A downward segmented filling mining method for a shuttle-shaped section
By adopting the downward-section filling mining method of the shuttle section in mining technology, the top stability of deep high-stress ore body mining field and medium-deep hole drilling quality is solved by using the interlaced spindle mining field and the interlaced filling body. The problem of this problem improves mining efficiency and economy, and is suitable for mining ore bodies above inclined medium and thick.
Patent Information
- Application Number
- CN202411009028.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-26
AI Technical Summary
In the mining of deep high-stress ore bodies, the stability of the top of the mining site is difficult to ensure, the support cost is high, and the quality of the medium-depth hole rock drilling and blasting effect are affected, and it is not suitable for ore bodies above inclined medium-thickness. Mining.
The downward-section filling mining method of the shuttle section is adopted. By dividing the mining site into an interlaced bobbin structure, the filling body is cemented with high-strength and low-strength, reducing the support workload of the pre-controlled top of the mining site and improving the mining. 场生产能力和开采效率,并降低充填成本。
In a deep high-stress environment, the support workload of the pre-controlled top of the mining site is reduced, the safety and production capacity of the mining site are improved, the quality of the medium-depth hole rock drilling and blasting effect are ensured, and the filling cost of the mining site is reduced. Suitable for mining of ore bodies above inclined medium and thick.
Smart Images

Figure CN118548058B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, in particular to a downward segmented filling mining method of a shuttle-shaped section. Background Art
[0002] According to incomplete statistics, deep, broken and difficult-to-mine ore bodies account for more than 30% of my country's metal mines. The safe and efficient mining of such minerals is crucial to the security of my country's mineral resources. Such ore bodies usually adopt traditional mining methods such as upward horizontal stratification and downward access filling. The production capacity of the stope is low, the labor intensity is high, the safety risk is high, and the degree of mechanization is low, which seriously restricts the safe and efficient mining of such ore bodies.
[0003] In the prior art, the invention patent CN112761640A discloses a segmented filling mining method for inclined medium-thick or thicker ore bodies, and proposes to use an integral box-pillar frame bearing structure of "diamond stope + ore pillar" to ensure the stability of the mining tunnel and reduce the impact of the mining and cutting project on the stope recovery. At the same time, the diamond stope is arranged in an up-and-down staggered manner to achieve continuous mining without top and bottom pillars, reducing the depletion rate of the recovered ore.
[0004] In this mining method, it is disclosed that a medium-deep hole rock drilling tunnel is constructed at the bottom of the diamond-shaped mine from the segmented mine connecting tunnel along the axial direction of the mine, and a pre-cut top pressure relief tunnel is constructed at the top from the segmented mine connecting tunnel along the axial direction of the mine, and short anchor rods + long anchor cables are constructed in the cut top pressure relief tunnel. It is also disclosed that a bottom-up mining sequence is adopted in the middle section, and at the same time, an upward horizontal layered filling mining method is adopted for pillar mining. In addition, an upward approach filling mining method is adopted to mine irregular diamond-shaped ore bodies that are not suitable for mining with diamond mine rooms, thereby reducing ore loss and depletion.
[0005] However, the above method has the following disadvantages:
[0006] 1. For deep high-stress ore bodies or broken and difficult-to-mine ore bodies, the mining process will always face the situation of working under the broken roof. The stability of the top of the mine is the key to the success of mining. Therefore, it is necessary to increase the support workload of the pre-controlled top of the mine. The short anchor rod + long anchor cable support method cannot effectively guarantee the safety of the top of the mine, and its support cost will increase significantly.
[0007] 2. In each diamond-shaped mining area, the top is pre-controlled by short anchor rods + long anchor cables. After the mining area is mined and filled, the next mining area will use the top-cutting and pressure-relieving tunnel as the medium-deep hole drilling tunnel. In the process of medium-deep hole drilling, it is easy for the anchor rods / anchor cables for pre-controlling the top to penetrate the drilling holes, affecting the quality of medium-deep hole drilling and further affecting the blasting effect.
[0008] 3. For medium-thick ore bodies, this technology is more suitable for mining steeply inclined ore bodies (ore body inclination angle > 55°); for thick and large ore bodies, this technology can be applied to mining inclined ore bodies. Therefore, this technology is not completely suitable for mining inclined medium-thick or thicker ore bodies (as mentioned in the article, inclined medium-thick or thicker ore bodies refer to ore bodies with an inclination angle of 30°-55° and a true thickness of more than 10m). Summary of the invention
[0009] The purpose of the present invention is to provide a downward segmented filling mining method for a shuttle-shaped section, which has the advantages of reducing the support workload of the pre-controlled top of the mining area, not affecting the quality of medium and deep hole drilling, improving the production capacity and mining efficiency of the mining area, and reducing the filling cost of the mining area.
[0010] To achieve the above object, the present invention provides the following technical solutions:
[0011] The present invention provides a downward segmented filling mining method for a shuttle-shaped section, comprising:
[0012] Divide the to-be-mined body into mining sections in the vertical direction and into stopes in the horizontal direction, each stope is placed within two mining sections in the height direction, each stope is in a shuttle-shaped structure in the height direction, being wide in the middle, gradually narrowing from the middle upwards and gradually narrowing from the middle downwards, and two stopes adjacent to each other in the horizontal plane are staggered in the height direction, and the staggered height is the height of one mining section;
[0013] Any of the above-mentioned stopes shall be mined after the stope directly above it and the two upper stopes adjacent to it are mined and filled and maintained, and each of the above-mentioned stopes shall be mined by medium-deep hole or deep hole rock drilling and blasting;
[0014] After the mining of each stope is completed, the goaf of the stope is filled.
[0015] Furthermore, in each of the mining areas, the portion of the middle and above the mining area is located in the upper mining section, and the portion of the mining area below the middle is located in the lower mining section.
[0016] Furthermore, each of the mining areas narrows uniformly from the middle to the upper part and narrows uniformly from the middle to the lower part.
[0017] Furthermore, a mining tunnel or mining chamber is arranged at the bottom of the mining field, the width of the bottom of the mining field is 3-20m, and the horizontal angle of the side walls below the middle of the mining field is greater than or equal to the natural repose angle of the ore.
[0018] Further, for each of the stopes:
[0019] When the rock drilling tunnel or rock drilling chamber is arranged at the uppermost part of the stope, a medium-deep hole or a deep hole is drilled downward;
[0020] When the rock drilling tunnel or the rock drilling chamber is arranged in the middle of the stope, medium-deep holes or deep holes are drilled upward and downward;
[0021] When the mining tunnel or the mining chamber is used as the rock drilling tunnel or the rock drilling chamber, an upward medium-depth hole or a deep hole is drilled.
[0022] Furthermore, the rock drilling tunnel or the rock drilling chamber is arranged at the uppermost part of the mining area, and the mining tunnel or the mining chamber at the bottom is utilized as the rock drilling tunnel or the rock drilling chamber, the uppermost rock drilling tunnel or the rock drilling chamber drills downward medium-depth holes or deep holes, and the mining tunnel or the mining chamber drills upward medium-depth holes or deep holes.
[0023] Furthermore, the rock drilling tunnel or the rock drilling chamber is arranged in the middle of the mining area, and the mining tunnel or the mining chamber at the bottom is used as the rock drilling tunnel or the rock drilling chamber, and the rock drilling tunnel or the rock drilling chamber drills upward medium-depth holes or deep holes, and the mining tunnel or the mining chamber drills upward medium-depth holes or deep holes.
[0024] Further, the height of the mining segment is 6-40m;
[0025] For ore bodies with medium thickness or less, the stope is arranged along the strike of the ore body, with a stope length of 10-100m and a stope height of 12-80m;
[0026] For medium to thick ore bodies, the stope is arranged perpendicular to the strike of the ore body, the stope length is 10-100m or equal to the thickness of the ore body, and the stope height is 12-80m;
[0027] For particularly thick and large ore bodies, the ore bodies are first divided into several panels. In each panel, the stope is arranged along the direction of the panel or perpendicular to the direction of the panel. The stope length is 10-100m and the stope height is 12-80m.
[0028] Furthermore, a mine exit tunnel or a mine exit chamber is arranged at the bottom of the stope;
[0029] When filling the goaf of the stope, high-strength cemented filling is carried out at the bottom of the stope, the filling height is not less than 3m and not less than the height of the mine roadway or the mine chamber at the bottom, and the uniaxial compressive strength of the high-strength cemented filling body is not less than 1.0MPa;
[0030] After the bottom high-strength cement filling, low-strength cement filling is used, the filling height at least reaches the middle of the stope, and the uniaxial compressive strength of the low-strength cement filling body is not less than 0.5MPa;
[0031] The remaining height is filled with non-cemented or cemented filling until the top of the mining area; if non-cemented filling is used, it must be fully dehydrated to reach a consolidated state; if cemented filling is used, the uniaxial compressive strength of the filling body shall not be less than 0.1MPa.
[0032] Furthermore, during mining, the stopes adjacent to each other in the vertical direction are mined first at the upper stope, and after the filling strength is reached, the lower stope is mined;
[0033] The mining areas adjacent to each other in the horizontal direction adopt a mining sequence of every other mining area or every other mining area.
[0034] The downward segmented filling mining method of a shuttle-shaped section provided by the present invention can produce the following beneficial effects:
[0035] 1. In the downward segmented filling mining method of a shuttle-shaped cross-section provided by the present invention, the recovery operation of the broken ore body in a deep high-stress environment is completed under the condition that the high-strength filling body formed after the filling of the two adjacent stopes directly above the stope and obliquely above the stope is used as the direct roof of the stope. Compared with the broken ore body, the support workload of the stope pre-control roof is reduced, the stope support cost is reduced, the safety of the recovery operation is improved, and at the same time, the quality of medium-deep hole drilling is not affected, and the blasting effect can be guaranteed;
[0036] 2. The stope in the present invention is a shuttle-shaped structure that is wide in the middle, gradually narrows from the middle upwards, and gradually narrows from the middle downwards. In actual operation, the stope in the present invention can gradually widen from the top to the middle, and gradually narrow from the middle downwards, which effectively increases the stope volume, improves the stope production capacity and mining efficiency, and at the same time ensures that the width of the bottom of the filling body after filling can be within a safe range;
[0037] 3. Compared with the traditional downward mining, in which the top plate of the goaf of the lower mining area completely exposes the filling body with the width of the upper adjacent mining area after the mining of the lower mining area, the shuttle-shaped mining area in the present invention can make the top plate of the lower mining area expose the filling body with a narrow boundary at the bottom end of the upper adjacent mining area, thereby improving the mining stress state of the goaf area after the mining of the lower mining area and improving its self-stabilizing ability. At the same time, since the bottom end of the upper adjacent mining area is narrower, the filling amount of the high-strength filling body at the bottom of the upper mining area can be reduced, thereby reducing the filling cost of the mining area and improving the economic benefits of mining the mining area. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 A schematic diagram of the stope distribution structure in a downward segmented filling mining method of a shuttle-shaped section provided by an embodiment of the present invention;
[0040] Figure 2 A structural distribution diagram of the filling body in the stope in a downward segmented filling mining method of a shuttle-shaped section provided by an embodiment of the present invention;
[0041] Figure 3 A mine site layout diagram provided by an embodiment of the present invention;
[0042] Figure 4 A mine construction sequence provided by an embodiment of the present invention Figure 1 ;
[0043] Figure 5 A mine construction sequence provided by an embodiment of the present invention Figure 2 ;
[0044] Figure 6 A mine construction sequence provided by an embodiment of the present invention Figure 3 ;
[0045] Figure 7 A mine construction sequence provided by an embodiment of the present invention Figure 4 ;
[0046] Figure 8 A mine construction sequence provided by an embodiment of the present invention Figure 5 ;
[0047] Fig. 9 A mine construction sequence provided by an embodiment of the present invention Figure 6 ;
[0048] Fig.10 A schematic diagram of the stope distribution structure in another downward segmented filling mining method for a shuttle-shaped section provided in an embodiment of the present invention.
[0049] Icons: 1-first mining area; 2-second mining area; 3-third mining area; 4-fourth mining area; 5-fifth mining area; 6-sixth mining area; 7-seventh mining area; 8-eighth mining area; 9-mining section; 10-mining area; 011-high-strength cemented filling body; 012-low-strength cemented filling body; 013-non-cemented or cemented filling body. DETAILED DESCRIPTION
[0050] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0052] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.
[0054] This embodiment provides a downward segmented filling mining method for a shuttle-shaped section, such as Figure 1 As shown, including:
[0055] The body to be mined is divided into mining sections 9 in the vertical direction and into stopes 10 in the horizontal direction. Each stope 10 is placed within two mining sections 9 in the height direction. In the height direction, each stope 10 is a shuttle-shaped structure that is wide in the middle, gradually narrows from the middle upwards, and gradually narrows from the middle downwards. Two adjacent stopes 10 on the horizontal plane are staggered in the height direction, and the staggered height is the height of one mining section 9.
[0056] Any stope 10 is mined after the stope 10 directly above it and the two upper stopes 10 adjacent to it are mined and filled and maintained. Each stope 10 is mined by medium-deep hole or deep hole rock drilling and blasting;
[0057] After 10 backfilling operations are completed in each stope, the goaf of the stope is filled.
[0058] The downward segmented filling mining method with a shuttle-shaped cross section provided in the above embodiment is suitable for inclined to steeply inclined medium-thick or thicker ore bodies, or horizontal to gently inclined thick and large ore bodies in underground metal / non-metal mines, and is particularly suitable for mining broken ore bodies in deep high-stress environments. By staggering the two horizontally adjacent stopes 10 in the height direction and optimizing the structural shape of each stope 10 to be a shuttle-shaped cross section, in the continuous mining process from top to bottom, the top plate of the lower stope reveals the filling body with a narrow bottom boundary of the upper adjacent stope, rather than the thickest filling body of the entire stope, which can produce the following beneficial effects:
[0059] 1. There is no need to rely on the short anchor rod + long anchor cable support method to ensure the safety of the top of the mining area. The filling body at the bottom of the upper adjacent mining area can ensure the stability of the roof structure of the lower mining area, reduce the support workload of the mining area pre-control top, reduce the mining area support cost, improve the safety of the mining operation, and at the same time will not affect the quality of medium and deep hole drilling, and can ensure the blasting effect.
[0060] 2. To ensure the safety of the top of the stope, Figure 2 As shown, in actual operation, the maximum exposed width d at the top of the stope has certain limitations. Since the bottom of the upper stope 10 needs to be used as the roof of the lower stope after filling, the above dimensions limit the width of the top and bottom of the stope. In the above embodiment, the stope 10 adopts a shuttle-shaped structure. Compared with the traditional rectangular stope structure, it can effectively increase the recovery volume of the stope, reduce the number of stopes in the horizontal direction, and thus improve the production capacity and mining efficiency of the stope. At the same time, it can ensure that the maximum exposed width d at the top of the stope meets the safety requirements.
[0061] 3. The filling body formed at the bottom of the upper mining area 10 after filling will serve as the top plate of the lower mining area 10. Since the mining area 10 in the above embodiment adopts a shuttle-shaped structure, the size of the bottom end of the mining area is small, and the required filling amount of high-strength filling body is small, which can reduce the filling cost of the mining area and improve the economic benefits of mining.
[0062] by Figures 3 to 9 Taking the mining steps of stope 10 as an example, the following are specifically described:
[0063] according to Figure 3 It can be seen that two adjacent mining areas 10 on the horizontal plane are staggered in the height direction. According to the mining order, the mining areas 10 are divided into the first mining area 1, the second mining area 2, the third mining area 3, the fourth mining area 4, the fifth mining area 5, the sixth mining area 6, the seventh mining area 7 and the eighth mining area 8.
[0064] It should be noted that between two mining areas 10 adjacent to each other in the horizontal direction, the mining can be carried out simultaneously or successively. For example, between the first mining area 1 and the second mining area 2 adjacent to each other in the horizontal direction, after the mining of one mining area is completed and filled and maintained, the other mining area can be mined, or the two mining areas can be mined and maintained at the same time.
[0065] In an optional embodiment, if Figure 4 As shown, the first stope 1 is first blasted and mined. Figure 5 As shown, after the first stope 1 is filled and maintained, the adjacent second stope 2 is mined. Figure 6 As shown, after the second stope 2 is filled and maintained, the third stope 3 at the bottom is mined. Figure 7 As shown, after the third stope 3 is filled and maintained, the adjacent fourth stope 4 is mined. Figure 8 and Fig. 9 As shown, after the fourth mining field 4 is filled and maintained, the fifth mining field 5 at the bottom is mined. After the fifth mining field 5 is filled and maintained, the adjacent sixth mining field 6 is mined. And so on, the seventh mining field 7 and the eighth mining field 8 are mined.
[0066] In an optional embodiment, if Figure 1 As shown, in each stope 10, the portion above the middle of the stope 10 is located in the upper mining segment, and the portion below the middle of the stope 10 is located in the lower mining segment. Figure 1 It can be seen that the top of any lower stope 10 or the sidewall located in the upper mining section 9 is exposed under the filling body of the upper adjacent stope 10.
[0067] In an optional embodiment, if Figure 1 As shown, each stope 10 becomes narrower uniformly from the middle to the upper part and from the middle to the lower part.
[0068] The above arrangement facilitates the seamless staggered distribution between adjacent stopes. Specifically, Figure 3 As shown, the angles θ1 between the two sides of the stope 10 located in the upper mining section 9 and the vertical direction are the same, and the angles θ2 between the two sides of the stope 10 located in the lower mining section 9 and the vertical direction are the same, and θ1 is equal to θ2; or as Fig.10 As shown, the angle θ3 between the left side wall of the mining area 10 located in the upper mining section 9 and the vertical direction is different from the angle θ4 between the right side wall and the vertical direction, and the angle θ5 between the left side wall of the mining area 10 located in the lower mining section 9 and the vertical direction is different from the angle θ6 between the right side wall and the vertical direction, and θ4 is equal to θ5, and θ3 is equal to θ6.
[0069] In an optional embodiment, a mining tunnel or mining chamber is arranged at the bottom of the mining area 10, and the bottom width of the mining area 10 is 3-20m, specifically 3m, 5m, 10m, 12m, 15m or 20m. The angle between the side wall below the middle part of the mining area 10 and the horizontal plane is greater than or equal to the natural repose angle of the ore, so that the ore can smoothly roll down from the above-mentioned side wall to the mining tunnel or mining chamber at the bottom of the mining area 10.
[0070] In an optional embodiment, for each stope 10:
[0071] When the rock drilling tunnel or rock drilling chamber is arranged at the uppermost part of the stope 10, a medium-deep hole or a deep hole is drilled downward from the top of the stope 10;
[0072] When the rock drilling tunnel or rock drilling chamber is arranged in the middle of the stope 10, a medium-deep hole is drilled upward and downward from the middle of the stope 10, or a deep hole is drilled upward and downward from the middle of the stope 10;
[0073] When the mining tunnel or mining chamber is used as the rock drilling tunnel or rock drilling chamber, medium-depth holes or deep holes are drilled upward from the bottom of the mining area.
[0074] The above embodiments provide a variety of optional arrangements for rock drilling tunnels and rock drilling chambers. In particular, when a mine exit tunnel or a mine exit chamber is used as a rock drilling tunnel or a rock drilling chamber, there is no need to arrange additional rock drilling tunnels and rock drilling chambers, thus saving mining costs.
[0075] In an optional embodiment, in order to improve operating efficiency, a rock drilling tunnel or rock drilling chamber is arranged at the top of the mining area 10, and the mining tunnel or mining chamber at the bottom is used as a rock drilling tunnel or rock drilling chamber, the top rock drilling tunnel or rock drilling chamber drills downward medium-depth holes or deep holes, and the mining tunnel or mining chamber drills upward medium-depth holes or deep holes.
[0076] In the above embodiment, the space of the mining tunnel or mining chamber is utilized to drill upward medium-depth holes or deep holes, thereby realizing bidirectional drilling from the top and bottom of the mining field 10, which can effectively improve the working efficiency.
[0077] In an optional embodiment, in order to improve operating efficiency, a rock drilling tunnel or rock drilling chamber is arranged in the middle of the mining area 10, and the mining tunnel or mining chamber at the bottom is used as a rock drilling tunnel or rock drilling chamber, and the rock drilling tunnel or rock drilling chamber drills upward medium-depth holes or deep holes, and the mining tunnel or mining chamber drills upward medium-depth holes or deep holes.
[0078] In the above embodiment, the space of the mining tunnel or mining chamber is utilized to drill upward medium-depth holes or deep holes, thereby realizing bidirectional drilling from the middle and bottom of the mining field 10, which can effectively improve the working efficiency.
[0079] In an optional embodiment, the height of the mining segment 9 is 6-40 m, specifically 6 m, 10 m, 20 m, 30 m or 40 m.
[0080] For a medium-thick ore body with a thickness of less than 5m, the stope 10 is arranged along the strike of the ore body. In this case, the stope length is 10-100m, and the stope height is 12-80m. Specifically, the height can be 12m, 20m, 40m, 60m or 80m.
[0081] For a medium-thick to thick ore body with a thickness of 5-50m, the stope 10 is arranged perpendicular to the strike of the ore body, the stope length is 10-100m or equal to the thickness of the ore body, and the stope height is 12-80m, and the specific height can be 12m, 20m, 40m, 60m or 80m;
[0082] For particularly thick and large ore bodies with a thickness greater than 50m, the ore bodies are first divided into several panels. In each panel, the mining area 10 is arranged along the direction of the panel or perpendicular to the direction of the panel. The length of the mining area is 10-100m, and the height of the mining area is 12-80m. The specific height can be 12m, 20m, 40m, 60m or 80m.
[0083] It should be noted that medium-thick ore bodies, thick and large ore bodies, and particularly thick and large ore bodies are professional and technical terms in this field, that is, the specific thickness ranges of medium-thick ore bodies, thick and large ore bodies, and particularly thick and large ore bodies are common knowledge in this field.
[0084] In an optional embodiment, a mine exit tunnel or a mine exit chamber is arranged at the bottom of the stope 10;
[0085] like Figure 2 As shown, when filling the goaf of the mining area, high-strength cemented filling is carried out at the bottom of the mining area 10 to form a high-strength cemented filling body 011. The filling height is not less than 3m and not less than the height of the bottom mining tunnel or mining chamber. The uniaxial compressive strength of the high-strength cemented filling body 011 is not less than 1.0MPa.
[0086] Since the high-strength cemented filling body 011 is directly opposite to the top of the mining area 10 below, its strength can replace the broken ore body as the direct roof of the mining area 10 below, solving the problem of large workload and high support cost of the broken ore body roof.
[0087] like Figure 2 As shown, after the bottom high-strength cemented filling, low-strength cemented filling can be used, and the filling height at least reaches the middle of the mining area 10, and the uniaxial compressive strength of the low-strength cemented filling body 012 is not less than 0.5MPa.
[0088] The above method reduces the filling amount of high-strength filling body, thereby reducing the filling cost of the mining site.
[0089] like Figure 2 As shown, the remaining height is filled with non-cemented or cemented filling until the top of the stope 10 to obtain a non-cemented or cemented filling body 013; if non-cemented filling is used, it must be fully dehydrated to reach a consolidated state; if cemented filling is used, the uniaxial compressive strength of the filling body shall not be less than 0.1MPa.
[0090] Since the remaining height stope 10 is adjacent to the high-strength cemented filling body 011 and the low-strength cemented filling body 012 of the stope 10 above and to the side, the strength requirement for the filling body in the remaining height stope 10 is relatively low. The above method can further reduce the stope filling cost.
[0091] In an optional embodiment, during mining, of the adjacent mining areas 10 in the vertical direction, the upper mining area 10 is mined first, and after the filling strength is reached, the lower mining area 10 is mined, so that the upper mining area 10 can replace the broken ore body as the direct roof of the lower mining area 10.
[0092] The mining sequence of adjacent stopes 10 in the horizontal direction is one-by-one or one-by-multiple.
[0093] A specific example is used to illustrate:
[0094] A large underground metal mine produces about 1.5 million tons of ore per year, with high ore grade and value. The main ore body is about 1500m long along the strike and about 1700m long along the dip. It is large in scale and thick overall. The main ore body is about 10-60m thick, with an average thickness of about 30m. The ore body is moderately inclined to inclined, with a dip angle of about 50°-70°.
[0095] The mining area has developed fault structures, the thickness of the ore-controlling structural alteration zone is large, and the engineering geological conditions are complex. Although the rock is relatively hard, the structural surface is well developed, which directly affects the quality of the rock mass. The ore body is mainly located in the granite fractured veins. The rock mass quality of the ore body is average to extremely poor. The rock mass quality of the shallow ore body is better than that of the deep ore body, and the tectonic stress will increase significantly during deep mining in the future. The surrounding rocks of the upper and lower plates of the ore body are granite and diorite. The surrounding rock mass is unstable or even broken, and has basically no self-stabilizing ability after exposure.
[0096] According to the occurrence thickness and rock quality of different areas of the ore body, the original design of the mine adopted the upward horizontal layering, upward approach and downward approach filling mining method. The rock quality of the shallow ore body of the mine is good, and the upward horizontal layering and upward approach filling mining method is mainly used for mining. However, the rock quality of the deep ore body has deteriorated, and the stress of the deep original rock is high, so the main ore body has been converted to the downward approach filling mining method.
[0097] On this basis, the mine's future planned production capacity will continue to expand. Under the mining conditions of deep, high-stress, and broken ore bodies, the downward approach and filling mining method will not be able to meet the mine's capacity expansion requirements, which may lead to problems such as a large number of people working simultaneously underground, complex production management, and high safety risks.
[0098] Using the downward segmented filling mining method of a shuttle-shaped cross section provided in the above embodiment, an example mine is used to mine a broken ore body in a deep high-stress environment. Figures 3 to 9 The overall downward-type segmented emptying and subsequent filling mining method with vertically staggered stopes shown in the figure specifically includes the following steps and requirements:
[0099] (1) Example: A deep mining body to be mined in a mine is divided into mining stages from top to bottom. The stage height is 60m. The mining sections are divided into 9 stages. The height of mining sections 9 is 15m. The distance between adjacent tunnels in the same section is 20m. The tunnels in the upper and lower adjacent mining sections 9 are staggered horizontally, and the staggered distance is 10m.
[0100] (2) Within the ore body area, the stopes 10 are arranged perpendicular to the ore body strike. The stopes 10 are wide in the middle, gradually narrowing from the middle to the top and from the middle to the bottom. The two adjacent stopes 10 on the horizontal plane are staggered in the height direction, such as Figure 3 As shown. The length of the stope 10 is the thickness of the ore body, which is about 20-80m. The maximum width of the stope 10 is fixed at 16m, and the stope height is fixed at 30m. The vertical staggered height between adjacent stopes 10 in the horizontal direction is 15m. For stopes 10 adjacent in the vertical direction, the upper stope 10 must be mined first, and after filling and curing and reaching a certain filling strength, the adjacent stope 10 at the lower part can be mined. Similarly, for stopes 10 adjacent in the horizontal direction, the upper staggered stope 10 must be mined first, and after filling and curing, the adjacent stope 10 at the lower part can be mined. That is, the stopes 10 as a whole adopt a top-down sequence for mining.
[0101] (3) If Figure 4 As shown, the first stope 1 and the second stope 2 at the upper vertical position are first mined, and then the third stope 3 and the fourth stope 4 at the lower vertical position are mined, for example:
[0102] Between the staggered upper stopes, the mining sequence of "three stops every other stope" is adopted. First, the first stope 1 at the staggered upper position is mined. Figure 4 As shown in FIG. 1 , after the goaf of the stope is filled and maintained, the second stope 2 located above the staggered stope is mined. Figure 5 As shown, the goaf should be filled as soon as possible after mining.
[0103] Between the staggered lower stopes, the same "three-mining-one" mining sequence is used. The third staggered lower stope 3 is mined first. Figure 6 After the goaf of the stope is filled and maintained, the fourth stope 4, which is staggered below, is mined. Figure 7 As shown, the goaf should be filled as soon as possible after mining.
[0104] (4) When mining in different types of stopes, a tunnel about 3-5m high is excavated at the bottom of the stope. This tunnel is used as both a rock drilling tunnel and a mine exit tunnel. In the rock drilling level of the stope, a down-the-hole drill or similar large-scale high-efficiency rock drilling equipment is used to drill an upward medium-deep hole (diameter 59-90mm) to the top of the stope 10. The hole depth is about 15-25m. After the blasthole is loaded with explosives, the ore is collapsed laterally in batches. Then, a 3-6m horizontal drill is used at the bottom of the stope. 3 The scraper loaders leave the mine, and transport the ore to the outer transport tunnel through the connecting tunnel, and then transport it in a centralized manner or lower it to the chute for reverse transportation.
[0105] (5) After each stope 10 is mined, the side walls of the adjacent stopes 10 are exposed at a height range in which the upper half is the filling material and the lower half is the ore rock. This ensures that the height of the goaf exposed by one-time safe mining reaches 30m when the allowable exposure height of the ore rock is 15m. The actual exposure height of the goaf is doubled compared to the allowable exposure height of the ore rock.
[0106] (6) After the mining is completed in each mining area, the filling operation of the goaf of the mining area should be carried out in time. For example, the filling aggregate of the mine is the whole tailings of the concentrator, and the cementitious material is PO42.5 grade ordinary Portland cement.
[0107] (7) When filling the goaf of each mining area, similar filling body strength and structural layout schemes are adopted, namely: first, high-strength cemented filling is carried out at a height of about 8m above the bottom of the mining area, and the designed uniaxial compressive strength is generally not less than 2MPa, and the filling station uses a lime-sand ratio of about 1:4-1:7; then low-strength cemented filling is carried out at a height of about 9m to the middle range of the mining area, and the designed uniaxial compressive strength is generally not less than 1MPa, and the filling station uses a lime-sand ratio of about 1:10-1:15; then micro-cemented filling is carried out for the remaining approximately 13m of the mining area height, and the designed uniaxial compressive strength is generally not less than 0.2MPa, and the filling station uses a lime-sand ratio of about 1:20-1:25.
[0108] (8) After the upper vertical staggered stope in the ore body area is mined and filled, and the predetermined filling body curing age and strength requirements are reached, the staggered stope immediately below is mined as a whole. Figure 8 and Fig. 9As shown, the mining and filling sequence, mining technology, filling body strength and structure of the lower vertical staggered stope are similar to the parameters of the upper staggered stope, and the overall implementation is the downward-type segmented empty stope and subsequent filling mining of the broken ore body in the high stress environment deep in the example mine.
[0109] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A downward segmented filling mining method for a shuttle-shaped section, characterized in that: include: The body to be mined is divided into mining sections (9) in the vertical direction and into mining areas (10) in the horizontal direction, each of the mining areas (10) is placed within two of the mining sections (9) in the height direction, each of the mining areas (10) is in a shuttle-shaped structure in the height direction, being wide in the middle, gradually narrowing from the middle upwards and gradually narrowing from the middle downwards, and two adjacent mining areas (10) in the horizontal plane are staggered in the height direction, and the staggered height is the height of one of the mining sections (9); Any of the stopes (10) is mined after the stope (10) directly above it and the two stopes (10) above it are mined and filled and maintained, and each stope (10) is mined by medium-deep hole or deep hole rock drilling and blasting; The mining areas (10) adjacent to each other in the horizontal direction adopt a mining sequence of every other mining area or every other mining area. After the mining of each stope (10) is completed, the goaf of the stope is filled; A mine exit tunnel or a mine exit chamber is arranged at the bottom of the stope (10); When filling the goaf of the mining area, high-strength cementing filling is performed at the bottom of the mining area (10), the filling height is not less than 3m and not less than the height of the mining tunnel or the mining chamber at the bottom, the uniaxial compressive strength of the high-strength cementing filling body (011) is not less than 1.0Mpa, and the lime-sand ratio is 1:4-1:7; After the bottom high-strength cement filling, low-strength cement filling is used, the filling height at least reaches the middle of the stope (10), and the uniaxial compressive strength of the low-strength cement filling body (012) is not less than 0.5Mpa; The remaining height is filled with non-cemented or cemented filling until the top of the stope (10); if non-cemented filling is used, it must be fully dehydrated to reach a consolidated state; if cemented filling is used, the uniaxial compressive strength of the filling body shall not be less than 0.1Mpa.
2. The downward segmented filling mining method of the shuttle section according to claim 1 is characterized in that: In each of the mining areas (10), the portion of the middle and above the mining area (10) is located in the upper mining section, and the portion of the mining area (10) below the middle is located in the lower mining section.
3. The downward segmented filling mining method of the shuttle section according to claim 1 is characterized in that: Each of the stopes (10) is uniformly narrowed from the middle to the upper part, and is uniformly narrowed from the middle to the lower part.
4. The downward segmented filling mining method of the shuttle section according to claim 3 is characterized in that: A mine exit tunnel or a mine exit chamber is arranged at the bottom of the stope (10), the bottom width of the stope (10) is 3-20 m, and the horizontal angle of the side walls below the middle of the stope (10) is greater than or equal to the natural repose angle of the ore.
5. The downward segmented filling mining method of the shuttle section according to claim 4 is characterized in that: For each of said stopes (10): When the rock drilling tunnel or rock drilling chamber is arranged at the uppermost part of the stope (10), a medium-deep hole or a deep hole is drilled downward; When the rock drilling tunnel or the rock drilling chamber is arranged in the middle of the stope (10), medium-depth holes or deep holes are drilled upward and downward; When the mining tunnel or the mining chamber is used as the rock drilling tunnel or the rock drilling chamber, an upward medium-depth hole or a deep hole is drilled.
6. The downward segmented filling mining method of the shuttle section according to claim 5 is characterized in that: The rock drilling tunnel or the rock drilling chamber is arranged at the top of the mining area (10), and the mining tunnel or the mining chamber at the bottom is used as the rock drilling tunnel or the rock drilling chamber. The top rock drilling tunnel or the rock drilling chamber drills downward medium-depth holes or deep holes, and the mining tunnel or the mining chamber drills upward medium-depth holes or deep holes.
7. The downward segmented filling mining method of the shuttle section according to claim 5 is characterized in that: The rock drilling tunnel or the rock drilling chamber is arranged in the middle of the mining area (10), and the mining tunnel or the mining chamber at the bottom is used as the rock drilling tunnel or the rock drilling chamber. The rock drilling tunnel or the rock drilling chamber drills upward medium-depth holes or deep holes, and the mining tunnel or the mining chamber drills upward medium-depth holes or deep holes.
8. The downward segmented filling mining method of the shuttle section according to claim 1 is characterized in that: The height of the mining section (9) is 6-40m; For ore bodies with a thickness of less than medium thickness, the stope (10) is arranged along the strike of the ore body, with a stope length of 10-100 m and a stope height of 12-80 m; For medium-thick to thick ore bodies, the stope (10) is arranged perpendicular to the direction of the ore body, the stope length is 10-100m or equal to the thickness of the ore body, and the stope height is 12-80m; For a particularly thick and large ore body, the ore body is first divided into a number of panels. In each panel, the stope (10) is arranged along the direction of the panel or perpendicular to the direction of the panel. The stope length is 10-100m and the stope height is 12-80m.
9. The downward segmented filling mining method of the shuttle section according to claim 1, characterized in that: During mining, the mining areas (10) adjacent to each other in the vertical direction are mined first by mining the upper mining area (10) and then mining the lower mining area (10) after the filling strength is reached.