Long-term flexibility support method for spatiotemporal coupling of cascade hydropower under multiple uncertainties
By establishing a mixed integer linear programming model based on quantile regression and central interval prediction, we optimize the solution of the flexible support output boundary of cascade power stations, and solve the problem of complex space-time and hydraulic coupling relationship of cascade hydropower groups under multiple uncertainties, and improve new Energy consumption capacity and power system stability.
Patent Information
- Application Number
- CN202410961370.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-18
AI Technical Summary
Under multiple uncertainties, traditional hydropower flexibility support methods are difficult to effectively deal with the complex space-time and hydraulic coupling relationship of cascade hydropower station groups, resulting in difficulties in absorbing new energy and affecting the safety and stability of the power system.
Using a mixed integer linear programming model based on quantile regression theory and central interval prediction method, a long-term water, wind and light integrated power generation maximum model considering multiple uncertain factors of runoff and wind and light output is established, and the solution is optimized to determine the flexibility support of cascade power stations. Expand the boundary.
It ensures the flexibility of the cascade hydropower station group under complex space-time coupling to support the feasibility and safety of the output boundary, improves the reliability of hydropower generation plans, and promotes the full absorption of new energy.
Smart Images

Figure CN118508527B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of new power system dispatching, and relates to a method for supporting long-term flexibility of spatiotemporal coupling of cascade hydropower under multiple uncertainties. Specifically, it is a method for supporting flexibility of hydropower to cope with multiple uncertainties in a continuous period under complex cascade hydraulic connections, and particularly relates to long-term dispatching that fully utilizes the flexibility support capability of hydropower. Background Art
[0002] In recent years, through the complementary operation of hydropower, wind power, and photovoltaic power, a power system with a gradually increasing proportion of new energy has been built, and the grid-connected capacity of wind and solar new energy has increased year by year. New energy sources such as wind and light have the characteristics of randomness and seasonal fluctuations on a long-term scale, which leads to prominent contradictions in the seasonal consumption of new energy. Carrying out multi-energy complementary joint dispatching such as water-wind, water-solar, and water-wind-solar can give full play to the good flexibility support capacity of hydropower and promote the full consumption of new energy. Due to the close spatiotemporal hydraulic coupling relationship between the upstream and downstream cascade hydropower stations, the traditional hydropower flexibility support output takes the conventional minimum or maximum output of hydropower as the boundary, ignoring the "cascade" relationship of cascade hydropower stations; in addition, the period runoff is also uncertain, which increases the complexity of the hydraulic connection of the cascade hydropower station group, and the runoff and wind and solar output are often accompanied by extreme events and have time complexity. For example, when there is more water and high occurrence of new energy in a continuous period, the hydropower flexibility support faces more severe tests, which seriously affects the safe implementation of the hydropower generation plan. Therefore, under the continuous multi-period and multi-uncertainty factors, how to ensure the reliability of the output boundary of flexibility support under the close hydraulic connection of the upstream and downstream cascade hydropower stations and improve the flexibility support capacity of hydropower has become the focus and difficulty of large-scale grid connection and consumption of new energy under the new power system.
[0003] In response to the above problems, the present invention proposes a long-term flexibility support method for cascade power stations facing multiple uncertainties of water, wind and solar power. Strict hydraulic constraint feasibility modeling is performed on the flexible supply output boundary of cascade hydropower that responds to flexibility needs under the complex spatiotemporal hydraulic coupling of the cascade; a maximum power generation model considering multiple uncertainties of runoff, wind and solar output is established, and converted into a mixed integer linear programming model for solution. The final results show that under certain flexibility requirements, the present invention can ensure the feasibility and safety of the flexible support output boundary of cascade power stations under the complex hydraulic spatiotemporal connection, improve the flexibility support capacity of hydropower, and ensure the full absorption of new energy. Summary of the invention
[0004] The purpose of the present invention is to provide a method for supporting long-term flexibility of spatiotemporal coupling of cascade hydropower under multiple uncertainties, that is, to provide a method for supporting flexibility of cascade hydropower stations that can effectively cope with multiple uncertainties in continuous periods under complex hydraulic spatiotemporal associations, promote the consumption of wind and solar resources, and improve the reliability of hydropower generation plans. Specifically, it includes: collecting initial calculation conditions, calculating the deviation between the monthly new energy forecast and the actual to obtain flexibility requirements; establishing flexibility supply and demand constraints considering multiple uncertainties under complex hydraulic connections of cascade hydropower stations, constructing a long-term maximum model for integrated power generation of water, wind and solar power, and giving constraints; establishing a simulation scheduling model, and using the optimization results of the above integrated scheduling model such as water level and output and runoff data as inputs to the scheduling model; using the optimization solver to solve the model to obtain the output boundary of the flexibility support of the cascade hydropower station.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A method for supporting long-term flexibility of cascade hydropower spatiotemporally coupled under multiple uncertainties mainly includes: implementing strict hydraulic constraint feasibility modeling of the cascade hydropower flexibility supply output boundary that responds to flexibility demand; quantifying flexibility demand based on quantile regression theory and central interval prediction method, establishing a long-term hydropower flexibility support model that considers multiple uncertainties, and converting it into a mixed integer linear programming model for solution. The method for supporting long-term flexibility of hydropower spatiotemporally coupled includes the following steps:
[0007] Step 1: Collect initial calculation conditions, including hydropower station operating conditions and constraints, hydraulic dispatch demand conditions, wind power output, photovoltaic output measured historical data and forecast data, and multi-year average output per unit value of wind power and photovoltaic power stations on a monthly scale.
[0008] Step 2: Based on the quantile regression theory, the historical operation information of wind power and photovoltaic power is sorted out to quantify the flexibility demand caused by the fluctuation of renewable energy output in the long term. The quantile distribution of input wind and photovoltaic output and each actual wind power output has the following relationship:
[0009] (1)
[0010] (2)
[0011] Where: The input is the wind farm In the period contribution Actual output Percentile, The input is the optical field In the period contribution Actual output quantile; , , , is the quantile regression model parameter. By inputting the wind and solar power output in each period, the wind farm , Photoelectric Field The results of different output quantiles in different time periods are as follows: For wind power index, The photovoltaic index.
[0012] Step 3: Use the central interval prediction method to convert the output quantile results obtained in step 2 into interval output results with confidence intervals. The conversion process is as follows:
[0013] (3)
[0014] (4)
[0015] (5)
[0016] (6)
[0017] (7)
[0018] Where: When the wind power output input value is When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are , ; When the photovoltaic output input value is When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are , ;in , are the model parameters for the lower and upper limits of the actual wind and solar output range, The actual wind and solar output are in the range , The probability value of .
[0019] The present invention increases the flexibility of the multi-energy complementary system and flexibility to adjust demand downwards The definition is as follows:
[0020] (8)
[0021] (9)
[0022] (10)
[0023] (11)
[0024] (12)
[0025] (13)
[0026] Where: , The time periods Since the actual wind power output and wind power input Flexibility to adjust demand up or down due to deviations; , The time periods Since the actual photovoltaic output and photovoltaic input Flexibility to adjust demand up or down due to deviations; , Adjust total demand up and down for system flexibility, respectively.
[0027] Step 4: Long-term integrated hydropower, wind and solar power complementary scheduling can improve the power generation efficiency of the complementary system and promote the consumption of wind and solar power. The maximum power generation of the hydropower, wind and solar power system is taken as the goal, and the average value of abandoned water output that exceeds the total transfer capability (TTC) of the transmission channel is included in the objective function to reduce channel crowding and improve power quality. The maximum power generation target of hydropower, wind and solar power is constructed as follows:
[0028] (14)
[0029] Where: It is the maximum objective function of water, wind and solar power generation; , , They are the total hydroelectric power generation, total photovoltaic power generation, and total wind power generation during the dispatch period; For the The average value of the system's abandoned water output during the period. This part of the abandoned water output average value refers to the output of the part of the total water, wind and solar power output that exceeds TTC and is treated as abandoned water; The number of hours of power generation during the dispatch period.
[0030] The constraints are as follows:
[0031] 1) Water balance constraints
[0032] (15)
[0033] (16)
[0034] (17)
[0035] Where: For hydropower station exist Initial storage capacity of the time period; , , Hydropower Station exist Inflow, power generation and abandoned water flow in each period; The step length of the scheduling calculation period; For hydropower station exist The interval flow of the time period.
[0036] 2) Operational boundary constraints
[0037] (18)
[0038] (19)
[0039] (20)
[0040] (twenty one)
[0041] (twenty two)
[0042] (twenty three)
[0043] Formula (18) to (23) are respectively the hydropower station exist Boundary constraints of the initial water level constraint, the final water level constraint, the water level above the dam, the output, the outflow flow, and the power generation flow. , Hydropower Station exist The upper and lower limits of power generation flow in the time period; , Hydropower Station exist The upper and lower limits of output during the time period; , Hydropower Station exist The upper and lower limits of the water level on the dam during the time period; , Hydropower Station The initial and final water level values on the dam during the dispatching period; , , Hydropower Station exist Water level on the dam, outflow, and power generation flow during the period; and Hydropower Station exist Time period and The water level on the dam.
[0044] 3) Power generation head constraints
[0045] (twenty four)
[0046] Where: For hydropower station exist The generating head during the period; For hydropower station exist Tailwater level of the time period; For hydropower station head loss.
[0047] 4) Dam water level-reservoir capacity constraints
[0048] (25)
[0049] Where: For hydropower station The relationship function between water level on the dam and reservoir capacity.
[0050] 5) Tailwater level-discharge flow constraint
[0051] (26)
[0052] Where: For hydropower station The tailwater level-downstream flow relationship function.
[0053] 6) Constraints on hydropower, wind power and solar power
[0054] (27)
[0055] (28)
[0056] (29)
[0057] Where: , , Hydropower Station , Wind Farm 、Photovoltaic power station In the period of effort.
[0058] 7) Constraints on hydropower, wind power and solar power
[0059] (30)
[0060] (31)
[0061] (32)
[0062] (33)
[0063] Where: For hydropower station In the period The comprehensive output coefficient; , Photovoltaic Station , Wind Farm installed capacity; , The time periods Output per unit value of photovoltaic power station and wind farm, The channel capacity is limited.
[0064] 8) Water abandonment constraints
[0065] (34)
[0066] Where: is the relationship function between the amount of abandoned water and the average output of abandoned water, is the total amount of discarded water.
[0067] Step 5: Construct a flexible supply output boundary constraint that takes into account the multiple uncertainties of hydropower, wind power, and solar power during continuous periods. Against the backdrop of the increasing installed capacity of new energy sources, the randomness and volatility of new energy output have led to an increasing demand for system flexibility. If the capacity of transmission channels and the maximum amount of electricity to be consumed are limited, if hydropower generation plans are formulated in a traditional way, it may lead to power shortages, transmission channel crowding, and difficulties in consuming electricity to be transmitted. Therefore, how to formulate a suitable hydropower generation plan, improve the flexible supply capacity of hydropower, reduce channel crowding, and promote electricity consumption is a crucial issue.
[0068] In recent years, extreme weather and climate events have also shown the characteristics of time compounding that occur one after another, which often have a greater impact than the occurrence of extreme events alone. The frequent occurrence of climate events such as continuous high temperature and extreme precipitation has caused a serious impact on the reliability of the execution of hydropower generation plans. In the existing model, only the relationship between flexible supply and demand in a single period is considered, and the impact of continuous multi-period uncertain factors is not considered, such as extreme situations such as excessive water inflow and high generation of new energy, insufficient water inflow and low generation of new energy. Therefore, a flexible supply and demand constraint formula considering the influence of multiple uncertainties in continuous periods is established. For the scenario of excessive water inflow and high generation of new energy, the hydropower output is continuously reduced for two periods, and for the scenario of insufficient water inflow and low generation of new energy, the hydropower output is continuously increased for two periods. The hydraulic constraints must satisfy equations (35)-(61):
[0069] (35)
[0070] (36)
[0071] (37)
[0072] (38)
[0073] (39)
[0074] (40)
[0075] (41)
[0076] (42)
[0077] (43)
[0078] (44)
[0079] (45)
[0080] (46)
[0081] (47)
[0082] (48)
[0083] (49)
[0084] (50)
[0085] (51)
[0086] (52)
[0087] (53)
[0088] (54)
[0089] (55)
[0090] (56)
[0091] (57)
[0092] (58)
[0093] (59)
[0094] (60)
[0095] (61)
[0096] Where: , They are respectively the hydropower stations when the hydropower output was first reduced In the period Initial reservoir capacity and initial water level above the dam; , Hydropower Station In the period Output and hydropower stations during the first reduction In the period The output during the first increase; , They are respectively the hydropower stations when the hydropower output was reduced for the second time In the period Initial reservoir capacity and initial water level above the dam; , , , , , They are respectively the power stations when the hydropower output was reduced for the second time In the period outflow, power generation flow, abandoned water flow, power generation head, hydropower output and tailwater level; , The hydropower station was adjusted up for the first time In the period Initial reservoir capacity and initial water level above the dam; , They are respectively the hydropower stations when the hydropower output was adjusted up for the second time In the period Initial reservoir capacity and initial water level above the dam; , , , , , They are respectively the power stations when the hydropower output was adjusted up for the second time In the period outflow, power generation flow, abandoned water flow, power generation head, hydropower output and tailwater level; is the uncertainty runoff set, , Hydropower Station In the period Minimum and maximum runoff values during the same period in history.
[0097] Step 6, equations (1) to (61) are the maximum long-term integrated hydro-wind-solar power generation models under the flexible supply and demand constraints of multi-uncertainty coupled cascade hydraulic spatiotemporal connections. The above model is optimized and solved to obtain the optimal values of the dam water level and hydropower output of each hydropower station in each time period.
[0098] Step 7: Establish a single-period cascade hydropower station output maximum model (Equations (62)-(63)), and input the optimization value obtained in step 6 into the single-period cascade hydropower station output maximum model, calculate the upper and lower boundaries of the output of the cascade hydropower station in each period under the current water level state, and calculate the hydropower flexibility supply capacity in each period.
[0099] (62)
[0100] (63)
[0101] Where: , The time periods Hydropower flexibility to adjust supply down and up; , Hydropower Station In the period Optimize the minimum and maximum outputs under the water level during this period.
[0102] The present invention has the following beneficial effects: With the large-scale grid connection of new energy, the uncertainty of new energy output seriously threatens the safe and stable operation of power grids with a high proportion of new energy. Based on this demand, the present invention strictly performs hydraulic constraint feasibility modeling on the flexible supply output boundary of cascade power stations that respond to flexibility needs under complex spatiotemporal hydraulic coupling of the cascade, and establishes a maximum power generation model that considers multiple uncertain factors such as runoff and wind and solar output. It can effectively characterize and improve the flexibility support capacity of hydropower in the long term, promote the consumption of electricity transmitted from integrated water, wind and solar bases, and make the power generation scheme more robust. In summary, the present invention ensures the feasibility and safety of the flexibility support output boundary of the cascade hydropower station group under the tight spatiotemporal coupling, improves the flexibility support capacity of hydropower under multiple uncertain factors in continuous periods, and can provide strong theoretical and technical support for long-term flexibility support of hydropower under power grids with a high proportion of new energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0103] Figure 1 It is a basic flow chart of the method of the present invention.
[0104] Figure 2 The following is a schematic diagram of the planned water levels for power generation in each typical year, where (a) is the water level result in a wet year, (b) is the water level result in a normal year, and (c) is the water level result in a dry year. The dotted lines in the figure represent the upper and lower limits of the water level of the power station.
[0105] Figure 3 are the output results of different models in a normal water year, where (a) is the output diagram of model A, (b) is the output diagram of model B, (c) is the output diagram of model C, and (d) is the output diagram of model D;
[0106] Figure 4 are the output results of different models in the flood year, where (a) is the output diagram of model A, (b) is the output diagram of model B, (c) is the output diagram of model C, and (d) is the output diagram of model D;
[0107] Figure 5 are the output results of different models in the dry year, where (a) is the output diagram of model A, (b) is the output diagram of model B, (c) is the output diagram of model C, and (d) is the output diagram of model D;
[0108] Figure 6 The results of the downward adjustment of flexibility supply and demand of different models in normal water years, where (a) is the schematic diagram of the downward adjustment of flexibility supply and demand of model A, (b) is the schematic diagram of the downward adjustment of flexibility supply and demand of model B, (c) is the schematic diagram of the downward adjustment of flexibility supply and demand of model C, and (d) is the schematic diagram of the downward adjustment of flexibility supply and demand of model D;
[0109] Figure 7The results of the flexibility supply and demand adjustment of different models in a normal water year, where (a) is the schematic diagram of the flexibility supply and demand adjustment of model A, (b) is the schematic diagram of the flexibility supply and demand adjustment of model B, (c) is the schematic diagram of the flexibility supply and demand adjustment of model C, and (d) is the schematic diagram of the flexibility supply and demand adjustment of model D;
[0110] Figure 8 It is the simulated dispatch output of each model under the scenario of partial abundance; among them, (a) is the schematic diagram of the output of model A, (b) is the schematic diagram of the output of model B, (c) is the schematic diagram of the output of model C, and (d) is the schematic diagram of the output of model D;
[0111] Fig. 9 The results of simulating the scheduling plan water level and adjusting the water level of each model under the scenario of partial abundance, where (a) is the schematic diagram of the water level of model A, (b) is the schematic diagram of the water level of model B, (c) is the schematic diagram of the water level of model C, and (d) is the schematic diagram of the water level of model D;
[0112] Fig.10 It is the result of water abandonment simulation dispatch of each model under the scenario of abundant water supply;
[0113] Fig.11 The following are the results of water level adjustment simulations of each model under the scenario of continuous overabundance. (c) is the schematic diagram of water level of model C, and (d) is the schematic diagram of water level of model D. The circle represents the result of the first water level adjustment under the scenario of continuous overabundance, and the triangle represents the result of the second water level adjustment under the scenario of continuous overabundance.
[0114] Fig.12 It is the result of water abandonment in the second period of the simulated scheduling of Model C and Model D under the scenario of continuous high abundance;
[0115] Fig.13 It is the simulated dispatching output of each model under the partial drought scenario; among them, (a) is the schematic diagram of the output of model A, (b) is the schematic diagram of the output of model B, (c) is the schematic diagram of the output of model C, and (d) is the schematic diagram of the output of model D;
[0116] Fig.14 The results of the simulated scheduling plan water level and adjusted water level of each model under the dry season scenario, where (a) is the schematic diagram of the water level of model A, (b) is the schematic diagram of the water level of model B, (c) is the schematic diagram of the water level of model C, and (d) is the schematic diagram of the water level of model D;
[0117] Fig.15 The following are the results of water level adjustment simulations of each model under the continuous drought scenario, where (c) is a schematic diagram of the water level of model C, and (d) is a schematic diagram of the water level of model D. The circle represents the first water level adjustment result under the flood scenario, and the triangle represents the second water level adjustment result under the flood scenario.
[0118] Fig.16These are the results of flexibility supply analysis at different water levels, where (a) is the result of upward flexibility supply analysis and (b) is the result of downward flexibility supply analysis. DETAILED DESCRIPTION
[0119] The present invention is further described below in conjunction with the accompanying drawings and implementation examples.
[0120] Case data
[0121] Take the cascade hydropower station group composed of XW, MW, NZD, and JH power stations on the main stream of the L River Basin in Y Province in Southwest China as an example. By the end of 2023, the province's installed power generation capacity will exceed 130 million kilowatts, with green energy installed capacity accounting for nearly 89% and green power generation accounting for about 86%, of which hydropower installed capacity is 82 million kilowatts, accounting for 63%. The basic information of each power station is shown in Table 1.
[0122] Table 1 Basic data information of power station
[0123]
[0124] like Figure 1 As shown, the analysis is carried out using the multi-uncertainty cascade hydropower spatiotemporal coupling long-term flexibility support method, which includes the following steps:
[0125] Step 1: Collect initial calculation conditions, including hydropower station operating conditions and constraints, hydraulic dispatch demand conditions, wind power output, photovoltaic output measured historical data and forecast data, and multi-year average output per unit value of wind power and photovoltaic power stations on a monthly scale.
[0126] Step 2: Based on the quantile regression theory, the historical operation information of wind power and photovoltaic power is sorted out to quantify the flexibility demand caused by the fluctuation of renewable energy output in the long term. The quantile distribution of input wind and photovoltaic output and each actual wind power output has the following relationship:
[0127] (64)
[0128] (65)
[0129] Where: The input is the wind farm In the period contribution Actual output Percentile, The input is the optical field In the period contribution Actual output quantile; , , , is the quantile regression model parameter. By inputting the wind and solar power output in each period, the wind farm , Photoelectric Field The results of different output quantiles in different time periods are as follows: For wind power index, The photovoltaic index.
[0130] Step 3: Use the central interval prediction method to convert the output quantile results obtained in step 2 into interval output results with confidence intervals. The conversion process is as follows:
[0131] (66)
[0132] (67)
[0133] (68)
[0134] (69)
[0135] (70)
[0136] Where: When the wind power output input value is When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are , ; When the photovoltaic output input value is When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are , ;in , are the model parameters for the lower and upper limits of the actual wind and solar output range, The actual wind and solar output are in the range , The probability value of .
[0137] The present invention increases the flexibility of the multi-energy complementary system and flexibility to adjust demand downwards The definition is as follows:
[0138] (71)
[0139] (72)
[0140] (73)
[0141] (74)
[0142] (75)
[0143] (76)
[0144] Where: , The time periods Since the actual wind power output and wind power input Flexibility to adjust demand up or down due to deviations; , The time periods Since the actual photovoltaic output and photovoltaic input Flexibility to adjust demand up or down due to deviations; , Adjust total demand up and down for system flexibility, respectively.
[0145] Step 4: Long-term integrated hydropower, wind and solar power complementary scheduling can improve the power generation efficiency of the complementary system and promote the consumption of wind and solar power. The maximum power generation of the hydropower, wind and solar power system is taken as the goal, and the average value of abandoned water output that exceeds the total transfer capability (TTC) of the transmission channel is included in the objective function to reduce channel crowding and improve power quality. The maximum power generation target of hydropower, wind and solar power is constructed as follows:
[0146] (77)
[0147] Where: It is the maximum objective function of water, wind and solar power generation; , , They are the total hydroelectric power generation, total photovoltaic power generation, and total wind power generation during the dispatch period; For the The average value of the system's abandoned water output during the period. This part of the abandoned water output average value refers to the output of the part of the total water, wind and solar power output that exceeds TTC and is treated as abandoned water; The number of hours of power generation during the dispatch period.
[0148] The constraints are as follows:
[0149] 1) Water balance constraints
[0150] (78)
[0151] (79)
[0152] (80)
[0153] Where: For hydropower station exist Initial storage capacity of the time period; , , Hydropower Station exist Inflow, power generation and abandoned water flow in each period; The step length of the scheduling calculation period; For hydropower station exist The interval flow of the time period.
[0154] 2) Operational boundary constraints
[0155] (81)
[0156] (82)
[0157] (83)
[0158] (84)
[0159] (85)
[0160] (86)
[0161] Formula (81) to (86) are respectively the hydropower station exist Boundary constraints of the initial water level constraint, the final water level constraint, the water level above the dam, the output, the outflow flow, and the power generation flow. , Hydropower Station exist The upper and lower limits of power generation flow in the time period; , Hydropower Station exist The upper and lower limits of output during the time period; , Hydropower Station exist The upper and lower limits of the water level on the dam during the time period; , Hydropower Station The initial and final water level values on the dam during the dispatching period; , , Hydropower Station exist The water level on the dam, outflow flow and power generation flow during the period.
[0162] 3) Power generation head constraints
[0163] (87)
[0164] Where: For hydropower station exist The generating head during the period; For hydropower station exist Tailwater level of the time period; For hydropower station head loss.
[0165] 4) Dam water level-reservoir capacity constraints
[0166] (88)
[0167] Where: For hydropower station The relationship function between water level on the dam and reservoir capacity.
[0168] 5) Tailwater level-discharge flow constraint
[0169] (89)
[0170] Where: For hydropower station The tailwater level-downstream flow relationship function.
[0171] 6) Constraints on hydropower, wind power and solar power
[0172] (90)
[0173] (91)
[0174] (92)
[0175] Where: , , Hydropower Station , Wind Farm 、Photovoltaic power station In the period of effort.
[0176] 7) Constraints on hydropower, wind power and solar power
[0177] (93)
[0178] (94)
[0179] (95)
[0180] (96)
[0181] Where: For hydropower station In the period The comprehensive output coefficient; , Photovoltaic Station , Wind Farm installed capacity; , The time periods Output per unit value of photovoltaic power station and wind farm, The channel capacity is limited.
[0182] 8) Water abandonment constraints
[0183] (97)
[0184] Where: is the relationship function between the amount of abandoned water and the average output of abandoned water, is the total amount of discarded water.
[0185] Step 5: Construct a flexible supply output boundary constraint that takes into account the multiple uncertainties of hydropower, wind power, and solar power. Against the backdrop of the increasing installed capacity of new energy sources, the randomness and volatility of new energy output have led to an increasing demand for system flexibility. If the capacity of transmission channels and the maximum amount of electricity to be consumed are limited, if hydropower generation plans are formulated in a traditional way, it may lead to power shortages, transmission channel crowding, and difficulties in consuming electricity to be transmitted. Therefore, how to formulate a suitable hydropower generation plan, improve the flexible supply capacity of hydropower, reduce channel crowding, and promote electricity consumption is a crucial issue.
[0186] 1) Traditional flexibility supply constraints
[0187] Against the backdrop of the increasing installed capacity of renewable energy, the randomness and volatility of renewable energy output has led to an increasing demand for system flexibility, and the transmission channels have been squeezed. If hydropower generation plans are formulated in the traditional way, it may lead to power shortages and wind and solar power abandonment caused by the crowding of transmission channels. Therefore, how to formulate a suitable hydropower generation plan, improve the flexibility supply capacity of hydropower, meet the flexibility needs of the system, and promote the priority consumption of renewable energy is a crucial issue. However, most studies simply define the hydropower flexibility supply capacity as the adjustable capacity between the current hydropower output and the power station output operating boundary (Equations (64)-(97) and (98)-(99) are collectively referred to as Model A). The traditional model describes the relationship between hydropower flexibility supply and system flexibility demand as follows:
[0188] (98)
[0189] (99)
[0190] 2) Flexibility supply and demand constraints considering cascade hydraulic operation constraints
[0191] However, the traditional model of hydropower flexibility supply capacity takes the theoretical output operation boundary of each power station in the cascade power station as the actual output operation boundary, ignoring the complex spatiotemporal hydraulic coupling relationship of the cascade power station, and does not impose effective constraints on the flexibility supply capacity under the actual operation boundary of each time period. Therefore, the present invention proposes a method that considers cascade hydraulic operation constraints based on the actual output operation boundary of each scheduling sub-period of the cascade power station (Formula (64)-Formula (97) and Formula (100)-Formula (123) are collectively referred to as Model B). Taking the increase in hydropower flexibility as an example, the single-period hydropower flexibility supply capacity is defined as follows:
[0192] (100)
[0193] (101)
[0194] (102)
[0195] (103)
[0196] (104)
[0197] (105)
[0198] (106)
[0199] (107)
[0200] (108)
[0201] (109)
[0202] (110)
[0203] (111)
[0204] (112)
[0205] (113)
[0206] (114)
[0207] (115)
[0208] (116)
[0209] (117)
[0210] (118)
[0211] (119)
[0212] (120)
[0213] (121)
[0214] (122)
[0215] (123)
[0216] Where: , Hydropower Station In the period The output increase boundary and output decrease boundary of hydropower output increase corresponding reservoir capacity , water level on the dam , contribute , Tailwater level , outbound traffic , Power generation flow , abandoned water flow , Power generation head Storage capacity corresponding to the reduction of hydropower output , water level on the dam , contribute , Tailwater level , outbound traffic , Power generation flow , abandoned water flow , Power generation head as well as , The hydraulic operation constraints corresponding to equations (102)-(123) must be satisfied.
[0217] 3) Considering the flexible supply and demand constraints of multiple uncertainties in water, wind and solar power
[0218] Model B only considers the impact of uncertainty factors of renewable energy output on the flexible supply capacity of cascade hydropower. In the long-term dispatch of water, wind and solar energy, due to the uncertainty of runoff, the uncertainty of runoff during the period is considered on the basis of Model B, and equations (34) and (35) are transformed into the following equations (equations (64)-(97) and (124)-(128) are collectively referred to as Model C):
[0219] (124)
[0220] (125)
[0221] (126)
[0222] (127)
[0223] (128)
[0224] Where: Hydropower station when the hydropower output is increased In the period The initial storage capacity, Hydropower station when hydropower output is reduced In the period The initial storage capacity; Hydropower station when the hydropower output is increased In the period Outbound flow, Hydropower station when the hydropower output is increased In the period Outbound flow; is the uncertainty runoff set, , Hydropower Station In the period Minimum and maximum runoff values during the same period in history; , The hydropower station under the uncertainty runoff set In the period The other hydraulic operation boundary constraints are the same as those in equations (104) to (123).
[0225] 4) Considering the flexible supply and demand constraints of multiple uncertainties of wind and solar power during continuous periods
[0226] In recent years, extreme weather and climate events have also shown the characteristics of a series of time-complex events, which often have a greater impact than the occurrence of extreme events alone. The frequent occurrence of climate events such as continuous high temperature and extreme precipitation has caused a serious impact on the reliability of the execution of hydropower generation plans. In the previous three models, only the relationship between flexible supply and demand in a single period was considered, and the impact of continuous multi-period uncertainties was not considered, such as extreme situations such as excessive water inflow and high generation of new energy, insufficient water inflow and low generation of new energy. Therefore, a flexible supply and demand constraint formula considering the influence of multiple uncertainties in continuous periods is established (Formulas (64)-(97) and (129)-(155) are collectively referred to as Model D). Take the scenario of excessive water inflow and high generation of new energy, the hydropower output is continuously reduced for two periods, and the scenario of insufficient water inflow and low generation of new energy, the hydropower output is continuously increased for two periods as an example:
[0227] (129)
[0228] (130)
[0229] (131)
[0230] (132)
[0231] (133)
[0232] (134)
[0233] (135)
[0234] (136)
[0235] (137)
[0236] (138)
[0237] (139)
[0238] (140)
[0239] (141)
[0240] (142)
[0241] (143)
[0242] (144)
[0243] (145)
[0244] (146)
[0245] (147)
[0246] (148)
[0247] (149)
[0248] (150)
[0249] (151)
[0250] (152)
[0251] (153)
[0252] (154)
[0253] (155)
[0254] Where: , The hydropower station was the first to reduce the hydropower output In the period Initial reservoir capacity and initial water level above the dam; , They are respectively the hydropower stations when the hydropower output was reduced for the second time In the period Initial reservoir capacity and initial water level above the dam; , , , , , They are respectively the power stations when the hydropower output was reduced for the second time In the period outflow, power generation flow, abandoned water flow, power generation head, hydropower output and tailwater level; , The hydropower station was adjusted up for the first time In the period Initial reservoir capacity and initial water level above the dam; , They are respectively the hydropower stations when the hydropower output was adjusted up for the second time In the period Initial reservoir capacity and initial water level above the dam; , , , , , They are respectively the power stations when the hydropower output was adjusted up for the second time In the period The outflow flow, power generation flow, abandoned water flow, power generation head, hydropower output and tail water level.
[0255] Step 6, optimize and solve the four models proposed in step 5 to obtain the optimal values of the dam water level and hydropower output of each hydropower station in each time period under different models.
[0256] Step 7: Establish a single-period cascade hydropower station output maximum model (Equations (156)-(157)), and input the optimization value obtained in step 6 into the single-period cascade hydropower station output maximum model, calculate the upper and lower boundaries of the output of the cascade hydropower station in each period under the current water level state, and calculate the hydropower flexibility supply capacity in each period.
[0257] (156)
[0258] (157)
[0259] Where: , The time periods Hydropower flexibility to adjust supply down and up; , Hydropower Station In the period Optimize the minimum and maximum outputs under the water level during this period.
[0260] Step 8. The model proposed in the present invention regards the water conditions and the output of new energy as deterministic scenarios for solution. Generally speaking, the solution of the deterministic scenario model is only optimal for the input scenario, but may not be optimal for other scenarios. The simulation scheduling is carried out by taking the hydropower generation plan in a normal water year as an example, and the robustness of the hydropower generation plan in different scenarios is tested respectively. The simulation scheduling scenario of the present invention takes the original plan and the relatively abundant scenario (more water inflow and more new energy) and the relatively dry scenario (less water inflow and less new energy) as input, and analyzes the scheduling results such as water level, output, and water abandonment.
[0261] The simulation analysis results are as follows:
[0262] (1) From Figure 2 It can be seen that in each typical year, the water level process of model B is slightly lower than that of model A. In model A, power stations XW and NZD reach the upper limit of water level at the same time in September and early October. When the output of new energy is too large, the transmission channel may be blocked due to the large output of hydropower in the flood season. The water level of the power station reaches the normal high water level, resulting in insufficient adjustable storage capacity and water abandonment. Model B chooses to lower the water level of XW power station in September and October, avoiding the operation of two regulating power stations at the same high water level. The adjustable storage capacity is large, reducing the risk of reservoir operation. Compared with model B, model C further considers the uncertainty of runoff in a single period, and the water level of XW power station drops to a lower level before October. In the optimization results of NZD water level, the water level process of model C is more stable than that of model B, reaching the normal high water level in early August, and operating at a water level lower than the high water level in the rest of the flood season. It can maintain a higher power generation head and avoid maintaining the high water level of the power station for a long time during the flood season. It ensures a large adjustable storage capacity in the entire dispatching cycle, and improves the robustness of the hydropower generation plan. Among the four proposed models, model D takes into account the impact of uncertain factors of water, wind and light for G consecutive time periods. The water level process line of the power station is the lowest, which greatly improves the ability of cascade power stations to cope with the risk of water abandonment during flood season.
[0263] (2) In the comparison results of the water level process in each typical year, the water level process lines of each model are from high to low: A, B, C, and D. The water level process line of model A is higher. The rise of water level can form a larger power generation head, which can increase the total power generation of the entire scheduling cycle. However, in this mode, both regulating power stations operate at a high water level during the flood season, and the risk of power station abandonment is relatively high under the high-generation scenario of new energy. Models B, C, and D have stricter constraints on the boundaries of hydropower flexible supply output than model A. They lower the water level before the flood season, increase the adjustable reservoir capacity during the flood season, and reduce the risk of water abandonment. Compared with model A, the models B, C, and D proposed in the present invention may lose a small part of the power generation benefits in actual scheduling, but improve the safety of the scheduling plan, are more in line with the actual scheduling rules of the power station, and the power generation plan is more robust.
[0264] (3) Figure 3 The output results of different models in normal water years show that in normal water years, the output results of Model A and Model B are relatively close, with larger hydropower output in the dry season and larger hydropower output in the flood season. In August-October, the output of water, wind and solar power reaches the upper limit of the transmission channel capacity, and there is a risk of channel crowding. Models C and D achieve seasonal transfer of hydropower output by decreasing the water level before the flood season, increasing the output of hydropower in the dry season and reducing the output of hydropower in the flood season. There is enough remaining capacity of the transmission channel in the flood season to respond to and meet the flexibility needs, reducing the risk of water abandonment.
[0265] Figure 4The output results of different models in a flood year show that the hydropower output of the four models in the dry season is relatively small due to the high water inflow throughout the year. Compared with the normal water year, the hydropower output in the flood season is relatively large, and there is a risk of transmission channel crowding. Once the output of new energy is too large or the water inflow increases suddenly, serious water abandonment may occur. The number of dispatching periods in which the transmission channel is crowded in the flood season of Model C and Model D is significantly less than that of Model A and Model D. It can be seen that the proposed Model C and Model D also have good applicability in flood years.
[0266] Figure 5 The output results of different models in dry years show that when the water inflow is relatively low, the residual capacity of the channel during the flood season under the four models is larger, and the risk of water abandonment is smaller.
[0267] (4) Figure 6 (a), (b), (c), and (d) are the results of the flexibility supply and demand adjustment of different models in normal water years, and (b), (c), and (d) are the results of the flexibility supply and demand adjustment of models A, B, C, and D, respectively. It can be seen that the hydropower flexibility supply of different models can meet the flexibility demand. This is because the energy storage of the reservoir station group is large, and the flexibility adjustment can be achieved by increasing the hydropower output. Compared with model A and model B, the flexibility supply curves of models C and D are smoother, and the hydropower supply capacity is more stable.
[0268] Figure 7 The results of the flexible supply and demand adjustment of different models in a normal year show that, as shown in Figure (a), the flexible supply capacity of hydropower in model A in January, February and September is lower than the flexible demand. The low flexible supply capacity of hydropower in January and February is because the hydropower output is low during the flood season, and the hydropower output is close to the minimum feasible boundary of hydropower output. During the flood season, the two major regulating hydropower stations are operating at high water levels, resulting in insufficient adjustable storage capacity. Under the limitation of water level, the power station cannot further raise the water level to reduce the output, resulting in the inability of the flexible supply capacity of hydropower to meet the flexibility demand in September, and there is a risk of water abandonment. In models B, C and D, the lower limit of the cascade hydropower output boundary is constrained to ensure the feasibility of the water level when the hydropower output is reduced. During the flood season, the cascade hydropower operates at a lower water level, freeing up more regulating storage capacity to raise the water level, thereby reducing the output of the power station. The flexible supply capacity of hydropower can meet the flexibility demand in the entire dispatching cycle, greatly reducing the risk of water abandonment. Compared with model B, model C and model D take into account the uncertainty of water inflow, have lower water level process lines and more regulating reservoir capacity, and can provide larger hydropower flexibility supply capacity, more stable flexibility supply, and more reliable power generation plans. These characteristics are particularly evident during the flood season. During the entire scheduling cycle, model D has the most stable hydropower flexibility supply.
[0269] (5) Figure 8 , Fig. 9 , Fig.10They are the simulated dispatching output, water level, and water abandonment results under the scenario of relatively abundant water. Figure 8 It can be seen that in the scenario of more actual water inflow, for the flexibility reduction demand caused by the increase in new energy output, Model A has insufficient flexibility reduction supply capacity in January and February, resulting in the adjusted output being unable to be executed according to the original plan. Compared with Model A, Models B, C, and D have stronger flexibility reduction supply capacity, and the adjusted output results can all be executed according to the original output plan. Fig.10 It can be seen that Models A and B produced serious water abandonment when simulating scheduling during the flood season (August to October). The reason is that Models A and B lack consideration of the uncertainty of water inflow during the period. Fig. 9 It can be seen from (a) and (b) that when the water inflow is relatively abundant during the flood season, the high water level operation mode of the two models limits the flexibility of hydropower to adjust supply downward. In order to avoid channel crowding and promote the consumption of new energy, it is necessary to reduce the output of hydropower, resulting in a large amount of water abandonment. Compared with Model A and Model B, Model C and Model D take into account the uncertainty of water inflow during the time period. When the water inflow is relatively abundant during the flood season, the water level process formulated by the two models ensures that the reservoir has sufficient adjustable storage capacity, which can meet the demand for flexible downward adjustment under the scenario of abundant water inflow, and provide a more reliable power generation solution. Fig. 9 Judging from the adjusted water levels in (c) and (d), at the end of the flood season (September-November), the power station in model C adjusted the water level to approach the high water level almost at the same time, while the water level in model D still had sufficient room for upward adjustment during the same period, which was more stable. This further illustrates the robustness of the power generation scheme of model D, which sacrifices a small part of the power generation efficiency in exchange for a safer system operation mode, and is more in line with the actual scheduling procedures.
[0270] (6) Fig.11 This is the water level result under the scenario of hydropower flexibility with continuous abundant water supply in two periods. Fig.12 The results of the second period of water abandonment when the hydropower flexibility is continuously reduced. It can be seen that due to the high adjustment water level in the first period, the remaining regulation storage capacity of model C is low. When the flexibility is continuously reduced for two periods, the higher water level of model C cannot support the flexibility reduction demand. Fig.12 It shows that model C has serious water abandonment during the flood season. However, model D has a lower water level in the first period and has more regulating storage capacity, which can meet the flexible downward adjustment needs for two consecutive periods and is more robust.
[0271] (7) Fig.13 This is the output result of the hydropower flexibility increase in the dry season. Fig.14 Increased water levels for hydropower flexibility results, Fig.15This is the result of flexible water level adjustment in the scenario of two consecutive periods of drought. It can be seen that due to the strong regulation and storage capacity of the cascade hydropower station group, the flexible supply capacity of hydropower can meet the flexibility increase demand in the scenario of single period or two consecutive periods of drought.
[0272] (8) Fig.16 The results of the flexible supply analysis at different water levels show that when the water level is low, the power station has a larger adjustable storage capacity, which means that the power station can store more water, reduce the power generation flow, and adjust the supply flexibly at the minimum output. Fig.16 It can be seen from (b) that when the power station is operating at a low water level, its three-dimensional surface of downward flexibility supply is close to a plane, while when it is operating at a high water level, the ability of hydropower to adjust its supply downward sharply decreases. This is because under the restriction of high water level, the adjustable storage capacity of the reservoir is small, and the power station cannot further reduce its output to adjust its supply downward flexibly. The ability of downward flexibility supply is weak. From the traditional model, that is, model A, the minimum output of the power station is used as the flexible downward adjustment boundary, and the difference between the current output and the lower limit of the output is the flexible downward adjustment supply. The cascade hydraulic connection is not considered, and its three-dimensional surface is a plane, which obviously does not conform to the actual scheduling procedures. In terms of upward flexibility supply, Fig.16 (a) shows that when the water level is low, the power generation head is low, the available water volume in the reservoir is small, the available power generation flow is small, the output increase boundary is low, and the flexible upward supply capacity is weak. When the water level is high, the power generation head is large, the available power generation flow is large, the output increase boundary is large, and the flexible upward supply capacity is strong. The traditional model uses the installed capacity of cascade hydropower stations as the flexible output increase boundary, ignoring the hydraulic connection of cascade hydropower stations. Its three-dimensional surface is a plane, which is obviously not in line with the actual dispatching regulations.
[0273] In summary, different models have different constraints on the boundaries of flexibility support output, and their flexibility supply capabilities are also different. The more uncertain factors are taken into account in the model, the stronger the flexibility supply capacity of the power station is. For cascade hydropower, obtaining more flexibility support capacity may lose a small part of the power generation benefits, but it can obtain more safety benefits and ensure the safe operation of the system. The planned water level optimization result obtained by the proposed model can be simply understood as the operation of the cascade hydropower station group according to the planned water level of the hydropower station. The hydropower flexibility support capacity provided under multiple uncertain factors and the complex hydraulic spatiotemporal coupling of the cascade can meet the flexibility needs in a single period or in multiple periods.
[0274] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for supporting long-term flexibility of spatiotemporal coupling of cascade hydropower under multiple uncertainties, characterized in that: The method for supporting long-term flexibility of hydropower spatiotemporal coupling includes the following steps: Step 1: Collect initial calculation conditions, including hydropower station operation conditions and constraints, hydraulic dispatch demand conditions, wind power output, photovoltaic output measured historical data and forecast data, and multi-year average output per unit value of wind power and photovoltaic power stations on a monthly scale; Step 2: Based on the quantile regression theory, the historical operation information of wind power and photovoltaic power is sorted out to quantify the flexibility demand caused by the fluctuation of renewable energy output on a long-term scale; the quantile distribution of the input wind and photovoltaic output and each actual wind power output has the following relationship: Where: The input is the output N of wind farm m in period t w,m,t The actual output τ percentile at time, The input is the output N of the photoelectric field s in time period t p,s,t The τ percentile of the actual output at time t; is the parameter of the quantile regression model; by changing different τ values and inputting the wind and solar power outputs in different time periods, we can obtain the output quantile results of wind farm m and photovoltaic farm s in different time periods, w is the wind power index and p is the photovoltaic index; Step 3: Use the central interval prediction method to convert the output quantile results obtained in step 2 into interval output results with confidence intervals. The conversion process is as follows: Where: β = 0.1, which means that when the wind power output input value is N w,m,t When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are When the photovoltaic output input value is N p,s,t When the actual output value Located in the interval The probability is 0.9, and the upper and lower limits of the actual output range are Among them, They are the model parameters for the lower and upper limits of the actual wind and solar output range, and 1-β is the actual wind and solar output in the range The probability value of Increase the flexibility of the multi-energy complementary system and flexibility to adjust demand downwards The definition is as follows: Where: They are the actual wind power output and wind power input N in period t. w,m,t Flexibility to adjust demand up or down due to deviations; They are the actual photovoltaic output and photovoltaic input N in period t. p,s,t Flexibility to adjust demand up or down due to deviations; Adjust total demand upward and downward for system flexibility, respectively; Step 4: Taking the maximum power generation of the hydropower, wind-solar system as the goal, and incorporating the mean value of the abandoned hydropower output that exceeds the transmission channel limit capacity TTC into the objective function, the maximum power generation target of the hydropower, wind-solar system is constructed as follows: maxF=E h +E p +E w -N c,t Δt h (14) Where: maxF is the maximum objective function of hydropower, wind power and solar power generation; E h 、E p 、E w are the total hydropower generation, photovoltaic power generation, and wind power generation during the dispatch period; N c,t is the average value of the system's abandoned water output in period t. This part of the abandoned water output means that the output of the total water, wind and solar power output exceeding TTC is treated as abandoned water; Δt h The number of hours of electricity generation during the dispatch period; The constraints are as follows: 1) Water balance constraints Where: V n,t is the initial storage capacity of hydropower station n in period t; I n,t , are the inflow, power generation and abandoned water flow of hydropower station n in period t respectively; Δt is the step length of the scheduling calculation period; is the interval flow of hydropower station n in period t; 2) Operational boundary constraints Formula (18) to Formula (23) are the boundary constraints of the initial water level constraint, final water level constraint, water level above the dam, output, outflow, and power generation flow of hydropower station n in period t, respectively; are the upper and lower limits of the power generation flow of hydropower station n in period t respectively; N n are the upper and lower limits of the output of hydropower station n in period t respectively; Z n are the upper and lower limits of the water level on the dam of hydropower station n in period t respectively; They are the initial and final water levels on the dam during the hydropower station’s dispatching period n; are the water level above the dam, outflow and power generation flow of hydropower station n in period t respectively; and are the water levels above the dam of hydropower station n at time t=1 and t=T+1 respectively; 3) Power generation head constraints Where: H n,t is the generating head of hydropower station n in period t; is the tailwater level of hydropower station n in period t; is the head loss of hydropower station n; 4) Dam water level-reservoir capacity constraints Where: is the relationship function between the water level on the dam and the reservoir capacity of the hydropower station n; 5) Tailwater level-discharge flow constraint Where: is the tailwater level-downflow relationship function of hydropower station n; 6) Constraints on hydropower, wind power and solar power Where: N h,n,t 、N w,m,t 、N p,s,t are the outputs of hydropower station n, wind farm m, and photovoltaic power station s in time period t; 7) Constraints on hydropower, wind power and solar power N p,s,t =S p,s l p,t (31) N w,m,t =S w,m l w,t (32) Where: K n,t is the comprehensive output coefficient of hydropower station n in period t; S p,s , S w,m are the installed capacities of photovoltaic power station s and wind farm m respectively; λ p,t , w,t are the output per unit values of the photovoltaic power station and wind farm in time period t, N s It is the channel capacity limitation; 8) Water abandonment constraints Where: is the relationship function between the amount of abandoned water and the average output of abandoned water, W t spill is the total amount of discarded water; Step 5: Construct flexible supply output boundary constraints that take into account multiple uncertainties of water, wind and solar power over a continuous period; For the scenario of more water inflow and high generation of new energy, the hydropower output is continuously reduced for two periods, and for the scenario of less water inflow and low generation of new energy, the hydropower output is continuously increased for two periods. The hydraulic constraints must satisfy equations (35) to (61): t∈[1…T-1] (61) Where: are the initial storage capacity and initial water level above the dam of hydropower station n in period t+1 when the hydropower output is first reduced; are the output of hydropower station n when it is first adjusted down in period t and the output of hydropower station n when it is first adjusted up in period t respectively; are the initial storage capacity and initial water level above the dam of hydropower station n in period t+2 when the hydropower output is adjusted down for the second time; They are the outflow, power generation flow, abandoned water flow, power generation head, hydropower output and tailwater level of power station n in time period t+1 when the hydropower output is adjusted down for the second time; is the initial storage capacity and initial water level above the dam of hydropower station n in period t+1 when the hydropower output is first increased; They are the initial storage capacity and initial water level above the dam of hydropower station n in period t+2 when the hydropower output is adjusted up for the second time; They are the outflow, power generation flow, abandoned water flow, power generation head, hydropower output and tailwater level of power station n in time period t+1 when the hydropower output is adjusted up for the second time; is the uncertainty runoff set, are the minimum and maximum runoff values of hydropower station n in the same period of time t; Step 6, equations (1) to (61) are the maximum model of long-term integrated hydropower, wind-solar power generation under the flexible supply and demand constraints of multi-uncertainty coupled cascade hydraulic spatiotemporal connections. The model is optimized and solved to obtain the optimal values of the dam water level and hydropower output of each hydropower station in each time period; Step 7, establish a single-period cascade hydropower station output maximum model, as shown in equations (62)-(63), and input the optimization value obtained in step 6 into the single-period cascade hydropower station output maximum model, calculate the output upper and lower boundaries of the cascade hydropower station in each period under the current water level state, and calculate the hydropower flexibility supply capacity in each period respectively; Where: They are the downward and upward supply capabilities of hydropower flexibility in period t, respectively; are the minimum output and maximum output of hydropower station n at the optimized water level in time period t.