Through BIM technology auxiliary construction methods, including collision detection, fusion processing and three-dimensional laser scanning, the construction process of large-area ceilings is optimized, the problems of low construction efficiency and high cost are solved, and more efficient ceiling installation and precise construction are achieved.
Patent Information
- Application Number
- CN202410974069.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-19
AI Technical Summary
The existing technology has problems of low construction efficiency and high construction costs in large-area ceiling construction, especially in large buildings, which leads to increased rework due to installation deviations, resulting in waste of resources and increased costs.
A ceiling-assisted construction method based on BIM is adopted to construct solid models through preset model collision detection, fusion processing, and three-dimensional laser scanning, deviation adjustment and second collision detection, to generate ceiling-assisted construction strategies, and optimize construction processes and material use.
It improves the construction efficiency of ceiling installation, reduces construction costs, reduces material waste and rework, and improves construction quality and accuracy.
Smart Images

Figure CN118520703B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of ceiling decoration installation, and in particular to a BIM-based ceiling auxiliary construction method, device, equipment and medium. Background Art
[0002] With the continuous advancement of science and technology and the continuous improvement of people's pursuit of a better life, there are more and more large spaces in buildings. Large-space buildings such as large conference centers, exhibition centers, stadiums, theaters, concert halls, high-end offices and hotels are not only common in large and medium-sized cities, but also in small and medium-sized cities. The large-space ceiling decoration of these buildings is a difficult point. It must not only reflect the beauty and atmosphere, but also reflect modern elements such as sound, light and electricity, and more importantly, reflect cultural and artistic characteristics. GRG (Glassfiber Reinforced Gypsum, precast glass fiber reinforced gypsum board, a special decorative improved fiber gypsum decorative material) gypsum board is a new material suitable for this type of ceiling needs. Large-space buildings have architectural decoration characteristics such as high height, large span, large area, and complex shape. In the construction of conventional large-area ceilings, the manufacture of various shapes of ceiling panels is mainly based on two-dimensional drawings, which is not combined with the actual state of the on-site building, resulting in poor dimensional accuracy of the ceiling panels, cumbersome and time-consuming on-site installation and adjustment, and labor-intensive, and also causing a lot of material waste. During the on-site installation process, there is a large error between the elevation size of large-area suspended ceilings and the actual size. Technicians need to hang in the air to adjust the position of the suspended ceiling panels or change the length of the suspension rods, which makes the adjustment difficult.
[0003] In addition, in the patent with patent number ZL 202110735854.4, a large-area complex-shaped ceiling construction method based on BIM technology is disclosed. The invention controls the position of the ceiling unit through corner point coordinates, simulates the installation process of the ceiling model to optimize the installation procedure, and numbers and sorts the installation process of the physical ceiling unit, thereby improving the construction quality and improving the construction efficiency. It greatly reduces the difficulty of large-area complex-shaped ceiling construction, and also has significant effects in preventing large-area complex-shaped ceilings from cracking. However, the invention does not use three-dimensional scanning technology for reverse modeling, and does not consider the influence of other professions in the building on the installation of the ceiling, resulting in large installation deviations during the ceiling installation process, which is easy to cause rework, and then leads to low construction efficiency and high construction costs. Summary of the invention
[0004] The embodiments of the present application provide a BIM-based suspended ceiling auxiliary construction method, device, equipment and medium, which aim to solve the problems of low construction efficiency and high construction cost in large-area suspended ceiling construction in the prior art methods.
[0005] In a first aspect, an embodiment of the present application provides a BIM-based ceiling auxiliary construction method, the method comprising:
[0006] Perform a first collision detection on the preset building structure design model, the preset electromechanical design model and the preset decoration ceiling design model of the target building to obtain a collision detection result;
[0007] Based on the first preset adjustment strategy and the collision detection result, the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model are integrated to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and decoration ceiling design deepening model corresponding to the preset decoration and decoration ceiling design model;
[0008] In response to the building entity model construction instruction, a building entity model corresponding to the target building is constructed based on a three-dimensional laser scanner;
[0009] Based on the building entity model, the first building structure design deepening model and the first decoration and ceiling design deepening model are adjusted for deviation to obtain a second decoration and ceiling design deepening model;
[0010] Performing a second collision detection on each professional component in the second decoration and ceiling design deepening model to obtain a target decoration and design model;
[0011] A ceiling auxiliary construction strategy is generated according to the target decoration design model.
[0012] In a second aspect, an embodiment of the present application provides a BIM-based ceiling auxiliary construction device, the device comprising:
[0013] A first collision detection unit is used to perform a first collision detection on a preset building structure design model, a preset electromechanical design model and a preset decoration and ceiling design model of the target building to obtain a collision detection result;
[0014] a fusion processing unit, configured to fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on a first preset adjustment strategy and the collision detection result, to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and decoration ceiling design deepening model corresponding to the preset decoration and decoration ceiling design model;
[0015] A construction unit, configured to construct a building entity model corresponding to the target building based on a three-dimensional laser scanner in response to a building entity model construction instruction;
[0016] a deviation adjustment unit, configured to adjust the deviations of the first building structure design deepening model and the first decoration and ceiling design deepening model based on the building entity model to obtain a second decoration and ceiling design deepening model;
[0017] A second collision detection unit is used to perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model to obtain a target decoration and decoration design model;
[0018] A generating unit is used to generate a ceiling auxiliary construction strategy according to the target decoration design model.
[0019] In the third aspect, an embodiment of the present application further provides a computer device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the computer program, the BIM-based ceiling auxiliary construction method described in the first aspect is implemented.
[0020] In a fourth aspect, an embodiment of the present application further provides a storage medium, wherein the storage medium stores a computer program, the computer program includes program instructions, and when the program instructions are executed by a processor, the processor executes the BIM-based ceiling auxiliary construction method described in the first aspect above.
[0021] It can be seen from the above technical scheme that the present invention can fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on the first preset adjustment strategy and the collision detection result obtained by the first collision detection, so as to obtain the first building structure design deepening model and the first decoration and decoration ceiling design deepening model; and perform deviation adjustment on the first building structure design deepening model and the first decoration and decoration ceiling design deepening model based on the building entity model constructed by the three-dimensional laser scanner, and perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model obtained by the deviation adjustment, so as to obtain the target decoration and decoration design model; generate a ceiling auxiliary construction strategy according to the target decoration and decoration design model to assist the ceiling installation of the target building, thereby improving the construction efficiency of the ceiling installation and reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0023] Figure 1A schematic diagram of a flow chart of a BIM-based ceiling auxiliary construction method provided in an embodiment of the present application;
[0024] Figure 2 A schematic diagram of a sub-process of a BIM-based ceiling auxiliary construction method provided in an embodiment of the present application;
[0025] Figure 3 A schematic block diagram of a BIM-based ceiling auxiliary construction device provided in an embodiment of the present application;
[0026] Figure 4 A schematic block diagram of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0028] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0029] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0030] It should be further understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0031] See also Figure 1 , Figure 1 A schematic diagram of a flow chart of a BIM-based ceiling auxiliary construction method provided in an embodiment of the present application. Figure 2 A sub-process diagram of a BIM-based ceiling auxiliary construction method provided in an embodiment of the present application. The BIM-based ceiling auxiliary construction method is executed by an application software installed in a terminal device, wherein the terminal device may be an electronic device with communication function such as a smart phone, a tablet computer, a laptop computer, a desktop computer, and a personal digital assistant.
[0032] like Figure 1 As shown, the method includes steps S110 to S160.
[0033] S110, performing a first collision detection on a preset building structure design model, a preset electromechanical design model, and a preset decoration and ceiling design model of the target building to obtain a collision detection result.
[0034] In this embodiment, a preset architectural structure design model, a preset electromechanical design model, and a preset decoration and decoration ceiling design model of the target building are created in BIM (Building Information Modeling) technology; wherein the preset decoration and decoration ceiling design model includes but is not limited to a large space structure conversion layer design optimization model, a suspension rod conversion layer design optimization model, a ceiling design model, a ceiling in-depth design model, an assembled unit module, etc.; the target building may be a large venue such as a large conference center, an exhibition center, a gymnasium, a theater, and a concert hall. In addition, the preset architectural structure design model, the preset electromechanical design model, and the preset decoration and decoration ceiling design model of the target building are subjected to a first collision detection (i.e., professional integration) through Navisworks software to discover collision problems between various professional design models, thereby aggregating the collision problems to obtain collision detection results, so that corrections can be made based on the collision detection results to eliminate the impact of the collision.
[0035] In one embodiment, before obtaining the collision detection result, the method further includes:
[0036] In response to the design model building instruction, obtaining the building structure design drawings, electromechanical design drawings and decoration and ceiling design drawings corresponding to the target building according to the design model building instruction;
[0037] The preset building structure design model is constructed based on the building structure design drawings, the preset electromechanical design model is constructed based on the electromechanical design drawings, and the preset decorative ceiling design model is constructed based on the decorative ceiling design drawings.
[0038] In this embodiment, the design model building instruction can be triggered by relevant staff; when the terminal device detects the design model building instruction triggered by the relevant staff, the building structure design drawings, electromechanical design drawings and decoration and decoration ceiling design drawings corresponding to the target building are obtained according to the design model building instruction, so as to use BIM technology to construct the preset building structure design model corresponding to the building structure design drawings, construct the preset electromechanical design model corresponding to the electromechanical design drawings, and construct the preset decoration and decoration ceiling design model corresponding to the decoration and decoration ceiling design drawings, and then by constructing the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model of the target building, a full-professional virtual construction simulation analysis can be carried out later.
[0039] S120. Based on the first preset adjustment strategy and the collision detection result, the preset building structure design model, the preset electromechanical design model and the preset decoration and ceiling design model are integrated to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and ceiling design deepening model corresponding to the preset decoration and ceiling design model.
[0040] In this embodiment, after obtaining the collision detection result, in order to correct the problem points in the collision detection result, the preset building structure design model, the preset electromechanical design model and the preset decoration ceiling design model are fused based on the first preset adjustment strategy and the collision detection result obtained by the first collision detection to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration ceiling design deepening model corresponding to the preset decoration ceiling design model. Among them, the fusion processing method can be divided into many kinds, such as the fusion of the same profession, the fusion between two professions or the fusion between multiple professions. In addition, the first preset adjustment strategy is an adjustment algorithm, such as an optimization algorithm, which is not specifically limited here; thereby, the first preset adjustment strategy and the problem points in the collision detection result are used to optimize and adjust the properties such as the position and size of each component in each model, so as to obtain the optimized and adjusted first building structure design deepening model and the first decoration ceiling design deepening model, thereby eliminating the collision caused by the deviation of each design model, and ensuring that the decoration ceiling can complete the on-site construction based on the decoration ceiling design model.
[0041] S130. In response to the building entity model construction instruction, construct a building entity model corresponding to the target building based on a three-dimensional laser scanner.
[0042] In this embodiment, the building entity model construction instruction can also be triggered by relevant staff. In specific implementation, when the terminal device detects the building entity model construction instruction triggered by the relevant staff, it responds to the building entity model construction instruction and constructs a building entity model corresponding to the target building based on a three-dimensional laser scanner. The constructed building entity model can be used to perform a third collision detection based on the building entity model and the first building structure design deepening model to find out the problems existing in the building entity model during on-site installation.
[0043] In one embodiment, if Figure 2 As shown, the step S130 of constructing a building entity model corresponding to the target building based on a three-dimensional laser scanner includes:
[0044] S131, scanning adjacent marking points of each preset marking point in the target building based on the three-dimensional laser scanner to obtain a marking point position information set corresponding to each preset marking point;
[0045] S132, if it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point reaches a preset area threshold, then the three-dimensional point cloud data corresponding to each preset marking point is obtained; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlap area;
[0046] S133, using a first preset algorithm to perform a preprocessing operation on the three-dimensional point cloud data corresponding to each preset marking point to obtain a target three-dimensional point cloud data set;
[0047] S134: constructing the building entity model based on the target three-dimensional point cloud data set.
[0048] In this embodiment, the creation of the building entity model of the target building is completed by using a three-dimensional laser scanner. In specific implementation, before the adjacent marking points of each preset marking point in the target building are scanned based on the three-dimensional laser scanner, the marking points need to be set in the building structure design drawings, and the markings are completed at the construction site according to the marking points in the building structure design drawings to ensure that the three-dimensional coordinates of the building entity model and the building structure design model are consistent; in addition, the three-dimensional laser scanner is set up on the marking points at the construction site to scan the adjacent marking points of each preset marking point in the target building, so as to obtain the marking point position information set corresponding to each preset marking point; and Furthermore, a scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point is detected. If it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point reaches a preset area threshold, three-dimensional point cloud data corresponding to each preset marking point can be obtained; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlapping area; wherein, in order to ensure the validity of the building entity model, the preset configuration ratio is at least 60% in this embodiment; and the three-dimensional point cloud data is the three-dimensional point cloud data of the main steel structure of the target building.
[0049] In addition, after obtaining the three-dimensional point cloud data corresponding to each preset mark point, the three-dimensional point cloud data corresponding to each preset mark point is preprocessed using a first preset algorithm to obtain a target three-dimensional point cloud data set, thereby ensuring the accuracy and integrity of the target three-dimensional point cloud data set through preprocessing operations; wherein the preprocessing operations may be coordinate conversion, graphic matching, noise correction, data simplification, point cloud cutting and synthesis, etc. Finally, the building entity model is constructed based on the target three-dimensional point cloud data set using three-dimensional modeling software, wherein the three-dimensional modeling software is preferably ContextCapture software in this embodiment, that is, the reverse three-dimensional model creation of the entity space is realized using ContextCapture software to obtain the building entity model.
[0050] In one embodiment, after obtaining the marking point position information set corresponding to each preset marking point, the method further includes:
[0051] If it is detected that the area of the scanning region formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point does not reach the preset area threshold, the area of the scanning region is automatically adjusted based on a second preset algorithm.
[0052] In this embodiment, in order to ensure the validity of the building entity model, after detecting the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point, if it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point does not reach the preset area threshold, the area of the scanning area can be automatically adjusted based on a second preset algorithm so that the area of the scanning area reaches the preset area threshold.
[0053] S140: Based on the building entity model, deviation adjustment is performed on the first building structure design deepening model and the first decoration and ceiling design deepening model to obtain a second decoration and ceiling design deepening model.
[0054] In this embodiment, since construction deviations are bound to occur during the construction of the main steel structure of the target building, the first decorative ceiling design deepening model will inevitably be unable to match after these steel structure installation deviations occur. At this time, in order to ensure the rationality of the building entity model and the first decorative ceiling design deepening model, the deviations of the first building structure design deepening model and the first decorative ceiling design deepening model are adjusted based on the building entity model, thereby obtaining the second decorative ceiling design deepening model.
[0055] In one embodiment, the step S140 includes:
[0056] Linking the building entity model to the first building structure design detailed model to perform a third collision detection to obtain at least one collision point;
[0057] Acquire a deviation adjustment strategy corresponding to each collision point of the at least one collision point to obtain a deviation adjustment strategy set;
[0058] The first decoration and ceiling design deepening model is deviation-adjusted according to the deviation adjustment strategy set to obtain the second decoration and ceiling design deepening model.
[0059] In this embodiment, in order to perform a third collision detection on the building entity model and the first building structure design deepening model, in specific implementation, the building entity model is linked to the first building structure design deepening model through the link instruction in the Navisworks software for comparative analysis, and the hard collision millimeter inspection function in the Navisworks software is used to perform a third collision detection on the building entity model and the first building structure design deepening model, so as to output a collision report including at least one collision point; and obtain the deviation adjustment strategy corresponding to each collision point in the at least one collision point to obtain a deviation adjustment strategy set; thereby eliminating the collision points one by one according to the deviation adjustment strategy set to achieve the deviation adjustment of the first decoration and decoration ceiling design deepening model, and then obtain the second decoration and decoration ceiling design deepening model. Wherein, the second decoration and decoration ceiling design deepening model includes components such as the ceiling, and after adjusting the first decoration and decoration ceiling design deepening model (i.e., ceiling adjustment), it is necessary to re-perform the ceiling grid division and layout and re-design the ceiling mold.
[0060] S150: Perform a second collision detection on each professional component in the second decoration and ceiling design deepening model to obtain a target decoration and design model.
[0061] In this embodiment, after obtaining the second decoration and decoration ceiling design deepening model, it is necessary to perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model to obtain the target decoration and decoration design model; wherein each professional component can be a professional component such as a suspension rod conversion layer, a suspension rod and a suspended ceiling. In this embodiment, by performing a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model, collision problems within the second decoration and decoration ceiling are discovered, such as the inability to effectively connect the suspension rod conversion layer and the suspension rod, the collision between the suspended ceiling and the lamps, or the collision between the suspended ceiling and the fire sprinkler, etc., and then targeted adjustments are made according to the collision problems to obtain the adjusted target decoration and decoration design model.
[0062] S160: Generate a ceiling auxiliary construction strategy according to the target decoration design model.
[0063] In this embodiment, after obtaining the target decoration design model, a ceiling auxiliary construction strategy is generated according to the target decoration design model, wherein the ceiling auxiliary construction strategy is used to assist the ceiling installation work of the target building, thereby greatly improving the construction efficiency of the ceiling installation according to the target decoration design model.
[0064] In one embodiment, the step S160 includes:
[0065] Typesetting the target decoration design model to obtain a typeset decoration design model;
[0066] Generate the ceiling auxiliary construction strategy according to the typesetting decoration design model;
[0067] Among them, the layout and decoration design model includes prefabricated unit module division information, prefabricated unit module number, embedded part position information and prefabricated unit module space coordinates.
[0068] In this embodiment, the specific process of generating the ceiling auxiliary construction strategy according to the target decoration design model is: automatically typeset the target decoration design model to obtain the typeset decoration design model; and generate the ceiling auxiliary construction strategy according to the typeset decoration design model, so as to realize the division of the assembled unit module information, the numbering of the assembled unit module, the design of the embedded parts and the output of the spatial coordinates of the assembled unit module. Among them, since the target decoration ceiling shape is an overall shape and cannot be installed as a whole, it is divided into multiple assembled unit modules to restore the overall effect of the ceiling shape while facilitating the installation of the construction personnel. In addition, in order to facilitate installation, the assembled unit modules are numbered so that the construction personnel can find the corresponding assembled unit modules according to the assembled unit module numbers and install them in sequence; and the embedded parts design plays the role of connecting the suspension rods, so that the assembled unit modules are connected and fixed to the rooting structure. In addition, the spatial coordinates of the assembled unit modules are for the purpose of installing, positioning and reviewing the assembled unit modules.
[0069] In one embodiment, generating the ceiling auxiliary construction strategy according to the typesetting decoration design model includes:
[0070] Generate ceiling installation information according to the assembly unit module division information, the assembly unit module number, the embedded part position information and the assembly unit module space coordinates;
[0071] The suspended ceiling installation information is sent to a first user terminal, so that the first user terminal generates the suspended ceiling auxiliary construction strategy corresponding to the target building according to the suspended ceiling installation information.
[0072] In this embodiment, while generating the ceiling installation information based on the prefabricated unit module division information, the prefabricated unit module number, the embedded part position information and the prefabricated unit module spatial coordinates, the production requirement information of the prefabricated unit module can also be generated based on the prefabricated unit module division information, the prefabricated unit module number, the embedded part position information and the prefabricated unit module spatial coordinates, and the production requirement information can be sent to the second user terminal so that the factory personnel corresponding to the second user terminal can produce the corresponding prefabricated unit module according to the production requirement information.
[0073] Furthermore, the ceiling installation information is sent to the first user terminal, so that the first user terminal generates the ceiling auxiliary construction strategy corresponding to the target building according to the ceiling installation information, so that the construction personnel corresponding to the first user terminal can construct the ceiling project of the target building according to the ceiling auxiliary construction strategy. The steps for constructing the ceiling project of the target building are as follows:
[0074] (1) According to the spatial coordinates of the assembled unit modules in the layout and decoration design model and the corresponding positions of the embedded parts of the assembled unit modules, the embedded parts are welded to the hangers; wherein the length of the hangers connected to the assembled unit modules is the key to the spatial coordinates of the unit modules, and is used to ensure that the hangers of the assembled unit modules and the hanger conversion layer are firmly welded;
[0075] (2) The height of the hanger is the spatial height positioning coordinate value of the GRG panel;
[0076] (3) Find the first prefabricated unit module corresponding to the number according to the prefabricated unit module number, install other models symmetrically on both sides of the first prefabricated unit module, and repeat the remaining prefabricated unit modules using the prefabricated unit module space coordinates corresponding to the prefabricated unit module number to complete the GRG ceiling installation.
[0077] It can be seen from the above technical scheme that the present invention can fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on the first preset adjustment strategy and the collision detection result obtained by the first collision detection, so as to obtain the first building structure design deepening model and the first decoration and decoration ceiling design deepening model; and perform deviation adjustment on the first building structure design deepening model and the first decoration and decoration ceiling design deepening model based on the building entity model constructed by the three-dimensional laser scanner, and perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model obtained by the deviation adjustment, so as to obtain the target decoration and decoration design model; generate a ceiling auxiliary construction strategy according to the target decoration and decoration design model to assist the ceiling installation of the target building, thereby improving the construction efficiency of the ceiling installation and reducing the construction cost.
[0078] Figure 3 A schematic block diagram of a BIM-based ceiling auxiliary construction device provided in an embodiment of the present application. Figure 3 As shown, the present invention also provides a BIM-based ceiling auxiliary construction device. The BIM-based ceiling auxiliary construction device includes a unit for executing the above-mentioned BIM-based ceiling auxiliary construction method. Specifically, please refer to Figure 3 The BIM-based suspended ceiling auxiliary construction device 100 includes a first collision detection unit 110, a fusion processing unit 120, a construction unit 130, a deviation adjustment unit 140, a second collision detection unit 150 and a generation unit 160.
[0079] The first collision detection unit 110 is used to perform a first collision detection on a preset building structure design model, a preset electromechanical design model and a preset decoration and ceiling design model of the target building to obtain a collision detection result.
[0080] In this embodiment, a preset architectural structure design model, a preset electromechanical design model, and a preset decoration and decoration ceiling design model of the target building are created in BIM (Building Information Modeling) technology; wherein the preset decoration and decoration ceiling design model includes but is not limited to a large space structure conversion layer design optimization model, a suspension rod conversion layer design optimization model, a ceiling design model, a ceiling in-depth design model, an assembled unit module, etc.; the target building may be a large venue such as a large conference center, an exhibition center, a gymnasium, a theater, and a concert hall. In addition, the preset architectural structure design model, the preset electromechanical design model, and the preset decoration and decoration ceiling design model of the target building are subjected to a first collision detection (i.e., professional integration) through Navisworks software to discover collision problems between various professional design models, thereby aggregating the collision problems to obtain collision detection results, so that corrections can be made based on the collision detection results to eliminate the impact of the collision.
[0081] In one embodiment, before obtaining the collision detection result, it is also used to:
[0082] In response to the design model building instruction, obtaining the building structure design drawings, electromechanical design drawings and decoration and ceiling design drawings corresponding to the target building according to the design model building instruction;
[0083] The preset building structure design model is constructed based on the building structure design drawings, the preset electromechanical design model is constructed based on the electromechanical design drawings, and the preset decorative ceiling design model is constructed based on the decorative ceiling design drawings.
[0084] In this embodiment, the design model building instruction can be triggered by relevant staff; when the terminal device detects the design model building instruction triggered by the relevant staff, the building structure design drawings, electromechanical design drawings and decoration and decoration ceiling design drawings corresponding to the target building are obtained according to the design model building instruction, so as to use BIM technology to construct the preset building structure design model corresponding to the building structure design drawings, construct the preset electromechanical design model corresponding to the electromechanical design drawings, and construct the preset decoration and decoration ceiling design model corresponding to the decoration and decoration ceiling design drawings, and then by constructing the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model of the target building, a full-professional virtual construction simulation analysis can be carried out later.
[0085] The fusion processing unit 120 is used to fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on the first preset adjustment strategy and the collision detection result to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and decoration ceiling design deepening model corresponding to the preset decoration and decoration ceiling design model.
[0086] In this embodiment, after obtaining the collision detection result, in order to correct the problem points in the collision detection result, the preset building structure design model, the preset electromechanical design model and the preset decoration ceiling design model are fused based on the first preset adjustment strategy and the collision detection result obtained by the first collision detection to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration ceiling design deepening model corresponding to the preset decoration ceiling design model. Among them, the fusion processing method can be divided into many kinds, such as the fusion of the same profession, the fusion between two professions or the fusion between multiple professions. In addition, the first preset adjustment strategy is an adjustment algorithm, such as an optimization algorithm, which is not specifically limited here; thereby, the first preset adjustment strategy and the problem points in the collision detection result are used to optimize and adjust the properties such as the position and size of each component in each model, so as to obtain the optimized and adjusted first building structure design deepening model and the first decoration ceiling design deepening model, thereby eliminating the collision caused by the deviation of each design model, and ensuring that the decoration ceiling can complete the on-site construction based on the decoration ceiling design model.
[0087] The construction unit 130 is used to construct a building entity model corresponding to the target building based on a three-dimensional laser scanner in response to the building entity model construction instruction.
[0088] In this embodiment, the building entity model construction instruction can also be triggered by relevant staff. In specific implementation, when the terminal device detects the building entity model construction instruction triggered by the relevant staff, it responds to the building entity model construction instruction and constructs a building entity model corresponding to the target building based on a three-dimensional laser scanner. The constructed building entity model can be used to perform a third collision detection based on the building entity model and the first building structure design deepening model to find out the problems existing in the building entity model during on-site installation.
[0089] In one embodiment, if Figure 2 As shown, the building entity model corresponding to the target building is constructed based on the three-dimensional laser scanner in the construction unit 130, for:
[0090] A scanning unit, configured to scan adjacent marking points of each preset marking point in the target building based on the three-dimensional laser scanner to obtain a marking point position information set corresponding to each preset marking point;
[0091] A first detection unit is used to obtain three-dimensional point cloud data corresponding to each preset marking point if the area of the scanning area formed between each preset marking point and the marking point in the marking point position information set corresponding to each preset marking point reaches a preset area threshold; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlap area;
[0092] A preprocessing unit, configured to perform a preprocessing operation on the three-dimensional point cloud data corresponding to each preset marking point using a first preset algorithm to obtain a target three-dimensional point cloud data set;
[0093] A solid construction unit is used to construct the building solid model based on the target three-dimensional point cloud data set.
[0094] In this embodiment, the creation of the building entity model of the target building is completed by using a three-dimensional laser scanner. In specific implementation, before the adjacent marking points of each preset marking point in the target building are scanned based on the three-dimensional laser scanner, the marking points need to be set in the building structure design drawings, and the markings are completed at the construction site according to the marking points in the building structure design drawings to ensure that the three-dimensional coordinates of the building entity model and the building structure design model are consistent; in addition, the three-dimensional laser scanner is set up on the marking points at the construction site to scan the adjacent marking points of each preset marking point in the target building, so as to obtain the marking point position information set corresponding to each preset marking point; and Furthermore, a scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point is detected. If it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point reaches a preset area threshold, three-dimensional point cloud data corresponding to each preset marking point can be obtained; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlapping area; wherein, in order to ensure the validity of the building entity model, the preset configuration ratio is at least 60% in this embodiment; and the three-dimensional point cloud data is the three-dimensional point cloud data of the main steel structure of the target building.
[0095] In addition, after obtaining the three-dimensional point cloud data corresponding to each preset mark point, the three-dimensional point cloud data corresponding to each preset mark point is preprocessed using a first preset algorithm to obtain a target three-dimensional point cloud data set, thereby ensuring the accuracy and integrity of the target three-dimensional point cloud data set through preprocessing operations; wherein the preprocessing operations may be coordinate conversion, graphic matching, noise correction, data simplification, point cloud cutting and synthesis, etc. Finally, the building entity model is constructed based on the target three-dimensional point cloud data set using three-dimensional modeling software, wherein the three-dimensional modeling software is preferably ContextCapture software in this embodiment, that is, the reverse three-dimensional model creation of the entity space is realized using ContextCapture software to obtain the building entity model.
[0096] In one embodiment, after obtaining the marking point position information set corresponding to each preset marking point, it is also used to:
[0097] The second detection unit is used to automatically adjust the area of the scanning area based on a second preset algorithm if it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point does not reach the preset area threshold.
[0098] In this embodiment, in order to ensure the validity of the building entity model, after detecting the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point, if it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point does not reach the preset area threshold, the area of the scanning area can be automatically adjusted based on a second preset algorithm so that the area of the scanning area reaches the preset area threshold.
[0099] The deviation adjustment unit 140 is used to perform deviation adjustment on the first building structure design deepening model and the first decoration and ceiling design deepening model based on the building entity model to obtain a second decoration and ceiling design deepening model.
[0100] In this embodiment, since construction deviations are bound to occur during the construction of the main steel structure of the target building, the first decorative ceiling design deepening model will inevitably be unable to match after these steel structure installation deviations occur. At this time, in order to ensure the rationality of the building entity model and the first decorative ceiling design deepening model, the deviations of the first building structure design deepening model and the first decorative ceiling design deepening model are adjusted based on the building entity model, thereby obtaining the second decorative ceiling design deepening model.
[0101] In one embodiment, the deviation adjustment unit 140 is specifically configured to:
[0102] Linking the building entity model to the first building structure design detailed model to perform a third collision detection to obtain at least one collision point;
[0103] Acquire a deviation adjustment strategy corresponding to each collision point of the at least one collision point to obtain a deviation adjustment strategy set;
[0104] The first decoration and ceiling design deepening model is deviation-adjusted according to the deviation adjustment strategy set to obtain the second decoration and ceiling design deepening model.
[0105] In this embodiment, in order to perform a third collision detection on the building entity model and the first building structure design deepening model, in specific implementation, the building entity model is linked to the first building structure design deepening model through the link instruction in the Navisworks software for comparative analysis, and the hard collision millimeter inspection function in the Navisworks software is used to perform a third collision detection on the building entity model and the first building structure design deepening model, so as to output a collision report including at least one collision point; and obtain the deviation adjustment strategy corresponding to each collision point in the at least one collision point to obtain a deviation adjustment strategy set; thereby eliminating the collision points one by one according to the deviation adjustment strategy set to achieve the deviation adjustment of the first decoration and decoration ceiling design deepening model, and then obtain the second decoration and decoration ceiling design deepening model. Wherein, the second decoration and decoration ceiling design deepening model includes components such as the ceiling, and after adjusting the first decoration and decoration ceiling design deepening model (i.e., ceiling adjustment), it is necessary to re-perform the ceiling grid division and layout and re-design the ceiling mold.
[0106] The second collision detection unit 150 is used to perform a second collision detection on each professional component in the second decoration and ceiling design deepening model to obtain a target decoration and design model.
[0107] In this embodiment, after obtaining the second decoration and decoration ceiling design deepening model, it is necessary to perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model to obtain the target decoration and decoration design model; wherein each professional component can be a professional component such as a suspension rod conversion layer, a suspension rod and a suspended ceiling. In this embodiment, by performing a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model, collision problems within the second decoration and decoration ceiling are discovered, such as the inability to effectively connect the suspension rod conversion layer and the suspension rod, the collision between the suspended ceiling and the lamps, or the collision between the suspended ceiling and the fire sprinkler, etc., and then targeted adjustments are made according to the collision problems to obtain the adjusted target decoration and decoration design model.
[0108] The generating unit 160 is used to generate a ceiling auxiliary construction strategy according to the target decoration design model.
[0109] In this embodiment, after obtaining the target decoration design model, a ceiling auxiliary construction strategy is generated according to the target decoration design model, wherein the ceiling auxiliary construction strategy is used to assist the ceiling installation work of the target building, thereby greatly improving the construction efficiency of the ceiling installation according to the target decoration design model.
[0110] In one embodiment, the generating unit 160 is specifically configured to:
[0111] Typesetting the target decoration design model to obtain a typeset decoration design model;
[0112] Generate the ceiling auxiliary construction strategy according to the typesetting decoration design model;
[0113] Among them, the layout and decoration design model includes prefabricated unit module division information, prefabricated unit module number, embedded part position information and prefabricated unit module space coordinates.
[0114] In this embodiment, the specific process of generating the ceiling auxiliary construction strategy according to the target decoration design model is: automatically typeset the target decoration design model to obtain the typeset decoration design model; and generate the ceiling auxiliary construction strategy according to the typeset decoration design model, so as to realize the division of the assembled unit module information, the numbering of the assembled unit module, the design of the embedded parts and the output of the spatial coordinates of the assembled unit module. Among them, since the target decoration ceiling shape is an overall shape and cannot be installed as a whole, it is divided into multiple assembled unit modules to restore the overall effect of the ceiling shape while facilitating the installation of the construction personnel. In addition, in order to facilitate installation, the assembled unit modules are numbered so that the construction personnel can find the corresponding assembled unit modules according to the assembled unit module numbers and install them in sequence; and the embedded parts design plays the role of connecting the suspension rods, so that the assembled unit modules are connected and fixed to the rooting structure. In addition, the spatial coordinates of the assembled unit modules are for the purpose of installing, positioning and reviewing the assembled unit modules.
[0115] In one embodiment, generating the ceiling auxiliary construction strategy according to the typesetting decoration design model includes:
[0116] Generate ceiling installation information according to the assembly unit module division information, the assembly unit module number, the embedded part position information and the assembly unit module space coordinates;
[0117] The suspended ceiling installation information is sent to a first user terminal, so that the first user terminal generates the suspended ceiling auxiliary construction strategy corresponding to the target building according to the suspended ceiling installation information.
[0118] In this embodiment, while generating the ceiling installation information based on the prefabricated unit module division information, the prefabricated unit module number, the embedded part position information and the prefabricated unit module spatial coordinates, the production requirement information of the prefabricated unit module can also be generated based on the prefabricated unit module division information, the prefabricated unit module number, the embedded part position information and the prefabricated unit module spatial coordinates, and the production requirement information can be sent to the second user terminal so that the factory personnel corresponding to the second user terminal can produce the corresponding prefabricated unit module according to the production requirement information.
[0119] Furthermore, the ceiling installation information is sent to the first user terminal, so that the first user terminal generates the ceiling auxiliary construction strategy corresponding to the target building according to the ceiling installation information, so that the construction personnel corresponding to the first user terminal can construct the ceiling project of the target building according to the ceiling auxiliary construction strategy. The steps for constructing the ceiling project of the target building are as follows:
[0120] (1) According to the spatial coordinates of the assembled unit modules in the layout and decoration design model and the corresponding positions of the embedded parts of the assembled unit modules, the embedded parts are welded to the hangers; wherein the length of the hangers connected to the assembled unit modules is the key to the spatial coordinates of the unit modules, and is used to ensure that the hangers of the assembled unit modules and the hanger conversion layer are firmly welded;
[0121] (2) When installing the GRG ceiling, the spatial coordinates of the prefabricated unit module corresponding to the prefabricated unit module number are used. The horizontal position of the prefabricated unit module installation uses the X-axis and Y-axis coordinates of the coordinates, and the Z-axis coordinate value of the vertical height is controlled by the length of the suspension rod. The height of the suspension rod is the spatial height positioning coordinate value of the GRG panel;
[0122] (3) Find the first prefabricated unit module corresponding to the number according to the prefabricated unit module number, install other models symmetrically on both sides of the first prefabricated unit module, and repeat the remaining prefabricated unit modules using the prefabricated unit module space coordinates corresponding to the prefabricated unit module number to complete the GRG ceiling installation.
[0123] It can be seen from the above technical scheme that the present invention can fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on the first preset adjustment strategy and the collision detection result obtained by the first collision detection, so as to obtain the first building structure design deepening model and the first decoration and decoration ceiling design deepening model; and perform deviation adjustment on the first building structure design deepening model and the first decoration and decoration ceiling design deepening model based on the building entity model constructed by the three-dimensional laser scanner, and perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model obtained by the deviation adjustment, so as to obtain the target decoration and decoration design model; generate a ceiling auxiliary construction strategy according to the target decoration and decoration design model to assist the ceiling installation of the target building, thereby improving the construction efficiency of the ceiling installation and reducing the construction cost.
[0124] It should be noted that technical personnel in the relevant field can clearly understand that the specific implementation process of the above-mentioned BIM-based ceiling auxiliary construction device and each unit can refer to the corresponding description in the aforementioned method embodiment, and for the convenience and conciseness of the description, it will not be repeated here.
[0125] The above-mentioned BIM-based ceiling auxiliary construction device can be implemented in the form of a computer program, which can be used in Figure 4 Runs on the computer device shown.
[0126] See also Figure 4 , Figure 4 Schematic block diagram of a computer device provided in an embodiment of the present application. The computer device 500 is a server, which may be an independent server or a server cluster composed of multiple servers.
[0127] See also Figure 4 The computer device 500 includes a processor 502 , a memory and a network interface 505 connected via a device bus 501 , wherein the memory may include a storage medium 503 and an internal memory 504 .
[0128] The storage medium 503 may store an operating system 5031 and a computer program 5032. When the computer program 5032 is executed, the processor 502 may execute a BIM-based suspended ceiling auxiliary construction method.
[0129] The processor 502 is used to provide computing and control capabilities to support the operation of the entire computer device 500 .
[0130] The internal memory 504 provides an environment for the operation of the computer program 5032 in the storage medium 503. When the computer program 5032 is executed by the processor 502, the processor 502 can execute the BIM-based ceiling auxiliary construction method.
[0131] The network interface 505 is used for network communication, such as providing data information transmission, etc. Those skilled in the art will understand that Figure 4 The structure shown in the figure is merely a block diagram of a portion of the structure related to the solution of the present application, and does not constitute a limitation on the computer device 500 to which the solution of the present application is applied. The specific computer device 500 may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0132] The processor 502 is used to run the computer program 5032 stored in the memory to implement the BIM-based ceiling auxiliary construction method disclosed in the embodiment of the present application.
[0133] Those skilled in the art will understand that Figure 4 The embodiments of the computer device shown in the figure do not constitute a limitation on the specific composition of the computer device. In other embodiments, the computer device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. For example, in some embodiments, the computer device may only include a memory and a processor. In such embodiments, the structure and function of the memory and the processor are the same as those of the embodiment of the present invention. Figure 4 The embodiments shown are consistent and will not be described again here.
[0134] It should be understood that in the embodiment of the present application, the processor 502 may be a central processing unit (CPU), and the processor 502 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. Among them, the general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0135] In another embodiment of the present application, a computer-readable storage medium is provided. The computer-readable storage medium may be a non-volatile computer-readable storage medium or a volatile computer-readable storage medium. The computer-readable storage medium stores a computer program, wherein when the computer program is executed by a processor, the BIM-based ceiling auxiliary construction method disclosed in the embodiment of the present application is implemented.
[0136] It will be clear to those skilled in the art that, for the convenience and simplicity of description, the specific working process of the above-described equipment, devices and units can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here. It will be appreciated by those of ordinary skill in the art that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented with electronic hardware, computer software or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are executed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of this application.
[0137] In the several embodiments provided in the present application, it should be understood that the disclosed equipment, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, and units with the same function may be combined into one unit. For example, multiple units or components may be combined or integrated into another device, or some features may be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interfaces, devices or units, or may be electrical, mechanical or other forms of connection.
[0138] The units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of the present application.
[0139] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0140] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a background server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM, Read-Only Memory), a magnetic disk or an optical disk.
[0141] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and these modifications or replacements should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A BIM-based ceiling auxiliary construction method, It is characterized in that The method comprises: Perform a first collision detection on the preset building structure design model, the preset electromechanical design model and the preset decoration ceiling design model of the target building to obtain a collision detection result; Based on the first preset adjustment strategy and the collision detection result, the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model are integrated to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and decoration ceiling design deepening model corresponding to the preset decoration and decoration ceiling design model; In response to the building entity model construction instruction, a building entity model corresponding to the target building is constructed based on a three-dimensional laser scanner; Based on the building entity model, the first building structure design deepening model and the first decoration and ceiling design deepening model are adjusted for deviation to obtain a second decoration and ceiling design deepening model; Performing a second collision detection on each professional component in the second decoration and ceiling design deepening model to obtain a target decoration and design model; Generate a ceiling auxiliary construction strategy according to the target decoration design model; The method of constructing a building entity model corresponding to the target building based on a three-dimensional laser scanner includes: Scanning adjacent marking points of each preset marking point in the target building based on the three-dimensional laser scanner to obtain a marking point position information set corresponding to each preset marking point; If it is detected that the area of the scanning area formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point reaches a preset area threshold, the three-dimensional point cloud data corresponding to each preset marking point is obtained; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlap area; Using a first preset algorithm to preprocess the three-dimensional point cloud data corresponding to each preset marking point to obtain a target three-dimensional point cloud data set; The building entity model is constructed based on the target three-dimensional point cloud data set.
2. According to the BIM-based ceiling auxiliary construction method of claim 1, It is characterized in that The step of adjusting the deviation of the first architectural structure design deepening model and the first decoration and ceiling design deepening model based on the architectural entity model to obtain a second decoration and ceiling design deepening model includes: Linking the building entity model to the first building structure design detailed model to perform a third collision detection to obtain at least one collision point; Acquire a deviation adjustment strategy corresponding to each collision point of the at least one collision point to obtain a deviation adjustment strategy set; The first decoration and ceiling design deepening model is deviation-adjusted according to the deviation adjustment strategy set to obtain the second decoration and ceiling design deepening model.
3. According to the BIM-based ceiling auxiliary construction method of claim 1, It is characterized in that The generating of the ceiling auxiliary construction strategy according to the target decoration design model includes: Typesetting the target decoration design model to obtain a typeset decoration design model; Generate the ceiling auxiliary construction strategy according to the typesetting decoration design model; Among them, the layout and decoration design model includes prefabricated unit module division information, prefabricated unit module number, embedded part position information and prefabricated unit module space coordinates.
4. According to the BIM-based ceiling auxiliary construction method of claim 3, It is characterized in that The generating the ceiling auxiliary construction strategy according to the typesetting decoration design model includes: Generate ceiling installation information according to the assembly unit module division information, the assembly unit module number, the embedded part position information and the assembly unit module space coordinates; The suspended ceiling installation information is sent to a first user terminal, so that the first user terminal generates the suspended ceiling auxiliary construction strategy corresponding to the target building according to the suspended ceiling installation information.
5. According to the BIM-based ceiling auxiliary construction method of claim 1, It is characterized in that Before obtaining the collision detection result, the method further includes: In response to the design model building instruction, obtaining the building structure design drawings, electromechanical design drawings and decoration and ceiling design drawings corresponding to the target building according to the design model building instruction; The preset building structure design model is constructed based on the building structure design drawings, the preset electromechanical design model is constructed based on the electromechanical design drawings, and the preset decorative ceiling design model is constructed based on the decorative ceiling design drawings.
6. The BIM-based ceiling auxiliary construction method according to claim 1, It is characterized in that After obtaining the marking point position information set corresponding to each preset marking point, the method further includes: If it is detected that the area of the scanning region formed between each preset marking point and the marking point in the marking point information set corresponding to each preset marking point does not reach the preset area threshold, the area of the scanning region is automatically adjusted based on a second preset algorithm.
7. A BIM-based ceiling auxiliary construction device, It is characterized in that The device comprises: A first collision detection unit is used to perform a first collision detection on a preset building structure design model, a preset electromechanical design model and a preset decoration and ceiling design model of the target building to obtain a collision detection result; a fusion processing unit, configured to fuse the preset building structure design model, the preset electromechanical design model and the preset decoration and decoration ceiling design model based on a first preset adjustment strategy and the collision detection result, to obtain a first building structure design deepening model corresponding to the preset building structure design model and a first decoration and decoration ceiling design deepening model corresponding to the preset decoration and decoration ceiling design model; A construction unit, configured to construct a building entity model corresponding to the target building based on a three-dimensional laser scanner in response to a building entity model construction instruction; a deviation adjustment unit, configured to adjust the deviations of the first building structure design deepening model and the first decoration and ceiling design deepening model based on the building entity model to obtain a second decoration and ceiling design deepening model; A second collision detection unit is used to perform a second collision detection on each professional component in the second decoration and decoration ceiling design deepening model to obtain a target decoration and decoration design model; A generating unit, used for generating a ceiling auxiliary construction strategy according to the target decoration design model; The method of constructing a building entity model corresponding to the target building based on a three-dimensional laser scanner includes: A scanning unit, configured to scan adjacent marking points of each preset marking point in the target building based on the three-dimensional laser scanner to obtain a marking point position information set corresponding to each preset marking point; A first detection unit is used to obtain three-dimensional point cloud data corresponding to each preset marking point if the area of the scanning area formed between each preset marking point and the marking point in the marking point position information set corresponding to each preset marking point reaches a preset area threshold; wherein the preset area threshold is the product of the configuration ratio and the area of the preset target overlap area; A preprocessing unit, configured to perform a preprocessing operation on the three-dimensional point cloud data corresponding to each preset marking point using a first preset algorithm to obtain a target three-dimensional point cloud data set; A solid construction unit is used to construct the building solid model based on the target three-dimensional point cloud data set.
8. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the BIM-based ceiling auxiliary construction method as described in any one of claims 1 to 6 is implemented.
9. A storage medium, It is characterized in that The storage medium stores a computer program, which includes program instructions. When the program instructions are executed by a processor, the processor executes the BIM-based ceiling auxiliary construction method as described in any one of claims 1 to 6.