Intelligent angle steel drilling processing center production line equipment and control method thereof

Through the production line equipment of the intelligent angle steel drilling machining center, the truss transportation and material collection mechanism combined with the hole drilling main machine is used to achieve efficient and precise drilling of angle steel, solving the problems of low efficiency and large error in the existing technology, and improving drilling Pore ​​quality and production efficiency.

CN118527701BActive Publication Date: 2024-11-15JIANGSU ZHENGUANG POWER EQUIP CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410963066.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-15
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

Existing angle steel drilling equipment relies on manual operation, is inefficient and prone to drilling errors, which increases costs and reduces product quality.

Method used

A production line equipment of intelligent angle steel drilling machining center is designed, including truss transportation mechanism and material collection mechanism. Combined with the hole drilling host, the efficient and precise transportation and drilling of angle steel is achieved through drive systems such as servo motors and hydraulic cylinders, and multiple uses Dimensional grid cell domain and entropy weight method are controlled to ensure drilling accuracy.

Benefits of technology

It greatly improves the efficiency and quality of angle steel drilling, reduces human resources consumption, realizes automated steel stamps, improves production reliability and stability, and saves production time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118527701B_ABST
    Figure CN118527701B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of intelligent angle steel processing equipment, and in particular to an intelligent angle steel drilling processing center production line equipment and a control method thereof. The truss transport mechanism includes a truss, and each of the two ends of the truss is provided with a group of first guide rail modules, and the first guide rail module is fixed to the bottom of the truss moving beam. The bottom of the truss moving beam is provided with a first ball screw transmission module, and one end is connected to a first servo motor through a coupling; the punching host includes a punching frame, and the inner side wall of the punching frame is provided with two groups of fourth guide rail modules, and the top of the fourth guide rail module is fixed to the side of the H-shaped moving inner frame, so that the fourth guide rail module can drive the H-shaped moving inner frame to adjust and slide in the punching frame. The present invention can perform intelligent drilling and steel stamping operations on angle steel, which greatly improves the production quality of angle steel, and the present invention can make the processes of punching, transfer, steel stamping and station processing run simultaneously, saving production time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of angle steel processing equipment, and in particular to intelligent angle steel drilling processing center production line equipment and a control method thereof. Background Art

[0002] Angle steel is a metal material with a specific cross-sectional shape, which is L-shaped or T-shaped. Angle steel is often used in supporting structures, frames and connectors in the construction and manufacturing industries. It is widely used due to its stable structure and high strength. In order to enhance its function and application scope and make it more adaptable to complex construction and manufacturing needs, the angle steel needs to be drilled. However, the current angle steel drilling equipment usually uses independent equipment, which continuously transports angle steel to the drilling equipment for manual intervention drilling operations. On the one hand, this drilling process requires a large amount of manpower to work together, which greatly increases the output of labor costs and has low drilling efficiency; on the other hand, manual intervention in drilling operations may cause certain drilling errors, which reduces the overall quality of angle steel drilling, and is not conducive to the basic needs of angle steel production and use. Summary of the invention

[0003] The present invention overcomes the deficiencies of the prior art and provides an intelligent angle steel drilling processing center production line equipment and a control method thereof.

[0004] To achieve the above object, the technical solution adopted by the present invention is:

[0005] The present invention provides an intelligent angle steel drilling processing center production line equipment, which includes a truss transportation mechanism, a material taking structure and a punching host:

[0006] The truss transport mechanism comprises a truss, each end of the truss is provided with a group of first guide rail modules, the first guide rail modules are fixed to the bottom of the truss moving beam, and the bottom of the truss moving beam is provided with a first ball screw transmission module, one end of which is connected to a first servo motor through a coupling;

[0007] The material-grabbing mechanism comprises a truss support column, the truss support column is installed through the truss moving beam, a second guide rail module is fixed to the side of the truss support column, a sliding table moving plate is arranged on the second guide rail module, a turning shaft is connected to the bottom end of the sliding table moving plate, a second servo motor is connected to the end of the turning shaft, a material-grabbing turning table is installed on the turning shaft, a first hydraulic cylinder is arranged on the top of the truss support column, and an output rod of the first hydraulic cylinder is fixed to the top of the sliding table moving plate;

[0008] A mainframe base is provided below the truss transport mechanism, two sets of third guide rail modules are provided above the mainframe base, a punching mainframe is fixed on the top of the third guide rail modules, and a second ball screw transmission module is provided at the bottom of the punching mainframe and fixed to the middle of the third guide rail module through a bearing frame, and a third servo motor is connected to the end of the second ball screw transmission module;

[0009] The punching host includes a punching frame, and two sets of fourth guide rail modules are arranged on the inner side wall of the punching frame. The top of the fourth guide rail module is fixed to the side of the H-shaped movable inner frame, so that the fourth guide rail module can drive the H-shaped movable inner frame to adjust and slide in the punching frame.

[0010] Furthermore, in a preferred embodiment of the present invention, a third ball screw transmission module is arranged in the middle of the H-shaped movable inner frame, the third ball screw transmission module is connected to the right-angle reducer, and the right-angle reducer is connected to the double-pass reducer through a double-pass connecting shaft, so that the double-pass reducer can drive the right-angle reducer to operate, and two groups of punching modules are fixed on the H-shaped movable inner frame, and the punching module includes a base, and a fifth guide rail module is arranged above the base, and a cross plate is fixed on the fifth guide rail module, and the cross plate is used to place and fix the punching device, and a fourth ball screw transmission module is arranged at the bottom of the cross plate, and the end of the fourth ball screw transmission module is connected to the fourth servo motor through a bearing frame and fixed to the side of the base.

[0011] Furthermore, in a preferred embodiment of the present invention, an angle steel limit bracket is provided on the top of the main machine base, and the angle steel limit bracket is located in the middle part of the two punching main machines. A plurality of chip removal holes are opened on the main machine base, and the plurality of chip removal holes are connected to a chip collecting cavity. The chip collecting cavity is opened and passes through the center of the main machine base. A chip conveyor is installed in the chip collecting cavity for collecting and discharging iron chips from punching the angle steel.

[0012] Furthermore, in a preferred embodiment of the present invention, two groups of angled beams are provided at the top of the punching main machine, and a second hydraulic cylinder is installed at the front end of each group of the angled beams, so that the second hydraulic cylinder is placed directly above the angle steel limit bracket, and a third hydraulic cylinder is obliquely fixed on both sides of each of the punching main machines, so that the third hydraulic cylinder is 45° as a whole.

[0013] Furthermore, in a preferred embodiment of the present invention, an ion cutting plate is provided on the back side of the truss column, a fifth servo motor is fixed on the ion cutting plate, a cylindrical gear is installed on the output shaft of the fifth servo motor, the cylindrical gear and the rack are meshed with each other, the rack is provided on one side of the reinforcement plate, a sixth guide rail module is fixed on the other side of the reinforcement plate, the sixth guide rail module is fixed on the ion cutting plate, and an ion cutting is provided at the bottom end of the reinforcement plate.

[0014] Furthermore, in a preferred embodiment of the present invention, a transfer mechanism is arranged on the side of the main engine base, and the transfer mechanism includes a transfer bearing seat, and one end of a plurality of transfer rollers is installed on the transfer bearing seat, and the other end of the transfer roller is installed on the side of the flip base, and a plurality of flip hands are arranged on the flip base, and the plurality of flip hands are fixed on the rotating shaft, and the end of the rotating shaft is connected to the sixth servo motor, and a steel printing processing device is arranged on the side of the flip base.

[0015] Furthermore, in a preferred embodiment of the present invention, the steel stamp processing equipment includes a feed rack, and a plurality of groups of bearing seats are provided on the feed rack, each group of the bearing seats is used to install two ends of a feed roller, a first sprocket is provided at one end of the feed roller, and the first sprockets of every two feed rollers on the feed rack are interconnected by a first chain, a second sprocket is also provided on each of the feed rollers, and the second sprockets of every two feed rollers are interconnected by a second chain, and the first sprocket on the feed roller at one end of the feed rack is connected to the output end sprocket of the second reduction motor through a third chain.

[0016] Furthermore, in a preferred embodiment of the present invention, a steel stamping device is provided at the other end of the feeding rack, and the steel stamping device includes a main housing, the main housing, and two sides of the main housing are provided with feeding holes, the feeding holes are connected to multiple gear rings through a rotating shaft, and each of the gear rings is provided with multiple steel stamping processing letter heads, a gear connecting seat is provided below the gear ring, a toggle gear is installed in the connecting groove opened on the gear connecting seat, and the toggle gear and the gear ring are connected to each other so that the toggle gear can rotate to toggle the gear ring, and a steel stamping cylinder is formed by arranging multiple gear rings in the main housing, and the toggle gear is connected to the first small pulley through the gear shaft, one end of the synchronous belt is sleeved on the first small pulley, and the other end of the synchronous belt is sleeved on the second small pulley, and the second small pulley is installed on the output end of the seventh servo motor.

[0017] Furthermore, in a preferred embodiment of the present invention, the seventh servo motor is arranged on the gear connecting seat, the seventh guide rail module is fixed at the bottom of the gear connecting seat, the slide rail seat is fixed on the seventh guide rail module, the slide rail seat is arranged inside the main housing, the bottom of the gear connecting seat is connected to the fifth ball screw transmission module, the end of the fifth ball screw transmission module is connected to the eighth servo motor through a coupling, the top of the main housing is provided with an oil cylinder, the output rod of the oil cylinder is fixed with a prefix pressure plate, and the prefix pressure plate is located directly above the steel-printed prefix on the gear ring.

[0018] A second aspect of the present invention provides a control method for intelligent angle steel drilling processing center production line equipment, which is applied to any one of the intelligent angle steel drilling processing center production line equipment, and comprises the following steps:

[0019] Obtaining preset transport control strategies for the truss transport mechanism and the material taking mechanism, and extracting the target fixing area of ​​the angle steel on the angle steel limit bracket by using the preset transport control strategies;

[0020] Obtaining production and processing requirements for angle steel, obtaining drilling size data required for the angle steel according to the production and processing requirements, and constructing a multi-dimensional grid unit field of a target fixed area based on the drilling size data;

[0021] Based on the multi-dimensional grid unit domain, the domain boundary of each grid unit is obtained, an entropy weight method is introduced to perform weighted calculation on each domain boundary to obtain a weight value of the domain boundary, and all domain boundaries are arranged in descending order according to the weight values ​​to obtain a domain boundary descending order diagram;

[0022] Preset the connected component interval of the domain boundary, take the connected component threshold as the inspection benchmark, and perform a descending traversal inspection operation on the descending order graph of the domain boundary;

[0023] Obtain the endpoint connected component values ​​of the two endpoints of each domain boundary in the corresponding grid unit through the domain boundary descending order diagram, check whether the endpoint connected component value is located in the connected component interval, if not, remove the domain boundary corresponding to the endpoint connected component value; if so, merge the connected components of the domain boundary corresponding to the endpoint connected component value to generate a check result;

[0024] Repeat the above steps to traverse and check the domain boundaries and arrange the connected components of each domain boundary in the graph in descending order until all domain boundaries are traversed and checked, output the inspection results of all domain boundaries, and generate the regional discrete control value of each grid unit in the multi-dimensional grid unit domain according to the inspection results of all domain boundaries;

[0025] According to the production and processing requirements, the target drilling area of ​​the angle steel is extracted, the position information of the current drilling host in the target fixed area and the multi-dimensional state in the multi-dimensional grid unit field are obtained, and the regional discrete control values ​​of the grid cells corresponding to the target drilling area and the multi-dimensional state and position information in the multi-dimensional grid unit field are obtained, which are defined as a regional discrete control value set. Based on the regional discrete value control set, the drilling host is controlled to run to the target drilling area to drill the angle steel.

[0026] The beneficial technical effects of the present invention are:

[0027] The present invention can efficiently and accurately transport the angle steel to the punching main machine for drilling through the coordinated material picking of the truss transport mechanism and the material picking mechanism, replacing the cumbersome steps of traditional manual material transportation, greatly improving the efficiency of angle steel drilling. At the same time, the flexible adjustability of the punching main machine can further ensure the quality of angle steel drilling and avoid the phenomenon of drilling errors. Compared with traditional independent angle steel drilling equipment, the intelligent angle steel drilling processing center production line equipment of the present invention saves a lot of manpower and material resources output, improves the reliability and stability of angle steel drilling, and can automatically stamp the angle steel after drilling, increasing the diversification of angle steel production functions. The present invention can make the processes of drilling, transfer, stamping and station processing run simultaneously, saving production time. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a first overall structural schematic diagram of an intelligent angle steel drilling processing center production line equipment;

[0030] Figure 2 This is a schematic diagram of the AA structure of an intelligent angle steel drilling processing center production line equipment;

[0031] Figure 3 This is a BB structure diagram of an intelligent angle steel drilling processing center production line equipment;

[0032] Figure 4 This is a schematic diagram of the overall structure of a punching host in an intelligent angle steel drilling processing center production line equipment;

[0033] Figure 5 It is a partial structural diagram of a punching host in a production line equipment of an intelligent angle steel drilling processing center;

[0034] Figure 6 It is a partial structural diagram of a production line equipment of an intelligent angle steel drilling processing center;

[0035] Figure 7 It is a schematic diagram of the cross-sectional structure of a steel stamping device in a production line equipment of an intelligent angle steel drilling processing center;

[0036] Figure 8 This is a schematic diagram of the CC structure of a steel stamping device in a production line equipment of an intelligent angle steel drilling processing center;

[0037] Fig. 9It is a second overall structural schematic diagram of an intelligent angle steel drilling processing center production line equipment;

[0038] Fig.10 This is a schematic diagram of the DD structure of an intelligent angle steel drilling processing center production line equipment.

[0039] The following are the descriptions of the reference numerals:

[0040] 101, truss; 102, first guide rail; 103, first guide block; 104, truss moving beam; 105, first ball screw nut; 106, first ball screw; 107, first servo motor; 108, truss support; 109, second guide block; 201, second guide rail; 202, slide moving plate; 203, turning axis; 204, second servo motor; 205, material retrieving turning table; 206, first hydraulic cylinder; 207, main engine base; 208, third guide rail; 209, third guide block; 301, second ball screw nut; 302, second ball screw; 303, third servo motor Servo motor; 304, punching rack; 305, fourth guide rail; 306, fourth guide block; 307, H-type moving inner frame; 308, third ball screw nut; 309, third ball screw; 401, right angle reducer; 402, double-pass connecting shaft; 403, double-pass reduction motor; 404, base; 405, fifth guide rail; 406, fifth guide block; 407, cross plate; 408, punching device; 409, fourth ball screw nut; 501, fourth ball screw; 502, fourth servo motor; 503, bevel beam; 504, second hydraulic cylinder; 505, third hydraulic cylinder; 506, Angle steel limit bracket; 507, chip removal hole; 508, chip collection cavity; 509, chip conveyor; 601, ion cutting plate; 602, fifth servo motor; 603, cylindrical gear; 604, rack; 605, reinforcement plate; 606, sixth guide rail; 607, sixth guide block; 608, ion cutting; 609, transfer bearing seat; 701, transfer roller; 702, flip base; 703, flip hand; 704, rotating shaft; 705, sixth servo motor; 706, feeding rack; 707, feeding roller; 708, first sprocket; 709, first chain; 801, second sprocket; 802, The second chain; 803, the third chain; 804, the reduction motor; 805, the main housing; 806, the rotating shaft; 807, the gear ring; 808, the steel-printed character head; 809, the gear connecting seat; 901, the shifting gear; 902, the steel-printed cylinder; 903, the first small pulley; 904, the synchronous belt; 905, the second small pulley; 906, the seventh servo motor; 907, the seventh guide block; 908, the seventh guide rail; 909, the slide rail seat; 1011, the fifth ball screw nut; 1012, the fifth ball screw; 1013, the eighth servo motor; 1014, the oil cylinder; 1015, the character head pressure plate. DETAILED DESCRIPTION

[0041] In order to more clearly understand the above-mentioned purposes, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the structures related to the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other without conflict.

[0042] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present application. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the invention, unless otherwise specified, "multiple" means two or more.

[0043] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood by specific circumstances.

[0044] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly understood.

[0045] like Figure 1-10 As shown, the first aspect of the present invention provides an intelligent angle steel drilling processing center production line equipment, and the intelligent angle steel drilling processing center production line equipment includes a truss transportation mechanism, a material picking structure and a punching main machine.

[0046] The truss transport mechanism includes a truss 101, each of which is provided with a group of first guide rail modules at both ends of the truss 101. The first guide rail modules are fixed to the bottom of the truss moving beam 104. The bottom of the truss moving beam 104 is provided with a first ball screw transmission module, one end of which is connected to the first servo motor 107 through a coupling.

[0047] It should be noted that the first guide rail module includes a first guide rail 102 and a first guide block 103 , and the first ball screw transmission module includes a first ball screw nut 105 and a first ball screw 106 . The present invention is used for punching and coding angle steel materials, and can be synchronously operated with the production line of angle steel materials. When the production line completes a batch of angle steel materials, the staff can place the completed angle steel materials in the artificial material cart and transport them to the designated storage area preset at the bottom of the truss transportation mechanism. At this time, the first servo motor 107 is controlled to rotate forward or reverse, thereby driving the first ball screw nut 105 to translate through the first ball screw 106, thereby driving the truss moving beam 104 to move above the truss 101 until it moves to the designated storage area where the artificial material cart is located. In this way, the truss moving beam 104 can be translated on the truss 101 to the designated storage area of ​​the artificial material cart by controlling the first servo motor 107 to rotate forward or reverse with precise instructions, thereby further accurately moving the material picking mechanism to the point directly above the angle steel materials, thereby achieving accurate and efficient material picking and positioning effect of the angle steel materials to be drilled.

[0048] The material picking mechanism includes a truss column 108, which is installed on the truss moving beam 104. A second guide rail module is fixed to the side of the truss column 108, and a slide moving plate 202 is arranged on the second guide rail module. The bottom end of the slide moving plate 202 is connected to a flip shaft 203, and the end of the flip shaft 203 is connected to a second servo motor 204. A material picking flip table 205 is installed on the flip shaft 203. A first hydraulic cylinder 206 is arranged on the top of the truss column 108, and the output rod of the first hydraulic cylinder 206 is fixed to the top of the slide moving plate 202.

[0049] It should be noted that the second guide rail module includes a second guide block 109 and a second guide rail 201. When the truss transport mechanism drives the material taking mechanism to move to the top of the artificial material vehicle, the first hydraulic cylinder 206 is controlled to start. At this time, the output rod of the first hydraulic cylinder 206 extends to push the sliding table moving plate 202 to vertically descend on the side of the truss support 108, thereby driving the material taking and turning platform 205 to absorb the angle steel to be drilled in the artificial material vehicle. After the angle steel is absorbed, the first hydraulic cylinder 206 is controlled to retract, so that the sliding table moving plate 202 rises vertically, and the truss mechanism is synchronously controlled to drive the vertically rising sliding table 202 to move horizontally above the angle steel limit bracket 506. At this time, the material taking and turning platform 205 is controlled to cancel the adsorption effect on the angle steel, so that the angle steel falls on the angle steel limit bracket 506 to wait for the next step of drilling processing, so as to realize the precise material taking and feeding action of the angle steel drilling, replace the steps of manual feeding in the traditional angle steel production, greatly improve the angle steel drilling rate, and save labor costs and resources.

[0050] It should be noted that due to the irregular placement of the angle steels on the artificial material cart, some angle steels are placed at different angles on the artificial material cart. By controlling the second servo motor 204 to perform precise forward or reverse rotation, so that the flip axis 203 rotates forward or reverse synchronously, the material picking flip table 205 can be driven to perform flipping actions required at different angles, so that the angle steels placed at different angles can be sucked, thereby improving the flexibility and adaptability of the flip table in picking up materials, and meeting the actual needs of the material picking mechanism in different angle steel picking scenarios.

[0051] A main engine base 207 is arranged below the truss transport mechanism, and two sets of third guide rail modules are arranged above the main engine base 207. A punching main engine is fixed on the top of the third guide rail modules, and a second ball screw transmission module is arranged at the bottom of the punching main engine and is fixed to the middle of the third guide rail module through a bearing frame, and a third servo motor 303 is connected to the end of the second ball screw transmission module.

[0052] It should be noted that the third guide rail module includes a third guide rail 208 and a third guide block 209 , and the second ball screw transmission module includes a second ball screw nut 301 and a second ball screw 302 . After the angle steel to be drilled is placed on the angle steel limiting bracket 506, the coordinates of the specific area required for drilling are obtained according to the drilling requirements and a control command is generated. The third servo motor 303 is operated through the control command, thereby driving the second ball screw 302 to rotate forward or reverse, so that the second ball screw nut 303 can be driven to translate on the second ball screw 302, thereby driving the punching frame 304 to translate through the second ball screw nut 303, and due to the setting of the third guide block 209 and the third guide rail 208, the punching frame 304 can be controlled to translate on the main machine base 207 and move to the position where the angle steel needs to be drilled, thereby further achieving the effect of accurately adjusting the angle steel drilling area of ​​the punching host according to different drilling requirements; compared with traditional fixed punching equipment, the present invention can solve the problem of manually adjusting the punching equipment to align with the target drilling area of ​​the angle steel, meet the drilling accuracy and reliability under different production requirements, greatly improve the flexibility of angle steel drilling, and have good economic benefits.

[0053] The punching host includes a punching frame 304, and two sets of fourth guide rail modules are arranged on the inner side wall of the punching frame 304. The top of the fourth guide rail module is fixed to the side of the H-shaped movable inner frame 307, so that the fourth guide rail module can drive the H-shaped movable inner frame 307 to adjust and slide in the punching frame 304;

[0054] A third ball screw transmission module is arranged in the middle of the H-shaped movable inner frame 307, and the third ball screw transmission module is connected to the right-angle reducer 401. The right-angle reducer 401 is connected to the double-pass reducer 403 through the double-pass connecting shaft 402, so that the double-pass reducer 403 can drive the right-angle reducer 401 to operate. Two sets of punching modules are fixed on the H-shaped movable inner frame 307, and the punching module includes a base 404, and a fifth guide rail module is arranged above the base 404. A cross plate 407 is fixed on the fifth guide rail module, and the cross plate 407 is used to place and fix the punching device 408. A fourth ball screw transmission module is arranged at the bottom of the cross plate 407, and the end of the fourth ball screw transmission module is connected to the fourth servo motor 502 through a bearing frame and fixed to the side of the base 404.

[0055] It should be noted that the fourth guide rail module includes a fourth guide rail 305 and a fourth guide block 306, and the third ball screw transmission module includes a third ball screw nut 308 and a third ball screw 309. When the punching host moves to the target position required for drilling, the double-pass reduction motor 403 is controlled to start, and the double-pass reduction motor 403 drives the double-pass connecting shaft 402 to rotate to drive the right-angle reducer 401 to operate. At this time, the third ball screw 309 connected to the right-angle reducer 401 will rotate synchronously at a reduced speed, and the third ball screw 309 rotating at a reduced speed will drive the third ball screw nut 308 to perform translational movement, thereby driving the H-shaped moving inner frame 307 to slide up and down in the punching frame, so that the H-shaped moving inner frame 307 drives the punching module to move up and down synchronously, so that the drilling position of the punching module can be adjusted, and the positioning effect of the punching module height aligning with the required drilling position in the target drilling area of ​​the angle steel is achieved, reducing the drilling error of the punching module for the angle steel, and improving the drilling accuracy rate.

[0056] It should be noted that the fifth guide rail module includes a fifth guide rail 405 and a fifth guide block 406 , and the fourth ball screw transmission module includes a fourth ball screw nut 409 and a fourth ball screw 501 . During the process of accurately positioning the target drilling position of the punching module, the fourth servo motor 502 is controlled to start running forward or reverse, so that the fourth servo motor 502 drives the fourth ball screw 501 to rotate forward or reverse, and the fourth ball screw nut 409 can be driven to translate above the base under the forward and reverse action of the fourth ball screw 501, and the translated fourth ball screw nut 409 will synchronously drive the cross plate 407 to translate, so that the cross plate 407 drives the punching device 408 arranged above it to move, and then the drilling height of the punching device 408 for the required drilling position of the angle steel can be adjusted. The present invention can achieve different drilling qualities and effects by adjusting the drilling height of the punching device, improve the drilling quality and the diversification of drilling effects, meet the production and use requirements of different angle steels, and improve the reliability and stability of angle steel drilling.

[0057] Two groups of angled beams 503 are arranged at the top of the punching main machine, and a second hydraulic cylinder 504 is installed at the front end of each group of angled beams 503, so that the second hydraulic cylinder 504 is placed directly above the angle steel limit bracket 506, and a third hydraulic cylinder 505 is fixed obliquely on both sides of each punching main machine, so that the third hydraulic cylinder 505 is 45° as a whole.

[0058] It should be noted that after the truss transport mechanism and the material-grabbing mechanism cooperate to control the transportation of the angle steel to be drilled and place it on the angle steel limit bracket 506, the second hydraulic cylinder 504 and the third hydraulic cylinder 505 are synchronously controlled to start. At this time, the output end of the second hydraulic cylinder 504 and the output end of the third hydraulic cylinder 505 will extend, and the output end of the second hydraulic cylinder 504 will support and fix the top of the angle steel on the angle steel limit bracket 506, while the third hydraulic cylinder 505 will support and fix both sides of the angle steel on the angle steel limit bracket 506 at an angle of 45°, thereby realizing a multi-directional fixing effect on the angle steel on the angle steel limit bracket 506, avoiding the phenomenon of autonomous sliding of the angle steel on the angle steel limit bracket 506 due to the vibration generated by the equipment during the drilling process, reducing the drilling offset error rate, improving the angle steel drilling quality and accuracy, and having high reliability.

[0059] An angle steel limit bracket 506 is arranged on the top of the main machine base 207, and the angle steel limit bracket 506 is located in the middle part of the two punching main machines. A plurality of chip removal holes 507 are opened on the main machine base 207, and the plurality of chip removal holes 507 are connected to a chip collecting cavity 508. The chip collecting cavity 508 is opened and passes through the center of the main machine base 207. A chip conveyor 509 is installed in the chip collecting cavity 508 for collecting and discharging iron chips from the punching of the angle steel.

[0060] It should be noted that the punching device runs on the angle steel to perform a punching action at a designated area position. The hole waste or scraps generated during the punching will be punched into the chip conveyor 509 in the chip collecting cavity 508 along the chip removal hole 507 for centralized collection and storage. By controlling the chip conveyor 509 to start running, the hole waste or scraps generated by the punching can be transported to the cart. Finally, the punching waste in the cart can be uniformly and rationally processed by the staff, which can avoid the waste or scraps generated by the punching from polluting the production environment and improve the waste cleaning effect of angle steel punching.

[0061] A transfer mechanism is arranged on the side of the main engine base 207, and the transfer mechanism includes a transfer bearing seat 609, on which one end of a plurality of transfer rollers 701 is installed, and the other end of the transfer roller 701 is installed on the side of the flip base 702, and a plurality of flip hands 703 are arranged on the flip base 702, and the plurality of flip hands 703 are fixed on a rotating shaft 704, and the end of the rotating shaft 704 is connected to a sixth servo motor 705, and a steel printing processing device is arranged on the side of the flip base 702.

[0062] It should be noted that by controlling the sixth servo motor 705 to start reverse rotation, the rotating shaft 704 can rotate counterclockwise, thereby driving multiple flipping hands 703 to flip towards the direction of several transfer rollers 701 at the same time, and finally flip and place them in the gap between two adjacent transfer rollers 701, at this time, the flipping preparatory action of the flipping hand 703 is completed; when the drilling of the angle steel on the punching main machine is completed, the truss transportation mechanism and the material picking mechanism are started to re-clamp, absorb and transfer the drilled angle steel to the transfer roller, at this time, the forward rotation of the sixth servo motor 705 causes the flipping hand 703 to gradually flip 180° in the clockwise direction. During the flipping process, the flipping hand 703 will drive the angle steel on the transfer roller 701 to flip together, and finally flip the angle steel to the feeding roller 707 on the other side, and execute the steel stamping transportation step of the angle steel, realizing the transfer function of the angle steel from the drilling process to the steel stamping process, reducing manual participation and labor costs, and having high transfer efficiency.

[0063] It should be noted that after the drilled angle steel is clamped and transferred to the transfer roller 701, the truss transport mechanism and the material picking mechanism are controlled to return to the manual material vehicle placement area to re-extract the angle steel to be drilled and transport it to the angle steel limiting bracket 506. After the drilling is completed, the above steps are repeated to continuously repeat the transfer and transportation, thereby achieving the purpose of uninterrupted supply and transfer of angle steel materials, improving the production and processing efficiency of the intelligent angle steel drilling processing center production line for angle steel, and having high economic benefits.

[0064] An ion cutting plate 601 is arranged on the back side of the truss support 108, and a fifth servo motor 602 is fixed on the ion cutting plate 601. A cylindrical gear 603 is installed on the output shaft of the fifth servo motor 602. The cylindrical gear 603 is meshed with a rack 604. The rack 604 is arranged on one side of a reinforcement plate 605. A sixth guide rail module is fixed on the other side of the reinforcement plate 605. The sixth guide rail module is fixed on the ion cutting plate 601, and an ion cutting 608 is arranged on the bottom end of the reinforcement plate 605.

[0065] It should be noted that the sixth guide rail module comprises a sixth guide rail 606 and a sixth guide block 607. When the material-picking mechanism transports the drilled angle steel to the transfer mechanism, the fifth servo motor 602 runs forward and reverse to drive the cylindrical gear 603 to reciprocate. Since the cylindrical gear 603 and the rack 604 are meshed with each other, and under the setting of the sixth guide rail 606 and the sixth guide block 607, the reciprocating cylindrical gear 603 will drive the reinforcement plate 605 to perform reciprocating lifting and lowering motion on the ion cutting plate 601, so that the ion cutting 608 at the bottom of the reinforcement plate 605 can cut and modify the edge of the drilled hole on the angle steel clamped by the material-picking mechanism, so as to achieve the deep processing effect of the drilled edge of the angle steel, improve the overall processing quality of the angle steel after drilling, and ensure the availability and stability of the angle steel drilling.

[0066] The steel printing processing equipment includes a feeding rack 706, on which are arranged several groups of bearing seats, each group of the bearing seats being used to mount two ends of a feeding roller 707, a first sprocket 708 being arranged at one end of the feeding roller 707, and the first sprockets 708 of every two feeding rollers 707 on the feeding rack 706 are interconnected by a first chain 709, a second sprocket 801 is also arranged on each of the feeding rollers 707, and the second sprockets 801 of every two feeding rollers 707 are interconnected by a second chain 802, and the second sprocket 801 on the feeding roller 707 at one end of the feeding rack 801 is connected to the output end sprocket of the reduction motor 804 through a third chain 803.

[0067] The other end of the feeding rack 706 is provided with a steel stamping device, which includes a main housing 805, and the main housing 805 is provided with feeding holes on both sides, and the feeding holes are connected to multiple gear rings 807 through a rotating shaft 806, and each of the gear rings 807 is provided with multiple steel stamping processing heads 808, and a gear connecting seat 809 is provided below the gear ring 807, and a toggle gear 901 is installed in the connecting groove provided on the gear connecting seat 809, and the toggle gear 901 is connected to the gear ring 807. The gear rings 807 are connected to each other so that the toggle gear 901 can rotate the toggle gear ring 807. The main housing 805 is provided with multiple gear rings 807 stacked to form a steel printing cylinder 902. The toggle gear 901 is connected to the first small pulley 903 through the gear shaft. One end of the synchronous belt 904 is sleeved on the first small pulley 903. The other end of the synchronous belt 904 is sleeved on the second small pulley 905. The second small pulley 905 is installed on the output end of the seventh servo motor 906.

[0068] The seventh servo motor 906 is arranged on the gear connecting seat 809, and the seventh guide rail module is fixed at the bottom of the gear connecting seat 809. The slide rail seat 909 is fixed on the seventh guide rail module. The slide rail seat 909 is arranged inside the main housing 805. The bottom of the gear connecting seat 809 is connected to the fifth ball screw transmission module. The end of the fifth ball screw transmission module is connected to the eighth servo motor 1013 through a coupling. The top of the main housing 805 is provided with an oil cylinder 1014, and the output rod of the oil cylinder 1014 is fixed with a prefix pressing plate 1015, and the prefix pressing plate 1015 is located directly above the steel-printed prefix 808 on the gear ring 807.

[0069] It should be noted that the seventh guide rail module includes a seventh guide block 907 and a seventh guide rail 908, and the fifth ball screw transmission module includes a fifth ball screw nut 1011 and a fifth ball screw 1012. By starting the reduction motor 804, the third chain 803 is driven to rotate and transmit, and the rotating third chain 803 drives the first sprocket 708 to make the feeding roller 707 at one end of the feeding rack 706 rotate at a constant speed. When the feeding roller 707 at one end of the feeding rack 706 rotates at a constant speed, the second sprocket 801 set on it will rotate synchronously, thereby driving the second sprocket 801 on the next adjacent feeding roller 707 to rotate through the second chain 802, so that the next adjacent feeding is realized. The roller 707 rotates at a uniform speed; when the next adjacent feeding roller 707 rotates at a uniform speed, it will again drive the next adjacent feeding roller 707 to rotate through the mutual transmission of the first sprocket 708 and the first chain 709, and at this time the flipping hand 703 flips the drilled angle steel and transports it to the feeding roller 707. By repeating the above-mentioned transmission steps, the drilled angle steel can be continuously transmitted horizontally, so that it enters the steel stamping device set at the other end of the feeding rack to perform the steel stamping operation on the angle steel.

[0070] It should be noted that, according to the steel printing requirements of the angle steel, the coding information required to be printed on the angle steel is obtained, and programming instructions are generated according to the coding information to control the precise operation of the seventh servo motor 906 and the eighth servo motor 1013; the seventh servo motor 906 is controlled to start so that the second small pulley 905 rotates, and the rotating second small pulley 905 drives the first small pulley 903 to rotate synchronously through the synchronous belt 904, and at this time the first small pulley 903 can drive the toggle gear 901 to rotate, so that the rotating toggle gear 901 can toggle the gear ring 807 of the steel printing cylinder 902, so that each gear ring in the steel printing cylinder 902 is realized 807 code is automatically and accurately replaced; at the same time, during the process of changing the code of the steel ring 807, the angle steel that is continuously transported horizontally will enter the main housing 805 through the feed hole and be placed above the gear ring 807 code required for the steel stamp. When the gear ring 807 code is adjusted and replaced, the oil cylinder 1014 is controlled to start, so that the output end of the oil cylinder 1014 extends downward, so that the head pressing plate 1015 can quickly stamp the angle steel in the direction of the gear ring 807 code adjusted and arranged on the steel stamp cylinder 902, and finally the code on the gear ring 807 prints the corresponding code sequence information on the angle steel, completing the rapid stamping and steel stamping action of the angle steel. The present invention can perform the purpose of stamping and steel stamping of the specified code on the angle steel after drilling, and can steel stamp multiple groups of angle steels in a short time, greatly speeding up the steel stamping rate. Compared with the traditional steel stamping equipment, it realizes the effect of automatically changing the steel stamping code, replacing the cumbersome steps of manual code change in the past, saving time and labor, and avoiding the phenomenon of under-printing and missed printing, ensuring the quality of the steel stamp.

[0071] It should be noted that when there are multiple gear rings 807 codes in the steel printing cylinder 902 that need to be adjusted and replaced, the eighth servo motor 1013 is controlled to drive the fifth ball screw 1012 to rotate, and the fifth ball screw 1012 drives the fifth ball screw nut 1011 to move, thereby driving the gear connecting seat 809 to slide to one side on the slide rail seat 909 under the guidance of the seventh guide rail 908 and the seventh guide block 907, which can synchronously drive the seventh servo motor 906 and the toggle gear 901 to slide. When sliding to the code sequence to be replaced, When the corresponding gear ring 807 is below, the seventh servo motor 906 is controlled to stop running. At this time, the seventh servo motor 906 is controlled to start again to drive the toggle gear 901 to rotate, so that the code on any gear ring 807 can be adjusted, and all codes on the steel printing cylinder 902 can be intelligently and quickly replaced according to the steel printing coding requirements. On the one hand, it saves the cost of manual coding and arranging one by one, and has high economic benefits. On the other hand, it guarantees the accuracy of coding while meeting the requirements of intelligent coding, prevents the occurrence of coding and arranging errors, and improves the steel printing quality of angle steels.

[0072] A second aspect of the present invention provides a control method for intelligent angle steel drilling processing center production line equipment, which is applied to any one of the intelligent angle steel drilling processing center production line equipment, and comprises the following steps:

[0073] Obtaining preset transport control strategies for the truss transport mechanism and the material taking mechanism, and extracting the target fixing area of ​​the angle steel on the angle steel limit bracket by using the preset transport control strategies;

[0074] Obtaining production and processing requirements for angle steel, obtaining drilling size data required for the angle steel according to the production and processing requirements, and constructing a multi-dimensional grid unit field of a target fixed area based on the drilling size data;

[0075] Based on the multi-dimensional grid unit domain, the domain boundary of each grid unit is obtained, an entropy weight method is introduced to perform weighted calculation on each domain boundary to obtain a weight value of the domain boundary, and all domain boundaries are arranged in descending order according to the weight values ​​to obtain a domain boundary descending order diagram;

[0076] Preset the connected component interval of the domain boundary, take the connected component threshold as the inspection benchmark, and perform a descending traversal inspection operation on the descending order graph of the domain boundary;

[0077] Obtain the endpoint connected component values ​​of the two endpoints of each domain boundary in the corresponding grid unit through the domain boundary descending order diagram, check whether the endpoint connected component value is located in the connected component interval, if not, remove the domain boundary corresponding to the endpoint connected component value; if so, merge the connected components of the domain boundary corresponding to the endpoint connected component value to generate a check result;

[0078] Repeat the above steps to traverse and check the domain boundaries and arrange the connected components of each domain boundary in the graph in descending order until all domain boundaries are traversed and checked, output the inspection results of all domain boundaries, and generate the regional discrete control value of each grid unit in the multi-dimensional grid unit domain according to the inspection results of all domain boundaries;

[0079] According to the production and processing requirements, the target drilling area of ​​the angle steel is extracted, the position information of the current drilling host in the target fixed area and the multi-dimensional state in the multi-dimensional grid unit field are obtained, and the regional discrete control values ​​of the grid cells corresponding to the target drilling area and the multi-dimensional state and position information in the multi-dimensional grid unit field are obtained, which are defined as a regional discrete control value set. Based on the regional discrete value control set, the drilling host is controlled to run to the target drilling area to drill the angle steel.

[0080] It should be noted that before drilling holes in angle steel, the punching host usually needs to adjust its position on the host base to align the punching device with the target drilling area of ​​the angle steel to ensure that the final drilling result meets the production and processing requirements. If the punching host cannot be accurately controlled to run to the position of the target drilling area, the position of the punching device drilling holes in the angle steel will not be in the target drilling area, which greatly increases the error rate of drilling holes in the angle steel, causing frequent rework of the angle steel and greatly reducing the production efficiency of the angle steel. Therefore, this method first determines the required movement range of the punching host by analyzing the final fixed area where the truss transportation mechanism and the material-taking mechanism place the angle steel on the angle steel limit bracket, limits the control range of the servo motor control amount, improves the servo motor to control the movement accuracy of the punching host on the host base, and avoids drilling errors; then, a multidimensional grid unit field is constructed based on the target fixed area, and the multidimensional grid unit field is a field formed by several multidimensional grid units based on the drilling size data, which can accurately represent the movement amount of the punching host in the target fixed area, and then the continuity of the field boundary corresponding to each grid unit in the multidimensional grid unit field is analyzed, that is, checking whether the endpoint connected component value is located in the connected component interval, if not, it means that the The two endpoints of the domain boundary are not connected to the endpoints of other domain boundaries, and the domain boundary should be eliminated to ensure the accuracy and continuity when generating regional discrete control quantities; if they are located at , it means that the two endpoints of the domain boundary are connected to the endpoints of other domain boundaries, and the regional discrete control quantity is generated by merging the connected components; finally, according to the inspection results generated by the analysis, the regional discrete control value required to control the movement between the current drilling host and the target drilling area in the multi-dimensional grid unit field is calculated, so that the various modules and mechanisms on the drilling host can be accurately controlled to work together to the target drilling area of ​​the angle steel, which can greatly improve the stability and accuracy of angle steel drilling, reduce the drilling deviation rate and the drilling defective rate, avoid the frequent rework phenomenon and cause additional output of manpower and material costs, and have high economic benefits.

[0081] In addition, the control method of the intelligent angle steel drilling processing center production line equipment further includes the following steps:

[0082] Obtaining production order information of the angle steel, obtaining a target steel stamp code sequence required for the angle steel according to the production order information, and controlling the seventh servo motor to adjust the steel stamp header code on the gear ring to the target steel stamp code sequence;

[0083] The structured light camera is used to obtain the spatial point cloud data of the steel stamp head corresponding to the target steel stamp code sequence in each gear ring after adjustment at the steel stamp station, and the spatial position of the steel stamp head corresponding to the target steel stamp code sequence after adjustment is calculated and reconstructed based on the point cloud data;

[0084] After the reconstruction is completed, a three-dimensional model of the actual space where the steel stamp head corresponding to the target steel stamp code sequence in each gear ring after adjustment is located on the steel stamp station is generated;

[0085] Obtain a standard assembly drawing of the steel stamping device, obtain preset position data of the steel stamp head on the steel stamping station according to the standard assembly drawing, and construct a standard spatial three-dimensional model of the steel stamp head in each gear ring at the steel stamping station based on the preset position data;

[0086] Based on the standard space three-dimensional model, the actual space three-dimensional model is registered to the standard space three-dimensional model and the degree of overlap after registration is calculated to obtain the registration overlap rate of the actual space position of the steel stamp head in each gear ring compared with the standard space position;

[0087] If the registration coincidence rate is not lower than the preset registration coincidence rate, the gear ring corresponding to the steel stamp head marking the registration coincidence rate is the standard adjustment gear ring, and the secondary adjustment process of the standard adjustment gear ring is ignored;

[0088] If the registration coincidence rate is lower than the preset registration coincidence rate, the gear ring corresponding to the steel stamp head marking the registration coincidence rate is an abnormally adjusted gear ring, and the deviation vector of the actual spatial three-dimensional model of the abnormally adjusted gear ring relative to the standard spatial three-dimensional model to generate the registration coincidence rate is obtained; wherein the deviation vector includes a deviation direction and a deviation angle;

[0089] The control parameters of the seventh servo motor are adjusted according to the deviation vector so that the actual spatial position of the steel stamp head corresponding to the target steel stamp code sequence in each gear ring is returned to the standard spatial position.

[0090] It should be noted that when the angle steel after drilling enters the steel stamping device to prepare for the steel stamping, the control instructions input by the staff are used to control the seventh servo motor and the eighth servo motor, so that the steel stamp header in each gear ring is adjusted to the required target steel stamping code sequence at the steel stamping station below the header pressure plate, thereby stamping the angle steel with different code sequences according to the coding requirements. However, when there is a deviation in the control behavior of the seventh servo motor, it will cause an error in the spatial position of the target steel stamping code header on the gear ring when it is at the steel stamping station, resulting in uneven steel stamp characters, incomplete steel stamping, missing steel stamps, and missing steel stamps on the final angle steel, which reduces the quality of the steel stamping device on the angle steel and increases the phenomenon of rework steel stamping on the angle steel, which does not meet the expected needs of actual angle steel production. Therefore, this method can perform control deviation analysis on the degree of alignment overlap between the actual spatial three-dimensional model of each gear ring at the steel printing station after adjustment and the standard spatial three-dimensional model. If the alignment overlap rate is not lower than the preset alignment overlap rate, it means that the target steel printing code on the gear ring is accurately adjusted to the steel printing station. Otherwise, it means that the target steel printing code on the gear ring deviates from the steel printing station. Therefore, it is necessary to adjust the control parameters of the seventh servo motor so that the actual spatial position of the steel printing head corresponding to the target steel printing code sequence in each gear ring is returned to the standard spatial position, ensuring that the target steel printing codes of all gear rings are arranged neatly and accurately at the steel printing station, reducing the unevenness, incompleteness, deficiency and missing printing during steel printing, reducing the rework rate of steel printing, and improving the quality and integrity of steel printing.

[0091] In addition, the control method of the intelligent angle steel drilling processing center production line equipment further includes the following steps:

[0092] Acquire drilling image data of the angle steel sample output after drilling by the punching host, introduce an algorithm to extract features from the drilling image data, and obtain actual drilling features of the angle steel sample;

[0093] Obtaining the model specifications and preset processing criteria of the punching device, and retrieving and obtaining the standard drilling features of the angle steel sample when drilling holes in the punching device based on the model specifications and preset processing criteria;

[0094] Calculating the Euclidean distance between the actual drilling feature and the standard drilling feature, determining the similarity between the actual drilling feature of the angle steel sample and the standard drilling feature according to the Euclidean distance, and marking the angle steel sample as an abnormal sample if the similarity is less than a preset similarity;

[0095] Obtaining a production log of a punching device, extracting all historical control parameters output by the punching device when producing the abnormal sample through the production log, introducing a factor association method to calculate the factor association degree between each historical control parameter and the similarity, and obtaining a plurality of factor association degrees;

[0096] Only the control parameters corresponding to the factor correlation degree greater than the preset factor correlation degree are extracted and defined as abnormal control parameters. At the same time, the working state of the current punching device is monitored in real time to obtain the real-time control parameter set of the punching device within the preset time period.

[0097] If there is at least one or more abnormal control parameters in the real-time control parameter set, the control parameters of the current punching device are adjusted accordingly in real time, and the fifth servo motor is started to control the ion cutting to cut and modify the drilling position of the angle steel sample.

[0098] It should be noted that if the control parameters of the punching device have errors or mistakes when drilling angle steel, burrs, unevenness, leaks and other defective features will appear inside or on the edge of the hole after drilling the angle steel. These defective features will affect the production and normal use of the angle steel, causing the unqualified rate of angle steel production and processing to rise sharply, which is not conducive to the production and processing quality requirements of the angle steel. This method can locate the abnormal control parameters that are likely to cause defective features of the punching device according to the similarity between the actual image features after the punching host drills and the standard features of the punching host drills, and determine whether there are at least one or more abnormal control parameters in the real-time control parameter set of the current punching device, so that the punching device can be accurately and efficiently controlled in real time, and at the same time, ion cutting can be started to cut and modify the burrs and other defects that have been generated, thereby improving the overall quality of the angle steel drilling and reducing the frequency of the unqualified rate of the angle steel drilling.

[0099] The above is based on the ideal embodiment of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. An intelligent angle steel drilling processing center production line equipment, the intelligent angle steel drilling processing center production line equipment includes a truss transportation mechanism, a material taking structure and a punching host, characterized in that: The truss transport mechanism comprises a truss, each end of the truss is provided with a group of first guide rail modules, the first guide rail modules are fixed to the bottom of the truss moving beam, and the bottom of the truss moving beam is provided with a first ball screw transmission module, one end of which is connected to a first servo motor through a coupling; The material-grabbing mechanism comprises a truss support column, the truss support column is installed through the truss moving beam, a second guide rail module is fixed to the side of the truss support column, a sliding table moving plate is arranged on the second guide rail module, a turning shaft is connected to the bottom end of the sliding table moving plate, a second servo motor is connected to the end of the turning shaft, a material-grabbing turning table is installed on the turning shaft, a first hydraulic cylinder is arranged on the top of the truss support column, and an output rod of the first hydraulic cylinder is fixed to the top of the sliding table moving plate; A mainframe base is provided below the truss transport mechanism, two sets of third guide rail modules are provided above the mainframe base, a punching mainframe is fixed on the top of the third guide rail modules, and a second ball screw transmission module is provided at the bottom of the punching mainframe and fixed to the middle of the third guide rail module through a bearing frame, and a third servo motor is connected to the end of the second ball screw transmission module; The punching host comprises a punching frame, and two sets of fourth guide rail modules are arranged on the inner side wall of the punching frame, and the top of the fourth guide rail module is fixed to the side of the H-shaped movable inner frame, so that the fourth guide rail module can drive the H-shaped movable inner frame to adjust and slide in the punching frame; An angle steel limit bracket is arranged on the top of the main machine base, and the angle steel limit bracket is located in the middle part of the two punching main machines. A plurality of chip removal holes are opened on the main machine base, and the plurality of chip removal holes are connected to a chip collecting inner cavity. The chip collecting inner cavity is opened and passes through the center of the main machine base. A chip conveyor is installed in the chip collecting inner cavity for collecting and discharging iron chips from the punching of the angle steel.

2. The intelligent angle steel drilling processing center production line equipment according to claim 1 is characterized by: A third ball screw transmission module is arranged in the middle of the H-shaped movable inner frame, and the third ball screw transmission module is connected to the right-angle reducer. The right-angle reducer is connected to the double-pass reducer through a double-pass connecting shaft, so that the double-pass reducer can drive the right-angle reducer to operate. Two sets of punching modules are fixed on the H-shaped movable inner frame, and the punching module includes a base. A fifth guide rail module is arranged above the base, and a cross plate is fixed on the fifth guide rail module. The cross plate is used to place and fix the punching device. A fourth ball screw transmission module is arranged at the bottom of the cross plate, and the end of the fourth ball screw transmission module is connected to the fourth servo motor through a bearing frame and fixed to the side of the base.

3. The intelligent angle steel drilling processing center production line equipment according to claim 1 is characterized by: Two groups of angled beams are arranged at the top of the punching main machine, and a second hydraulic cylinder is installed at the front end of each group of angled beams, so that the second hydraulic cylinder is placed directly above the angle steel limit bracket, and a third hydraulic cylinder is fixed obliquely on both sides of each punching main machine, so that the third hydraulic cylinder is 45° as a whole.

4. The intelligent angle steel drilling processing center production line equipment according to claim 1 is characterized by: An ion cutting plate is arranged on the back of the truss support, a fifth servo motor is fixed on the ion cutting plate, a cylindrical gear is installed on the output shaft of the fifth servo motor, the cylindrical gear is meshed with the rack, the rack is arranged on one side of the reinforcement plate, a sixth guide rail module is fixed on the other side of the reinforcement plate, the sixth guide rail module is fixed on the ion cutting plate, and an ion cutting is arranged on the bottom end of the reinforcement plate.

5. The intelligent angle steel drilling processing center production line equipment according to claim 1 is characterized by: A transfer mechanism is arranged on the side of the main engine base, and the transfer mechanism includes a transfer bearing seat, one end of a plurality of transfer rollers is installed on the transfer bearing seat, and the other end of the transfer roller is installed on the side of the flip base. A plurality of flip hands are arranged on the flip base, and the plurality of flip hands are fixed on the rotating shaft. The end of the rotating shaft is connected to the sixth servo motor, and a steel printing processing device is arranged on the side of the flip base.

6. The intelligent angle steel drilling processing center production line equipment according to claim 5 is characterized by: The steel printing processing equipment includes a feed rack, on which are arranged several groups of bearing seats, each group of bearing seats is used to mount two ends of a feed roller, a first sprocket is arranged at one end of the feed roller, and the first sprockets of every two feed rollers on the feed rack are interconnected by a first chain, a second sprocket is also arranged on each of the feed rollers, and the second sprockets of every two feed rollers are interconnected by a second chain, and the first sprocket on the feed roller at one end of the feed rack is connected to the output end sprocket of the second reduction motor by a third chain.

7. The intelligent angle steel drilling processing center production line equipment according to claim 6 is characterized by: A stamping device is provided at the other end of the feeding rack, and the stamping device includes a main housing, the main housing, and two sides of the main housing are provided with feeding holes, the feeding holes are connected with multiple gear rings through a rotating shaft, and each of the gear rings is provided with multiple stamping processing letter heads, a gear connecting seat is provided below the gear ring, a toggle gear is installed in the connecting groove provided on the gear connecting seat, and the toggle gear and the gear ring are connected to each other so that the toggle gear can rotate to toggle the gear ring, and a plurality of gear rings are arranged in the main housing to form a stamp cylinder, the toggle gear is connected to the first small pulley through the gear shaft, one end of the synchronous belt is sleeved on the first small pulley, and the other end of the synchronous belt is sleeved on the second small pulley, and the second small pulley is installed on the output end of the seventh servo motor.

8. The intelligent angle steel drilling processing center production line equipment according to claim 7 is characterized by: The seventh servo motor is arranged on the gear connecting seat, the seventh guide rail module is fixed at the bottom of the gear connecting seat, the slide rail seat is fixed on the seventh guide rail module, the slide rail seat is arranged inside the main housing, the fifth ball screw transmission module is connected to the bottom of the gear connecting seat, the end of the fifth ball screw transmission module is connected to the eighth servo motor through a coupling, and an oil cylinder is arranged on the top of the main housing, the output rod of the oil cylinder is fixed with a prefix pressure plate, and the prefix pressure plate is located directly above the steel-printed prefix on the gear ring.

9. A control method for an intelligent angle steel drilling processing center production line equipment, applied to an intelligent angle steel drilling processing center production line equipment according to any one of claims 1 to 8, characterized in that: The steps include: Obtaining preset transport control strategies for the truss transport mechanism and the material taking mechanism, and extracting the target fixing area of ​​the angle steel on the angle steel limit bracket by using the preset transport control strategies; Obtaining production and processing requirements for angle steel, obtaining drilling size data required for the angle steel according to the production and processing requirements, and constructing a multi-dimensional grid unit field of a target fixed area based on the drilling size data; Based on the multi-dimensional grid unit domain, the domain boundary of each grid unit is obtained, an entropy weight method is introduced to perform weighted calculation on each domain boundary to obtain a weight value of the domain boundary, and all domain boundaries are arranged in descending order according to the weight values ​​to obtain a domain boundary descending order diagram; Preset the connected component interval of the domain boundary, take the connected component threshold as the inspection benchmark, and perform a descending traversal inspection operation on the descending order graph of the domain boundary; Obtain the endpoint connected component values ​​of the two endpoints of each domain boundary in the corresponding grid unit through the domain boundary descending order diagram, check whether the endpoint connected component value is located in the connected component interval, if not, remove the domain boundary corresponding to the endpoint connected component value; if so, merge the connected components of the domain boundary corresponding to the endpoint connected component value to generate a check result; Repeat the above steps to traverse and check the domain boundaries and arrange the connected components of each domain boundary in the graph in descending order until all domain boundaries are traversed and checked, output the inspection results of all domain boundaries, and generate the regional discrete control value of each grid unit in the multi-dimensional grid unit domain according to the inspection results of all domain boundaries; According to the production and processing requirements, the target drilling area of ​​the angle steel is extracted, the position information of the current drilling host in the target fixed area and the multi-dimensional state in the multi-dimensional grid unit field are obtained, and the regional discrete control values ​​of the grid cells corresponding to the target drilling area and the multi-dimensional state and position information in the multi-dimensional grid unit field are obtained, which are defined as a regional discrete control value set. Based on the regional discrete value control set, the drilling host is controlled to run to the target drilling area to drill the angle steel.