Tunnel settlement monitoring system based on ad hoc network collection

By introducing the self-organizing network collection and analysis module into the tunnel settlement monitoring system, the monitoring frequency and emergency response are automatically adjusted, which solves the problem of low manual adjustment efficiency and improves the timeliness of monitoring and emergency response capabilities.

CN118482687BActive Publication Date: 2024-10-11钧雷光电有限公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410918001.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-11
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

The existing tunnel settlement monitoring system requires manual adjustment of the monitoring frequency according to on-site conditions, which is inefficient and results in untimely adjustments.

Method used

A tunnel settlement monitoring system based on self-organizing network collection is designed, including a data collection module, a tunnel usage data analysis module, a management analysis module, a tunnel monitoring analysis module, a response adjustment module and a data storage module. Through the tunnel usage and monitoring The data is analyzed in real time, the monitoring frequency is automatically adjusted, and emergency measures are generated when abnormalities are detected.

Benefits of technology

It realizes the automatic adjustment of tunnel settlement monitoring frequency, reduces the efficiency of manual intervention, and improves the timeliness of monitoring and emergency response capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118482687B_ABST
    Figure CN118482687B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of tunnel settlement monitoring, specifically to a tunnel settlement monitoring system based on self-organizing network collection, including: a data collection module, a tunnel usage data analysis module, a management analysis module, a tunnel monitoring analysis module, a response adjustment module and a data storage module. The present invention obtains management information of tunnel monitoring by analyzing tunnel usage parameters, and obtains an adjustment signal by analyzing the management information of tunnel monitoring, and adjusts the monitoring frequency of tunnel monitoring by the adjustment signal, thereby reducing manual monitoring according to the usage of the tunnel site, avoiding the poor efficiency of manual adjustment, and resulting in untimely adjustment; and the present invention obtains the monitoring result of the tunnel by analyzing the monitored data, and obtains the response instruction by analyzing the monitoring result, and generates emergency measures and abnormal alarms according to the response instruction, implements corresponding responses to monitoring anomalies, and is more convenient for emergency response to abnormal conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel settlement monitoring, in particular to a tunnel settlement monitoring system based on self-organizing network collection. Background Art

[0002] Tunnel settlement monitoring is an important engineering and technical means. It can timely understand the deformation of the tunnel, ensure the safe operation of the project and the protection of the environment. It can rely on advanced sensor technology and self-organizing network communication technology to achieve real-time monitoring of tunnel settlement and deformation. Through sensors installed at different locations in the tunnel, settlement data is collected in real time and efficiently transmitted to the central processing unit through the self-organizing network, which improves the real-time and accuracy of monitoring.

[0003] After the main tunnel project is completed, the deformation observation period generally needs to last for several months. The current tunnel settlement monitoring system needs to be manually monitored according to the usage of the tunnel site, and then the frequency of tunnel settlement monitoring is adjusted according to the usage. However, the efficiency of manual adjustment is poor, resulting in untimely adjustment and inconvenience in use. Summary of the invention

[0004] The present invention provides a tunnel settlement monitoring system based on ad hoc network collection, which is used to solve the above technical problems.

[0005] The first aspect of the present invention provides a tunnel settlement monitoring system based on ad hoc network data collection, including: a data collection module, a tunnel usage data analysis module, a management analysis module, a tunnel monitoring analysis module, a response adjustment module and a data storage module.

[0006] The data acquisition module is used to collect tunnel usage parameters and tunnel monitoring data and send the tunnel usage parameters and tunnel monitoring data to the data storage module; the tunnel usage parameters include tunnel video data and environmental parameter data collected by the detection component; and the tunnel monitoring data collected by the sensor.

[0007] The tunnel usage data analysis module is used to receive tunnel usage parameters and analyze the tunnel usage parameters to obtain tunnel monitoring management information, and send the tunnel monitoring management information to the management analysis module.

[0008] As a preferred implementation manner of the present invention, the tunnel usage parameters are analyzed in the following specific analysis method:

[0009] The tunnel video data corresponding to the tunnel usage parameters is obtained, a single date is set to multiple unit times, and the passing vehicles in the tunnel per unit time are extracted based on the tunnel video data for identification and the number of passing vehicles per unit time is counted. The passing vehicles per unit time are identified for model and the passing vehicles include heavy vehicles and light vehicles, and the number of heavy vehicles and the number of light vehicles are counted respectively. The number of heavy vehicles per unit time is compared with the number of passing vehicles per unit time to obtain the proportion of heavy vehicles. The passing speed of each vehicle per unit time in the tunnel is identified, and the passing time of each vehicle through the tunnel is calculated according to the passing speed of each vehicle.

[0010] A preset travel time threshold is obtained, and the travel time of each vehicle through the tunnel is compared with the set travel time threshold. If the travel time of each vehicle through the tunnel is greater than the set travel time threshold, the corresponding unit time is marked as a congested period; otherwise, the corresponding unit time is marked as a smooth period. The number of congested periods is counted and compared with the number of congested periods and the total number of unit times to obtain a congested period ratio. The congested period ratio is compared with the set congestion ratio threshold to obtain the traffic status of the corresponding date. The historical traffic status of each date in the historical data is obtained, and the historical traffic status of each date in the historical data is comprehensively analyzed with the traffic status of the current date to obtain the changing trend of the traffic status, and the corresponding management information is generated according to the changing trend of the traffic status.

[0011] Obtain environmental parameter data corresponding to the tunnel usage parameters, including tunnel temperature, tunnel smoke concentration, light propagation distance and tunnel road surface water; obtain the preset tunnel standard temperature, compare the current tunnel temperature with the tunnel standard temperature, and calculate the current tunnel temperature difference; take the values ​​of light propagation distance and tunnel smoke concentration, and draw a circle with the value of tunnel smoke concentration as the radius, draw a straight line with the center of the circle, the length of the straight line is equal to the value of light propagation distance, and the straight line extends along the diameter of the circle and intersects with the edge of the circle, and the value of the part of the straight line that exceeds the circle is marked as visibility.

[0012] The water accumulation area and water accumulation depth of the tunnel road surface are obtained, and the water accumulation area and the total area of ​​the tunnel road surface are calculated to obtain the water accumulation area ratio; the pre-set water accumulation depth threshold is obtained, and the water accumulation depth of each water accumulation is compared with the water accumulation depth threshold. If the water accumulation depth exceeds the water accumulation depth threshold, the corresponding water accumulation depth is marked as the prohibited water accumulation depth, and the area of ​​the prohibited water accumulation depth is counted and the area of ​​the prohibited water accumulation depth is calculated with the tunnel road surface area to obtain the prohibited water accumulation area ratio; the water accumulation area ratio and the prohibited water accumulation area ratio are normalized and their values ​​are taken, and according to the formula The waterlogging impact value JS is obtained; SZ and JX represent the proportion of waterlogging area and the proportion of waterlogging prohibited area respectively; r1 and r2 are both preset weight factors, with values ​​of 2.56 and 2.44 respectively.

[0013] An ellipse is constructed with the tunnel temperature difference and visibility values ​​as the major and minor axes of the ellipse. The center of the ellipse is taken as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the water impact value. A cone is then constructed with the ellipse and the straight line, and the volume of the cone is calculated and the volume value is marked as the environmental impact value. When the environmental impact value is greater than the set threshold, the corresponding tunnel passage information is obtained, and a non-passable instruction is generated as the corresponding management information.

[0014] The management and analysis module is used to receive management information and analyze the management information to obtain a corresponding adjustment signal, and send the adjustment signal to the response adjustment module, specifically: obtaining the change trend of the traffic status corresponding to the management information and the corresponding traffic information of the tunnel, when the change trend of the traffic status is increasing, the increase in the tunnel usage frequency is used as the management analysis when the change trend of the traffic status is increasing, and according to the management analysis of the increase in the tunnel usage frequency, the tunnel monitoring frequency is increased as the corresponding adjustment signal, otherwise, the tunnel monitoring frequency is reduced as the corresponding adjustment signal; wherein, when the adjustment signal is a reduction in the tunnel monitoring frequency, the traffic information corresponding to the tunnel is extracted, and when the traffic information is a non-passable instruction, an adjustment signal to cancel the reduction in the tunnel monitoring frequency is generated.

[0015] The tunnel monitoring and analysis module is used to receive tunnel monitoring data and analyze the tunnel monitoring data to obtain tunnel monitoring results, and to obtain corresponding response instructions by analyzing the monitoring results and send the response instructions corresponding to the monitoring results to the response adjustment module.

[0016] As a preferred embodiment of the present invention, the tunnel monitoring data is analyzed in the following specific analysis method:

[0017] Tunnel monitoring data includes tunnel monitoring point location information, tunnel wall parameters and structural stress information; the location information of each tunnel monitoring point at each monitoring time is obtained, the location information of the tunnel monitoring point at the current monitoring time is overlapped and compared with the location information of the tunnel monitoring point at the previous monitoring time to obtain the displacement distance of the tunnel monitoring point, the displacement distance of each tunnel monitoring point is calculated with the set threshold to obtain the displacement distance difference, and the displacement distance difference of each tunnel monitoring point is added and summed to obtain the total offset value of the monitoring point.

[0018] The scanning image information corresponding to the tunnel wall parameters is obtained, and the scanning image information of the current tunnel wall parameters is overlapped and combined with the historical scanning information to obtain the crack information corresponding to the scanning image information of the current tunnel wall parameters. If the initial crack is identified in the scanning image information of the tunnel wall parameters, the crack area corresponding to the initial crack is calculated. When the initial crack is detected on the tunnel wall, the cracks on the tunnel wall are monitored intensively, and the key scanning image of the crack corresponding to the key monitoring is obtained. The key scanning image of the crack corresponding to the key monitoring is overlapped and compared with the scanning image information corresponding to the initial crack to obtain the crack area difference of the crack corresponding to the key monitoring.

[0019] The structural stress values ​​corresponding to the structural stress information of multiple orientations of the tunnel monitoring point are obtained, and each structural stress value is compared with the set structural stress threshold. When the structural stress value exceeds the structural stress threshold, the structural stress value exceeding the structural stress threshold is marked as an excessive stress value, and the number of excessive stress values ​​is counted and the number of excessive stress values ​​and the total number of monitoring orientations are calculated to obtain the excessive stress proportion; multiple stress value intervals are set for the excessive stress value, each stress value interval corresponds to a stress value influence value, and each excessive stress value is matched with multiple stress value intervals to obtain the stress influence value corresponding to each excessive stress value, and the total stress influence value corresponding to each excessive stress value is obtained by calculation.

[0020] An ellipse is constructed with the total offset value of the monitoring point and the difference in the crack area as the major and minor axes of the ellipse. The center of the ellipse is taken as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the excess stress ratio. A circle is drawn with the upper end of the straight line as the center and the total stress influence value as the radius. A frustum is constructed with the ellipse, the straight line and the circle, and the volume of the frustum is calculated and the value of the volume is marked as the tunnel monitoring data influence value. When the tunnel monitoring data influence value is greater than the set threshold, the corresponding monitoring result of the tunnel monitoring data is abnormal.

[0021] As a preferred embodiment of the present invention, the monitoring results are analyzed in the following specific analysis method:

[0022] Obtain the corresponding tunnel monitoring data impact value when the monitoring result is abnormal, and obtain the abnormal items corresponding to the tunnel monitoring data impact value, the abnormal items include monitoring point displacement abnormality, gap abnormality and stress abnormality; generate corresponding response instructions according to the abnormal items corresponding to the monitoring data impact value, if the abnormal item is a gap abnormality, generate a corresponding gap abnormality alarm, and generate corresponding emergency measures according to the processing measures in the gap abnormality corresponding database, and use the gap abnormality alarm and the corresponding emergency measures as corresponding response instructions.

[0023] The response adjustment module is used to receive the adjustment signal corresponding to each management information and the response instruction corresponding to each monitoring result, and execute the corresponding execution steps according to the adjustment signal and the response instruction, and send the adjustment signal and the response instruction to the data storage module.

[0024] The data storage module is used to store tunnel usage parameters and tunnel monitoring data, and store adjustment signals and response instructions to execute corresponding execution steps.

[0025] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects:

[0026] 1. The present invention obtains management information of tunnel monitoring by analyzing tunnel usage parameters, and obtains corresponding adjustment signals by analyzing the management information of tunnel monitoring. The monitoring frequency of tunnel monitoring is adjusted by the adjustment signal, thereby reducing manual monitoring according to the tunnel usage on site and avoiding poor efficiency of manual adjustment, which leads to untimely adjustment.

[0027] 2. The present invention obtains the monitoring results of the tunnel by analyzing the monitoring data, obtains the corresponding response instructions by analyzing the monitoring results, generates corresponding emergency measures and abnormal alarms according to the response instructions, implements corresponding responses to the monitoring abnormalities, and makes emergency response to abnormal conditions more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. The following drawings are not intentionally scaled to the actual size, and the focus is on illustrating the main purpose of the present application.

[0029] Figure 1 It is a principle block diagram of the present invention. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] For ease of understanding, the specific process of the embodiment of the present invention is described below. Figure 1 In an embodiment of the present invention, an embodiment of a tunnel settlement monitoring system based on ad hoc network collection includes: a data collection module, a tunnel usage data analysis module, a management analysis module, a tunnel monitoring analysis module, a response adjustment module and a data storage module.

[0032] The data acquisition module collects tunnel usage parameters and tunnel monitoring data and sends the tunnel usage parameters and tunnel monitoring data to the data storage module; the tunnel usage parameters include tunnel video data and environmental parameter data collected by the detection component; the tunnel monitoring data is obtained by sensor collection.

[0033] The tunnel usage data analysis module receives the tunnel usage parameters and analyzes the tunnel usage parameters to obtain the management information of tunnel monitoring, and sends the management information of tunnel monitoring to the management analysis module.

[0034] The tunnel usage parameters are analyzed in the following ways:

[0035] The tunnel video data corresponding to the tunnel usage parameters is obtained, a single date is set to multiple unit times, and the passing vehicles in the tunnel per unit time are extracted based on the tunnel video data for identification and the number of passing vehicles per unit time is counted. The passing vehicles per unit time are identified for model and the passing vehicles include heavy vehicles and light vehicles, and the number of heavy vehicles and the number of light vehicles are counted respectively. The number of heavy vehicles per unit time is compared with the number of passing vehicles per unit time to obtain the proportion of heavy vehicles. The passing speed of each vehicle per unit time in the tunnel is identified, and the passing time of each vehicle through the tunnel is calculated according to the passing speed of each vehicle.

[0036] A preset travel time threshold is obtained, and the travel time of each vehicle through the tunnel is compared with the set travel time threshold. If the travel time of each vehicle through the tunnel is greater than the set travel time threshold, the corresponding unit time is marked as a congested period; otherwise, the corresponding unit time is marked as a smooth period. The number of congested periods is counted and compared with the number of congested periods and the total number of unit times to obtain a congested period ratio. The congested period ratio is compared with the set congestion ratio threshold to obtain the traffic status of the corresponding date. The historical traffic status of each date in the historical data is obtained, and the historical traffic status of each date in the historical data is comprehensively analyzed with the traffic status of the current date to obtain the changing trend of the traffic status, and the corresponding management information is generated according to the changing trend of the traffic status.

[0037] Obtain environmental parameter data corresponding to the tunnel usage parameters, including tunnel temperature, tunnel smoke concentration, light propagation distance and tunnel road surface water; obtain the preset tunnel standard temperature, compare the current tunnel temperature with the tunnel standard temperature, and calculate the current tunnel temperature difference; take the values ​​of light propagation distance and tunnel smoke concentration, and draw a circle with the value of tunnel smoke concentration as the radius, draw a straight line with the center of the circle, the length of the straight line is equal to the value of light propagation distance, and the straight line extends along the diameter of the circle and intersects with the edge of the circle, and the value of the part of the straight line that exceeds the circle is marked as visibility.

[0038] The water accumulation area and water accumulation depth of the tunnel road surface are obtained, and the water accumulation area and the total area of ​​the tunnel road surface are calculated to obtain the water accumulation area ratio; the pre-set water accumulation depth threshold is obtained, and the water accumulation depth of each water accumulation is compared with the water accumulation depth threshold. If the water accumulation depth exceeds the water accumulation depth threshold, the corresponding water accumulation depth is marked as the prohibited water accumulation depth, and the area of ​​the prohibited water accumulation depth is counted and the area of ​​the prohibited water accumulation depth is calculated with the tunnel road surface area to obtain the prohibited water accumulation area ratio; the water accumulation area ratio and the prohibited water accumulation area ratio are normalized and their values ​​are taken, and according to the formula The waterlogging impact value JS is obtained; SZ and JX represent the proportion of waterlogging area and the proportion of waterlogging prohibited area respectively; r1 and r2 are both preset weight factors, with values ​​of 2.56 and 2.44 respectively.

[0039] An ellipse is constructed with the tunnel temperature difference and visibility values ​​as the major and minor axes of the ellipse. The center of the ellipse is taken as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the water impact value. A cone is then constructed with the ellipse and the straight line, and the volume of the cone is calculated and the volume value is marked as the environmental impact value. When the environmental impact value is greater than the set threshold, the corresponding tunnel passage information is obtained, and a non-passable instruction is generated as the corresponding management information.

[0040] The management and analysis module is used to receive management information and analyze the management information to obtain a corresponding adjustment signal, and send the adjustment signal to the response adjustment module, specifically: obtaining the change trend of the traffic status corresponding to the management information and the corresponding traffic information of the tunnel, when the change trend of the traffic status is increasing, the increase in the tunnel usage frequency is used as the management analysis when the change trend of the traffic status is increasing, and according to the management analysis of the increase in the tunnel usage frequency, the tunnel monitoring frequency is increased as the corresponding adjustment signal, otherwise, the tunnel monitoring frequency is reduced as the corresponding adjustment signal; wherein, when the adjustment signal is a reduction in the tunnel monitoring frequency, the traffic information corresponding to the tunnel is extracted, and when the traffic information is a non-passable instruction, an adjustment signal to cancel the reduction in the tunnel monitoring frequency is generated.

[0041] The tunnel monitoring and analysis module receives tunnel monitoring data and analyzes the tunnel monitoring data to obtain tunnel monitoring results, and obtains corresponding response instructions by analyzing the monitoring results and sends the response instructions corresponding to the monitoring results to the response adjustment module.

[0042] The tunnel monitoring data is analyzed in the following specific ways:

[0043] Tunnel monitoring data includes tunnel monitoring point location information, tunnel wall parameters and structural stress information; the location information of each tunnel monitoring point at each monitoring time is obtained, the location information of the tunnel monitoring point at the current monitoring time is overlapped and compared with the location information of the tunnel monitoring point at the previous monitoring time to obtain the displacement distance of the tunnel monitoring point, the displacement distance of each tunnel monitoring point is calculated with the set threshold to obtain the displacement distance difference, and the displacement distance difference of each tunnel monitoring point is added and summed to obtain the total offset value of the monitoring point.

[0044] The scanning image information corresponding to the tunnel wall parameters is obtained, and the scanning image information of the current tunnel wall parameters is overlapped and combined with the historical scanning information to obtain the crack information corresponding to the scanning image information of the current tunnel wall parameters. If the initial crack is identified in the scanning image information of the tunnel wall parameters, the crack area corresponding to the initial crack is calculated. When the initial crack is detected on the tunnel wall, the cracks on the tunnel wall are monitored intensively, and the key scanning image of the crack corresponding to the key monitoring is obtained. The key scanning image of the crack corresponding to the key monitoring is overlapped and compared with the scanning image information corresponding to the initial crack to obtain the crack area difference of the crack corresponding to the key monitoring.

[0045] The structural stress values ​​corresponding to the structural stress information of multiple orientations of the tunnel monitoring point are obtained, and each structural stress value is compared with the set structural stress threshold. When the structural stress value exceeds the structural stress threshold, the structural stress value exceeding the structural stress threshold is marked as an excessive stress value, and the number of excessive stress values ​​is counted and the number of excessive stress values ​​and the total number of monitoring orientations are calculated to obtain the excessive stress proportion; multiple stress value intervals are set for the excessive stress value, each stress value interval corresponds to a stress value influence value, and each excessive stress value is matched with multiple stress value intervals to obtain the stress influence value corresponding to each excessive stress value, and the total stress influence value corresponding to each excessive stress value is obtained by calculation.

[0046] An ellipse is constructed with the total offset value of the monitoring point and the difference in the crack area as the major and minor axes of the ellipse. The center of the ellipse is taken as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the excess stress ratio. A circle is drawn with the upper end of the straight line as the center and the total stress influence value as the radius. A frustum is constructed with the ellipse, the straight line and the circle, and the volume of the frustum is calculated and the value of the volume is marked as the tunnel monitoring data influence value. When the tunnel monitoring data influence value is greater than the set threshold, the corresponding monitoring result of the tunnel monitoring data is abnormal.

[0047] The monitoring results are analyzed in the following specific ways:

[0048] Obtain the corresponding tunnel monitoring data impact value when the monitoring result is abnormal, and obtain the abnormal items corresponding to the tunnel monitoring data impact value, the abnormal items include monitoring point displacement abnormality, gap abnormality and stress abnormality; generate corresponding response instructions according to the abnormal items corresponding to the monitoring data impact value, if the abnormal item is a gap abnormality, generate a corresponding gap abnormality alarm, and generate corresponding emergency measures according to the processing measures in the gap abnormality corresponding database, and use the gap abnormality alarm and the corresponding emergency measures as corresponding response instructions.

[0049] The response adjustment module receives the adjustment signal corresponding to each management information and the response instruction corresponding to each monitoring result, and executes the corresponding execution steps according to the adjustment signal and the response instruction, and sends the adjustment signal and the response instruction to the data storage module.

[0050] The data storage module stores tunnel usage parameters and tunnel monitoring data, and stores adjustment signals and response instructions to execute corresponding execution steps.

[0051] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A tunnel settlement monitoring system based on ad hoc network data collection includes a data collection module, a response adjustment module and a data storage module, characterized in that: Also includes: A tunnel usage data analysis module, used to receive tunnel usage parameters and analyze the tunnel usage parameters to obtain tunnel monitoring management information, and send the tunnel monitoring management information to the management analysis module; The tunnel usage parameters are analyzed in the following specific manner: The tunnel video data corresponding to the tunnel usage parameters are obtained, a single date is set to multiple unit times, vehicles passing through the tunnel within a unit time are extracted based on the tunnel video data for identification and the number of vehicles passing through the tunnel within a unit time is counted, the vehicles passing through the tunnel within a unit time are identified for their models, including heavy vehicles and light vehicles, and the number of heavy vehicles and the number of light vehicles are counted respectively, and the number of heavy vehicles within a unit time is compared with the number of vehicles passing through the tunnel within a unit time to obtain the proportion of heavy vehicles; Identify the speed of each vehicle per unit time in the tunnel, and calculate the travel time of each vehicle through the tunnel based on the travel speed of each vehicle; Obtain a preset travel time threshold, compare the travel time of each vehicle through the tunnel with the set travel time threshold, if the travel time of each vehicle through the tunnel is greater than the set travel time threshold, mark the corresponding unit time as a congested period; otherwise, mark the corresponding unit time as a smooth period, count the number of congested periods and compare the number of congested periods with the total number of unit times to obtain a congested period ratio, compare the congested period ratio with the set congestion ratio threshold to obtain the traffic status of the corresponding date, obtain the historical traffic status of each date in the historical data, and conduct a comprehensive analysis of the historical traffic status of each date in the historical data and the traffic status of the current date to obtain the change trend of the traffic status, and generate corresponding management information according to the change trend of the traffic status; Obtaining environmental parameter data corresponding to tunnel usage parameters, including tunnel temperature, tunnel smoke concentration, light propagation distance, and tunnel road surface water accumulation; Obtain the preset tunnel standard temperature, compare the current tunnel temperature with the tunnel standard temperature, and calculate the current tunnel temperature difference; take the values ​​of the light propagation distance and the tunnel smoke concentration, and draw a circle with the tunnel smoke concentration as the radius, draw a straight line with the center of the circle, the length of the straight line is equal to the value of the light propagation distance, and the straight line extends along the diameter of the circle and intersects with the edge of the circle, and take the value of the part of the straight line that exceeds the circle and mark it as visibility; Obtain the water accumulation area and water accumulation depth of the tunnel road surface, calculate the water accumulation area and the total area of ​​the tunnel road surface to obtain the water accumulation area ratio; compare the water accumulation depth of each water accumulation with the set water accumulation depth threshold, if the water accumulation depth exceeds the water accumulation depth threshold, mark the corresponding water accumulation depth as the prohibited water accumulation depth, count the area of ​​the prohibited water accumulation depth, and calculate the area of ​​the prohibited water accumulation depth and the tunnel road surface area to obtain the prohibited water accumulation area ratio; conduct a comprehensive analysis of the water accumulation area ratio and the prohibited water accumulation area ratio to obtain the water accumulation impact value; An ellipse is constructed with the tunnel temperature difference and visibility values ​​as the major and minor axes of the ellipse. The center of the ellipse is used as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the water impact value. A cone is then constructed with the ellipse and the straight line, and the volume of the cone is calculated and the volume value is marked as the environmental impact value. When the environmental impact value is greater than the set threshold, the corresponding tunnel pass information is obtained, and a non-passable instruction is generated as the corresponding management information. The management and analysis module is used to receive management information and analyze the management information to obtain a corresponding adjustment signal, and send the adjustment signal to the response adjustment module, specifically: obtaining the change trend of the traffic state corresponding to the management information and the traffic information corresponding to the tunnel, when the change trend of the traffic state is increasing, the increase in the frequency of tunnel use is used as the management analysis when the change trend of the traffic state is increasing, and according to the management analysis of the increase in the frequency of tunnel use, the tunnel monitoring frequency is increased as the corresponding adjustment signal, otherwise, the tunnel monitoring frequency is reduced as the corresponding adjustment signal; wherein, when the adjustment signal is that the tunnel monitoring frequency is reduced, the traffic information corresponding to the tunnel is extracted, and when the traffic information is a non-passable instruction, an adjustment signal is generated to cancel the reduction of the tunnel monitoring frequency; The tunnel monitoring and analysis module is used to receive tunnel monitoring data and analyze the tunnel monitoring data to obtain tunnel monitoring results, and to obtain corresponding response instructions by analyzing the monitoring results and send the response instructions corresponding to the monitoring results to the response adjustment module.

2. The tunnel settlement monitoring system based on ad hoc network collection according to claim 1 is characterized in that: The data acquisition module is used to collect tunnel usage parameters and tunnel monitoring data and send the tunnel usage parameters and tunnel monitoring data to the data storage module; the tunnel usage parameters include tunnel video data and environmental parameter data collected by the detection component; the tunnel monitoring data is obtained by sensor collection.

3. The tunnel settlement monitoring system based on ad hoc network collection according to claim 1 is characterized in that: The tunnel monitoring data is analyzed in the following specific manner: The tunnel monitoring data includes the location information of the tunnel monitoring points, the tunnel wall parameters and the structural stress information; the location information of each tunnel monitoring point at each monitoring time is obtained, the location information of the tunnel monitoring point at the current monitoring time is overlapped and compared with the location information of the tunnel monitoring point at the previous monitoring time to obtain the displacement distance of the tunnel monitoring point, the displacement distance of each tunnel monitoring point is calculated with the set threshold to obtain the displacement distance difference, and the displacement distance difference of each tunnel monitoring point is added and summed to obtain the total displacement value of the monitoring point; The scanning image information corresponding to the tunnel wall parameters is obtained, and the scanning image information of the current tunnel wall parameters is overlapped and combined with the historical scanning information to obtain crack information corresponding to the scanning image information of the current tunnel wall parameters. If the initial crack is identified in the scanning image information of the tunnel wall parameters, the crack area corresponding to the initial crack is obtained by calculation; when the initial crack is detected on the tunnel wall, the crack of the tunnel wall is monitored, and the key scanning image of the crack corresponding to the key monitoring is obtained, and the key scanning image of the crack corresponding to the key monitoring is overlapped and compared with the scanning image information corresponding to the initial crack to obtain the crack area difference of the crack corresponding to the key monitoring; The structural stress values ​​corresponding to the structural stress information of multiple directions of the tunnel monitoring point are obtained, and each structural stress value is compared with the set structural stress threshold. When the structural stress value exceeds the structural stress threshold, the structural stress value exceeding the structural stress threshold is marked as an excessive stress value, and the number of excessive stress values ​​is counted and the number of excessive stress values ​​and the total number of monitoring directions are calculated to obtain the excessive stress ratio; The excess stress value is set to multiple stress value intervals, each stress value interval corresponds to a stress value influence value, each excess stress value is matched with the multiple stress value intervals to obtain the stress influence value corresponding to each excess stress value, and the total stress influence value corresponding to each excess stress value is obtained by calculation; An ellipse is constructed with the total offset value of the monitoring point and the difference in the crack area as the major and minor axes of the ellipse. The center of the ellipse is taken as the starting point, and a straight line perpendicular to the ellipse is drawn, and the value of the straight line length is equal to the excess stress ratio. A circle is drawn with the upper end of the straight line as the center and the total stress influence value as the radius. A frustum is constructed with the ellipse, the straight line and the circle. The volume of the frustum is calculated and the value of the volume is marked as the tunnel monitoring data influence value. When the tunnel monitoring data influence value is greater than the set threshold, the corresponding monitoring result of the tunnel monitoring data is abnormal.

4. The tunnel settlement monitoring system based on ad hoc network collection according to claim 3 is characterized in that: The monitoring results are analyzed in the following specific way: Obtain the corresponding tunnel monitoring data impact value when the monitoring result is abnormal, and obtain the abnormal item corresponding to the tunnel monitoring data impact value; generate a corresponding response instruction according to the abnormal item corresponding to the monitoring data impact value, if the abnormal item is a gap abnormality, generate a corresponding gap abnormality alarm, and generate corresponding emergency measures according to the processing measures in the gap abnormality corresponding database, and use the gap abnormality alarm and the corresponding emergency measures as corresponding response instructions.

5. The tunnel settlement monitoring system based on ad hoc network collection according to claim 1 is characterized in that: The response adjustment module is used to receive adjustment signals corresponding to each piece of management information and response instructions corresponding to each monitoring result, and execute corresponding execution steps according to the adjustment signals and response instructions, and send the execution steps to the data storage module.

Citation Information

Patent Citations

  • Energy-saving device and method for concrete stress-strain monitoring

    CN113176056A

  • Railway tunnel engineering safety detection method and system

    CN115375202A

  • Settlement value detection system and detection method for engineering construction

    CN117450996A

  • Bridge load detection device and detection method

    CN117804712A