A real-time monitoring device and method for bridge expansion joints
By installing the vertical and horizontal monitoring mechanism of the real-time monitoring device and the positioning and fixing mechanism on the bridge expansion joints, the problem of potential safety hazards caused by the inability to handle large displacements in time in the existing technology is solved, and real-time monitoring and position limiting of the bridge expansion joints are realized. Fixed for improved safety and ease of maintenance.
Patent Information
- Application Number
- CN202411110212.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-14
AI Technical Summary
The existing bridge expansion joint monitoring device cannot perform preprocessing in time when the displacement is large, which may cause the gap to further increase or break, posing safety risks.
A real-time monitoring device for bridge expansion joints is designed, including vertical and horizontal monitoring mechanisms, equipped with positioning and fixing mechanisms, and real-time monitoring and limit fixing through wireless sensors and control modules to ensure preliminary processing before workers arrive at the scene. .
It realizes real-time monitoring and limit fixation of bridge expansion joints, improves safety, prevents breakage caused by excessive displacement, ensures the safety of vehicle traffic, and facilitates subsequent monitoring and maintenance.
Smart Images

Figure CN118640851B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge expansion joint monitoring, and in particular to a real-time monitoring device and a monitoring method for bridge expansion joints. Background Art
[0002] The expansion joint of a bridge is an indispensable part of the bridge structure. If the design is unreasonable, the construction quality does not meet the standards, and the maintenance method is unscientific, these will cause varying degrees of damage to the expansion device of the bridge, resulting in height differences between the beams on both sides of the expansion joint, cracks in the road surface, and vehicles jumping and impacting when passing, which will cause additional impact loads on the bridge and the road surface, and make the driver feel uncomfortable. Severe cases may cause traffic accidents, thus affecting the normal life and operation of highway bridges. In order to meet the requirements of deformation and longitudinal displacement of the bridge superstructure, expansion joints are usually set between the two beam ends, between the beam end and the abutment, or at the hinged position of the bridge. Due to the great influence of temperature, concrete will expand and contract, which will cause the length of the beam to change. At the same time, under the action of vehicle load, the length of the bridge beam will change and the lower structure will also settle. When the displacement of the expansion joint is too large, the expansion joint device will be damaged and the vehicle will jump. The width monitoring of the expansion joint is an important part of bridge maintenance.
[0003] After searching, the Chinese patent announcement number CN113029067B discloses a bridge expansion joint monitoring connection device, including a bridge body, on which an expansion joint is arranged; a mounting seat, which is arranged inside the expansion joint, and there are two mounting seats, and one side of each of the two mounting seats is provided with a fixed anchor bolt; a monitoring seat, which is arranged between the two mounting seats, and both ends of the monitoring seat are provided with a telescopic cavity, and both sides of the monitoring seat are provided with a telescopic detection rod, one end of the telescopic detection rod extends to the inside of the telescopic cavity, and a first pressure sensor is arranged inside the telescopic cavity, and an elastic head is arranged between the first pressure sensor and the telescopic detection rod, and the elastic head fits with the first pressure sensor. It realizes the monitoring of the working performance of the bridge expansion joint, and can repair the expansion joint in time, thereby ensuring the use effect of the bridge expansion joint, making the vehicle pass smoothly, and improving the safety performance of vehicle passage.
[0004] However, the monitoring device has certain defects in actual use. Although it can monitor the displacement of the expansion joint of the bridge in real time, when the displacement is large, it reminds the staff to carry out maintenance. However, when the staff arrives, the expansion joint cannot be pre-treated in time, which may cause the gap of the expansion joint to further increase or break, etc., which poses certain safety hazards when vehicles pass. Summary of the invention
[0005] The object of the present invention is to provide a real-time monitoring device and method for bridge expansion joints to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a real-time monitoring device for a bridge expansion joint, comprising two base plates, mounting plates being equidistantly provided on the side walls of the two base plates that are close to each other, the mounting plates being provided with a fixing plate through a mounting assembly, a vertical monitoring mechanism being provided in the fixing plate, and a positioning mechanism matching the vertical monitoring mechanism being provided in the fixing plate, a horizontal monitoring mechanism and a fixing mechanism being provided between the two vertical monitoring mechanisms, and the vertical monitoring mechanism and the horizontal monitoring mechanism being electrically connected to a monitoring system.
[0007] Preferably, in order to facilitate installation and disassembly operations and subsequent replacement operations, the installation component includes an installation slot opened in the installation plate, a mounting card is provided in the installation slot, the installation card is fixedly connected to the fixed plate through a connecting plate, and the connecting plate, the installation card and the installation plate are fixedly connected by fixing screws.
[0008] Preferably, in order to monitor the displacement in the vertical direction, the vertical monitoring mechanism includes an adjustment cavity opened inside the fixed plate, guide columns are symmetrically arranged inside the adjustment cavity, a sliding plate is slidably arranged between the two guide columns, the top and bottom ends of the sliding plate are connected to the inner wall of the adjustment cavity through a spring, and a displacement sensor is provided in the middle of the side wall of the sliding plate.
[0009] Preferably, in order to limit the displacement in the vertical direction when it exceeds a preset value, and thus limit the displacement, preliminary processing is performed before the staff arrives at the site. The positioning mechanism includes an electric push rod symmetrically arranged on the two side walls of the adjustment cavity, and the output ends of the two electric push rods on the same side are provided with positioning teeth, and limiting teeth meshing with the positioning teeth are fixedly provided on the two side walls of the sliding plate.
[0010] Preferably, in order to monitor the displacement in the horizontal direction, the horizontal monitoring mechanism includes a replacement plate arranged on the side wall of the sliding plate, a second sleeve is provided at the end of the replacement plate, and a displacement sensor 2 is provided between two second sleeves on the same straight line through a sliding assembly.
[0011] Preferably, in order to facilitate guiding during daily horizontal monitoring and positioning and fixing when exceeding the preset value, the fixing mechanism includes a first sleeve arranged on the sliding plate and located on one side of the second sleeve, the end of the first sleeve is fixedly connected to the sliding plate through a replacement plate, the two first sleeves on the same straight line are connected by a sliding assembly, and a limit assembly is provided in the first sleeve.
[0012] Preferably, in order to monitor the displacement in the horizontal direction without affecting daily use, the sliding assembly includes a sliding cavity opened inside the first sleeve, a movable plate is slidably provided in the sliding cavity, a sealing ring is provided on the outside of the movable plate, and the two movable plates are fixedly connected by a sliding rod, and the structure of the sliding assembly in the second sleeve is the same as the structure of the sliding assembly in the first sleeve.
[0013] Preferably, in order to be able to puncture when the horizontal displacement exceeds a preset value, the internal movable plate can be bonded and fixed, thereby limiting the displacement, and preliminary processing is performed before the staff arrives at the site. The limiting assembly includes a storage capsule arranged in the sliding cavity of the first sleeve, a rectangular plate is fixedly provided on the fixed plate, an electric push rod 2 is provided on the rectangular plate, a lifting plate is provided at the output end of the electric push rod 2, a moving column is provided at the bottom end of the lifting plate, the moving column slides into the first sleeve and extends to the interior, and a puncture cone matching the storage capsule is fixedly provided at the bottom end of the moving column.
[0014] Preferably, in order to facilitate real-time monitoring of the expansion joint displacement of the bridge and thereby ensure safety, the monitoring system includes a control module, a wireless receiving module is provided under the control module, the wireless receiving module is electrically connected to the wireless transmitting module, the wireless transmitting module is electrically connected to the monitoring module, an alarm module is provided at one end of the control module, and a storage module is provided at the other end.
[0015] According to another aspect of the present invention, a monitoring method of a bridge expansion joint real-time monitoring device is provided, comprising the following steps:
[0016] S01: The real-time monitoring device for the bridge expansion joint is installed in the bridge expansion joint. In daily use, when displacement occurs in the vertical direction, the sliding plate slides back and forth on the guide column, and the spring expands and contracts accordingly. At this time, the displacement in the vertical direction is monitored by the displacement sensor 1 in the monitoring module, and then the detection data is transmitted to the control module through the wireless transmitting module and the wireless receiving module. When displacement occurs in the horizontal direction, the sliding rod and the moving plate slide in the sliding cavity, and the displacement sensor 2 monitors the displacement in the horizontal direction.
[0017] S02: The monitoring data is analyzed by the control module, and the monitoring data is stored by the storage module. When the preset displacement value is exceeded, the alarm module first issues an alarm. If the vertical displacement exceeds the preset value, the electric push rod is extended, and the positioning teeth are brought closer to each other, and then they can be engaged and limited with the limit teeth on the sliding plate, and they are limited and fixed, and then the whole can be fixed to prevent further displacement in the vertical direction;
[0018] S03: When the horizontal displacement exceeds the preset value, the second electric push rod is extended to move the lifting plate downward, so that the puncture cone under the moving column contacts the storage capsule and punctures it, and the glue inside flows out, so that the moving plate in the first sleeve can be bonded and fixed to prevent horizontal displacement;
[0019] S04: When the staff arrives at the site and resolves the displacement problem, they can retract the electric push rod and move the positioning tooth back away from the limit tooth, thereby losing the limit on the sliding plate and continuing to monitor the displacement in the vertical direction. When restoring the monitoring in the horizontal direction, the replacement plate is removed, and the first sleeve is replaced and then installed. The moving plate and the sliding rod can continue to slide in the horizontal direction, and the displacement in the horizontal direction can be monitored.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] (1) The present invention can monitor the vertical and horizontal displacements of the bridge expansion joint in real time during daily use by means of a monitoring system provided in cooperation with a vertical monitoring mechanism and a horizontal monitoring mechanism, thereby ensuring safety during use. At the same time, an alarm can be given when an abnormality occurs, so that timely detection and treatment can be carried out;
[0022] (2) Through the provided positioning mechanism and fixing mechanism, when the displacement in the vertical direction or horizontal direction exceeds the preset value, the corresponding direction can be positioned and fixed, so that preliminary treatment can be carried out before the staff arrives at the site, which can ensure safety and prevent other situations such as breakage. At the same time, it can be reset or replaced after the treatment is completed without affecting the subsequent monitoring use. The provided installation components can facilitate the installation and disassembly of the fixing plate, so that the vertical monitoring mechanism and the horizontal monitoring mechanism can be assembled conveniently, which can facilitate real-time monitoring and can be disassembled and replaced conveniently when a fault occurs. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a structural schematic diagram of a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0024] Figure 2 A schematic diagram of the structure between two mounting plates in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0025] Figure 3 This is a structural schematic diagram of installing a card plate in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0026] Figure 4 A schematic diagram of the structure between two fixed plates in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0027] Figure 5 This is a schematic diagram of the internal structure of a fixed plate in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0028] Figure 6 This is a structural schematic diagram of a fixing mechanism in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0029] Figure 7 This is a structural schematic diagram of a horizontal monitoring mechanism in a real-time monitoring device for bridge expansion joints proposed by the present invention;
[0030] Figure 8 This is a structural schematic diagram of a monitoring system in a real-time monitoring device for bridge expansion joints proposed by the present invention.
[0031] In the figure: 1. base plate; 2. mounting plate; 3. connecting plate; 4. fixing plate; 5. first sleeve; 6. second sleeve; 7. mounting card plate; 8. mounting card slot; 9. fixing screw; 10. sliding rod; 11. electric push rod one; 12. adjusting cavity; 13. rectangular plate; 14. electric push rod two; 15. limiting tooth; 16. guide column; 17. spring; 18. displacement sensor one; 19. sliding plate; 20. replacement plate; 21. sliding cavity; 22. moving plate; 23. sealing ring; 24. storage capsule; 25. lifting plate; 26. moving column; 27. puncture cone; 28. displacement sensor two; 29. positioning tooth; 30. alarm module; 31. storage module; 32. wireless receiving module; 33. wireless transmitting module; 34. control module; 35. monitoring module. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-Figure 8An embodiment of the present invention is as follows: a real-time monitoring device for a bridge expansion joint comprises two groups of base plates 1 (only a part of the figure is shown), which can be connected and fixed to the two ends of the bridge expansion joint respectively by means of screws or welding, and mounting plates 2 are welded equidistantly between the two base plates 1 (a group can be arranged at an interval of 50 cm, or other intervals can be arranged according to actual conditions, so as to facilitate the monitoring of the displacement of the expansion joint and ensure the accuracy of the data), an installation card slot 8 (the cross-sectional shape can be T-shaped) for installing the assembly is opened inside the mounting plate 2, an installation card plate 7 is slidably arranged inside the mounting card slot 8, and a fixing plate 4 is welded to the end of the installation card plate 7 through the connecting plate 3, in order to ensure the firmness after installation, the connecting plate 3, the mounting plate 2 and the mounting card plate 7 are connected and fixed by fixing screws 9 (the number can be four groups to ensure firmness), and a vertical monitoring mechanism is arranged inside the fixing plate 4, and between the two vertical monitoring mechanisms (on the same straight line ) is provided with a horizontal monitoring mechanism, which can facilitate real-time monitoring of the vertical and horizontal displacements of the expansion joint. In order to better monitor and feedback, a corresponding monitoring system is also provided, which mainly includes a control module 34 (which can be a computer), and can also be logged in and viewed through a mobile phone, so that the monitored data can be conveniently viewed and retrieved in real time. It is connected to a monitoring module 35 through a wireless receiving module 32 and a wireless transmitting module 33, and wireless data transmission can be achieved through a local area network or 5G. The monitoring module 35 is a displacement sensor 18 and a displacement sensor 28, which can also be replaced by a pressure sensor, etc., to monitor the displacement, which is a relatively mature technology and will not be elaborated here. At the same time, a corresponding alarm module 30 is also provided, which can give an alarm when the preset value is exceeded, and a storage module 31 for storing monitoring data can be cloud and local storage, etc., which is convenient for retrieval and viewing.
[0034] See also Figure 1-Figure 8 In order to monitor the displacement in the vertical direction and limit the displacement when it exceeds the preset value, the fixed plate 4 can be positioned and fixed before the staff arrives at the site to ensure safety. An adjustment cavity 12 of a vertical monitoring mechanism is provided inside the fixed plate 4, and two sets of guide columns 16 are symmetrically and vertically welded inside the fixed plate 4. A sliding plate 19 is slidably arranged on the guide column 16, which can slide up and down in the adjustment cavity 12. The top and bottom ends of the sliding plate 19 are connected to the inner wall of the adjustment cavity 12 through a spring 17, and a displacement sensor is installed in the middle of the sliding plate 19. The device 18 can monitor the displacement in the vertical direction, and the electric push rods 11 of the positioning mechanism are installed on the two side walls of the adjustment chamber 12. The output ends of the two electric push rods 11 at the same end are jointly installed with positioning teeth 29, and the two side walls of the sliding plate 19 are welded with limiting teeth 15 that mesh with the positioning teeth 29. When the displacement exceeds the preset value, the electric push rods 11 can be extended to cooperate with the positioning teeth 29 to mesh with the limiting teeth 15, so that the sliding plate 19 can be limited to prevent it from sliding up and down, and it can be limited and fixed.
[0035] See also Figure 1-Figure 8 In order to monitor the displacement in the horizontal direction and limit the displacement when it exceeds the preset value, the positioning and fixing can be performed before the staff arrives at the site to ensure safety. A replacement plate 20 with a horizontal monitoring mechanism can be fixedly installed on the side wall of the sliding plate 19 by bolts, and a second sleeve 6 is installed at the end of the replacement plate 20 on the same straight line. A displacement sensor 28 is provided between the two second sleeves 6 on the same straight line through a sliding component, and a first sleeve 5 is provided on one side of the displaced second sleeve 6, which is also fixedly connected to the sliding plate 19 through the replacement plate 20. The two first sleeves 5 on the same straight line are also connected through a sliding component, and a limiting component is provided in the first sleeve 5. The sliding component includes a sliding cavity 21 opened in the first sleeve 5, and a movable plate 22 is slidably provided in the sliding cavity 21. The outside of the movable plate 22 A sealing ring 23 is provided, and the two movable plates 22 are fixedly connected by a sliding rod 10. The structure of the sliding component in the second sleeve 6 is the same as that in the first sleeve 5. For the limiting component, the storage capsule 24 in the sliding cavity 21 of the first sleeve 5 may contain a foam glue or other glue, which is convenient for bonding after puncture, thereby limiting the movable plate 22 and preventing the first sleeve 5 from moving, thereby limiting the second sleeve 6. A rectangular plate 13 is fixedly provided on the fixed plate 4, and an electric push rod 2 14 is provided on the rectangular plate 13. A lifting plate 25 is provided at the output end of the electric push rod 2 14, and a moving column 26 is provided at the bottom end of the lifting plate 25. The moving column 26 slides into the first sleeve 5 and extends to the inside, and a puncture cone 27 matching the storage capsule 24 is welded at the bottom end of the moving column 26.
[0036] A monitoring method for a bridge expansion joint real-time monitoring device comprises the following steps:
[0037] S01: The device is installed in the expansion joint of the bridge. In daily use, when displacement occurs in the vertical direction, the sliding plate 19 slides back and forth on the guide column 16, and the spring 17 expands and contracts accordingly. At this time, the displacement in the vertical direction is monitored by the displacement sensor 18 in the monitoring module 35, and then the detection data is transmitted to the control module 34 through the wireless transmission module 33 and the wireless receiving module 32. When displacement occurs in the horizontal direction, the sliding rod 10 and the moving plate 22 slide in the sliding cavity 21, and the displacement sensor 2 28 monitors the displacement in the horizontal direction;
[0038] S02: The monitoring data is analyzed by the control module 34, and the monitoring data is stored by the storage module 31. When the preset displacement value is exceeded, the alarm module 30 first issues an alarm. If the vertical displacement exceeds the preset value, the electric push rod 11 is extended, and the positioning teeth 29 are brought closer to each other, and then the positioning teeth 15 on the sliding plate 19 are engaged and limited, and the positioning teeth 15 on the sliding plate 19 are limited and fixed, so that the whole can be fixed to prevent further displacement in the vertical direction.
[0039] S03: When the horizontal displacement exceeds the preset value, the electric push rod 14 is extended, and the lifting plate 25 is moved downward, so that the puncture cone 27 under the moving column 26 contacts the storage capsule 24, puncturing it, and the glue inside flows out, so that the moving plate 22 in the first sleeve 5 can be bonded and fixed, and the horizontal displacement can be prevented;
[0040] S04: When the staff arrives at the scene and solves the displacement problem, the electric push rod 11 can be retracted to move the positioning tooth 29 away from the limit tooth 15, and the limit on the sliding plate 19 can be lost. The displacement in the vertical direction can continue to be monitored. When the monitoring in the horizontal direction is restored, the replacement plate 20 is removed, and the first sleeve 5 is replaced and then installed. Then, the moving plate 22 and the slide rod 10 can continue to slide in the horizontal direction, and the displacement in the horizontal direction can be monitored.
[0041] In summary, the present invention can monitor the vertical and horizontal displacements of the bridge expansion joint in real time during daily use through the monitoring system provided in cooperation with the vertical monitoring mechanism and the horizontal monitoring mechanism, thereby ensuring safety during use. At the same time, it can also issue an alarm when an abnormality occurs, and can be discovered and handled in time. Through the provided positioning mechanism and fixing mechanism, when the displacement in the vertical or horizontal direction exceeds the preset value, the corresponding direction of the excess can be positioned and fixed, so that preliminary processing can be carried out before the staff arrives at the scene, which can ensure safety and prevent other situations such as breakage. At the same time, it can be reset or replaced after the processing is completed without affecting subsequent monitoring and use. The provided installation component can facilitate the installation and disassembly of the fixing plate 4, thereby facilitating the assembly of the vertical monitoring mechanism and the horizontal monitoring mechanism, and can facilitate the assembly of them, thereby facilitating real-time monitoring, and can also facilitate disassembly and replacement when a fault occurs.
[0042] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A real-time monitoring device for a bridge expansion joint, comprising two substrates (1), characterized in that: Mounting plates (2) are equidistantly arranged on the side walls of the two substrates (1) that are close to each other; the mounting plates (2) are provided with fixing plates (4) through a mounting assembly; a vertical monitoring mechanism is arranged in the fixing plate (4); and a positioning mechanism matching the vertical monitoring mechanism is arranged in the fixing plate (4); a horizontal monitoring mechanism and a fixing mechanism are arranged between the two vertical monitoring mechanisms; the vertical monitoring mechanism and the horizontal monitoring mechanism are electrically connected to a monitoring system; the mounting assembly comprises a mounting card slot (8) provided in the mounting plate (2); a mounting card plate (7) is arranged in the mounting card slot (8); the mounting card plate (7) is connected to the mounting plate (3) through a connecting plate (3). The fixing plate (4) is fixedly connected, and the connecting plate (3), the mounting card plate (7) and the mounting plate (2) are fixedly connected by fixing screws (9); the vertical monitoring mechanism comprises an adjusting cavity (12) opened inside the fixing plate (4), guide columns (16) are symmetrically arranged inside the adjusting cavity (12), a sliding plate (19) is slidably arranged between two of the guide columns (16), the top and bottom ends of the sliding plate (19) are connected to the inner wall of the adjusting cavity (12) by springs (17), and a displacement sensor (18) is arranged in the middle of the side wall of the sliding plate (19); the positioning mechanism comprises a plurality of symmetrically arranged guide columns (16) in the adjusting cavity (12); ) on both side walls, the output ends of the two electric push rods (11) on the same side are provided with positioning teeth (29), and the two side walls of the sliding plate (19) are fixedly provided with limiting teeth (15) meshing with the positioning teeth (29); the level monitoring mechanism comprises a replacement plate (20) arranged on the side wall of the sliding plate (19), the end of the replacement plate (20) is provided with a second sleeve (6), and a displacement sensor (28) is provided between the two second sleeves (6) on the same straight line through a sliding component; the fixing mechanism comprises a first sleeve (5) arranged on the sliding plate (19) and located on one side of the second sleeve (6), and the first sleeve (5) is provided on the sliding plate (19). The end of the sleeve (5) is fixedly connected to the sliding plate (19) via a replacement plate (20), and the two first sleeves (5) on the same straight line are connected via a sliding assembly, and a limit assembly is provided in the first sleeve (5); the sliding assembly comprises a sliding cavity (21) opened inside the first sleeve (5), a movable plate (22) is slidably provided in the sliding cavity (21), a sealing ring (23) is sleeved on the outside of the movable plate (22), and the two movable plates (22) are fixedly connected via a sliding rod (10), and the structure of the sliding assembly in the second sleeve (6) is the same as the structure of the sliding assembly in the first sleeve (5).
2. A real-time monitoring device for bridge expansion joints according to claim 1, characterized in that: The limiting assembly comprises a storage capsule (24) arranged in a sliding cavity (21) of a first sleeve (5); a rectangular plate (13) is fixedly arranged on the fixing plate (4); a second electric push rod (14) is arranged on the rectangular plate (13); a lifting plate (25) is arranged at the output end of the second electric push rod (14); a moving column (26) is arranged at the bottom end of the lifting plate (25); the moving column (26) slides into the first sleeve (5) and extends to the inside; and a puncturing cone (27) matching the storage capsule (24) is fixedly arranged at the bottom end of the moving column (26).
3. A real-time monitoring device for bridge expansion joints according to claim 2, characterized in that: The monitoring system comprises a control module (34), a wireless receiving module (32) is arranged under the control module (34), the wireless receiving module (32) is electrically connected to a wireless transmitting module (33), the wireless transmitting module (33) is electrically connected to a monitoring module (35), an alarm module (30) is arranged at one end of the control module (34), and a storage module (31) is arranged at the other end.
4. A monitoring method for a bridge expansion joint real-time monitoring device, characterized in that: Using the real-time monitoring device for bridge expansion joints as described in claim 3 comprises the following steps: S01: The real-time monitoring device for the bridge expansion joint is installed in the bridge expansion joint. In daily use, when displacement occurs in the vertical direction, the sliding plate (19) slides back and forth on the guide column (16), and the spring (17) expands and contracts accordingly. At this time, the displacement in the vertical direction is monitored by the displacement sensor 1 (18) in the monitoring module (35), and the detection data is transmitted to the control module (34) through the wireless transmission module (33) and the wireless receiving module (32). When displacement occurs in the horizontal direction, the sliding rod (10) and the moving plate (22) slide in the sliding cavity (21), and the displacement sensor 2 (28) monitors the displacement in the horizontal direction. S02: The monitoring data is analyzed by the control module (34), and the monitoring data is stored by the storage module (31). When the preset displacement value is exceeded, the alarm module (30) first issues an alarm. If the displacement in the vertical direction exceeds the preset value, the electric push rod (11) is extended, and the positioning teeth (29) are brought closer to each other, and then the positioning teeth (15) on the sliding plate (19) are engaged and limited, and the positioning teeth (15) on the sliding plate (19) are limited and fixed, so that the whole can be fixed to prevent further displacement in the vertical direction; S03: When the displacement in the horizontal direction exceeds the preset value, the second electric push rod (14) is extended, and the lifting plate (25) is moved downward, so that the piercing cone (27) under the moving column (26) contacts the storage capsule (24), piercing it, and the glue inside flows out, so that the moving plate (22) in the first sleeve (5) can be bonded and fixed, thereby preventing the displacement in the horizontal direction; S04: When the staff arrives at the site and solves the displacement problem, the electric push rod (11) can be retracted to move the positioning tooth (29) away from the limit tooth (15), and the limit on the sliding plate (19) can be lost. The displacement in the vertical direction can continue to be monitored. When the monitoring in the horizontal direction is restored, the replacement plate (20) is removed, and the first sleeve (5) is replaced and installed again. Then, the moving plate (22) and the sliding rod (10) can continue to slide in the horizontal direction, and the displacement in the horizontal direction can be monitored.
Citation Information
Patent Citations
Bridge Expansion Joint Monitoring Connection Device
CN113029067B
Bridge expansion joint alarm equipment for road engineering
CN112880544A
Bridge expansion joint real-time monitoring device
CN116448043A
Bridge expansion joint monitoring device
CN117990031A
Bridge displacement monitoring equipment with high precision
CN216144321U