Method, device and equipment for planning regional power grid expansion considering hydropower station coordination
By constructing a regional power grid expansion planning model that considers the coordination of hydropower stations, the problem of the correlation between wind power photovoltaic installed capacity and hydropower station time in the existing technology is solved, and the optimal configuration combination and high-fidelity rules of water, wind, light and storage combined power generation system are realized. curve, reduces total cost.
Patent Information
- Application Number
- CN202411096271.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-12
AI Technical Summary
The existing combined water, wind, light and storage power generation system does not consider the impact of wind power photovoltaic installed capacity on dispatching operation in the capacity expansion plan, and does not clearly consider the time correlation between natural inflow and forced outflow of hydropower stations, resulting in distortion of the rule curve.
Provide a regional power grid expansion planning method that considers the coordination of hydropower stations. By obtaining unit data of the target regional power grid, a capacity expansion planning model is constructed, including fixed investment total cost, variable operation total cost and relaxation total cost, and constrained according to the properties of cascade hydropower stations. , calculate the optimal configuration strategy to determine the installed capacity of thermal power units and renewable energy.
The optimal configuration combination of conventional power generation and energy storage under the conditions of meeting the variable new energy penetration target is achieved, which reduces the total cost of water, wind, light and storage combined power generation system. By considering the time correlation between natural inflow and forced outflow of hydropower stations, it has been constructed. High fidelity rule curve.
Smart Images

Figure CN118627938B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power systems, and in particular to a method, device and equipment for planning regional power grid expansion in consideration of the coordination of hydropower stations. Background Art
[0002] Clean energy bases with a high proportion of wind and solar power generation can achieve efficient energy utilization, but the randomness and volatility of wind and solar power output pose great difficulties for the safe and economical operation of the power system. On the basis of a vast cascade hydropower station group, pumped storage power stations are added for transformation, and wind farms and photovoltaic power stations of a certain capacity are configured to build a water-wind-solar-storage combined power generation system, which can make full use of the regulation capacity of conventional hydropower stations and pumped storage power stations and reduce the instability of wind and solar power generation output.
[0003] At present, the research on the capacity configuration of the combined power generation system of water, wind, photovoltaic and storage mainly takes the abandonment of wind and photovoltaic in the system as the starting point, and uses the regulation capacity of the hydropower station to establish the expansion planning model with the goal of minimizing the amount of wind and photovoltaic abandoned in the system or maximizing the total scale of wind and photovoltaic connected, without considering the impact of the installed capacity of wind power and photovoltaic on the dispatching operation. Moreover, the existing research does not explicitly consider the time correlation of the natural inflow and forced outflow of the hydropower station in the expansion planning model, and the reservoir rule curve constructed by this is also seriously distorted. Summary of the invention
[0004] The purpose of the present invention is to determine the optimal configuration combination of conventional power generation, energy storage and intermittent renewable energy under the condition of meeting the predetermined variable new energy penetration target. In order to achieve the above purpose, the present invention provides a method, device and equipment for regional power grid expansion planning considering the coordination of hydropower stations.
[0005] In a first aspect, an embodiment of the present invention provides a method for planning regional power grid expansion considering the coordination of hydropower stations, including:
[0006] Acquire unit data of the target regional power grid, the unit data at least including cost data and parameter data, the cost data including installed capacity of thermal power units, installed capacity of renewable energy, output data of pumped storage power stations, output data of run-of-river hydropower stations and output data of energy storage equipment, the parameter data at least including output power of thermal power units, penetration rate of renewable energy and charging and discharging power of energy storage equipment;
[0007] Based on the cost data and the preset cost rules, constructing a capacity expansion planning model for the target regional power grid, wherein the preset cost rules are to minimize the total cost of the regional power grid capacity expansion planning, wherein the total cost of the regional power grid capacity expansion planning includes the total fixed investment cost, the total variable operating cost and the total relaxation cost, wherein the total relaxation cost includes the overflow cost and the reserve cost;
[0008] According to the parameter data and the attributes of the cascade hydropower stations, the capacity expansion planning model is constrained to obtain constraint conditions of the capacity expansion planning model, wherein the attributes of the cascade hydropower stations include natural inflow of reservoirs and forced outflow of reservoirs;
[0009] The capacity expansion planning model is calculated based on the constraint conditions, and the obtained calculation results are characterized as the optimal configuration strategy of the target area power grid, and the calculation results at least include the optimal installed capacity of thermal power units and the optimal installed capacity of renewable energy.
[0010] Preferably, the constructing of the expansion planning model of the target area power grid based on the cost data and the preset cost rules includes:
[0011] The following formula is used to characterize the capacity expansion planning model:
[0012]
[0013] in, represents the total fixed investment cost, represents the total variable operating cost, represents the total slack cost.
[0014] Preferably, the total fixed investment cost is calculated using the following formula:
[0015]
[0016] in, represents the total fixed investment cost, represents the installed capacity of renewable energy, represents the fixed investment cost per unit of renewable energy, Indicates the installed capacity of thermal power plants, represents the unit fixed investment cost of thermal power units, Indicates the power capacity of the energy storage device, represents the fixed investment cost per unit of power capacity of energy storage equipment, Indicates the energy capacity of the energy storage device, Represents the unit fixed investment cost of energy storage equipment energy capacity.
[0017] Preferably, the variable total operating cost is calculated using the following formula:
[0018]
[0019] in, represents the total variable operating cost, represents the output power of the thermal power unit at time t, represents the unit operating cost of thermal power units, represents the output power of the hydropower unit at time t, represents the unit operating cost of the hydropower unit, represents the discharge power of the energy storage device at time t, represents the unit operating cost of energy storage equipment, represents the renewable energy output power at time t, represents the unit operating cost of renewable energy, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, and T represents the time set within the optimization range.
[0020] Preferably, the total relaxation cost is calculated using the following formula:
[0021]
[0022] in, represents the total slack cost, represents the overflow water volume at time t, represents the unit penalty cost caused by overflow, represents the reserve demand of reserve type r at time t, represents the slack reserve unit cost, and R represents the reserve type set, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, two-way reserve, upward reserve and downward reserve.
[0023] Preferably, constraining the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model includes:
[0024] Constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model, wherein the first constraint condition includes a power balance constraint condition, a reserve allocation balance constraint condition, a renewable energy output constraint condition, a thermal power unit output constraint condition, an energy storage device charge and discharge constraint condition, an energy storage device reserve allocation constraint condition, an energy storage device power balance constraint condition, an energy storage device charge and discharge state switching constraint condition, a reserve allocation constraint condition, and a renewable energy penetration constraint condition;
[0025] The expansion planning model is constrained according to the attributes of the cascade hydropower stations to obtain a second constraint condition of the expansion planning model, wherein the second constraint condition includes a water balance constraint condition of the hydropower station reservoir, an output constraint condition of the hydropower station, a pumping capacity constraint condition of the pumped storage power station, and a production capacity constraint condition of the hydropower station.
[0026] Preferably, constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model includes:
[0027] The power balance constraint condition is represented by the following formula:
[0028]
[0029] in, represents the output power of the thermal power unit at time t, represents the renewable energy output power at time t, represents the output power of the hydropower unit at time t, represents the discharge power of the energy storage device at time t, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, T represents the time set within the optimization range, represents the system load demand at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the charging power of the energy storage device at time t;
[0030] The following formula is used to characterize the reserve allocation balance constraint:
[0031]
[0032] in, represents the type r reserve allocated to thermal power at time t, represents the type r reserve allocated to renewable energy at time t, represents the type r reserve allocated to hydropower at time t, represents the type r reserve allocated to energy storage at time t, represents the reserve demand of reserve type r at time t, represents the system reserve requirement of type r at time t, R represents a set of reserve types, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, bidirectional reserve, upward reserve and downward reserve;
[0033] The following formula is used to characterize the renewable energy output constraint condition:
[0034]
[0035] in, represents the installed capacity of renewable energy, represents the available output ratio of renewable energy at time t, represents the available output of the run-of-river hydropower station at time t;
[0036] The following formula is used to characterize the output constraint condition of the thermal power unit:
[0037]
[0038]
[0039] in, Indicates an increase in reserves, Indicates a reduction in reserves, Indicates the installed capacity of thermal power plants;
[0040] The following formula is used to characterize the charging and discharging constraints of the energy storage device:
[0041]
[0042]
[0043] in, Indicates the power capacity of the energy storage device;
[0044] The following formula is used to characterize the energy storage equipment reserve allocation constraint:
[0045]
[0046]
[0047]
[0048]
[0049] in, Represents lithium-ion battery energy storage technology, It stands for power-to-gas energy storage technology. It stands for pumped hydro energy storage technology;
[0050] The following formula is used to characterize the energy balance constraint of the energy storage device:
[0051]
[0052] in, represents the state of charge of the energy storage device at time t, Indicates the state of charge of the energy storage device at time t-1, Indicates the charge-discharge conversion efficiency of energy storage equipment;
[0053] The following formula is used to characterize the charging and discharging state switching constraint of the energy storage device:
[0054]
[0055]
[0056] in, Indicates the energy capacity of the energy storage device, Indicates the reserve type the protection period;
[0057] The reserve allocation constraint is represented by the following formula:
[0058]
[0059]
[0060]
[0061]
[0062] in, It represents the percentage of rated capacity of thermal power units specified by reserve type r, Indicates the installed capacity of thermal power plants, It represents the percentage of the rated capacity of the energy storage device specified by the reserve type r, It represents the percentage of the rated capacity of the hydropower unit specified by the reserve type r, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, represents the downward manual frequency restoration reserve allocated to renewable energy sources at time t, represents the percentage of renewable energy unit rated capacity provided for by the downward manual frequency restoration reserve;
[0063] The following formula is used to characterize the renewable energy penetration constraint:
[0064]
[0065] in, Indicates the minimum penetration rate of renewable energy.
[0066] Preferably, constraining the capacity expansion planning model according to the attributes of the cascade hydropower stations to obtain a second constraint condition of the capacity expansion planning model includes:
[0067] The following formula is used to characterize the water balance constraint condition of the hydropower station reservoir:
[0068]
[0069]
[0070]
[0071]
[0072] in, represents the water storage capacity of the hydropower station reservoir at time t, represents the water storage capacity of the hydropower station reservoir at time t-1, represents the inflow into the hydropower station reservoir at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the conversion efficiency of the hydropower unit, represents the water density coefficient, represents the output power of the hydropower unit at time t, represents the interconnection matrix of cascade hydropower stations, represents the overflow water volume at time t, H represents the set of hydropower equipment, T represents the time set within the optimization range, Indicates the water head of the hydropower station, represents the acceleration due to gravity, Indicates the maximum water storage capacity of the hydropower station reservoir;
[0073] The following formula is used to characterize the output constraint of the hydropower station:
[0074]
[0075]
[0076] in, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, Indicates an increase in reserves, It means to adjust the reserve downward;
[0077] The following formula is used to characterize the pumping capacity constraint of the pumped storage power station:
[0078]
[0079] in, Indicates the maximum pumping capacity of the hydropower station;
[0080] The following formula is used to characterize the capacity constraint of the hydropower station:
[0081]
[0082] in, Indicates the minimum production capacity of the hydropower station.
[0083] In a second aspect, an embodiment of the present invention provides a regional power grid expansion planning device considering the coordination of hydropower stations, which is applicable to the regional power grid expansion planning method as described above, and includes:
[0084] A data acquisition unit is used to acquire unit data of the target area power grid, wherein the unit data includes cost data and parameter data, wherein the cost data includes at least the installed capacity of thermal power units, the installed capacity of renewable energy, the output data of pumped storage power stations, the output data of run-of-river hydropower stations and the output data of energy storage equipment, and the parameter data includes at least the output power of thermal power units, the penetration rate of renewable energy and the charging and discharging power of energy storage equipment;
[0085] A model building unit, configured to build a capacity expansion planning model of the target regional power grid based on the cost data and a preset cost rule, wherein the preset cost rule is to minimize the total cost of the regional power grid capacity expansion planning, wherein the total cost of the regional power grid capacity expansion planning includes the total fixed investment cost, the total variable operating cost and the total relaxation cost, wherein the total relaxation cost includes the overflow cost and the reserve cost;
[0086] A constraint condition construction unit, used to constrain the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model, wherein the attributes of the cascade hydropower stations include natural inflow of reservoirs and forced outflow of reservoirs;
[0087] A configuration optimization unit is used to calculate the capacity expansion planning model based on the constraint conditions, and characterize the obtained calculation results as the optimal configuration strategy of the target area power grid, wherein the calculation results at least include the optimal installed capacity of thermal power units and the optimal installed capacity of renewable energy.
[0088] In a third aspect, an embodiment of the present invention provides a terminal device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements the regional power grid expansion planning method as described above when executing the computer program.
[0089] Compared with the prior art, the method, device and equipment for regional power grid expansion planning considering the coordination of hydropower stations in the embodiments of the present invention have the following beneficial effects: fully tapping the important role of hydropower station groups in the power grid expansion planning in areas with high penetration of variable renewable energy, achieving the optimal configuration combination of conventional power generation, energy storage and intermittent renewable energy under the conditions of meeting the predetermined variable renewable energy penetration target, and effectively reducing the total cost of the water-wind-solar-storage combined power generation system; by considering the time correlation of natural inflow and forced outflow of hydropower stations, a high-fidelity regular curve is constructed for hydropower stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0090] Figure 1 It is a flow chart of a method for planning regional power grid expansion considering the coordination of hydropower stations according to an embodiment of the present invention;
[0091] Figure 2 is a schematic diagram of a process for constructing constraint conditions in an embodiment of the present invention;
[0092] Figure 3 This is a schematic diagram of the connection relationship of a hydropower station according to an embodiment of the present invention;
[0093] Figure 4 It is a structural schematic diagram of a regional power grid expansion planning device considering the coordination of hydropower stations according to an embodiment of the present invention;
[0094] Figure 5 is a schematic diagram of the structure of a terminal device according to an embodiment of the present invention;
[0095] Figure 3 Among them, 1~3, cascade hydropower stations; 4, independent hydropower station. DETAILED DESCRIPTION
[0096] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0097] In the description of the present invention, it should be understood that the term cost used in the present invention is an intuitive mapping expression for measuring capacity and output, does not involve market behavior, and has nothing to do with economic laws.
[0098] like Figure 1 As shown, an embodiment of the present invention provides a method for planning regional power grid expansion considering the coordination of hydropower stations, including the steps of:
[0099] S1. Obtaining the unit data of the target area power grid;
[0100] This step considers that the unit types include thermal power units, renewable energy, pumped storage power stations, run-of-river hydropower stations and energy storage equipment. Specifically, the unit data includes cost data and parameter data. Further, the cost data at least includes the installed capacity of thermal power units, the installed capacity of renewable energy, the output data of pumped storage power stations, the output data of run-of-river hydropower stations and the output data of energy storage equipment, and the parameter data at least includes the output power of thermal power units, the penetration rate of renewable energy and the charging and discharging power of energy storage equipment.
[0101] S2. Based on the cost data and preset cost rules, a capacity expansion planning model for the target area power grid is constructed;
[0102] The preset cost rule is to minimize the total cost of regional power grid expansion planning, which includes total fixed investment cost, total variable operating cost and total relaxation cost. Specifically, a regional power grid expansion planning model considering the synergy of hydropower stations is established. The objective function of the model aims to determine the optimal configuration of power generation and energy storage assets so as to minimize the total cost of regional power grid expansion planning. The total cost of regional power grid expansion planning considered specifically includes the total fixed investment cost of all assets of the regional power grid, the total variable operating cost of each asset of the regional power grid and the total relaxation cost caused by the relaxation variables in the problem. Furthermore, the following formula is used to characterize the expansion planning model:
[0103]
[0104] in, represents the total fixed investment cost, represents the total variable operating cost, represents the total slack cost.
[0105] The total fixed investment cost includes the fixed investment cost of renewable energy, thermal power units and energy storage equipment. Specifically, the total fixed investment cost is calculated using the following formula:
[0106]
[0107] in, represents the total fixed investment cost, represents the installed capacity of renewable energy, represents the fixed investment cost per unit of renewable energy, Indicates the installed capacity of thermal power plants, represents the unit fixed investment cost of thermal power units, Indicates the power capacity of the energy storage device, represents the fixed investment cost per unit of power capacity of energy storage equipment, Indicates the energy capacity of the energy storage device, Represents the fixed investment cost per unit of energy storage equipment energy capacity. The fixed investment cost of each asset consists of overnight investment cost and fixed operation and maintenance cost. Specifically, it is calculated using the following formula:
[0108]
[0109]
[0110]
[0111]
[0112] in, represents the fixed investment cost of asset type, Indicates the overnight investment cost of asset type, Indicates the fixed operation and maintenance costs of asset type, Indicates the capital expenditure of asset type, represents the percentage of fixed operation and maintenance costs of asset type to capital expenditure, i represents the discount rate, It indicates the service life of asset type, res indicates renewable energy asset type, th indicates thermal power unit asset type, and sto indicates energy storage equipment asset type.
[0113] The total variable operating cost includes the operating cost of thermal power units, the operating cost of hydropower units, the operating cost of renewable energy and the operating cost of energy storage equipment. Specifically, the total variable operating cost is calculated using the following formula:
[0114]
[0115] in, represents the total variable operating cost, represents the output power of the thermal power unit at time t, represents the unit operating cost of thermal power units, represents the output power of the hydropower unit at time t, represents the unit operating cost of the hydropower unit, represents the discharge power of the energy storage device at time t, represents the unit operating cost of energy storage equipment, represents the renewable energy output power at time t, represents the unit operating cost of renewable energy, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, and T represents the time set within the optimization range.
[0116] The total slack cost is considered to ensure the feasibility of hydropower plant management and the smooth realization of reserve requirements when natural inflow exceeds the available storage capacity of the reservoir. Overflow will bring penalty costs, while potential unmet reserve requirements require relaxation reserve costs. Therefore, the total slack cost includes overflow costs and reserve costs. Specifically, the following formula is used to calculate the total slack cost:
[0117]
[0118] in, represents the total slack cost, represents the overflow water volume at time t, represents the unit penalty cost caused by overflow, represents the reserve demand of reserve type r at time t, represents the slack reserve unit cost, and R represents the reserve type set, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, two-way reserve, upward reserve and downward reserve.
[0119] S3. Constrain the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model;
[0120] Specifically, Figure 2 As shown, step S3 includes:
[0121] S301, constraining the capacity expansion planning model according to parameter data to obtain a first constraint condition of the capacity expansion planning model;
[0122] Specifically, the first constraint conditions include power balance constraint conditions, reserve allocation balance constraint conditions, renewable energy output constraint conditions, thermal power unit output constraint conditions, energy storage equipment charging and discharging constraint conditions, energy storage equipment reserve allocation constraint conditions, energy storage equipment power balance constraint conditions, energy storage equipment charging and discharging state switching constraint conditions, reserve allocation constraint conditions and renewable energy penetration constraint conditions.
[0123] 1) Power balance constraints
[0124] This constraint condition considers the balance between power generation and consumption in the power grid, where power generation includes thermal power units, hydropower units, renewable energy power generation and the output power of energy storage equipment, and power consumption includes system load demand, pumped water power consumption of pumped storage power stations and charging of energy storage power stations. Specifically, the following formula is used to characterize the power balance constraint condition:
[0125]
[0126] in, represents the output power of the thermal power unit at time t, represents the renewable energy output power at time t, represents the output power of the hydropower unit at time t, represents the discharge power of the energy storage device at time t, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, T represents the time set within the optimization range, represents the system load demand at time t, represents the pumping power of the pumped storage hydropower station at time t, Represents the charging power of the energy storage device at time t.
[0127] 2) Reserve Allocation Balance Constraints
[0128] This constraint considers the reserve balance of each reserve type. Reserves are allocated according to thermal power, hydropower, energy storage and renewable energy, and slack variables are considered. , to ensure that the system reserve requirements are met. This constraint applies to six types of reserves: frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, two-way reserve, upward reserve and downward reserve. Specifically, the following formula is used to characterize the reserve allocation balance constraint:
[0129]
[0130] in, represents the type r reserve allocated to thermal power at time t, represents the type r reserve allocated to renewable energy at time t, represents the type r reserve allocated to hydropower at time t, represents the type r reserve allocated to energy storage at time t, represents the reserve demand of reserve type r at time t, represents the system reserve requirement of type r at time t, R represents a reserve type set, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, bidirectional reserve, upward reserve and downward reserve.
[0131] 3) Constraints on renewable energy output
[0132] This constraint condition considers the maximum active output requirement of the renewable energy generator set. Specifically, the following formula is used to characterize the renewable energy output constraint condition:
[0133]
[0134] in, represents the installed capacity of renewable energy, represents the available output ratio of renewable energy at time t, Represents the available output of the run-of-river hydropower station at time t.
[0135] 4) Output constraints of thermal power units
[0136] This constraint condition considers the restrictions on the output of thermal power units by two factors: the installed capacity of thermal power units and the allocated positive and negative rotation reserves. Specifically, the following formula is used to characterize the output constraint condition of thermal power units:
[0137]
[0138]
[0139] in, Indicates an increase in reserves, Indicates a reduction in reserves, Indicates the installed capacity of thermal power plants.
[0140] 5) Constraints on charging and discharging of energy storage equipment
[0141] This constraint condition takes into account the charging and discharging requirements of the energy storage device. Specifically, the following formula is used to characterize the charging and discharging constraint condition of the energy storage device:
[0142]
[0143]
[0144] in, Indicates the power capacity of energy storage equipment.
[0145] 6) Energy storage equipment reserve allocation constraints
[0146] This constraint condition takes into account the requirements of energy storage devices with different energy storage technologies for reserve demand. For lithium-ion battery energy storage technology, lithium-ion battery energy storage devices can quickly switch between charging mode and discharging mode, and can provide up to twice its installed capacity. Reserves; for power-to-gas energy storage technology and pumped storage energy storage technology, upward reserve allocation can be achieved by increasing the discharge of energy storage devices, and downward reserves can be provided to the power grid by charging energy storage devices. Specifically, the following formula is used to characterize the energy storage device reserve allocation constraint:
[0147]
[0148]
[0149]
[0150]
[0151] in, Represents lithium-ion battery energy storage technology, It stands for power-to-gas energy storage technology. It stands for pumped hydro energy storage technology.
[0152] 7) Energy storage equipment power balance constraints
[0153] This constraint condition takes into account the state of charge of each energy storage technology. Considering the charge and discharge conversion efficiency of the energy storage device, it is ensured that the state of charge and the charge and discharge amount in the previous time interval are consistent with the state of charge after charging and discharging. Specifically, the following formula is used to characterize the energy storage device charge balance constraint condition:
[0154]
[0155] in, represents the charge state of the energy storage device at time t, Indicates the charge state of the energy storage device at time t-1, Indicates the charge and discharge conversion efficiency of energy storage equipment.
[0156] 8) Constraints for switching between charging and discharging states of energy storage equipment
[0157] This constraint condition takes into account the requirements that the energy storage device must meet when switching between charging and discharging states: when the energy storage provides downward reserves, sufficient space must be left for charging, when the energy storage provides upward reserves, sufficient energy must be stored for discharging, and various types of reserve protection periods must be maintained. Specifically, the following formula is used to characterize the energy storage device charging and discharging state switching constraint condition:
[0158]
[0159]
[0160] in, Indicates the energy capacity of the energy storage device, Indicates the reserve type protection period.
[0161] 9) Reserve Allocation Constraints
[0162] This constraint condition considers the upper limit of reserve supply for thermal power units, energy storage equipment, hydropower units and renewable energy. For renewable energy units, downward manual frequency recovery reserves can be provided according to a certain proportion of their available power generation, and faster downward reserve types such as automatic frequency recovery reserves cannot be provided. Specifically, the following formula is used to characterize the reserve allocation constraint condition:
[0163]
[0164]
[0165]
[0166]
[0167] in, It represents the percentage of rated capacity of thermal power units specified by reserve type r, Indicates the installed capacity of thermal power plants, It represents the percentage of the rated capacity of the energy storage device specified by the reserve type r, It represents the percentage of the rated capacity of the hydropower unit specified by the reserve type r, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, represents the downward manual frequency restoration reserve allocated to renewable energy sources at time t, Indicates the percentage of rated capacity of renewable energy units that is provided for by the downward manual frequency restoration reserve.
[0168] 10) Renewable energy penetration constraints
[0169] Specifically, the following formula is used to characterize the renewable energy penetration constraint:
[0170]
[0171] in, Indicates the minimum penetration rate of renewable energy.
[0172] S302. Constraining the capacity expansion planning model according to the attributes of the cascade hydropower stations to obtain a second constraint condition of the capacity expansion planning model.
[0173] Considering the coordination of hydropower stations, the second constraint condition considering the attributes of cascade hydropower stations in the basin is constructed and incorporated into the regional power grid expansion planning model. By managing the water storage capacity of each reservoir, the basic principles of hydropower station operation can be better followed. Among them, the attributes of cascade hydropower stations include natural inflow and forced outflow of reservoirs, and the second constraint condition includes the water balance constraint of hydropower station reservoirs, the output constraint of hydropower stations, the pumping capacity constraint of pumped storage power stations, and the capacity constraint of hydropower stations.
[0174] 1) Constraints on water balance of hydropower station reservoirs
[0175] This constraint condition considers the water balance of each hydropower station reservoir, including natural inflow, discharge, pumping and overflow when the reservoir capacity is exceeded. The water storage capacity of each hydropower station reservoir determines the rule curve of the power plant. Specifically, the following formula is used to characterize the water balance constraint condition of the hydropower station reservoir:
[0176]
[0177]
[0178]
[0179]
[0180] in, represents the water storage capacity of the hydropower station reservoir at time t, represents the water storage capacity of the hydropower station reservoir at time t-1, represents the inflow into the hydropower station reservoir at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the conversion efficiency of the hydropower unit, represents the water density coefficient, represents the output power of the hydropower unit at time t, represents the interconnection matrix of cascade hydropower stations, represents the overflow water volume at time t, H represents the set of hydropower equipment, T represents the time set within the optimization range, Indicates the water head of the hydropower station, represents the acceleration due to gravity, Indicates the maximum water storage capacity of the hydropower station reservoir.
[0181] It should be noted that the interconnection matrix of cascade hydropower stations The following rules are used for construction:
[0182] a) Rows and columns are available hydropower stations;
[0183] b) When the row and column positions point to the same hydropower station, the corresponding matrix element is assigned a value of 1;
[0184] c) When the hydropower station pointed to by the row position is located downstream of the hydropower station pointed to by the column position, the corresponding matrix element is assigned a value of -1;
[0185] d) When there is no upstream-downstream relationship between two hydropower stations, the corresponding matrix element is assigned a value of 0.
[0186] In a specific embodiment, the power system includes two groups of cascade hydropower stations and one independent hydropower station. The connection relationship between the hydropower stations is as follows: Figure 3 As shown in the figure, 1 to 3 represent cascade hydropower stations, 4 represents an independent hydropower station, river 1 represents the first river, river 2 represents the second river, outflows represents the outflow, and the corresponding cascade hydropower station interconnection matrix for:
[0187]
[0188] 2) Hydropower station output constraints
[0189] This constraint condition considers the restrictions on the output of hydropower units by two factors: the installed capacity of the hydropower unit and the allocated reserve requirements. Specifically, the following formula is used to characterize the output constraint condition of the hydropower station:
[0190]
[0191]
[0192] in, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, Indicates an increase in reserves, Indicates a reduction in reserves.
[0193] 3) Pumping capacity constraints of pumped storage power stations
[0194] This constraint condition limits the pumping capacity of the pumped storage power station with natural inflow. Specifically, the following formula is used to characterize the pumping capacity constraint condition of the pumped storage power station:
[0195]
[0196] in, Indicates the maximum pumping capacity of a hydropower station.
[0197] 4) Hydropower station capacity constraints
[0198] This constraint condition guarantees the mandatory production volume of the hydropower station every day throughout the year. Specifically, the following formula is used to represent the capacity constraint condition of the hydropower station:
[0199]
[0200] in, Indicates the minimum production capacity of the hydropower station.
[0201] S4. Calculate the capacity expansion planning model based on the constraint conditions, and characterize the calculated results as the optimal configuration strategy of the target area power grid.
[0202] Based on the constraints, the capacity expansion planning model is solved by a solver, and the calculation results obtained include at least the optimal installed capacity of thermal power units and the optimal installed capacity of renewable energy, and the calculation results are characterized as the optimal configuration of the power units and energy storage assets in the target area. Specifically, this embodiment uses Python to call the Gurobi solver to solve the capacity expansion planning model, and obtains the optimal configuration of the units and energy storage assets, including the installed capacity of thermal power units and renewable energy, and the configuration capacity of three types of energy storage technologies: pumped storage, battery energy storage, and power-to-gas energy storage.
[0203] The embodiment of the present invention provides a method for regional power grid expansion planning considering the coordination of hydropower stations, fully taps the important role of hydropower station groups in the regional power grid expansion planning with high penetration of variable renewable energy, and achieves the optimal configuration combination of conventional power generation, energy storage and intermittent renewable energy under the condition of meeting the predetermined variable renewable energy penetration target, effectively reducing the total cost of the water-wind-solar-storage combined power generation system; by considering the time correlation of natural inflow and forced outflow of hydropower stations, a high-fidelity regular curve is constructed for the hydropower station.
[0204] like Figure 4 As shown, an embodiment of the present invention provides a regional power grid expansion planning device considering the coordination of hydropower stations, which is applicable to the regional power grid expansion planning method as described above, including:
[0205] Data acquisition unit 1, used to acquire unit data of the target area power grid, the unit data includes cost data and parameter data, the cost data includes at least the installed capacity of thermal power units, the installed capacity of renewable energy, the output data of pumped storage power stations, the output data of run-of-river hydropower stations and the output data of energy storage equipment, and the parameter data includes at least the output power of thermal power units, the penetration rate of renewable energy and the charging and discharging power of energy storage equipment;
[0206] Model building unit 2, used for building a capacity expansion planning model of the target regional power grid based on cost data and preset cost rules, the preset cost rule is to minimize the total cost of regional power grid capacity expansion planning, the total cost of regional power grid capacity expansion planning includes total fixed investment cost, total variable operation cost and total relaxation cost, and the total relaxation cost includes overflow cost and reserve cost;
[0207] The constraint condition construction unit 3 is used to constrain the expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the expansion planning model, and the attributes of the cascade hydropower stations include natural inflow of the reservoir and forced outflow of the reservoir;
[0208] The configuration optimization unit 4 is used to calculate the capacity expansion planning model based on the constraint conditions, and characterize the obtained calculation results as the optimal configuration strategy of the target area power grid, and the calculation results at least include the optimal installed capacity of the thermal power units and the optimal installed capacity of renewable energy.
[0209] It should be noted that each unit in the above-mentioned regional power grid expansion planning device considering the coordination of hydropower stations can be fully or partially implemented by software, hardware and a combination thereof. The above-mentioned units can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above-mentioned units. For the specific definition of a regional power grid expansion planning device considering the coordination of hydropower stations, please refer to the above definition of a regional power grid expansion planning method considering the coordination of hydropower stations. The two have the same functions and effects and will not be repeated here.
[0210] An embodiment of the present invention further provides a terminal device, the terminal device comprising:
[0211] processor, memory, and bus;
[0212] The bus is used to connect the processor and the memory;
[0213] The memory is used to store operation instructions;
[0214] The processor is used to call the operation instruction, and the executable instruction enables the processor to perform operations corresponding to the regional power grid expansion planning method considering the coordination of hydropower stations as described above in the present invention.
[0215] In an optional embodiment, a terminal device is provided, such as Figure 5 As shown, Figure 5 The terminal device 5000 shown includes: a processor 5001 and a memory 5003. The processor 5001 and the memory 5003 are connected, such as through a bus 5002. Optionally, the terminal device 5000 may also include a transceiver 5004. It should be noted that in actual applications, the transceiver 5004 is not limited to one, and the structure of the terminal device 5000 does not constitute a limitation on the embodiments of the present invention.
[0216] Processor 5001 may be a CPU, a general-purpose processor, a DSP, an ASIC, an FPGA or other programmable logic device, a transistor logic device, a hardware component or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of the present invention. Processor 5001 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0217] The bus 5002 may include a path to transmit information between the above components. The bus 5002 may be a PCI bus or an EISA bus, etc. The bus 5002 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0218] The memory 5003 may be a ROM or other type of static storage device that can store static information and instructions, a RAM or other type of dynamic storage device that can store information and instructions, or an EEPROM, a CD-ROM or other optical disk storage, an optical disk storage (including a compressed optical disk, a laser disk, an optical disk, a digital versatile disk, a Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited to these.
[0219] The memory 5003 is used to store application code for executing the solution of the present invention, and the execution is controlled by the processor 5001. The processor 5001 is used to execute the application code stored in the memory 5003 to implement the content shown in any of the above method embodiments.
[0220] Among them, terminal devices include but are not limited to: mobile terminals such as mobile phones, laptops, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc.
[0221] To sum up, the embodiments of the present invention provide a method, device and equipment for regional power grid expansion planning considering the coordination of hydropower stations, which fully tap the important role of hydropower station groups in the regional power grid expansion planning with high penetration of variable renewable energy, and achieve the optimal configuration combination of conventional power generation, energy storage and intermittent renewable energy under the condition of meeting the predetermined variable renewable energy penetration target, effectively reducing the total cost of the combined power generation system of water, wind, light and storage; by considering the time correlation of natural inflow and forced outflow of hydropower stations, a high-fidelity regular curve is constructed for hydropower stations.
[0222] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0223] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A regional power grid expansion planning method considering hydropower station coordination, It is characterized in that include: Acquire unit data of the target regional power grid, the unit data including cost data and parameter data, the cost data including at least thermal power installed capacity, renewable energy installed capacity, pumped storage power station output data, run-of-river hydropower station output data and energy storage equipment output data, the parameter data including at least thermal power unit output power, renewable energy penetration rate and energy storage equipment charge and discharge power; Based on the cost data and the preset cost rules, constructing a capacity expansion planning model for the target regional power grid, wherein the preset cost rules are to minimize the total cost of the regional power grid capacity expansion planning, wherein the total cost of the regional power grid capacity expansion planning includes the total fixed investment cost, the total variable operating cost and the total relaxation cost, wherein the total relaxation cost includes the overflow cost and the reserve cost; According to the parameter data and the attributes of the cascade hydropower stations, the capacity expansion planning model is constrained to obtain constraint conditions of the capacity expansion planning model, wherein the attributes of the cascade hydropower stations include natural inflow of reservoirs and forced outflow of reservoirs; Calculating the capacity expansion planning model based on the constraint conditions, and characterizing the obtained calculation results as the optimal configuration strategy of the target area power grid, wherein the calculation results at least include the optimal installed capacity of thermal power units and the optimal installed capacity of renewable energy; The step of constructing a capacity expansion planning model for the target area power grid based on the cost data and the preset cost rules includes: The following formula is used to characterize the capacity expansion planning model: in, represents the total fixed investment cost, represents the total variable operating cost, represents the total slack cost; The step of constraining the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model includes: Constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model, wherein the first constraint condition includes a power balance constraint condition, a reserve allocation balance constraint condition, a renewable energy output constraint condition, a thermal power unit output constraint condition, an energy storage device charge and discharge constraint condition, an energy storage device reserve allocation constraint condition, an energy storage device power balance constraint condition, an energy storage device charge and discharge state switching constraint condition, a reserve allocation constraint condition, and a renewable energy penetration constraint condition; Constraining the expansion planning model according to the attributes of the cascade hydropower stations to obtain a second constraint condition of the expansion planning model, wherein the second constraint condition includes a water balance constraint condition of a hydropower station reservoir, an output constraint condition of a hydropower station, a pumping capacity constraint condition of a pumped storage power station, and a production capacity constraint condition of a hydropower station; The constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model includes: The power balance constraint condition is represented by the following formula: in, represents the output power of the thermal power unit at time t, represents the renewable energy output power at time t, represents the output power of the hydropower unit at time t, represents the discharge power of the energy storage device at time t, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, T represents the time set within the optimization range, represents the system load demand at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the charging power of the energy storage device at time t; The following formula is used to characterize the reserve allocation balance constraint: in, represents the type r reserve allocated to thermal power at time t, represents the type r reserve allocated to renewable energy at time t, represents the type r reserve allocated to hydropower at time t, represents the type r reserve allocated to energy storage at time t, represents the reserve requirement of reserve type r at time t, represents the system reserve requirement of type r at time t, R represents a set of reserve types, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, bidirectional reserve, upward reserve and downward reserve; The following formula is used to characterize the renewable energy output constraint condition: in, represents the installed capacity of renewable energy, represents the available output ratio of renewable energy at time t, represents the available output of the run-of-river hydropower station at time t; The following formula is used to characterize the output constraint condition of the thermal power unit: in, Indicates an increase in reserves, Indicates a reduction in reserves, Indicates the installed capacity of thermal power plants; The following formula is used to characterize the charging and discharging constraints of the energy storage device: in, Indicates the power capacity of the energy storage device; The following formula is used to characterize the energy storage equipment reserve allocation constraint: in, Represents lithium-ion battery energy storage technology, It stands for power-to-gas energy storage technology. It stands for pumped hydro energy storage technology; The following formula is used to characterize the energy balance constraint of the energy storage device: in, represents the charge state of the energy storage device at time t, Indicates the charge state of the energy storage device at time t-1, Indicates the charge-discharge conversion efficiency of energy storage equipment; The following formula is used to characterize the charging and discharging state switching constraint of the energy storage device: in, Indicates the energy capacity of the energy storage device, Indicates the reserve type the protection period; The reserve allocation constraint is represented by the following formula: in, It represents the percentage of rated capacity of thermal power units specified by reserve type r, Indicates the installed capacity of thermal power plants, It represents the percentage of the rated capacity of the energy storage device specified by the reserve type r, It represents the percentage of the rated capacity of the hydropower unit specified by the reserve type r, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, represents the downward manual frequency restoration reserve allocated to renewable energy sources at time t, represents the percentage of renewable energy unit rated capacity provided for by the downward manual frequency restoration reserve; The following formula is used to characterize the renewable energy penetration constraint: in, represents the minimum penetration rate of renewable energy; The constraining the capacity expansion planning model according to the attributes of the cascade hydropower stations to obtain the second constraint condition of the capacity expansion planning model includes: The following formula is used to characterize the water balance constraint condition of the hydropower station reservoir: in, represents the water storage capacity of the hydropower station reservoir at time t, represents the water storage capacity of the hydropower station reservoir at time t-1, represents the inflow into the hydropower station reservoir at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the conversion efficiency of the hydropower unit, represents the water density coefficient, represents the output power of the hydropower unit at time t, represents the interconnection matrix of cascade hydropower stations, represents the overflow water volume at time t, H represents the set of hydropower equipment, T represents the time set within the optimization range, Indicates the water head of the hydropower station, represents the acceleration due to gravity, Indicates the maximum water storage capacity of the hydropower station reservoir; The following formula is used to characterize the output constraint of the hydropower station: in, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, Indicates an increase in reserves, It means to adjust the reserve downward; The following formula is used to characterize the pumping capacity constraint of the pumped storage power station: in, Indicates the maximum pumping capacity of a hydropower station; The following formula is used to characterize the capacity constraint of the hydropower station: in, Indicates the minimum production capacity of the hydropower station.
2. The regional power grid expansion planning method according to claim 1, It is characterized in that The total cost of the fixed investment is calculated using the following formula: in, represents the total fixed investment cost, represents the installed capacity of renewable energy, represents the fixed investment cost per unit of renewable energy, Indicates the installed capacity of thermal power plants, represents the unit fixed investment cost of thermal power units, Indicates the power capacity of the energy storage device, represents the fixed investment cost per unit of power capacity of energy storage equipment, Indicates the energy capacity of the energy storage device, Represents the unit fixed investment cost of energy storage equipment energy capacity.
3. The regional power grid expansion planning method according to claim 1, It is characterized in that The total variable operating cost is calculated using the following formula: in, represents the total variable operating cost, represents the output power of the thermal power unit at time t, represents the unit operating cost of thermal power units, represents the output power of the hydropower unit at time t, represents the unit operating cost of the hydropower unit, represents the discharge power of the energy storage device at time t, represents the unit operating cost of energy storage equipment, represents the renewable energy output power at time t, represents the unit operating cost of renewable energy, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, and T represents the time set within the optimization range.
4. The regional power grid expansion planning method according to claim 1, It is characterized in that The total relaxation cost is calculated using the following formula: in, represents the total slack cost, represents the overflow water volume at time t, represents the unit penalty cost caused by overflow, represents the reserve requirement of reserve type r at time t, represents the slack reserve unit cost, and R represents the reserve type set, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, two-way reserve, upward reserve and downward reserve.
5. A regional power grid expansion planning device considering the coordination of hydropower stations, applicable to the regional power grid expansion planning method as claimed in any one of claims 1 to 4, It is characterized in that include: A data acquisition unit is used to acquire unit data of the target area power grid, wherein the unit data includes cost data and parameter data, wherein the cost data includes at least the installed capacity of thermal power units, the installed capacity of renewable energy, the output data of pumped storage power stations, the output data of run-of-river hydropower stations and the output data of energy storage equipment, and the parameter data includes at least the output power of thermal power units, the penetration rate of renewable energy and the charging and discharging power of energy storage equipment; A model building unit, configured to build a capacity expansion planning model of the target regional power grid based on the cost data and a preset cost rule, wherein the preset cost rule is to minimize the total cost of the regional power grid capacity expansion planning, wherein the total cost of the regional power grid capacity expansion planning includes the total fixed investment cost, the total variable operating cost and the total relaxation cost, wherein the total relaxation cost includes the overflow cost and the reserve cost; A constraint condition construction unit, used to constrain the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model, wherein the attributes of the cascade hydropower stations include natural inflow of reservoirs and forced outflow of reservoirs; A configuration optimization unit, configured to calculate the capacity expansion planning model based on the constraint conditions, and characterize the obtained calculation results as the optimal configuration strategy of the target area power grid, wherein the calculation results at least include the optimal installed capacity of thermal power units and the optimal installed capacity of renewable energy; The step of constructing a capacity expansion planning model for the target area power grid based on the cost data and the preset cost rules includes: The following formula is used to characterize the capacity expansion planning model: in, represents the total fixed investment cost, represents the total variable operating cost, represents the total slack cost; The step of constraining the capacity expansion planning model according to the parameter data and the attributes of the cascade hydropower stations to obtain the constraint conditions of the capacity expansion planning model includes: Constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model, wherein the first constraint condition includes a power balance constraint condition, a reserve allocation balance constraint condition, a renewable energy output constraint condition, a thermal power unit output constraint condition, an energy storage device charge and discharge constraint condition, an energy storage device reserve allocation constraint condition, an energy storage device power balance constraint condition, an energy storage device charge and discharge state switching constraint condition, a reserve allocation constraint condition, and a renewable energy penetration constraint condition; Constraining the expansion planning model according to the attributes of the cascade hydropower stations to obtain a second constraint condition of the expansion planning model, wherein the second constraint condition includes a water balance constraint condition of a hydropower station reservoir, an output constraint condition of a hydropower station, a pumping capacity constraint condition of a pumped storage power station, and a production capacity constraint condition of a hydropower station; The constraining the capacity expansion planning model according to the parameter data to obtain a first constraint condition of the capacity expansion planning model includes: The power balance constraint condition is represented by the following formula: in, represents the output power of the thermal power unit at time t, represents the renewable energy output power at time t, represents the output power of the hydropower unit at time t, represents the discharge power of the energy storage device at time t, They represent the equipment sets of thermal power, hydropower, energy storage and renewable energy respectively, T represents the time set within the optimization range, represents the system load demand at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the charging power of the energy storage device at time t; The following formula is used to characterize the reserve allocation balance constraint: in, represents the type r reserve allocated to thermal power at time t, represents the type r reserve allocated to renewable energy at time t, represents the type r reserve allocated to hydropower at time t, represents the type r reserve allocated to energy storage at time t, represents the reserve demand of reserve type r at time t, represents the system reserve requirement of type r at time t, R represents a set of reserve types, which includes frequency control reserve, automatic frequency recovery reserve, manual frequency recovery reserve, bidirectional reserve, upward reserve and downward reserve; The following formula is used to characterize the renewable energy output constraint condition: in, represents the installed capacity of renewable energy, represents the available output ratio of renewable energy at time t, represents the available output of the run-of-river hydropower station at time t; The following formula is used to characterize the output constraint condition of the thermal power unit: in, Indicates an increase in reserves, Indicates a reduction in reserves, Indicates the installed capacity of thermal power plants; The following formula is used to characterize the charging and discharging constraints of the energy storage device: in, Indicates the power capacity of the energy storage device; The following formula is used to characterize the energy storage equipment reserve allocation constraint: in, Represents lithium-ion battery energy storage technology, It stands for power-to-gas energy storage technology. It stands for pumped hydro energy storage technology; The following formula is used to characterize the energy balance constraint of the energy storage device: in, represents the charge state of the energy storage device at time t, Indicates the charge state of the energy storage device at time t-1, Indicates the charge-discharge conversion efficiency of energy storage equipment; The following formula is used to characterize the charging and discharging state switching constraint of the energy storage device: in, Indicates the energy capacity of the energy storage device, Indicates the reserve type the protection period; The reserve allocation constraint is represented by the following formula: in, It represents the percentage of rated capacity of thermal power units specified by reserve type r, Indicates the installed capacity of thermal power plants, It represents the percentage of the rated capacity of the energy storage device specified by the reserve type r, It represents the percentage of the rated capacity of the hydropower unit specified by the reserve type r, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, represents the downward manual frequency restoration reserve allocated to renewable energy sources at time t, represents the percentage of renewable energy unit rated capacity provided for by the downward manual frequency restoration reserve; The following formula is used to characterize the renewable energy penetration constraint: in, represents the minimum penetration rate of renewable energy; The constraining the capacity expansion planning model according to the attributes of the cascade hydropower stations to obtain the second constraint condition of the capacity expansion planning model includes: The following formula is used to characterize the water balance constraint condition of the hydropower station reservoir: in, represents the water storage capacity of the hydropower station reservoir at time t, represents the water storage capacity of the hydropower station reservoir at time t-1, represents the inflow into the hydropower station reservoir at time t, represents the pumping power of the pumped storage hydropower station at time t, represents the conversion efficiency of the hydropower unit, represents the water density coefficient, represents the output power of the hydropower unit at time t, represents the interconnection matrix of cascade hydropower stations, represents the overflow water volume at time t, H represents the set of hydropower equipment, T represents the time set within the optimization range, Indicates the water head of the hydropower station, represents the acceleration due to gravity, Indicates the maximum water storage capacity of the hydropower station reservoir; The following formula is used to characterize the output constraint of the hydropower station: in, represents the type r reserve allocated to hydropower at time t, represents the maximum energy output of the hydropower station, Indicates an increase in reserves, It means to adjust the reserve downward; The following formula is used to characterize the pumping capacity constraint of the pumped storage power station: in, Indicates the maximum pumping capacity of the hydropower station; The following formula is used to characterize the capacity constraint of the hydropower station: in, Indicates the minimum production capacity of the hydropower station.
6. A terminal device, It is characterized in that The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the method for regional power grid expansion planning as claimed in any one of claims 1 to 4 is implemented.
Citation Information
Patent Citations
Sending end power grid power source structure planning method considering local load peak regulation capacity
CN109599861A
Power transmission network extension planning method by considering power transmission blocking surplus
CN110994592A
Capacity selection method for hydropower station unit expansion
CN114400716A
Wind-solar-water-fire-storage integrated planning method
CN115276083A
Source network load coordination expansion planning method considering water-wind-solar combined direct current delivery optimization
CN115622121A