Optimized drainage method for reducing shield tunnel face gushing with consideration of environmental effects

By designing adjustable drainage holes and integrated drainage frames in the shield tunnel, combined with an automated control system, the problems of low efficiency and maintenance difficulties in the traditional shield tunnel palm surface drainage method under complex geological conditions are solved, and more efficient is achieved , safe and economical drainage effects.

CN118653878BActive Publication Date: 2024-11-22SHANGHAI RAIL TRANSIT ENG CO LTD OF CHINA RAILWAY 17 BUREAU GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411147434.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-22
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The traditional shield tunnel palm surface drainage method has poor effect under complex geological conditions, relies on high-tech systems and is difficult to maintain, which increases construction costs and safety risks.

Method used

Design adjustable drainage holes and optimized drainage system structure, predict water influx through data acquisition and calculation, combine the formation impact coefficient and joint development coefficient, dynamically adjust the opening status of the drainage holes, and use the integrated drainage framework and automated control system to monitor water in real time Pressure and flow rate for flexible drainage management.

Benefits of technology

Improve drainage efficiency and system reliability, reduce operational complexity and maintenance needs, reduce environmental impact, and ensure the safety and economic benefits of tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653878B_ABST
    Figure CN118653878B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses an optimized drainage method for reducing shield tunnel face gushing while taking into account environmental effects, including: (1) calculating the water inflow volume in combination with the formation influence coefficient and the joint development influence coefficient; (2) designing a drainage hole that can be controlled to open and close on the tunnel segment, and judging the opening status of the drainage hole according to the water inflow volume; (3) arranging a drainage frame that is dynamically connected to the drainage hole along the inner side of the tunnel segment; (4) connecting the drainage hole with the drainage pipe for drainage, monitoring the water pressure and flow of the drainage hole in real time, and adjusting the position state of the drainage frame; (5) closing the drainage hole and disconnecting it, and moving the drainage frame to the next drainage point. The present invention accurately calculates the water volume, designs the drainage hole and the integrated mobile drainage frame at the same time, improves the drainage efficiency and adaptability, reduces the complexity of technical operations, and enhances the reliability and safety of the system, thereby ensuring the smooth progress of tunnel construction, reducing environmental impact, and improving engineering quality and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shield excavation, and in particular to an optimized drainage method for reducing shield tunnel face gushing while taking environmental effects into consideration. Background Art

[0002] When constructing tunnels or underground projects, especially in karst formations, we often face various problems caused by groundwater, such as water gushing and excessive water pressure. These problems not only increase the difficulty of construction, but may also affect the safety and progress of the project. Traditional solutions include using waterproof linings, pumping and other methods to control water gushing problems, but these methods are often costly and are not ideal under some complex geological conditions.

[0003] Especially in tunnel construction, the drainage problem is more complicated due to the instability of karst strata. Insufficient drainage may cause groundwater to gather along the gaps between the segments to the tunnel face of the shield machine, resulting in increased water pressure on the tunnel face. Increased water pressure on the tunnel face will cause a variety of problems, such as increased thrust and torque of the shield machine, slower advancement speed, serious slag shedding from the belt conveyor, increased time for cleaning the shield tail and pumping water, affecting overall work efficiency, and increased transportation frequency of battery vehicles. Excessive drainage will lead to local pressure instability, resulting in ground subsidence and changes in tunnel posture, which will endanger the safety and stability of nearby buildings and facilities and the tunnel itself.

[0004] Existing shield tunnel face drainage methods include reducing water pressure through local drainage systems and comprehensive pressure balance technology to ensure the safety and efficiency of tunnel construction. These technologies resist water pressure by enhancing soil stability, directly removing accumulated water, or adjusting the soil pressure of the face. The design of this system has the following main defects: (1) In scenarios with complex or changing geological conditions, the local drainage system may not be able to effectively cope with rapidly changing water pressure. Geological conditions such as rock permeability and uneven distribution of cracks may affect the drainage effect; (2) The drainage system also requires regular maintenance to prevent blockage, which is particularly difficult and costly in underground environments. Drainage pipes are easily blocked by silt, especially in strata with high sand content; (3) Drainage technology is highly dependent on the system performance and control accuracy of the shield machine. Any technical failure may lead to serious consequences. The pressure balance system of the shield machine relies on precise pressure sensing and adjustment technology. Any sensor error or control failure will directly affect the stability of the face; (4) Highly skilled operators and complex control systems are required, which not only increases the technical difficulty of construction but also increases costs. The equipment and maintenance costs of high-tech systems are high, requiring professional knowledge and continuous technical support. Summary of the invention

[0005] The technical problem to be solved by the embodiments of the present invention is to provide an optimized drainage method for reducing water gushing at the face of a shield tunnel while taking into account environmental effects. By innovatively designing adjustable drainage holes and optimizing the drainage system structure, a more economical, simple and environmentally friendly method is provided to effectively reduce the water gushing problem at the tunnel excavation face in karst strata and reduce the negative impact of drainage on the stratum environment, effectively solving the problems of low efficiency, complex operation and difficult maintenance existing in traditional shield tunnel face drainage methods.

[0006] In order to solve the above technical problems, an embodiment of the present invention provides an optimized drainage method for reducing shield tunnel face gushing while taking into account environmental effects, comprising the following steps:

[0007] (1) Data collection and calculation: Calculate the water inflow volume by combining the formation influence coefficient and the joint development influence coefficient;

[0008] (2) Design and layout of drainage holes: Drainage holes that can be controlled to open and close are designed on the tunnel segments, and the opening status of the drainage holes is determined based on the amount of water inflow; there are five drainage holes, one of which is set on the top tunnel segment, two of which are set in two layers on the tunnel segments on both sides of the upper part, and the other two are set on the tunnel segments on both sides of the lower part;

[0009] (3) Design of drainage frame: A drainage frame dynamically connected to the drainage holes is set along the inner side of the tunnel segment;

[0010] (4) Integration and dynamic adaptability of the drainage system: connect the drainage holes to the drainage pipes for drainage, monitor the water pressure and flow of each drainage hole in real time, and remotely monitor and adjust the position status of the drainage frame through the main console;

[0011] (5) Drainage completed: close the drainage hole and disconnect it, and move the drainage frame to the next drainage point.

[0012] Furthermore, the formula for calculating the water inflow in step (1) is:

[0013]

[0014] in: Q for tunnel penetration water flow; h o is the initial water head outside the tunnel; is the water head at the tunnel face; is the outer radius of the tunnel to take into account the influence of water; is the tunnel radius; L is the characteristic length of the water flow; , They are respectively the permeability coefficient of the soil layer and the coefficient reflecting the influence of the degree of joint development on water flow, which are determined through geological survey data or field tests.

[0015] Formulas ② and ③ are the modified formulas of formula ①. Formula ② is the likelihood function, where Denotes the given observed flow Q obs When the permeability coefficient and The likelihood function of .

[0016] Q theo To calculate the theoretical flow. Formula ③ is the posterior probability, where Indicates that given the observed flow Q obs Permeability and The posterior probability of Q is used to update the posterior probability of Q based on the new evidence. obs Parameter estimates of . It is the product of the likelihood function and the prior probability, reflecting the combination of the prior probability of the parameter before the observation of the data and the likelihood function of the observation data itself. For all possible and The values ​​are integrated to ensure that the posterior probability is a suitable probability distribution.

[0017] Among the three formulas, formula ① is the core formula for predicting water volume, and formulas ②③ are the modified formulas of formula ①. , Joint development coefficient It reflects the characteristics of the stratum. The larger the permeability coefficient of the soil layer, the stronger the water infiltration capacity of the soil, and the groundwater is more likely to flow to the tunnel face with lower pressure along the hydraulic gradient; the larger the joint development coefficient, the more and wider the cracks in the rock layer, and there may be more groundwater connected to the tunnel. The stratum conditions will change with the continuous excavation of the tunnel, and the data in the geological survey data are scattered points with a certain interval. Therefore, it is necessary to use formulas ②③ to correct the stratum characteristic coefficient. The correction method is to measure the actual drainage and use the Bayesian formula to update and improve the estimation of the model parameters. Only the actual drainage needs to be measured. The actual drainage is strongly correlated with the geological conditions. If the stratum characteristic coefficient is large, it means that more groundwater will gather at the tunnel face, and more water needs to be discharged to reduce the harm of the tunnel face eruption.

[0018] The opening state of the drain hole is controlled by rotating the inner layer. The opening state of the drain hole affects the hydraulic gradient distribution outside the drain hole. If it is fully opened, the water outside the drain hole will flow to the drain hole at a faster speed. The high-speed water is more likely to carry away the nearby soil and rocks, causing the drain hole to be blocked and the cavity to be locally eroded, affecting safety and construction quality. The state of the drain hole will not affect formula ①, because formula ① calculates the total water volume in a certain area, and the drainage is fixed-point drainage, which only needs to correspond to the total drainage volume at this point.

[0019] Furthermore, the method further comprises step (6): correcting the water inflow amount formula according to the monitored actual measured water volume , The entire process is a cycle of "prediction-correction-prediction", namely: (1) Predict the water volume and plan the drainage work. (2) Start drainage, measure the actual value, and correct the prediction formula. (3) Use the corrected formula to continue predicting the water volume of the next stage and plan the drainage work of the next stage.

[0020] Traditional methods often rely on experience or on-site conditions to determine the amount of water inflow. The present invention uses a specific formula to quantify the amount of water inflow, which has a wider range of applications and is more accurate.

[0021] Furthermore, the drainage hole is composed of an inner layer and an outer layer, both of which are semi-open permeable. The drainage hole is controlled by a revolving door to switch between fully open, semi-open or closed. Because the shield tunnel segments are all prefabricated, space is reserved together with the grouting holes during production. Each ring is composed of multiple segments, so there will be multiple drainage holes available. The segment splicing method is fixed, so the number of segments and the number of drainage holes in each ring are the same, but the angle between adjacent rings will rotate during staggered splicing, and the drainage holes on each segment need to be aligned through the drainage frame. The drainage hole is a structure reserved on the segment, which is composed of five prefabricated segments spliced ​​into a complete circular ring, that is, a ring of the tunnel. The cross section of this ring has five drainage holes distributed on five segments. For a single hole, the permeable holes in the inner and outer layers are misaligned. The inner layer, that is, the revolving door, can be manually rotated to adjust the permeable area to prevent the external soil from being flushed by high-speed water flow due to rapid pressure relief.

[0022] 1. Open several drainage holes based on the predicted flow rate to ensure drainage effect and prevent overall settlement. 2. Adjust the permeable area of ​​the opened drainage holes based on the flow rate to control the drainage flow rate and ensure the stability and safety of the strata near the opened drainage holes.

[0023] The present invention designs adjustable drainage holes on each tunnel segment. The holes are opened and closed by a revolving door and can be switched between fully open, half open or closed through an internal mechanism. The holes can be flexibly adjusted according to actual water pressure and water flow conditions.

[0024] Furthermore, the drainage frame is provided with a plurality of connection devices, a main drainage pipe (10), and a guide wheel (4); the connection devices are used to connect the drainage pipe and the drainage hole; the main drainage pipe (10) is used to collect drainage from each drainage pipe; the guide wheel is provided on the drainage frame, and is used to enable the drainage frame to rotate along the tunnel wall to accurately align the drainage hole (3) and the interface of the main drainage pipe (10) and to move along the tunnel construction direction; the guide wheel 4 is an omnidirectional wheel to meet the movement requirements in different directions.

[0025] The present invention designs an integrated drainage frame, which is arranged along the inner side of the tunnel segment and can be dynamically connected with the drainage holes to automatically adjust the position to adapt to the tunnel excavation process.

[0026] Furthermore, the method for judging the opening of the drainage hole according to the water inflow is: when the water inflow is less than 100m 3 / dOpen a drainage hole; water inflow is 100-200m 3 / dOpen two drainage holes; water inflow is 200-300m 3 / dOpen three drainage holes; water inflow is 300-400m 3 / dOpen four drainage holes; water inflow is greater than 400m 3 / dOpen all 5 drain holes.

[0027] Furthermore, the drainage hole can be connected to an air compressor. When the drainage flow rate is abnormal, compressed air is input from the top drainage hole to balance the pressure and improve the drainage effect.

[0028] The main characteristics of abnormal drainage flow rate are that the drainage flow rate drops rapidly and the flow rate has been greatly reduced before the predetermined drainage volume is reached. Under normal circumstances, the drainage flow rate should be gradually reduced until the drainage work is completed. The amount of compressed air and the timing of stopping need to be determined based on the drainage flow rate. When the drainage flow rate returns to the level before the sudden change, it means that the pressure has reached equilibrium. At this time, it means that the flow rate has returned to normal and the addition of compressed air can be stopped.

[0029] Furthermore, the drainage framework is integrated into the operation of the shield machine through the automated control system of the main console to monitor the water pressure and flow in real time.

[0030] Compared with the prior art, the present invention improves drainage efficiency and adaptability, reduces the complexity of technical operations, and enhances the reliability and safety of the system, thereby ensuring the smooth progress of tunnel construction, reducing environmental impact, and improving project quality and economic benefits; it has the following advantages:

[0031] (1) Enhanced drainage adaptability and efficiency: The present invention not only greatly improves the accuracy of prediction by introducing a quantitative formula to calculate the water inflow, but also can more accurately calculate the water volume by combining the formation influence coefficient and the joint development influence coefficient. By designing adjustable drainage holes on the tunnel segments and combining a revolving door control mechanism, more accurate water pressure control and water flow management can be achieved. This design is significantly different from the fixed or single adjustment drainage system commonly used in the prior art. It allows the drainage strategy to be flexibly adjusted according to specific circumstances, thereby effectively responding to the changing groundwater environment and improving safety and efficiency during construction.

[0032] (2) Reduce operational complexity and maintenance requirements: The integrated mobile drainage frame of the present invention can be continuously moved and rotated with the tunnel excavation through the guide wheel design, and can be easily moved and matched with the misplaced drainage holes without the need for additional construction processes. And due to the circular design, it can minimize the space occupation while ensuring the drainage effect. The use of the drainage frame not only simplifies the operation process, but also reduces the maintenance work caused by the complexity or failure of the drainage system, especially in underground environments that are difficult to access or have poor visibility, significantly reducing the difficulty and cost of maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the drainage process of the present invention;

[0034] Figure 2 is a cross-sectional view of a drainage hole of the present invention;

[0035] Figure 3 is a top view of the drainage hole of the present invention;

[0036] Figure 4 is a schematic diagram of a drainage framework of the present invention;

[0037] Among them, 1-drainage hole outer layer, 2-drainage hole inner layer, 3-drainage hole, 4-guide wheel, 5-drainage support frame, 6-pedestrian passage, 7-sensor, 8-drainage pipe fixing frame, 9-drainage pipe 1, 10-main drainage pipe, 11-drainage pipe 2, 12-battery car track. DETAILED DESCRIPTION

[0038] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings.

[0039] Reference Figures 1 to 4 The structural diagram shown.

[0040] A method for optimizing drainage to reduce shield tunnel face gushing while taking into account environmental effects, such as Figure 1 As shown, the following steps are included:

[0041] 1. Data collection and calculation: The collected data include tunnel structure and geological exploration information, which are the most basic known information in the project and are used to prepare materials before construction. In addition, it is necessary to collect water volume information during drainage and detect and record it through flow meters. Water volume calculation formulas with different stratum adaptability are used to cope with changes in groundwater flow and pressure. On the one hand, it is necessary to ensure the drainage speed and effect, and on the other hand, it is necessary to ensure the stability of the surrounding soil environment and the safety of operations, so it is necessary to determine the optimal number of drainage holes to be opened. The number of drainage holes to be opened is determined by the following ①, ② and ③ water volume formulas, and the Bayesian update mechanism is used to ensure the optimal drainage effect under different geological conditions.

[0042] ①

[0043] ②

[0044] ③

[0045] Where: 𝑄 is the tunnel penetration water flow; h o is the initial water head outside the tunnel; is the water head at the tunnel face; is the outer radius of the tunnel to take into account the influence of water; is the tunnel radius; L is the characteristic length of the water flow; , They are respectively the permeability coefficient of the soil layer and the coefficient reflecting the influence of the degree of joint development on water flow, which are determined through geological survey data or field tests.

[0046] Formulas ② and ③ are the modified formulas of formula ①. Formula ② is the likelihood function, where Denotes the given observed flow Q obs When the permeability coefficient and The likelihood function of .

[0047] Q theo To calculate the theoretical flow. Formula ③ is the posterior probability, where Indicates that given the observed flow Q obs Permeability and The posterior probability of Q is used to update the posterior probability of Q based on the new evidence. obs Parameter estimates of . It is the product of the likelihood function and the prior probability, reflecting the combination of the prior probability of the parameter before the observation of the data and the likelihood function of the observation data itself. For all possible and The values ​​are integrated to ensure that the posterior probability is a suitable probability distribution.

[0048] Among the three formulas, formula ① is the core formula for predicting water volume, and formulas ②③ are the modified formulas of formula ①. , Joint development coefficient It reflects the characteristics of the stratum. The larger the permeability coefficient of the soil layer, the stronger the water infiltration capacity of the soil, and the groundwater is more likely to flow to the tunnel face with lower pressure along the hydraulic gradient; the larger the joint development coefficient, the more and wider the cracks in the rock layer, and there may be more groundwater connected to the tunnel. The stratum conditions will change with the continuous excavation of the tunnel, and the data in the geological survey data are scattered points with a certain interval. Therefore, it is necessary to use formulas ②③ to correct the stratum characteristic coefficient. The correction method is to measure the actual drainage and use the Bayesian formula to update and improve the estimation of the model parameters. Only the actual drainage needs to be measured. The actual drainage is strongly correlated with the geological conditions. If the stratum characteristic coefficient is large, it means that more groundwater will gather at the tunnel face, and more water needs to be discharged to reduce the harm of the tunnel face eruption.

[0049] The opening state of the drain hole is controlled by rotating the inner layer. The opening state of the drain hole affects the hydraulic gradient distribution outside the drain hole. If it is fully opened, the water outside the drain hole will flow to the drain hole at a faster speed. The high-flow water is more likely to carry away the nearby soil and rocks, causing the drain hole to be blocked and the cavity to be locally eroded, affecting safety and construction quality. The state of the drain hole will not affect formula ①, because formula ① calculates the total water volume in a certain area, and the drainage is fixed-point drainage, which only needs to correspond to the total drainage volume at this point. Changes in flow rate will affect the drainage time but will not change the total drainage volume.

[0050] In this embodiment, the engineering geological conditions and the shield machine selection are first determined k 1 =0.01, k 2 =0.01, h 0 =50m, h s =20m, R =5m, r =3m. Calculated Q = 184.5m 3 / d, at which point the water volume is between 100-200m 3 / dOpen the two drainage holes at the bottom. The actual water volume measured is 190m 3 / d, use formula ②, ③ to update k 1 , k 2 , calculatedk 1 = 0.0104, k 2 =0.0102. Using the updated k 1 , k 2 Using formula ①, we can get Q=189.99m 3 / d, complete the parameter update for the new stratum conditions. The parameters are constantly modified as the stratum changes during the excavation process, ensuring the accuracy of the predicted tunnel water inflow.

[0051] The purpose of calculating the water volume is to select the appropriate number of drainage holes to be opened. The measurement can only be performed after the drainage holes are opened, which has a lag. The purpose of drainage is to prevent hidden dangers before they occur, so a predicted value is needed to prepare and drain in advance, and drainage cannot be started only when a large flow is encountered during construction. In addition, opening too many or too few drainage holes will cause adverse effects, so it is necessary to select the appropriate number of openings by predicting the water volume.

[0052] During tunnel construction, the ground conditions will change, so the parameters of the formula will also change. The geological survey report is for point selection and cannot reflect the actual ground changes in detail throughout the process, so it is necessary to correct the coefficients according to the actual flow to ensure that the error does not continue to accumulate. The water volume is calculated after correction to verify whether the corrected coefficients are correct. If the verification is consistent with the actual, the new parameters can be used to predict the water volume of the next excavation surface and arrange drainage work.

[0053] The number of drainage holes to be opened is determined by Q obtained from the water volume calculation formula ①, which is less than 100m 3 / dOpen a drainage hole; 100 -200m 3 / dOpen two drainage holes; 200-300m 3 / dOpen three drainage holes; 300-400m 3 / dOpen four drainage holes; more than 400m 3 / dOpen all 5 drainage holes. When the number of drainage holes opened is less than 3, the lower drainage holes should be opened. When the number of drainage holes opened is greater than 3, they must be opened in order from bottom to top to ensure safety and drainage effect.

[0054] 2. Design and layout of drainage holes: Design drainage holes that can be opened and closed, and judge the opening of drainage holes according to the amount of water inflow. There are 5 drainage holes, one of which is set on the top tunnel segment, 2 of which are set in two layers on the tunnel segments on both sides of the upper part, and the other 2 are set on the tunnel segments on both sides of the lower part.

[0055] The drain hole revolving door of this embodiment is made of high-strength stainless steel material, and consists of an inner layer and an outer layer. Both layers are semi-open hole water-permeable, which can regulate water flow while blocking foreign objects such as stones.

[0056] like Figure 2 , Figure 3 As shown, the outer layer 1 of the drainage hole and the inner layer of the drainage hole are connected by threads to form a mutually rotatable structure, and a number of offset through holes are opened on the corresponding surfaces of the two. In the closed state, the through holes of the two are completely offset and closed. When one of them is rotated 180 degrees, the through holes of the two are aligned and connected. In another way, the alignment surfaces of the two can be set to be semicircular, and the semicircular surfaces of the two have offset through holes. When the two are rotated and aligned, the through holes on the upper side are offset and closed, and when the planes of the two are completely offset, the through holes of the two are completely connected.

[0057] The drainage volume needs to be controlled. If the flow rate is too fast, it will cause blockage by large pieces of soil and rocks. If the flow rate is too small, the drainage speed will be slow, which will not effectively reduce the water pressure and affect the construction progress. The revolving door in the drainage hole can be fully opened, half-opened or fully closed to adapt to the real-time water pressure and adjust the drainage rate. When the water volume exceeds 400m 3 / d, open all five drainage holes to speed up drainage and reduce the risk of water inrush on the excavation surface; the water volume is less than 400m 3 / d, taking into account the construction risks of drainage holes, the number of openings should be reduced as much as possible while ensuring the drainage effect, and the number of openings should be selected according to different flow rates.

[0058] The drainage rate will cause water pressure changes, and too fast a change in water pressure will cause pressure imbalance and instability in the rock and soil around the tunnel, which will develop into ground settlement and tunnel displacement, seriously endangering the safety of the building structure above the tunnel and the quality of the tunnel itself. Therefore, the number of drainage holes to be opened needs to be determined by estimating the water volume based on the characteristics of the stratum, considering both the drainage effect and the impact of the environmental effect, and not all of them can be opened for the drainage speed.

[0059] 3. Design of drainage framework. Figure 4The drainage frame shown is designed as a circular structure, close to the inner side of the tunnel segment. The circular structure of the drainage frame is to save space. The drainage support frame 5 is to ensure that the drainage frame as a whole does not infringe on the equipment limit of the battery vehicle and to ensure the overall stability and structural strength; the drainage pipe fixing frame 8 is to fix the drainage pipe 1 9 and the drainage pipe 2 11 to prevent poor drainage due to sagging, invading the equipment limit of the battery vehicle and blocking the pedestrian passage 6, affecting other construction processes. The guide wheel 4 can make the drainage frame as a whole move along the tunnel construction direction, and move to a new ring for drainage as the project progresses; in addition, the frame can be rotated in the circumferential direction. When the tunnel segments are assembled using staggered seams, the drainage holes between different rings have different circumferential angles. The guide wheel can be used to rotate the frame as a whole in the circumferential direction to correspond to the drainage holes. So that it can move smoothly with the advancement of the shield machine and automatically adjust to adapt to the misalignment of the drainage holes caused by the staggered splicing of the segments. The frame is made of stainless steel or specially treated alloy materials, with good corrosion resistance and moisture resistance, ensuring stability and durability in the underground environment. The main function of the frame is to connect the drainage hole 3 with the drainage pipe 1 9 and the drainage pipe 2 11 through multiple sets of internal connection devices to collect the drainage from the drainage hole, and guide it to the main drainage pipe 10 through the drainage pipe 1 9 and the drainage pipe 2 11 mounted on the drainage support frame 5. The guide wheel 4 in the pulley system can make the frame rotate clockwise or counterclockwise along the tunnel wall to accurately align the drainage hole 3 and the drainage pipe interface under different pipe segment splicing methods, and the pulley system can make the frame as a whole move along the tunnel construction direction. The main drainage pipe 10 is arranged under the battery car track to reduce space occupancy and facilitate maintenance and extension. The design of the frame ensures the integrity and continuity of the drainage system, while reducing maintenance requirements and failure rates, and greatly simplifying the drainage workflow.

[0060] 4. Drainage and monitoring. Connect the drain hole to the drain pipe for drainage, and monitor and adjust the drainage process through the flow meter. The top drain hole can be connected to an air compressor. When the drainage flow rate is abnormal, compressed air is input from the top drain hole to balance the pressure and improve the drainage effect. In addition, the drainage frame is integrated into the operation of the shield machine through an automated control system. The sensor 7 that monitors the water pressure and flow in real time can display the data together with other excavation parameters on the shield machine main control program interface. Through real-time data, operators can use these data to correct water volume forecasts to guide subsequent drainage work. Combining the actual water volume with the progress of the project can determine whether it is necessary to adjust the number of drainage holes opened. When the water pressure is reduced, the construction workers can be notified to close the drainage holes and move the drainage frame to a new drainage location for the next drainage work.

[0061] 5. Drainage completed: close the drainage hole and disconnect, and move the drainage frame to the next drainage point. After completing the drainage and water pressure reduction work at the drainage point, the drainage frame can be moved to the next drainage point along the construction direction. The main drainage pipe is also extended as the frame is extended, and the next drainage work can be started by connecting the drainage pipe and the drainage hole.

[0062] Before construction, the optimal number of openings for each drainage hole is determined based on geological survey reports and field measurements. During construction, as the shield machine advances, the water pressure on the face is monitored in real time, and the operator monitors the water pressure flow and adjusts the opening and closing status of the drainage holes to achieve the best drainage effect. The entire system automatically adapts to the advancement of the shield machine through an integrated drainage frame, and the drainage frame is pushed by the guide wheel to move with the construction progress and rotate along the pipe segment to adapt to the position deviation of the drainage holes caused by the staggered joints.

[0063] In summary, the main innovations of the present invention are: 1. Water volume calculation and drainage hole design: a water volume calculation formula adapted to the stratum conditions is proposed, and the number of drainage holes to be opened is determined by the water volume. Each tunnel segment is arranged with adjustable drainage holes, which can be opened and closed by external mechanical devices through built-in revolving doors, thereby adjusting the water flow to adapt to different geological and water pressure conditions. 2. Integrated drainage frame: a dynamic adjustment frame arranged along the inner side of the tunnel segment, used to support and guide the drainage holes to connect with the drainage system at the bottom of the tunnel, and can be moved forward with the tunnel excavation to carry out drainage operations without reassembly, which can effectively save space.

[0064] The above disclosure is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope of the present invention.

Claims

1. An optimized drainage method for reducing shield tunnel face gushing taking into account environmental effects, characterized in that: The following steps are involved: S1: Data collection and calculation: Calculate the water inflow by combining the permeability coefficient of the soil layer and the coefficient reflecting the influence of the degree of joint development on water flow; S2: Design and layout of drainage holes: Drainage holes that can be controlled to open and close are set on the tunnel segments, and the opening status of the drainage holes is determined according to the amount of water inflow. There are 5 drainage holes, one of which is set on the top tunnel segment, two of which are set on the tunnel segments on both sides of the upper part, and the other two are set on the tunnel segments on both sides of the lower part; the drainage holes are composed of an inner layer and an outer layer, and the inner layer and the outer layer are connected by threads to form a mutually rotatable structure. A number of dislocated through holes are opened on the corresponding surfaces of the inner layer and the outer layer. In the closed state, the through holes of the two layers are completely dislocated to be closed. When one of them rotates 180 degrees, the through holes of the two layers are aligned to be connected. The drainage holes are controlled to open and close by a revolving door to switch between fully open, half open or closed; The method of judging the opening of the drainage hole according to the water inflow is: when the water inflow is less than 100m 3 / dOpen a drainage hole; water inflow is 100-200m 3 / dOpen two drainage holes; water inflow is 200-300m 3 / dOpen three drainage holes; water inflow is 300-400m 3 / dOpen four drainage holes; water inflow is greater than 400m 3 / dOpen all five drain holes; The drain hole can be switched to connect to an air compressor, and compressed air can be input into the drain hole to balance the pressure when the drainage flow rate is abnormal; S3: Design of the drainage frame: a drainage frame dynamically connected to the drainage hole is arranged along the inner side of the tunnel segment; a plurality of connection devices, a main drainage pipe (10), and a guide wheel (4) are arranged on the drainage frame, the connection device is used to connect the drainage pipe with the drainage hole, and the main drainage pipe (10) is used to collect drainage from each drainage pipe; the guide wheel is arranged on the drainage frame, and is used to rotate the drainage frame along the tunnel wall to accurately align the drainage hole (3) and the drainage pipe interface, and can move along the tunnel construction direction; S4: Integration and dynamic adaptability of drainage system: connect the drain holes to the drain pipes for drainage, monitor the water pressure and flow of each drain hole in real time, and remotely monitor and adjust the position status of the drainage frame through the main console; S5: Drainage is completed: close the drainage hole and disconnect it, move the drainage frame to the next drainage point, and repeat the steps of S1 and S4.

2. The optimized drainage method for reducing shield tunnel face gushing taking into account environmental effects according to claim 1 is characterized in that: In S1, the formula for calculating the water inflow is: in: Q for tunnel penetration water flow; h o is the initial water head outside the tunnel; is the water head at the tunnel face; is the outer radius of the tunnel to take into account the influence of water; is the tunnel radius; L is the characteristic length of the water flow; , They are the permeability coefficient of the soil layer and the coefficient reflecting the influence of the degree of joint development on water flow, which are determined through geological survey data or field tests; Q theo To calculate the theoretical flow rate, Indicates that given the observed flow Q obs hour and The posterior probability of It is the product of the likelihood function and the prior probability. For all possible and The values ​​are integrated to ensure that the posterior probability is a suitable probability distribution.

3. The optimized drainage method for reducing shield tunnel face gushing taking into account environmental effects according to claim 2 is characterized in that: It also includes S6: according to the actual measured water volume monitored, correct the water inflow volume formula k 1. k 2.

4. The optimized drainage method for reducing shield tunnel face gushing taking into account environmental effects according to claim 1 is characterized in that: The drainage frame is integrated into the operation of the shield machine through the automated control system of the main control console to monitor the water pressure and flow of the drainage holes in real time.