A kind of anti-seepage construction equipment for concrete prefabricated parts
By designing anti-seepage construction equipment for concrete prefabricated slabs, and using high-pressure pumps and jet components for automated glue filling and smoothing treatment, the problems of debris at the joints and uneven distribution of glue are solved, which significantly improves the Anti-seepage effect and work efficiency.
Patent Information
- Application Number
- CN202410956359.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-17
AI Technical Summary
In the prior art, the anti-seepage water treatment at the joints of the prefabricated concrete plates has the problem of debris affecting the viscosity and uneven distribution of the glue, resulting in poor anti-seepage water effect and low manual operation efficiency.
A concrete prefabricated parts anti-seepage construction equipment is designed, including glue injection mechanism and treatment mechanism. It uses high-pressure pump glue filling, jet assembly ash cleaning and smoothing components for automated glue filling, smoothing and drying treatment to ensure sufficient joints. The filling and glue are evenly distributed.
High-density glue filling and even smoothing of the joints is achieved, which improves the anti-seepage effect and work efficiency, and ensures the overall density and durability of the joints.
Smart Images

Figure CN118532060B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water seepage prevention construction, and in particular to a concrete prefabricated part water seepage prevention construction equipment. Background Art
[0002] Precast concrete panels are a common type of precast concrete parts. They are made of concrete and are produced in factories. Precast concrete panels have specific shapes and can be assembled into buildings by splicing multiple panels together. However, in the assembled buildings, the two precast concrete panels do not fit together perfectly, so there will be many joints.
[0003] The joints of precast concrete panels refer to the connecting parts between precast concrete panels. The joints are a weak part of the precast concrete panels. If they are not effectively waterproofed, water may seep in from the joints, affecting the stability and durability of the building structure. Water leakage at the joints will also cause the internal structure of the precast panels to become damp, causing corrosion, loosening or cracking, thus affecting the service life and performance of the precast panels. Therefore, effective waterproofing construction at the joints of precast concrete panels can not only protect the building structure and the precast panels themselves, but also improve the durability and overall quality of the building.
[0004] In the prior art, glue injection into the joints is mostly performed manually by holding glue, and the glue injected into the joints is subsequently smoothed using a handheld brush. The entire process is completed manually. However, before the glue injection, due to the large amount of dust at the installation site of the precast concrete panels, debris, soil and other debris can easily enter the joints. These debris will affect the adhesion between the glue and the precast concrete panels, which is not conducive to the anti-seepage effect of the glue. At the same time, manual squeezing of the glue cannot ensure the uniformity of the distribution of the glue, which will result in a situation where the glue content is less in some parts of the joints, which will affect the overall anti-seepage performance of the glue and require subsequent observation and filling, which is more troublesome. Summary of the invention
[0005] Technical problem to be solved: The present invention provides a concrete prefabricated anti-seepage construction equipment, which can solve the above-mentioned problems.
[0006] Technical solution: In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: a concrete precast part anti-seepage construction equipment, including a frame, a glue injection mechanism for injecting glue into the joints of the concrete precast panels is provided on the rear side of the front-to-back central axis of the frame, and a processing mechanism for cleaning, injecting glue, drying and smoothing the joints of the concrete precast panels is provided on the front side of the front-to-back central axis of the frame.
[0007] The glue injection mechanism includes a glue injection component correspondingly arranged at the rear side of the front-to-back central axis of the frame and outside the frame for performing glue injection operations, and a translation component 1 is arranged inside the frame for controlling the translation of the glue injection component along the joint.
[0008] The processing mechanism includes a jet assembly correspondingly arranged at the front side position of the front-back central axis of the frame and the outside of the frame, the jet assembly includes a jet pipe arranged at the front side position of the front-back central axis of the frame, the jet pipe is slidably and limit-connected in the gear sleeve, the gear sleeve is rotatably connected to the movable seat 2, the lower end of the gear sleeve is meshedly connected with a rack, the rack is fixedly connected between the front and rear edges of the frame, the upper end of the jet pipe is rotatably connected with a connecting box, the connecting box and the inside of the jet pipe are communicated, the connecting box is fixedly connected to the connecting seat 2, an electric push rod 2 is fixedly connected between the connecting seat 2 and the movable seat 2, an air pump is fixedly connected to the front side of the outside of the frame, the output pipe of the air pump is connected to a warming box, the output port of the warming box is connected to a spiral hose through a pipe, the end of the spiral hose away from the air pump is connected to the connecting box, the movable seat 2 is provided with a translation assembly 2 for making it translate along the joint, the rear side of the movable seat 2 is provided with an extension plate, and the extension plate is provided with a smoothing assembly for smoothing the rubber material at the joint.
[0009] Through the coordinated use of the glue injection mechanism and the processing mechanism, the integrated processing of glue injection, glue leveling and glue drying of the joints of two concrete precast panels can be automatically completed.
[0010] As a preferred technical solution of the present invention, the glue injection assembly includes a glue injection tube arranged at the rear side of the front-to-back central axis of the frame, and a glue storage box and a high-pressure pump fixedly connected to the rear side of the outside of the frame. The glue injection tube is slidably connected to a movable seat, and a connecting seat is fixedly connected to the upper side of the glue injection tube. An electric push rod is fixedly connected between the connecting seat and the movable seat. The upper end of the glue injection tube is connected to the output port of the high-pressure pump through a spiral hose, and the input port of the high-pressure pump is connected to the output port pipeline of the glue storage box.
[0011] As a preferred technical solution of the present invention, the translation assembly includes a screw rod rotatably connected to the left side between the front and rear edges of the frame, and a guide rod fixedly connected to the left side between the front and rear edges of the frame, a moving seat slidably connected to the guide rod and threadedly connected to the screw rod, one end of the screw rod extends to the outside of the frame and is fixedly connected to the output end of the motor, and the motor is fixedly connected to the outside of the frame.
[0012] As a preferred technical solution of the present invention, the translation component 2 includes a screw rod 2 rotatably connected to the right side between the front and rear edges of the frame, and a guide rod 2 fixedly connected to the right side between the front and rear edges of the frame. The moving seat 2 is slidably connected to the guide rod 2 and is threadedly connected to the screw rod 2. One end of the screw rod 2 extends to the outside of the frame and is fixedly connected to the output end of the motor 2. The motor 2 is fixedly connected to the outside of the frame.
[0013] As a preferred technical solution of the present invention, the smoothing assembly includes a smoothing brush 1 distributed in the front-to-back direction on the lower side of the extended support plate, and a smoothing brush 2 distributed in the left-to-right direction on the lower side of the extended support plate. The smoothing brush 1 is provided with a reciprocating component for controlling its left-to-right reciprocating brushing movement, and the bottom of the smoothing brush 2 is provided with an arc-shaped opening.
[0014] As a preferred technical solution of the present invention, the reciprocating component includes an electric push rod three fixedly connected to the middle position of the upper side of the extension plate, the output end of the electric push rod three faces upward and is fixedly connected to the Z frame, the lower end of the Z frame is fixedly connected to a fixed rod, the lower end of the fixed rod is fixedly connected to the smoothing brush two, the upper end of the Z frame is fixedly connected to an arch frame, the two fork sides of the arch frame are distributed on both sides of the rack, the rear end and lower side of the extension plate are rotatably connected to a rotating column, a linkage gear is fixedly connected to the rotating column, the linkage gear is meshed with the rack, the lower end of the rotating column is fixedly connected to a long gear, the long gear is a half gear structure, a movable frame is provided on the periphery of the long gear, the front and rear inner walls of the movable frame are provided with racks, and the long gear is only meshed with one side of the rack at the same time, the left and right ends of the movable frame are fixedly connected to the centers of the guide rods three, the guide rods three are slidably connected to the fork side of the arch frame, and the smoothing brush one is fixedly connected to the front side of the movable frame.
[0015] As a preferred technical solution of the present invention, a supporting mechanism for supporting the equipment as a whole is provided on the periphery of the frame, and the supporting mechanism includes side mounting plates fixedly connected to the four corners of the frame, and a universal wheel and four electric push rods are fixedly connected to the lower side of each side mounting plate, and the output end of the four electric push rods faces downward and is fixedly connected to a support plate, and a plurality of conical feet are fixedly connected to the lower side of the support plate at equal intervals.
[0016] As a preferred technical solution of the present invention, a plurality of branch pipe heads are installed at equal intervals on the circumference of the bottom of the pipe wall of the air jet pipe.
[0017] As a preferred technical solution of the present invention, a spiral tube group is connected to the pipe between the input port and the output port of the heating box, and a plurality of resistance wires are arranged on the periphery of the spiral tube group. The resistance wires are fixedly connected to the interior of the heating box through a circuit board and are evenly distributed around the circumference.
[0018] Beneficial effects: 1. The glue injection mechanism adopted by the present invention utilizes a high-pressure pump to deliver glue into the joint at high pressure, so that the glue can fully fill the joint, effectively ensure the filling integrity of the joint, further improve the glue injection density of the joint, increase the anti-water seepage effect of the joint, and the glue extrusion is more uniform, which can ensure the overall anti-water seepage effect of the joint, and is more convenient to use.
[0019] 2. The processing mechanism adopted in the present invention can clean the joints by extracting air before injecting glue, and the airflow direction is changeable, which can effectively ensure the cleaning effect and further improve the adhesion of the joints between the glue and the precast concrete board. At the same time, the glue on the periphery of the joint can be evenly smoothed by reciprocating brushing, so that the glue and the surface of the precast concrete board are bonded, further increasing the anti-water seepage effect. After the glue is smoothed, the air can be heated to dry the glue, thereby accelerating the solidification efficiency of the glue.
[0020] 3. The glue injection mechanism and processing mechanism adopted in the present invention are used in combination to automatically complete the integrated processing of glue injection, glue leveling and glue drying of the concrete precast panel joints. Compared with the traditional manual processing method, the work efficiency is significantly improved, the sealing quality of the joints is denser, and the anti-water seepage effect is more superior. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0022] Figure 1 It is a schematic diagram of the three-dimensional structure from the first viewing angle of the present invention.
[0023] Figure 2 It is a schematic diagram of the stereoscopic structure from a second viewing angle of the present invention.
[0024] Figure 3 It is a schematic diagram of the stereoscopic connection structure of the jetting component and the smoothing component in the present invention from a first perspective.
[0025] Figure 4 It is a schematic diagram of the stereoscopic connection structure of the jetting component and the smoothing component from a second viewing angle in the present invention.
[0026] Figure 5 It is a schematic diagram of the three-dimensional connection structure of the jetting component and the smoothing component in the present invention from a third perspective.
[0027] Figure 6 It is a three-dimensional structural schematic diagram of the glue injection mechanism of the present invention.
[0028] Figure 7 It is a schematic diagram of the internal connection structure of the temperature increasing box of the present invention.
[0029] Figure 8 The present invention Figure 3 Schematic diagram of the enlarged structure of area A in the middle.
[0030] In the figure: 1. frame; 2. glue injection mechanism; 21. translation component 1; 211. screw rod 1; 212. guide rod 1; 213. motor 1; 214. moving seat 1; 22. glue injection component; 221. electric push rod 1; 222. connecting seat 1; 223. glue injection tube; 224. high pressure pump; 225. glue storage box; 3. processing mechanism; 31. translation component 2; 311. screw rod 2; 312. guide rod 2; 313. motor 2; 314. moving seat 2; 3141. extension plate; 32. jet assembly; 321. air pump; 322. heating box; 3221. resistance wire; 3222. spiral tube group; 323. jet tube; 3231. branch pipe head; 324. gear sleeve; 325. rack; 326. connection box; 327. connection seat 2; 328. electric push rod 2; 33. smoothing assembly; 331. smoothing brush 1; 332. smoothing brush 2; 333. reciprocating component; 3331. guide rod 3; 3332. arch frame; 3333. linkage gear; 3334. rack; 3335. movable frame; 3336. long gear; 3337. fixed rod; 3338. Z frame; 3339. rotating column; 334. electric push rod 3; 4. supporting mechanism; 41. universal wheel; 42. side mounting plate; 43. electric push rod 4; 44. support plate; 45. cone foot. DETAILED DESCRIPTION
[0031] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0032] See also Figure 1 A construction device for preventing water seepage of precast concrete parts comprises a frame 1, wherein a glue injection mechanism 2 for injecting glue into the joints of precast concrete panels is arranged on the rear side of the front-to-back central axis of the frame 1, and a processing mechanism 3 for cleaning, injecting glue, drying and smoothing the joints of precast concrete panels is arranged on the front side of the front-to-back central axis of the frame 1.
[0033] See also Figure 1 and Figure 6 The glue injection mechanism 2 includes a glue injection component 22 correspondingly arranged at the rear side of the front-to-back central axis of the frame 1 and outside the frame 1 for performing glue injection operations, and a translation component 21 is arranged inside the frame 1 for controlling the glue injection component 22 to translate along the joint.
[0034] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5The processing mechanism 3 includes an injection assembly 32 correspondingly arranged at the front side of the front-to-back central axis of the frame 1 and outside the frame 1. The injection assembly 32 includes an injection pipe 323 arranged at the front side of the front-to-back central axis of the frame 1. The injection pipe 323 is slidably and limitedly connected in a gear sleeve 324. The gear sleeve 324 is rotatably connected to the movable seat 314. The lower end of the gear sleeve 324 is meshedly connected with a rack 325. The rack 325 is fixedly connected between the front and rear edges of the frame 1. The upper end of the injection pipe 323 is rotatably connected with a connecting box 326. The connecting box 326 is communicated with the inside of the injection pipe 323. The connecting box 326 is fixedly connected to the connecting On the connecting seat 327, an electric push rod 328 is fixedly connected between the connecting seat 327 and the movable seat 314, an air pump 321 is fixedly connected to the front side of the outside of the frame 1, the output pipe of the air pump 321 is connected to the warming box 322, the output port of the warming box 322 is connected to a spiral hose through a pipe, and the end of the spiral hose away from the air pump 321 is connected to the connecting box 326, and the movable seat 314 is provided with a translation component 31 for making it translate along the seam, and the rear side of the movable seat 314 is provided with an extension plate 3141, and the extension plate 3141 is provided with a smoothing component 33 for smoothing the rubber material at the seam.
[0035] During specific operation, air is drawn into the heating box 322 through the air pump 321. During dust cleaning, normal temperature air is transported to the connecting box 326, and the connecting box 326 transports the air into the jet pipe 323. The jet pipe 323 sprays air to clean the inside of the joint. When the translation component 2 31 drives the moving seat 2 314 to move, the gear sleeve 324 rotates along the rack 325, so that the gear sleeve 324 drives the jet pipe 323 to rotate, so that the jet pipe 323 can spray in multiple directions. The jet pipe 323 is controlled to move up and down by the electric push rod 2 328 to change the height of the jet, so that the jet pipe 323 can extend into the joint.
[0036] By using the glue injection mechanism 2 and the processing mechanism 3 in coordination, the integrated processing of glue injection, glue leveling and glue drying of the joints of two concrete precast panels can be automatically completed.
[0037] See also Figure 6 The glue injection assembly 22 includes a glue injection tube 223 arranged at the rear side of the front-to-back central axis of the frame 1, and a glue storage box 225 and a high-pressure pump 224 fixedly connected to the rear side of the outside of the frame 1. The glue injection tube 223 is slidably connected to the movable seat 214, and a connecting seat 222 is fixedly connected to the upper side of the glue injection tube 223. An electric push rod 221 is fixedly connected between the connecting seat 222 and the movable seat 214. The upper end of the glue injection tube 223 is communicated with the output port of the high-pressure pump 224 through a spiral hose, and the input port of the high-pressure pump 224 is communicated with the output port pipeline of the glue storage box 225.
[0038] During specific operation, the glue in the glue storage box 225 is extracted by the high-pressure pump 224 and transported to the glue injection tube 223, which sprays the high-pressure glue into the joint. The glue injection tube 223 is controlled to move up and down by the electric push rod 221 to change the height of the glue injection so that the glue injection tube 223 can extend into the joint.
[0039] See also Figure 1 and Figure 2 The translation assembly 21 includes a screw rod 211 rotatably connected to the left side between the front and rear edges of the frame 1, and a guide rod 212 fixedly connected to the left side between the front and rear edges of the frame 1. A moving seat 214 is slidably connected to the guide rod 212 and threadedly connected to the screw rod 211. One end of the screw rod 211 extends to the outside of the frame 1 and is fixedly connected to the output end of a motor 213. The motor 213 is fixedly connected to the outside of the frame 1.
[0040] During specific operation, the motor 213 drives the screw rod 211 to rotate and control the movable seat 214 to move along the guide rod 212, and the movement of the movable seat 214 can control the glue injection component 22 to operate along the straight line of the joint.
[0041] See also Figure 1 , Figure 2 and Figure 3 The translation assembly 2 31 includes a screw rod 2 311 rotatably connected to the right side between the front and rear edges of the frame 1, and a guide rod 2 312 fixedly connected to the right side between the front and rear edges of the frame 1. The moving seat 2 314 is slidably connected to the guide rod 2 312 and threadedly connected to the screw rod 2 311. One end of the screw rod 2 311 extends to the outside of the frame 1 and is fixedly connected to the output end of the motor 2 313. The motor 2 313 is fixedly connected to the outside of the frame 1.
[0042] During specific operation, the second motor 313 drives the second screw rod 311 to rotate and control the second movable seat 314 to move along the second guide rod 312, and the second movable seat 314 can be controlled by the movement control processing mechanism 3 to perform dust cleaning, glue filling, drying and smoothing along the straight line of the joint.
[0043] See also Figure 2 , Figure 3 and Figure 4 The smoothing assembly 33 includes a smoothing brush 331 distributed in the front-to-back direction on the lower side of the extension plate 3141, and a smoothing brush 332 distributed in the left-to-right direction on the lower side of the extension plate 3141. The smoothing brush 331 is provided with a reciprocating component 333 for controlling its left-to-right reciprocating brushing movement, and the bottom of the smoothing brush 332 is provided with an arc-shaped opening.
[0044] See also Figure 3 , Figure 4 , Figure 5 and Figure 8The reciprocating component 333 includes an electric push rod 334 fixedly connected to the middle position of the upper side of the extension plate 3141, the output end of the electric push rod 334 faces upward and is fixedly connected to a Z frame 3338, the lower end of the Z frame 3338 is fixedly connected to a fixed rod 3337, the lower end of the fixed rod 3337 is fixedly connected to the smoothing brush 2 332, the upper end of the Z frame 3338 is fixedly connected to an arch frame 3332, the two fork edges of the arch frame 3332 are distributed on both sides of the rack 325, the lower side of the rear end of the extension plate 3141 is rotatably connected to a rotating column 3339, and the rotating column 3339 is fixedly connected to a linkage gear 333 3. The linkage gear 3333 is meshed with the rack 325. The lower end of the rotating column 3339 is fixedly connected with a long gear 3336. The long gear 3336 is a half gear structure. A movable frame 3335 is arranged on the periphery of the long gear 3336. A rack 3334 is arranged on the front and rear inner walls of the movable frame 3335. At the same time, the long gear 3336 is only meshed with the rack 3334 on one side. The centers of the left and right ends of the movable frame 3335 are fixedly connected with guide rods 3331. The guide rods 3331 are slidably connected with the fork edge of the arch frame 3332. The smoothing brush 1 331 is fixedly connected to the front side of the movable frame 3335.
[0045] During specific operation, the electric push rod 334 is used to control the movement of the arch frame 3332, and the arch frame 3332 drives the Z frame 3338 to link the fixed rod 3337 to drive the smoothing brush 2 332 to move. The arch frame 3332 also drives the movable frame 3335 to move along the long gear 3336, and the movable frame 3335 drives the smoothing brush 1 331 to move, so as to achieve the effect of controlling the up and down movement of the smoothing brush 1 331 and the smoothing brush 2 332, ensuring that the smoothing brush 1 331 and the smoothing brush 2 332 are in contact with the surface of the concrete precast slab. The movable seat 2 314 is moved to control the linkage gear 3333 to rotate along the rack 325, so that the linkage gear 3333 drives the rotating column 3339 to rotate and controls the long gear 3336 to rotate. The cooperation of the long gear 3336 and the movable frame 3335 drives the smoothing brush 1 331 to move back and forth left and right. The bottom of the smoothing brush 2 332 is provided with an arc-shaped opening, which can make the upper cross-section of the smoothed rubber material arc-shaped, increase the quality and height of the middle part of the rubber material, make water flow to a low place, and improve the anti-seepage effect.
[0046] See also Figure 1 and Figure 2 The frame 1 is provided with a supporting mechanism 4 for supporting the equipment as a whole on the periphery. The supporting mechanism 4 includes side mounting plates 42 fixedly connected to the four corners of the frame 1. A universal wheel 41 and four electric push rods 43 are fixedly connected to the lower side of each side mounting plate 42. The output end of the four electric push rods 43 faces downward and is fixedly connected to a support plate 44. A plurality of cone feet 45 are fixedly connected to the lower side of the support plate 44 at equal intervals.
[0047] During specific operation, the entire device is moved by the universal wheel 41, so that the device and the joint are well aligned, ensuring that the moving paths of the injection tube 223 and the air jet tube 323 coincide with the joint. The support plate 44 is controlled to move downward by the electric push rod 43, so that the cone foot 45 supports the entire device, which can stably place the device and facilitate device positioning.
[0048] See also Figure 4 A plurality of branch pipe heads 3231 are equidistantly installed on the bottom circumference of the pipe wall of the jet pipe 323 .
[0049] During specific operation, setting up multi-directional branch pipe heads 3231 can ensure the multi-directional spraying of the airflow, reduce the blind corner area of cleaning, and improve the cleaning effect.
[0050] See also Figure 7 The pipe between the input port and the output port of the temperature increasing box 322 is connected with a spiral tube group 3222, and a plurality of resistance wires 3221 are arranged on the periphery of the spiral tube group 3222. The resistance wires 3221 are fixedly connected to the interior of the temperature increasing box 322 through a circuit board and are evenly distributed around the circumference.
[0051] During specific operation, the spiral tube group 3222 is provided to extend the flow time of the airflow in the temperature increasing box 322 and ensure the heating effect of the airflow.
[0052] When in use: S1: The entire device is moved by the universal wheel 41 until the device and the joint are well aligned, that is, the moving paths of the injection tube 223 and the air jet tube 323 coincide with the joint, and the support plate 44 is controlled to move downward by the electric push rod 43 so that the conical foot 45 supports the entire device.
[0053] S2: The jet pipe 323 is controlled to move downward by the electric push rod 328 so that the jet pipe 323 extends into the joint, and then the air is drawn into the heating box 322 by the air pump 321. When cleaning, normal temperature air is transported to the connecting box 326, and the connecting box 326 transports the air into the jet pipe 323, and the jet pipe 323 sprays air to clean the inside of the joint. At the same time, the motor 313 drives the screw rod 311 to rotate and control the moving seat 314 to move along the guide rod 312. When the moving seat 314 moves, the gear sleeve 324 rotates along the rack 325, so that the gear sleeve 324 drives the jet pipe 323 to rotate, so that the jet pipe 323 sprays the joint in multiple directions. The jet pipe 323 continues to spray and follows the moving seat 314 to translate along the joint. After the cleaning is completed, the moving seat 314 and the jet pipe 323 are reset to their original positions.
[0054] S3: The glue injection tube 223 is controlled to move downward by the electric push rod 221 so that the glue injection tube 223 can extend into the joint, and then the glue in the glue storage box 225 is extracted by the high-pressure pump 224 and transported to the glue injection tube 223, and the glue injection tube 223 sprays the high-pressure glue into the joint. At the same time, the motor 213 drives the screw rod 211 to rotate and control the moving seat 214 to move along the guide rod 212, so that the glue injection tube 223 follows the moving seat 214 to move horizontally along the joint. After the glue injection is completed, the moving seat 214 and the glue injection tube 223 are reset to their original positions.
[0055] S4: The electric push rod 334 is used to control the movement of the arch frame 3332, which drives the Z frame 3338 to link the fixed rod 3337 to drive the smoothing brush 2 332 to move downward. The arch frame 3332 also drives the movable frame 3335 to move along the long gear 3336, and the movable frame 3335 drives the smoothing brush 1 331 to move downward, so that the smoothing brush 1 331 and the smoothing brush 2 332 are fully in contact with the surface of the concrete precast slab, and the movable seat 2 314 is controlled to translate along the joint again. , the linkage gear 3333 is controlled to rotate along the rack 325 through the movement of the movable seat 2 314, so that the linkage gear 3333 drives the rotating column 3339 to rotate and control the long gear 3336 to rotate, and the cooperation of the long gear 3336 and the movable frame 3335 drives the smoothing brush 1 331 to move back and forth left and right. At the same time, when the smoothing brush 2 332 is translated along the joint, the upper cross-section of the smoothed rubber material is arc-shaped through the arc-shaped mouth. After the smoothing is completed, the movable seat 2 314 and the arch frame 3332 are reset to the original position.
[0056] S5: The resistance wire 3221 is energized to increase the temperature inside the heating box 322, and then the electric push rod 2 328 is used to control the jet pipe 323 to move downward, so that the jet pipe 323 reaches the top of the rubber material, and then the air pump 321 draws air into the heating box 322, and the connecting box 326 delivers the air to the jet pipe 323, and the jet pipe 323 sprays hot air to dry the rubber material. At the same time, the motor 2 313 drives the screw rod 2 311 to rotate and control the moving seat The second guide rod 314 moves along the second guide rod 312. When the movable seat 314 moves, the gear sleeve 324 rotates along the rack 325, so that the gear sleeve 324 drives the jet pipe 323 to rotate, so that the jet pipe 323 sprays the rubber material in multiple directions. The jet pipe 323 continuously sprays hot air while following the movable seat 314 to move horizontally along the rubber material. After drying is completed, the movable seat 314 and the jet pipe 323 are reset to the original position, the equipment is moved by the universal wheel 41, and then the next seam is processed.
[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction device for preventing water seepage of prefabricated concrete parts, comprising a frame (1), Features: The frame (1) is provided with a glue injection mechanism (2) at the rear side of the front-to-back central axis, and a processing mechanism (3) is provided at the front side of the front-to-back central axis of the frame (1); The glue injection mechanism (2) comprises a glue injection component (22) correspondingly arranged at a rear side of the front-rear central axis of the frame (1) and outside the frame (1) for performing glue injection operations, and a translation component (21) for controlling the translation of the glue injection component (22) is arranged inside the frame (1); The processing mechanism (3) comprises an injection assembly (32) correspondingly arranged at a front position of the front-back central axis of the frame (1) and outside the frame (1), the injection assembly (32) comprises an injection pipe (323) arranged at a front position of the front-back central axis of the frame (1), the injection pipe (323) is slidably and positionally connected in a gear sleeve (324), the gear sleeve (324) is rotatably connected to the second movable seat (314), the lower end of the gear sleeve (324) is meshedly connected to a rack (325), and the rack (325) is fixedly connected between the front and rear edges of the frame (1); The upper end of the jet pipe (323) is rotatably connected to a connection box (326), the connection box (326) and the jet pipe (323) are internally connected, the connection box (326) is fixedly connected to a second connection seat (327), a second electric push rod (328) is fixedly connected between the second connection seat (327) and the second movable seat (314), an air pump (321) is fixedly connected to the front side of the exterior of the frame (1), the output port pipeline of the air pump (321) is connected to a temperature increasing box (322), the output port of the temperature increasing box (322) is connected to a spiral hose through a pipeline, and the end of the spiral hose away from the air pump (321) is connected to the connection box (326); The second movable seat (314) is provided with a second translation assembly (31) for translation, and the rear side of the second movable seat (314) is provided with an extension plate (3141), and the extension plate (3141) is provided with a smoothing assembly (33) for smoothing the rubber material at the joint. By using the glue injection mechanism (2) and the processing mechanism (3) in coordination, the glue injection, glue leveling and glue drying of the joints of two concrete precast panels can be automatically completed in an integrated manner. The glue injection assembly (22) comprises a glue injection tube (223) arranged at the rear side of the front-to-back central axis of the frame (1), and a glue storage box (225) and a high-pressure pump (224) fixedly connected to the rear side of the outside of the frame (1); the glue injection tube (223) is slidably connected to a movable seat (214); a connecting seat (222) is fixedly connected to the upper side of the glue injection tube (223); an electric push rod (221) is fixedly connected between the connecting seat (222) and the movable seat (214); the upper end of the glue injection tube (223) is connected to the output port of the high-pressure pump (224) through a spiral hose; and the input port of the high-pressure pump (224) is connected to the output port pipeline of the glue storage box (225); The translation assembly (21) comprises a screw rod (211) rotatably connected to a position between the front and rear edges of the frame (1) and biased to the left, and a guide rod (212) fixedly connected to a position between the front and rear edges of the frame (1) and biased to the left, a moving seat (214) slidably connected to the guide rod (212) and threadedly connected to the screw rod (211), one end of the screw rod (211) extends to the outside of the frame (1) and is fixedly connected to the output end of a motor (213), and the motor (213) is fixedly connected to the outside of the frame (1); The second translation assembly (31) comprises a second screw rod (311) rotatably connected to a position between the front and rear edges of the frame (1) and biased to the right, and a second guide rod (312) fixedly connected to a position between the front and rear edges of the frame (1) and biased to the right, a second moving seat (314) slidably connected to the second guide rod (312) and threadedly connected to the second screw rod (311), one end of the second screw rod (311) extends to the outside of the frame (1) and is fixedly connected to the output end of the second motor (313), and the second motor (313) is fixedly connected to the outside of the frame (1); The smoothing assembly (33) comprises a smoothing brush 1 (331) distributed in the front-to-back direction on the lower side of the extension plate (3141), and a smoothing brush 2 (332) distributed in the left-to-right direction on the lower side of the extension plate (3141); the smoothing brush 1 (331) is provided with a reciprocating component (333) for controlling its left-to-right reciprocating brushing movement; and the bottom of the smoothing brush 2 (332) is provided with an arc-shaped opening; A spiral tube group (3222) is connected to the pipe between the input port and the output port of the temperature increasing box (322). A plurality of resistance wires (3221) are arranged on the periphery of the spiral tube group (3222). The resistance wires (3221) are fixedly connected to the interior of the temperature increasing box (322) via a circuit board and are equidistantly distributed around the circumference.
2. A precast concrete part water seepage prevention construction equipment according to claim 1, Features: The reciprocating component (333) comprises an electric push rod 3 (334) fixedly connected to the middle position of the upper side of the extension plate (3141); the output end of the electric push rod 3 (334) faces upward and is fixedly connected to a Z frame (3338); the lower end of the Z frame (3338) is fixedly connected to a fixed rod (3337); the lower end of the fixed rod (3337) is fixedly connected to the second smoothing brush (332); the upper end of the Z frame (3338) is fixedly connected to an arch frame (3332); the two fork edges of the arch frame (3332) are distributed on both sides of the rack (325); the lower side of the rear end of the extension plate (3141) is rotatably connected to a rotating column (3339); the rotating column (3339) is fixedly connected to a linkage gear (3333) The linkage gear (3333) is meshedly connected with the rack (325), the lower end of the rotating column (3339) is fixedly connected with a long gear (3336), the long gear (3336) is a half gear structure, a movable frame (3335) is arranged outside the long gear (3336), the front and rear inner walls of the movable frame (3335) are provided with a rack (3334), the long gear (3336) is meshedly connected with only one side of the rack (3334) at the same time, the left and right ends of the movable frame (3335) are fixedly connected with a guide rod three (3331), the guide rod three (3331) is slidably connected with the fork edge of the arch frame (3332), and the smoothing brush one (331) is fixedly connected to the front side of the movable frame (3335).
3. The anti-seepage construction equipment for precast concrete parts according to claim 1, Features: The frame (1) is provided with a supporting mechanism (4) for supporting the device as a whole on the periphery, the supporting mechanism (4) comprising side mounting plates (42) fixedly connected to the four corners of the frame (1), the lower side of each side mounting plate (42) being fixedly connected to a universal wheel (41) and four electric push rods (43), the output end of the four electric push rods (43) facing downwards and fixedly connected to a supporting plate (44), the lower side of the supporting plate (44) being fixedly connected to a plurality of cone feet (45) at equal intervals around the circumference.
4. The anti-seepage construction equipment for precast concrete parts according to claim 1, Features: A plurality of branch pipe heads (3231) are installed at equal intervals on the circumference of the bottom of the pipe wall of the jet pipe (323).
