be compared pairwise to avoid the problem of difficulty in comparison due to different properties as much as possible, and to improve the accuracy of weight assignment. Assume that the lower-level elements that can be controlled by element C in the criterion layer are c1~c n In order to quantitatively characterize the relative importance of each element, a comparative scale a is usually used. ij To characterize the relative importance of the i-th and j-th elements. ij The matrix A is composed ofij ) is called the judgment matrix. ij It is generally a positive integer in the range of 1 to 9 or its reciprocal.
[0105] Afterwards, the single-layer weight vector and the maximum eigenvalue are determined based on the judgment matrix. Specifically, the sum-product method is used to calculate the relative weight of each factor. First, the judgment matrix A ij Each column of is normalized, and we get A * ij , the specific formula is as follows.
[0106]
[0107] After that, the judgment matrix A after column normalization is * ij Add by row. The specific formula is as follows.
[0108]
[0109] The added vector W is normalized to determine the single-layer weight vector W*=(w1,w2,...,w n ) T , then calculate the maximum eigenvalue λ of the judgment matrix A max , the specific formula is as follows.
[0110]
[0111] Afterwards, a consistency check is performed based on the maximum eigenvalue, and the consistency of the judgment matrix is quantitatively characterized by calculating the size of the consistency index CI. The specific formula is shown below.
[0112]
[0113] When the CI value is close to 0, it can be considered that the constructed judgment matrix has good consistency. Through the consistency test, the larger the CI value, the more serious the inconsistency of the judgment matrix.
[0114] Finally, the total hierarchical ranking weight vector is determined based on the single-layer weight vector, and the consistency test of the total hierarchical ranking is performed. Specifically, after obtaining the relative weights of the factors in each layer, it is necessary to calculate the relative importance scale of all elements in the same layer to the target layer, that is, the total hierarchical ranking. Calculate layer by layer from high to low to obtain the combined weight of the lowest layer elements relative to the target layer. Assume that the kth layer has n k elements, and relative to an element c in the upper layer (k-1) i The criterion ranking weight vector p i k =(w 1i k ,w 2ik ,...,w nki k ) T , layer k-1 n k The ranking weight vector of -1 element relative to the total target is P k-1 =(w1 k-1 ,w2 k-1 ,...,w nk-1 k-1 ) T , then the relative sorting weight vector of all elements in the kth layer is:
[0115]
[0116] Suppose the consistency index of the hierarchical single ranking of the corresponding factors of the kth layer to the k-1th layer is CI j (j=1,2,...,n k -1), the random consistency index is RI j , then the hierarchical total order consistency ratio is:
[0117]
[0118] In this embodiment, by constructing a hierarchical model, constructing a judgment matrix based on the hierarchical model, determining a single-layer weight vector and a maximum eigenvalue based on the judgment matrix, performing a consistency check based on the maximum eigenvalue, determining a hierarchical total ranking weight vector based on a single-layer weight vector, and performing a hierarchical total ranking consistency check, the subjective weights of all evaluation indicators can be obtained, thereby avoiding the loss of information contained in subjective experience.
[0119] In one embodiment of the present application, the step of respectively using the subjective weighting method and the objective weighting method to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment index layer by layer also includes:
[0120] S601: Normalizing the dynamic flood risk assessment index.
[0121] S603: Calculating the indicator variability of the dynamic flood risk assessment indicator.
[0122] S605: Calculating the index conflict of the dynamic flood risk assessment index.
[0123] S607: Determine the horizontal objective weight of the dynamic flood risk assessment index based on the index variability and index conflict.
[0124] In one embodiment of the present application, the objective weighting method mainly adopts the CRITIC method, which is an objective weighting method that can not only take into account the differences in evaluation indicators in different standards, but also make up for the error problems that may be caused by the correlation between indicators. This method divides the weights by calculating the variability of the indicators themselves and the conflicts between indicators on the basis of mastering the effective information provided by the sample data. The CRITIC method modeling includes four steps. First, the dynamic flood risk assessment indicators are normalized. In order to facilitate the comparison between the evaluation indicators in the evaluation system, it is necessary to first perform dimensionless processing on the values of each indicator. The CRITIC weighting method generally recommends the use of forward or reverse processing. Afterwards, the indicator variability is calculated for the dynamic flood risk assessment indicators. This method achieves the characterization of the fluctuation of the differences in the values of each indicator by calculating the standard deviation to reflect the evaluation strength of the indicator. For the jth evaluation indicator, its standard deviation S j The calculation formula is as follows.
[0125]
[0126]
[0127] Among them, x ij is the i-th value of index j; n is the amount of data of index j; is the mean value of the data corresponding to indicator j. Generally, the larger the standard deviation of the data corresponding to an indicator, the greater the difference of the indicator itself, the more information it can provide, the higher the evaluation value, and the higher the weight should be assigned.
[0128] Afterwards, the dynamic flood risk assessment indicators are calculated for conflict. The strength of the conflict between the assessment indicators can often be characterized by the correlation between the indicators, and can be quantitatively evaluated by calculating the correlation coefficient. When the positive correlation coefficient value is larger, it means that the positive correlation between the indicators is stronger. Correspondingly, the conflict between the indicators is smaller, and the amount of information that can be reflected is relatively small, so a smaller weight should be assigned. The quantitative calculation formula for the conflict between indicators of the CRITIC method is as follows.
[0129]
[0130] Among them, R j Used to quantitatively characterize the conflict of indicator j, r ij is the correlation coefficient between two indicators (i and j), and p is the total number of evaluation indicators.
[0131] Finally, the horizontal objective weights of dynamic flood risk assessment indicators are determined based on indicator variability and indicator conflict. In order to comprehensively measure the variability of the indicators themselves and the conflict between indicators, it is necessary to integrate the information that can be provided by the two for the objective allocation of indicator weights. The comprehensive information of the i-th evaluation indicator is denoted as C i , then:
[0132] C i =S i ×R i
[0133] C i The larger the value, the more important the evaluation index is in the entire evaluation index system and the higher the weight should be assigned. Therefore, the objective weight of the evaluation index can be expressed as:
[0134]
[0135] In this embodiment, by normalizing the dynamic flood risk assessment indicators, calculating the indicator variability of the dynamic flood risk assessment indicators, calculating the indicator conflict of the dynamic flood risk assessment indicators, and determining the horizontal objective weights of the dynamic flood risk assessment indicators based on the indicator variability and indicator conflict, the objective weights of all evaluation indicators can be obtained, thereby avoiding the loss of information contained in the objective data.
[0136] In one embodiment of the present application, the step of determining the horizontal subjective and objective combined weights based on the horizontal subjective and objective weights by using an improved game theory combined weighting method includes:
[0137] S701: Construct a basic weight vector set.
[0138] S703: Determine the optimal horizontal subjective and objective combined weight based on the basic weight vector set and the horizontal subjective and objective weights.
[0139] In one embodiment of the present application, game theory combination is one of the commonly used methods for weight aggregation. The basic idea of this method is to find a compromise value between the corresponding weights of different weighting methods, obtain the optimal combination weight, and minimize the deviation between it and the indicator weight. First, construct a basic weight vector set. Assuming that there are n evaluation indicators involved, a total of M evaluation indicator weight calculation methods are selected, and the basic weight vector set obtained using the mth weighting method can be expressed as:
[0140] ω m ={ω m1 ,ω m2 ,…,ω mn}m=1,2,…,M
[0141] Then, any linear combination of m basic weight sets can be expressed as:
[0142]
[0143] Among them, α m is the linear combination coefficient of the basic weight vector set corresponding to the mth weighting method, and ω is the comprehensive weight vector.
[0144] Afterwards, the optimal horizontal subjective and objective combination weight is determined based on the basic weight vector set and the horizontal subjective and objective weights. The optimal weight vector obtained based on the basic idea of game theory combination can be converted into the optimized linear combination weight coefficient α m , so that the deviation between the optimal combination weight and the weight of each indicator is minimized. At this time, the optimized countermeasure model can be expressed as:
[0145]
[0146] Among them, ω k is the basic weight set obtained using the kth weight calculation method.
[0147] In order to avoid the problem of negative values of linear combination coefficients, according to the differential properties of the matrix, the optimal condition for game theory combination weighting is set as:
[0148]
[0149] Among them, α m >0, and
[0150] Construct the Lagrangian function, the specific formula is as follows.
[0151]
[0152] The linear combination coefficient solution is:
[0153]
[0154] The weight coefficient set corresponding to different weighting methods can be obtained α=(α1,α2,...,α M ), after normalization:
[0155]
[0156] Finally, calculate the optimal combination weights:
[0157]
[0158] like Figure 5 As shown in the figure, it is a schematic diagram of the change of the weights of all evaluation factors in the indicator layer obtained by different methods. It can be seen that the improved game theory combined weighting method can better find a compromise value between subjective and objective weights.
[0159] In this embodiment, by constructing a basic weight vector set and determining the optimal horizontal subjective and objective combined weight based on the basic weight vector set and the horizontal subjective and objective weights, more scientific and reasonable weight values can be allocated to all evaluation indicators in the indicator system.
[0160] In one embodiment of the present application, the dynamic flood risk assessment index is weightedly superimposed layer by layer horizontally and weightedly superimposed vertically based on the optimal horizontal subjective and objective combined weight and vertical time weight to determine the vertical and horizontal flood disaster risk, including:
[0161] S801: Based on the optimal horizontal subjective and objective combined weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer to determine the horizontal flood disaster risk.
[0162] S803: The longitudinal time weighted superposition of the transverse flood disaster risk is performed based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk.
[0163] In one embodiment of the present application, after improving the game theory combined weighting, all evaluation indicators in the index system can be assigned relatively scientific and reasonable weight values. This weighting process can be regarded as a weight calculation method on a spatial scale. Based on the optimal horizontal subjective and objective combined weights, all dynamic flood risk evaluation index values are weighted and superimposed horizontally layer by layer to calculate the flood disaster risk of the study area at different times and obtain its spatial distribution. Based on the longitudinal time weight, the spatial distribution of the horizontal flood disaster risk within the time period is weighted vertically, that is, weighted on the time scale, to obtain the longitudinal and transverse flood disaster risk.
[0164] In this embodiment, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer based on the optimal horizontal subjective and objective combined weights to determine the horizontal flood disaster risk degree, and the horizontal flood disaster risk degrees are weighted and superimposed vertically based on the vertical time weights to determine the vertical and horizontal flood disaster risks. This comprehensively considers the changes in time and space, thereby optimizing the accuracy and rationality of flood risk assessment.
[0165] In one embodiment of the present application, the longitudinal time weighted superposition of the transverse flood disaster risk based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk includes:
[0166] The TOWA-GA operator is combined with the longitudinal time weight to perform longitudinal time weighted superposition of the transverse flood disaster risk to determine the longitudinal and transverse flood disaster risk.
[0167] In one embodiment of the present application, a TOWA-GA hybrid operator is introduced for time series weighting of risk data. The TOWA-GA operator is a combination of the time series weighted average (TOWA) operator and the time series geometric average (TOWGA) operator. t is the time-induced component, a t is the data component, t ,a t >(t∈N) is a TOWA / TOWGA operator pair. At this time, TOWA and TOWGA can be expressed as:
[0168]
[0169]
[0170] Among them, b t is the risk assessment value at time t. Then, the TOWA-GA hybrid operator can be expressed as:
[0171] Y(<u1,a1> ,…, N ,a N >)=a1TOWA+a2TOWGA
[0172]
[0173] Where σ1 and σ2 represent the sum of squares of the deviations of the TOWA operator and the TOWGA operator, respectively.
[0174] In this embodiment, the TOWA-GA operator is used in combination with the time weight to perform the longitudinal time weighted superposition of the lateral flood disaster risk to determine the longitudinal and lateral flood disaster risk, which can better play the role of the time weight obtained by the nonlinear programming method in the comprehensive process of risk at different times.
[0175] In one embodiment of the present application, clustering is performed based on the longitudinal and transverse flood disaster risk levels to determine the target flood disaster risk level classification, and evaluating the flood disaster risk includes:
[0176] The Gaussian mixture model is used to cluster the longitudinal and transverse flood disaster risk levels, and the clustering results are evaluated using the Davidson-Botting Index to determine the target flood disaster risk level.
[0177] In one embodiment of the present application, the Gaussian mixture model (GMM) is a fuzzy clustering algorithm that describes the distribution of mixture density and belongs to the category of unsupervised machine learning. The corresponding probability density function of the model can be expressed as:
[0178]
[0179] Where K is the number of normal distributions included in the GMM model; f K (x|μ k ,σ k 2 ) is the probability density function of the kth normal distribution; ω k , μ k and σ k 2 are the weight, expectation and variance of the normal distribution, respectively, where ω k satisfy:
[0180]
[0181] Usually, the expectation maximization algorithm is used to calculate the parameters (ω k , μ k and σ k 2 ) is used to solve the problem. The algorithm obtains the maximum likelihood estimate of the distribution parameters by introducing implicit variables, and repeatedly introduces the expectation and parameter estimation formula of the variables until convergence.
[0182] The Davies Bouldin Index (DBI) is an indicator used to evaluate the clustering effect. The smaller the DBI value, the tighter the clusters themselves and the more dispersed the clusters, and the better the clustering effect. In order to determine the reasonable number of cluster centers, DBI is used to evaluate the clustering effect corresponding to different numbers of cluster centers, and the case with the smallest DBI value is selected. The specific calculation formula of DBI is:
[0183]
[0184] Among them, D is the number of cluster centers, R i,j is the similarity between classes, and the specific calculation formula is:
[0185]
[0186] Among them, S i and S j are the average distances from the i-th and j-th data to the centroid of their respective classes; M i,j is the distance between the centroids of the i-th and j-th classes.
[0187] like Figure 6 As shown, it is a schematic diagram of the variation of the DBI index with the number of cluster centers D in one embodiment. It can be seen that when D is 5, the DBI value is the smallest, indicating that the tighter the clusters are and the more dispersed the clusters are, the better the clustering effect is.
[0188] In this embodiment, the Gaussian mixture model is used to cluster the longitudinal and transverse flood disaster risk levels, and the clustering results are evaluated in combination with the Davidson-Botting Index to determine the target flood disaster risk level, thereby obtaining an accurate flood disaster risk level classification.
[0189] The following is a specific example to illustrate the specific implementation steps of the dynamic flood risk assessment method based on flood inundation simulation of the present application. Figure 7 As shown, first, S901, obtain flood inundation depth data. Specifically, S903-S905, construct a flood inundation simulation model, input the site observation flow data collected by the hydrological station into the flood inundation simulation model, and output the flood inundation depth data. Afterwards, S907, using the hazard factor hazard, the exposure of the disaster-prone environment, and the vulnerability of the disaster-bearing body as dynamic flood risk assessment indicators, a dynamic flood risk assessment indicator system is established, wherein the hazard factor hazard is determined according to the flood inundation depth data.
[0190] Afterwards, S909, the dynamic flood risk assessment index is normalized to eliminate magnitude or dimension differences.
[0191] Afterwards, S911, based on the dynamic flood risk assessment index system, the optimal horizontal subjective and objective combined weight and vertical time weight of the dynamic flood risk assessment index are determined by using the vertical and horizontal subjective and objective combined weighting method. Specifically, S913-S917, the horizontal subjective and objective weights of the dynamic flood risk assessment index are obtained layer by layer by using the subjective weighting method and the objective weighting method respectively; based on the horizontal subjective and objective weights, the optimal horizontal subjective and objective combined weights are determined by using the improved game theory combined weighting method; and the vertical time weight of the dynamic flood risk assessment index is determined by using the nonlinear programming method.
[0192] Among them, S919-S927, construct a hierarchical model, construct a judgment matrix based on the hierarchical model; determine the single-layer weight vector and the maximum eigenvalue based on the judgment matrix, and perform a consistency check based on the maximum eigenvalue; determine the hierarchical total ranking weight vector based on the single-layer weight vector, and perform a hierarchical total ranking consistency check. S929-S935, normalize the dynamic flood risk assessment index; calculate the indicator variability of the dynamic flood risk assessment index; calculate the indicator conflict of the dynamic flood risk assessment index; determine the horizontal objective weight of the dynamic flood risk assessment index based on the indicator variability and indicator conflict. S937-S939, construct a basic weight vector set; determine the optimal horizontal subjective and objective combination weight based on the basic weight vector set and the horizontal subjective and objective weights.
[0193] Afterwards, S941, based on the optimal horizontal subjective and objective combined weights and the vertical time weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer horizontally and weighted and superimposed in time vertically to determine the vertical and horizontal flood disaster risks. Specifically, S943-S945, based on the optimal horizontal subjective and objective combined weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer horizontally to determine the horizontal flood disaster risk; based on the vertical time weights, the horizontal flood disaster risk is weighted and superimposed vertically and time-wise to determine the vertical and horizontal flood disaster risks. S947, the TOWA-GA operator is used in combination with the vertical time weights to weight and superimpose the horizontal flood disaster risk vertically and time-wise to determine the vertical and horizontal flood disaster risks.
[0194] Finally, S949, clustering is performed based on the longitudinal and transverse flood disaster risk degrees, a target flood disaster risk level classification is determined, and the flood disaster risk is evaluated. Specifically, S951, a Gaussian mixture model is used to cluster the longitudinal and transverse flood disaster risk degrees, and the clustering results are evaluated in combination with the Davidson-Botting index to determine the target flood disaster risk level.
[0195] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0196] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a dynamic flood risk assessment method based on flood inundation simulation is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.
[0197] Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0198] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.
[0199] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0200] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0201] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A dynamic flood risk assessment method based on flood inundation simulation, characterized in that: The method comprises: Obtain flood inundation depth data; A dynamic flood risk assessment index system is established by taking the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies as dynamic flood risk assessment indicators, wherein the hazard of disaster-causing factors is determined according to the flood inundation depth data; Based on the dynamic flood risk assessment index system, the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment index are determined by using the vertical and horizontal subjective and objective combination weighting method; Based on the optimal horizontal subjective and objective combined weights and the vertical time weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer horizontally and time-weighted and superimposed vertically to determine the vertical and horizontal flood disaster risk levels; Based on the longitudinal and transverse flood disaster risk levels, clustering is performed to determine the target flood disaster risk level classification and evaluate the flood disaster risk; The method of determining the optimal horizontal subjective and objective combination weight and vertical time weight of the dynamic flood risk assessment index based on the dynamic flood risk assessment index system by adopting the vertical and horizontal subjective and objective combination weighting method includes: The subjective and objective weighting methods are respectively used to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment indicators layer by layer; Based on the horizontal subjective and objective weights, an improved game theory combined weighting method is used to determine the optimal horizontal subjective and objective combined weights; Using nonlinear programming method to determine the longitudinal time weight of the dynamic flood risk assessment index; The subjective and objective weights of the dynamic flood risk assessment indexes are obtained layer by layer by using the subjective and objective weighting methods respectively, including: Construct hierarchical model; Constructing a judgment matrix based on the hierarchical structure model; Determine a single-layer weight vector and a maximum eigenvalue based on the judgment matrix; Performing a consistency check based on the maximum eigenvalue; Determine the hierarchical total order weight vector based on the single-layer weight vector, and perform a hierarchical total order consistency check; The method of respectively using the subjective weighting method and the objective weighting method to obtain the horizontal subjective and objective weights of the dynamic flood risk assessment index layer by layer also includes: Normalizing the dynamic flood risk assessment index; Calculating the indicator variability of the dynamic flood risk assessment indicator; Performing indicator conflict calculation on the dynamic flood risk assessment indicators; Determining the horizontal objective weight of the dynamic flood risk assessment index based on the index variability and index conflict; The method of performing horizontal layer-by-layer weighted superposition and vertical time weighted superposition of the dynamic flood risk assessment index based on the optimal horizontal subjective and objective combined weight and the vertical time weight to determine the vertical and horizontal flood disaster risk includes: Based on the optimal horizontal subjective and objective combined weights, the dynamic flood risk assessment indicators are weighted and superimposed layer by layer to determine the horizontal flood disaster risk degree; The longitudinal and transverse flood disaster risk degrees are weighted and superimposed based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk degrees.
2. The dynamic flood risk assessment method based on flood inundation simulation according to claim 1 is characterized in that: The obtaining of flood inundation depth data comprises: Construct flood inundation simulation models; The site observed flow data collected by the hydrological station is input into the flood inundation simulation model, and the flood inundation depth data is output.
3. The dynamic flood risk assessment method based on flood inundation simulation according to claim 1 is characterized in that: The above mentioned dynamic flood risk assessment index system, which takes the hazard of disaster-causing factors, exposure of disaster-prone environments and vulnerability of disaster-bearing bodies as dynamic flood risk assessment indicators, also includes: The dynamic flood risk assessment index is normalized to eliminate differences in magnitude or dimension.
4. The dynamic flood risk assessment method based on flood inundation simulation according to claim 1 is characterized in that: The method of determining the optimal horizontal subjective and objective combined weights based on the horizontal subjective and objective weights by using an improved game theory combined weighting method includes: Constructing a basic weight vector set; An optimal transverse subjective and objective combined weight is determined based on the basic weight vector set and the transverse subjective and objective weights.
5. The dynamic flood risk assessment method based on flood inundation simulation according to claim 1 is characterized in that: The method of superimposing the longitudinal time weighted flood disaster risk degree based on the longitudinal time weight to determine the longitudinal and transverse flood disaster risk degree includes: The TOWA-GA operator is combined with the longitudinal time weight to perform longitudinal time weighted superposition of the transverse flood disaster risk to determine the longitudinal and transverse flood disaster risk.
6. The dynamic flood risk assessment method based on flood inundation simulation according to claim 1 is characterized in that: The clustering based on the longitudinal and transverse flood disaster risk levels to determine the target flood disaster risk level classification and evaluate the flood disaster risk includes: The Gaussian mixture model is used to cluster the longitudinal and transverse flood disaster risk levels, and the clustering results are evaluated using the Davidson-Botting Index to determine the target flood disaster risk level.