A folding device in a PE pipe production line and a PE pipe production process

By setting alternating extrusion and guiding mechanisms in the PE pipe production line, continuous folding of the pipe is achieved, solving the problem of low construction efficiency in existing technologies and improving the construction efficiency of trenchless pipeline repair.

CN118559991BActive Publication Date: 2024-11-05ZHANGZHOU ANYUE ADVANCED MATERIALS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411053089.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-05
Estimated Expiration
2044-08-02

AI Technical Summary

Technical Problem

Existing PE pipes are typically manufactured in a circular shape, which necessitates on-site folding during trenchless pipeline repair work, impacting construction efficiency.

Method used

The PE pipe production line is equipped with alternating first and second extrusion mechanisms. Through the cooperation of the abutment roller and the extrusion roller, the pipe is continuously and stably folded. The extrusion pressure is gradually adjusted to avoid damage, and a guiding mechanism is provided to ensure the folding quality.

Benefits of technology

This technology enables pipes to be folded directly on the production line, improving construction efficiency, adapting to different pipe specifications, ensuring folding accuracy and smoothness, and eliminating the need for on-site folding steps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118559991B_ABST
    Figure CN118559991B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of pipe production, and discloses a folding device in a PE pipe production line and a PE pipe production process, wherein the PE pipe production line includes a frame, a first extrusion mechanism and a second extrusion mechanism; the first extrusion mechanism and the second extrusion mechanism are both provided with a plurality of them, and the first extrusion mechanism and the second extrusion mechanism are alternately installed on the frame along the pipe conveying direction; the first extrusion mechanism includes a first frame, an abutment wheel, a movable frame and an extrusion wheel; the abutment wheel rotates on one side of the first frame; the extrusion wheel rotates on the movable frame and is opposite to the abutment wheel; the position of the movable frame is adjusted on the first frame along the direction of approaching or moving away from the abutment wheel; the second extrusion mechanism includes a second frame, a pressing roller and a connecting member, the connecting member is provided at both ends of the pressing roller, the pressing roller is installed on the second frame through the connecting member, and the position of the connecting member on the second frame can be adjusted. The present application can improve the construction efficiency of the trenchless pipeline repair site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe production, and in particular to a folding device in a PE pipe production line and a PE pipe production process. Background Art

[0002] PE pipe is a non-polar, highly crystalline thermoplastic resin pipe with good flexibility, long service life and corrosion resistance. It is often used in water supply pipes, drainage pipes, gas pipes, agricultural irrigation, industrial fields, underground cable protective sleeves, trenchless pipe repair and other fields.

[0003] Among them, when PE pipes are used in the field of trenchless pipeline repair, the PE pipes need to be folded to reduce the diameter of the PE pipes and then put into the mother pipe that needs to be repaired. The PE pipes are then heated or pressurized to make them round again in order to repair the mother pipe.

[0004] The existing Chinese patent document with publication number CN105128374A discloses a production process for PE pipes, which includes the following steps in sequence: preliminary preparation, installation of molds and adjustment of equipment, raw material processing and feeding, extrusion molding, cooling and shaping, coding and printing, traction by a traction machine, finished product cutting, and packaging and warehousing.

[0005] According to the above-mentioned related technologies, the existing PE pipes are usually stored in a circular state after production and molding, so that the PE pipes need to be folded at the repair site during trenchless pipeline repair, which can easily slow down the construction efficiency. Summary of the invention

[0006] In order to improve the construction efficiency of trenchless pipeline repair on site, the present application provides a folding device in a PE pipe production line and a PE pipe production process.

[0007] In the first aspect, the present application provides a folding device in a PE pipe production line, which adopts the following technical solution:

[0008] A folding device in a PE pipe production line, comprising a frame, a first extrusion mechanism and a second extrusion mechanism; a plurality of the first extrusion mechanism and the second extrusion mechanism are provided, and the first extrusion mechanism and the second extrusion mechanism are alternately installed on the frame along a pipe conveying direction;

[0009] The first extrusion mechanism comprises a first frame, an abutment wheel, a movable frame and an extrusion wheel; the first frame is mounted on the frame; the abutment wheel rotates on one side of the first frame for the pipe to abut against; the extrusion wheel rotates on the movable frame and is opposite to the abutment wheel, and the extrusion wheel is used to extrude the side of the pipe away from the abutment wheel toward the abutment wheel; the position of the movable frame is adjusted on the first frame along the direction of approaching or away from the abutment wheel;

[0010] The second extrusion mechanism includes a second frame, a pressing roller and a connecting piece, wherein the connecting piece is arranged at both ends of the pressing roller, the pressing roller is installed on the second frame through the connecting piece, and the position of the connecting piece on the second frame can be adjusted; the number of the pressing rollers in the second extrusion mechanism is two, and the two pressing rollers are respectively in contact with the upper and lower sides of the pipe.

[0011] By adopting the above technical solution, folding equipment is set up in the production line to directly fold the PE pipe, so that the step of folding at the repair site can be omitted, which significantly improves the construction efficiency. At the same time, the continuous and stable folding of the pipe is achieved by alternately installing the first extrusion mechanism and the second extrusion mechanism. Specifically, when the pipe is folded, one side is abutted against the abutment wheel, and the other side is squeezed by the extrusion wheel and is concave, and the upper and lower sides of the pipe are squeezed and limited by the two abutment rollers in the second extrusion mechanism. After the alternating action of multiple first extrusion mechanisms and second extrusion mechanisms, the pipe can be folded into a U shape.

[0012] Optionally, the distance between the abutment wheel and the extrusion wheel in the first extrusion mechanism located at the feeding end of the frame is greater than the distance between the abutment wheel and the extrusion wheel in the remaining first extrusion mechanisms.

[0013] By adopting the above technical solution, the pipe has a gradual folding process when entering the folding device, avoiding large-scale folding at the beginning to cause damage to the pipe.

[0014] Optionally, the distance between the two pressing rollers in the second extrusion mechanism located at the feeding end of the frame gradually increases along the direction from the abutment wheel to the extrusion wheel.

[0015] By adopting the above technical solution, the distance between the two pressing rollers gradually increases along the direction from the abutting wheel to the squeezing wheel to cooperate with the progressive folding effect of the first squeezing mechanism.

[0016] Optionally, the movable frame has a threaded portion that can rotate relative to the extrusion wheel, and the threaded portion is threadedly moved on the first frame along a direction approaching or moving away from the abutment wheel.

[0017] By adopting the above technical solution, by rotating the threaded part, the movable frame can be finely threadedly moved in the direction of approaching or moving away from the abutting wheel, thereby adjusting the position of the extrusion wheel. This not only improves the folding accuracy, but also enables the equipment to adapt to more PE pipes of different specifications.

[0018] Optionally, the pressing roller includes a central shaft and a sleeve, the sleeve rotates coaxially and is sleeved on the outer wall of the central shaft, and the connecting piece is connected to the end of the central shaft.

[0019] By adopting the above technical solution, the sleeve rotates relative to the central axis, so that the sleeve can be driven to rotate when the pipe is conveyed, thereby improving the smoothness of the pipe conveying.

[0020] Optionally, the folding device also includes a guiding mechanism, which includes a guiding frame and a guiding roller. The guiding frame has two groups, and both groups of the guiding frames are installed on the frame and can be height-adjusted on the frame; the guiding roller is rotatably connected to the guiding frame, and a space is formed between the guide rollers on the two groups of the guiding frames for the folded tube to pass through.

[0021] By adopting the above technical solution and adjusting the height of the guide frame and the position of the guide roller, the folded pipe can pass through the folding equipment smoothly and accurately, thereby further improving the folding quality.

[0022] Optionally, a support member for adjusting the height of the rack is provided at the bottom of the rack.

[0023] By adopting the above technical solution, a support member is arranged at the bottom of the rack so that the height of the equipment can be adjusted according to the on-site environment.

[0024] Optionally, the first extrusion mechanism and the second extrusion mechanism are both provided with two groups along a direction perpendicular to the pipe conveying direction; the first frames in the two groups of the first extrusion mechanisms are both moved on the frame along a direction perpendicular to the pipe conveying direction, and the frame is provided with a locking member for locking the first frame on the frame;

[0025] The first frames in the two groups of the first extrusion mechanisms have a clearance opening on one side close to each other, and the abutment wheel is detachably connected to the clearance opening of the first frame.

[0026] By adopting the above technical solution, two sets of parallel first extrusion mechanisms and two sets of parallel second extrusion mechanisms are provided, so that the pipes of two production lines can be folded at the same time. And by adjusting the position of the first frame and detachably connecting the abutment wheel to the clearance opening of the first frame, the abutment wheels of the two sets of first extrusion mechanisms can be matched, or the extrusion wheels of the two sets of first extrusion mechanisms can be matched.

[0027] In a second aspect, the present application provides a PE pipe production process, using the folding device in the above-mentioned PE pipe production line, comprising the following steps:

[0028] S1, raw material unloading, put the raw material into the hopper and feed it to the next process;

[0029] S2, extrusion molding, forming the raw material into a tube through an extrusion device and outputting it;

[0030] S3, cooling and shaping, inputting the extruded pipe into a cooling device for water cooling and shaping;

[0031] S4, tube folding, the shaped tube is sent to the folding equipment for folding;

[0032] S5, pipe traction, the pipe is pulled by the traction equipment to ensure continuous transmission of the pipe;

[0033] S6, tube winding, the folded tube is wound and stored by a winding device.

[0034] Optionally, after the pipe is removed from the traction device, it enters a heating device for heating. After the pipe leaves the heating device, it is guided by a reshaping device and then rolled up.

[0035] By adopting the above technical solution, the pipe is moved out of the traction device and enters the heating device to soften the folded pipe, so as to reduce the rebound of the folded pipe.

[0036] In summary, the present application includes at least one of the following beneficial effects:

[0037] 1. By setting the first extrusion mechanism and the second extrusion mechanism arranged alternately, the folding operation can be directly performed during the production process of the PE pipe, thereby avoiding additional folding steps at the repair site and improving the construction efficiency;

[0038] 2. By adjusting the distance between the extrusion wheel and the abutment wheel, and by adjusting the height between the abutment rollers and the inclination direction of the abutment rollers, the folding mechanism can fold pipes of different sizes;

[0039] 3. The folded pipe can be guided and supported by the guiding mechanism, further enhancing the folding effect of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 is a schematic diagram of the structure of a folding device according to Embodiment 1 of the present application;

[0041] Figure 2 is a top view of a folding device according to a first embodiment of the present application;

[0042] Figure 3 is a schematic diagram of the explosion structure between the first extrusion mechanism and the frame in the first embodiment of the present application;

[0043] Figure 4 It is a structural schematic diagram of a second extrusion mechanism in an embodiment of the present application;

[0044] Figure 5 is a schematic diagram of the structure of a folding device according to Embodiment 2 of the present application;

[0045] Figure 6 is a top view of the folding device of Embodiment 2 of the present application;

[0046] Figure 7 is a schematic diagram of the explosion structure between the first frame and the abutment wheel in the second embodiment of the present application;

[0047] Figure 8 is a front view of the folding device in the second embodiment of the present application after the abutment wheel is removed;

[0048] Fig. 9 It is a schematic diagram of the cross section of the folded tube in Example 2 of the present application.

[0049] Explanation of the reference numerals: 1. frame; 2. first frame; 3. abutment wheel; 4. movable frame; 41. threaded portion; 42. connecting portion; 43. guide portion; 44. extension portion; 5. extrusion wheel; 6. second frame; 61. mounting rod; 7. pressure roller; 71. center axis; 72. sleeve; 8. connector; 81. connecting piece; 82. connecting bolt; 9. guide mechanism; 91. guide frame; 92. guide roller; 10. support member; 11. locking member; 12. clearance port; 13. feed end; 14. discharge end; 15. first connecting seat; 16. abutment groove; 17. guide strip; 18. second connecting seat; 19. first adjustment hole; 20. second adjustment hole; 21. horizontal strip; 22. adjustment strip; 23. strip hole; 24. disassembly and assembly frame; 25. snap-in groove. DETAILED DESCRIPTION

[0050] The following is combined with Figure 1-9 This application is described in further detail.

[0051] Embodiment 1:

[0052] The present application embodiment discloses a folding device in a PE pipe production line. Figure 1 and Figure 2 The folding device in the PE pipe production line includes a frame 1, and a first extrusion mechanism and a second extrusion mechanism installed on the frame 1.

[0053] The rack 1 is set up between the cooling device (not shown in the figure) and the traction device (not shown in the figure) of the PE pipe production line. The pipe is sequentially conveyed along the arrangement direction of the cooling device, the folding device and the traction device. The traction device pulls the pipe to make the pipe continue to move forward. The cooling device and the traction device are both existing equipment in the existing production line, and will not be described in detail here. The end of the rack 1 close to the cooling device is the feed end 13, and the end of the rack 1 close to the traction device is the discharge end 14.

[0054] Reference Figure 1 and Figure 3 The frame 1 is in the shape of a square frame welded by steel bars, and the bottom of the frame 1 has a plurality of support members 10 for adjusting the height of the frame 1, so as to adjust the height of the frame 1. Specifically, the support member 10 is in the shape of a bolt and the bottom surface of the support member 10 is a plane, and the screw part of the support member 10 is threadedly connected to the bottom rod of the frame 1. When the height of the frame 1 needs to be adjusted, the frame 1 is lifted up by a jack to facilitate the threaded movement of the support member 10. After the height adjustment of the frame 1 is completed, the bottom surface of the support member 10 abuts against the ground to support the frame 1, and the frame 1 limits the movement of the support member 10 by its own gravity.

[0055] There are multiple first extrusion mechanisms and multiple second extrusion mechanisms, which are alternately distributed along the pipe conveying direction, and there are gaps between adjacent first extrusion mechanisms and second extrusion mechanisms, so that the first extrusion mechanisms and the second extrusion mechanisms do not interfere with each other. In this embodiment, the rack 1 is vertical to the pipe conveying and the number of groups of the first extrusion mechanisms and the second extrusion mechanisms in the horizontal direction are both one group.

[0056] Reference Figure 3 , each group of the first extrusion mechanism includes a first frame 2, an abutment wheel 3, a movable frame 4 and an extrusion wheel 5. In the present embodiment, the first frame 2 is in the shape of a square frame formed by welding steel bars and is fixed in the frame 1. A first connecting seat 15 for rotationally connecting the abutment wheel 3 is installed on the first frame 2. The first connecting seat 15 is in the shape of a frame and is installed to one side of the first frame 2. The first connecting seat 15 and the first frame 2 can be connected by bolts or welding. The rotation axis of the abutment wheel 3 extends vertically, and the outer diameter of the abutment wheel 3 gradually decreases from the upper and lower ends of the abutment wheel 3 to the middle position, so that an arc-shaped abutment groove 16 is formed on the side of the abutment wheel 3.

[0057] Reference Figure 3The movable frame 4 includes a threaded portion 41, a connecting portion 42, a guide portion 43 and an extension portion 44. The connecting portion 42 is in the shape of a vertically extending rod, and each movable frame 4 has two connecting portions 42 that are parallel to each other and extend vertically. The guide portion 43 is block-shaped and has two guide portions 43. The two guide portions 43 are respectively fixed at the upper and lower ends of the connecting portion 42, and each guide portion 43 is simultaneously connected to the two connecting portions 42 to connect the two connecting portions 42. A guide bar 17 is fixed to one side of the rods at the upper and lower ends of the first frame 2 that are close to each other. The guide bar 17 is in the shape of a long strip extending in a direction perpendicular to the pipe conveying direction. The two guide portions 43 are respectively slidably mounted on the two guide bars 17 along the length direction of the guide bar 17 to guide the movement of the movable frame 4.

[0058] The extension part 44 is in the shape of a strip, fixed on the guide part 43, and extends toward the abutment wheel 3 in a direction perpendicular to the pipe conveying direction. A second connection seat 18 is fixed to one end of the extension part 44 close to the abutment wheel 3, and the extrusion wheel 5 is rotatably connected to the second connection seat 18. The extrusion wheel 5 is in the shape of a flat wheel with an axis extending vertically. The upper and lower surfaces of the second connection seat 18 are close to the upper and lower end surfaces of the extrusion wheel 5 respectively, and the side of the extrusion wheel 5 away from the extension part 44 is opposite to the middle of the abutment wheel 3.

[0059] The threaded portion 41 is in the shape of a screw, one end of the threaded portion 41 is rotatably connected to the end of the extension portion 44 away from the extrusion wheel 5, and the threaded portion 41 is threadedly penetrated on the side of the first frame 2 away from the extrusion wheel 5. The threaded moving direction of the threaded portion 41 on the first frame 2 is parallel to the length extension direction of the guide bar 17, and the end of the threaded portion 41 away from the extension portion 44 has a handle. By rotating the threaded portion 41, the entire moving frame 4 can be driven to move along the length direction of the guide bar 17, thereby adjusting the position between the extrusion wheel 5 and the abutment wheel 3.

[0060] A space for the pipe to pass through is formed between the extrusion wheel 5 and the abutment wheel 3. When the pipe is folded, the pipe is simultaneously located between the abutment wheel 3 and the extrusion wheel 5 of each group of first extrusion mechanisms. One side of the pipe abuts against the abutment groove 16 of the abutment wheel 3, and the middle part of the pipe is squeezed by the extrusion wheel 5 relative to the other side and is depressed toward the abutment wheel 3. When the pipe is pulled by the traction device and transported, the abutment wheel 3 and the extrusion wheel 5 are driven to rotate.

[0061] Reference Figure 1 and Figure 4Each set of second extrusion mechanisms includes a second frame 6, a pressing roller 7 and a connecting member 8. The second frame 6 includes two mounting rods 61 that are parallel to each other and extend vertically. The upper and lower ends of the mounting rods 61 are fixed to the frame 1, and each mounting rod 61 is vertically provided with two symmetrical first adjustment holes 19. There are two pressing rollers 7 in each set of second extrusion mechanisms. Each pressing roller 7 includes a central shaft 71 and a sleeve 72 that is coaxially sleeved and rotated on the outer wall of the central shaft 71, and the sleeve 72 is cylindrical.

[0062] Reference Figure 4 Each pressing roller 7 corresponds to two sets of connecting members 8, and the two sets of connecting members 8 are respectively installed at two ends of the pressing roller 7 that are far away from each other. Specifically, each set of connecting members 8 includes a connecting piece 81 and a connecting bolt 82. The connecting piece 81 is fixed to the end of the central shaft 71, and the connecting piece 81 is provided with a second adjustment hole 20 that passes through two opposite sides of the connecting piece 81 along the axial direction of the central shaft 71.

[0063] The pressing roller 7 is mounted on the mounting rod 61 through the connecting piece 8. Specifically, the connecting pieces 81 at both ends of the pressing roller 7 are respectively abutted against the two mounting rods 61, so that the second adjustment holes 20 on the connecting pieces 81 at both ends of the pressing roller 7 are respectively connected with the first adjustment holes 19 on the two mounting rods 61, and the rod of the connecting bolt 82 passes through the connecting piece 81 and the mounting rod 61 through the first adjustment hole 19 and the second adjustment hole 20, so that the head of the connecting bolt 82 is pressed against the side of the connecting piece 81 away from the mounting rod 61, and then the nut is threadedly sleeved on the connecting bolt 82 and pressed against the side of the mounting rod 61 away from the connecting piece 81, so that the connecting pieces 81 at both ends of the pressing roller 7 are respectively locked to the two mounting rods 61, thereby limiting the pressing roller 7. Through the cooperation of the first adjustment hole 19 and the second adjustment hole 20, the extension direction and height of the pressing roller 7 can be adjusted.

[0064] Reference Figure 3 and Figure 4 When the tube is folded, the two pressing rollers 7 in each group of the second squeezing mechanism respectively abut against the upper and lower sides of the tube to limit the height of the tube, so that when the tube is squeezed by the squeezing wheel 5 and recessed toward the abutting wheel 3, the upper and lower sides of the tube are squeezed by the pressing rollers 7 and deformed toward each other, so that the tube can be squeezed into a U-shaped shape with the opening facing the squeezing wheel 5. During the conveying process, the tube drives the sleeve 72 of the pressing roller 7 to rotate.

[0065] In order to improve the smoothness of the folding of the tube, the distance between the extrusion wheel 5 and the contact wheel 3 in each first extrusion mechanism is adjusted to gradually decrease toward the discharge end 14 of the frame 1. At the same time, the distance between the two pressing rollers 7 in the second extrusion mechanism near the feed end 13 of the frame 1 is gradually increased along the length direction of the parallel guide bar 17 and in the direction close to the handle on the mobile frame 4, so that the two pressing rollers 7 form a flared shape together, and the flaring angle between the two pressing rollers 7 in the second extrusion mechanism is gradually reduced until the two pressing rollers 7 in the second extrusion mechanism located at the feed end 13 are parallel to each other.

[0066] By changing the distance between the extrusion wheel 5 and the abutment wheel 3, and the distance between the pressing rollers 7, the pipe can undergo a relatively gentle extrusion process when it is transferred from the feeding end 13 of the frame 1 to the discharging end 14, thereby avoiding damage to the pipe caused by sudden strong extrusion. In addition, by adjusting the positions of the extrusion wheel 5 and the pressing roller 7, the extrusion wheel 5 and the abutment wheel 3 can adapt to pipes of different diameters.

[0067] Reference Figure 1 Furthermore, the folding device further includes a guide mechanism 9 installed at the discharge end 14 of the frame 1. Specifically, the guide mechanism 9 includes a guide frame 91 and a guide roller 92. The guide frame 91 has two, and the two sets of guide frames 91 are installed on the frame 1 and distributed up and down. The frame 1 is provided with an adjustment component for adjusting the height of the guide frame 91. The adjustment component can be a screw connected to the guide frame 91 and rotated on the frame 1, or it can be an electric telescopic rod connected between the frame 1 and the guide frame 91.

[0068] The guide roller 92 is rotatably connected to the guide frame 91, and the rotation axis of the guide roller 92 extends in the horizontal direction and is perpendicular to the conveying direction of the pipe. There are multiple guide rollers 92 on each guide frame 91, and multiple guide rollers 92 are distributed on the guide frame 91 along the conveying direction of the pipe, and a space for the pipe to pass through is formed between the guide rollers 92 on the upper and lower guide frames 91. The distance between the upper and lower guide rollers 92 is consistent with the distance between the two pressing rollers 7 in the second extrusion mechanism near the discharge end 14 of the frame 1, so that the folded pipe can be squeezed by the guide roller 92 and maintain the folded state, which helps to shape the folded pipe. The folded pipe passes between the guide rollers 92 and enters the traction device.

[0069] The implementation principle of the folding device in a PE pipe production line of the embodiment of the present application is as follows: after the pipe is discharged from the cooling device, it enters the frame 1 from the feed end 13 of the frame 1, and the pipe passes through the first extrusion mechanism and the second extrusion mechanism which are alternately arranged in sequence. When the pipe passes through the first extrusion mechanism, one side of the pipe abuts against the abutment wheel 3, and the other side is squeezed by the extrusion wheel 5 toward the abutment wheel 3 to become concave. When the pipe passes through the second extrusion mechanism, the two pressing rollers 7 in the second extrusion mechanism abut against the upper and lower sides of the pipe respectively to squeeze the upper and lower sides of the pipe toward the middle. Through the coordinated action of the first extrusion mechanism and the second extrusion mechanism, the pipe is squeezed and folded into a U-shape with the opening facing the extrusion wheel 5 during the pipe transmission process.

[0070] The present application also provides a PE pipe production process, comprising the following steps:

[0071] S1, raw material unloading, put the raw material into the hopper and feed it to the next process;

[0072] S2, extrusion molding, the raw material enters the extrusion equipment for heating, and then the raw material is extruded from the extrusion equipment into a tube and transported to the next process;

[0073] S3, cooling and shaping, the extruded pipe is input into the cooling equipment, and the cooling equipment uses the circulating water cooling system to evenly cool the pipe to shape the pipe;

[0074] S4, tube folding, the shaped tube is sent to the folding equipment for folding;

[0075] S5, pipe traction, the traction equipment traction and transmission of the folded pipe, so that the pipe is continuously transmitted;

[0076] S6, pipe heating, the folded pipe enters the heating equipment for heating and softening to reduce the rebound phenomenon of the pipe;

[0077] S7, the pipe is shaped. The softened pipe is sent to the reshaping equipment. The reshaping equipment sets rotating rollers that abut against the pipe to limit the position of the pipe, so that the folded pipe can be shaped again. The rotating rollers are driven to rotate when the pipe is conveyed.

[0078] S8, tube winding, the winding device continuously rotates to wind and store the folded tube.

[0079] Embodiment 2:

[0080] The difference between the embodiment of the present application and the embodiment one is that the number of groups of the first extrusion mechanism and the second extrusion mechanism of the frame 1 along the horizontal and vertical pipe conveying direction is two, and the installation method of the first extrusion mechanism is different from that in the embodiment one.

[0081] Reference Figure 5and Figure 6 The length direction of the frame 1 is defined as the conveying direction of the pipe, and the width direction of the frame 1 is the direction perpendicular to the conveying direction of the pipe. The first extrusion mechanism and the second extrusion mechanism are arranged in two groups in parallel along the width direction of the frame 1, so that the extrusion equipment can support two pipe production lines at the same time, and the two pipes pass through the two parallel groups of the first extrusion mechanism and the two parallel groups of the second extrusion mechanism respectively.

[0082] Reference Figure 5 and Figure 7 The bottom and top of the frame 1 both have horizontal bars 21 corresponding to the first extrusion mechanism, and the horizontal bars 21 extend along the width direction of the frame 1. The first frames 2 in the two groups of first extrusion mechanisms arranged in parallel along the width direction of the frame 1 both slide between the corresponding upper and lower horizontal bars 21 along the width direction of the frame 1.

[0083] In order to position the first frame 2, a locking member 11 is provided on the frame 1. Specifically, the locking member 11 includes a locking bolt threadedly provided on the horizontal bar 21 at the bottom of the frame 1 along the length direction of the frame 1. An adjustment bar 22 extending along the width direction of the frame 1 is fixed to the bottom side wall of the first frame 2. The adjustment bar 22 abuts against the side wall of the horizontal bar 21 at the bottom of the frame 1, and a strip hole 23 is provided on the adjustment bar 22 along the width direction of the frame 1. The locking bolt can pass through the adjustment bar 22 through the strip hole 23 and then be threadedly connected and passed through the horizontal bar 21. The adjustment bar 22 is locked by moving the locking bolt thread to the head to abut against the side of the adjustment bar 22 away from the horizontal bar 21. The nut thread is sleeved on the locking bolt rod and abuts against the side of the horizontal bar 21 away from the adjustment bar 22, so as to further improve the locking degree between the adjustment bar 22 and the horizontal bar 21. Each adjustment bar 22 is matched with at least two locking bolts.

[0084] By adjusting the position of the first frame 2 along the width direction of the frame 1, the position of the first extrusion mechanism can be adapted to the discharge positions of the two pipe production lines.

[0085] Reference Figure 5 and Figure 7 Furthermore, in the embodiment of the present application, a clearance opening 12 is provided on the side where two first frames 2 arranged in parallel along the width direction of the frame 1 are close to each other, and the clearance opening 12 cuts off the continuous extension of the first frame 2. In the embodiment of the present application, there is a disassembly frame 24, and the abutment wheel 3 is rotatably sleeved on the disassembly frame 24. The upper and lower ends of the disassembly frame 24 extend out of the upper and lower ends of the abutment wheel 3 and form a clamping groove 25. The disassembly frame 24 can be sleeved on the upper and lower rods of the first frame 2 at the clearance opening 12 along the width direction of the frame 1 through the clamping grooves 25 at the upper and lower ends. The disassembly frame 24 is locked with the first frame 2 by bolts passing through the disassembly frame 24 and the first frame 2 at the same time and then locked with nuts. By removing the bolts and nuts, the disassembly frame 24 and the abutment wheel 3 can be removed from the first frame 2.

[0086] Reference Figure 5 and Figure 6 The distance between the two groups of second frames 6 arranged in parallel along the width direction of the rack 1 and the sides close to each other is consistent with the distance between two mounting rods 61 in any second frame 6, that is, four mounting rods 61 are evenly spaced and fixed along the width direction of the rack 1.

[0087] Therefore, the pressing roller 7 can be installed on two mounting rods 61 close to each other in the two parallel sets of second frames 6 through the connecting piece 8, so that the space between the two parallel abutment wheels 3 along the width direction of the frame 1 is opposite to the pressing roller 7. In this case, the pipe material that does not need to be squeezed and folded can pass between the two parallel abutment wheels 3, so that the left and right opposite sides of the pipe material are respectively pressed into the abutment grooves 16 of the two abutment wheels 3, and the abutment wheels 3 limit the left and right positions of the pipe material; the pipe material simultaneously enters the space formed by the pressing roller 7 between the two sets of second frames 6, so that the upper and lower sides of the pipe material are pressed against the pressing roller 7, and the abutment wheels 3 and the sleeve 72 of the pressing roller 7 are driven to rotate together when the pipe material is conveyed.

[0088] Reference Figure 7 and Figure 8 In addition, all the abutment wheels 3 are removed from the first frame 2, and the two parallel groups of first frames 2 are adjusted to be close to each other, and the position of the extrusion wheel 5 is adjusted through the movable frame 4, so that a space for the pipe to pass through can be formed between the extrusion wheels 5 in the two parallel groups of first extrusion mechanisms, and the make way openings 12 of the first frames 2 make way for the extrusion wheels 5 and the pipe. At the same time, the pressing rollers 7 are installed between the two groups of second frames 6, so that the pressing rollers 7 are opposite to the extrusion wheels 5, and a space for the pipe to pass through is formed between the upper and lower pressing rollers 7. At this time, the pipe is transferred from between the extrusion wheels 5 and between the pressing rollers 7 through the frame 1, so that the opposite sides of the pipe are squeezed inward by the extrusion wheels 5, so that the opposite sides of the pipe are both concave, and the upper and lower sides of the pipe are limited by the pressing rollers 7, so that the pipe is folded as follows. Fig. 9 The concave shape on both sides is shown to improve the adaptability of foldable devices.

[0089] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A folding device in a PE pipe production line, characterized in that: include: A frame (1), a first extrusion mechanism, and a second extrusion mechanism; a plurality of the first extrusion mechanism and the second extrusion mechanism are provided, and the first extrusion mechanism and the second extrusion mechanism are alternately installed on the frame (1) along the pipe conveying direction; The first extrusion mechanism comprises a first frame (2), an abutment wheel (3), a movable frame (4) and an extrusion wheel (5); the first frame (2) is mounted on the frame (1); the abutment wheel (3) rotates on one side of the first frame (2) for abutment with the pipe; the extrusion wheel (5) rotates on the movable frame (4) and is opposite to the abutment wheel (3), and the extrusion wheel (5) is used to extrude the side of the pipe away from the abutment wheel (3) towards the abutment wheel (3); the position of the movable frame (4) is adjusted on the first frame (2) along the direction of approaching or moving away from the abutment wheel (3); The second extrusion mechanism comprises a second frame (6), a pressing roller (7) and a connecting member (8), wherein the connecting member (8) is arranged at both ends of the pressing roller (7), the pressing roller (7) is mounted on the second frame (6) via the connecting member (8), and the position of the connecting member (8) on the second frame (6) is adjustable; the number of the pressing rollers (7) in the second extrusion mechanism is two, and the two pressing rollers (7) are respectively in contact with the upper and lower sides of the pipe; The pressing roller (7) comprises a central shaft (71) and a sleeve (72), wherein the sleeve (72) coaxially rotates and is sleeved on the outer wall of the central shaft (71), and the connecting member (8) is connected to the end of the central shaft (71); the second frame (6) comprises two mounting rods (61) which are parallel to each other and extend vertically, wherein the upper and lower ends of the mounting rods (61) are fixed to the frame (1), and each of the mounting rods (61) is provided with two symmetrical first adjustment holes (19) in the vertical direction; each group of the connecting members (8) comprises a connecting plate (81) and a connecting bolt (82), wherein the connecting plate (81) is fixed to the end of the central shaft (71), and the connecting plate (81) is provided with a second adjustment hole (20) which passes through two opposite sides of the connecting plate (81) along the axial direction of the central shaft (71); The connecting pieces (81) at both ends of the pressing roller (7) are respectively in contact with the two mounting rods (61), so that the second adjustment holes (20) on the connecting pieces (81) at both ends of the pressing roller (7) are respectively connected with the first adjustment holes (19) on the two mounting rods (61), and the rod portion of the connecting bolt (82) passes through the first adjustment hole (19) and the second adjustment hole (20) and passes through the connecting piece (81) and the mounting rod (61); The movable frame (4) has a threaded portion (41) that can rotate relative to the extrusion wheel (5), and the threaded portion (41) is threadedly movable on the first frame (2) in a direction approaching or moving away from the abutment wheel (3); The first extrusion mechanism and the second extrusion mechanism are both provided in two groups along a direction perpendicular to the pipe conveying direction; the first frames (2) in the two groups of the first extrusion mechanisms are both moved on the frame (1) along a direction perpendicular to the pipe conveying direction, and the frame (1) is provided with a locking member (11) for locking the first frame (2) on the frame (1); The first frames (2) in the two groups of the first extrusion mechanisms are provided with a clearance opening (12) on the sides close to each other, and the abutment wheel (3) is detachably connected to the clearance opening (12) of the first frame (2).

2. The folding device in a PE pipe production line according to claim 1, characterized in that: The distance between the abutment wheel (3) and the extrusion wheel (5) in the first extrusion mechanism located at the feeding end (13) of the frame (1) is greater than the distance between the abutment wheel (3) and the extrusion wheel (5) in the remaining first extrusion mechanisms.

3. The folding device in a PE pipe production line according to claim 1, characterized in that: The distance between the two pressing rollers (7) in the second extrusion mechanism located at the feeding end (13) of the frame (1) gradually increases along the direction from the abutment wheel (3) to the extrusion wheel (5).

4. The folding device in a PE pipe production line according to claim 1, characterized in that: The folding device further comprises a guide mechanism (9), wherein the guide mechanism (9) comprises a guide frame (91) and a guide roller (92), wherein the guide frame (91) comprises two groups, and the two groups of guide frames (91) are both mounted on the frame (1) and can be height-adjusted on the frame (1); the guide roller (92) is rotatably connected to the guide frame (91), and a space for the folded tube to pass through is formed between the guide rollers (92) on the two groups of guide frames (91).

5. The folding device in a PE pipe production line according to claim 1, characterized in that: A support member (10) for adjusting the height of the frame (1) is provided at the bottom of the frame (1).

6. A PE pipe production process, characterized in that: Using a folding device in a PE pipe production line as described in any one of claims 1 to 5, The following steps are involved: S1, raw material unloading, put the raw material into the hopper and feed it to the next process; S2, extrusion molding, forming the raw material into a tube through an extrusion device and outputting it; S3, cooling and shaping, inputting the extruded pipe into a cooling device for water cooling and shaping; S4, tube folding, the shaped tube is sent to the folding equipment for folding; S5, pipe traction, the pipe is pulled by the traction equipment to ensure continuous transmission of the pipe; S6, tube winding, the folded tube is wound and stored by a winding device.

7. A PE pipe production process according to claim 6, characterized in that: After the pipe is removed from the traction device, it enters the heating device for heating. After leaving the heating device, the pipe is guided by the reshaping device and then reeled.