Mining method, device, medium and equipment based on support and downward fan blasting

By adopting a mining method based on support and downward fan-shaped blasting in the mining of thick and large ore bodies in deep metal ores, the problems of poor stability of the stope roof and large amounts of mining and cutting work have been solved, and an efficient and safe mining process has been achieved, reducing It reduces the loss of ore and the amount of mining and cutting work, and improves the economic benefits of the mine.

CN118564249BActive Publication Date: 2024-10-08NORTHEASTERN UNIV CHINA
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411061287.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-08
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The existing open field subsequent filling mining method has problems such as unreasonable ore falling methods, uncontrollable blasting disturbance, difficult ground pressure control, and large mining and cutting engineering quantities in the mining of deep metal ore thick and large ore bodies, resulting in poor stability of the stope roof. , serious loss of ore, limiting the safe and efficient mining of deep mineral resources.

Method used

Adopting a mining method based on support and downward fan-shaped blasting, through the stope structure parameter correction calculation method that considers the flow characteristics of the ore bulk, pre-support technology, downward fan-shaped medium-deep hole full-stage blasting ore-falling technology and flat-bottom structure joint remote control The scraper mining system optimizes the stope design and blasting methods, reduces the amount of mining and cutting work, and improves the stability of the stope roof and the mining efficiency.

Benefits of technology

It improves the stability of the stope roof and the ore extraction efficiency during the mining process, simplifies the mining and cutting engineering design, reduces the mining accuracy, reduces the loss of ore, and improves the economic benefits and production efficiency of the mine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564249B_ABST
    Figure CN118564249B_ABST
Patent Text Reader

Abstract

The present application discloses a mining method and device, medium and equipment based on support and downward fan-shaped blasting. The method comprises: determining the mining field structural parameters of a flat-bottomed mining field, determining the mining field division direction according to the mining field structural parameters and the thickness of the ore body corresponding to the mining field, dividing the ore body into mining fields according to the mining field division direction, and determining the mining sequence of each mining field; constructing a mining field connecting tunnel, a rock drilling tunnel and a mining exit tunnel in the mining field according to the mining sequence and providing pre-support, constructing a cutting well connected with the mining exit tunnel based on the rock drilling tunnel, and drilling a downward fan-shaped medium-deep hole in the rock drilling tunnel according to the position of the cutting well, taking the cutting well as the free surface and compensation space, and blasting in sections to form a cutting groove; using a rock drilling vehicle in the rock drilling tunnel to construct a downward fan-shaped medium-deep hole as a blast hole according to a preset angle and a preset length and place explosives, and adopting a V-shaped detonation sequence of the middle first and then the two sides to blast the mining field to drop the ore; then ventilating the mining field, mining, and filling are carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of mining technology, and in particular to a mining method and device, medium, and equipment based on support and downward fan-shaped blasting. Background Art

[0002] At present, my country mainly adopts upward horizontal layered filling mining method and open-pit subsequent filling mining method for the mining of thick and large ore bodies of deep metal mines. The open-pit subsequent filling mining method has gradually become the mainstream method for mining thick and large ore bodies of metal mines in my country due to its advantages of less damage to the surface, high production efficiency, high resource recovery intensity, and small mining and cutting engineering volume. The open-pit subsequent filling mining method currently used in my country for deep and thick large ore bodies of metal mines has the following disadvantages: (1) The ore dropping method is unreasonable. The domestic main methods are upward fan-shaped medium-deep hole segmented drilling and downward large-diameter vertical deep hole drilling. The segmented drilling method has a simple perforation process, but the mining and cutting engineering volume is large, and the damage to the mining site roof caused by blasting disturbance is uncontrollable; when downward vertical deep hole drilling is used, there are disadvantages such as large exposed area of ​​the drilling chamber roof, great difficulty in controlling ground pressure, and poor drilling safety; (2) The bottom structure design is unreasonable. At present, the "V"-shaped trench bottom structure is mainly used in China. Most mines have technical difficulties such as serious damage to the eyebrow line of the mining access route, difficulty in support, the second-step mining site mining tunnel needs to be arranged in the filling body, and the peach-shaped mining pillar is difficult to recover.

[0003] Deep mining has become an important part of my country's mining industry. The mining of deep thick metal ore bodies is carried out in a special environment of strong disturbance and high ground pressure. If the traditional open-pit and subsequent filling mining method is still used for the mining of deep thick metal ore bodies, it will lead to the collapse of the roof of the rock drilling chamber in the deep mining field, difficulty in support, and large loss and depletion of ore, which seriously restricts the safe and efficient mining of deep mineral resources. Therefore, it is urgent to break through the current open-pit and subsequent filling mining method, and develop a new mining method suitable for the safe and efficient mining of deep thick metal ore bodies from the perspective of deep mining ground pressure control, simplified mining design, and reduced mining and cutting engineering. Summary of the invention

[0004] In view of this, the embodiments of the present application provide a mining method and device, medium, and equipment based on support and downward fan-shaped blasting. The mining method is innovated in four aspects by adopting a mine structure parameter correction calculation method that considers the flow characteristics of ore bulk, pre-support technology, downward fan-shaped medium and deep hole full-stage blasting ore-dropping technology, and a flat-bottom structure combined with a remote-controlled shovel loader mining system. While ensuring the stability of the mine roof during the mining process, the amount of mining engineering is reduced and the mine design is simplified to achieve the purpose of safe and efficient mining.

[0005] According to one aspect of the present application, a mining method based on support and downward fan-shaped blasting is provided, the method comprising:

[0006] Determine the stope structure parameters of the flat-bottom structure stope, determine the stope division direction according to the stope structure parameters and the thickness of the ore body corresponding to the stope, divide the ore body into stopes according to the stope division direction, and determine the mining order of each stope;

[0007] According to the mining sequence, a mine-joining tunnel, a rock drilling tunnel and a mine-exit tunnel are respectively constructed in the mine and pre-support is provided; a cutting well connected to the mine-exit tunnel is constructed based on the rock drilling tunnel, and a downward fan-shaped medium-deep hole is drilled in the rock drilling tunnel according to the position of the cutting well; the cutting well is used as a free surface and compensation space, and cutting grooves are formed by sequential blasting in sections to provide a free surface and compensation space for the mine blasting;

[0008] In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length and explosives are placed therein. Based on the free surface and compensation space for blasting and dropping of ore in the stope provided by the cutting groove, a V-shaped detonation sequence of first the middle and then the two sides is adopted to blast and drop ore in the stope;

[0009] The stope is cleaned by using the gas flowing through the mine exit tunnel at the bottom of the stope, so that the dirty gas generated after cleaning is collected into the stage tunnel through the rock drilling tunnel at the top of the stope, and discharged to the surface through the main return air shaft of the mine;

[0010] Use a scraper to unload the ore through the mine tunnel, and use a remote-controlled scraper to enter the stope to unload the remaining ore;

[0011] The interior of the stope is filled through the rock drilling tunnel using a filling pipeline.

[0012] In the embodiment of the present application, optionally, determining the stope structure parameters of the flat-bottom structure stope includes:

[0013] Acquiring the stage height of the stope as the stope height in the stope structure parameters;

[0014] Determine the stope length and stope width in the stope structure parameters according to the rock mass quality classification, ground stress and rock mechanics parameters corresponding to the stope;

[0015] The length of the stope is corrected according to the stope height, the preset remote-controlled scraper ore output ratio coefficient and the natural repose angle of the collapsed ore bulk corresponding to the stope.

[0016] In the embodiment of the present application, optionally, the stope length is corrected according to the stope height, the preset remote-controlled scraper ore output ratio coefficient and the natural repose angle of the caved ore bulk corresponding to the stope, including:

[0017] Calculate the upper limit of the length corresponding to the stope, where the upper limit of the length = , H is the stope height, P is the preset remote-controlled scraper ore output ratio, is the natural repose angle of the loose body of caved ore corresponding to the stope;

[0018] If the stope length is less than or equal to the upper limit of the length, the stope length is kept unchanged;

[0019] If the stope length is greater than the upper limit of length, the stope length is corrected to the upper limit of length.

[0020] In the embodiment of the present application, optionally, in the stope, stope joint tunnels, rock drilling tunnels and mine exit tunnels are constructed separately and pre-support is provided, including:

[0021] Constructing a stope-joint tunnel from the stope's stage tunnel to the interior of the ore body to carry out transportation, ventilation and filling work, and using a long anchor cable and bolt support system to provide pre-support to maintain the stability of the stope-joint tunnel;

[0022] In the upper part of the stope, a rock drilling tunnel is arranged from the stope joint tunnel along the stope recovery direction, and a long anchor cable and bolt support system are used to provide pre-support to maintain the stability of the rock drilling tunnel;

[0023] In the lower part of the mining field, an exit tunnel is arranged from the mining field connecting tunnel along the mining direction of the mining field, and a long anchor cable and anchor support system is used to provide pre-support to maintain the stability of the exit tunnel.

[0024] In the embodiment of the present application, optionally, using a rock drilling vehicle in the rock drilling tunnel to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length and placing explosives, includes:

[0025] In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes with a hole diameter of 165 mm, a row spacing of 2.5 m, and a hole bottom distance of 3.3 m at a preset angle and preset length as blast holes, and explosives are loaded into the blast holes using a water column interval charging structure, wherein the water column interval ratio is 35%.

[0026] In the embodiment of the present application, optionally, the blast holes include multiple rows; and the mine blasting is performed in the stope using a V-shaped detonation sequence of first the middle and then the two sides, including:

[0027] Carry out two blastings in a V-shaped detonation order of first the middle and then the sides of the same row of blast holes, each time blasting three rows of blast holes, and then blast all the blast holes at once.

[0028] In the embodiment of the present application, optionally, the mine blasting and ore dropping in the mining area adopts hole-by-hole delay and reverse detonation technology at the bottom of the hole.

[0029] According to another aspect of the present application, a mining device based on support and downward fan-shaped blasting is provided, the device comprising:

[0030] A parameter determination module is used to determine the stope structure parameters of the flat-bottom structure stope, determine the stope division direction according to the stope structure parameters and the ore body thickness corresponding to the stope, divide the ore body into stopes according to the stope division direction, and determine the mining order of each stope;

[0031] A cutting module is used to construct a stope joint tunnel, a rock drilling tunnel and a mine exit tunnel in the stope according to the mining sequence and provide pre-support, construct a cutting well connected with the mine exit tunnel based on the rock drilling tunnel, and drill a downward fan-shaped medium-deep hole in the rock drilling tunnel according to the position of the cutting well, use the cutting well as a free surface and compensation space, and perform segmented sequential blasting to form a cutting groove, so as to provide a free surface and compensation space for the ore falling in the stope blasting;

[0032] A blasting module is used to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length in the rock drilling tunnel using a rock drilling vehicle and place explosives, and to blast the mines in the mine field using a V-shaped detonation sequence of first the middle and then the two sides based on the free surface and compensation space for the mine field blasting provided by the cutting groove;

[0033] A ventilation module is used to clean the stope by using the gas flowing through the mine exit tunnel at the bottom of the stope, so that the dirty gas generated after cleaning is collected into the stage tunnel through the rock drilling tunnel at the top of the stope, and discharged to the surface through the main return air shaft of the mine;

[0034] The ore-exporting module is used to use a loader to excavate the ore through the ore-exporting tunnel, and use a remote-controlled loader to enter the stope to excavate the residual ore;

[0035] The filling module is used to fill the interior of the stope through the rock drilling tunnel using a filling pipeline.

[0036] In the embodiment of the present application, optionally, the parameter determination module is further used to:

[0037] Acquiring the stage height of the stope as the stope height in the stope structure parameters;

[0038] Determine the stope length and stope width in the stope structure parameters according to the rock mass quality classification, ground stress and rock mechanics parameters corresponding to the stope;

[0039] The length of the stope is corrected according to the stope height, the preset remote-controlled scraper ore output ratio coefficient and the natural repose angle of the collapsed ore bulk corresponding to the stope.

[0040] In the embodiment of the present application, optionally, the parameter determination module is further used to:

[0041] Calculate the upper limit of the length corresponding to the stope, where the upper limit of the length = , H is the stope height, P is the preset remote-controlled scraper ore output ratio, is the natural repose angle of the loose body of caved ore corresponding to the stope;

[0042] If the stope length is less than or equal to the upper limit of the length, the stope length is kept unchanged;

[0043] If the stope length is greater than the upper limit of length, the stope length is corrected to the upper limit of length.

[0044] In the embodiment of the present application, optionally, the cutting module is further used for:

[0045] Constructing a stope-joint tunnel from the stope's stage tunnel to the interior of the ore body to carry out transportation, ventilation and filling work, and using a long anchor cable and bolt support system to provide pre-support to maintain the stability of the stope-joint tunnel;

[0046] In the upper part of the stope, a rock drilling tunnel is arranged from the stope joint tunnel along the stope recovery direction, and a long anchor cable and bolt support system are used to provide pre-support to maintain the stability of the rock drilling tunnel;

[0047] In the lower part of the mining field, an exit tunnel is arranged from the mining field connecting tunnel along the mining direction of the mining field, and a long anchor cable and anchor support system is used to provide pre-support to maintain the stability of the exit tunnel.

[0048] In the embodiment of the present application, optionally, the blasting module is also used to:

[0049] In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes with a hole diameter of 165 mm, a row spacing of 2.5 m, and a hole bottom distance of 3.3 m at a preset angle and preset length as blast holes, and explosives are loaded into the blast holes using a water column interval charging structure, wherein the water column interval ratio is 35%.

[0050] In the embodiment of the present application, optionally, the blast holes include multiple rows; the blasting module is further used for:

[0051] Carry out two blastings in a V-shaped detonation order of first the middle and then the sides of the same row of blast holes, each time blasting three rows of blast holes, and then blast all the blast holes at once.

[0052] In the embodiment of the present application, optionally, the mine blasting and ore dropping in the mining area adopts hole-by-hole delay and reverse detonation technology at the bottom of the hole.

[0053] According to another aspect of the present application, a storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned mining method based on support and downward fan blasting is implemented.

[0054] According to another aspect of the present application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor implements the above-mentioned mining method based on support and downward fan blasting when executing the computer program.

[0055] By means of the above technical solution, the embodiments of the present application provide a mining method, device, medium, and equipment based on support and downward fan-shaped blasting, which have the following beneficial effects:

[0056] (1) Improved the mining efficiency of the flat bottom structure;

[0057] The stope structure parameter correction method considering the flow characteristics of ore bulk was adopted. By optimizing the stope structure parameters, the insufficient mining efficiency of the remote-controlled scraper was compensated, thereby improving the mining efficiency of the flat-bottom structure.

[0058] (2) Convenient for ground pressure control and high operation safety;

[0059] The use of fan-shaped medium-long holes instead of vertical medium-long holes for blasting and dropping ore changes the top of the mine from a rectangular shape to an arched structure, which reduces the stress concentration of the mine roof, facilitates ground pressure control and reduces the amount of mining engineering; the arched structure on the top is conducive to the bearing of the filling body, reducing the requirements for the filling top; by supporting the mine roof in advance, the ground pressure of the mine roof is actively controlled to prevent engineering disasters such as instability and collapse of the mine roof, and people work in the well-supported rock drilling tunnel and mining tunnel in the mine, which is safe;

[0060] (3) Simplify the design of cutting and harvesting engineering, reduce the cutting and harvesting workload, and increase production efficiency;

[0061] The flat-bottomed mining structure is used to replace the traditional "V"-shaped trench mining structure, which avoids the problem of complex "V"-shaped trench construction technology and simplifies the mining and cutting engineering design; it avoids the construction of the mining access road, and the rock drilling tunnel can be used for the filling and ventilation tunnels in the middle section and the mining tunnels in the upper middle section. The mining and cutting engineering volume is small, avoiding the problem of tunneling in the filling body for the two-step stope recovery, and improving the mine production efficiency;

[0062] (4) The blasting efficiency of the mine is high and the blasting dust is small;

[0063] The downward fan-shaped medium-deep hole full-stage blasting technology reduces the auxiliary blasting operation time, improves the efficiency of mining, reduces the exposure time of surrounding rocks in the mining area, and facilitates ground pressure control. The uniformity of explosive energy distribution and energy utilization are improved through the staggered distribution of explosives in space and the water column interval charging structure, which improves the blasting effect; in addition, the water column interval charging structure has a certain dust suppression effect;

[0064] (5) Reduce ore losses and improve mine economic benefits;

[0065] The peach-shaped pillars left by the traditional "V"-shaped trench mining structure have the problems of great difficulty in mining technology, low recovery rate, or even non-mining, which often causes the loss of a large amount of valuable resources. The mining method based on the flat bottom structure of the present invention avoids the setting of peach-shaped pillars, reduces ore loss, and has better economic benefits.

[0066] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0068] Figure 1 A schematic flow chart of a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application is shown;

[0069] Figure 2 A schematic diagram of a front view along the strike direction of the ore body of a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application;

[0070] Figure 3 A schematic diagram of a top view along the strike direction of the ore body of a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application;

[0071] Figure 4 A schematic diagram of a shovel loader mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application;

[0072] Figure 5 Schematic diagram of a remote-controlled scraper for clearing residual ore in a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application.

[0073] In the figure, A1: stage tunnel; A2: mining area tunnel; A3: long anchor cable and bolt support system; A4: rock drilling tunnel; A5: mining tunnel; A6: cutting shaft; A7: downward fan-shaped medium-deep hole; A8: cutting groove; A9: scraper; A10: remote-controlled scraper; A11: residual ore inside the mining area; A12: collapsed ore; A13: ore body to be mined; A14: tailings cemented filling body. DETAILED DESCRIPTION

[0074] The present application will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0075] In this embodiment, a mining method based on support and downward fan-shaped blasting is provided. Figure 1 As shown, the method includes:

[0076] Step 101, determine the stope structure parameters of the flat-bottom structure stope, determine the stope division direction according to the stope structure parameters and the ore body thickness corresponding to the stope, divide the ore body into stops according to the stope division direction, and determine the mining order of each stope.

[0077] In this embodiment, first, reasonable stope structural parameters are determined according to the specific conditions of the stope (such as stage height, rock mass quality classification, ground stress, and ore-rock mechanics parameters), and then the stope is divided and its recovery order is determined. This is to optimize the mining process and ensure the balance of mining stress. Within the stage, the stope is divided along the direction of the ore body strike or perpendicular to the direction of the ore body strike according to the ore body thickness and the stope structural parameters; when the ore body thickness is greater than the stope width, the stope is divided perpendicular to the ore body strike; when the ore body thickness is less than the stope width, the stope is divided along the direction of the ore body strike; when the ore body thickness is equal to the stope width, the stope can be divided perpendicular to the ore body strike or along the ore body strike; the stope recovery order can be determined by numerical simulation.

[0078] In an embodiment of the present application, optionally, determining the stope structure parameters of a flat-bottom structure stope includes: obtaining the stage height of the stope as the stope height in the stope structure parameters; determining the stope length and stope width in the stope structure parameters according to the rock mass quality classification, ground stress, and ore-rock mechanics parameters corresponding to the stope; and correcting the stope length according to the stope height, a preset remote-controlled shovel loader output ratio, and a natural repose angle of the collapsed ore body corresponding to the stope. Further, correcting the stope length according to the stope height, a preset remote-controlled shovel loader output ratio, and a natural repose angle of the collapsed ore body corresponding to the stope includes: calculating the upper limit of the length corresponding to the stope, wherein the upper limit of the length = , H is the stope height, P is the preset remote-controlled scraper ore output ratio, is the natural repose angle of the collapsed ore bulk corresponding to the stope; if the stope length is less than or equal to the upper limit of the length, the stope length is kept unchanged; if the stope length is greater than the upper limit of the length, the stope length is corrected to the upper limit of the length.

[0079] In the above embodiment, the stope structural parameters include the length, width and height of the stope; the stope height is the stage height, and the stope length and width are preliminarily determined according to the stability of the rock mass, and then the stope length is corrected, including: calculating the upper limit of the length corresponding to the stope, wherein the upper limit of the length = Among them, H is the height of the stope; P is the preset remote-controlled scraper ore output ratio coefficient, which can be 0.2~0.5, and can be determined according to the mine remote-controlled scraper ore output efficiency. The larger value is taken when the remote-controlled scraper ore output efficiency is higher; is the natural repose angle of the caving ore bulk corresponding to the stope, which is related to the ore characteristics and the blasting block size of the ore. If the stope length is less than or equal to the upper limit, the stope length is kept unchanged; if the stope length is greater than the upper limit, the stope length is corrected to the upper limit.

[0080] Step 102, according to the mining sequence, respectively construct the mine connecting tunnel, rock drilling tunnel and ore exit tunnel in the mine and provide pre-support, construct a cutting well connected with the ore exit tunnel based on the rock drilling tunnel, and drill a downward fan-shaped medium-deep hole in the rock drilling tunnel according to the position of the cutting well, use the cutting well as the free surface and compensation space, blast in stages to form a cutting groove, so as to provide a free surface and compensation space for ore falling during blasting in the mine.

[0081] In this embodiment, necessary joint tunnels, rock drilling tunnels and mine exit tunnels are constructed in the stope, and pre-support is provided to enhance stability. Subsequently, a cutting well is excavated based on the rock drilling tunnel, and a downward fan-shaped medium-deep hole is excavated along the well, and a cutting groove is formed by segmented sequential blasting. This step provides a key free surface and compensation space for subsequent stope blasting.

[0082] In an embodiment of the present application, optionally, mining joint tunnels, rock drilling tunnels and ore exit tunnels are constructed separately in the mining field and pre-support is provided, including: constructing mining joint tunnels from the stage tunnels of the mining field to the interior of the ore body to undertake transportation, ventilation and filling work, and using long anchor cables and anchor support systems to provide pre-support to maintain the stability of the mining joint tunnels; in the upper part of the mining field, rock drilling tunnels are arranged along the mining direction of the mining field from the mining joint tunnels, and long anchor cables and anchor support systems are used to provide pre-support to maintain the stability of the rock drilling tunnels; in the lower part of the mining field, ore exit tunnels are arranged along the mining direction of the mining field from the mining joint tunnels, and long anchor cables and anchor support systems are used to provide pre-support to maintain the stability of the ore exit tunnels.

[0083] In the above embodiment, a mining field joint tunnel is constructed from the stage tunnel to the interior of the ore body to undertake transportation, ventilation and filling work, and a long anchor cable and an anchor support system are used to maintain the stability of the mining field joint tunnel; in the upper part of the mining field, a rock drilling tunnel is arranged from the mining field joint tunnel along the mining direction of the mining field, and a long anchor cable and an anchor support system are used to maintain the stability of the rock drilling tunnel; in the lower part of the mining field, a mining exit tunnel is arranged from the mining field joint tunnel along the mining direction of the mining field, and a long anchor cable and an anchor support system are used to maintain the stability of the mining exit tunnel; a cutting well is excavated at the end position of the mining field, and a parallel medium-deep hole is constructed from the rock drilling tunnel, and a medium-deep hole blasting method is used to form the cutting well, and the cutting well needs to be connected with the mining exit tunnel; according to the position of the cutting well, a downward fan-shaped medium-deep hole is excavated in the rock drilling tunnel, with the cutting well as the free surface and compensation space, and according to the size of the compensation space and the free surface conditions, a cutting groove is formed by segmented sequential blasting to form the initial free surface and compensation space for the mining field blasting.

[0084] Step 103, using a rock drill vehicle in the rock drilling tunnel to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length and place explosives, based on the free surface and compensation space for blasting and dropping of ore in the mining area provided by the cutting groove, a V-shaped detonation sequence of first the middle and then the two sides is adopted to carry out blasting and dropping of ore in the mining area.

[0085] In this embodiment, the cutting groove is used as the free surface and compensation space, and the downward fan-shaped medium-deep hole full-stage blasting ore-dropping technology is used to blast the ore. In the rock drilling tunnel, the blasthole is constructed according to the preset parameters and the explosives are placed by the rock drilling vehicle. A V-shaped detonation sequence (first the middle and then the two sides) is adopted, and the free surface and compensation space provided by the cutting groove are used for the stope blasting to achieve effective crushing of the ore.

[0086] In an embodiment of the present application, optionally, a rock drill is used in the rock drilling tunnel to construct downward fan-shaped medium-deep holes as blastholes according to a preset angle and a preset length and to place explosives, including: using a rock drill in the rock drilling tunnel to construct downward fan-shaped medium-deep holes with a hole diameter of 165mm, a row spacing of 2.5m, and a hole bottom distance of 3.3m as blastholes according to a preset angle and a preset length, and using a water column interval charging structure to load explosives into the blastholes, wherein the water column interval ratio is 35%. Further, the blastholes include multiple rows; a V-shaped detonation sequence of first the middle and then the two sides is used to blast the mine in the mining area, including: two blasts are performed in the same row of blastholes according to a V-shaped detonation sequence of first the middle and then the two sides, each blasting three rows of blastholes, and then all the blastholes are blasted at one time. The mine blasting adopts hole-by-hole delay and reverse detonation technology at the bottom of the hole.

[0087] In the above embodiment, a drilling trolley is used in a drilling tunnel to construct blastholes according to the designed angle and length, and the blastholes are downward fan-shaped medium-deep holes; further, the downward fan-shaped medium-deep holes adopt a water column interval charging structure, and in order to ensure the uniformity of the energy distribution of the explosives, the explosives of different blastholes are staggered in space; further, the downward fan-shaped medium-deep hole blasting adopts a hole-by-hole delay and bottom-of-hole reverse detonation technology based on electronic digital detonators, and the same row of blastholes adopts a "V"-shaped detonation sequence of first the middle and then the two sides, which can effectively reduce the blasting clamping force of the blastholes on both sides, reduce blasting vibration and surrounding rock (filling body) damage, improve blasting effect, and reduce the large block rate; further, in order to reduce the number of blasting times and give full play to the high production efficiency of medium-deep hole blasting, the blasting sequence of the mining area is designed, and when the compensation space meets the requirements of subsequent ore body blasting, the mining area is subjected to a one-time full-stage blasting and ore dropping.

[0088] Step 104, using the gas flowing through the mining tunnel at the bottom of the mining area to clean the mining area, so that the dirty gas generated after cleaning is merged into the stage tunnel through the rock drilling tunnel at the top of the mining area, and discharged to the surface through the main return air shaft of the mine.

[0089] In this embodiment, the gas in the mine exit tunnel is used to clean the mining area, and the dirty gas is guided to the rock drilling tunnel and finally discharged to the surface through the main return air shaft of the mine, thereby ensuring the air quality in the mining area.

[0090] Step 105, use a scraper to unload the ore through the unloading tunnel, and use a remote-controlled scraper to enter the mining area to unload the residual ore.

[0091] Step 106, using a filling pipeline to fill the interior of the stope through the rock drilling tunnel.

[0092] In this embodiment, a scraper is used to remove ore from the mine exit tunnel, and a remote-controlled scraper is used to clean the residual ore inside the stope. After the ore is removed, the stope is filled with a filling pipeline through the rock drilling tunnel to support the surrounding rock, restore the ground pressure balance, and prepare for the next round of mining.

[0093] By applying the technical solution of this embodiment, the beneficial effects of the mining method based on support and downward fan-shaped blasting provided by the present invention are:

[0094] (1) Improved the mining efficiency of the flat bottom structure;

[0095] The stope structure parameter correction method considering the flow characteristics of ore bulk was adopted. By optimizing the stope structure parameters, the insufficient mining efficiency of the remote-controlled scraper was compensated, thereby improving the mining efficiency of the flat-bottom structure.

[0096] (2) Convenient for ground pressure control and high operation safety;

[0097] The use of fan-shaped medium-long holes instead of vertical medium-long holes for blasting and dropping ore changes the top of the mine from a rectangular shape to an arched structure, which reduces the stress concentration of the mine roof, facilitates ground pressure control and reduces the amount of mining engineering; the arched structure on the top is conducive to the bearing of the filling body, reducing the requirements for the filling top; by supporting the mine roof in advance, the ground pressure of the mine roof is actively controlled to prevent engineering disasters such as instability and collapse of the mine roof, and people work in the well-supported rock drilling tunnel and mining tunnel in the mine, which is safe;

[0098] (3) Simplify the design of cutting and harvesting engineering, reduce the cutting and harvesting workload, and increase production efficiency;

[0099] The flat-bottomed mining structure is used to replace the traditional "V"-shaped trench mining structure, which avoids the problem of complex "V"-shaped trench construction technology and simplifies the mining and cutting engineering design; it avoids the construction of the mining access road, and the rock drilling tunnel can be used for the filling and ventilation tunnels in the middle section and the mining tunnels in the upper middle section. The mining and cutting engineering volume is small, avoiding the problem of tunneling in the filling body for the two-step stope recovery, and improving the mine production efficiency;

[0100] (4) The blasting efficiency of the mine is high and the blasting dust is small;

[0101] The downward fan-shaped medium-deep hole full-stage blasting technology reduces the auxiliary blasting operation time, improves the efficiency of mining, reduces the exposure time of surrounding rocks in the mining area, and facilitates ground pressure control. The uniformity of explosive energy distribution and energy utilization are improved through the staggered distribution of explosives in space and the water column interval charging structure, which improves the blasting effect; in addition, the water column interval charging structure has a certain dust suppression effect;

[0102] (5) Reduce ore losses and improve mine economic benefits;

[0103] The peach-shaped pillars left by the traditional "V"-shaped trench mining structure have the problems of great difficulty in mining technology, low recovery rate, or even non-mining, which often causes the loss of a large amount of valuable resources. The mining method based on the flat bottom structure of the present invention avoids the setting of peach-shaped pillars, reduces ore loss, and has better economic benefits.

[0104] In a specific application scenario, Figure 2 A schematic diagram of a front view along the strike direction of the ore body of a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application, Figure 3 A schematic diagram of a top view along the strike direction of the ore body of a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application, Figure 4 A schematic diagram of a shovel loader mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application, Figure 5 A schematic diagram of a remote-controlled scraper cleaning residual ore in a mining method based on support and downward fan-shaped blasting provided in an embodiment of the present application. Figure 2 The direction of the middle A section is the strike direction of the ore body. The mining method based on support and downward fan blasting includes the following steps:

[0105] Step 1: Calculate the stope structural parameters, divide the stope and determine the stope recovery sequence.

[0106] In this embodiment, according to the mine development system, the stage height is 50m, so the stope height is determined to be 50m, and the stope width is determined to be 18m and the stope length is determined to be 40m according to the rock mass quality classification, ground stress and mine rock mechanics parameters.

[0107] Then, the stope length is corrected, including: calculating the upper limit of the length corresponding to the stope, wherein the upper limit of the length = . Wherein, H is the stope height, which is 50m in this embodiment; P is the preset remote-controlled scraper ore output ratio coefficient, which is 0.25 in this embodiment; is the natural repose angle of the caving ore bulk corresponding to the stope, and in this embodiment, it is 45°. It is calculated that the upper limit of the length in this embodiment is 25m, and the stope length is 40m, which is greater than the upper limit of 25m, so the stope length is corrected to the upper limit of the length. Therefore, the corrected stope structure parameters are: 25m×18m×50m (length×width×height).

[0108] Within the stage, the mining field is divided along the direction of the ore body strike or perpendicular to the direction of the ore body strike according to the ore body thickness and the mining field structural parameters. In this embodiment, since the average thickness of the ore body is 25m, the average thickness of the ore body is greater than the mining field width, the mining field is divided perpendicular to the direction of the ore body strike.

[0109] The stope extraction sequence can be determined by numerical simulation. In this embodiment, in the same stage, the stopes adopt an extraction sequence of extracting every other one, and in different stages, the stopes adopt a "pin" - shaped extraction sequence.

[0110] Step 2: Development and cutting.

[0111] In this embodiment, the designed mining method is as Figure 2-Figure 5 shown, where A13 is the ore body to be mined. From the stage roadway A1, the stope connecting roadway A2 is constructed towards the interior of the ore body, which is used to undertake transportation, ventilation, and filling work, and the long cable bolt and bolt support system A3 is used to maintain the stability of the stope connecting roadway A2; at the upper part of the stope, the drilling roadway A4 is arranged along the stope extraction direction from the stope connecting roadway A2, and the long cable bolt and bolt support system A3 is used to maintain the stability of the drilling roadway A4; at the lower part of the stope, the ore - drawing roadway A5 is arranged along the stope extraction direction from the stope connecting roadway A2, and the long cable bolt and bolt support system A3 is used to maintain the stability of the ore - drawing roadway A5; at the end of the stope, downward parallel medium - deep holes are constructed from the drilling roadway A4, and the cutting shaft A6 is formed by medium - deep hole blasting method. The cutting shaft A6 needs to be connected with the ore - drawing roadway A5; in this embodiment, according to the position of the cutting shaft A6, downward fan - shaped medium - deep holes A7 are drilled in the drilling roadway. Taking the cutting shaft A6 as the free face, according to the size of the compensation space and the free - face conditions, the cutting slot A8 is formed by segmented sequential blasting, and finally the initial free face and compensation space for ore blasting in the ore room are formed.

[0112] Step 3: Using the cutting slot as the free face and compensation space, the downward fan - shaped medium - deep hole full - stage blasting ore - drawing technology is used for ore drawing by blasting.

[0113] In this embodiment, in the drilling roadway A4, a rock - drilling jumbo is used to construct downward fan - shaped medium - deep holes A7 according to the designed angle and length. The diameter of the downward fan - shaped medium - deep holes is 165 mm, the water column interval ratio is 35%, 2# rock emulsion explosive is selected, the cartridge diameter is 140 mm, and the explosives in different blast holes are staggered in space; the row spacing of the downward fan - shaped medium - deep holes is 2.5 m, the hole - bottom distance is 3.3 m. For the blast holes at the bottom of the ore room in the first step, the hole bottom is arranged 0.3 m away from the stope boundary. When mining the ore room in the second step, the two sides of the stope are filling bodies, and the hole bottom of the blast holes is arranged 0.6 m - 0.8 m away from the filling body. The hole - by - hole delay and hole - bottom reverse initiation technology are adopted, and the "V" - type initiation sequence of starting from the middle and then to both sides is adopted for the blast holes in the same row; to reduce the number of blasts and give full play to the high production efficiency of medium - deep hole blasting, the blasting sequence of the stope is designed. After the cutting slot is formed, two production blasts are carried out first in the normal blasting mode, three rows of blast holes are blasted each time, and the ore caving step distance is 7.5 m. After two blasts, the compensation space meets the requirements for subsequent ore body blasting, and all the blast holes are blasted at one time.

[0114] Step 4: Stope ventilation.

[0115] In this embodiment, fresh air flows into the mining area through the mining tunnel A5 at the bottom of the mining area. After cleaning the working face, the polluted air flows into the stage tunnel A1 through the rock drilling tunnel A4 at the top of the mining area, and is finally discharged to the surface through the main return air shaft of the mine.

[0116] Step 5: Mining.

[0117] In this embodiment, the collapsed ore A12 is unearthed by the shovel loader A9 through the mining tunnel A5 at the bottom of the mine, and the residual ore A11 accumulated inside the mine is unearthed by the remote-controlled shovel loader A10 entering the mine, among which A14 is the tailings cemented filling body.

[0118] Step 6: Filling the stope.

[0119] After mining is completed, the filling pipeline is lowered from the rock drilling tunnel A4 at the top of the mining area to the inside of the mining area for filling. In this embodiment, the first-step mining room adopts tailings cementation filling, and the second-step mining room adopts full tailings filling.

[0120] Further, as Figure 1 The specific implementation of the method, the embodiment of the present application provides a mining device based on support and downward fan-shaped blasting, the device comprising:

[0121] A parameter determination module is used to determine the stope structure parameters of a stope with a flat bottom structure, determine the stope division direction according to the stope structure parameters and the thickness of the ore body corresponding to the stope, divide the ore body into stopes according to the stope division direction, and determine the mining order of each stope;

[0122] A cutting module is used to construct a stope joint tunnel, a rock drilling tunnel and a mine exit tunnel in the stope according to the mining sequence and provide pre-support, construct a cutting well connected with the mine exit tunnel based on the rock drilling tunnel, and drill a downward fan-shaped medium-deep hole in the rock drilling tunnel according to the position of the cutting well, use the cutting well as a free surface and compensation space, and perform segmented sequential blasting to form a cutting groove, so as to provide a free surface and compensation space for the ore falling in the stope blasting;

[0123] A blasting module is used to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length in the rock drilling tunnel using a rock drilling vehicle and place explosives, and to blast the mines in the mine field using a V-shaped detonation sequence of first the middle and then the two sides based on the free surface and compensation space for the mine field blasting provided by the cutting groove;

[0124] A ventilation module is used to clean the stope by using the gas flowing through the mine exit tunnel at the bottom of the stope, so that the dirty gas generated after cleaning is collected into the stage tunnel through the rock drilling tunnel at the top of the stope, and discharged to the surface through the main return air shaft of the mine;

[0125] The ore-exporting module is used to use a loader to excavate the ore through the ore-exporting tunnel, and use a remote-controlled loader to enter the stope to excavate the residual ore;

[0126] The filling module is used to fill the interior of the stope through the rock drilling tunnel using a filling pipeline.

[0127] In the embodiment of the present application, optionally, the parameter determination module is further used to:

[0128] Acquiring the stage height of the stope as the stope height in the stope structure parameters;

[0129] Determine the stope length and stope width in the stope structure parameters according to the rock mass quality classification, ground stress and rock mechanics parameters corresponding to the stope;

[0130] The length of the stope is corrected according to the stope height, the preset remote-controlled scraper ore output ratio coefficient and the natural repose angle of the collapsed ore bulk corresponding to the stope.

[0131] In the embodiment of the present application, optionally, the parameter determination module is further used to:

[0132] Calculate the upper limit of the length corresponding to the stope, where the upper limit of the length = , H is the stope height, P is the preset remote-controlled scraper ore output ratio, is the natural repose angle of the loose body of caved ore corresponding to the stope;

[0133] If the stope length is less than or equal to the upper limit of the length, the stope length is kept unchanged;

[0134] If the stope length is greater than the upper limit of length, the stope length is corrected to the upper limit of length.

[0135] In the embodiment of the present application, optionally, the cutting module is further used for:

[0136] Constructing a stope-joint tunnel from the stope's stage tunnel to the interior of the ore body to carry out transportation, ventilation and filling work, and using a long anchor cable and bolt support system to provide pre-support to maintain the stability of the stope-joint tunnel;

[0137] In the upper part of the stope, a rock drilling tunnel is arranged from the stope joint tunnel along the stope recovery direction, and a long anchor cable and bolt support system are used to provide pre-support to maintain the stability of the rock drilling tunnel;

[0138] In the lower part of the mining field, an exit tunnel is arranged from the mining field connecting tunnel along the mining direction of the mining field, and a long anchor cable and anchor support system is used to provide pre-support to maintain the stability of the exit tunnel.

[0139] In the embodiment of the present application, optionally, the blasting module is also used to:

[0140] In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes with a hole diameter of 165 mm, a row spacing of 2.5 m, and a hole bottom distance of 3.3 m at a preset angle and preset length as blast holes, and explosives are loaded into the blast holes using a water column interval charging structure, wherein the water column interval ratio is 35%.

[0141] In the embodiment of the present application, optionally, the blast holes include multiple rows; the blasting module is further used for:

[0142] Carry out two blastings in a V-shaped detonation order of first the middle and then the sides of the same row of blast holes, each time blasting three rows of blast holes, and then blast all the blast holes at once.

[0143] In the embodiment of the present application, optionally, the mine blasting and ore dropping in the mining area adopts hole-by-hole delay and reverse detonation technology at the bottom of the hole.

[0144] It should be noted that for other corresponding descriptions of the functional units involved in the mining device based on support and downward fan-shaped blasting provided in the embodiment of the present application, reference can be made to Figures 1 to 5 The corresponding description in the method will not be repeated here.

[0145] The embodiment of the present application also provides a computer device, which can be a personal computer, a server, a network device, etc. The computer device includes a bus, a processor, a memory and a communication interface, and can also include an input and output interface and a display device. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store location information. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps in each method embodiment are implemented.

[0146] Those skilled in the art will appreciate that the structure of the above-mentioned computer device is merely a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components, or combine certain components, or have a different arrangement of components.

[0147] In one embodiment, a computer-readable storage medium is provided. The computer-readable storage medium may be non-volatile or volatile, and stores a computer program thereon. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0148] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0149] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.

[0150] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0151] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0152] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A mining method based on support and downward fan-shaped blasting, characterized in that: The method comprises: Determine the stope structure parameters of the flat-bottom structure stope, determine the stope division direction according to the stope structure parameters and the thickness of the ore body corresponding to the stope, divide the ore body into stopes according to the stope division direction, and determine the mining order of each stope; According to the mining sequence, a mine-joining tunnel, a rock drilling tunnel and a mine-exit tunnel are respectively constructed in the mine and pre-support is provided; a cutting well connected to the mine-exit tunnel is constructed based on the rock drilling tunnel, and a downward fan-shaped medium-deep hole is drilled in the rock drilling tunnel according to the position of the cutting well; the cutting well is used as a free surface and compensation space, and cutting grooves are formed by sequential blasting in sections to provide a free surface and compensation space for the mine blasting; In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length and explosives are placed therein. Based on the free surface and compensation space for blasting and dropping of ore in the mining area provided by the cutting groove, a V-shaped detonation sequence of the middle first and then the two sides is adopted to blast and drop ore in the mining area. The blast holes include multiple rows, and two blasts are performed in the same row of blast holes according to the V-shaped detonation sequence of the middle first and then the two sides, with three rows of blast holes being blasted each time, and then all the blast holes are blasted at one time. The stope is cleaned by using the gas flowing through the mine exit tunnel at the bottom of the stope, so that the dirty gas generated after cleaning is collected into the stage tunnel through the rock drilling tunnel at the top of the stope, and discharged to the surface through the main return air shaft of the mine; Use a scraper to unload the ore through the mine tunnel, and use a remote-controlled scraper to enter the stope to unload the remaining ore; Filling the interior of the stope through the rock drilling tunnel using a filling pipeline; Determining the stope structure parameters of a flat-bottom structure stope, including: obtaining the stage height of the stope as the stope height in the stope structure parameters; determining the stope length and stope width in the stope structure parameters according to the rock mass quality classification, ground stress and ore-rock mechanics parameters corresponding to the stope; and correcting the stope length according to the stope height, a preset remote-controlled scraper ore output ratio coefficient and a natural repose angle of the caved ore bulk corresponding to the stope; According to the stope height, the preset remote-controlled scraper ore output ratio coefficient and the natural repose angle of the caved ore bulk corresponding to the stope, the stope length is corrected, including: calculating the upper limit of the length corresponding to the stope, wherein the upper limit of the length = , H is the stope height, P is the preset remote-controlled scraper ore output ratio, is the natural repose angle of the collapsed ore bulk corresponding to the stope; if the stope length is less than or equal to the upper limit of the length, the stope length is kept unchanged; if the stope length is greater than the upper limit of the length, the stope length is corrected to the upper limit of the length.

2. The mining method based on support and downward fan-shaped blasting according to claim 1, characterized in that: In the stope, stope joint tunnels, rock drilling tunnels and mine exit tunnels are constructed and pre-support is provided, including: Constructing a stope-joint tunnel from the stope's stage tunnel to the interior of the ore body to carry out transportation, ventilation and filling work, and using a long anchor cable and bolt support system to provide pre-support to maintain the stability of the stope-joint tunnel; In the upper part of the stope, a rock drilling tunnel is arranged from the stope joint tunnel along the stope recovery direction, and a long anchor cable and bolt support system are used to provide pre-support to maintain the stability of the rock drilling tunnel; In the lower part of the mining field, an exit tunnel is arranged from the mining field connecting tunnel along the mining direction of the mining field, and a long anchor cable and anchor support system is used to provide pre-support to maintain the stability of the exit tunnel.

3. The mining method based on support and downward fan-shaped blasting according to claim 1 or 2, characterized in that: Using a rock drill truck in the rock drilling tunnel to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length and place explosives, including: In the rock drilling tunnel, a rock drilling vehicle is used to construct downward fan-shaped medium-deep holes with a hole diameter of 165 mm, a row spacing of 2.5 m, and a hole bottom distance of 3.3 m at a preset angle and preset length as blast holes, and explosives are loaded into the blast holes using a water column interval charging structure, wherein the water column interval ratio is 35%.

4. The mining method based on support and downward fan-shaped blasting according to claim 3, characterized in that: The mine blasting and ore dropping adopts hole-by-hole delay and reverse detonation technology at the bottom of the hole.

5. A mining device based on support and downward fan-shaped blasting, characterized in that: For implementing the method according to any one of claims 1 to 4, the device comprises: A parameter determination module is used to determine the stope structure parameters of the flat-bottom structure stope, determine the stope division direction according to the stope structure parameters and the ore body thickness corresponding to the stope, divide the ore body into stopes according to the stope division direction, and determine the mining order of each stope; A cutting module is used to construct a stope joint tunnel, a rock drilling tunnel and a mine exit tunnel in the stope according to the mining sequence and provide pre-support, construct a cutting well connected with the mine exit tunnel based on the rock drilling tunnel, and drill a downward fan-shaped medium-deep hole in the rock drilling tunnel according to the position of the cutting well, use the cutting well as a free surface and compensation space, and perform segmented sequential blasting to form a cutting groove, so as to provide a free surface and compensation space for the ore falling in the stope blasting; A blasting module is used to construct downward fan-shaped medium-deep holes as blast holes at a preset angle and a preset length in the rock drilling tunnel using a rock drilling vehicle and place explosives, and to blast the mines in the mine field using a V-shaped detonation sequence of first the middle and then the two sides based on the free surface and compensation space for the mine field blasting provided by the cutting groove; A ventilation module is used to clean the stope by using the gas flowing through the mine exit tunnel at the bottom of the stope, so that the dirty gas generated after cleaning is collected into the stage tunnel through the rock drilling tunnel at the top of the stope, and discharged to the surface through the main return air shaft of the mine; The ore-exporting module is used to use a loader to excavate the ore through the ore-exporting tunnel, and use a remote-controlled loader to enter the stope to excavate the residual ore; The filling module is used to fill the interior of the stope through the rock drilling tunnel using a filling pipeline.

6. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

7. A computer device comprising a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Downward sequential stair section type stope ore breaking method for deep thick and large ore body

    CN114109388A

  • Safe and efficient mining method for low-grade thick and large ore body under broken ore rock condition

    CN114183143A

  • Staged open stoping subsequent filling mining method for opposite explosion of upper and lower fan-shaped medium-length holes

    CN116446879A

  • Continuous mining method of stepped sectional extruding and ore caving followed by filling

    CN1474032A

  • Systems and methods of underhand closed bench mining

    US20230126105A1