A construction method for a new tunnel in a herringbone shape merging into an existing tunnel transition section

By using the transitional form of plug walls, central ditches and side ditches at the dividing point between the new tunnel and the existing tunnel, the problems of weak acceptance of the lining structure of the new and old tunnels and difficulty in waterproofing and drainage are solved, and high-quality The construction of the transition section ensures the stability and service life of the tunnel.

CN118564253BActive Publication Date: 2024-10-11CCCC FIRST HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411044602.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-11
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

During the construction of large-section high-speed railway tunnels that are gradually merged into existing tunnels in a herringbone shape, the lining structures of the new and old tunnels are weak in bearing capacity, and waterproof and drainage construction is difficult. The quality of the connection in the transition section affects the stability and service life of the reconstructed and expanded tunnels.

Method used

Adopt the transitional form of blocking walls, central ditches and side ditches, and set up blocking walls, inspection wells and trenches at the boundary between the new tunnel and the existing tunnel to ensure structural integrity and smooth drainage. Use reinforced concrete structures and waterproofing The board enhances waterproof performance.

Benefits of technology

It improves the construction quality of the transition section, ensures smooth drainage and construction safety of the new and old tunnels, shortens the construction period, reduces costs, and improves the construction efficiency of the reconstruction and extension section.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564253B_ABST
    Figure CN118564253B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction, and specifically to a construction method for a transition section in which a new tunnel is merged into an existing tunnel in a herringbone shape. The method comprises: S1, setting a plugging wall at the dividing point between the lining of the new tunnel and the lining of the existing tunnel; S2, setting a central ditch inspection well at a certain distance from the dividing point to the small mileage side to connect the central ditch of the new and old tunnels and ensure smooth drainage in the tunnel; S3, to ensure smooth drainage of the grooves on the left and right sides of the new and old tunnel lines, groove transition is performed within a certain distance from the dividing point to the large and small mileage sides. The present invention effectively improves the construction quality of the transition section, ensures smooth drainage of the new and old tunnels in the tunnel, ensures the safety and stability of the transition section construction, and improves the construction efficiency at the junction of the new and old tunnels in the expansion section.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a construction method for transitional forms such as lining end plugging walls, central ditch and side ditch grooves at the boundary between new and old tunnels after a newly built tunnel is merged into an existing tunnel in a herringbone shape. Background Art

[0002] During the construction of a large-section high-speed railway tunnel that is gradually merged into the existing tunnel in a herringbone shape, the end of the expansion and reconstruction section is also the dividing point between the new tunnel and the existing tunnel lining and trench. After the lines are merged, a transition section of the tunnel structure is formed. Its construction process is relatively complicated, the lining structures of the new and old tunnels have the weakest relative stress, and the drainage construction is the most difficult. The construction quality of the transition section will have a great impact on the overall stability and service life of the expansion and reconstruction tunnel, and is the key to the success of the expansion and reconstruction tunnel construction. Summary of the invention

[0003] The purpose of the present invention is to adopt transition forms such as plugging walls, central ditches and side ditches in the construction of the end of the expansion section of the newly built tunnel merged into the existing tunnel, so as to solve a series of problems in the connection and transition between the newly built tunnel and the sections before and after the lining and groove demarcation point of the existing tunnel, such as complex construction technology, weak stress structure and difficult control of drainage quality.

[0004] The technical solution adopted by the present invention to solve the above problems is: a construction method for a transition section of a newly built tunnel in a herringbone shape into an existing tunnel, characterized in that after the existing tunnel and the newly built tunnel are aligned, when the demarcation point is within the range of 0.6 to 1.8 m between the line spacing between the new and old tunnels, a tunnel structure transition section is formed at the mileage position of the lining and groove demarcation point, i.e., the end of the expansion section, and the transition section construction is completed by using a blocking wall, a central ditch and a side ditch transition form, and the specific construction method is as follows:

[0005] S1. Set up a plug wall at the boundary between the new tunnel lining and the existing tunnel lining;

[0006] S2. To connect the central ditch of the new and old tunnels and ensure smooth drainage in the tunnel, a central ditch inspection well is set at a certain distance from the dividing point to the small mileage side;

[0007] S3. In order to ensure smooth drainage of the trenches on the left and right sides of the new and old tunnel lines, trench transition is carried out within a certain distance from the dividing point to the large and small mileage sides.

[0008] In step S1, the dimensions of the blocking wall are: thickness 0.5-1.5m, radial maximum width: 1.38-2.58m, within the range of the circumferential secondary lining arch wall.

[0009] In step S1, the plugging wall is a reinforced concrete structure, and the steel bars are φ22mm and φ8mm. For details, see the schematic diagram of the steel bar arrangement of the plugging wall.

[0010] In step S1, the initial support at the plugging wall is provided with φ22mm mortar anchor rods, with a length of L=3.5m and a spacing of: circumferential 1.2m*longitudinal 1.2m. The anchor rods are reliably connected to the plugging wall reinforcement, and the secondary lining longitudinal steel bars are connected to the plugging wall reinforcement to enhance the structural integrity.

[0011] In step S1, a plugging wall is set at the demarcation point. The junction of the new and old tunnels is a weak link in drainage. A waterproof board and non-woven fabric are set behind the plugging wall. The circumferential construction joint is treated with epoxy resin waterproofing using a φ15mm needle hole. The circumferential spacing of the grouting pipes is 0.3m.

[0012] In step S2, the central ditch of the new and old tunnels is connected, and the construction joint is staggered at least 1.0m to the smaller mileage side at the dividing point, and a central ditch inspection well is set with dimensions of: 1.0m long, 1.6-2.4m wide, and 1.5m deep, to converge the water flow in the central ditch of the existing tunnel into the inspection well.

[0013] In step S2, the central ditch of the new and old tunnels is connected, and a single section of 2.0-3.0m concrete prefabricated pipe with an inner diameter of φ600mm is used to pass through the construction joint to collect the water flow in the central ditch of the existing tunnel to the inspection well. The joint between the existing circular ditch and the inspection well is backfilled and compacted with M40 slightly expansive cement mortar.

[0014] In step S3, the left side groove of the new and old tunnel lines is transitioned within 2.0 to 4.0 m from the dividing point to the smaller mileage side, and the right side groove of the line is transitioned within 2.0 to 5.0 m from the dividing point to the larger mileage side.

[0015] In step S3, the grooves on the left and right sides of the new and old tunnel lines are transitioned, and at the long mileage position where the left and right sides are transitioned and connected, 0.5m thick C30 concrete is used to block the side grooves.

[0016] The present invention innovatively completes a construction method for the transition section of the demarcation point after the newly built tunnel is merged into the existing tunnel in a herringbone shape, and successfully solves the problem that after the newly built tunnel is merged into the existing tunnel demarcation point, the transition section is mainly composed of Quaternary Upper Pleistocene alluvial coarse rounded gravel soil, medium density, slightly wet-humid, Class III hard soil, developed joints and fissures, and relatively broken rock mass. Faced with a series of problems such as the demarcation point lining, central ditch and side ditch transition connection after the new tunnel is gradually merged into the existing tunnel line fitting, the construction quality of the transition section is effectively improved through innovative thinking, ensuring smooth drainage of the new and old tunnels in the tunnel, ensuring the safety and stability of the transition section construction, and improving the construction efficiency of the junction of the new and old tunnels in the expansion section. According to statistical data: the construction of the transition section was completed in only 23 days, about 22 days ahead of the planned construction period of 45 days, which greatly reduced the construction cost and provided strong support for the overall performance of the expansion section tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the construction plane position of the transition section between the newly built tunnel and the existing tunnel expansion and parallel construction of the present invention;

[0018] Figure 2 This is a front view schematic diagram of the location of the demarcation point between the newly built tunnel and the existing tunnel of the present invention;

[0019] Figure 3 This is a front view of the boundary point between the newly built tunnel and the existing tunnel of the present invention, 3m away from the maximum mileage;

[0020] Figure 4 This is a front view of the boundary point between the newly built tunnel and the existing tunnel of the present invention, 3m away from the small mileage;

[0021] Figure 5 This is a front view schematic diagram of the reinforcement of the plugging wall at the boundary between the newly built tunnel and the existing tunnel of the present invention;

[0022] Figure 6 A schematic diagram of the steel bars of the side section of the plugging wall at the boundary between the newly built tunnel and the existing tunnel of the present invention;

[0023] Figure 7 This is a schematic diagram of a semicircular hook of a plugging wall at a boundary point between a newly built tunnel and an existing tunnel of the present invention;

[0024] Figure 8 A schematic diagram of the stirrups of the plugging wall at the boundary between the newly built tunnel and the existing tunnel of the present invention;

[0025] Fig. 9 This is a schematic cross-sectional view of the central ditch at the boundary between the newly built tunnel and the existing tunnel of the present invention;

[0026] Fig.10 It is a plan view schematic diagram of the transition form of the plugging wall, central ditch and side ditch grooves in the transition section of the newly built tunnel and the existing tunnel expansion and paralleling according to the present invention. DETAILED DESCRIPTION

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. For ordinary technicians in this field, all other embodiments obtained without creative work are within the scope of protection of the present invention.

[0028] To facilitate understanding of the embodiments of the present invention, further explanation will be given below using specific embodiments as examples in conjunction with the accompanying drawings. Example 1

[0029] The schematic diagram of the plane position relationship of the line fitting completed by the method of the present invention when the new tunnel is built and the existing tunnel is expanded and paralleled is as follows: Figure 1 The starting line spacing of the reconstruction and expansion section parallel construction is 15.1m, and the end line spacing of the reconstruction and expansion section parallel construction is 0.6m, that is, the transition section construction of the boundary between the new tunnel and the existing tunnel reconstruction and expansion parallel construction. The solid line represents the existing tunnel, and the dotted line represents the new tunnel. The two lines of the existing tunnel and the new tunnel are gradually merged into one line.

[0030] like Figure 2 , Figure 3 and Figure 4 As shown, they are the front schematic diagrams of the blocking wall at the boundary between the new and old tunnels, the existing tunnel at 3m from the boundary, and the lining structure of the new tunnel at 3m from the boundary. In the figure, the clearance section radius of the existing tunnel is 6.65m, and the clearance section radius of the new tunnel is 5.86m. When the line spacing between the new and old tunnels is 0.6m, the lines are fully fitted and merged into one.

[0031] like Figure 5-Figure 8 The figure shows the schematic diagram of the reinforcement arrangement of the lining plugging wall at the boundary between the new and old tunnels: the main reinforcement is φ22mm steel bars, the grid spacing is 20cm, the stirrups are φ8mm steel bars, the effective length of the stirrups is 65cm, and the longitudinal reinforcement of the secondary lining of the new tunnel is reliably connected to the reinforcement of the plugging wall.

[0032] like Fig. 9 The figure shows the schematic diagram of the cross section of the central ditch at the boundary between the new and old tunnels: the transition and connection between the φ600mm circular central ditch (cast-in-place cover) of the existing tunnel and the rectangular central ditch (prefabricated cover) of the new tunnel.

[0033] like Fig.10 As shown, a plugging wall is set up at the boundary point of the new and old tunnel reconstruction and expansion to seal the end, and a plan schematic diagram of the transition form of the central ditch and side ditch is carried out within the transition section.

[0034] At the boundary between the newly built tunnel and the existing tunnel lining and trench, the transition section construction is completed by using transition forms such as plugging wall, central ditch and side ditch, which enhances the structural integrity of the transition position at the end of the parallel line. When the newly built tunnel of the expansion section is paralleled with the existing tunnel, the line spacing is 0.6m at the end position. The present invention mainly includes the following steps:

[0035] S1. A plugging wall is set at the boundary between the new tunnel and the existing tunnel lining. The weak rigid retaining structure has the following dimensions: thickness 0.5m, maximum radial width: 1.38m. It is within the range of the circumferential secondary lining arch wall and is constructed using a hydraulic secondary lining trolley and end steel formwork.

[0036] The plug wall adopts C30 reinforced concrete structure, with steel bars of φ22mm and φ8mm, and the main reinforcement spacing is 20cm. The plug wall reinforcement layout is as follows: Figure 5-Figure 8 .

[0037] The initial support at the plugging wall is set with φ22mm mortar anchor rods, anchoring the rock behind the initial support, with a length of L=3.5m and a layout spacing of: 1.2m in the circumferential direction and 1.2m in the longitudinal direction. The anchor rods are reliably connected to the plugging wall reinforcement, and the secondary lining longitudinal steel bars are connected to the plugging wall reinforcement to enhance the integrity of the structure.

[0038] The junction of the new and old tunnels is a weak link in drainage. Waterproof boards and non-woven fabrics are installed behind the plugging wall, which are closely attached to the surrounding rock surface. The joints of the waterproof materials are tight. φ15mm needle holes are used to inject epoxy resin for waterproofing at the circumferential construction joints, and the circumferential spacing of the grouting pipes is 0.3m.

[0039] S2. In order to connect the central ditch of the new and old tunnels and ensure smooth drainage in the tunnel, the construction joint is staggered at least 1.0m to the smaller mileage side of the demarcation point (the waterproofing is weak at the construction joint position), and a central ditch inspection well is set up with the dimensions of: 1.0m long*1.6m wide*1.5m deep, to collect the water in the existing tunnel central ditch to the inspection well.

[0040] A single section of 2.0m long precast concrete pipe with an inner diameter of φ600mm is used to pass through the construction joint to guide the water flow in the existing tunnel center trench to the inspection well. The joint between the existing circular trench and the inspection well is backfilled and compacted with M40 slightly expansive cement mortar.

[0041] S3. To ensure smooth drainage of the trenches on the left and right sides of the new and old tunnel lines, the trench on the left side of the new and old tunnel lines is transitioned within 3.0m from the dividing point to the smaller mileage side, and the trench on the right side of the line is transitioned within 4.0m from the dividing point to the larger mileage side, and the groove transition section is controlled to have a smooth transition line.

[0042] The grooves on the left and right sides of the new and old tunnel lines transition. At the long mileage position where the left and right sides are transitioned, 0.5m thick C30 concrete is used to seal the side ditches to guide the water flow in the side ditches of the new and old tunnels to flow to their corresponding central ditches as quickly as possible and discharge them in time.

[0043] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention. Example 2

[0044] The steps and construction parameters of the construction method for a new tunnel in a herringbone shape and merging into a transition section of an existing tunnel described in this embodiment are the same as those in Example 1, except that:

[0045] 1. When the line spacing between the new and old tunnels is 1.2m, the lines are fully fitted and then merged into one;

[0046] 2. The thickness of the plug wall is 1.0m, and the maximum radial width is 1.98m;

[0047] 3. The width of the central ditch inspection well is 2.0m;

[0048] 4. The length of a single section of the central ditch is 2.5m;

[0049] 5. The left side groove of the new and old tunnel lines shall be transitioned within 2.0m from the dividing point to the smaller mileage side, and the right side groove of the line shall be transitioned within 2.0m from the dividing point to the larger mileage side. Example 3

[0050] The steps and construction parameters of the construction method for a new tunnel in a herringbone shape and merging into a transition section of an existing tunnel described in this embodiment are the same as those in Example 1, except that:

[0051] 1. When the line spacing between the new and old tunnels is 1.8m, the lines are fully fitted and then merged into one;

[0052] 2. The thickness of the plug wall is 1.5m, and the maximum radial width is 2.58m;

[0053] 3. The width of the central ditch inspection well is 2.4m;

[0054] 4. The length of a single section of the central ditch is 3.0m;

[0055] 5. The left side groove of the new and old tunnel lines shall be transitioned within 4.0m from the dividing point to the smaller mileage side, and the right side groove of the line shall be transitioned within 5.0m from the dividing point to the larger mileage side.

Claims

1. A construction method for a new tunnel in a herringbone shape merging into an existing tunnel transition section, characterized in that: After the existing tunnel and the new tunnel are aligned, when the demarcation point is within the range of 0.6 to 1.8 m between the old and new tunnel lines, a tunnel structure transition section is formed at the mileage position of the lining and trench demarcation point, i.e., the end of the expansion section. The transition section construction is completed by using the transition form of plugging wall, central ditch and side ditch. The specific construction methods are as follows: S1. Set up a plug wall at the boundary between the new tunnel lining and the existing tunnel lining; S2. To connect the central ditch of the new and old tunnels and ensure smooth drainage in the tunnel, a central ditch inspection well is set up on the side of the smaller mileage at the dividing point; S3. In order to ensure smooth drainage of the trenches on the left and right sides of the new and old tunnel lines, trench transition is carried out to the larger and smaller mileage sides at the dividing points respectively.

2. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S1, the dimensions of the blocking wall are: thickness 0.5-1.5m, radial maximum width: 1.38-2.58m, within the range of the circumferential secondary lining arch wall.

3. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S1, the blocking wall is a reinforced concrete structure, and the steel bars are φ22mm and φ8mm.

4. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S1, the initial support at the plugging wall is provided with φ22mm mortar anchor rods, with a length of L=3.5m and a spacing of: circumferential 1.2m*longitudinal 1.2m. The anchor rods are reliably connected to the plugging wall reinforcement, and the secondary lining longitudinal steel bars are connected to the plugging wall reinforcement to enhance the structural integrity.

5. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S1, a plugging wall is set at the demarcation point. The junction of the new and old tunnels is a weak link in drainage. A waterproof board and non-woven fabric are set behind the plugging wall. The circumferential construction joint is treated with epoxy resin waterproofing using a φ15mm needle hole. The circumferential spacing of the grouting pipes is 0.3m.

6. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S2, the central ditch of the new and old tunnels is connected, and the construction joint is staggered at least 1.0m to the smaller mileage side at the dividing point, and a central ditch inspection well is set with dimensions of: 1.0m long, 1.6-2.4m wide, and 1.5m deep, to converge the water flow in the central pipe ditch of the existing tunnel to the central ditch inspection well.

7. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S2, the central ditches of the new and old tunnels are connected, and a single-section 2.0-3.0m prefabricated concrete pipe with an inner diameter of φ600mm is used to pass through the construction joint to converge the water flow in the central pipe ditch of the existing tunnel to the central ditch inspection well. The joints between the existing circular ditch and the central ditch inspection well are backfilled and compacted with M40 slightly expansive cement mortar.

8. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S3, the left side groove of the new and old tunnel lines is transitioned within 2.0 to 4.0 m from the dividing point to the smaller mileage side, and the right side groove of the new and old tunnel lines is transitioned within 2.0 to 5.0 m from the dividing point to the larger mileage side.

9. The construction method of a new tunnel in a herringbone shape merging into an existing tunnel transition section according to claim 1, characterized in that: In step S3, the grooves on the left and right sides of the new and old tunnel lines are transitioned, and at the long mileage position where the left and right sides are transitioned and connected, 0.5m thick C30 concrete is used to block the side grooves.