Fast-response interconnected energy storage converter coordinated control method and system
By obtaining the connection information between the power grid and the energy storage converter, establishing a topology and virtual connection model, synchronizing data in real time, judging and adjusting the control information of the energy storage converter, it solves the problem of difficulty in judging the rationality of the power grid debugging information, and realizes This ensures the stability of the power grid and improves the safety of energy storage converter regulation.
Patent Information
- Application Number
- CN202410940111.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-15
AI Technical Summary
The existing technology makes it difficult to judge the rationality of the debugging information when debugging the power grid through energy storage converters, resulting in unstable power grid operation and difficulty in reducing the probability of power grid instability.
By obtaining the connection information between the power grid and the energy storage converter, the topology and virtual connection model are established, the operating data is synchronized in real time, the status of the control information is judged, and the control information of the energy storage converter is adjusted to ensure the stability of the power grid.
When the control information is put into the power grid, potential unstable factors can be simulated and understood in advance to ensure the stability of the power grid operation, improve the control safety of the energy storage converter, and reduce the probability of impact on the power grid operation.
Smart Images

Figure CN118487304B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage converter regulation and control, and in particular to a fast-response interconnected energy storage converter coordinated control method and system. Background Art
[0002] An interconnected energy storage inverter is an energy storage device with Internet connection function, which can store and release energy in the power grid. It is usually composed of one or more rechargeable batteries and one or more inverters. It can convert direct current into alternating current, or convert alternating current into direct current through power electronics technology, thereby realizing the storage and release of electric energy in the power grid. However, when the power grid is debugged through the energy storage inverter, it is difficult to cooperate with the power grid line to judge the rationality of the debugging information. It is difficult to ensure the stability of the power grid operation by directly inputting the debugging information, which is prone to instability in the power grid operation or damage to the power grid, and it is difficult to reduce the probability of power grid instability caused by debugging problems. Summary of the invention
[0003] The purpose of the present invention is to provide a fast-response interconnected energy storage converter coordinated control method and system to address the deficiencies in the background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a fast-response interconnected energy storage converter coordinated control method, comprising the following steps:
[0005] Acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information;
[0006] Connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and connection information, and collect the operating data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time;
[0007] Establishing a virtual connection model of the energy storage converter based on the topological structure, and establishing corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between the corresponding objects;
[0008] Acquire control information of the energy storage converter, and input the control information into the energy storage converter in the virtual connection model to obtain simulated control information;
[0009] The simulated control information is judged based on the qualified preset conditions to obtain the status information of the lines and the energy storage converter in the power grid, wherein the status information includes a qualified state and an abnormal state, and the control information of the energy storage converter is adjusted based on the status information.
[0010] In a preferred embodiment, the step of obtaining connection information between the power grid and a plurality of energy storage converters and formulating conversion rule information of the energy storage converter based on the connection information includes:
[0011] Collecting the position of the energy storage converter in the power grid and the connection structure between the energy storage converter and the line as connection information;
[0012] The load information of the lines in the power grid is collected, and corresponding current conversion rule information is formulated for each of the multiple energy storage converters based on the connection structure between the energy storage converter and the lines and the load information of the lines, wherein the current conversion rule information includes current conversion restriction information and load restriction information of the lines in the power grid applied by the current conversion information of the energy storage converter.
[0013] In a preferred embodiment, the steps of connecting a plurality of energy storage converters based on the Internet to obtain interconnection information, establishing a topological structure of the energy storage converter based on the interconnection information and the connection information, and collecting the operating data information of the energy storage converter in the power grid and synchronizing it in real time to the topological structure include:
[0014] Encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters, and collecting verification information between the multiple energy storage converters, wherein the verification information includes location information of the energy storage converter and relationship information between the energy storage converter and the line;
[0015] Binding the verification information and the identity code as the identity information of the energy storage converter;
[0016] Connecting multiple energy storage converters based on the Internet to obtain communication information, and using identity information and communication information of multiple energy storage converters as interconnection information;
[0017] Establishing a topological structure of the energy storage converter based on the interconnection information and the connection information;
[0018] The operating data information of the energy storage converter in the power grid is collected and synchronized to the topology structure in real time.
[0019] In a preferred embodiment, the step of encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters and collecting verification information between the multiple energy storage converters includes:
[0020] Based on the identity codes of the energy storage converters, the positions of the multiple energy storage converters are collected, and the multiple energy storage converters are connected to form an energy storage converter position network;
[0021] Obtain an upper projection surface of the energy storage converter position network as an upper reference surface, and obtain any side projection surface as a side reference surface;
[0022] Collecting the mapping position of the energy storage converter on the upper reference surface and the side reference surface, and matching the mapping position with the identity information of the energy storage converter to obtain the position information;
[0023] The relationship information between the energy storage converter and the line is obtained, wherein the relationship information is the connection mode and connection structure between the energy storage converter and the line, and the relationship information and the position information are used as verification information.
[0024] In a preferred embodiment, the step of establishing a virtual connection model of the energy storage converter based on the topological structure and establishing corresponding relationship information between the virtual connection model and the topological structure includes:
[0025] A virtual model of the energy storage converter and the power grid is established based on the topological structure, and the virtual model of the energy storage converter is connected through the power grid line to obtain a virtual connection model;
[0026] Selecting corresponding multiple nodes in the virtual connection model and the topology structure based on preset selection conditions;
[0027] Based on the nodes, corresponding objects between the virtual connection model and the topological structure and corresponding channels between the corresponding objects are established as corresponding relationship information.
[0028] In a preferred embodiment, the step of obtaining the control information of the energy storage converter and inputting the control information into the energy storage converter in the virtual connection model to obtain simulated control information includes:
[0029] Acquire control information of the energy storage converter based on the Internet, and input the control information corresponding to the energy storage converter into the energy storage converter in the virtual connection model;
[0030] The power supply information of the power grid line in which the energy storage converter operates according to the control information is obtained as the simulation control information.
[0031] In a preferred embodiment, the step of adjusting the control information of the energy storage converter based on the state information includes:
[0032] Based on the qualified preset conditions, the state information of the analog control information is judged, and the energy storage converter corresponding to the analog control information in the qualified state is regarded as the qualified energy storage converter;
[0033] The energy storage converter corresponding to the simulated control information of the abnormal state is regarded as an unqualified energy storage converter;
[0034] Adjusting the control information of the unqualified energy storage converter to obtain the target control information in the virtual connection model;
[0035] Based on the verification information, the receiving state of the energy storage inverter in the actual power grid is determined, wherein the receiving state includes a qualified receiving state and an unqualified receiving state. Based on the Internet, the target control information is input into the energy storage inverter in the qualified receiving state in the actual power grid, and the operating data of the energy storage inverter in the actual power grid is collected in real time and marked in the topology structure.
[0036] The present invention also provides a fast-response interconnected energy storage converter coordinated control system, comprising:
[0037] An acquisition module is used to acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information;
[0038] A construction module is connected to the acquisition module and is used to connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and the connection information, and collect the operation data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time;
[0039] A corresponding module, connected to the building module, is used to establish a virtual connection model of the energy storage converter based on the topological structure, and establish corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between the corresponding objects;
[0040] A simulation module, connected to the corresponding module, is used to obtain the control information of the energy storage converter, and input the control information into the energy storage converter in the virtual connection model to obtain the simulated control information;
[0041] The control module is connected to the simulation module and is used to judge the simulated control information based on qualified preset conditions to obtain the status information of the lines and energy storage converters in the power grid, wherein the status information includes qualified status and abnormal status, and the control information of the energy storage converter is adjusted based on the status information.
[0042] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0043] The present invention simulates in advance whether there are factors that lead to unstable operation of the power grid due to the control information, and can ensure the stability of the power grid operation when the control information is put into the actual power grid. It can greatly improve the control safety of the energy storage inverter, can greatly ensure the stability of the power grid controlled by the energy storage inverter, can effectively reduce the probability of occurrence of impacts on the power grid operation, and has a good power grid stabilization effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0045] Figure 1 The figure is a flow chart of the method of the present invention.
[0046] Figure 2 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] Example 1, please refer to Figure 1 As shown, the fast-response interconnected energy storage converter coordinated control method described in this embodiment includes the following steps:
[0049] S1. Acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information;
[0050] S2. Connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and the connection information, and collect the operating data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time;
[0051] S3, establishing a virtual connection model of the energy storage converter based on the topological structure, and establishing corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between corresponding objects;
[0052] S4, obtaining control information of the energy storage converter, and inputting the control information into the energy storage converter in the virtual connection model to obtain simulated control information;
[0053] S5. Judging the simulated control information based on the qualified preset conditions to obtain the status information of the lines in the power grid and the energy storage converter, wherein the status information includes a qualified state and an abnormal state, and adjusting the control information of the energy storage converter based on the status information;
[0054] As described in the above steps S1-S5, the interconnected energy storage converter is an energy storage device with an Internet connection function, which can store and release energy in the power grid; it is usually composed of one or more rechargeable batteries and one or more inverters, and can convert direct current into alternating current, or convert alternating current into direct current, through power electronics technology, so as to realize the storage and release of electric energy in the power grid. However, when the power grid is debugged through the energy storage converter, it is difficult to cooperate with the power grid line to judge the rationality of the debugging information. It is difficult to ensure the stability of the power grid operation by directly inputting the debugging information, and it is easy to cause instability in the power grid operation or damage to the power grid, and it is difficult to reduce the probability of power grid instability caused by debugging problems. The present application simulates in advance whether there are factors that cause instability in the operation of the power grid in the regulation information, and can ensure the stability of the power grid operation when the regulation information is put into the actual power grid, which can greatly improve the regulation safety of the energy storage converter, can greatly ensure the stability of the power grid regulated by the energy storage converter, can effectively reduce the probability of the occurrence of the impact on the operation of the power grid, and has a good power grid stabilization effect;
[0055] In one embodiment, the step S1 of obtaining connection information between the power grid and a plurality of energy storage converters and formulating conversion rule information of the energy storage converter based on the connection information includes:
[0056] S11, collecting the position of the energy storage converter in the power grid and the connection structure between the energy storage converter and the line as connection information;
[0057] S12, collecting load information of the lines in the power grid, and formulating corresponding current conversion rule information corresponding to a plurality of energy storage converters based on the connection structure between the energy storage converter and the lines and the load information of the lines, wherein the current conversion rule information includes current conversion restriction information and load restriction information of the lines in the power grid applied by the current conversion information of the energy storage converter;
[0058] As described in the above steps S11-S12, first, when studying the control of the energy storage converter in the power grid, it is necessary to collect the position of the energy storage converter in the power grid and the connection structure between the energy storage converter and the line as connection information, and then collect the load information of the line in the power grid, and formulate corresponding flow conversion rule information corresponding to multiple energy storage converters based on the connection structure between the energy storage converter and the line and the load information of the line, wherein the flow conversion rule information includes flow conversion restriction information and load restriction information of the line in the power grid applied by the flow conversion information of the energy storage converter, so that the position of the energy storage converter in the power grid and its role in the power grid can be understood, and the relationship between the energy storage converter and the multiple connected lines can be understood, so that the flow conversion rule of the energy storage converter can be limited according to the load of the line, so as to better ensure the stable operation of the power grid;
[0059] In one embodiment, the step S2 of connecting a plurality of energy storage converters based on the Internet to obtain interconnection information, establishing a topology structure of the energy storage converter based on the interconnection information and the connection information, and collecting operation data information of the energy storage converter in the power grid and synchronizing it in real time to the topology structure includes:
[0060] S21, encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters, and collecting verification information between the multiple energy storage converters, wherein the verification information includes location information of the energy storage converter and relationship information between the energy storage converter and the line;
[0061] S22, binding the verification information and the identity code as the identity information of the energy storage converter;
[0062] S23, connecting multiple energy storage converters based on the Internet to obtain communication information, and using the identity information and the communication information of the multiple energy storage converters as interconnection information;
[0063] S24, establishing a topological structure of the energy storage converter based on the interconnection information and the connection information;
[0064] S25, collecting the operating data information of the energy storage converter in the power grid and synchronizing it in real time to the topology structure;
[0065] In one embodiment, the step S21 of encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters and collecting verification information between the multiple energy storage converters includes:
[0066] S211, collecting positions of multiple energy storage converters based on the identity codes of the energy storage converters, and connecting the multiple energy storage converters to form an energy storage converter position network;
[0067] S212, obtaining an upper projection surface of the energy storage converter position network as an upper reference surface, and obtaining any side projection surface as a side reference surface;
[0068] S213, collecting the mapping position of the energy storage converter on the upper reference surface and the side reference surface, and matching the mapping position with the identity information of the energy storage converter to obtain position information;
[0069] S214, obtaining relationship information between the energy storage converter and the line, wherein the relationship information is a connection mode and a connection structure between the energy storage converter and the line, and using the relationship information and the position information as verification information;
[0070] As described in the above steps S211-S214, when the energy storage inverters in the power grid are interconnected through the Internet, it is necessary to encode the energy storage inverters in the power grid to obtain an identity code as the identity of the energy storage inverter in the power grid, and then collect verification information between multiple energy storage inverters. Here, the positions of multiple energy storage inverters are collected, and multiple energy storage inverters are connected to each other to form an energy storage inverter position network. The upper projection surface of the energy storage inverter position network is obtained as the upper reference surface, and any side projection surface is obtained as the side reference surface. The upper reference surface and the side reference surface are both planes. Then, the energy storage inverter is The position of the converter is mapped on the side reference surface and the upper reference surface to record the position of the energy storage converter. Here, the position of the energy storage converter is recorded by the side reference surface and the upper reference surface. Here, it is used as the position information. Then, the connection mode and connection structure of each energy storage converter and the line are obtained as the relationship information. The relationship information and the position information are used as the verification information. The networking position of the energy storage converter can be restricted. As a verification of the energy storage converter, other personnel can be prevented from replacing the energy storage converter in the power grid, which can ensure the safety of the use of the energy storage converter and avoid the situation of network intrusion to replace the receiving energy storage converter.
[0071] In one embodiment, the step S3 of establishing a virtual connection model of the energy storage converter based on the topological structure and establishing corresponding relationship information between the virtual connection model and the topological structure includes:
[0072] S31, establishing a virtual model of the energy storage converter and the power grid based on the topological structure, and connecting the virtual model of the energy storage converter through the power grid line to obtain a virtual connection model;
[0073] S32, selecting corresponding multiple nodes in the virtual connection model and the topological structure based on the preset selection conditions;
[0074] S33, establishing corresponding objects between the virtual connection model and the topological structure based on the nodes and corresponding channels between the corresponding objects as corresponding relationship information;
[0075] As described in the above steps S31-S33, the position of the energy storage converter in the power grid can be understood through the topological structure, so firstly a virtual model of the energy storage converter is established, which can be a virtual display graph, and then a virtual connection model is obtained according to the relationship between the energy storage converter and the line. The virtual connection model here is a complete power grid structure containing the energy storage converter, and then corresponding nodes are selected in the virtual connection model and the topological structure based on preset selection conditions. The preset selection conditions here are components in the power grid line structure, and the components here include the energy storage converter. Multiple nodes are selected corresponding to the virtual connection model and the topological structure, and then the corresponding nodes on the virtual connection model and the topological structure are used as corresponding objects, for example, the corresponding energy storage converter on the virtual connection model and the topological structure, and then the corresponding objects between the virtual connection model and the topological structure and the corresponding channels between the corresponding objects are established based on the nodes as corresponding relationship information, so as to establish a connection between the virtual connection model and the topological structure, which can be used for subsequent interconnection of the virtual connection model and the topological structure, so as to facilitate the regulation of the energy storage converter in the actual power grid, and have a good monitoring effect;
[0076] In one embodiment, the step S4 of obtaining the control information of the energy storage converter and inputting the control information into the energy storage converter in the virtual connection model to obtain the simulated control information includes:
[0077] S41, obtaining control information of the energy storage converter based on the Internet, and inputting the control information corresponding to the energy storage converter into the energy storage converter in the virtual connection model;
[0078] S42, obtaining power supply information of the power grid line in which the energy storage converter operates according to the control information as simulation control information;
[0079] As described in the above steps S41-S42, the control information for the energy storage converter is obtained based on the Internet, and the control information is first put into the energy storage converter in the virtual connection model for operation, and then the power-on information of the power grid line in the virtual connection model after the control information is put into operation is collected, and then the power-on information of the power grid line in the virtual connection model is used as the simulation control information, so that the control information can be simulated in the virtual connection model first, and the control information can be simulated in advance to understand whether there are factors that cause unstable operation of the power grid, so that the stability of the power grid operation can be guaranteed when the control information is put into the actual power grid, and the control safety of the energy storage converter can be greatly improved;
[0080] In one embodiment, the step S5 of adjusting the control information of the energy storage converter based on the state information includes:
[0081] S51, judging the state information of the analog control information based on the qualified preset condition, and taking the energy storage converter corresponding to the analog control information in the qualified state as the qualified energy storage converter;
[0082] S52, treating the energy storage converter corresponding to the simulated control information of the abnormal state as an unqualified energy storage converter;
[0083] S53, adjusting the control information of the unqualified energy storage converter to obtain target control information in the virtual connection model;
[0084] S54, determining the receiving state of the energy storage converter in the actual power grid based on the verification information, wherein the receiving state includes a qualified receiving state and an unqualified receiving state, and inputting the target control information into the energy storage converter in the qualified receiving state in the actual power grid based on the Internet, collecting the operating data of the energy storage converter in the actual power grid in real time and marking it in the topology structure;
[0085] As described in the above steps S51-S54, the state information of the simulated control information is judged based on the qualified preset conditions, and the energy storage converter corresponding to the simulated control information in the qualified state is used as a qualified energy storage converter. Here, it can be judged whether the debugging information can ensure the operation of the power grid, and can quickly respond to the abnormality of the power grid. The virtual operation here reduces the risk of actual power grid operation. The qualified preset conditions here are the load limit data of the power grid line after the energy storage converter is regulated. Then, the energy storage converter corresponding to the simulated control information in the abnormal state is used as an unqualified energy storage converter, and the control information of the unqualified energy storage converter is adjusted to obtain the target control information in the virtual connection model. Here The target control information of the energy storage converter in the entire power grid is adjusted by adjusting the control information of the unqualified energy storage converter. The target control information can be directly put into the energy storage converter in the actual power grid, and then the receiving state of the energy storage converter in the actual power grid is determined based on the verification information, wherein the receiving state includes a qualified receiving state and an unqualified receiving state. The target control information is put into the energy storage converter in the qualified receiving state in the actual power grid based on the Internet, and the operating data of the energy storage converter of the actual power grid is collected in real time and marked in the topology structure, which can greatly ensure the stability of the power grid regulated by the energy storage converter, can effectively reduce the probability of the occurrence of the impact on the power grid operation, and has a good power grid stabilization effect;
[0086] See also Figure 2 As shown, the fast-response interconnected energy storage converter coordinated control system includes:
[0087] An acquisition module is used to acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information;
[0088] A construction module is connected to the acquisition module and is used to connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and the connection information, and collect the operation data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time;
[0089] A corresponding module, connected to the building module, is used to establish a virtual connection model of the energy storage converter based on the topological structure, and establish corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between the corresponding objects;
[0090] A simulation module, connected to the corresponding module, is used to obtain the control information of the energy storage converter, and input the control information into the energy storage converter in the virtual connection model to obtain the simulated control information;
[0091] The control module is connected to the simulation module and is used to judge the simulated control information based on qualified preset conditions to obtain the status information of the lines and energy storage converters in the power grid, wherein the status information includes qualified status and abnormal status, and the control information of the energy storage converter is adjusted based on the status information.
[0092] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A fast-response interconnected energy storage converter coordinated control method, characterized in that: The following steps are involved: Acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information; Connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and connection information, and collect the operating data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time; Establishing a virtual connection model of the energy storage converter based on the topological structure, and establishing corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between the corresponding objects; Acquire control information of the energy storage converter, and input the control information into the energy storage converter in the virtual connection model to obtain simulated control information; The simulated control information is judged based on the qualified preset conditions to obtain the status information of the lines and the energy storage converter in the power grid, wherein the status information includes the qualified status and the abnormal status, and the control information of the energy storage converter is adjusted based on the status information; The step of obtaining connection information between the power grid and a plurality of energy storage converters and formulating conversion rule information of the energy storage converter based on the connection information includes: Collecting the position of the energy storage converter in the power grid and the connection structure between the energy storage converter and the line as connection information; Collect load information of the lines in the power grid, and formulate corresponding current conversion rule information corresponding to a plurality of energy storage converters based on the connection structure between the energy storage converter and the lines and the load information of the lines, wherein the current conversion rule information includes current conversion restriction information and load restriction information of the lines in the power grid applied by the current conversion information of the energy storage converter; The steps of connecting a plurality of energy storage converters based on the Internet to obtain interconnection information, establishing a topological structure of the energy storage converter based on the interconnection information and the connection information, and collecting the operation data information of the energy storage converter in the power grid and synchronizing it in real time to the topological structure include: Encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters, and collecting verification information between the multiple energy storage converters, wherein the verification information includes location information of the energy storage converter and relationship information between the energy storage converter and the line; Binding the verification information and the identity code as the identity information of the energy storage converter; Connecting multiple energy storage converters based on the Internet to obtain communication information, and using identity information and communication information of multiple energy storage converters as interconnection information; Establishing a topological structure of the energy storage converter based on the interconnection information and the connection information; Collect the operating data information of the energy storage converter in the power grid and synchronize it to the topology structure in real time; The step of encoding multiple energy storage converters in the power grid as identity codes of the energy storage converters and collecting verification information between the multiple energy storage converters includes: Based on the identity codes of the energy storage converters, the positions of the multiple energy storage converters are collected, and the multiple energy storage converters are connected to form an energy storage converter position network; Obtain an upper projection surface of the energy storage converter position network as an upper reference surface, and obtain any side projection surface as a side reference surface; Collecting the mapping position of the energy storage converter on the upper reference surface and the side reference surface, and matching the mapping position with the identity information of the energy storage converter to obtain the position information; Acquire relationship information between the energy storage converter and the line, wherein the relationship information is the connection mode and connection structure between the energy storage converter and the line, and use the relationship information and the position information as verification information; The step of establishing a virtual connection model of the energy storage converter based on the topological structure and establishing corresponding relationship information between the virtual connection model and the topological structure includes: A virtual model of the energy storage converter and the power grid is established based on the topological structure, and the virtual model of the energy storage converter is connected through the power grid line to obtain a virtual connection model; Selecting corresponding multiple nodes in the virtual connection model and the topology structure based on preset selection conditions; Based on the nodes, corresponding objects between the virtual connection model and the topological structure and corresponding channels between the corresponding objects are established as corresponding relationship information; The step of obtaining the control information of the energy storage converter and inputting the control information into the energy storage converter in the virtual connection model to obtain simulated control information includes: Acquire control information of the energy storage converter based on the Internet, and input the control information corresponding to the energy storage converter into the energy storage converter in the virtual connection model; The power supply information of the power grid line in which the energy storage converter operates according to the control information is obtained as the simulation control information.
2. The fast-response interconnected energy storage converter coordinated control method according to claim 1, characterized in that: The step of adjusting the control information of the energy storage converter based on the state information includes: Based on the qualified preset conditions, the state information of the analog control information is judged, and the energy storage converter corresponding to the analog control information in the qualified state is regarded as the qualified energy storage converter; The energy storage converter corresponding to the simulated control information of the abnormal state is regarded as an unqualified energy storage converter; Adjusting the control information of the unqualified energy storage converter to obtain the target control information in the virtual connection model; Based on the verification information, the receiving state of the energy storage inverter in the actual power grid is determined, wherein the receiving state includes a qualified receiving state and an unqualified receiving state. Based on the Internet, the target control information is input into the energy storage inverter in the qualified receiving state in the actual power grid, and the operating data of the energy storage inverter in the actual power grid is collected in real time and marked in the topology structure.
3. A fast-response interconnected energy storage converter coordinated control system, used to implement the fast-response interconnected energy storage converter coordinated control method according to any one of claims 1-2, characterized in that: include: An acquisition module is used to acquire connection information between the power grid and multiple energy storage converters, and formulate conversion rule information of the energy storage converter based on the connection information; A construction module is connected to the acquisition module and is used to connect multiple energy storage converters based on the Internet to obtain interconnection information, establish a topological structure of the energy storage converter based on the interconnection information and the connection information, and collect the operation data information of the energy storage converter in the power grid and synchronize it to the topological structure in real time; A corresponding module, connected to the building module, is used to establish a virtual connection model of the energy storage converter based on the topological structure, and establish corresponding relationship information between the virtual connection model and the topological structure, wherein the corresponding relationship information includes corresponding objects and corresponding channels between the corresponding objects; A simulation module, connected to the corresponding module, is used to obtain the control information of the energy storage converter, and input the control information into the energy storage converter in the virtual connection model to obtain the simulated control information; The control module is connected to the simulation module and is used to judge the simulated control information based on qualified preset conditions to obtain the status information of the lines and energy storage converters in the power grid, wherein the status information includes qualified status and abnormal status, and the control information of the energy storage converter is adjusted based on the status information.