Complete set of equipment and method for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering

By designing a complete set of equipment and treatment processes, the problem of low wastewater treatment efficiency in construction sites is solved, efficient treatment of groundwater and soil treatment wastewater is achieved, and the convenience and treatment efficiency of foundation pit water extraction are improved. It is suitable for groundwater and soil treatment sites.

CN118652013BActive Publication Date: 2024-11-29NANJING INST OF ENVIRONMENTAL SCI MINIST OF ECOLOGY & ENVIRONMENT OF THE PEOPLES REPUBLIC OF CHINA
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411132303.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-29
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

It is difficult for the prior art to effectively and uniformly treat various different wastewaters generated in groundwater and soil treatment, especially in construction sites, resulting in rising water levels of foundation pits and low wastewater disposal efficiency.

Method used

A complete set of equipment for mixed treatment of comprehensive wastewater and foundation pit precipitation in polluted sites is designed, including sand sinks, air floats, filters, catalytic tanks, adsorption tanks and diversion pumps. The water level of the foundation pit is monitored through liquid level sensors and automated Water at different liquid levels is extracted, wastewater with different sand content is treated diversion, and gas float, catalytic oxidation and activated carbon adsorption treatment technology is used.

Benefits of technology

It realizes the synchronous disposal of wastewater such as tailwater and foundation pit precipitation generated by groundwater and thermal desorption, effectively removes pollutants and odor substances, improves treatment efficiency and convenience, saves costs, and is suitable for groundwater and ectopic thermal desorption. Attached to the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118652013B_ABST
    Figure CN118652013B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of wastewater treatment, and specifically to a complete set of equipment and a method for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering; the complete set of equipment includes a grit chamber, an air flotation chamber, a filter chamber, a catalytic chamber, an adsorption tank connected in sequence, and a diversion pump group located in a foundation pit and connected to the grit chamber and the air flotation chamber. The method includes the following steps: S1, low-sand content sewage treatment; S2, medium-sand content sewage treatment: S2-1, tail water treatment generated by ectopic thermal desorption; S2-2, foundation pit upper layer water treatment; S3, high-sand content sewage treatment; S3-1, construction wastewater treatment; S3-2, foundation pit lower layer water treatment. The present invention can simultaneously realize the disposal of groundwater, thermal desorption tail water, foundation pit dewatering and other comprehensive wastewaters, effectively remove pollutants and odor substances in wastewater, and realize the extraction of wastewater at different liquid levels inside the foundation pit, and treat them separately according to the different sand contents in various types of wastewater, thereby greatly improving the treatment efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wastewater treatment, and in particular to a complete set of equipment and a method for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering. Background Art

[0002] At present, the groundwater and soil pollution problems in my country are becoming increasingly serious, and the management of groundwater and soil pollution has become more important. In the existing groundwater and soil management measures, the two are often combined and managed simultaneously to improve the management efficiency, but there are still some technical obstacles.

[0003] Pump and treat is one of the most commonly used groundwater remediation technologies. According to the scope of groundwater pollution, a certain number of pumping wells are arranged at the contaminated site. The contaminated groundwater is pumped to the ground through a series of pumping wells, and then the pollutants in the groundwater are removed through corresponding treatment facilities and equipment. After meeting the prescribed emission standards, it is discharged into the corresponding pipeline network or water body, or directly injected back into the underground environment.

[0004] Soil treatment generally adopts in-situ thermal desorption or ex-situ thermal desorption, or a combination of the two. Generally, when in-situ or ex-situ thermal desorption is carried out, groundwater can be extracted and treated simultaneously nearby. At this time, foundation pit excavation is inevitable. The precipitation in the foundation pit and the groundwater seepage will cause the water level of the foundation pit to rise, which needs to be properly disposed of. At the same time, the car wash wastewater and construction waste washing wastewater generated by the entire construction site also need to be properly disposed of. At present, no relevant construction site has uniformly and properly disposed of the various wastewaters generated during the construction of this project.

[0005] In order to solve the above problems, the present invention decides to solve the problem of simultaneous and proper disposal of various wastewaters generated by the simultaneous treatment of groundwater and soil by developing a complete set of equipment and related methods. Summary of the invention

[0006] In order to solve the above problems, the present invention provides a complete set of equipment and method for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering.

[0007] A complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering, including a grit chamber, an air flotation chamber, a filter chamber, a catalytic chamber, an adsorption tank connected in sequence, and a diversion pump group located in the foundation pit and connected to the grit chamber and the air flotation chamber;

[0008] The diversion pump group includes a hollow floating block and a floating drum located at the bottom of the floating block. A telescopic rod is provided at the bottom of the floating drum, and the telescopic rod includes a telescopic outer rod and a telescopic inner rod. A first water pump is provided on one side of the bottom of the telescopic outer rod, and a second water pump is provided at the bottom of the telescopic inner rod. The telescopic outer rod is connected to the inside of the floating drum for vertical sliding. A steel wire rope is fixed on the top of the telescopic outer rod. An electric winch is provided on the top of the floating block. The steel wire rope passes through the inside of the floating drum and is connected to the output end of the electric winch to drive the telescopic rod to move up and down along the floating drum. A driving motor is provided on the top of the telescopic outer rod, and a hydraulic rod for driving the telescopic inner rod to move up and down along the telescopic outer rod is provided at the output end of the driving motor.

[0009] Liquid level sensors are provided on the bottom side walls of the telescopic outer rod and the telescopic inner rod.

[0010] Furthermore, a limit bar is provided on each side of the outer wall of the telescopic outer rod, and a slide groove slidably connected to the limit bar is provided on each side of the inner wall of the floating cylinder corresponding to the positions of the two limit bars, and the slide groove extends to the upper inner part of the floating cylinder.

[0011] Note: By setting the limit bar, the stability of the telescopic rod can be maintained when it slides up and down.

[0012] Furthermore, a first receiving groove for accommodating the first water pump is provided on the inner wall of the float corresponding to the position of the first water pump, and a second receiving groove for accommodating the liquid level sensor is provided at the position of the liquid level sensor. The plane where the bottom of the float is located is used as a reference plane. On the reference plane, the line between the first receiving groove and the second receiving groove is perpendicular to the line between the two slide grooves.

[0013] Note: The water level in the foundation pit can be monitored in real time by setting up the liquid level sensor.

[0014] Preferably, a third accommodating groove for accommodating a liquid level sensor is provided on the inner wall of the telescopic outer rod at a position corresponding to the position of the liquid level sensor on the telescopic inner rod.

[0015] Preferably, a first water pipe is provided on the top of the first water pump, the first water pipe passes through the first receiving groove and the floating block and then extends to the ground surface; a second water pipe is provided on the top of the second water pump, the second water pipe passes through the outer wall of the telescopic inner rod, the third receiving groove, the outer wall of the telescopic outer rod, the second receiving groove and the floating block in sequence and then extends to the ground surface; a first opening is provided at the joint between the telescopic inner rod and the second water pipe, and a second opening is provided at the joint between the telescopic outer rod and the second water pipe.

[0016] Note: The first opening and the second opening are provided to facilitate the passage of the second water conduit, so that the normal pumping of the second water pump is not affected when the telescopic rod is extended or retracted.

[0017] Furthermore, a connecting rod is provided on one side of the floating block for fixing the floating block to the edge of the foundation pit, and a retractable auxiliary fixing rod is provided on both side walls of the floating block located on both sides of the connecting rod. The connecting rod is divided into two detachable front and rear sections, and the front and rear sections of the connecting rod are connected by a traction rope to guide the floating block into the deep of the foundation pit and float autonomously.

[0018] The present invention also provides a method for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering, and a complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering;

[0019] The comprehensive wastewater from the contaminated site includes contaminated groundwater, tail water generated by ex situ thermal desorption, and construction wastewater;

[0020] The foundation pit dewatering is divided into upper layer water and lower layer water of the foundation pit by taking the midpoint of the liquid level in the foundation pit as the dividing line;

[0021] Wherein, the contaminated groundwater is sewage with low sand content;

[0022] The tail water and upper layer water of the foundation pit produced by the ex situ thermal desorption are sewage with medium sand content;

[0023] The construction wastewater and foundation pit lower layer water are sewage with high sand content;

[0024] The following steps are involved:

[0025] S1. Low-sand-content sewage treatment: transport the low-sand-content sewage to the filter tank for filtration, then pass through the catalytic tank for catalytic oxidation treatment, and finally pass through the adsorption tank for activated carbon adsorption treatment and discharge;

[0026] S2. Treatment of sewage with medium sand content:

[0027] S2-1, treatment of tail water generated by ex situ thermal desorption: injecting the tail water generated by ex situ thermal desorption into the flotation tank for flotation treatment, and then treating the tail water after flotation treatment as low-sand content wastewater according to the method of step S1;

[0028] S2-2, treatment of upper water in the foundation pit: install the diversion pump group inside the foundation pit, adjust the height of the telescopic rod, make the telescopic outer rod move up and down along the floating cylinder, and the telescopic inner rod move up and down along the telescopic outer rod, so that the second water pump is located at the underwater bottom of the foundation pit, and the first water pump is located at the underwater middle of the foundation pit. The water level in the foundation pit is monitored by a liquid level sensor. When the water level in the foundation pit exceeds 4-8m, start the first water pump to pump water, pump the water level in the foundation pit to half, and the pumped water is the upper water of the foundation pit. Inject the upper water of the foundation pit into the flotation tank for flotation treatment, and then treat the upper water of the foundation pit after flotation treatment as low-sand content sewage according to the method of step S1. Pump the upper water of the foundation pit every 7-14 days;

[0029] S3. Treatment of sewage with high sand content:

[0030] S3-1, construction wastewater treatment: inject the construction wastewater into the grit chamber for sedimentation and sludge removal, and then inject it into the flotation tank for flotation treatment, and treat the construction wastewater after flotation treatment as low-sand wastewater according to the method of step S1;

[0031] S3-2, treatment of the lower layer water of the foundation pit: after completing 3 to 5 times of extraction of the upper layer water of the foundation pit according to the method in step S2-2, the lower layer water of the foundation pit is extracted, and the height of the telescopic rod is adjusted so that the telescopic outer rod moves up and down along the floating cylinder, and the telescopic inner rod moves up and down along the telescopic outer rod, so that the first water pump and the second water pump are simultaneously located at the underwater bottom of the foundation pit, and the water in the foundation pit is pumped out, and the pumped water is the lower layer water of the foundation pit, and the lower layer water of the foundation pit is injected into the sand settling tank for sedimentation and sludge removal, and then injected into the flotation tank for flotation treatment, and the lower layer water of the foundation pit after flotation treatment is treated as low-sand content sewage according to the method of step S1.

[0032] Furthermore, the construction wastewater in step S3 includes car washing water and construction waste flushing wastewater.

[0033] Furthermore, the tail water generated by the ex situ thermal desorption in the step S2-1 is cooled before being treated, and the temperature of the tail water generated by the ex situ thermal desorption is reduced to below 45°C.

[0034] Note: By cooling the tail water before processing, it is possible to avoid the effect of flotation caused by excessive temperature.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] (1) The complete set of equipment for mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering of the present invention can simultaneously realize the treatment of groundwater, tail water generated by thermal desorption, foundation pit dewatering and other comprehensive wastewater, effectively remove pollutants and odorous substances in the wastewater, and by setting up a diversion pump group, it can realize the extraction of accumulated water at different liquid levels inside the foundation pit, and can realize automatic extraction, which greatly improves the convenience and extraction efficiency of foundation pit water extraction.

[0037] (2) The method of mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering of the present invention is divided according to the different sand contents in various types of wastewater, and wastewater with similar sand contents are classified and enter corresponding treatment equipment, thereby greatly improving the treatment efficiency. Equipment that is not in working condition can be suspended or maintained, saving costs and improving efficiency. It is particularly practical for groundwater and ex situ thermal desorption comprehensive construction sites, and combined with the complete set of equipment of the present invention, it can quickly drain the foundation pit water, and provides a detailed drainage plan for the water level in the foundation pit. The overall method is highly practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the overall structure of a complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0039] Among them, A represents the foundation pit, B represents the ex situ thermal desorption zone, and C represents the groundwater multiphase extraction zone;

[0040] Figure 2 It is a schematic diagram of the overall structure of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0041] Figure 3 It is a schematic diagram of the bottom structure of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0042] Figure 4 It is a schematic diagram of the partial structure of the middle part of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0043] Figure 5 It is a schematic diagram of the local structure of the bottom of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0044] Figure 6 It is a schematic diagram of the internal structure of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention;

[0045] Figure 7 It is a top view of the diversion pump group in the complete set of equipment for mixed treatment of comprehensive wastewater from polluted sites and foundation pit dewatering of the present invention.

[0046] In the figure: 1-sand settling tank, 2-air flotation tank, 3-filtration tank, 4-catalytic tank, 5-adsorption tank, 6-diversion pump group, 61-floating block, 62-floating cylinder, 63-electric winch, 64-chute, 65-first receiving tank, 66-second receiving tank, 7-telescopic rod, 71-telescopic outer rod, 711-limiting strip, 712-second opening, 72-telescopic inner rod, 721-first opening, 73-first water pump, 731-first water pipe, 74-second water pump, 741-second water pipe, 75-wire rope, 76-drive motor, 77-hydraulic rod, 78-third receiving tank, 8-liquid level sensor, 9-connecting rod, 91-traction rope, 92-auxiliary fixing rod. DETAILED DESCRIPTION

[0047] In order to further illustrate the method adopted by the present invention and the effect achieved, the technical solution of the present invention will be clearly and completely described in combination with experiments below.

[0048] Example 1: Figure 1 As shown, a complete set of equipment for mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering includes a grit chamber 1, an air flotation chamber 2, a filter chamber 3, a catalytic chamber 4, an adsorption tank 5, and a diversion pump group 6 located in the foundation pit and connected to the grit chamber 1 and the air flotation chamber 2, wherein A represents the foundation pit, B represents the ex situ thermal desorption zone, and C represents the groundwater multiphase extraction zone;

[0049] like Figure 2 and Figure 6 As shown, the diversion pump group 6 includes a hollow floating block 61, and a floating cylinder 62 located at the bottom of the floating block 61. A telescopic rod 7 is provided at the bottom of the floating cylinder 62. The telescopic rod 7 includes a telescopic outer rod 71 and a telescopic inner rod 72. A first water pump 73 is provided on one side of the bottom of the telescopic outer rod 71, and a second water pump 74 is provided at the bottom of the telescopic inner rod 72. The telescopic outer rod 71 is connected to the inside of the floating cylinder 62 for sliding up and down. A steel wire rope 75 is fixedly provided on the top of the telescopic outer rod 71. An electric winch 63 is provided on the top of the floating block 61. The steel wire rope 75 passes through the inside of the floating cylinder 62 and is connected to the output end of the electric winch 63 to drive the telescopic rod 7 to move up and down along the floating cylinder 62. A driving motor 76 is provided on the top of the telescopic outer rod 71. A hydraulic rod 77 for driving the telescopic inner rod 72 to move up and down along the telescopic outer rod 71 is provided on the output end of the driving motor 76.

[0050] like Figure 3 As shown, liquid level sensors 8 are provided on the bottom side walls of the telescopic outer rod 71 and the telescopic inner rod 72;

[0051] like Figure 4~Figure 6As shown, a limit strip 711 is provided on each side of the outer wall of the telescopic outer rod 71, and a slide groove 64 slidably connected to the limit strip 711 is provided at each side of the inner wall of the floating cylinder 62 corresponding to the position of the two limit strips 711, and the slide groove 64 extends to the upper inner part of the floating cylinder 62, and a first receiving groove 65 for accommodating the first water pump 73 is provided on the inner wall of the floating cylinder 62 corresponding to the position of the first water pump 73, and a second receiving groove 66 for accommodating the liquid level sensor 8 is provided at the position of the liquid level sensor 8. The plane where the bottom of the floating cylinder 62 is located is taken as the reference plane. On the reference plane, the line between the first receiving groove 65 and the second receiving groove 66 is perpendicular to the line between the two slide grooves 64; the inner wall of the telescopic outer rod 71 A third receiving groove 78 for receiving the liquid level sensor 8 is provided on the wall at a position corresponding to the liquid level sensor 8 on the telescopic inner rod 72; a first water conduit 731 is provided on the top of the first water pump 73, and the first water conduit 731 extends to the ground surface after passing through the first receiving groove 65 and the floating block 61; a second water conduit 741 is provided on the top of the second water pump 74, and the second water conduit 741 extends to the ground surface after passing through the outer wall of the telescopic inner rod 72, the third receiving groove 78, the outer wall of the telescopic outer rod 71, the second receiving groove 66 and the floating block 61 in sequence; a first opening 721 is provided at the joint between the telescopic inner rod 72 and the second water conduit 741, and a second opening 712 is provided at the joint between the telescopic outer rod 71 and the second water conduit 741;

[0052] like Figure 2 and Figure 7 As shown, a connecting rod 9 for fixing the floating block 61 on the edge of the foundation pit is provided on one side of the floating block 61, and a retractable auxiliary fixing rod 92 is provided on both side walls of the floating block 61 on both sides of the connecting rod 9. The connecting rod 9 is divided into two detachable front and rear sections, and the front and rear sections of the connecting rod 9 are connected by a traction rope 91 for introducing the floating block 61 into the deep of the foundation pit and floating autonomously.

[0053] Embodiment 2: This embodiment discloses a method for mixed treatment of comprehensive wastewater from contaminated sites and dewatering of foundation pits, based on the complete set of equipment for mixed treatment of comprehensive wastewater from contaminated sites and dewatering of foundation pits in Embodiment 1;

[0054] The comprehensive wastewater from contaminated sites includes contaminated groundwater, tail water generated by ex situ thermal desorption and construction wastewater. Construction wastewater includes car washing water and construction waste washing wastewater.

[0055] The foundation pit dewatering is divided into upper pit water and lower pit water with the midpoint of the liquid level in the foundation pit as the dividing line; (foundation pit dewatering includes seepage water and rainfall water in the foundation pit)

[0056] Among them, the contaminated groundwater is low-sediment-content sewage;

[0057] The tailwater and upper layer water of foundation pit produced by ex situ thermal desorption are sewage with medium sand content;

[0058] Construction wastewater and foundation pit bottom water are sewage with high sand content;

[0059] The following steps are involved:

[0060] S1. Low-sand-content sewage treatment: The low-sand-content sewage is transported to the filter tank 3 for filtration, then passed through the catalytic tank 4 for catalytic oxidation treatment, and finally passed through the adsorption tank 5 for activated carbon adsorption treatment and discharged;

[0061] S2. Treatment of sewage with medium sand content:

[0062] S2-1. Treatment of tail water generated by ectopic thermal desorption: inject the tail water generated by ectopic thermal desorption into the flotation tank 2 for flotation treatment, and then treat the tail water after flotation treatment as low-sand content sewage according to the method of step S1; cool the tail water generated by ectopic thermal desorption before treatment, and reduce the temperature of the tail water generated by ectopic thermal desorption to 43°C;

[0063] S2-2, treatment of upper water in the foundation pit: install the diversion pump group 6 inside the foundation pit, adjust the height of the telescopic rod 7, make the telescopic outer rod 71 move up and down along the floating tube 62, and the telescopic inner rod 72 move up and down along the telescopic outer rod 71, so that the second water pump 74 is located at the underwater bottom of the foundation pit, and the first water pump 73 is located at the underwater middle of the foundation pit. The water level in the foundation pit is monitored by the liquid level sensor 8. When the water level in the foundation pit exceeds 6m, start the first water pump 73 to pump water, pump the water level in the foundation pit to half, and the pumped water is the upper water of the foundation pit. The upper water of the foundation pit is injected into the flotation tank 2 for flotation treatment, and then the upper water of the foundation pit after flotation treatment is treated as low-sand content sewage according to the method of step S1, and the upper water of the foundation pit is extracted every 10 days;

[0064] S3. Treatment of sewage with high sand content:

[0065] S3-1, construction wastewater treatment: inject the construction wastewater into the grit chamber 1 for sedimentation and sludge removal, and then inject it into the flotation chamber 2 for flotation treatment, and treat the construction wastewater after flotation treatment as low-sand wastewater according to the method of step S1;

[0066] S3-2, treatment of the lower layer water of the foundation pit: after completing the extraction of the upper layer water of the foundation pit 4 times according to the method in step S2-2, the lower layer water of the foundation pit is extracted, and the height of the telescopic rod 7 is adjusted so that the telescopic outer rod 71 moves up and down along the floating tube 62, and the telescopic inner rod 72 moves up and down along the telescopic outer rod 71, so that the first water pump 73 and the second water pump 74 are simultaneously located at the underwater bottom of the foundation pit, and the water in the foundation pit is pumped out. The pumped water is the lower layer water of the foundation pit, and the lower layer water of the foundation pit is injected into the sand settling tank 1 for sedimentation and sludge removal, and then injected into the flotation tank 2 for flotation treatment. The lower layer water of the foundation pit after flotation treatment is treated as low-sand content sewage according to the method of step S1.

[0067] Embodiment 3: This embodiment differs from Embodiment 2 in that:

[0068] In S2-1, the temperature of tail water generated by ex situ thermal desorption is reduced to 40°C.

[0069] Embodiment 4: This embodiment differs from Embodiment 2 in that:

[0070] In S2-1, the temperature of the tail water produced by ex situ thermal desorption was reduced to 38°C.

[0071] Embodiment 5: This embodiment differs from Embodiment 2 in that:

[0072] In S2-2, when the water level in the foundation pit exceeds 4 m, the first water pump 73 is turned on to pump water;

[0073] Extract water from the upper layer of the foundation pit every 14 days;

[0074] In S3-2, after the upper layer water of the foundation pit is extracted three times, the lower layer water of the foundation pit is extracted.

[0075] Embodiment 6: This embodiment differs from Embodiment 2 in that:

[0076] In S2-2, when the water level in the foundation pit exceeds 8m, the first water pump 73 is turned on to pump water;

[0077] Extract water from the upper layer of the foundation pit every 7 days;

[0078] In S3-2, after the upper layer water of the foundation pit is extracted 5 times, the lower layer water of the foundation pit is extracted.

[0079] Note: The parameter adjustments in Example 2, Example 5 and Example 6 are conventional adjustments based on the size of the foundation pit. At the same time, the time for extracting water from the lower layer of the foundation pit is reasonably selected based on the amount of rainfall.

[0080] The working principle of the complete set of equipment of the present invention is further explained below in combination with the method of the present invention.

[0081] When in use, first fix one end of the connecting rod 9 at the edge of the foundation pit, and extend the auxiliary fixing rod 92 for auxiliary fixing. If the diversion pump group 6 needs to float freely, open the connecting rod 9 to increase the distance between the diversion pump group 6 and the shore through the traction rope 91, then adjust the position of the second water pump 74, turn on the electric winch 63 to release the wire rope 75, make the limit bar 711 slide in the slide groove 64, and make the telescopic rod 7 descend, then turn on the drive motor 76 to drive the hydraulic rod 77 to descend until the second water pump 74 is located at the bottom of the foundation pit; then fine-tune the electric winch 63 and the drive motor 76 synchronously, so as to adjust the position of the first water pump 73 so that it is located in the middle of the foundation pit;

[0082] During the adjustment process, the staff pulls the first water pipe 731 and the second water pipe 741 outside the foundation pit to prevent the second water pipe 741 from getting stuck at the first opening 721 and the second opening 712;

[0083] During the process of the first water pump 73 pumping water, its position needs to be kept unchanged so as to completely pump out the upper water of the foundation pit. When the upper water of the foundation pit needs to be pumped out again after a specified number of days, the position of the first water pump 73 needs to be readjusted according to the position of the liquid level sensor 8, while the position of the second water pump 74 remains unchanged.

[0084] According to the method of the present invention, the working time of the filter tank 3 is the longest, the working time of the air flotation tank 2 is the second, and the working time of the grit chamber 1 is the shortest. Therefore, the equipment that is not in working state can be suspended or maintained, saving costs and improving efficiency.

[0085] Working principle of grit chamber 1: After the organic wastewater enters grit chamber 1, the larger particle pollutants are deposited in the mud bucket. The mud is discharged once a week. By using the pressure of the static water head, the valve connecting the grit chamber 1 and the bottom of the sludge tank can be manually opened to discharge the mud. Each discharge lasts about 5 minutes, and the effluent flows to the flotation tank 2 by gravity.

[0086] The sludge discharged from the grit chamber enters the sludge pool, and the sludge produced by the air stripping scraper, the suspended matter produced by the sand filter, and the sludge produced by adding PAC and PAM are all sent to the filter press for filtration, and the mud cakes produced are uniformly disposed of as hazardous waste.

[0087] Working principle of flotation tank 2: wastewater filtered by sand settling enters flotation tank 2 for air stripping and removal of organic matter. Organic gas generated during air stripping is treated by activated carbon adsorption. Add clean water to the water outlet weir of flotation tank 2. The water level is regulated by the regulating device at the outlet of the water collecting pipe. Close the control valve and the dissolved air water outlet valve, turn the gas selection switch to the automatic position, turn on the power, start the water pump, and then open the working pump control valve. The pressure on the pressure gauge gradually rises until it reaches the pressure that the pump can reach, 3~5kg / cm 2 At this time, the outlet valve of the dissolved air water can be opened, and the dissolved air water enters the releaser through the outlet valve and is released into the flotation tank 2;

[0088] When a large number of microbubbles appear in the pool and the clear water turns milky white, the dissolved air system is considered normal. The pressure of the dissolved air water can be seen from the pressure gauge reading on the dissolved air tank. The pressure can be controlled by the opening of the manual control valve. It can be adjusted within the pressure range of the water pump, generally 3~5kg / cm 2 The higher the pressure, the greater the amount of dissolved air and water, and the denser the microbubbles released.

[0089] Working principle of catalytic pool 4: This equipment consists of four parts: power control cabinet, pre-catalytic reactor, catalytic oxidation reactor, and dosing device, and is equipped with a water pump for lifting. After installation, first turn on the main power switch on the main cabinet. At this time, the power indicator on the remote control cabinet will light up. At the same time, turn the voltage and current adjustment knob counterclockwise to zero, turn on the control switch, and the power indicator will go out, the working indicator will light up, the phase loss indicator and the overheating indicator will not light up, and the exhaust fan will rotate. Overall workflow:

[0090] (1) Turn on the main power switch on the main electrical control cabinet.

[0091] (2) Turn on the air switch inside the electrocatalytic oxidation device. The blower starts blowing and the power indicator light on the display screen lights up.

[0092] (3) Turn on the control switch, the working indicator light will light up, but the phase failure indicator and overheat indicator light will not light up.

[0093] (4) Turn the "Auto-Manual" button to "Auto", the "Forward-Reverse" button to "Forward", and the "Steady Voltage-Steady Current" button to "Steady Current" state.

[0094] (5) Use the forward adjustment button to adjust the current to 510A (steady current state), set the forward and reverse power supply interval to 25 minutes, and after automatic switching, use the reverse adjustment button to adjust the current to 510A.

[0095] (6) Open the water inlet valve of the electrocatalytic oxidation device (unless there are special circumstances, keep it normally open).

[0096] (7) Turn on the hydrogen peroxide (H2O2) dosing pump and stirring device.

[0097] (8) After the treatment is completed, turn off the dosing pump and stirring device, the electrocatalytic oxidation control switch and the internal control switch of the device in turn, and finally turn off the main power switch of the main electrical control cabinet.

[0098] Working principle of adsorption tank 5: wastewater enters adsorption tank 5 for final treatment. This process uses the large number of micropores contained in activated carbon to adsorb various suspended particles and most organic or inorganic pollutants in the wastewater, and can effectively remove color and odor.

[0099] After testing, the target pollutants benzene, carbon tetrachloride, chlorobenzene, chloroform, 4-chlorodiphenyl ether, and C6 to C9 in the treated sewage finally discharged from the adsorption tank 5 meet the requirements of Grade B of the Water Quality Standard for Sewage Discharge into Urban Sewers (GB / T31962-2015).

Claims

1. A method for mixed treatment of comprehensive wastewater from contaminated sites and dewatering of foundation pits, based on a complete set of equipment for mixed treatment of comprehensive wastewater from contaminated sites and dewatering of foundation pits, characterized in that: The complete set of equipment comprises a grit chamber (1), an air flotation chamber (2), a filter chamber (3), a catalytic chamber (4), an adsorption tank (5) which are connected in sequence, and a diversion pump group (6) which is located in the foundation pit and is connected to the grit chamber (1) and the air flotation chamber (2); The diversion pump group (6) comprises a hollow floating block (61) and a floating cylinder (62) located at the bottom of the floating block (61); a telescopic rod (7) is provided at the bottom of the floating cylinder (62); the telescopic rod (7) comprises a telescopic outer rod (71) and a telescopic inner rod (72); a first water pump (73) is provided at one side of the bottom of the telescopic outer rod (71); a second water pump (74) is provided at the bottom of the telescopic inner rod (72); the telescopic outer rod (71) is slidably connected to the inside of the floating cylinder (62) up and down; and the telescopic outer rod (71) is slidably connected to the inside of the floating cylinder (62) up and down. A steel wire rope (75) is fixedly provided on the top of the rod (71), an electric winch (63) is provided on the top of the floating block (61), the steel wire rope (75) passes through the interior of the floating cylinder (62) and is connected to the output end of the electric winch (63) to drive the telescopic rod (7) to move up and down along the floating cylinder (62), a driving motor (76) is provided on the top of the telescopic outer rod (71), and a hydraulic rod (77) is provided on the output end of the driving motor (76) for driving the telescopic inner rod (72) to move up and down along the telescopic outer rod (71); Liquid level sensors (8) are provided on the bottom side walls of the telescopic outer rod (71) and the telescopic inner rod (72); A limit strip (711) is provided on each side of the outer wall of the telescopic outer rod (71), and a slide groove (64) slidably connected to the limit strip (711) is provided on each side of the inner wall of the floating cylinder (62) at positions corresponding to the two limit strips (711), and the slide groove (64) extends to the upper inner part of the floating cylinder (62); A first receiving groove (65) for receiving the first water pump (73) is provided on the inner wall of the floating cylinder (62) at a position corresponding to the position of the first water pump (73), and a second receiving groove (66) for receiving the liquid level sensor (8) is provided at a position corresponding to the position of the liquid level sensor (8), and the plane where the bottom of the floating cylinder (62) is located is used as a reference plane. On the reference plane, a line connecting the first receiving groove (65) and the second receiving groove (66) is perpendicular to a line connecting the two slide grooves (64); A third accommodating groove (78) for accommodating the liquid level sensor (8) is provided on the inner wall of the telescopic outer rod (71) at a position corresponding to the position of the liquid level sensor (8) on the telescopic inner rod (72); A first water guide pipe (731) is provided on the top of the first water pump (73), the first water guide pipe (731) penetrates the first receiving groove (65) and the floating block (61) and then extends to the ground surface; a second water guide pipe (741) is provided on the top of the second water pump (74), the second water guide pipe (741) sequentially penetrates the outer wall of the telescopic inner rod (72), the third receiving groove (78), the outer wall of the telescopic outer rod (71), the second receiving groove (66) and the floating block (61) and then extends to the ground surface; a first opening (721) is provided at the joint between the telescopic inner rod (72) and the second water guide pipe (741), and a second opening (712) is provided at the joint between the telescopic outer rod (71) and the second water guide pipe (741); The comprehensive wastewater from the contaminated site includes contaminated groundwater, tail water generated by ex situ thermal desorption, and construction wastewater; The foundation pit dewatering is divided into upper layer water and lower layer water of the foundation pit by taking the midpoint of the liquid level in the foundation pit as the dividing line; Wherein, the contaminated groundwater is sewage with low sand content; The tail water and upper layer water of the foundation pit produced by the ex situ thermal desorption are sewage with medium sand content; The construction wastewater and foundation pit lower layer water are sewage with high sand content; The following steps are involved: S1. Low-sand-content sewage treatment: transporting the low-sand-content sewage to the filter tank (3) for filtration, then passing through the catalytic tank (4) for catalytic oxidation treatment, and finally passing through the adsorption tank (5) for activated carbon adsorption treatment and then discharging; S2. Treatment of sewage with medium sand content: S2-1, treatment of tail water generated by ex situ thermal desorption: injecting the tail water generated by ex situ thermal desorption into the flotation tank (2) for flotation treatment, and then treating the tail water after flotation treatment as low-sand content wastewater according to the method of step S1; S2-2, treatment of upper water in the foundation pit: installing the diversion pump group (6) inside the foundation pit, adjusting the height of the telescopic rod (7), so that the telescopic outer rod (71) moves up and down along the floating cylinder (62), and the telescopic inner rod (72) moves up and down along the telescopic outer rod (71), so that the second water pump (74) is located at the bottom of the underwater in the foundation pit, and the first water pump (73) is located at the middle of the underwater in the foundation pit. The water level in the foundation pit is monitored by a liquid level sensor (8). When the water level in the foundation pit exceeds 4 to 8 m, the first water pump (73) is turned on to pump water, and the water level in the foundation pit is pumped to half. The pumped water is the upper water of the foundation pit, and the upper water of the foundation pit is injected into the flotation tank (2) for flotation treatment. Subsequently, the upper water of the foundation pit after the flotation treatment is treated as low-sand content sewage according to the method of step S1. The upper water of the foundation pit is pumped every 7 to 14 days; S3. Treatment of sewage with high sand content: S3-1, construction wastewater treatment: injecting the construction wastewater into the grit chamber (1) for sedimentation and sludge removal, and then injecting it into the flotation tank (2) for flotation treatment, and treating the construction wastewater after flotation treatment as low-sand wastewater according to the method of step S1; S3-2, treatment of the lower layer water of the foundation pit: after the upper layer water of the foundation pit is extracted 3 to 5 times according to the method in step S2-2, the lower layer water of the foundation pit is extracted, and the height of the telescopic rod (7) is adjusted so that the telescopic outer rod (71) moves up and down along the floating cylinder (62), and the telescopic inner rod (72) moves up and down along the telescopic outer rod (71), so that the first water pump (73) and the second water pump (74) are simultaneously located at the underwater bottom of the foundation pit, and the water in the foundation pit is pumped out. The pumped water is the lower layer water of the foundation pit, and the lower layer water of the foundation pit is injected into the sand settling tank (1) for sedimentation and mud removal, and then injected into the flotation tank (2) for flotation treatment. The lower layer water of the foundation pit after the flotation treatment is used as low-sand content sewage and treated according to the method of step S1.

2. The method for mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering according to claim 1, characterized in that: A connecting rod (9) for fixing the floating block (61) to the edge of the foundation pit is provided on one side of the floating block (61); a retractable auxiliary fixing rod (92) is provided on both side walls of the floating block (61) located on both sides of the connecting rod (9); the connecting rod (9) is divided into two detachable front and rear sections; the front and rear sections of the connecting rod (9) are connected by a traction rope (91) for guiding the floating block (61) into the depth of the foundation pit and floating autonomously.

3. The method for mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering according to claim 1, characterized in that: The construction wastewater in step S3 includes car washing water and construction waste flushing wastewater.

4. The method for mixed treatment of comprehensive wastewater from contaminated sites and foundation pit dewatering according to claim 1, characterized in that: The tail water generated by the ex situ thermal desorption in step S2-1 is cooled before being treated, and the temperature of the tail water generated by the ex situ thermal desorption is reduced to below 45°C.

Citation Information

Patent Citations

  • Floating type water pumping device used in geotechnical engineering deep foundation pit

    CN115681197A

  • Treatment system and method for industrial wastewater in rare earth separation industry

    CN116040866A

  • Floating fountain

    CN219804861U