A method and system for monitoring the long-distance transmission status of a transmission line

By dynamically switching the monitoring module, combined with sensor dislocation, tight connection and subsidence coefficient, the post-disaster impact index and health status coefficient are calculated, which solves the problem of accuracy of long-distance transmission status monitoring of transmission lines, reduces the monitoring error rate, and achieves more accurate monitoring. Comprehensive monitoring effect.

CN118539614BActive Publication Date: 2024-10-01SHANDONG BEST NEW ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410961328.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-01
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

Existing long-distance transmission status monitoring systems for transmission lines may not be able to accurately monitor the status of transmission lines based on traditional evaluation parameters after natural disasters or risk events, resulting in a high error rate in monitoring results.

Method used

Propose a long-distance transmission status monitoring method and system for transmission lines. By dividing the transmission line area into sub-areas, the sensor dislocation coefficient, connection tightness coefficient and subsidence coefficient are obtained, the post-disaster impact index and health status coefficient are calculated, and the monitoring is dynamically switched Modules to improve monitoring accuracy, including total monitoring module, main monitoring module, backup monitoring module, replacement monitoring module and adjustment module.

Benefits of technology

By dynamically switching monitoring modules, the error rate of monitoring results is reduced, more comprehensive and accurate monitoring of long-distance transmission status of transmission lines is achieved, and the degree of errors is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118539614B_ABST
    Figure CN118539614B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for monitoring the long-distance transmission status of a power transmission line, and specifically relates to the technical field of monitoring the transmission status of a power transmission line. If a post-disaster impact index is not less than a preset post-disaster impact index threshold, an alarm is issued and a main monitoring module is switched to a replacement monitoring module to monitor the long-distance transmission status of the power transmission line. If the post-disaster impact index is less than the preset post-disaster impact index threshold and the power transmission line health coefficient is less than the preset health coefficient threshold, an adjustment module adjusts the main monitoring module according to the power transmission line health coefficient to monitor the long-distance transmission status of the power transmission line. If the power transmission line health coefficient is not less than the preset health coefficient threshold, the main monitoring module is immediately switched to a standby monitoring module to monitor the long-distance transmission status of the power transmission line. In this way, a more comprehensive and accurate monitoring of the long-distance transmission status of the power transmission line is made, and the error degree of the final monitoring result is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission line transmission status monitoring, and in particular to a method and system for monitoring the long-distance transmission status of a power transmission line. Background Art

[0002] The long-distance transmission status monitoring system of power transmission lines refers to a technology that uses various technical means and equipment to monitor and remotely manage the operating status of power transmission lines in real time. Generally, when monitoring the long-distance transmission status of power transmission lines in a certain area, some evaluation parameters related to the long-distance transmission status of the power transmission lines are collected in the area. The long-distance transmission status monitoring system of power transmission lines analyzes these evaluation parameters and determines in real time whether there is a problem with the long-distance transmission status of the power transmission lines, thereby notifying and reminding maintenance personnel to perform maintenance in a timely manner.

[0003] However, in the above method, if the transmission line has experienced a natural disaster or risk, relying solely on some evaluation parameters previously collected and related to the long-distance transmission status of the transmission line may not be able to accurately monitor the long-distance transmission status of the transmission line in a relatively comprehensive manner. If the transmission line long-distance transmission status monitoring system still monitors the long-distance transmission status of the transmission line in the previous manner, the final monitoring results may have a high degree of error. Summary of the invention

[0004] The purpose of the present invention is to solve the problem and to propose a method and system for monitoring the long-distance transmission status of a power transmission line.

[0005] In the first aspect of the implementation of the present invention, a method for monitoring the long-distance transmission status of a transmission line is first proposed. The long-distance transmission status monitoring system of the transmission line includes a general monitoring module, a main monitoring module, a backup monitoring module, a replacement monitoring module and an adjustment module. The main monitoring module, the backup monitoring module and the replacement monitoring module can all be used to monitor the long-distance transmission status of the transmission line. The main monitoring module is used to monitor the long-distance transmission status of the transmission line at the current moment. The method is applied to the general monitoring module, wherein:

[0006] Divide the target transmission line area into a plurality of sub-areas to obtain the target sub-areas, obtain the sensor misalignment coefficient of each target sub-area, and use the sensor misalignment coefficient of each target sub-area as the data point of the target sub-area to obtain a data set, determine the total number of data points in the data set, cluster the data set, and obtain the target transmission line inaccuracy coefficient according to the clustering result;

[0007] Acquire the connection density data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection density coefficient; acquire the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient;

[0008] The post-disaster impact index is obtained by the target transmission line inaccuracy coefficient, the transmission line connection tightness coefficient and the transmission line sinking coefficient, and the post-disaster impact index is compared with the preset threshold value. If the post-disaster impact index is not less than the preset post-disaster impact index threshold value, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line;

[0009] When the post-disaster impact index is less than a preset post-disaster impact index threshold, the health data of the transmission line is obtained to obtain a health status coefficient of the transmission line, and the health status coefficient of the transmission line is compared with a preset health status coefficient threshold;

[0010] When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line; when the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.

[0011] Optionally, the method for obtaining the sensor misalignment coefficient is:

[0012] For different target sub-areas, images of each target sub-area at different angles are obtained to obtain a preliminary image set of the target sub-area, and each image in the preliminary image set is compared with the image of the corresponding angle in the preset sensor effective monitoring image set to obtain the number of inconsistencies between the actual sensor position in each image in the preliminary image set and the sensor position in the image of the corresponding angle in the preset sensor effective monitoring image set to obtain the number of sensor misalignments of the image; the sum of the number of sensor misalignments of all images in the preliminary image set is calculated and divided by the number of images in the preliminary image set to obtain the sensor misalignment coefficient of the target sub-area.

[0013] Optionally, the steps for clustering the data set are:

[0014] The steps to cluster the data set using the K-means clustering method are:

[0015] Step 1: Use the elbow method to determine the optimal number of clusters for the data set;

[0016] Step 2: Randomly select a corresponding number of data points as the initial clusters according to the optimal number of clusters;

[0017] Step 3: For each data point, use the Euclidean distance algorithm to calculate the distance between the data point and each initial cluster center, and assign the data point to the cluster to which the nearest cluster center belongs. After traversing all data points, the initial cluster cluster is obtained;

[0018] Step 4: For each initial cluster, calculate the average value of all data points and use the average value as the new cluster center;

[0019] Step 5: Repeat steps 3 and 4 until the cluster center no longer changes, and obtain the final cluster and the final cluster center.

[0020] Optionally, the steps of obtaining the target transmission line inaccuracy coefficient according to the clustering result are:

[0021] Count the number of data points in each final cluster, calculate the ratio of the number of data points in each final cluster to the total number of data sets, and get the weight coefficient of each final cluster. The calculation formula is: ,in Expressed as the weight coefficient of the kth final cluster, It is represented as the number of data points in the kth final cluster, and n is represented as the total number of data sets;

[0022] The product of the weight coefficient of each final cluster and the final cluster center is summed to obtain the target transmission line inaccuracy coefficient, which is calculated as follows: ,in represents the target transmission line inaccuracy coefficient, Expressed as the weight coefficient of the kth final cluster, Represented as the cluster center of the kth final cluster.

[0023] Optionally, the transmission line sinking factor includes:

[0024] Obtain the height of each transmission line in each target sub-area, obtain a height set of the transmission lines in the target sub-area, and make a difference between each data in the height set and the corresponding preset reference value, and calculate the ratio of the difference and the corresponding preset reference value to obtain the standardized deviation of the data, and sum the standardized deviations of all data in the height set to obtain the height deviation of the target sub-area;

[0025] The height deviations of all target sub-areas are summarized to calculate the transmission line sinking coefficient of the entire target transmission line area. The calculation formula is: , where U is the transmission line sinking coefficient, n is the number of target sub-areas, is the height deviation of the i-th target sub-region.

[0026] Optionally, the post-disaster impact index is obtained by:

[0027] The target transmission line inaccuracy coefficient, transmission line connection coefficient and transmission line sinking coefficient are weighted and summed to obtain the post-disaster impact index. The calculation formula is:

[0028] In the formula, is the post-disaster impact index, are preset proportional coefficients of the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, respectively, and Both are greater than 0.

[0029] Optionally, the transmission line health status coefficient includes:

[0030] Obtain the usage time of each transmission line in the target transmission line area and obtain the average usage time;

[0031] Obtain the corroded area of ​​the transmission line in the target transmission line area, and divide the corroded area by the total area of ​​the transmission line to obtain the corrosion coefficient;

[0032] Obtain weather data of the target transmission line area in real time, and obtain the weather impact coefficient based on the weather data, which includes temperature and humidity;

[0033] The average usage time, corrosion coefficient and weather impact coefficient are weighted and summed to obtain the transmission line health status coefficient.

[0034] In the implementation of the present invention, a transmission line long-distance transmission status monitoring system is proposed, the system includes a total monitoring module, a main monitoring module, a backup monitoring module, a replacement monitoring module and an adjustment module, the main monitoring module, the backup monitoring module, and the replacement monitoring module can all be used to monitor the long-distance transmission status of the transmission line, the main monitoring module is used to monitor the long-distance transmission status of the transmission line at the current moment, and the method is applied to the total monitoring module, including:

[0035] Inaccuracy coefficient module: divide the target transmission line area into several sub-areas, obtain the target sub-areas, obtain the sensor misalignment coefficient of each target sub-area, and use the sensor misalignment coefficient of each target sub-area as the data point of the target sub-area to obtain a data set, determine the total number of data points in the data set, cluster the data set, and obtain the target transmission line inaccuracy coefficient according to the clustering result;

[0036] Parameter calculation module: obtain the connection tightness data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection tightness coefficient; obtain the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient;

[0037] Comparison module: obtain the post-disaster impact index through the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, and compare the post-disaster impact index with the preset threshold. If the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line;

[0038] Analysis module: when the post-disaster impact index is less than the preset post-disaster impact index threshold, the health data of the transmission line is obtained, the health status coefficient of the transmission line is obtained, and the health status coefficient of the transmission line is compared with the preset health status coefficient threshold;

[0039] Processing module: When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line; when the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.

[0040] Beneficial effects of the present invention:

[0041] The present invention proposes a method and system for monitoring the long-distance transmission status of a transmission line. Through the above-mentioned method, if the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to a replacement monitoring module to monitor the long-distance transmission status of the transmission line. If the post-disaster impact index is less than the preset post-disaster impact index threshold and the transmission line health status coefficient is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the transmission line health status coefficient to monitor the long-distance transmission status of the transmission line. If the transmission line health status coefficient is not less than the preset health status coefficient threshold, the main monitoring module is immediately switched to a standby monitoring module to monitor the long-distance transmission status of the transmission line. In this way, the long-distance transmission status of the transmission line is more comprehensively and accurately monitored, and the error degree of the final monitoring result is lower. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The present invention will be further described below in conjunction with the accompanying drawings.

[0043] Figure 1 A flow chart of a method for monitoring the long-distance transmission status of a power transmission line provided by an embodiment of the present invention;

[0044] Figure 2 A framework diagram of a power transmission line long-distance transmission status monitoring system provided by an embodiment of the present invention;

[0045] Figure 3 A diagram of a network architecture module provided for an embodiment of the present invention. DETAILED DESCRIPTION

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of the present invention.

[0048] The embodiment of the present invention provides a method for monitoring the long-distance transmission status of a power transmission line. Figure 1 , Figure 1 A flow chart of a method for monitoring the long-distance transmission status of a power transmission line provided by an embodiment of the present invention. The long-distance transmission status monitoring system of a power transmission line includes a general monitoring module, a main monitoring module, a backup monitoring module, a replacement monitoring module and an adjustment module. The main monitoring module, the backup monitoring module and the replacement monitoring module can all be used to monitor the long-distance transmission status of the power transmission line. The main monitoring module is used to monitor the long-distance transmission status of the power transmission line at the current moment. The method is applied to the general monitoring module, wherein:

[0049] The target transmission line area is divided into several sub-areas to obtain the target sub-areas, the sensor misalignment coefficient of each target sub-area is obtained, and the sensor misalignment coefficient of each target sub-area is used as the data point of the target sub-area to obtain a data set, and the total number of data points in the data set is determined, the data set is clustered, and the target transmission line inaccuracy coefficient is obtained according to the clustering result;

[0050] Acquire the connection density data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection density coefficient; acquire the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient;

[0051] The post-disaster impact index is obtained by the target transmission line inaccuracy coefficient, the transmission line connection tightness coefficient and the transmission line sinking coefficient, and the post-disaster impact index is compared with the preset threshold value. If the post-disaster impact index is not less than the preset post-disaster impact index threshold value, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line;

[0052] When the post-disaster impact index is less than a preset post-disaster impact index threshold, the health data of the transmission line is obtained to obtain a health status coefficient of the transmission line, and the health status coefficient of the transmission line is compared with a preset health status coefficient threshold;

[0053] When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line;

[0054] When the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.

[0055] Based on a method for monitoring the long-distance transmission status of a transmission line provided by an embodiment of the present invention, through the above-mentioned method, if the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to a replacement monitoring module to monitor the long-distance transmission status of the transmission line. If the post-disaster impact index is less than the preset post-disaster impact index threshold and the transmission line health status coefficient is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the transmission line health status coefficient to monitor the long-distance transmission status of the transmission line. If the transmission line health status coefficient is not less than the preset health status coefficient threshold, the main monitoring module is immediately switched to a standby monitoring module to monitor the long-distance transmission status of the transmission line. In this way, a more comprehensive and accurate monitoring of the long-distance transmission status of the transmission line is made, and the error degree of the final monitoring result is relatively low.

[0056] In one embodiment, the method for obtaining the sensor misalignment coefficient is:

[0057] For different target sub-areas, images of each target sub-area at different angles are obtained to obtain a preliminary image set of the target sub-area, and each image in the preliminary image set is compared with the image of the corresponding angle in the preset sensor effective monitoring image set to obtain the number of inconsistencies between the actual sensor position in each image in the preliminary image set and the sensor position in the image of the corresponding angle in the preset sensor effective monitoring image set, thereby obtaining the number of sensor misalignments of the image; the sum of the number of sensor misalignments of all images in the preliminary image set is calculated and divided by the number of images in the preliminary image set to obtain the sensor misalignment coefficient of the target sub-area;

[0058] In one implementation, the sensor misalignment coefficient calculated by the above method is the sensor misalignment coefficient of the target sub-area finally determined by comparing images at multiple angles; the sensor misalignment coefficient calculated in this way can more accurately represent the sensor displacement of the target sub-area and more accurately judge the degree of damage to the subsequent target transmission line area;

[0059] In one implementation, the preset sensor effective monitoring image set is an image of the position presented by the sensor when the sensor, which is set according to the actual transmission conditions of the transmission line, can effectively monitor the status of the transmission line; the specific image can be determined by professionals or historical data without specific limitation; in addition, images of each target sub-area at different angles can be obtained through technologies such as drones.

[0060] It should be noted that sensor misalignment refers to the degree of inconsistency between the actual position of the sensor in the target sub-area and the preset position of the sensor in the target sub-area; the greater the inconsistency, the greater the degree of damage to the target sub-area, because it may mean that there are fewer and fewer sensors that can effectively monitor the status of the transmission lines, and the monitoring data is less reliable, which ultimately leads to the original transmission line long-distance transmission system's monitoring of the transmission line long-distance transmission status of the target transmission line area being less accurate.

[0061] In one embodiment, clustering the data set and obtaining the target transmission line inaccuracy coefficient according to the clustering result includes:

[0062] The steps to cluster the data set using the K-means clustering method are:

[0063] Step 1: Use the elbow method to determine the optimal number of clusters for the data set. The elbow method is a commonly used method to help determine the optimal number of clusters (i.e., the optimal K value) in K-means clustering. This method makes a judgment by observing the relationship between the number of clusters K and the performance indicator of the corresponding clustering model (usually the sum of squares within the cluster);

[0064] Step 2: Randomly select the corresponding number of data points as the initial clusters according to the optimal number of clusters. A cluster refers to a set of similar data points formed in cluster analysis. In the context of unsupervised learning, clustering algorithms group data points in a data set according to their similarities, and each group is a cluster.

[0065] Step 3: For each data point, use the Euclidean distance algorithm to calculate the distance between the data point and each initial cluster center. and cluster centers , and the Euclidean distance calculation formula is: , which is represented by Represents data points The value in the kth cluster, Represents the cluster center The value of the kth cluster, n represents the data point and cluster centers The number of features is calculated, and the data points are assigned to the clusters to which the nearest cluster center belongs. After traversing all data points, the initial clusters are obtained. The Euclidean distance algorithm is a commonly used distance measurement method used to calculate the distance between two points in a vector space. In the K-means clustering algorithm, the Euclidean distance is often used to calculate the distance between a data point and a cluster center, thereby determining the cluster to which the data point belongs.

[0066] Step 4: For each initial cluster, calculate the average value of all data points and use the average value as the new cluster center;

[0067] Step 5: Repeat steps 3 and 4 until the cluster center no longer changes, and obtain the final cluster and the final cluster center.

[0068] In this embodiment, it should be specifically explained that the steps of obtaining the target transmission line inaccuracy coefficient according to the clustering result are as follows:

[0069] Count the number of data points in each final cluster, calculate the ratio of the number of data points in each final cluster to the total number of data sets, and get the weight coefficient of each final cluster. The calculation formula is: ,in Expressed as the weight coefficient of the kth final cluster, It is represented as the number of data points in the kth final cluster, and n is represented as the total number of data sets;

[0070] The product of the weight coefficient of each final cluster and the final cluster center is summed to obtain the target transmission line inaccuracy coefficient, which is calculated as follows: ,in represents the target transmission line inaccuracy coefficient, Expressed as the weight coefficient of the kth final cluster, Represented as the cluster center of the kth final cluster.

[0071] It should be noted that K-means clustering is a commonly used unsupervised learning method for dividing a data set into K categories. The basic idea is to assign data points to K cluster centers through iterative optimization so that the distance between each data point and its cluster center is minimized. This process can be vividly described as dividing the data points into clusters represented by the K centers closest to them;

[0072] In one implementation, the above method can more accurately calculate the overall data acquisition inaccuracy of the target transmission line area.

[0073] It should be noted that by clustering the sensor misalignment coefficients, the target transmission line area can be divided into different categories and the areas with different degrees of impact can be identified. This helps the transmission line managers to better understand the accuracy of the transmission line data obtained by each part of the transmission line, judge the reliability of the existing monitoring, and formulate emergency repair and restoration plans in a targeted manner. According to the clustering results, the center point or representative point of each cluster can be calculated. Using these center points as references, the impact of damage to the target transmission line area can be quantified to form a digital evaluation result.

[0074] In one embodiment, obtaining the connection density data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection density coefficient includes:

[0075] Get the number of transmission lines in the target transmission line area and record it as , and at the same time obtain the number of connection points corresponding to each transmission line;

[0076] According to the number of transmission lines in the target transmission line area and the number of connection points corresponding to each transmission line, the degree centrality of each transmission line is obtained and marked as ;

[0077] According to the number of transmission lines in the target transmission line area and the degree centrality of each transmission line Get the transmission line connection tightness coefficient , the calculation formula is:

[0078] In one implementation, through the above method, the connection tightness of the transmission lines in the target transmission line area compared with the transmission lines in other transmission line areas, that is, the connection importance, can be accurately obtained.

[0079] It should be noted that the number of transmission lines in the target transmission line area and the number of connection points corresponding to each transmission line can be obtained through power companies, grid operators, government departments or related geographic information system (GIS) platforms. Usually, these organizations maintain databases of urban transmission lines and may provide various information about transmission lines, including the number of connection points, length, type, etc.

[0080] It should be noted that degree centrality refers to the number of edges connected to a node.

[0081] It should be noted that a high connectivity coefficient means that the transmission line network in the area is more complex and riskier. Once a disaster occurs, the impact will be greater, and the index of post-disaster impact may be greater.

[0082] In one embodiment, obtaining the height data of the transmission line in the target transmission line area and obtaining the transmission line sinking coefficient includes:

[0083] Obtain the height of each transmission line in each target sub-area, obtain a height set of the transmission lines in the target sub-area, and make a difference between each data in the height set and the corresponding preset reference value, and calculate the ratio of the difference and the corresponding preset reference value to obtain the standardized deviation of the data, and sum the standardized deviations of all data in the height set to obtain the height deviation of the target sub-area;

[0084] The height deviations of all target sub-areas are summarized to calculate the transmission line sinking coefficient of the entire target transmission line area. The calculation formula is: , where U is the transmission line sinking coefficient, n is the number of target sub-areas, is the height deviation of the i-th target sub-region.

[0085] In one implementation, the above method can accurately obtain the height sinking degree of the transmission line in the target transmission line area, so as to more accurately determine the degree of post-disaster impact of the target transmission line area.

[0086] It should be noted that the average height of each transmission line under normal conditions can be obtained through long-term historical monitoring data. These historical data can be used as benchmark values ​​to calculate standardized deviations.

[0087] It should be noted that if the height of the transmission line in the target transmission line area sinks more, the degree of post-disaster impact on the target transmission line area may be higher.

[0088] In one embodiment, the post-disaster impact index obtained by using the target transmission line inaccuracy coefficient, the transmission line connection density coefficient and the transmission line sinking coefficient includes:

[0089] The target transmission line inaccuracy coefficient, transmission line connection coefficient and transmission line sinking coefficient are weighted and summed to obtain the post-disaster impact index. The calculation formula is:

[0090] In the formula, is the post-disaster impact index, are preset proportional coefficients of the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, respectively, and Both are greater than 0.

[0091] In one implementation, the post-disaster impact index obtained through the above method is more accurate.

[0092] It should be noted that the reason for selecting the three data of target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line subsidence coefficient is that the target transmission line inaccuracy coefficient represents the reliability and accuracy of sensor data. In the post-disaster environment, sensors may be misplaced or fail, resulting in increased data errors. Therefore, this coefficient can reflect the credibility of the current monitoring data; the transmission line connection tightness coefficient reflects the interconnection degree and importance of the transmission line network. Tightly connected areas are more critical because any failure may affect the stability of a larger power grid; the transmission line subsidence coefficient reflects the change in the physical height of the transmission line, indicating ground subsidence or structural problems. This change may indicate damage or aging of infrastructure and pose a threat to the safe operation of the power grid. Comprehensively evaluating the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line subsidence coefficient can more comprehensively and accurately judge the degree of post-disaster impact of the target transmission line area.

[0093] In one embodiment, obtaining the health data of the transmission line and obtaining the health status coefficient of the transmission line includes:

[0094] Obtain the usage time of each transmission line in the target transmission line area and obtain the average usage time;

[0095] Obtain the corroded area of ​​the transmission line in the target transmission line area, and divide the corroded area by the total area of ​​the transmission line to obtain the corrosion coefficient;

[0096] Obtain weather data of the target transmission line area in real time, and obtain the weather impact coefficient based on the weather data, which includes temperature and humidity;

[0097] The average usage time, corrosion coefficient and weather impact coefficient are weighted and summed to obtain the transmission line health status coefficient.

[0098] In one implementation, the transmission line health status coefficient obtained by the above method is more accurate and can better reflect the health status of the transmission line.

[0099] It should be noted that drones can be used to take high-definition images of transmission lines, and corroded areas can be identified through image analysis software. Drone inspections can quickly cover large areas and identify corrosion spots, thereby obtaining the corroded area of ​​the transmission lines; the total area of ​​the transmission lines and the length of use of each transmission line can be obtained based on the previously retained database of the transmission lines; in addition, the real-time temperature and humidity of the target transmission line area can be obtained based on the real-time database of the meteorological section.

[0100] It should be noted that the impact of temperature and humidity on the health status of transmission lines is that high temperature and high humidity environment will accelerate the comprehensive aging process of transmission lines, including mechanical fatigue, insulation material degradation, metal corrosion and other aspects. The combined effect of temperature and humidity will cause the electrical performance of transmission lines to deteriorate, increasing losses and failure rates during power transmission.

[0101] The health status coefficient of the transmission line is compared with a preset health status coefficient threshold. When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line;

[0102] When the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.

[0103] It should be noted that the reason why the replacement monitoring module was not directly replaced at the beginning was that, compared with the main monitoring module, the replacement monitoring module is only a temporary monitoring module set up for the transmission line monitoring area after the disaster. It cannot perform multi-faceted and detailed analysis like the main monitoring module. The replacement monitoring module is mainly used for basic monitoring functions in emergency situations to ensure that key data can continue to be obtained after a disaster or in an emergency, but its functions and performance may not be as good as the main monitoring module; the replacement monitoring module is mainly used when the impact of a disaster is large.

[0104] Compared with the replacement monitoring module, the design of the backup monitoring module is closer to the main monitoring module, and it has more comprehensive and detailed monitoring functions. The backup monitoring module can provide advanced data analysis and processing capabilities, and support various fault diagnosis and prediction functions. Although the backup monitoring module is not the main monitoring module, it has performance and functions close to the main monitoring module, and can replace the main monitoring module for long-term detailed monitoring when necessary; it is mainly suitable for post-disaster situations where the impact is not very large, but at the same time the main monitoring module has no way to accurately monitor the target transmission line area.

[0105] The adjustment module can make subtle adjustments to the main monitoring module, so that it can still accurately monitor the long-distance transmission status of the transmission line in the target transmission line area. It is mainly suitable for areas with less impact after disasters and a higher level of health of the transmission lines.

[0106] It can be understood as: in emergency situations, switch to a replacement monitoring module to ensure that the system can respond quickly after a disaster or in an emergency, provide basic monitoring data, and avoid system interruption.

[0107] In moderate impact situations, switch to the backup monitoring module to provide a high-performance alternative when the main monitoring module fails to work properly, ensuring data accuracy and system stability.

[0108] In the case of minor impact, the adjustment module can be used to make minor adjustments to ensure that the main monitoring module can still work effectively, extend its service life and avoid unnecessary waste of resources.

[0109] Based on the same inventive concept, the embodiment of the present invention also provides a long-distance transmission status monitoring system for a power transmission line. Figure 2 , Figure 2 A schematic diagram of the structure of a transmission line long-distance transmission status monitoring system provided by an embodiment of the present invention, the system includes a general monitoring module, a main monitoring module, a backup monitoring module, a replacement monitoring module and an adjustment module, the main monitoring module, the backup monitoring module and the replacement monitoring module can all be used to monitor the long-distance transmission status of the transmission line, the main monitoring module is used to monitor the long-distance transmission status of the transmission line at the current moment, the method is applied to the general monitoring module, including:

[0110] Inaccuracy coefficient module: divide the target transmission line area into several sub-areas, obtain the target sub-areas, obtain the sensor misalignment coefficient of each target sub-area, and use the sensor misalignment coefficient of each target sub-area as the data point of the target sub-area to obtain a data set, determine the total number of data points in the data set, cluster the data set, and obtain the target transmission line inaccuracy coefficient according to the clustering result;

[0111] Parameter calculation module: obtain the connection tightness data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection tightness coefficient; obtain the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient;

[0112] Comparison module: obtain the post-disaster impact index through the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, and compare the post-disaster impact index with the preset threshold. If the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line;

[0113] Analysis module: when the post-disaster impact index is less than the preset post-disaster impact index threshold, the health data of the transmission line is obtained, the health status coefficient of the transmission line is obtained, and the health status coefficient of the transmission line is compared with the preset health status coefficient threshold;

[0114] Processing module: When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line; when the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.

[0115] Based on a transmission line long-distance transmission status monitoring device provided by an embodiment of the present invention, through the above method, if the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to a replacement monitoring module to monitor the long-distance transmission status of the transmission line. If the post-disaster impact index is less than the preset post-disaster impact index threshold and the transmission line health status coefficient is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the transmission line health status coefficient to monitor the long-distance transmission status of the transmission line. If the transmission line health status coefficient is not less than the preset health status coefficient threshold, the main monitoring module is immediately switched to the backup monitoring module to monitor the long-distance transmission status of the transmission line. In this way, the long-distance transmission status of the transmission line is more comprehensively and accurately monitored, and the error degree of the final monitoring result is lower.

[0116] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for monitoring the long-distance transmission status of a power transmission line, characterized in that: The long-distance transmission status monitoring system of a power transmission line comprises a total monitoring module, a main monitoring module, a backup monitoring module, a replacement monitoring module and an adjustment module. The main monitoring module, the backup monitoring module and the replacement monitoring module can all be used to monitor the long-distance transmission status of the power transmission line. The main monitoring module is used to monitor the long-distance transmission status of the power transmission line at the current moment. The method is applied to the total monitoring module, wherein: The target transmission line area is divided into several sub-areas to obtain the target sub-areas, the sensor misalignment coefficient of each target sub-area is obtained, and the sensor misalignment coefficient of each target sub-area is used as the data point of the target sub-area to obtain a data set, and the total number of data points in the data set is determined, the data set is clustered, and the target transmission line inaccuracy coefficient is obtained according to the clustering result; Acquire the connection density data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection density coefficient; acquire the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient; The post-disaster impact index is obtained by the target transmission line inaccuracy coefficient, the transmission line connection tightness coefficient and the transmission line sinking coefficient, and the post-disaster impact index is compared with the preset threshold value. If the post-disaster impact index is not less than the preset post-disaster impact index threshold value, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line; When the post-disaster impact index is less than a preset post-disaster impact index threshold, the health data of the transmission line is obtained to obtain a health status coefficient of the transmission line, and the health status coefficient of the transmission line is compared with a preset health status coefficient threshold; When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line; when the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the standby monitoring module to monitor the long-distance transmission status of the transmission line; The method for obtaining the sensor misalignment coefficient is: For different target sub-areas, images of each target sub-area at different angles are obtained to obtain a preliminary image set of the target sub-area, and each image in the preliminary image set is compared with the image of the corresponding angle in the preset sensor effective monitoring image set, and the number of inconsistencies between the actual sensor position in each image in the preliminary image set and the sensor position in the image of the corresponding angle in the preset sensor effective monitoring image set is obtained to obtain the number of sensor misalignments of the image; the sum of the number of sensor misalignments of all images in the preliminary image set is calculated, and divided by the number of images in the preliminary image set to obtain the sensor misalignment coefficient of the target sub-area; The steps to obtain the target transmission line inaccuracy coefficient based on the clustering results are as follows: Count the number of data points in each final cluster, calculate the ratio of the number of data points in each final cluster to the total number of data sets, and get the weight coefficient of each final cluster. The calculation formula is: , where represents the weight coefficient of the kth final cluster, represents the number of data points in the kth final cluster, and n represents the total number of data sets; The product of the weight coefficient of each final cluster and the final cluster center is summed to obtain the target transmission line inaccuracy coefficient, which is calculated as follows: ,in represents the target transmission line inaccuracy coefficient, Expressed as the weight coefficient of the kth final cluster, Represented as the cluster center of the kth final cluster; The transmission line connection tightness factor includes: Get the number of transmission lines in the target transmission line area and record it as , and at the same time obtain the number of connection points corresponding to each transmission line; According to the number of transmission lines in the target transmission line area and the number of connection points corresponding to each transmission line, the degree centrality of each transmission line is obtained and marked as ; According to the number of transmission lines in the target transmission line area and the degree centrality of each transmission line Get the transmission line connection tightness coefficient , the calculation formula is: ; Transmission line sinking factors include: Obtain the height of each transmission line in each target sub-area, obtain a height set of the transmission lines in the target sub-area, and make a difference between each data in the height set and the corresponding preset reference value, and calculate the ratio of the difference and the corresponding preset reference value to obtain the standardized deviation of the data, and sum the standardized deviations of all data in the height set to obtain the height deviation of the target sub-area; The height deviations of all target sub-areas are summarized to calculate the transmission line sinking coefficient of the entire target transmission line area. The calculation formula is: , where is the transmission line sinking coefficient, n is the number of target sub-areas, It is Height deviation of each target sub-region; The method for obtaining the post-disaster impact index is as follows: The target transmission line inaccuracy coefficient, transmission line connection coefficient and transmission line sinking coefficient are weighted and summed to obtain the post-disaster impact index. The calculation formula is: ; In the formula, is the post-disaster impact index, are preset proportional coefficients of the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, respectively, and All are greater than 0; Transmission line health status factors include: Obtain the usage time of each healthy transmission line in the target transmission line area, and obtain the average usage time; Obtain the corroded area of ​​the transmission line in the target transmission line area, and divide the corroded area by the total area of ​​the transmission line to obtain the corrosion coefficient; Obtain weather data of the target transmission line area in real time, and obtain the weather impact coefficient based on the weather data, which includes temperature and humidity; The average usage time, corrosion coefficient and weather impact coefficient are weighted and summed to obtain the transmission line health status coefficient.

2. A method for monitoring the long-distance transmission status of a power transmission line according to claim 1, characterized in that: The steps to cluster a data set are: The steps to cluster the data set using the K-means clustering method are: Step 1: Use the elbow method to determine the optimal number of clusters for the data set; Step 2: Randomly select a corresponding number of data points as the initial clusters according to the optimal number of clusters; Step 3: For each data point, use the Euclidean distance algorithm to calculate the distance between the data point and each initial cluster center, and assign the data point to the cluster to which the nearest cluster center belongs. After traversing all data points, the initial cluster cluster is obtained; Step 4: For each initial cluster, calculate the average value of all data points and use the average value as the new cluster center; Step 5: Repeat steps 3 and 4 until the cluster center no longer changes, and obtain the final cluster and the final cluster center.

3. A transmission line long-distance transmission status monitoring system, used to implement a transmission line long-distance transmission status monitoring method according to any one of claims 1-2, characterized in that: The system includes a total monitoring module, a main monitoring module, a standby monitoring module, a replacement monitoring module and an adjustment module. The main monitoring module, the standby monitoring module and the replacement monitoring module can all be used to monitor the long-distance transmission status of the transmission line. The main monitoring module is used to monitor the long-distance transmission status of the transmission line at the current moment. The method is applied to the total monitoring module, including: Inaccuracy coefficient module: divide the target transmission line area into several sub-areas, obtain the target sub-areas, obtain the sensor misalignment coefficient of each target sub-area, and use the sensor misalignment coefficient of each target sub-area as the data point of the target sub-area to obtain a data set, determine the total number of data points in the data set, cluster the data set, and obtain the target transmission line inaccuracy coefficient according to the clustering result; Parameter calculation module: obtain the connection tightness data of the transmission lines in the target transmission line area and the transmission lines in other transmission line areas to obtain the transmission line connection tightness coefficient; obtain the height data of the transmission lines in the target transmission line area to obtain the transmission line sinking coefficient; Comparison module: obtain the post-disaster impact index through the target transmission line inaccuracy coefficient, transmission line connection tightness coefficient and transmission line sinking coefficient, and compare the post-disaster impact index with the preset threshold. If the post-disaster impact index is not less than the preset post-disaster impact index threshold, an alarm is issued and the main monitoring module is switched to the replacement monitoring module to monitor the long-distance transmission status of the transmission line; Analysis module: when the post-disaster impact index is less than the preset post-disaster impact index threshold, the health data of the transmission line is obtained, the health status coefficient of the transmission line is obtained, and the health status coefficient of the transmission line is compared with the preset health status coefficient threshold; Processing module: When the health status coefficient of the transmission line is less than the preset health status coefficient threshold, the adjustment module adjusts the main monitoring module according to the health status coefficient of the transmission line to monitor the long-distance transmission status of the transmission line; when the health status coefficient of the transmission line is not less than the preset health status coefficient threshold, the main monitoring module immediately switches to the backup monitoring module to monitor the long-distance transmission status of the transmission line.