A concrete cable pipe convenient for docking
By introducing sealing pads, positioning blocks and traction mechanisms into the concrete cable tube, automatic docking and waterproof filling are realized, which solves the problems of manual support and gaps in the existing technology and improves the stability and safety of the cable.
Patent Information
- Application Number
- CN202411073937.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-07
AI Technical Summary
Existing prefabricated cable tubes require manual support when splicing, which is time-consuming and labor-intensive, and gaps are prone to exist, leading to the intrusion of external substances, damaging the cable insulation performance, and increasing the risk of short circuits and leakage.
A concrete cable pipe is designed for easy docking. It uses sealing pads, positioning blocks, positioning rods and a traction mechanism. The prefabricated cable pipe is automatically docked through the traction mechanism, and waterproof materials are filled to fill the gaps to ensure sealing and stability.
It realizes automated cable tube docking, reduces manual operation time and effort, prevents the intrusion of external substances, extends the service life of the cable, and improves the safety and reliability of the cable.
Smart Images

Figure CN118589375B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of electric power assembled buildings, and in particular to a concrete cable pipe which is easy to connect. Background Art
[0002] In the process of modern urban construction and infrastructure development, the laying of power, communication and other lines is an indispensable part; in order to ensure the safety, stability and easy maintenance of these lines, cable ducts are often required for laying. Prefabricated cable duct technology is an important technological innovation that has developed rapidly in the field of cable laying in recent years. It significantly improves construction efficiency and project quality by changing the traditional on-site made cable ducts to pre-customized production in the factory and then transporting them to the construction site for direct installation.
[0003] When the prefabricated cable pipe is used nowadays, it is first transported to the laying site, and then the prefabricated cable pipe is lifted to the top of the laying position by a crane, and the prefabricated cable pipe is slowly lowered to make it fall on the laying position. During the period, when the prefabricated cable pipe slowly falls, it is manually supported to stabilize it, so that the prefabricated cable pipe falls accurately on the laying position and the adjacent prefabricated cable pipes are aligned. After the prefabricated cable pipe is placed, the prefabricated cable pipes are fixed with bolts, so that the splicing of the prefabricated cable pipes can be completed; however, when operating the above method, not only does it require manual support to stabilize the prefabricated cable pipe, which is time-consuming and laborious, but also after the prefabricated cable pipes are spliced, gaps are easily formed between the prefabricated cable pipes, which leads to the invasion of external moisture, moisture, dust or harmful substances, and then corrodes the cable protective layer. In the long run, it will damage the insulation performance of the cable, increase the risk of short circuit and leakage, and thus affect the safe operation of the cable. Summary of the invention
[0004] In view of this, the present invention provides a concrete cable pipe that is easy to connect, which can solve the shortcomings of existing prefabricated cable pipes that require manual support to stabilize the prefabricated cable pipes during splicing, which is time-consuming and labor-intensive, and the gaps between the prefabricated cable pipes easily cause damage to the cables.
[0005] Technical solution: A concrete cable tube that is easy to connect, including a prefabricated cable tube, cable holes are spaced apart inside the prefabricated cable tube, threaded holes are symmetrically opened on the prefabricated cable tube, and also includes a sealing pad, a butt tube, a positioning block I, a positioning block II, a positioning rod and a traction mechanism. Filling grooves are opened at both ends of the prefabricated cable tube, and the filling grooves are used to fill waterproof materials. Sealing pads are connected to both ends of the prefabricated cable tube, and the sealing pads are used to seal adjacent prefabricated cable tubes. One end of the prefabricated cable tube is spaced apart with a butt tube, and the number of the butt tubes is consistent with the number of cable holes in the prefabricated cable tube, and the butt tubes are connected to the cable holes one by one. A placement groove and a card slot are symmetrically opened on the top of the prefabricated cable tube, and the placement groove is connected to the card slot. The positioning block I is used to be installed on the prefabricated cable tube, and the positioning block I is in the card slot. A positioning hole is opened on the positioning block I. The positioning block II is used to be installed on the prefabricated cable tube, and the positioning block II is in the card slot. The positioning rod is connected to the positioning block II, and the traction mechanism is used to pull the prefabricated cable tube to move.
[0006] In addition, it is particularly preferred that the traction mechanism includes a guide rail, an electric slide, a connecting plate, a servo motor, a winding wheel, a traction rope and a clamping column, the guide rails are symmetrically arranged on the prefabricated cable tube, a circular hole is opened at one end of the guide rail, the electric slide is slidably installed on the guide rail, the connecting plate is connected to the electric slide, the servo motor is installed on the connecting plate, the winding wheel is rotatably connected to the connecting plate, and the winding wheel is connected to the output shaft of the servo motor, one end of the traction rope is connected to the winding wheel, and the other end of the traction rope is connected to the clamping column, and the clamping column is used to clamp into the circular hole of the guide rail.
[0007] In addition, it is particularly preferred that the traction mechanism further includes a clamping block and a spring I, the clamping block is symmetrically slidably arranged on the clamping column, and the two ends of the spring I are respectively connected to the clamping block and the clamping column.
[0008] In addition, it is particularly preferred that the traction mechanism further includes a pull rod and a spring II, the pull rod is slidably arranged on the clamping column, and the pull rod is in contact with the clamping block, and the two ends of the spring II are respectively connected to the pull rod and the clamping column.
[0009] In addition, it is particularly preferred that a supporting mechanism is further included, the supporting mechanism includes an electric push rod and a roller, the electric push rods are symmetrically arranged on the electric slide, and the rollers are rotatably connected to the telescopic rods of the electric push rods.
[0010] In addition, it is particularly preferred that a magnetic plate is further included, the magnetic plate is connected to the connecting plate, and the magnetic plate is used to adsorb the card column.
[0011] In addition, it is particularly preferred that a partition is further included, the partition is located in the filling groove, and the partition is used to separate the waterproof material in the filling groove.
[0012] In addition, it is particularly preferred that a template is further included, the template is arranged in the filling slot, and the template is used to prevent foreign matter from entering the filling slot.
[0013] The present invention has the following advantages: 1. The present invention can automatically stabilize the prefabricated cable pipe in the air by arranging a sealing gasket, a positioning block I, a positioning block II, a positioning rod and a traction mechanism, so as to achieve the purpose of saving time and labor, thereby facilitating people to dock the prefabricated cable pipes, and using the sealing gasket to seal the adjacent prefabricated cable pipes, and then by injecting asphalt between the adjacent prefabricated cable pipes, the gaps between the prefabricated cable pipes can be filled, thereby protecting the cables in the prefabricated cable pipes.
[0014] 2. The present invention provides a support mechanism, and after the electric slide is installed on the guide rail, rollers can be used to provide support for the electric slide to prevent the electric slide from being stabilized on the guide rail.
[0015] 3. The present invention provides a magnetic plate, which can use magnetic force to adsorb the card column, thereby fixing the card column, making it convenient to use and find the card column next time. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the first viewing angle stereoscopic structure of the present invention.
[0017] Figure 2 This is a schematic diagram of the second viewing angle stereoscopic structure of the present invention.
[0018] Figure 3 It is a three-dimensional structural schematic diagram of the filling groove, sealing gasket and butt pipe of the present invention.
[0019] Figure 4 It is a cross-sectional view of the prefabricated cable tube and sealing gasket of the present invention.
[0020] Figure 5 It is a three-dimensional structural schematic diagram of the positioning block I, positioning block II and positioning rod of the present invention.
[0021] Figure 6 This is a structural separation diagram of the positioning block I, positioning block II and positioning rod of the present invention.
[0022] Figure 7 It is a three-dimensional structural schematic diagram of the traction mechanism, partition and template of the present invention.
[0023] Figure 8 It is a schematic diagram of the three-dimensional structure of the support mechanism of the present invention.
[0024] Fig. 9 It is a cross-sectional view of the clamping column of the present invention.
[0025] Among them, the above-mentioned drawings include the following drawing marks: 1. prefabricated cable pipe, 101. cable hole, 102. threaded hole, 2. filling groove, 3. sealing gasket, 4. butt tube, 5. placement groove, 6. card slot, 7. positioning block I, 701. positioning hole, 8. positioning block II, 9. positioning rod, 10. guide rail, 11. round hole, 12. electric slide, 13. connecting plate, 14. servo motor, 15. winding wheel, 16. traction rope, 17. card column, 18. card block, 19. spring I, 20. pull rod, 21. spring II, 22. electric push rod, 23. roller, 24. magnetic plate, 25. partition, 26. template. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0027] Embodiment: A concrete cable pipe that is easy to connect, see Figure 1-Figure 9 As shown, a prefabricated cable tube 1 is included; cable holes 101 are spaced apart in the prefabricated cable tube 1, and the cable holes 101 are used to subsequently pass the cables through the prefabricated cable tube 1; threaded holes 102 are symmetrically opened on the prefabricated cable tube 1, and the threaded holes 102 are used for adjacent prefabricated cable tubes 1 to be screwed into the threaded holes 102 after splicing, so as to fix the adjacent prefabricated cable tubes 1 with bolts;
[0028] It also includes a sealing pad 3, a butt joint pipe 4, a positioning block I7, a positioning block II8, a positioning rod 9 and a traction mechanism; filling grooves 2 are opened at both ends of the prefabricated cable tube 1, and the filling grooves 2 are used to fill waterproof materials (such as asphalt); sealing pads 3 are connected to both ends of the prefabricated cable tube 1. After the two prefabricated cable tubes 1 are spliced, the sealing pads 3 can seal the adjacent prefabricated cable tubes 1, thereby preventing the gaps between the prefabricated cable tubes 1 from causing external moisture, moisture, dust or harmful substances to invade; butt joint pipes 4 are arranged at intervals on the right end of the prefabricated cable tube 1, and the number of butt joint pipes 4 is consistent with the number of cable holes 101 in the prefabricated cable tube 1, and the butt joint pipes 4 are connected to the cable holes 101 one by one; placement grooves 5 are opened symmetrically on the top of the prefabricated cable tube 1, and the number of placement grooves 5 is equal to the number of cable holes 101 in the prefabricated cable tube 1. The number is four; the top of the prefabricated cable tube 1 is symmetrically provided with card slots 6, the number of the card slots 6 is four, and the four placement slots 5 are respectively connected with the four card slots 6; the positioning block I7 is used to be installed on the prefabricated cable tube 1, and the positioning block I7 is in the card slot 6, and a positioning hole 701 is opened on the positioning block I7, and the edge of the positioning hole 701 is an arc surface; the positioning block II8 is used to be installed on the prefabricated cable tube 1, and the positioning block II8 is in the card slot 6; the positioning rod 9 is connected to the positioning block II8, and the positioning rod 9 is used to be passed into the positioning hole 701 of the positioning block I7, so as to align the prefabricated cable tubes 1 on the left and right sides, so that the prefabricated cable tubes 1 on the left and right sides can be spliced; the traction mechanism is used to pull the prefabricated cable tube 1 to move, so that the two prefabricated cable tubes 1 that need to be spliced gradually approach each other.
[0029] See also Figure 7-Figure 9 As shown, the traction mechanism includes a guide rail 10, an electric slide 12, a connecting plate 13, a servo motor 14, a winding wheel 15, a traction rope 16, a clamping column 17, a clamping block 18, a spring I 19, a pull rod 20 and a spring II 21; the prefabricated cable tube 1 is provided with guide rails 10 on both the front and rear sides, and a round hole 11 is opened at the left end of the guide rail 10; the electric slide 12 is slidably mounted on the guide rail 10; the connecting plate 13 is connected to the right side of the electric slide 12; the servo motor 14 is installed on the upper side of the connecting plate 13; the winding wheel 15 is rotatably connected to the lower side of the connecting plate 13, and the winding wheel 15 is connected to the output shaft of the servo motor 14, so that the servo motor 14 can drive the winding wheel 15 to rotate; the traction rope 16 is wound on The winding wheel 15 has one end connected to the winding wheel 15; the other end of the traction rope 16 is connected to a clamping column 17, which is used to be clamped into the circular hole 11 of the guide rail 10, and the material of the clamping column 17 is iron; a clamping block 18 is symmetrically slidably arranged at the lower part of the clamping column 17, and the clamping block 18 is used to limit the clamping column 17 in the circular hole 11 of the guide rail 10 to prevent the clamping column 17 from escaping from the circular hole 11 of the guide rail 10; the two ends of the spring I 19 are respectively connected to the clamping block 18 and the clamping column 17; the pull rod 20 is slidably arranged on the clamping column 17, the bottom end of the pull rod 20 is an inclined surface, and the lower end of the pull rod 20 contacts with two clamping blocks 18; the two ends of the spring II 21 are respectively connected to the pull rod 20 and the clamping column 17.
[0030] In the initial state, the spring II 21 is in a normal state, and because the lower end of the pull rod 20 presses against the clamping block 18, the spring I 19 is in a stretched state; when in use, the first prefabricated cable tube 1 is hoisted to a designated position by a crane, and then the electric slide 12 is installed on the guide rail 10 of the first prefabricated cable tube 1, so that the electric slide 12 is limited on the guide rail 10, and then the positioning block I 7 is placed in the placement groove 5 on the right side of the top of the first prefabricated cable tube 1, and then the positioning block I 7 is pushed to move to the left, so that the positioning block I 7 is clamped in the clamping groove 6, thereby limiting the positioning block I 7;
[0031] Then, place the positioning block II8 into the placement groove 5 on the left side of the top of the second prefabricated cable tube 1, and then push the positioning block II8 to move to the right so that the positioning block II8 is stuck in the slot 6, thereby limiting the positioning block II8, and then use the crane to lift the second prefabricated cable tube 1. When the crane lifts the second prefabricated cable tube 1 to the upper right of the first prefabricated cable tube 1, pull the pull rod 20 upward, and the spring II 21 is compressed to separate the lower end of the pull rod 20 from the block 18. At this time, the spring I 19 returns to its original state, and the spring I 19 drives the block 18 to move to the side close to each other, so that the block 18 retracts into the column 17, and then the servo motor 14 drives the winding wheel 15 to rotate, so that the winding wheel 15 unwinds the traction rope 16, and then the column 17 is Insert the second prefabricated cable tube 1 into the round hole 11 of the guide rail 10, then release the pull rod 20, and the spring II 21 returns to its original state. The spring II 21 drives the pull rod 20 to move downward and reset. When the bottom end of the pull rod 20 contacts the block 18, the inclined surface at the bottom end of the pull rod 20 squeezes the block 18 to move to the side away from each other and resets. The spring I 19 stretches, so that the block 18 extends out from the column 17, so that the block 18 limits the column 17 on the guide rail 10 of the second prefabricated cable tube 1. Then, the second prefabricated cable tube 1 is slowly lowered by the crane, and the winding wheel 15 is driven by the servo motor 14 to reverse, so that the winding wheel 15 reels the traction rope 16, so that the traction rope 16 continues to pull the column 17 and the second prefabricated cable tube 1, thereby The second prefabricated cable tube 1 in the air is stabilized to prevent the second prefabricated cable tube 1 from shaking in the air (during this period, the speed of winding up the traction rope 16 is synchronized with the speed of lowering the second prefabricated cable tube 1 by the crane, so as to prevent the traction rope 16 from winding up too fast, causing the second prefabricated cable tube 1 to be pulled to the left above the first prefabricated cable tube 1, and avoiding the second prefabricated cable tube 1 from colliding with the first prefabricated cable tube 1 when falling), when the second prefabricated cable tube 1 falls close to the ground (the second prefabricated cable tube 1 is not in contact with the ground at this time), the second prefabricated cable tube 1 is to the right of the first prefabricated cable tube 1 (the second prefabricated cable tube 1 is higher than the first prefabricated cable tube 1), and then the servo motor 14 is used to continue to drive The movable winding wheel 15 is reversed, so that the winding wheel 15 continues to reel in the traction rope 16, so that the traction rope 16 pulls the clamping column 17 and the second prefabricated cable tube 1 to move to the left, thereby driving the positioning block II 8 and the positioning rod 9 to move to the left. When the positioning rod 9 contacts the arc surface of the edge of the positioning hole 701, the arc surface of the edge of the positioning hole 701 will squeeze the positioning rod 9 to move downward and adjust its position, so that the positioning rod 9 enters the positioning hole 701. During this period, the positioning rod 9 will drive the positioning block II 8 and the second prefabricated cable tube 1 to move downward and adjust their positions synchronously, so that the second prefabricated cable tube 1 contacts the ground. When the positioning rod 9 enters the positioning hole 701, the positioning block I7 will begin to limit the positioning rod 9, thereby limiting the positioning block II 8 and the second prefabricated cable tube 1.In order to prevent the left end face of the second prefabricated cable tube 1 from being offset due to collision when it contacts the right end face of the first prefabricated cable tube 1, when the left end face of the second prefabricated cable tube 1 contacts the right end face of the first prefabricated cable tube 1, the butt joint pipe 4 on the first prefabricated cable tube 1 will enter the cable hole 101 of the second prefabricated cable tube 1, and the sealing gasket 3 on the right side of the first prefabricated cable tube 1 will contact the sealing gasket 3 on the left side of the second prefabricated cable tube 1, so that the two sealing gaskets 3 are connected between the two prefabricated cable tubes 1. The filling groove 2 on the right side of the first prefabricated cable tube 1 will be combined with the filling groove 2 on the left side of the second prefabricated cable tube 1 to form a large filling groove 2. Then, the bolts are screwed into the threaded holes 102 of the prefabricated cable tubes 1 to fix the two prefabricated cable tubes 1. Then, the positioning block I7 is pushed to the right, and then the positioning block II8 is pushed to the left, so that both the positioning block I7 and the positioning block II8 are moved from the card slot 6 to the placement slot 5. Then, the positioning block I7 and the positioning block II8 are removed from the placement slot together. 5, and then add asphalt into the large filling groove 2 to fill the large filling groove 2, so as to fill the gap between the two prefabricated cable pipes 1 to prevent the gap between the two prefabricated cable pipes 1 from causing external moisture, moisture, dust or harmful substances to invade, and then pull the pull rod 20 upward again to retract the block 18 into the clamping column 17 again, and then take the clamping column 17 out of the round hole 11 of the guide rail 10 on the second prefabricated cable pipe 1, and release the pull rod 20 again to retract the block 18 The electric slide 12 is extended from the clamping column 17, and then the electric slide 12 is controlled to move rightward on the guide rail 10 of the first prefabricated cable tube 1 until the electric slide 12 moves to the guide rail 10 of the second prefabricated cable tube 1. In this way, the splicing of the two prefabricated cable tubes 1 can be automatically completed, and then the above operation can be repeated to automatically splice the subsequent prefabricated cable tubes 1; when all the subsequent prefabricated cable tubes 1 are spliced, the electric slide 12 is removed from the guide rail 10 of the last prefabricated cable tube 1.
[0032] See also Figure 8 As shown, a supporting mechanism is also included, which includes an electric push rod 22 and a roller 23; the electric slide 12 is symmetrically provided with the electric push rod 22; the roller 23 is rotatably connected to the telescopic rod of the electric push rod 22, and the roller 23 is driven by the electric push rod 22 to move to contact the ground, so that the roller 23 can provide support for the electric slide 12.
[0033] By setting up a supporting mechanism, after the electric slide 12 is installed on the guide rail 10 of the first prefabricated cable pipe 1, the roller 23 can be driven downward by the electric push rod 22 to make the roller 23 contact with the ground, so that the roller 23 provides support for the electric slide 12; when the electric slide 12 moves on the guide rail 10, it can drive the roller 23 to roll on the ground; when the subsequent prefabricated cable pipes 1 are all spliced, the roller 23 is driven upward to reset by the electric push rod 22.
[0034] See also Figure 8 As shown, a magnetic plate 24 is also included; the magnetic plate 24 is connected to the connecting plate 13, the traction rope 16 movably passes through the middle of the magnetic plate 24, and the magnetic plate 24 is used to adsorb the card column 17, so as to fix the card column 17.
[0035] By setting the magnetic plate 24, when the card column 17 is taken out from the circular hole 11 of the guide rail 10 on the prefabricated cable tube 1, the servo motor 14 can be used to drive the winding wheel 15 to reverse, so that the winding wheel 15 can reel in the traction rope 16, so that the traction rope 16 pulls the card column 17 close to the magnetic plate 24 until the card column 17 is attached to the magnetic plate 24, so that the magnetic plate 24 can attract the card column 17 with magnetic force, thereby fixing the card column 17 for the next use and finding of the card column 17.
[0036] See also Figure 7 As shown, a partition 25 is also included; the partition 25 is located in the filling tank 2, and the partition 25 is used to separate the waterproof material in the filling tank 2.
[0037] When it is necessary to add asphalt into the large filling tank 2 for filling, the partition 25 can be placed in the middle of the upper side of the large filling tank 2, and then the asphalt is only poured into the large filling tank 2 in front of or behind the partition 25, so that the asphalt can only be filled into the large filling tank 2 from one side, and the air in the large filling tank 2 can be discharged from the other side. In this way, the air in the large filling tank 2 can be easily discharged; when the large filling tank 2 is almost filled, the partition 25 is taken out of the large filling tank 2 so that the large filling tank 2 is completely filled.
[0038] See also Figure 7 As shown, a template 26 is also included; the template 26 is detachably installed in the filling slot 2, and the template 26 is used to prevent foreign matter from entering the filling slot 2.
[0039] By setting the template 26, the template 26 can block foreign matter from entering the filling slot 2, thereby preventing foreign matter from getting stuck in the filling slot 2; when the prefabricated cable tube 1 needs to be used, the template 26 in the filling slot 2 can be removed and recycled first, and then the prefabricated cable tube 1 can be used normally.
[0040] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A concrete cable pipe that is easy to connect, comprising a prefabricated cable pipe (1), the prefabricated cable pipe (1) having cable holes (101) spaced apart therein, and the prefabricated cable pipe (1) having threaded holes (102) symmetrically formed thereon, wherein: The prefabricated cable tube (1) further comprises a sealing pad (3), a butt-joint tube (4), a positioning block I (7), a positioning block II (8), a positioning rod (9) and a traction mechanism. Both ends of the prefabricated cable tube (1) are provided with filling grooves (2), the filling grooves (2) are used to fill waterproof material, both ends of the prefabricated cable tube (1) are connected with sealing pads (3), the sealing pads (3) are used to seal adjacent prefabricated cable tubes (1), one end of the prefabricated cable tube (1) is provided with a butt-joint tube (4) at intervals, the number of the butt-joint tubes (4) is the same as the number of the cable holes (101) in the prefabricated cable tube (1), and the butt-joint tubes (4) and the cable holes (101) are arranged one by one. The prefabricated cable tube (1) is symmetrically provided with a placement groove (5) and a clamping groove (6) on the top, the placement groove (5) is connected with the clamping groove (6), a positioning block I (7) is used to be installed on the prefabricated cable tube (1), and the positioning block I (7) is located in the clamping groove (6), a positioning hole (701) is opened on the positioning block I (7), a positioning block II (8) is used to be installed on the prefabricated cable tube (1), and the positioning block II (8) is located in the clamping groove (6), a positioning rod (9) is connected to the positioning block II (8), and a traction mechanism is used to pull the prefabricated cable tube (1) to move; the traction mechanism includes a guide rail (10), an electric slide (12), a connection A prefabricated cable tube (1) is provided with a guide rail (10) symmetrically, a round hole (11) is opened at one end of the guide rail (10), an electric slide (12) is slidably mounted on the guide rail (10), a connecting plate (13) is connected to the electric slide (12), the servo motor (14) is mounted on the connecting plate (13), the winding wheel (15) is rotatably connected to the connecting plate (13), and the winding wheel (15) is connected to the output shaft of the servo motor (14), one end of the traction rope (16) is connected to the winding wheel (15), and the traction rope (16) is connected to the winding wheel (15). The other end of the guide rope (16) is connected to a clamping column (17), and the clamping column (17) is used to be clamped into the circular hole (11) of the guide rail (10); the traction mechanism also includes a clamping block (18) and a spring I (19), and the clamping block (18) is symmetrically slidably arranged on the clamping column (17), and the two ends of the spring I (19) are respectively connected to the clamping block (18) and the clamping column (17); the traction mechanism also includes a pull rod (20) and a spring II (21), and the pull rod (20) is slidably arranged on the clamping column (17), and the pull rod (20) is in contact with the clamping block (18), and the two ends of the spring II (21) are respectively connected to the pull rod (20) and the clamping column (17).
2. A concrete cable pipe that is easy to connect as claimed in claim 1, characterized in that: It also includes a support mechanism, which includes an electric push rod (22) and a roller (23). The electric push rod (22) is symmetrically arranged on the electric slide (12), and the roller (23) is rotatably connected to the telescopic rod of the electric push rod (22).
3. A concrete cable pipe that is easy to connect as claimed in claim 2, characterized in that: It also includes a magnetic plate (24), which is connected to the connecting plate (13), and the magnetic plate (24) is used to adsorb the card column (17).
4. A concrete cable pipe that is easy to connect as claimed in claim 3, characterized in that: It also includes a partition plate (25), which is located in the filling groove (2) and is used to separate the waterproof material in the filling groove (2).
5. The concrete cable pipe that is easy to connect as claimed in claim 4, characterized in that: It also includes a template (26), which is arranged in the filling groove (2), and the template (26) is used to prevent foreign matter from entering the filling groove (2).
Citation Information
Patent Citations
Air-floating-type flexible pulling butt joint assembling platform
CN106826179A
Prefabricated cable duct bank and construction method thereof
CN108832563A
High-voltage electric power pipe connecting device
CN116587630A
Prefabricated cable duct bank
CN217741275U
Cable duct bank unit and cable duct bank structure
CN220156153U
