A grouting reinforcement and repair method for mortar-laid rubble retaining wall

By constructing the frame beam on the outside of the retaining wall and reserving grouting holes, grouting is done using inclined conduits and inclined steel flower pipes for grouting and repair, the problem of instability caused by drilling is solved and the overall strength of the retaining wall is improved. and lifespan.

CN118563829BActive Publication Date: 2024-11-19CCCC FIRST HIGHWAY CONSULTANTS CO LTD

Patent Information

Application Number
CN202411037691.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-19
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

In the prior art, when the mortar-built stone retaining wall is reinforced by hollow self-advance anchor rods during repair, the strong vibration caused by the drilling hole affects the loose soil inside the retaining wall, resulting in the retaining wall being easily instable when the reinforced structure does not form strength.

Method used

The frame beam is constructed on the outside of the retaining wall, and the grouting holes for the inclined small conduit and inclined steel pipe are reserved. The grouting is carried out through the inclined small conduit and inclined steel pipe, and reinforcement is strengthened and repaired to avoid the instability of the retaining wall during drilling, and through The frame beam setting provides stable conditions to ensure the stability of the reinforcement system.

Benefits of technology

It effectively avoids the problem of instability of the retaining wall during the repair process, and improves the stability of reinforcement and the overall strength and life of the retaining wall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118563829B_ABST
    Figure CN118563829B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of repairing mortar-laid rubble retaining walls, and in particular to a grouting reinforcement and repair method for mortar-laid rubble retaining walls. The method comprises the following steps: firstly detecting the internal structure of the retaining wall to determine the severity of damage to the retaining wall and the distribution of high-risk instability areas, and then formulating a grouting hole position layout plan; constructing a frame beam outside the retaining wall to reinforce the retaining wall first, and reserving grouting holes for inclined small guide tubes and inclined steel flower pipes on the frame beam according to the grouting hole position layout plan, thereby avoiding the need to drill holes on the frame beam in the later stage; providing stable conditions for drilling and grouting of small guide tubes through the frame beam setting, and then providing stable conditions for drilling and grouting of inclined steel flower pipes through the small guide tube grouting, and forming a stable reinforcement system for anchoring the inclined steel flower pipes to the frame beams through the inclined steel flower pipe grouting, thereby not only overcoming the problem of easy instability during the repair process, but also greatly improving the stability of the later reinforcement, and improving the overall strength and service life of the retaining wall structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of repairing mortar-laid rubble stone retaining walls, and in particular to a grouting reinforcement and repairing method for mortar-laid rubble stone retaining walls. Background Art

[0002] Roadbed retaining walls are an effective structure for supporting roadbeds and slopes. They can prevent typical roadbed disasters such as roadbed collapse and slope sliding, and are important structures for ensuring smooth roads. Among them, mortar-laid rubble retaining walls made of a mixture of rubble and cement mortar have become a widely used retaining wall structure due to their simple construction process, low cost, beautiful appearance, and good water permeability. However, with the increase in the service life of highways, coupled with the influence of adverse factors such as strong rainfall and earthquakes, the risk of retaining walls suffering from cracking, dislocation, bulging, overturning, and cavities has increased, which will further lead to the instability of the roadbed slopes and the interruption of the road. Therefore, it is necessary to develop effective retaining wall reinforcement methods to eliminate safety hazards and extend the service life of roads.

[0003] Announcement No. CN216379627U introduces an enhanced mortar-made stone retaining wall structure, which is mainly composed of a mortar-made stone retaining wall, in which a reinforced concrete hole-making retaining wall is firmly inserted. Furthermore, reinforced concrete cast-in-place piles are arranged inside the reinforced concrete hole-making retaining wall to strengthen its structural strength. At the top of the reinforced concrete hole-making retaining wall, a reinforced concrete crown beam is designed, one end of which is closely connected to the sidewalk platform. In order to enhance the stability of the sidewalk platform area, a reinforced concrete face is specially arranged on the side wall of the reinforced concrete hole-making retaining wall and on the side close to the sidewalk platform, and a supporting mechanism is installed between the reinforced concrete face and the sidewalk platform. This structure can be used for the construction of new retaining walls, but is not suitable for the reinforcement of existing retaining walls, and the structural design is complex. Although the built-in reinforced concrete structure improves the structural strength of the retaining wall, the structural repair is time-consuming and labor-intensive.

[0004] For another example, patent application publication number CN116607562A discloses a grouting reinforcement structure for a grouting rubble retaining wall and its construction method, including a retaining wall structure with internal drainage holes and hollow self-advancing anchor rods, a concrete face and an external grouting machine, a grouting pipe connected to the hollow self-advancing anchor rod, and filling grouting to improve the overall strength of the retaining wall. This method only relies on the concrete face to support the retaining wall when drilling, ignoring the impact of the strong vibration caused by drilling on the loose soil inside the retaining wall, which can easily cause the retaining wall to become unstable prematurely before the grouting reinforcement structure has formed strength. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art that when a mortar-laid rubble retaining wall is repaired and reinforced by hollow self-advancing anchor rods, the strong vibration caused by drilling affects the loose soil inside the retaining wall, which easily causes the retaining wall to become unstable prematurely before the grouting reinforcement structure has formed strength. A grouting reinforcement and repair method for a mortar-laid rubble retaining wall is provided. When reinforcing a roadbed retaining wall with a risk of instability, the retaining wall body and the internal structure are pre-reinforced in advance to avoid instability of the retaining wall during drilling construction.

[0006] The present invention provides a grouting reinforcement and repair method for a mortar-laid rubble stone retaining wall, comprising the following steps:

[0007] S1. On-site investigation: Conduct on-site investigation on the defects and severity of the retaining wall, and use testing equipment to test the internal structure of the retaining wall;

[0008] S2. Grouting hole location layout: Develop a grouting hole location layout plan based on the severity of the retaining wall damage and the distribution of high-risk instability areas;

[0009] S3. Frame beam construction: construct frame beams outside the retaining wall, and reserve grouting holes for inclined small guide tubes and inclined steel flower pipes on the frame beams according to the grouting hole location layout plan;

[0010] S4, inclined small conduit grouting: grouting holes for inclined small conduits are drilled at the reserved grouting holes and the retaining wall, and then the inclined small conduits are inserted to inject grout into the interior of the retaining wall and the inner soil through the inclined small conduits; wherein the inclined small conduits extend from the outer side of the retaining wall to the inner side of the retaining wall;

[0011] S5, inclined steel pipe grouting: after the small pipe grouting solidifies, inclined steel pipe grouting holes are drilled at the reserved grouting holes and the retaining wall, and then the inclined steel pipe is inserted, and grouting is performed through the inclined steel pipe; wherein, during the inclined steel pipe grouting, anchor steel bars are inserted into the inclined steel pipe, and the inclined steel pipe extends from the outside of the retaining wall to the inside of the retaining wall into the slope soil;

[0012] S6. Anchoring of inclined steel pipes: After the grouting slurry solidifies and the concrete strength of the frame beam is greater than 80% of the design strength, the anchor rods in the inclined steel pipes are tensioned so that the inclined steel pipes are anchored on the frame beam, and the reinforcement and repair is completed.

[0013] In this scheme, the internal structure of the retaining wall is first inspected to determine the severity of damage to the retaining wall and the distribution of high-risk instability areas, and then a grouting hole layout plan is formulated; by constructing frame beams on the outside of the retaining wall, the retaining wall can be reinforced first, and grouting holes for inclined small guide tubes and inclined steel flower pipes are reserved on the frame beams according to the grouting hole layout plan, avoiding the need to drill holes on the frame beams later; the depth of the inclined small guide tube is shallower than that of the inclined steel flower pipe, and the drilled hole is shallow and small. With the reinforcement of the frame beam, grouting holes for inclined small guide tubes can be drilled in the reserved grouting holes and in the retaining wall. Grouting with inclined small guide tubes can avoid instability of the retaining wall during construction, and the inclined small guide tubes extend from the outside of the retaining wall to the inside of the retaining wall, which can grout and reinforce the interior of the retaining wall and the inner soil; although the drilling hole required for the inclined steel flower pipe is deep and large, in the small guide tube After the grouting solidifies, the stability of the retaining wall itself and the inner soil are higher. The inclined steel pipe grouting hole can be drilled, and then the inclined steel pipe is inserted, and grouting is carried out through the inclined steel pipe. When the inclined steel pipe is grouting, anchor steel bars are inserted inside the inclined steel pipe. After the grouting slurry solidifies and the concrete strength of the frame beam is greater than 80% of the design strength, the anchor steel bars in the inclined steel pipe are tensioned, so that the inclined steel pipe is anchored on the frame beam to achieve reinforcement and repair; the frame beam is set to provide stable conditions for small guide tube drilling grouting, and then the small guide tube grouting provides stable conditions for the inclined steel pipe drilling grouting. The inclined steel pipe grouting is used to form a stable reinforcement system for the inclined steel pipe anchoring the frame beam, which not only overcomes the problem of easy instability in the repair process, but also can greatly improve the stability of the later reinforcement and improve the overall strength and life of the retaining wall structure.

[0014] Preferably, in step S4, a vertical small conduit grouting step is also included: a grouting hole of a vertical small conduit is drilled downward from the road surface above the backfill soil body inside the retaining wall, and then grouting is performed downward through the vertical small conduit to backfill the soil body;

[0015] Among them, vertical small-duct grouting and inclined small-duct grouting are carried out simultaneously.

[0016] The retaining wall is located on the slope, and there is backfill soil between the retaining wall and the slope, that is, the inner side of the retaining wall is the backfill soil, and the top of the backfill soil is the road surface. The vertical grouting of the lower backfill soil through the vertical small pipe, combined with the inclined small pipe grouting, can reinforce the backfill soil inside the retaining wall and the slope soil, thereby better providing stability for the subsequent inclined steel pipe drilling. Moreover, the vertical grouting of the vertical small pipe can also raise the settled road surface, which is conducive to the repair of the road surface. The simultaneous vertical small pipe grouting and the inclined small pipe grouting can improve the grouting efficiency and improve the efficiency of the repair and reinforcement of the retaining wall.

[0017] Preferably, grouting is performed only on the outer part of the road surface through a small vertical conduit to avoid affecting traffic, and the backfill soil close to the retaining wall is reinforced, which is more conducive to preventing the retaining wall from becoming unstable during repair.

[0018] Preferably, the grouting holes of the vertical small conduits and the grouting holes of the inclined small conduits do not intersect, so as to avoid cross-linking of grouting and affecting the grouting quality.

[0019] Preferably, the inclined small conduit grouting holes and the inclined steel flower pipe grouting holes are arranged in an upper and lower staggered manner to avoid grouting and to cover a wider grouting area.

[0020] Preferably, secondary grouting is used for grouting to ensure the compactness of the grouting and the safety of the structure.

[0021] Preferably, in step S5, the drilling position, drilling depth and inclination angle of the inclined steel pipe are calibrated during the period of forming strength of the soft soil, and then the inclined steel pipe grouting hole is drilled, and then the inclined steel pipe is inserted into the inclined steel pipe grouting hole, and the anchor steel bar is inserted;

[0022] Among them, the inclined steel flower pipe grouting is carried out from the bottom layer upwards, and the inclined steel flower pipe grouting adopts intermittent skip hole grouting.

[0023] Calibration of the drilling position, drilling depth and inclination angle of the inclined steel pipe during the period of strength formation of soft soil can improve efficiency. Grouting of the inclined steel pipe is carried out from the bottom to the top. The intermittent skipping grouting of the inclined steel pipe can better ensure the stability of the construction.

[0024] Preferably, before step S4, pretreatment is also included: grouting cracks on the surface of the retaining wall with a width greater than or equal to 1 cm to ensure that the slurry does not seep out of the wall during grouting.

[0025] Preferably, between steps S2 and S3, when there is a risk of sliding of the retaining wall, the step of constructing anti-sliding piers is further included: constructing anti-sliding piers on the outer side of the retaining wall;

[0026] and / or,

[0027] Between step S3 and step S4, a rib column facing wall is constructed within the frame of the frame beam, and grouting holes for inclined small guide tubes and inclined steel flower pipes are reserved on the rib column facing wall.

[0028] The rib column facing wall can further strengthen the reinforcement of the retaining wall.

[0029] Preferably, between step S2 and step S4, the anti-slip pier and frame beam foundation construction is first carried out: test layout is carried out before construction to determine the structural dimensions of the anti-slip pier and frame beam foundation, and then the anti-slip pier and frame beam foundation part are constructed by excavating and pouring at the same time, and steel bar joints are reserved; then the rib column protection wall and frame beam construction are carried out: the frame beam is constructed by first erecting the vertical beam and then the horizontal beam, and the grouting hole position is reserved. After the frame beam construction is completed, the rib column protection wall is constructed on the inner side of the frame beam;

[0030] In step S4, the inclined small pipe and the vertical small pipe are grouting: first, the hole position is measured and laid out, the hole position spacing and the angle are determined, and the holes are drilled. Before grouting, the grouting pressure and grouting volume test are carried out, and then the small pipe is placed. After the small pipe is placed, the grouting begins. The grouting sequence is from bottom to top, from outside to inside, and in a sequential manner between rows and intensified within rows. The final grouting pressure is 1.0 MPa.

[0031] In step S5, grouting is performed on the inclined steel pipe: after the grouting of the small tube solidifies, drilling is performed on the inclined steel pipe to check the hole formation. After the grouting pressure and grouting amount test are completed, the inclined steel pipe and anchor steel bars are placed, and then the inclined steel pipe is grouted using a repeated intermittent grouting mode, wherein the grouting pressure of the first pressure grouting is controlled at 0.6MPa-0.8MPa, and the grouting pressure of the second pressure grouting is increased to 0.9MPa-1.1MPa, and the anchor is sealed after the slurry is finally solidified.

[0032] The above method can ensure the stability of the retaining wall repair and reinforcement construction.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] The present invention provides a grouting reinforcement and repair method for a mortar-laid rubble retaining wall. The method comprises the following steps: firstly detecting the internal structure of the retaining wall to determine the severity of damage to the retaining wall and the distribution of high-risk instability areas, and then formulating a grouting hole position layout plan; constructing a frame beam on the outer side of the retaining wall to reinforce the retaining wall first, and reserving grouting holes for inclined small guide tubes and inclined steel flower pipes on the frame beam according to the grouting hole position layout plan, thereby avoiding the need to drill holes on the frame beam in the later stage; providing stable conditions for drilling and grouting of small guide tubes through the frame beam arrangement, and then providing stable conditions for drilling and grouting of inclined steel flower pipes through the small guide tube grouting, and forming a stable reinforcement system for anchoring the inclined steel flower pipes to the frame beams through the inclined steel flower pipe grouting, which not only overcomes the problem of easy instability during the repair process, but also can greatly improve the stability of the later reinforcement, thereby improving the overall strength and service life of the retaining wall structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a schematic flow chart of the grouting reinforcement and repair method of the mortar-laid rubble retaining wall according to the present invention;

[0036] Figure 2 This is a cross-sectional view of the in-situ reinforcement construction of the retaining wall in the present invention;

[0037] Figure 3 It is a schematic diagram of the vertical surface of the retaining wall construction in the present invention.

[0038] Markings in the figure: 1. Slope; 11. Slope soil; 12. Drainage pipe; 2. Retaining wall; 21. Retaining wall foundation; 3. Frame beam; 31. Frame beam foundation; 32. Vertical beam; 33. Horizontal beam; 34. Rib column facing wall; 4. Inclined small duct; 5. Inclined steel flower pipe; 6. Vertical small duct; 61. Road surface; 62. Backfill soil. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0040] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0041] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0042] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0043] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0044] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0045] Example 1

[0046] This embodiment provides a grouting reinforcement repair method for a mortar-laid rubble retaining wall 2, comprising the following steps:

[0047] S1. On-site investigation: Conduct on-site investigation on the defects and severity of retaining wall 2, and use testing equipment to test the internal structure of retaining wall 2;

[0048] S2. Grouting hole location layout: According to the severity of damage to retaining wall 2 and the distribution of high-risk instability areas, a grouting hole location layout plan is formulated; by first testing the internal structure of retaining wall 2, the severity of damage to retaining wall 2 and the distribution of high-risk instability areas are determined, and then a grouting hole location layout plan is formulated;

[0049] S3, construction of frame beam 3: construct frame beam 3 outside retaining wall 2, and reserve grouting holes for inclined small conduit 4 and inclined steel flower pipe 5 on frame beam 3 according to grouting hole position layout plan; by constructing frame beam 3 outside retaining wall 2, retaining wall 2 can be reinforced first, and grouting holes for inclined small conduit 4 and inclined steel flower pipe 5 can be reserved on frame beam 3 according to grouting hole position layout plan, avoiding the need to drill holes on frame beam 3 in the later stage;

[0050] S4, grouting of the inclined small conduit 4: drilling grouting holes for the inclined small conduit 4 at the reserved grouting holes and the retaining wall 2, then inserting the inclined small conduit 4, and grouting the inside and inner soil of the retaining wall 2 through the inclined small conduit 4; wherein the inclined small conduit 4 extends from the outer side of the retaining wall 2 to the inner side of the retaining wall 2;

[0051] The depth of the inclined small conduit 4 is shallower than that of the inclined steel flower pipe 5, and the drilling hole is shallow and small. Under the reinforcement of the frame beam 3, the grouting holes of the inclined small conduit 4 can be drilled in the reserved grouting holes and the retaining wall 2. The inclined small conduit 4 is used for grouting, which can avoid the instability of the retaining wall 2 during construction. The inclined small conduit 4 extends from the outside of the retaining wall 2 to the inside of the retaining wall 2, and the grouting reinforcement of the interior of the retaining wall 2 and the inner soil body can be carried out.

[0052] like Figure 2 As shown, the retaining wall 2 is located on the slope 1, and there is a backfill soil body 62 between the retaining wall 2 and the slope 1, that is, the inner side of the retaining wall 2 is the backfill soil body 62, and the upper side of the backfill soil body 62 is the road surface 61. In one or more embodiments, in step S4, a vertical small conduit 6 grouting step is also included: a grouting hole of the vertical small conduit 6 is drilled downward from the road surface 61 above the backfill soil body 62 inside the retaining wall 2, and then grouting is performed downwardly through the vertical small conduit 6; in conjunction with the grouting of the inclined small conduit 4, the backfill soil body 62 inside the retaining wall 2 and the slope soil body 11 can be reinforced, thereby better providing stability for the subsequent drilling of the inclined steel flower pipe 5. Moreover, the vertical grouting of the vertical small conduit 6 can also raise the settled road surface 61, which is conducive to repairing the road surface 61.

[0053] The grouting of the vertical small conduit 6 and the grouting of the inclined small conduit 4 are performed simultaneously, which can improve the grouting efficiency and the repair and reinforcement efficiency of the retaining wall 2. The present invention adopts two grouting modes, vertical and inclined, in the small conduit grouting operation, and performs small conduit grouting from the road surface 61 and the retaining wall 2 at the same time, thereby improving the grouting efficiency, improving the mechanical properties of the soil, and staggering the grouting holes and the grouting sequence to avoid grouting.

[0054] Furthermore, grouting is performed only on the outer portion of the road surface 61 through the small vertical duct 6 to avoid affecting traffic, and the backfill soil 62 close to the side of the retaining wall 2 is reinforced, which is more conducive to preventing the retaining wall 2 from becoming unstable during repair.

[0055] Furthermore, the grouting holes of the vertical small conduit 6 and the grouting holes of the inclined small conduit 4 do not intersect, so as to avoid cross-slurry affecting the grouting quality.

[0056] S5, grouting of the inclined steel flower pipe 5: after the grouting of the small conduit is solidified, grouting holes for the inclined steel flower pipe 5 are drilled at the reserved grouting holes and the retaining wall 2, and then the inclined steel flower pipe 5 is inserted, and grouting is performed through the inclined steel flower pipe 5; wherein, during the grouting of the inclined steel flower pipe 5, anchor steel bars are inserted into the inclined steel flower pipe 5, and the inclined steel flower pipe 5 extends from the outer side of the retaining wall 2 to the inner side of the retaining wall 2 into the slope soil 11; although the drilling hole required for the inclined steel flower pipe 5 is deep and large, after the grouting of the small conduit is solidified, the stability of the retaining wall 2 itself and the inner soil is higher, and grouting holes for the inclined steel flower pipe 5 can be drilled, and then the inclined steel flower pipe 5 is inserted, and grouting is performed through the inclined steel flower pipe 5 to reinforce the retaining wall 2 itself and the inner soil;

[0057] In one or more embodiments, Figure 3 As shown, the grouting holes of the inclined small guide tube 4 and the grouting holes of the inclined steel flower tube 5 are arranged in an upper and lower staggered manner to avoid grouting and cover a wider grouting area.

[0058] In one or more embodiments, in step S5, the drilling position, drilling depth and inclination angle of the inclined steel pipe 5 are calibrated during the period of strength formation of the soft soil, and then the grouting hole of the inclined steel pipe 5 is drilled, and then the inclined steel pipe 5 is inserted into the grouting hole of the inclined steel pipe 5, and the anchor rod steel bar is inserted; efficiency can be improved. Among them, the inclined steel pipe 5 is grouted from the bottom layer upwards, and the grouting of the inclined steel pipe 5 adopts intermittent skipping grouting, which can better ensure the stability of the construction. And low-pressure, small-flow, intermittent skipping grouting and anchor rod steel bar installation are performed from the bottom layer upwards to improve the stability of the retaining wall 2 structure and the safety of the operation during the anchoring of the inclined steel pipe 5.

[0059] S6. Anchoring of the inclined steel flower tube 5: After the grouting slurry solidifies and the concrete strength of the frame beam 3 is greater than 80% of the design strength, the anchor rod steel bars in the inclined steel flower tube 5 are tensioned so that the inclined steel flower tube 5 is anchored on the frame beam 3, and the reinforcement and repair is completed.

[0060] In one or more embodiments, all of the above grouting is performed by secondary grouting to ensure the compactness of the grouting and the safety of the structure.

[0061] In one or more embodiments, the grouting reinforcement and repair method of the mortar-laid rubble retaining wall 2 is provided by first inspecting the internal structure of the retaining wall 2 to determine the severity of damage to the retaining wall 2 and the distribution of high-risk instability areas, and then a grouting hole location layout plan is formulated; the frame beam 3 is set to provide stable conditions for small-duct drilling and grouting, and then the small-duct grouting is used to provide stable conditions for the inclined steel flower pipe 5 drilling and grouting, and the inclined steel flower pipe 5 is anchored to the frame beam 3 through grouting to form a stable reinforcement system, which not only overcomes the problem of easy instability during the repair process, but also can greatly improve the stability of the later reinforcement, and improve the overall strength and life of the retaining wall 2 structure.

[0062] In one or more embodiments, before step S4, a pre-treatment is further included: grouting cracks on the surface of the retaining wall 2 with a width greater than or equal to 1 cm to ensure that the grout does not seep out of the wall during grouting. Figure 1 As shown, preprocessing is performed between step S1 and step S2.

[0063] In one or more embodiments, Figure 1As shown, between steps S2 and S3, when there is a risk of sliding of the retaining wall 2, the construction step of anti-sliding piers is also included: anti-sliding piers are constructed on the outside of the retaining wall 2; anti-sliding pier supports are added before grouting reinforcement, and the wall body and internal soil of the retaining wall 2 are structurally strengthened.

[0064] In one or more embodiments, Figure 1 and Figure 3 As shown, between step S3 and step S4, a rib column armour wall 34 is constructed in the frame of the frame beam 3, and the rib column armour wall 34 can further strengthen the reinforcement of the retaining wall 2. Grouting holes for the inclined small guide tube 4 and the inclined steel flower tube 5 are reserved on the rib column armour wall 34, which can avoid the need to drill holes in the rib column armour wall 34 in the later stage, reduce the construction process, and avoid damage to the rib column armour wall 34.

[0065] like Figure 1 As shown, the grouting reinforcement repair method of the mortar-laid rubble retaining wall 2 in this embodiment includes the following steps:

[0066] Step 1: On-site investigation, on-site investigation of the defects and severity of the retaining wall 2, and detection of the internal structure of the retaining wall 2 using detection equipment;

[0067] Step 2: Pretreatment: clean the surface of the retaining wall 2, treat surface cracks, and fill the wider cracks with grout to ensure that the slurry does not seep out of the wall during grouting;

[0068] Step 3: According to the severity of damage to retaining wall 2 and the distribution of high-risk instability areas, formulate a grouting hole location layout plan;

[0069] Step 4: Construction of anti-sliding pier and frame beam foundation 31. Before construction, test and layout are carried out to determine the structural dimensions. The anti-sliding pier and frame beam foundation 31 are constructed by excavating and pouring at the same time, and steel bar joints are reserved; Figure 2 As shown, the frame beam foundation 31 is located below the drainage pipe 12 and above the retaining wall foundation 21 . The drainage pipe 12 is a drainage structure for the inner side slope soil 11 of the retaining wall 2 .

[0070] Step 5: Construction of rib column facing wall 34 and frame beam 3. The inner reinforcement of frame beam 3 is overlapped by binding, and the outer reinforcement is connected by manual arc welding. The frame beam 3 is constructed by first vertical beam and then horizontal beam 33. The formwork is cast and the grouting holes are reserved. After the construction of frame beam 3 is completed, the rib column facing wall 34 is constructed. Figure 3 As shown, the spacing between adjacent vertical beams in the transverse direction is 2m, the spacing between adjacent horizontal beams 33 in the vertical direction is 1.6m, the width of the horizontal beams 33 and the vertical beams 32 is 40cm, the reserved grouting holes are located at the intersection of the horizontal beams 33 and the vertical beams 32, and the frame formed between the horizontal beams 33 and the vertical beams 32 is the rib column protective wall 34.

[0071] Step 6: Grouting of the inclined small conduit 4 and the vertical small conduit 6. First, the hole position is measured and laid out to determine the hole position spacing and angle, and then drilling is performed. Before grouting, the grouting pressure and grouting amount test are performed. After the conduit is placed, the grouting begins. The grouting sequence is from bottom to top, from outside to inside, in order between rows, and intensified within rows to avoid damage to the retaining wall 2 due to excessive grouting pressure. The grouting pressure should not be too large, and 1.0 MPa is taken as the final grouting pressure; if Figure 2 As shown, the vertical small ducts 6 are arranged at intervals of 1 m, and the lengths of the vertical small ducts 6 and the inclined small ducts 4 are 4 m to 6 m.

[0072] Step 7: Grouting the inclined steel tube 5. After the small conduit grouting increases the internal strength of the retaining wall 2, drill holes in the inclined steel tube 5, check the hole formation, and complete the grouting pressure and grouting volume test. Then, grout the inclined steel tube 5 using a repeated intermittent grouting mode. The grouting pressure of the first pressure grouting is controlled at about 0.7 MPa, and the grouting pressure of the second pressure grouting can be adjusted to about 1.0 MPa. After the slurry is finally set, the anchor is sealed. Figure 2 As shown, the inclined steel flower pipe 5 is 12m-15m long and can extend into the interior of the slope 1.

[0073] Step 8: Anchor the inclined steel flower tube 5 and tension it after the slurry setting period reaches 20 days (solidification) and the concrete strength of the frame beam 3 is greater than 80% of the design strength.

[0074] The present invention combines small-duct grouting, inclined steel flower tube 5 anchoring and anti-slip pier support to form a comprehensive reinforcement scheme for mortar-laid rubble retaining wall 2. First, before grouting, the cracks in the wall of the retaining wall 2 are grouted and slurried, and then the anchor frame beam 3 is constructed, and the anti-slip pier is installed at the bottom of the retaining wall 2 to improve the structural strength of the retaining wall 2. Then, vertical and oblique small-duct grouting is used to improve the physical and mechanical properties of the soft soil behind the retaining wall 2, and inclined steel flower tube 5 anchors are used to drill holes to form grouting holes, and low-pressure, small-flow, intermittent jump-hole grouting is used to reinforce the anchors. Compared with the traditional grouting reinforcement scheme for retaining wall 2, this scheme can effectively avoid premature instability of the retaining wall 2 during reinforcement construction, and improve the overall strength and life of the retaining wall 2 structure.

[0075] Compared with the prior art, the beneficial effects of this embodiment are:

[0076] (1) The grouting reinforcement and repair method of the mortar-laid rubble retaining wall 2 is used to reinforce the retaining wall 2 and the soil inside the wall which are in poor condition. It has little impact on the traffic of the road and does not need to be closed. It avoids traffic congestion caused by the reinforcement of the retaining wall 2 and the related economic and social problems caused by it. At the same time, the filling grouting and anchoring of the original retaining wall 2 can improve the overall strength of the retaining wall 2.

[0077] (2) By reinforcing the original retaining wall 2 for the second time, compared with rebuilding the retaining wall 2, the repair and construction period is shortened, costs are saved, and the impact of dust and noise on nearby residents during the implementation of the project is reduced;

[0078] (3) The repair and reinforcement scheme of grouting first and then anchoring can prevent retaining wall 2 from suffering secondary damage during drilling construction, reduce the risk of further instability of retaining wall 2, and ensure the safety of construction workers.

[0079] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A grouting reinforcement and repair method for a mortar-laid rubble retaining wall, characterized in that: The following steps are involved: S1. On-site investigation: Conduct on-site investigation on the defects and severity of the retaining wall, and use testing equipment to test the internal structure of the retaining wall; S2. Grouting hole location layout: Develop a grouting hole location layout plan based on the severity of the retaining wall damage and the distribution of high-risk instability areas; S3. Frame beam construction: construct frame beams outside the retaining wall, and reserve grouting holes for inclined small guide tubes and inclined steel flower pipes on the frame beams according to the grouting hole location layout plan; S4, inclined small conduit grouting: grouting holes for inclined small conduits are drilled at the reserved grouting holes and the retaining wall, and then the inclined small conduits are inserted to inject grout into the interior of the retaining wall and the inner soil through the inclined small conduits; wherein the inclined small conduits extend from the outer side of the retaining wall to the inner side of the retaining wall; In step S4, a vertical small pipe grouting step is also included: a grouting hole of a vertical small pipe is drilled downward from the road surface above the backfill soil body inside the retaining wall, and then grouting is performed downward through the vertical small pipe to backfill the soil body; Among them, vertical small pipe grouting and inclined small pipe grouting are carried out simultaneously; only the vertical small pipe grouting is used on the outer part of the road surface; S5, inclined steel pipe grouting: after the small pipe grouting solidifies, inclined steel pipe grouting holes are drilled at the reserved grouting holes and the retaining wall, and then the inclined steel pipe is inserted, and grouting is performed through the inclined steel pipe; wherein, during the inclined steel pipe grouting, anchor steel bars are inserted into the inclined steel pipe, and the inclined steel pipe extends from the outside of the retaining wall to the inside of the retaining wall into the slope soil; S6. Anchoring of inclined steel pipes: After the grouting slurry solidifies and the concrete strength of the frame beam is greater than 80% of the design strength, the anchor rods in the inclined steel pipes are tensioned so that the inclined steel pipes are anchored on the frame beam, and the reinforcement and repair is completed.

2. A grouting reinforcement and repair method for mortar-laid rubble retaining wall according to claim 1, characterized in that: The grouting holes of the vertical small ducts and the grouting holes of the inclined small ducts do not intersect.

3. A grouting reinforcement and repair method for mortar-laid rubble retaining wall according to claim 2, characterized in that: The inclined small conduit grouting holes and the inclined steel flower pipe grouting holes are arranged alternately in upper and lower rows.

4. A grouting reinforcement and repair method for mortar-laid rubble retaining wall according to claim 3, characterized in that: The secondary grouting method is used for grouting.

5. The grouting reinforcement and repair method for mortar-laid rubble retaining wall according to claim 1 is characterized in that: In step S5, the drilling position, drilling depth and inclination angle of the inclined steel pipe are calibrated during the period of forming strength of the soft soil, and then the inclined steel pipe grouting hole is drilled, and then the inclined steel pipe is inserted into the inclined steel pipe grouting hole, and the anchor steel bar is inserted; Among them, the inclined steel flower pipe grouting is carried out from the bottom layer upwards, and the inclined steel flower pipe grouting adopts intermittent skip hole grouting.

6. A grouting reinforcement and repair method for a mortar-laid rubble retaining wall according to any one of claims 1 to 5, characterized in that: Before step S4, pre-treatment is also included: grouting is performed on cracks on the surface of the retaining wall with a width greater than or equal to 1 cm.

7. A grouting reinforcement and repair method for a mortar-laid rubble retaining wall according to any one of claims 1 to 5, characterized in that: Between steps S2 and S3, when there is a risk of sliding of the retaining wall, the method further includes the steps of constructing anti-sliding piers: constructing anti-sliding piers on the outer side of the retaining wall; And / or, between step S3 and step S4, a rib column facing wall is constructed within the frame of the frame beam, and grouting holes for inclined small guide tubes and inclined steel flower pipes are reserved on the rib column facing wall.

8. A grouting reinforcement and repair method for mortar-laid rubble retaining wall according to claim 7, characterized in that: Between step S2 and step S4, the anti-slip pier and frame beam foundation construction is first carried out: before construction, test layout is carried out to determine the structural dimensions of the anti-slip pier and frame beam foundation, and then the anti-slip pier and frame beam foundation part are constructed by excavating and pouring at the same time, and steel bar joints are reserved; then the rib column protection wall and frame beam construction is carried out: the frame beam is constructed by first erecting the vertical beam and then the horizontal beam, and the grouting hole position is reserved. After the frame beam construction is completed, the rib column protection wall is constructed on the inner side of the frame beam; In step S4, the inclined small pipe and the vertical small pipe are grouting: first, the hole position is measured and laid out, the hole position spacing and the angle are determined, and the holes are drilled. Before grouting, the grouting pressure and grouting volume test are carried out, and then the small pipe is placed. After the small pipe is placed, the grouting begins. The grouting sequence is from bottom to top, from outside to inside, and in a sequential manner between rows and intensified within rows. The final grouting pressure is 1.0 MPa. In step S5, grouting is performed on the inclined steel pipe: after the grouting of the small tube solidifies, drilling is performed on the inclined steel pipe to check the hole formation. After the grouting pressure and grouting amount test are completed, the inclined steel pipe and anchor steel bars are placed, and then the inclined steel pipe is grouted using a repeated intermittent grouting mode, wherein the grouting pressure of the first pressure grouting is controlled at 0.6MPa-0.8MPa, and the grouting pressure of the second pressure grouting is increased to 0.9MPa-1.1MPa, and the anchor is sealed after the slurry is finally solidified.

Citation Information

Patent Citations

  • Grouting rubble retaining wall body grouting reinforcement structure and construction method thereof

    CN116607562A

  • Reinforced masonry retaining wall structure

    CN216379627U

  • Environmental-friendly grass concrete highway slope protection structure and construction method thereof

    CN106013191A

  • Gravity type retaining wall tilt correction, resetting and reinforcement method

    CN109208631A

  • Fill side slope gravity type retaining wall reinforcing structure and construction method thereof

    CN110847224A

Cited By

  • Grouting retaining wall anchoring, grouting and spraying composite reinforcing structure and construction method

    CN119824967A

  • Anchoring, grouting and spraying composite reinforcing structure of mortar building retaining wall

    CN223577185U