A method for monitoring and early warning of building equipment operation failure based on the Internet of Things
Through IoT technology, the vibration, noise, temperature and humidity parameters of construction equipment are monitored, and the evaluation index and evaluation coefficient are calculated, which solves the problem of untimely fault monitoring in the existing technology, and efficient fault warning and equipment maintenance are achieved, and the equipment is improved. stability and safety.
Patent Information
- Application Number
- CN202410718029.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-06-05
AI Technical Summary
The existing construction equipment fault monitoring technology has low degree of automation and intelligence, resulting in failures not being discovered and handled in time, affecting the normal operation of the equipment.
Using the Internet of Things-based construction equipment operation fault monitoring and early warning method, the operating status evaluation index and environmental evaluation coefficient are calculated by monitoring the vibration, noise, temperature and humidity parameters of the equipment, and compared with the set thresholds, and the warning terminal is activated to execute the corresponding operate.
It improves the accuracy and timeliness of fault warning, reduces the number of maintenance times, reduces maintenance costs, and ensures the stability and safety of equipment.
Smart Images

Figure CN118548928B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building equipment fault monitoring, and in particular to a building equipment operation fault monitoring and early warning method based on the Internet of Things. Background Art
[0002] Building equipment is an indispensable and important part of a building, covering facilities and equipment such as water supply, drainage, heating, ventilation, air conditioning, electricity, elevators, communications and building intelligence. The existence of these equipment ensures the smooth progress of people's daily life and work in buildings, and provides people with a healthy and comfortable indoor environment. Building equipment fault monitoring refers to the real-time monitoring and fault diagnosis of various equipment in the building through the installation of sensors, monitoring equipment and other technical means, so as to detect equipment failures in advance, reduce the impact of failures on building operations, and take timely maintenance measures to ensure the normal operation of building equipment.
[0003] At present, construction equipment is usually maintained and inspected manually for wear and tear within a set period. Such operations do not have a high degree of automation and intelligence in fault monitoring of construction equipment, and are prone to certain errors. They are also unable to effectively and timely check for hidden dangers in the operation of construction equipment, resulting in operational failures of construction equipment not being resolved in a timely manner, affecting the normal operation and use of construction equipment. Summary of the invention
[0004] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a construction equipment operation fault monitoring and early warning method based on the Internet of Things, in order to solve the above-mentioned technical defects.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: A construction equipment operation fault monitoring and early warning method based on the Internet of Things, comprising the following steps:
[0006] S1. Equipment operation stability monitoring: monitor and analyze the operation stability of each building equipment at the current monitoring time point. The specific monitoring and analysis process is as follows:
[0007] S10: evenly distributing monitoring points on each building equipment, monitoring the vibration value and noise value of each monitoring point on each building equipment at the current monitoring time point, and calculating the mean value based on the monitored vibration value and noise value to obtain the average vibration value and average noise value of each building equipment corresponding to the current monitoring time point;
[0008] S11: By combining the data values obtained in the previous step with the allowable vibration value and the allowable noise value of each building equipment corresponding to the current monitoring point, the operation vibration state evaluation index of each building equipment corresponding to the current monitoring time point is analyzed and calculated;
[0009] S12: Match the operating state of each building equipment at the current monitoring time point with the reference operating vibration value and reference operating noise value corresponding to each set operating state, obtain the reference operating vibration value and reference operating noise value of each building equipment at the current monitoring time point, and analyze and calculate the operating stability matching degree of each building equipment at the current monitoring time point;
[0010] S13: Calculate the equipment operation stability state coefficient of each building equipment corresponding to the current monitoring time point by analyzing the operation vibration state evaluation index and the operation stability matching degree, and compare the equipment operation stability state coefficient with the set equipment operation stability state coefficient threshold, and start the early warning terminal to execute the corresponding early warning according to the comparison result;
[0011] S2. Equipment operating environment status monitoring: Monitor and analyze the equipment operating environment status of each building equipment at the current monitoring time point. The specific monitoring and analysis methods are as follows:
[0012] S21: Monitor the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point, obtain the average temperature and humidity values of each building equipment at the current monitoring time point through mean calculation, and then calculate the operating temperature status evaluation index of each building equipment at the current monitoring time point through analysis;
[0013] S22: Obtain the reference temperature value and the reference humidity value of each building equipment corresponding to the current monitoring time point, and obtain the operating environment matching degree of each building equipment at the current monitoring time point through analysis and calculation;
[0014] S23: Calculate the operating environment status evaluation coefficient of each building equipment at the current monitoring time point according to the operating temperature status evaluation index and the operating environment matching degree, and compare the operating environment status evaluation coefficient with the set operating environment status evaluation coefficient threshold, and start the early warning terminal to execute the corresponding early warning according to the comparison result;
[0015] S3. Equipment operation optimization analysis: Optimize and analyze the safety status of each building equipment at the current monitoring time point;
[0016] S4. Equipment fault operation analysis: Fault operation status analysis is performed based on the equipment operation stability state coefficient and operation environment state assessment coefficient of each building equipment corresponding to the current monitoring time point.
[0017] Furthermore, the specific optimization analysis process of optimizing the safety status of each building equipment corresponding to the current monitoring time point is as follows:
[0018] Get the running time of each building equipment corresponding to the current monitoring time point and extract its value to obtain the running time of each building equipment corresponding to the current monitoring time point, which is recorded as SJ i , and at the same time obtain the reference operating time set for each building equipment from the database and record it as ;
[0019] Get the start and stop times of each building equipment corresponding to the current monitoring time point and extract its value to obtain the start and stop times of each building equipment corresponding to the current monitoring time point, which is recorded as QT i , and at the same time obtain the reference start and stop times set for each building equipment from the database and record it as ;
[0020] According to the formula Calculate the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point , c1 and c2 represent the influencing factors corresponding to the running time and the number of starts and stops respectively.
[0021] Furthermore, by matching the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point with the set operation optimization evaluation coefficient threshold of each building equipment corresponding to the current monitoring time point, if the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point is greater than the set operation optimization evaluation coefficient threshold, then it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a state to be optimized; otherwise, it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a healthy state.
[0022] Furthermore, if the operation optimization state of each building equipment corresponding to the current monitoring time point is a state to be optimized, the early warning terminal is started to execute the corresponding early warning, and the operation time and start and stop times data of each building equipment are displayed in real time through the display terminal.
[0023] Furthermore, the specific process of performing fault operation status analysis based on the equipment operation stability state coefficient and the operation environment state evaluation coefficient of each building equipment corresponding to the current monitoring time point is as follows:
[0024] According to the formula Calculate the fault operation evaluation coefficient of each building equipment corresponding to the current monitoring time point, e is a natural constant, d1 and d2 represent the influencing factors corresponding to the set equipment operation stability state coefficient and operation environment state evaluation coefficient respectively.
[0025] Furthermore, after the step S4, equipment failure operation analysis, there is also a step S5, display and warning, and the specific execution method corresponding to this step is:
[0026] The over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are displayed accordingly through the display terminal, and the over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are warned accordingly through the warning terminal.
[0027] Beneficial effects of the present invention:
[0028] 1. In the present invention, the operation vibration state evaluation index and the operation stability matching degree of each building equipment corresponding to the current monitoring time point are analyzed, and the equipment operation stability state coefficient of each building equipment corresponding to the current monitoring time point is obtained by analysis, and then it is compared with the set equipment operation stability state coefficient threshold, and then the corresponding early warning operation is performed. It not only greatly improves the response timeliness of the vibration value and noise value of the building equipment in the operation state, but also can effectively reduce the maintenance times of equipment maintenance personnel and reduce the maintenance cost of the building equipment. At the same time, it can also ensure the operation stability and safety of the building equipment to the greatest extent, and avoid serious damage to the building equipment due to the continued operation of the building equipment after a failure.
[0029] 2. In the present invention, the operating temperature value and humidity value of each building equipment at the current monitoring time point are monitored and analyzed to obtain the operating temperature status evaluation index of each building equipment at the current monitoring time point, and then the operating temperature status evaluation index and the operating environment matching degree are comprehensively analyzed and processed to obtain the operating environment status evaluation coefficient of each building equipment at the current monitoring time point, and then it is compared with the set operating environment status evaluation coefficient threshold, and then the corresponding early warning operation is performed, and the temperature and humidity status of each building equipment in the operating state are analyzed and processed, which can provide more comprehensive data support for the fault early warning of each building equipment, and greatly improve the accuracy of fault early warning of each building equipment.
[0030] 3. In the present invention, a comprehensive analysis is performed on the equipment operation stability state coefficient and the operation environment state assessment coefficient of each building equipment corresponding to the current monitoring time point, thereby obtaining the fault operation assessment coefficient of each building equipment corresponding to the current monitoring time point, and comparing it with the set fault operation assessment coefficient threshold, and then executing the corresponding early warning operation, thereby avoiding the problem of untimely early warning caused by different fault problems of building equipment to the greatest extent, greatly improving the timeliness of fault early warning response of building equipment and the comprehensiveness of fault early warning, and effectively ensuring the stability and safety of building equipment during operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The present invention will be further described below in conjunction with the accompanying drawings.
[0032] Figure 1The present invention is a block diagram of a method for monitoring and early warning of building equipment operation failures based on the Internet of Things according to an embodiment of the present invention. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] For example, see Figure 1 As shown, a method for monitoring and early warning of building equipment operation failures based on the Internet of Things includes the following steps:
[0035] S1. Equipment operation stability monitoring: monitor and analyze the operation stability of each building equipment at the current monitoring time point. The specific monitoring and analysis process is as follows:
[0036] S10: evenly arrange monitoring points on each building equipment, and monitor the vibration value and noise value of each monitoring point on each building equipment at the current monitoring time point through a vibration sensor and a sound sensor, obtain the vibration value and noise value of each monitoring point corresponding to each building equipment at the current monitoring time point, and record them as ZD i j and ZY i j , i represents the number of each building equipment, i=1,2,...,n, j represents the number of each monitoring point, j=1,2,...,m.
[0037] The average vibration value and noise value of each monitoring point of each building equipment at the current monitoring time point are calculated to obtain the average vibration value and average noise value of each building equipment at the current monitoring time point, and they are recorded as and .
[0038] S11: According to the formula Calculate the operating vibration status evaluation index of each building equipment corresponding to the current monitoring time point , It is expressed as the allowable vibration value of each building equipment corresponding to the current monitoring point. It represents the allowable noise value of each building equipment corresponding to the current monitoring point, and a1 and a2 represent the weight factors corresponding to the set vibration value and noise value respectively.
[0039] S12: Match the operating state of each building equipment at the current monitoring time point with the reference operating vibration value and reference operating noise value corresponding to each set operating state, and obtain the reference operating vibration value and reference operating noise value of each building equipment at the current monitoring time point, and record them as and .
[0040] According to the formula Calculate the operation stability matching degree of each building equipment corresponding to the current monitoring time point .
[0041] S13: According to the formula Calculate the equipment operation stability coefficient of each building equipment corresponding to the current monitoring time point , a3 and a4 represent the corresponding influencing factors of the set operation vibration state evaluation index and operation stability matching degree, respectively.
[0042] The equipment operation stability state coefficient corresponding to the current monitoring time point of each building equipment is compared with the set equipment operation stability state coefficient threshold of each building equipment corresponding to the current monitoring time point. If the equipment operation stability state coefficient of each building equipment corresponding to the current monitoring time point is greater than the set equipment operation stability state coefficient threshold, then the equipment operation stability state of each building equipment corresponding to the current monitoring time point is determined to be an over-vibration state; otherwise, the equipment operation stability state of each building equipment corresponding to the current monitoring time point is a stable state.
[0043] If the stable operating state of each building equipment corresponding to the current monitoring time point is an over-vibration state, the early warning terminal is activated to execute the corresponding early warning, and the operating vibration value and noise value data of each building equipment are displayed in real time through the display terminal.
[0044] In a specific embodiment, the present invention analyzes the operation vibration state evaluation index and the operation stability matching degree of each building equipment at the current monitoring time point, and thereby obtains the equipment operation stability state coefficient of each building equipment at the current monitoring time point, and then compares it with the set equipment operation stability state coefficient threshold, and then performs the corresponding early warning operation, which not only greatly improves the response timeliness of the vibration value and noise value of the building equipment in the operation state, can effectively reduce the maintenance times of equipment maintenance personnel, reduce the maintenance cost of construction equipment, but also can ensure the operation stability and safety of the construction equipment to the greatest extent, and avoid serious damage to the construction equipment due to the continued operation of the construction equipment after a failure occurs.
[0045] S2. Equipment operating environment status monitoring: Monitor and analyze the equipment operating environment status of each building equipment at the current monitoring time point. The specific monitoring and analysis methods are as follows:
[0046] S21: Monitor the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point through the temperature and humidity sensor, and obtain the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point, which are recorded as WD i j and SD i j At the same time, the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point are averaged to obtain the average temperature and humidity values of each building equipment at the current monitoring time point, which are used as the average temperature value of each building equipment at the current monitoring time point. and .
[0047] According to the formula Calculate the operating temperature status evaluation index of each building equipment at the current monitoring time point , b1 and b2 represent the weight factors corresponding to the set temperature and humidity values respectively.
[0048] S21: Match the operating state of each building equipment at the current monitoring time point with the reference operating temperature value and reference operating humidity value corresponding to each set operating state, obtain the reference temperature value and reference humidity value of each building equipment at the current monitoring time point, and record them as and .
[0049] According to the formula Calculate the matching degree of the operating environment of each building equipment at the current monitoring time point , , They are respectively represented as the allowable temperature value and allowable humidity value of each building equipment corresponding to the current monitoring time point.
[0050] S23: According to the formula Calculate the operating environment status assessment coefficient of each building equipment at the current monitoring time point, b3 and b4 represent the influencing factors corresponding to the set operating temperature status assessment index and operating environment matching degree respectively.
[0051] The equipment operating environment status assessment coefficient of each building equipment corresponding to the current monitoring time point is compared with the set equipment operating environment status assessment coefficient threshold of each building equipment corresponding to the current monitoring time point. If the equipment operating environment status assessment coefficient of each building equipment corresponding to the current monitoring time point is greater than the set equipment operating environment status assessment coefficient threshold, then the equipment operating environment status of each building equipment corresponding to the current monitoring time point is determined to be an over-temperature state; otherwise, the equipment operating environment status of each building equipment corresponding to the current monitoring time point is a normal temperature state.
[0052] If the stable operating state of the equipment at the current monitoring time point of each building equipment is an over-temperature state, the early warning terminal is activated to execute the corresponding early warning, and the operating temperature and humidity data of each building equipment are displayed in real time through the display terminal.
[0053] In a specific embodiment, the present invention monitors and analyzes the operating temperature and humidity values of each building equipment at the current monitoring time point to obtain the operating temperature status evaluation index of each building equipment at the current monitoring time point, and then comprehensively analyzes and processes the operating temperature status evaluation index and the operating environment matching degree to obtain the operating environment status evaluation coefficient of each building equipment at the current monitoring time point, and then compares it with the set operating environment status evaluation coefficient threshold, and then performs corresponding early warning operations, analyzes and processes the temperature and humidity status of each building equipment in the operating state, can provide more comprehensive data support for the fault early warning of each building equipment, and greatly improves the accuracy of fault early warning of each building equipment.
[0054] S3. Equipment operation optimization analysis: Optimize and analyze the safety status of each building equipment at the current monitoring time point. The specific optimization analysis process is as follows:
[0055] Get the running time of each building equipment corresponding to the current monitoring time point and extract its value to obtain the running time of each building equipment corresponding to the current monitoring time point, which is recorded as SJ i , and at the same time obtain the reference operating time set for each building equipment from the database and record it as .
[0056] Get the start and stop times of each building equipment corresponding to the current monitoring time point and extract its value to obtain the start and stop times of each building equipment corresponding to the current monitoring time point, which is recorded as QT i , and at the same time obtain the reference start and stop times set for each building equipment from the database and record it as .
[0057] According to the formula Calculate the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point , c1 and c2 represent the influencing factors corresponding to the running time and the number of starts and stops respectively.
[0058] By matching the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point with the set operation optimization evaluation coefficient threshold of each building equipment corresponding to the current monitoring time point, if the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point is greater than the set operation optimization evaluation coefficient threshold, then it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a state to be optimized; otherwise, it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a healthy state.
[0059] If the operation optimization status of each building equipment corresponding to the current monitoring time point is a state to be optimized, the early warning terminal is started to execute the corresponding early warning, and the operation time and start-stop number data of each building equipment are displayed in real time through the display terminal.
[0060] S4. Equipment Failure Operation Analysis: Failure operation status analysis is performed based on the equipment operation stability state coefficient and operation environment state assessment coefficient of each building equipment corresponding to the current monitoring time point. The specific analysis process is as follows:
[0061] According to the formula Calculate the fault operation evaluation coefficient of each building equipment corresponding to the current monitoring time point, e is a natural constant, d1 and d2 represent the influencing factors corresponding to the set equipment operation stability state coefficient and operation environment state evaluation coefficient respectively.
[0062] In a specific embodiment, the present invention conducts a comprehensive analysis on the equipment operation stability state coefficient and the operation environment state assessment coefficient of each building equipment corresponding to the current monitoring time point, thereby obtaining the fault operation assessment coefficient of each building equipment corresponding to the current monitoring time point, and compares it with the set fault operation assessment coefficient threshold, and then performs the corresponding early warning operation, thereby avoiding the problem of untimely early warning caused by different fault problems of building equipment to the greatest extent, greatly improving the timeliness of fault warning response of building equipment and the comprehensiveness of fault warning, and effectively ensuring the stability and safety of building equipment during operation.
[0063] S5. Display and warning: The over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are displayed through the display terminal, and the over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are warned through the warning terminal.
[0064] The above formulas are all dimensionless and numerical calculations. The formula is a formula that is obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The size of the coefficient is to quantify each parameter to obtain a specific value. Regarding the size of the coefficient, it is acceptable as long as it does not affect the proportional relationship between the parameter and the quantified value.
[0065] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for monitoring and early warning of construction equipment operation failures based on the Internet of Things, characterized in that: The following steps are involved: S1. Equipment operation stability monitoring: monitor and analyze the operation stability of each building equipment at the current monitoring time point. The specific monitoring and analysis process is as follows: S10: evenly arrange monitoring points on each building equipment, monitor the vibration value and noise value of each monitoring point on each building equipment at the current monitoring time point, obtain the vibration value and noise value of each monitoring point corresponding to each building equipment at the current monitoring time point, and record them as ZD i j and ZY i j , i represents the number of each building equipment, i=1,2,...,n, j represents the number of each monitoring point, j=1,2,...,m, and the average value is calculated according to the monitored vibration value and noise value to obtain the average vibration value and average noise value of each building equipment corresponding to the current monitoring time point, and they are recorded as and ; S11: By combining the data values obtained in the previous step with the allowable vibration value and allowable noise value of each building equipment corresponding to the current monitoring point, the operating vibration state evaluation index of each building equipment corresponding to the current monitoring time point is analyzed and calculated. According to the formula Calculate the operating vibration status evaluation index of each building equipment corresponding to the current monitoring time point , It is expressed as the allowable vibration value of each building equipment corresponding to the current monitoring point. It is represented by the allowable noise value of each building equipment corresponding to the current monitoring point, and a1 and a2 are weight factors corresponding to the set vibration value and noise value respectively; S12: Match the operating state of each building equipment at the current monitoring time point with the reference operating vibration value and reference operating noise value corresponding to each set operating state, and obtain the reference operating vibration value and reference operating noise value of each building equipment at the current monitoring time point, and record them as and , According to the formula Analyze and calculate the operation stability matching degree of each building equipment corresponding to the current monitoring time point ; S13: By analyzing the operation vibration state evaluation index and the operation stability matching degree, the equipment operation stability state coefficient of each building equipment corresponding to the current monitoring time point is calculated according to the formula Calculate the equipment operation stability coefficient of each building equipment corresponding to the current monitoring time point , a3 and a4 represent the set operation vibration state evaluation index and the corresponding influencing factor of the operation stability matching degree respectively, and compare the equipment operation stability state coefficient with the set equipment operation stability state coefficient threshold, and start the early warning terminal to execute the corresponding early warning according to the comparison result; S2. Equipment operating environment status monitoring: Monitor and analyze the equipment operating environment status of each building equipment at the current monitoring time point. The specific monitoring and analysis methods are as follows: S21: Monitor the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point, and obtain the temperature and humidity values of each monitoring point on each building equipment at the current monitoring time point, which are recorded as WD i j and SD i j , the average temperature and humidity of each building equipment at the current monitoring time point are obtained through mean calculation, which are recorded as and , and then analyze and calculate the operating temperature status evaluation index of each building equipment at the current monitoring time point, According to the formula Calculate the operating temperature status evaluation index of each building equipment at the current monitoring time point , b1 and b2 represent the weight factors corresponding to the set temperature and humidity values respectively; S22: Obtain the reference temperature value and reference humidity value of each building equipment corresponding to the current monitoring time point, and record them as and , the operating environment matching degree of each building equipment at the current monitoring time point is obtained through analysis and calculation. According to the formula Calculate the matching degree of the operating environment of each building equipment at the current monitoring time point , , They are respectively expressed as the allowable temperature value and the allowable humidity value of each building equipment corresponding to the current monitoring time point; S23: Calculate the operating environment status evaluation coefficient of each building equipment at the current monitoring time point based on the operating temperature status evaluation index and the operating environment matching degree analysis, According to the formula Calculate the operating environment status assessment coefficient of each building equipment at the current monitoring time point, b3 and b4 represent the impact factors corresponding to the set operating temperature status assessment index and the operating environment matching degree respectively, and compare the operating environment status assessment coefficient with the set operating environment status assessment coefficient threshold, and start the early warning terminal to execute the corresponding early warning according to the comparison result; S3. Equipment operation optimization analysis: Optimize and analyze the safety status of each building equipment at the current monitoring time point; S4. Equipment fault operation analysis: Fault operation status analysis is performed based on the equipment operation stability state coefficient and operation environment state assessment coefficient of each building equipment corresponding to the current monitoring time point.
2. According to the method of claim 1, the construction equipment operation failure monitoring and early warning method based on the Internet of Things is characterized by: The specific optimization analysis process of optimizing the safety status of each building equipment corresponding to the current monitoring time point is as follows: Get the running time of each building equipment corresponding to the current monitoring time point and extract its value to obtain the running time of each building equipment corresponding to the current monitoring time point, which is recorded as SJ i , and at the same time obtain the reference operating time set for each building equipment from the database and record it as ; Get the start and stop times of each building equipment corresponding to the current monitoring time point and extract its value to obtain the start and stop times of each building equipment corresponding to the current monitoring time point, which is recorded as QT i , and at the same time obtain the reference start and stop times set for each building equipment from the database and record it as ; According to the formula Calculate the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point , c1 and c2 represent the influencing factors corresponding to the running time and the number of starts and stops respectively.
3. The method for monitoring and early warning of construction equipment operation failure based on the Internet of Things according to claim 2 is characterized by: The operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point is matched with the set operation optimization evaluation coefficient threshold of each building equipment corresponding to the current monitoring time point. If the operation optimization evaluation coefficient of each building equipment corresponding to the current monitoring time point is greater than the set operation optimization evaluation coefficient threshold, then it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a state to be optimized; otherwise, it is determined that the operation optimization state of each building equipment corresponding to the current monitoring time point is a healthy state.
4. The method for monitoring and early warning of construction equipment operation failure based on the Internet of Things according to claim 3 is characterized by: If the operation optimization state of each building equipment corresponding to the current monitoring time point is a state to be optimized, the early warning terminal is started to execute the corresponding early warning, and the operation time and start-stop number data of each building equipment are displayed in real time through the display terminal.
5. The method for monitoring and early warning of construction equipment operation failure based on the Internet of Things according to claim 1 is characterized by: The specific process of performing fault operation status analysis based on the equipment operation stability state coefficient and the operation environment state evaluation coefficient of each building equipment corresponding to the current monitoring time point is as follows: According to the formula Calculate the fault operation evaluation coefficient of each building equipment corresponding to the current monitoring time point, e is a natural constant, d1 and d2 represent the influencing factors corresponding to the set equipment operation stability state coefficient and operation environment state evaluation coefficient respectively.
6. The method for monitoring and early warning of construction equipment operation failure based on the Internet of Things according to claim 3 is characterized by: After the step S4, equipment failure operation analysis, there is also a step S5, display and warning, and the specific execution method corresponding to this step is: The over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are displayed accordingly through the display terminal, and the over-vibration state parameters, over-temperature state and state to be optimized of each building equipment corresponding to the current monitoring time point are warned accordingly through the warning terminal.