Urban rail transit power outage method and system based on card serialization control

Through a method based on card serialization control, digital twin modeling and topological sorting algorithms are used to automatically control the power outage and power transmission operations of the rail transit network, which solves the problems of time-consuming and labor-intensive operations and difficult priority determination in the existing technology, and improves efficiency Reliability and efficiency of power outage operations.

CN118584879BActive Publication Date: 2024-10-25DONGFANG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411052665.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-25
Estimated Expiration
2044-08-02

Smart Images

  • Figure CN118584879B_ABST
    Figure CN118584879B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of power outage and power supply control, and discloses a method and system for power outage and power supply of urban rail transit based on card serialization control. The method comprises obtaining a power design drawing of a rail transit network to generate a power outage card group and a power supply card group for power-on devices corresponding to each power-consuming object; generating a power twin model in a power simulation program based on the power design drawing, and training a topology algorithm based on a preset power operation procedure to generate a power search algorithm; topologically sorting a number of operation nodes of each power-on device in the power twin model through the power search algorithm to set execution limitation information for each operation card; when a traffic power control signal is received, determining the control type and sending an execution instruction to the corresponding card group to control the operation of each operation card according to the execution limitation information; the present invention has the effect of improving the reliability of serialization control of rail transit power outage and power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power outage control, and in particular to a method and system for power outage in urban rail transit based on card serialization control. Background Art

[0002] Urban rail transit needs to supply power in the morning and shut down power at night every day. Usually, each power user is independently controlled by a remote control switch to gradually complete the entire power-off / power-on operation. If there are many stations on the line, the entire power-off / power-on operation process takes dozens of minutes or even more than an hour. On this basis, there are also methods to solve the problem of time-consuming and labor-intensive independent control through sequence control operations. However, it is still difficult to determine the operation priority and preconditions of each power user during sequence control, which can easily cause problems such as sequence control interruption. Summary of the invention

[0003] In order to improve the reliability of serialized control of rail transit power off / on, the present invention provides a method and system for urban rail transit power off / on based on card serialization control.

[0004] The first object of the present invention is achieved by adopting the following technical solution:

[0005] The urban rail transit power outage method based on card serialization control includes:

[0006] Obtaining the power design diagram of the rail transit network, and generating corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram;

[0007] Based on the power design diagram, digital twin modeling is performed in the power simulation program to generate a power twin model, and the topology algorithm is trained based on the preset power operation procedures to generate a power search algorithm;

[0008] A plurality of operation nodes of each powered device in the power twin model are topologically sorted by a power search algorithm to set execution limiting information for each operation card;

[0009] When a traffic power control signal is received, the control type is determined and an execution instruction is sent to the corresponding card group to control the operation of each operation card according to the execution limit information;

[0010] The power design drawing records the circuit structure and connection structure of all power-consuming objects and power-on devices in the rail transit network; the power outage card group and the power supply card group each include a number of operation cards, one operation card corresponds to one operation node; the execution limitation information includes the execution order and a number of execution conditions.

[0011] By adopting the above technical solution, the power design drawing of the rail transit network is obtained so as to know the power-consuming objects and power-on devices included in the rail transit network. Since each power-on device may include several operation nodes, a power-off card group for executing power-off work and a power-on card group for executing power-on work are generated for the power-on devices corresponding to each power-consuming object; the circuit structure and connection structure of each power-consuming object and power-on device are determined according to the power design drawing, so as to perform digital twin modeling in the power simulation program to generate a power twin model, and the topology algorithm is trained based on the power operation procedure to generate a store search algorithm to facilitate the subsequent topological search of the power twin model; the several operation nodes in the power twin model are topologically sorted by the power search algorithm to determine the execution order between several operation nodes of the same power-on device and the constraint relationship between the operation nodes from different power-on devices, and then the execution limitation information is set for each operation card to facilitate the subsequent guidance of the execution order of each operation card; when the traffic power control signal is received, the corresponding power-off / power-on control type is determined, and the execution instruction is sent to the card group of the corresponding type to control the execution work of each operation card according to the determined execution limitation information.

[0012] In a preferred example of the present application, the power design diagram of the rail transit network is obtained, and based on the power design diagram, a corresponding power outage card group and a power supply card group are generated for the power-on device corresponding to each power-consuming object, including:

[0013] Obtain the power design diagram of the rail transit network, determine several operation nodes of each power-on device based on the power design diagram, and generate corresponding power-off operation cards and power-on operation cards;

[0014] Generate a power-off card group based on a number of power-off operation cards corresponding to the same power-on device, and generate a power-on card group based on a number of power-on operation cards corresponding to the same power-on device;

[0015] The associated information of the operation card includes the card sequence name, control object, execution order, several execution conditions, control type, and failure processing setting information. The failure processing setting information includes failure processing method, number of retries, and retry interval time. The failure processing method includes failure retry, failure skip, and failure termination.

[0016] By adopting the above technical scheme, all operation nodes of all power-on devices are determined based on the power design diagram of the rail transit network, and corresponding power-off operation cards and power-on operation cards are generated for each operation node, so as to facilitate the subsequent control of the operation nodes through the operation cards; corresponding power-off card groups and power-on card groups are generated based on several power-off operation cards and power-on operation cards corresponding to the same power-on device, so as to facilitate the subsequent power-off control and power-on control of the power-on device through the power-off card groups and power-on card groups.

[0017] In a preferred example of the present application: the power operation procedure includes execution order restriction information and execution condition restriction information of various operation nodes;

[0018] The method includes performing digital twin modeling in a power simulation program based on a power design diagram to generate a power twin model, and training a topology algorithm based on a preset power operation procedure to generate a power search algorithm, including:

[0019] Conduct digital twin modeling of the power design diagram in the power simulation program to generate a power twin model of the rail transit network;

[0020] A power operation specification is received, and a topology algorithm is trained based on each execution order restriction information and execution condition restriction information to generate a power search algorithm.

[0021] By adopting the above technical solution, digital twin modeling is performed on the circuit structure and connection structure of all power-consuming objects and power-on devices in the power design diagram in the power simulation program, thereby generating a power twin model of the rail transit network, which is convenient for the subsequent simulation of power outage operations of the rail transit network; the power operation procedures are received to obtain the execution order restriction information and execution condition restriction information of various operation nodes, which are used for targeted training of the existing topology algorithm, thereby generating a power search algorithm, which is convenient for the subsequent topological search of several operation nodes in the digital twin model.

[0022] In a preferred example of the present application: the topological sorting of the operation nodes of each powered device in the power twin model by the power search algorithm to set execution limiting information for each operation card includes:

[0023] Through the power search algorithm, all operation nodes in the power twin model are traversed according to the execution order restrictions and execution condition restrictions of each operation card, so as to topologically sort several operation nodes of each energized device;

[0024] Based on the sorting result, corresponding execution limitation information is set for each operation card.

[0025] By adopting the above technical solution, all operation nodes in the power twin model are traversed through the power search algorithm to analyze and optimize the sorting of several operation nodes of each power-on device under the constraints of execution order restrictions and execution condition restrictions; corresponding execution limitation information is set for each operation card based on the sorting result, thereby realizing the function of automatically setting the execution order and execution conditions of the operation cards using the optimized topology algorithm.

[0026] In a preferred example of the present application, before generating a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device and generating a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device, the method includes:

[0027] Obtain the power control log to calculate the execution resource occupancy data of each operation card, and count the device resource occupancy and network resource occupancy required by several operation cards corresponding to each control type;

[0028] Obtaining device status logs and network status logs to determine available device resources and available network resources within a future preset power control time limit;

[0029] Calculate the equipment resource occupancy rate and network resource occupancy rate within the power control time limit based on the equipment resource occupancy rate, available equipment resources, network resource occupancy rate and available network resource data;

[0030] Calculate and determine the failure handling method, number of retries and retry interval of the target operation card based on the device resource utilization rate and network resource utilization rate;

[0031] The calculation formula of the failure processing characteristic value is:

[0032] ,

[0033] ,

[0034] when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure retry;

[0035] when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip;

[0036] when , the failure handling method is set to failure termination;

[0037] Handle the characteristic value for failure, is the maximum value, is the failure mode judgment threshold, is the device resource occupancy rate, is the device resource usage, is the available device resources, is the network resource utilization rate, is the network resource usage, For available network resources;

[0038] The retry interval is ; The calculation formula for the number of retries is:

[0039] ,

[0040] when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure termination;

[0041] when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip;

[0042] For power control time, is the minimum value, To round down the value, is the redundancy coefficient, is the preset value;

[0043] The execution resource occupancy data includes prediction data of device resource occupancy and prediction data of network resource occupancy.

[0044] By adopting the above technical solution, the power control log is obtained to calculate the equipment resources and network resources occupied by each operation card in the past execution operation, and the equipment resource occupation and network resource occupation required by the operation cards corresponding to the power outage operation and power supply operation in the entire rail transit network are respectively counted; the equipment status log and the network status log are obtained to quantitatively predict the available equipment resources and available network resources within a preset power control time limit in the future based on the available equipment resources and available network resources when the power outage operation or power supply operation was performed in the past; the equipment resource occupancy rate within the power control time limit is calculated based on the equipment resource occupancy and the available equipment resources, and the network resource occupancy rate within the power control time limit is calculated based on the network resource occupancy and the available network resource data; the failure handling method, number of retries and retry interval time of the target operation card are calculated and determined based on the equipment resource occupancy rate, the network resource occupancy rate and the power control time limit, so as to facilitate the subsequent setting of the execution limitation information of each operation card.

[0045] The second objective of the present invention is achieved by the following technical solution:

[0046] The urban rail transit power outage system based on card serialization control is applied to any of the above-mentioned urban rail transit power outage methods based on card serialization control, comprising:

[0047] A card group creation module is used to obtain the power design diagram of the rail transit network, and generate corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram;

[0048] A power search algorithm generation module is used to perform digital twin modeling in a power simulation program based on a power design diagram to generate a power twin model, and to train a topology algorithm based on a preset power operation procedure to generate a power search algorithm;

[0049] An execution limitation setting module, used to topologically sort a number of operation nodes of each powered device in the power twin model through a power search algorithm, so as to set execution limitation information for each operation card;

[0050] The card group execution module is used to determine the control type and send the execution instruction to the corresponding card group when receiving the traffic power control signal, so as to control the work of each operation card according to the execution limit information;

[0051] The power design drawing records the circuit structure and connection structure of all power-consuming objects and power-on devices in the rail transit network; the power outage card group and the power supply card group each include a number of operation cards, one operation card corresponds to one operation node; the execution limitation information includes the execution order and a number of execution conditions.

[0052] In a preferred example of the present application: the card group creation module includes:

[0053] An operation card generation submodule is used to obtain a power design diagram of the rail transit network, determine a number of operation nodes of each energized device based on the power design diagram, and generate corresponding power outage operation cards and power supply operation cards;

[0054] A card group generation submodule, used to generate a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device, and to generate a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device;

[0055] The associated information of the operation card includes the card sequence name, control object, execution order, several execution conditions, control type, and failure processing setting information. The failure processing setting information includes failure processing method, number of retries, and retry interval time. The failure processing method includes failure retry, failure skip, and failure termination.

[0056] In a preferred example of the present application: the power search algorithm generation module includes:

[0057] The power twin model generation submodule is used to perform digital twin modeling of the power design diagram in the power simulation program, thereby generating a power twin model of the rail transit network;

[0058] A topology algorithm training submodule is used to receive the power operation procedure and train the topology algorithm based on each execution order restriction information and execution condition restriction information to generate a power search algorithm;

[0059] The power operation procedure includes execution order restriction information and execution condition restriction information of various operation nodes.

[0060] The third objective of the present invention is achieved by the following technical solution:

[0061] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the urban rail transit power outage method based on card serialization control are implemented.

[0062] The fourth objective of the present invention is achieved by the following technical solution:

[0063] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the urban rail transit power outage method based on card serialization control.

[0064] In summary, the present invention includes at least one of the following beneficial technical effects:

[0065] 1. Obtain the power design drawing of the rail transit network in order to know the power-consuming objects and power-on devices included in the rail transit network. Since each power-on device may include several operation nodes, a power-off card group for executing power-off work and a power-on card group for executing power-on work are generated for the power-on devices corresponding to each power-consuming object; determine the circuit structure and connection structure of each power-consuming object and power-on device according to the power design drawing, so as to perform digital twin modeling in the power simulation program to generate a power twin model, and train the topology algorithm based on the power operation procedure to generate a store search algorithm to facilitate subsequent topological search of the power twin model; topologically sort several operation nodes in the power twin model through the power search algorithm to determine the execution order between several operation nodes of the same power-on device and the constraint relationship between operation nodes from different power-on devices, and then set execution limitation information for each operation card to facilitate subsequent guidance of the execution order of each operation card; when a traffic power control signal is received, determine the corresponding power-off / power-on control type, and send the execution instruction to the corresponding type of card group to control the execution of each operation card according to the determined execution limitation information.

[0066] 2. Based on the power design diagram of the rail transit network, all operation nodes of all energized devices are determined, and corresponding power-off operation cards and power-on operation cards are generated for each operation node, so as to facilitate the subsequent control of the operation nodes through the operation cards; based on several power-off operation cards and power-on operation cards corresponding to the same energized device, corresponding power-off card groups and power-on card groups are generated, so as to facilitate the subsequent power-off control and power-on control of the energized device through the power-off card groups and power-on card groups.

[0067] 3. In the power simulation program, digital twin modeling is performed on the circuit structure and connection structure of all power-consuming objects and power-on devices in the power design diagram, so as to generate a power twin model of the rail transit network, which is convenient for the subsequent simulation of power outage and power supply operations of the rail transit network; the power operation procedures are received to obtain the execution order restriction information and execution condition restriction information of various operation nodes, which are used for targeted training of the existing topology algorithm, so as to generate a power search algorithm, which is convenient for the subsequent topological search of several operation nodes in the digital twin model. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 It is a flow chart of the urban rail transit power outage method based on card serialization control in the first embodiment of the present invention.

[0069] Figure 2 It is a principle block diagram of an urban rail transit power outage system based on card serialization control in the second embodiment of the present invention.

[0070] Figure 3 It is a schematic diagram of the equipment in the third embodiment of the present invention. DETAILED DESCRIPTION

[0071] The following is combined with Figures 1 to 3 This application is described in further detail.

[0072] Example 1: Reference Figure 1 The present invention discloses a method for stopping power supply in urban rail transit based on card serialization control, which specifically comprises the following steps:

[0073] S10: Obtain the power design diagram of the rail transit network, and generate corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram.

[0074] In this embodiment, the power design diagram records all power-consuming objects in the rail transit network, the circuit structure and connection structure of the power-on devices; the power outage card group and the power supply card group both include a number of operation cards, and one operation card corresponds to one operation node.

[0075] Specifically, the power design diagram of the rail transit network is obtained in order to know the power-consuming objects and power-supply devices included in the rail transit network. Since each power-supply device may include several operation nodes, a power outage card group for performing power outage work and a power supply card group for performing power supply work are generated for the power-supply devices corresponding to each power-consuming object.

[0076] Wherein, in step S10, it includes:

[0077] S11: Obtain a power design diagram of the rail transit network, determine a number of operation nodes of each energized device based on the power design diagram, and generate corresponding power outage operation cards and power supply operation cards.

[0078] Specifically, all operation nodes of all energized devices are determined based on the power design diagram of the rail transit network, and corresponding power outage operation cards and power supply operation cards are generated for each operation node, so as to facilitate the subsequent control of the operation nodes through the operation cards.

[0079] S12: generating a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device, and generating a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device.

[0080] In this embodiment, the associated information of the operation card includes the card sequence name, control object, execution order, several execution conditions, control type, and failure processing setting information. The failure processing setting information includes failure processing method, number of retries, and retry interval time. The failure processing methods include failure retry, failure skip, and failure termination.

[0081] Specifically, based on several power-off operation cards and power-on operation cards corresponding to the same power-on device, corresponding power-off card groups and power-on card groups are generated to facilitate the subsequent power-off control and power-on control of the power-on device through the power-off card groups and power-on card groups.

[0082] Before step S12, the method further includes:

[0083] S121: Obtain the power control log to calculate the execution resource occupancy data of each operation card, and respectively count the device resource occupancy and network resource occupancy required by a number of operation cards corresponding to each control type.

[0084] In this embodiment, the power control log is used to record the device resource occupancy data and network resource occupancy data corresponding to several historical operation records of each operation card; the execution resource occupancy data includes the predicted data of device resource occupancy and the predicted data of network resource occupancy; the control type includes at least two types: power outage operation and power supply operation.

[0085] Specifically, the power control log is obtained to analyze the equipment resources and network resources occupied by each operation card in the past, so as to predict the amount of equipment resources and network resources required by each operation card when performing operations in the future, and then count the equipment resources and network resources occupied by the operation cards corresponding to the power outage operations and power supply operations in the entire rail transit network.

[0086] S122: Obtain device status logs and network status logs to determine available device resources and available network resources within a future preset power control time limit.

[0087] In this embodiment, the power control time limit refers to a preset acceptable duration for limiting power outage operations or power supply operations of the rail transit network.

[0088] Specifically, the device status log and the network status log are obtained to quantitatively predict the status of available device resources and available network resources within a preset power control time limit in the future based on the available device resources and available network resources during past power outage operations or power supply operations.

[0089] S123: Calculate the device resource occupancy rate and the network resource occupancy rate within the power control time limit based on the device resource occupancy, available device resources, network resource occupancy, and available network resource data.

[0090] In this embodiment, the calculation formulas for the device resource occupancy rate and the network resource occupancy rate are respectively:

[0091] ,

[0092] ,

[0093] is the device resource occupancy rate, is the device resource usage, is the available device resources, is the network resource utilization rate, is the network resource usage, Available network resources.

[0094] Specifically, the device resource occupancy rate within the power control time limit is calculated based on the device resource occupancy and the available device resources, and the network resource occupancy rate within the power control time limit is calculated based on the network resource occupancy and the available network resource data.

[0095] S124: Calculate and determine the failure handling method, retry times and retry interval time of the target operation card based on the device resource occupancy rate and the network resource occupancy rate.

[0096] In this embodiment, the calculation formula of the failure processing characteristic value is:

[0097] ,

[0098] when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure retry;

[0099] when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip;

[0100] when , the failure handling method is set to failure termination;

[0101] Handle the characteristic value for failure, is the maximum value, It is the threshold value for judging the failure mode;

[0102] The retry interval is ; The calculation formula for the number of retries is:

[0103] ,

[0104] when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure termination;

[0105] when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip;

[0106] For power control time, is the minimum value, To round down the value, is the redundancy coefficient, It is a preset value; preferably, the redundancy coefficient can be set to 1.1.

[0107] Specifically, based on the device resource occupancy rate, network resource occupancy rate, and power control time efficiency calculation and determination of the failure handling method, number of retries, and retry interval of the target operation card, it is convenient to subsequently set the execution limitation information of each operation card.

[0108] S20: Perform digital twin modeling in a power simulation program based on the power design diagram to generate a power twin model, and train a topology algorithm based on preset power operation procedures to generate a power search algorithm.

[0109] Specifically, the circuit structure and connection structure of each power-consuming object and power-connected device are determined according to the power design drawing, and digital twin modeling is performed in the power simulation program to generate a power twin model. The topology algorithm is trained based on the power operating procedures to generate a store search algorithm to facilitate subsequent topological search of the power twin model.

[0110] Wherein, in step S20, it includes:

[0111] S21: Conduct digital twin modeling of the power design diagram in the power simulation program to generate a power twin model of the rail transit network.

[0112] In this embodiment, the power operation procedure includes execution order restriction information and execution condition restriction information of various types of operation nodes.

[0113] Specifically, in the power simulation program, digital twin modeling is performed on all power-consuming objects, circuit structures, and connection structures of power-carrying devices in the power design diagram, thereby generating a power twin model of the rail transit network, which facilitates the subsequent simulation of power outage operations in the rail transit network.

[0114] S22: receiving a power operation specification, and training a topology algorithm based on each execution order restriction information and execution condition restriction information to generate a power search algorithm.

[0115] Specifically, the power operation procedures are received to obtain the execution order restriction information and execution condition restriction information of various operation nodes, which are used for targeted training of the existing topology algorithm, thereby generating a power search algorithm to facilitate subsequent topological search of several operation nodes in the digital twin model.

[0116] S30: topologically sorting a number of operation nodes of each powered device in the power twin model through a power search algorithm to set execution limitation information for each operation card.

[0117] In this embodiment, the execution limitation information includes an execution order and several execution conditions.

[0118] Specifically, a number of operation nodes in the power twin model are topologically sorted through the power search algorithm to determine the execution order between several operation nodes of the same power-on device and the constraint relationship between operation nodes from different power-on devices, and then set execution limitation information for each operation card to facilitate subsequent guidance of the execution order of each operation card.

[0119] Wherein, in step S30, it includes:

[0120] S31: Through the power search algorithm, all operation nodes in the power twin model are traversed according to the execution order restrictions and execution condition restrictions of each operation card, so as to topologically sort the operation nodes of each power-on device.

[0121] Specifically, all operation nodes in the power twin model are traversed through the power search algorithm to analyze and optimize the sorting of several operation nodes of each powered device according to the connection mode between power-consuming equipment and powered devices, as well as the constraints of execution order and execution condition.

[0122] S32: Setting corresponding execution limitation information for each operation card based on the sorting result.

[0123] Specifically, corresponding execution limitation information is set for each operation card based on the sorting result, thereby realizing the function of automatically setting the execution order and execution conditions of the operation cards by using the optimized topology algorithm.

[0124] S40: When a traffic power control signal is received, the control type is determined and an execution instruction is sent to a corresponding card group to control the operation of each operation card according to the execution limitation information.

[0125] In this embodiment, the traffic power control signal records the control type.

[0126] Specifically, when a traffic power control signal is received, the corresponding power cut / power supply control type is determined, and an execution instruction is sent to a card group of the corresponding type to control the execution work of each operation card according to the determined execution limitation information.

[0127] It should be understood that the serial numbers of the steps in the above embodiments do not imply a sequence of execution. The execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0128] Embodiment 2: Urban rail transit power outage system based on card serialization control. The urban rail transit power outage system based on card serialization control corresponds to the urban rail transit power outage method based on card serialization control in the above embodiment.

[0129] like Figure 2 As shown, the urban rail transit power outage system based on card serialization control includes a card group creation module, a power search algorithm generation module, an execution limit setting module and a card group execution module. The detailed description of each functional module is as follows:

[0130] A card group creation module is used to obtain the power design diagram of the rail transit network, and generate corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram;

[0131] A power search algorithm generation module is used to perform digital twin modeling in a power simulation program based on a power design diagram to generate a power twin model, and to train a topology algorithm based on a preset power operation procedure to generate a power search algorithm;

[0132] An execution limitation setting module, used to topologically sort a number of operation nodes of each powered device in the power twin model through a power search algorithm, so as to set execution limitation information for each operation card;

[0133] The card group execution module is used to determine the control type and send the execution instruction to the corresponding card group when receiving the traffic power control signal, so as to control the work of each operation card according to the execution limitation information.

[0134] Among them, the card group creation module also includes:

[0135] An operation card generation submodule is used to obtain a power design diagram of the rail transit network, determine a number of operation nodes of each energized device based on the power design diagram, and generate corresponding power outage operation cards and power supply operation cards;

[0136] The card group generation submodule is used to generate a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device, and to generate a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device.

[0137] Among them, the card group generation submodule also includes:

[0138] The resource occupancy analysis submodule is used to obtain the power control log to calculate the execution resource occupancy data of each operation card, and to count the device resource occupancy and network resource occupancy required by several operation cards corresponding to each control type;

[0139] The available resource analysis submodule is used to obtain the device status log and the network status log to determine the available device resources and available network resources within the future preset power control time limit;

[0140] The resource occupancy rate calculation submodule is used to calculate the device resource occupancy rate and the network resource occupancy rate within the power control time limit based on the device resource occupancy rate, available device resources, network resource occupancy rate and available network resource data;

[0141] The failure processing setting submodule is used to calculate and determine the failure processing method, number of retries and retry interval of the target operation card based on the device resource utilization rate and network resource utilization rate.

[0142] Among them, the power search algorithm generation module also includes:

[0143] The power twin model generation submodule is used to perform digital twin modeling of the power design diagram in the power simulation program, thereby generating a power twin model of the rail transit network;

[0144] The topology algorithm training submodule is used to receive the power operation procedure and train the topology algorithm based on each execution order restriction information and execution condition restriction information to generate a power search algorithm.

[0145] The execution limit setting module also includes:

[0146] A topological sorting submodule is used to traverse all operation nodes in the power twin model through a power search algorithm according to the execution order restriction and execution condition restriction of each operation card, thereby topologically sorting a number of operation nodes of each energized device;

[0147] The operation card setting submodule is used to set corresponding execution limitation information for each operation card based on the sorting result.

[0148] For the specific limitations of the urban rail transit power outage system based on card serialization control, please refer to the limitations of the urban rail transit power outage method based on card serialization control in the above text, which will not be repeated here; the various modules in the above-mentioned urban rail transit power outage system based on card serialization control can be fully or partially implemented by software, hardware and their combination; the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of the above modules.

[0149] Embodiment 3: A computer device, which may be a server, may have an internal structure as shown in FIG. Figure 3 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as power design drawings, power outage card groups, power supply card groups, power simulation programs, power twin models, power operation procedures, power search algorithms, execution limitation information, traffic power control signals and execution instructions. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, it realizes a method for stopping and supplying power to urban rail transit based on card serialization control.

[0150] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0151] S10: obtaining a power design diagram of the rail transit network, and generating a corresponding power outage card group and a power supply card group for the power-on device corresponding to each power-consuming object based on the power design diagram;

[0152] S20: Perform digital twin modeling in a power simulation program based on the power design diagram to generate a power twin model, and train a topology algorithm based on a preset power operation procedure to generate a power search algorithm;

[0153] S30: topologically sorting a number of operation nodes of each powered device in the power twin model by using a power search algorithm to set execution limitation information for each operation card;

[0154] S40: When a traffic power control signal is received, the control type is determined and an execution instruction is sent to a corresponding card group to control the operation of each operation card according to the execution limitation information.

[0155] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0156] S10: obtaining a power design diagram of the rail transit network, and generating a corresponding power outage card group and a power supply card group for the power-on device corresponding to each power-consuming object based on the power design diagram;

[0157] S20: Perform digital twin modeling in a power simulation program based on the power design diagram to generate a power twin model, and train a topology algorithm based on a preset power operation procedure to generate a power search algorithm;

[0158] S30: topologically sorting a number of operation nodes of each powered device in the power twin model by using a power search algorithm to set execution limitation information for each operation card;

[0159] S40: When a traffic power control signal is received, the control type is determined and an execution instruction is sent to a corresponding card group to control the operation of each operation card according to the execution limitation information.

[0160] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink), DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0161] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0162] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for stopping power supply in urban rail transit based on card serialization control, characterized in that: include: Obtaining the power design diagram of the rail transit network, and generating corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram; Based on the power design diagram, digital twin modeling is performed in the power simulation program to generate a power twin model, and the topology algorithm is trained based on the preset power operation procedures to generate a power search algorithm; A plurality of operation nodes of each powered device in the power twin model are topologically sorted by a power search algorithm to set execution limiting information for each operation card; When a traffic power control signal is received, the control type is determined and an execution instruction is sent to the corresponding card group to control the operation of each operation card according to the execution limit information; The power design diagram records the circuit structure and connection structure of all power-consuming objects and power-on devices in the rail transit network; the power-off card group and the power-on card group each include a plurality of operation cards, one operation card corresponds to one operation node; the execution limitation information includes an execution order and a plurality of execution conditions; The step of obtaining the power design diagram of the rail transit network and generating a corresponding power outage card group and a power supply card group for the power-on devices corresponding to each power-consuming object based on the power design diagram includes: Obtain the power design diagram of the rail transit network, determine several operation nodes of each power-on device based on the power design diagram, and generate corresponding power-off operation cards and power-on operation cards; Generate a power-off card group based on a number of power-off operation cards corresponding to the same power-on device, and generate a power-on card group based on a number of power-on operation cards corresponding to the same power-on device; The associated information of the operation card includes the card sequence name, control object, execution order, several execution conditions, control type, and failure processing setting information. The failure processing setting information includes failure processing mode, number of retries, and retry interval. The failure processing mode includes failure retry, failure skip, and failure termination. Before generating a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device and generating a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device, the method includes: Obtain the power control log to calculate the execution resource occupancy data of each operation card, and count the device resource occupancy and network resource occupancy required by several operation cards corresponding to each control type; Obtaining device status logs and network status logs to determine available device resources and available network resources within a future preset power control time limit; Calculate the equipment resource occupancy rate and network resource occupancy rate within the power control time limit based on the equipment resource occupancy rate, available equipment resources, network resource occupancy rate and available network resource data; Calculate and determine the failure handling method, number of retries and retry interval of the target operation card based on the device resource utilization rate and network resource utilization rate; The calculation formula of the failure processing characteristic value is: when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure retry; when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip; when , the failure handling method is set to failure termination; Handle the characteristic value for failure, is the maximum value, is the failure mode judgment threshold, is the device resource occupancy rate, is the device resource usage, is the available device resources, is the network resource utilization rate, is the network resource usage, For available network resources; The retry interval is ; The calculation formula for the number of retries is: when , and when the target operation card is associated with the execution conditions of other operation cards, the failure handling method is set to failure termination; when , and the target operation card is not associated with the execution conditions of other operation cards, the failure handling method is set to fail skip; For power control time, is the minimum value, To round down the value, is the redundancy coefficient, Preset value; The execution resource occupancy data includes prediction data of device resource occupancy and prediction data of network resource occupancy.

2. The urban rail transit power outage method based on card serialization control according to claim 1 is characterized in that: The power operation procedure includes execution order restriction information and execution condition restriction information of various operation nodes; The method includes performing digital twin modeling in a power simulation program based on a power design diagram to generate a power twin model, and training a topology algorithm based on a preset power operation procedure to generate a power search algorithm, including: Conduct digital twin modeling of the power design diagram in the power simulation program to generate a power twin model of the rail transit network; A power operation specification is received, and a topology algorithm is trained based on each execution order restriction information and execution condition restriction information to generate a power search algorithm.

3. The urban rail transit power outage method based on card serialization control according to claim 1 is characterized in that: The topological sorting of the operation nodes of each powered device in the power twin model by the power search algorithm to set execution limiting information for each operation card includes: Through the power search algorithm, all operation nodes in the power twin model are traversed according to the execution order restrictions and execution condition restrictions of each operation card, so as to topologically sort several operation nodes of each energized device; Based on the sorting result, corresponding execution limitation information is set for each operation card.

4. The urban rail transit power outage system based on card serialization control is characterized by: The urban rail transit power outage method based on card serialization control applied to any one of claims 1 to 3 comprises: A card group creation module is used to obtain the power design diagram of the rail transit network, and generate corresponding power outage card groups and power supply card groups for the power-on devices corresponding to each power-consuming object based on the power design diagram; A power search algorithm generation module is used to perform digital twin modeling in a power simulation program based on a power design diagram to generate a power twin model, and to train a topology algorithm based on a preset power operation procedure to generate a power search algorithm; An execution limitation setting module, used to topologically sort a number of operation nodes of each powered device in the power twin model through a power search algorithm, so as to set execution limitation information for each operation card; The card group execution module is used to determine the control type and send the execution instruction to the corresponding card group when receiving the traffic power control signal, so as to control the work of each operation card according to the execution limit information; The power design diagram records the circuit structure and connection structure of all power-consuming objects and power-on devices in the rail transit network; the power-off card group and the power-on card group each include a plurality of operation cards, one operation card corresponds to one operation node; the execution limitation information includes an execution order and a plurality of execution conditions; Wherein, the card group creation module includes: An operation card generation submodule is used to obtain a power design diagram of the rail transit network, determine a number of operation nodes of each energized device based on the power design diagram, and generate corresponding power outage operation cards and power supply operation cards; A card group generation submodule, used to generate a power-off card group based on a plurality of power-off operation cards corresponding to the same power-on device, and to generate a power-on card group based on a plurality of power-on operation cards corresponding to the same power-on device; The associated information of the operation card includes the card sequence name, control object, execution order, several execution conditions, control type, and failure processing setting information. The failure processing setting information includes failure processing mode, number of retries, and retry interval. The failure processing mode includes failure retry, failure skip, and failure termination. Among them, the card group generation submodule also includes: The resource occupancy analysis submodule is used to obtain the power control log to calculate the execution resource occupancy data of each operation card, and to count the device resource occupancy and network resource occupancy required by several operation cards corresponding to each control type; The available resource analysis submodule is used to obtain the device status log and the network status log to determine the available device resources and available network resources within the future preset power control time limit; The resource occupancy rate calculation submodule is used to calculate the device resource occupancy rate and the network resource occupancy rate within the power control time limit based on the device resource occupancy rate, available device resources, network resource occupancy rate and available network resource data; The failure processing setting submodule is used to calculate and determine the failure processing method, number of retries and retry interval of the target operation card based on the device resource utilization rate and network resource utilization rate.

5. The urban rail transit power outage system based on card serialization control according to claim 4 is characterized in that: The power search algorithm generation module includes: The power twin model generation submodule is used to perform digital twin modeling of the power design diagram in the power simulation program, thereby generating a power twin model of the rail transit network; A topology algorithm training submodule is used to receive the power operation procedure and train the topology algorithm based on each execution order restriction information and execution condition restriction information to generate a power search algorithm; The power operation procedure includes execution order restriction information and execution condition restriction information of various operation nodes.

6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the urban rail transit power outage method based on card serialization control as described in any one of claims 1 to 3 are implemented.

7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the urban rail transit power outage method based on card serialization control as described in any one of claims 1 to 3 are implemented.