Stability monitoring method for underground water-sealed caverns

By constructing a nonlinear model of the groundwater sealing reservoir and laying a monitoring device, the stress and displacement around the cave are monitored in real time, which solves the problem that surrounding rock stability monitoring is difficult to achieve real-time dynamic changes in the existing technology, and improves construction safety and efficiency.

CN118654758BActive Publication Date: 2024-11-05CHINA GASOLINEEUM PIPELINE ENG CORP +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411148393.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-05
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

In the prior art, the stability monitoring of surrounding rocks in groundwater sealed reservoirs relies on traditional geological surveys and manual monitoring, making it difficult to achieve real-time dynamic change monitoring, and it is time-consuming and labor-intensive, making it difficult to warn of potential instability risks.

Method used

Build a nonlinear model of the groundwater sealing reservoir, combine the rock mass and blasting conditions, arrange stability and vibration monitoring devices, and determine high-risk areas by comparing monitoring data and calculation results, and monitor the stress and displacement of the cave and its surroundings in real time. Condition.

Benefits of technology

Real-time monitoring of the surrounding rock stability of the groundwater sealing reservoir is achieved, construction safety is improved, instability accidents are avoided, and human resources are saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118654758B_ABST
    Figure CN118654758B_ABST
Patent Text Reader

Abstract

The invention discloses a stability monitoring method for an underground water-sealed cavern, which comprises: constructing a nonlinear model of the underground water-sealed cavern according to rock mass quality and blasting conditions, and calculating a linear model of the underground water-sealed cavern; arranging a stability monitoring device in and around a rock cave under construction according to a calculation result of the nonlinear model of the underground water-sealed cavern; judging whether an area where the monitoring data is located is in a high-risk area according to a comparison result between the stability monitoring data and the calculation result; arranging a vibration monitoring device around the construction rock cave according to the calculation result of the nonlinear model of the underground water-sealed cavern and the actual excavation situation of the rock cave; judging whether an area where the vibration monitoring data is located is in a high-risk area according to the calculation result of the vibration monitoring data; judging whether the rock cave is in an unstable state according to whether the area where the stability monitoring data is located is in a high-risk area or the area where the vibration monitoring data is located is in a high-risk area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present disclosure belong to the technical field of underground water-sealed caverns, and specifically relate to a stability monitoring method for underground water-sealed caverns. Background Art

[0002] An underground water-sealed cavern is a storage method for storing oil and gas products in a cavern of a certain shape and volume excavated in a rock layer below the groundwater level. Underground water-sealed caverns are usually buried hundreds of meters underground. The caverns have the characteristics of large cross-sections and high spans, and there are cross-sections between different underground units, such as the intersection of construction tunnels and water curtain tunnels, the intersection of construction tunnels and connecting tunnels, and the intersection of connecting tunnels and caverns. The intersection of the cross-sections is prone to loose surrounding rock and weak support areas. The design and construction of the project requires a high degree of consideration of the stability and safety of the underground space, especially the structural stability of the surrounding rock, which is one of the key factors affecting the safety of underground water-sealed caverns.

[0003] Structural instability of surrounding rock mainly refers to the damage and deformation of rock structure due to external loading, uneven internal stress distribution, changes in geological conditions and other factors, which may eventually cause the collapse or instability of the cavern. Stability analysis and early warning of surrounding rock of underground water-sealed caverns is a complex technical issue involving multiple fields such as rock mechanics, geological engineering, hydrogeology and automated monitoring.

[0004] In the related technologies, the monitoring of surrounding rock stability mainly relies on traditional geological surveys and manual monitoring. These methods are not only time-consuming and labor-intensive, but also difficult to achieve real-time monitoring of the dynamic changes of the surrounding rock of underground water-sealed caverns. Summary of the invention

[0005] The embodiments of the present disclosure aim to solve at least one of the technical problems existing in the prior art and provide a method for monitoring the stability of an underground water-sealed cavern.

[0006] An embodiment of the present disclosure provides a method for monitoring the stability of an underground water-sealed cavern, the method comprising:

[0007] According to the rock mass quality and blasting conditions, a nonlinear model of underground water-sealed caverns is constructed, and a linear model of underground water-sealed caverns is calculated;

[0008] According to the calculation results of the nonlinear model of underground water-sealed caverns, stability monitoring devices are arranged in and around the caverns under construction;

[0009] According to the comparison between stable monitoring data and calculation results, it is judged whether the area where the monitoring data is located is in a high-risk area;

[0010] According to the calculation results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cavern, a vibration monitoring device is arranged around the construction cavern.

[0011] Determine whether the area where the vibration monitoring data is located is in a high-risk area based on the calculation results of the vibration monitoring data;

[0012] Based on the fact that the area where the stable monitoring data is located is in the high-risk area or the area where the vibration monitoring data is located is in the high-risk area, it is determined that the cave is in an unstable state.

[0013] In some embodiments of the present disclosure, the nonlinear model of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the linear model of the underground water-sealed cavern is calculated, which specifically includes:

[0014] Construct a nonlinear model of the underground water-sealed cavern based on rock mass quality and blasting conditions, and calculate the nonlinear model of the cavern;

[0015] According to the calculation results of the nonlinear model of the rock cave, the nonlinear model of the supporting structure of the rock cave is constructed, and the nonlinear model of the supporting structure is calculated.

[0016] In some embodiments of the present disclosure, the nonlinear model of the rock cave of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the nonlinear model of the rock cave is calculated, specifically including:

[0017] Constructing the geometric model of the underground water-sealed cavern according to the rock mass quality, blasting conditions and the preset geometric dimensions of the cavern;

[0018] Set the geological parameters of the geometric model according to the geology surrounding the cave;

[0019] Set the strength parameters of the geometric model according to the HB strength criterion;

[0020] Estimate the geostress field of the geometric model based on the structural analysis map of China, the distribution map of crustal movement velocity and the distribution of geostress;

[0021] According to the preset cross-sectional dimensions of the rock cave, the step excavation conditions of the rock cave are set;

[0022] Calculate the force data for different step excavation conditions in the rock cave.

[0023] In some embodiments of the present disclosure, the arrangement of a stability monitoring device in and around the cavern under construction according to the calculation results of the nonlinear model of the underground water-sealed cavern specifically includes:

[0024] According to the calculation results of the nonlinear model of the rock cave, the simulation data of ground uplift, the simulation data of peripheral displacement, the simulation data of arch subsidence and the simulation data are obtained;

[0025] Based on the ground uplift simulation data, peripheral displacement simulation data, arch subsidence simulation data and surrounding rock internal displacement simulation data, stability monitoring devices are set up in the excavated cave and its surroundings.

[0026] In some embodiments of the present disclosure, judging whether the area where the monitoring data is located is in a high-risk area according to the comparison result between the stable monitoring data and the calculation result specifically includes:

[0027] According to the fact that the stability monitoring data is greater than the simulation data of the calculation result and the deformation parameter is greater than the preset value, it is determined that the area where the stability monitoring data is located is in a high-risk area.

[0028] In some embodiments of the present disclosure, judging that the area where the stable monitoring data is located is in a high-risk area according to the stable monitoring data being greater than the calculated result simulation data and the deformation parameter being greater than a preset value specifically includes:

[0029] When the actual ground uplift data exceeds the simulated ground uplift data, the absolute value of the accumulated deformation is greater than 80 mm, and the rate of change is greater than 5 mm / d, the area where the actual ground uplift data is located is determined to be a high-risk area;

[0030] When the actual data of peripheral displacement exceeds the simulated data of peripheral displacement, the absolute value of the accumulated deformation is greater than 50 mm, and the rate of change is greater than 4 mm / d, the area where the actual data of peripheral displacement is located is determined to be a high-risk area;

[0031] When the actual data of arch subsidence exceeds the simulated data of arch subsidence, the absolute value of the accumulated deformation is greater than 40 mm, and the rate of change is greater than 3 mm / d, the area where the actual data of arch subsidence is located is determined to be a high-risk area;

[0032] When the actual displacement data of the surrounding rock exceeds the simulated displacement data of the surrounding rock, the accumulated deformation absolute value is greater than 50 mm, and the rate of change is greater than 1 mm / d, the area where the actual displacement data of the surrounding rock is located is determined to be a high-risk area. In some embodiments of the present disclosure, the nonlinear model of the support structure of the rock cave is constructed according to the calculation result of the nonlinear model of the rock cave, and the nonlinear model of the support structure is calculated, which specifically includes:

[0033] According to the calculation results of the nonlinear model of the rock cave, a support structure model corresponding to the stress condition of the nonlinear model of the rock cave is constructed, and the parameters of the support structure model are set;

[0034] The nonlinear model of the rock cave and the supporting structure model are calculated to obtain the simulated force data of the supporting structure.

[0035] In some embodiments of the present disclosure, the step of calculating the nonlinear model of the rock cave and the supporting structure model to obtain simulated force data of the supporting structure comprises:

[0036] According to the calculation of the nonlinear model of the support structure, the simulation data of the anchor axial force, the simulation data of the internal and external forces of the steel frame, the simulation data of the surrounding rock pressure and the simulation data of the internal stress of the support structure are obtained;

[0037] According to the simulation data of anchor axial force, steel frame internal and external force, surrounding rock pressure and support structure internal stress, data monitoring devices are set up in and around the support structure;

[0038] Based on the fact that the actual monitoring data exceeds the simulation data, the area where the actual monitoring data is located is judged to be a high-risk area.

[0039] In some embodiments of the present disclosure, judging whether the area where the monitoring data is located is in a high-risk area according to the comparison result between the stable monitoring data and the calculation result specifically includes:

[0040] According to the anchor rod axial force simulation data where the actual anchor rod axial force data exceeds the preset multiple, the area where the actual anchor rod axial force data is located is determined to be a high-risk area;

[0041] According to the simulated data of the internal and external forces of the steel frame where the actual data of the internal and external forces of the steel frame exceeds the preset multiple, the area where the actual data of the internal and external forces of the steel frame are located is determined to be a high-risk area;

[0042] According to the surrounding rock pressure simulation data where the actual surrounding rock pressure data exceeds the preset multiple, the area where the actual surrounding rock pressure data is located is determined to be a high-risk area;

[0043] According to the support structure internal stress simulation data where the actual data of the support structure internal stress exceeds the preset multiple, the area where the actual data of the support structure internal stress is located is determined to be a high-risk area.

[0044] In some embodiments of the present disclosure, judging whether the area where the vibration monitoring data is located is in a high-risk area according to the calculation result of the vibration monitoring data specifically includes:

[0045] Arrange vibration monitoring devices based on the finite element analysis results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cavern;

[0046] Based on the event rate, magnitude, cumulative apparent volume-energy index, energy-seismic moment and η value of the monitoring data of the vibration monitoring device, it is determined whether the cave is in a high-risk area.

[0047] According to the stability monitoring method of the underground water-sealed cavern in the embodiment of the present disclosure, firstly, a nonlinear model of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the nonlinear model of the underground water-sealed cavern is calculated to obtain the stress analysis of the rock cave of the underground water-sealed cavern and its internal support structure; then, according to the stress analysis of the rock cave of the underground water-sealed cavern and its internal support structure, a stability monitoring device is arranged in the rock cave under construction and its surroundings to monitor the stress and / or displacement of the rock cave and its surroundings during the construction process, and finally, the actual monitoring results are compared with the simulation calculation results to determine whether the stable actual monitoring area is in a high-risk area. In addition, according to the actual excavation conditions of the rock cave, a vibration monitoring device is arranged on the side of the construction rock cave, and the vibration monitoring area is determined to be in a high-risk area according to the comparison results of the vibration monitoring data and the vibration threshold. Finally, according to whether the stable actual monitoring area is in a high-risk area or the vibration actual monitoring area is in a high-risk area, it is determined that the rock cave is in an unstable state. The stability monitoring method of the underground water-sealed cavern of this embodiment can monitor the stress or displacement of the cavern and its surrounding areas in real time during the construction process, timely obtain the stability state during the construction process, improve the safety during the construction process, avoid serious instability accidents during the construction process, and ensure the personal safety of construction workers. In addition, monitoring the structure of the underground water-sealed cavern through various monitoring equipment can also save a lot of manpower. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 is a flow chart of the disclosed method;

[0049] Figure 2 It is a diagram showing the scope of the geometric model disclosed in the present invention;

[0050] Figure 3 It is a finite element model and mesh division display diagram of the present disclosure;

[0051] Figure 4 This is a plan diagram of the rock cave step method excavation disclosed in the present invention;

[0052] Figure 5 It is a simulated cloud diagram of the maximum principal stress σ1 of the upper step disclosed in the present invention;

[0053] Figure 6 It is a simulated cloud diagram of the minimum principal stress σ3 of the upper step disclosed in the present invention;

[0054] Figure 7 It is a simulated cloud diagram of the total displacement around the upper step disclosed in the present invention;

[0055] Figure 8 It is the displacement vector diagram of the upper step periphery of the present disclosure;

[0056] Fig. 9 A simulated cloud map of the yielded units around the upper steps of the cave disclosed in the present invention;

[0057] Fig.10 It is a simulated cloud diagram of the maximum principal stress σ1 of the middle step disclosed in the present invention;

[0058] Fig.11 It is a simulated cloud diagram of the minimum principal stress σ3 of the middle step disclosed in the present invention;

[0059] Fig.12 It is a simulated cloud diagram of the total displacement around the middle step of the present disclosure;

[0060] Fig.13 A displacement vector diagram of the periphery of the middle step of the present disclosure;

[0061] Fig.14 A simulated cloud map of the yielded units around the steps in the rock cave disclosed in the present invention;

[0062] Fig.15 It is a simulated cloud diagram of the maximum principal stress σ1 of the lower step disclosed in the present invention;

[0063] Fig.16 It is a simulated cloud diagram of the minimum principal stress σ3 of the lower step disclosed in the present invention;

[0064] Fig.17 It is a simulated cloud diagram of the total displacement around the lower step disclosed in the present invention;

[0065] Fig.18 A displacement vector diagram of the lower step periphery disclosed in the present invention;

[0066] Fig.19 A simulated cloud map of the yielded units around the lower steps of the cave disclosed in the present invention;

[0067] Fig. 20 The cloud diagram of anchor axial force calculation disclosed in the present invention;

[0068] Fig.21 The cloud diagram of the steel frame stress calculation disclosed in the present invention;

[0069] Fig. 22 The diagram is a layout diagram of the rock cave stress monitoring disclosed in the present invention;

[0070] Fig.23 It is a layout diagram of the rock cave multi-point displacement meter disclosed in the present invention;

[0071] Fig.24 This is a schematic diagram of the installation of the vibration sensor disclosed in the present invention;

[0072] Fig.25 A distribution map of microseismic events disclosed in the present invention;

[0073] Fig.26 It is a microseismic event density map of the present disclosure.

[0074] Reference numerals:

[0075] 100. Cave;

[0076] 1. Cables; 2. Cable ties; 3. Well wall; 4. Vibration sensor; 5. Vibration sensor installation hole; 6. Vibration sensor deep buried calculation point; 7. Grouting hole; 8. PVC pipe;

[0077] 200. Water curtain tunnel. DETAILED DESCRIPTION

[0078] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0079] like Figure 1 As shown, an embodiment of the present disclosure provides a stability monitoring method for an underground water-sealed cavern, and the stability monitoring method for an underground water-sealed cavern includes:

[0080] S100: Construct a nonlinear model of the underground water-sealed cavern based on rock mass quality and blasting conditions, and calculate the linear model of the underground water-sealed cavern;

[0081] S200: Based on the calculation results of the nonlinear model of the underground water-sealed cavern, a stability monitoring device is arranged in and around the cavern under construction;

[0082] S300: judging whether the area where the monitoring data is located is in a high-risk area according to the comparison result between the stable monitoring data and the calculation result;

[0083] S400: Arrange vibration monitoring devices around the construction cavern according to the calculation results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cavern;

[0084] S500: judging whether the area where the vibration monitoring data is located is in a high-risk area according to the calculation result of the vibration monitoring data;

[0085] S600: Determine that the rock cave is in an unstable state according to whether the area where the stable monitoring data is located is in a high-risk area or the area where the vibration monitoring data is located is in a high-risk area.

[0086] According to the stability monitoring method of underground water-sealed caverns disclosed in the present invention, firstly, a nonlinear model of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the nonlinear model of the underground water-sealed cavern is calculated to obtain the stress analysis of the rock cavern of the underground water-sealed cavern and its internal support structure; then, according to the stress analysis of the rock cavern of the underground water-sealed cavern and its internal support structure, a stability monitoring device is arranged in the rock cavern under construction and its surroundings to monitor the stress and / or displacement of the rock cavern and its surroundings during the construction process, and finally, according to the actual monitoring results and the simulation calculation results, it is determined whether the stable actual monitoring area is in a high-risk area. In addition, according to the actual excavation conditions of the rock cavern, a vibration monitoring device is arranged on the side of the construction rock cavern, and it is determined whether the vibration monitoring area is in a high-risk area according to the comparison results of the vibration monitoring data and the vibration threshold, and finally, according to whether the stable actual monitoring area is in a high-risk area or the vibration actual monitoring area is in a high-risk area, it is determined that the rock cave is in an unstable state. The stability monitoring method of the underground water-sealed cavern of this embodiment can monitor the stress or displacement of the cavern and its surrounding areas in real time during the construction process, timely obtain the stability state during the construction process, improve the safety during the construction process, avoid serious instability accidents during the construction process, and ensure the personal safety of construction workers. In addition, monitoring the structure of the underground water-sealed cavern through various monitoring equipment can also save a lot of manpower.

[0087] In some embodiments of the present disclosure, step S100: constructing a nonlinear model of the underground water-sealed cavern according to the rock mass quality and blasting conditions, and calculating a linear model of the underground water-sealed cavern, specifically includes:

[0088] S110: construct a nonlinear model of the rock cavern of the underground water-sealed cavern according to the rock mass quality and blasting conditions, and calculate the nonlinear model of the rock cavern;

[0089] S120: constructing a nonlinear model of the support structure of the rock cave according to the calculation result of the nonlinear model of the rock cave, and calculating the nonlinear model of the support structure.

[0090] Specifically, the nonlinear model mainly includes the nonlinear model part of the rock cave and the nonlinear model part of the support structure. Therefore, it is necessary to construct and calculate the nonlinear model of the rock cave and the nonlinear model of the support structure respectively. First, the nonlinear model of the rock cave of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the nonlinear model is calculated to obtain the calculation result of the nonlinear model of the rock cave, so as to provide a reference for the arrangement of the monitoring device of the rock cave; then, according to the calculation result of the nonlinear model of the rock cave, the nonlinear model of the support structure corresponding to the calculation result is constructed, and then the nonlinear model of the rock cave and the nonlinear model of the support structure are simulated and calculated to obtain the simulated stress condition of the support structure, so as to provide a reference for the arrangement of the monitoring device of the support structure.

[0091] In some embodiments of the present disclosure, step S110: constructing a nonlinear model of a rock cavern of an underground water-sealed cavern according to rock mass quality and blasting conditions, and calculating the nonlinear model of the rock cavern, specifically includes:

[0092] S111: constructing a geometric model of a rock cavern of an underground water-sealed cavern according to rock mass quality, blasting conditions and preset geometric dimensions of the rock cavern;

[0093] S112: Setting geological parameters of the geometric model according to the geology surrounding the cave;

[0094] S113: setting strength parameters of the geometric model according to the HB strength criterion;

[0095] S114: Estimate the geostress field of the geometric model based on the structural analysis map of China, the crustal movement velocity distribution map and the geostress distribution;

[0096] S115: setting a step excavation condition of the rock cave according to a preset cross-sectional size of the rock cave;

[0097] S116: Calculate the force data of different step excavation conditions in the rock cave.

[0098] Specifically, S111: constructing a geometric model of a rock cavern of an underground water-sealed cavern according to rock mass quality, blasting conditions, and preset geometric dimensions of the rock cavern;

[0099] The rock mass quality refers to the geological structure of the rock mass. According to the geological structure of the rock mass, the rock cave is excavated in the elastic body. The influence range of the stress concentration of the rock cave excavated in the elastic body is generally 1 to 2 times the edge of the rock cave. Therefore, based on the preset geometric dimensions of the rock cave, the edges on both sides of the rock cave are expanded outward by 1 to 2 times, and the bottom edge of the rock cave is expanded downward by 1 to 2 times, and the top edge of the rock cave is expanded upward by 1 to 2 times. The obtained model is a geometric model constructed according to the rock mass quality and the preset geometric dimensions. In order to ensure that the rock mass around the rock cave that is subject to stress concentration is within the range of the geometric model, the range of the rock cave geometric model is set to: along the edges on both sides of the rock cave, the length of the bottom edge is expanded outward by 2 times, and the length of the bottom edge of the rock cave is expanded downward by 2 times, and the length of the top edge of the rock cave is expanded upward by 2 times. The blasting condition of the rock mass in this embodiment refers to the fact that after the cave is excavated, a loosening circle is formed around the cave, and the range of the loosening circle is about 1 meter extended outward along the edge of the cave. Since the lengths of the bottom, side, and top of the preset geometric dimensions of the cave are all greater than 1 meter, that is, the loosening circle of the cave is located within a range of 2 times the extension of the edge of the cave. Therefore, the geometric model is used to calculate the stress conditions of the cave and its surroundings by extending 2 times outward along the edge of the cave. Since the burial depth of the cave is affected by the weight of the rock mass covering the cave, and in this embodiment, the burial depth of the cave is greater than twice the length of the height of the top edge of the cave extending upward, therefore, the calculation range of the geometric model in this embodiment is: the length of the bottom edge extending outward along both sides of the cave is twice the length, and the length of the height extending downward along the bottom edge of the cave is twice the length, and the length of the burial depth extending upward along the top edge of the cave is, such as Figure 2 shown.

[0100] S112: Setting geological parameters of the geometric model according to the geology surrounding the cave;

[0101] According to the actual geological conditions of the underground water-sealed cavern, complete the geological parameter setting of the geometric model. Figure 3As shown, the strata of the geometric model in this embodiment are divided into three layers, among which 0-10 meters are fully-strongly weathered surrounding rocks, 10-30 meters are moderately weathered surrounding rocks, and the surrounding rocks with a burial depth of less than 30 meters are slightly-unweathered surrounding rocks. If all the geometric models in this embodiment are below a burial depth of 30 meters, the geological parameters of the geometric model are all set to the geological parameters of slightly-unweathered surrounding rocks; if the first part of the geometric model is located below a burial depth of 30 meters, the geological parameters of the first part of the geometric model are set to the geological parameters of slightly-unweathered surrounding rocks, the second part of the geometric model is located within the range of 10-30 meters of surrounding rocks, the geological parameters of the second part of the geometric model are set to the geological parameters of moderately weathered surrounding rocks, and the third part of the geometric model is located within the range of 0-10 meters of surrounding rocks, the geological parameters of the third part of the geometric model are set to the geological parameters of fully-strongly weathered surrounding rocks. The geometric model may also be partially located within the range of 10 to 30 meters and partially located below 30 meters, or the geometric model may be partially located between 20 and 30 meters and partially located between 0 and 10 meters, depending on the geological parameters corresponding to the locations of the portions of the geometric model.

[0102] In addition, the length dimension of the underground water-sealed cavern is much larger than its cross-sectional dimension, that is, the longitudinal axis dimension of the underground water-sealed cavern is much larger than its cross-sectional dimension. Therefore, it can be approximately considered that strain only occurs in the cross-sectional surface of the cavern, and the strain perpendicular to the cross-sectional direction can be ignored, which basically conforms to the plane strain assumption. Therefore, the nonlinear model of the cavern in this embodiment is subjected to plane finite element analysis according to the plane strain condition.

[0103] S113: setting strength parameters of the geometric model according to the HB strength criterion;

[0104] The buried depth of the underground hydrogen storage in this embodiment is relatively large, and the HB strength criterion can avoid the confining pressure effect of parameter values. The HB strength criterion uses a curve to express the relationship between the peak strength of the rock mass and the confining pressure level. Its strength parameters mb, s, and a do not change with the confining pressure, that is, there is no confining pressure effect.

[0105] Specifically, the calculation methods of the three intensity parameters mb, s, and a in the HB criterion are as follows:

[0106] ;

[0107] Where mi is a rock quality parameter, which is determined by the rock type and is determined by indoor triaxial tests or statistical results. The recommended value given by Hoek can also be cited; s represents the degree of rock crushing and a is a material parameter.

[0108] The parameters s and a are determined as follows: When GSI>25, Hoek recommends:

[0109] ;

[0110] Among them, GSI>25 is equivalent to medium Class IV or above rock mass in the hydropower classification.

[0111] According to Hoek's suggestion, the mi of a certain underground water-sealed cavern project on which this disclosure is based is 17, and this recommended value will be used in this calculation.

[0112] In the calculation and analysis of the implementation case of this disclosure, the surrounding rock category is determined to be Class III based on the exploration data revealed by the drilling and the data of the indoor test. The HB strength criterion is adopted for the rock mass of the library. When the uniaxial compressive strength of the rock is 60MPa (natural conditions), mi=17, and GIS=50, the HB strength parameter indicators are as follows:

[0113] mb=2.851;

[0114] s=0.0039;

[0115] a=0.506.

[0116] S114: Estimate the geostress field of the geometric model based on the structural analysis map of China, the crustal movement velocity distribution map and the geostress distribution;

[0117] Specifically, based on the structural analysis map of China, the crustal movement velocity distribution map and the ground stress distribution, the estimated ground stress distribution with depth is as follows:

[0118] σH=0.028h+5.641;

[0119] σv=0.026h;

[0120] σh =0.026h+3.378;

[0121] The unit of stress is MPa and the unit of depth h is meter.

[0122] According to the engineering test results based on the implementation cases of this disclosure, the maximum horizontal principal stress σH is oriented at S55°E, and the minimum horizontal principal stress σh is oriented at N45°E. The three principal stresses are assumed to be equivalent to the above three characteristic stresses in the calculation and analysis. According to the basic principle of the plane layout of underground water-sealed caverns, the axis of the general cave is parallel to the direction of the maximum principal stress in situ. Therefore, in the plane finite element model, the maximum principal stress σ1 in the plane is σh, and the minimum principal stress σ3 is the vertical principal stress σv.

[0123] Considering that the top of the cave in the implementation case of the present disclosure is covered with soil about 120m thick, the ground stress water calculated according to the above formula is: σH=9.0MPa, σv=3.12,MPa; σh =6.5MPa.

[0124] S115: setting a step excavation condition of the rock cave according to a preset cross-sectional size of the rock cave;

[0125] Specifically, the preset cross-sectional dimensions of the rock cave in this embodiment are the preset cross-sectional dimensions of the rock cave set before the excavation of the underground water-sealed cavern, and the preset cross-sectional dimensions are the same as the actual cross-sectional dimensions of the rock cave after the excavation of the rock cave in this embodiment. Since the actual cross-sectional dimensions of the rock cave in this embodiment are 20 meters wide and 28 meters high, that is, the preset cross-sectional dimensions of the rock cave are 20 meters wide and 28 meters high, the cross-sectional dimensions are relatively large and difficult to achieve one-time excavation. Therefore, combined with the engineering experience of similar projects and engineering geological conditions, a step excavation method is adopted, specifically three-step excavation, in which the excavation height of the upper step is 8 meters, the excavation height of the middle step is 10 meters, and the excavation height of the lower step is 10 meters. Figure 4 As shown, in this embodiment, three simulated excavation conditions are set, the first condition is that the upper step excavation is completed, the second condition is that the middle step excavation is completed, and the third condition is that the lower step excavation is completed.

[0126] S116: Calculate the force data of different step excavation conditions in the rock cave.

[0127] First working condition step simulation:

[0128] After the upper step is excavated and without support, the changes of the principal stresses σ1 and σ3 are as follows: Figure 5 , Figure 6 As shown, the maximum principal stress of the arch is about 8.5MPa, and the minimum principal stress is 0.25MPa; stress concentration occurs at the arch waist (the intersection of the arch and the bottom plate), with the maximum principal stress of about 11.7MPa and the minimum principal stress of about 4.25MPa.

[0129] The displacement around the upper step of the cave without supporting structure is as follows Figure 7 , Figure 8 As shown, the top of the arch is displaced by about 3 mm, the waist of the arch is displaced by about 3.25 mm, and the middle of the bottom plate is displaced upward by about 4.75 mm.

[0130] like Fig. 9 As shown in the figure, although the overall displacement of the surrounding rock of the upper step is not large, by observing the yield unit of the surrounding rock, it is found that local yielding has occurred around the upper step of the cave due to the deformation of the surrounding rock, and the surrounding rock has entered a plastic state.

[0131] The second working condition step simulation:

[0132] After the middle step is excavated and without support, the changes of the principal stresses σ1 and σ3 are as follows: Fig.10 , Fig.11As shown, the maximum principal stress of the arch is about 9.1MPa, and the minimum principal stress is 0.3MPa; stress concentration occurs at the bottom of the side wall, with the maximum principal stress of about 13MPa and the minimum principal stress of about 3.55MPa.

[0133] The displacement around the unsupported cave is as follows Fig.12 , Fig.13 As shown, the top of the arch displaced about 2.7 mm, the middle of the side wall displaced about 8.1 mm, and the middle of the bottom plate displaced upward by about 4.5 mm.

[0134] like Fig.14 As shown, although the overall displacement of the surrounding rock is not large, by observing the yield unit of the surrounding rock, it is found that local yielding has occurred around the cave due to the deformation of the surrounding rock, and the surrounding rock has entered a plastic state.

[0135] The third working condition step simulation:

[0136] After the lower step is excavated and without support, the changes of the principal stresses σ1 and σ3 are as follows: Fig.15 , Fig.16 As shown, the maximum principal stress of the arch is about 9.1MPa, and the minimum principal stress is 0.5MPa; stress concentration occurs at the bottom of the side wall, with a maximum principal stress of about 14MPa and a minimum principal stress of about 4MPa; a low stress zone is formed in the middle of the side wall, with a maximum principal stress of only 0.7MPa and a minimum principal stress of 0, indicating that the surrounding rock has entered the plastic zone.

[0137] The displacement around the unsupported cave is as follows Fig.17 , Fig.18 As shown, the top of the arch displaced about 2.4 mm, the middle of the side wall displaced about 12 mm, and the middle of the bottom plate displaced upward by about 4.2 mm.

[0138] like Fig.19 As shown, although the overall displacement of the surrounding rock is not large, by observing the yield unit of the surrounding rock, it is found that local yielding has occurred around the cave due to the deformation of the surrounding rock, and the surrounding rock has entered a plastic state.

[0139] According to the displacement field analysis of the first working condition step simulation, the second working condition step simulation and the third working condition step simulation after the cave excavation, under the action of the far field stress field, the maximum displacement of the arch after the full section excavation is about 3mm, the maximum displacement of the side wall is about 12mm, and the bottom plate uplift deformation is about 4.2mm. Although the overall displacement of the surrounding rock is not large, the surrounding rock stress has reached the material yield stress, indicating that the surrounding rock has yielded and entered a plastic state.

[0140] In order to prevent the surrounding rock of the cave from entering the yield state prematurely, the cave and its surrounding rock conditions must be monitored and measured in real time during the cave excavation process to detect dangerous information as soon as possible and issue early warnings.

[0141] In some embodiments of the present disclosure, step S120: constructing a nonlinear model of the support structure of the rock cave according to the calculation result of the nonlinear model of the rock cave, and calculating the nonlinear model of the support structure, specifically includes:

[0142] S121: constructing a support structure model corresponding to the stress condition of the nonlinear model of the rock cave according to the calculation result of the nonlinear model of the rock cave, and setting parameters of the support structure model;

[0143] S122: Calculate the nonlinear model of the rock cave and the support structure model to obtain simulated force data of the support structure.

[0144] Specifically, S121: constructing a support structure model corresponding to the stress condition of the nonlinear model of the rock cave according to the calculation result of the nonlinear model of the rock cave, and setting parameters of the support structure model;

[0145] The nonlinear model of the cave is calculated without any supporting structure. According to the calculation results of the nonlinear model of the cave, the stress of the surrounding rock of the cave and the possible displacement of the rock wall in each working condition of the cave can be obtained. According to the stress of the surrounding rock of the cave and the possible displacement of the rock wall, a supporting structure is constructed on the inner wall of the cave to support the inner wall of the cave and improve the safety and stability of the cave. If the stress of some positions of the surrounding rock of the cave is large, then the corresponding parameters are set at the corresponding position of the supporting structure so that the strength of the supporting structure at that position can be greater; if the stress of some positions of the surrounding rock of the cave is small, then the corresponding parameters are set at the corresponding position of the supporting structure so that the strength of the supporting structure at that position can be smaller.

[0146] S122: Calculate the nonlinear model of the rock cave and the supporting structure model to obtain simulated force data of the supporting structure;

[0147] The nonlinear model of the rock cave and the nonlinear model of the supporting structure are calculated to obtain the force analysis of the nonlinear model of the supporting structure. Alternatively, the force applied by the nonlinear model of the rock cave to the nonlinear model of the supporting structure is set as an external force parameter in the nonlinear model of the supporting structure. The force analysis of the nonlinear model of the supporting structure can also be obtained by only calculating the nonlinear model of the supporting structure.

[0148] Once the calculation results of the nonlinear model of the rock cave and the nonlinear model of the supporting structure are obtained, the excavation process of the underground water-sealed cavern can be monitored in real time based on the data.

[0149] In some embodiments of the present disclosure, step S200: arranging a stability monitoring device in and around the constructed cavern according to the calculation result of the nonlinear model of the underground water-sealed cavern specifically includes:

[0150] S210: obtaining ground uplift simulation data, peripheral displacement simulation data, arch subsidence simulation data, and surrounding rock internal displacement simulation data according to the calculation results of the rock cave nonlinear model;

[0151] S220: A stability monitoring device is set up in the excavated rock cave and its surroundings based on the ground uplift simulation data, the peripheral displacement simulation data, the arch subsidence simulation data and the surrounding rock internal displacement simulation data.

[0152] like Figures 5 to 19 As shown in the figure, the calculation results of the nonlinear model of the cave can obtain the simulation data of ground uplift, the simulation data of peripheral displacement, the simulation data of arch subsidence and the simulation data of internal displacement of the surrounding rock. According to the simulation data of ground uplift, the simulation data of peripheral displacement, the simulation data of arch subsidence and the simulation data of internal displacement of the surrounding rock, corresponding stable monitoring devices are set in the excavated cave to monitor the actual data of ground uplift, the actual data of peripheral position, the actual data of arch subsidence and the actual data of internal displacement of the surrounding rock, so as to find abnormal monitoring data in time.

[0153] The monitoring data mainly include condition observation, peripheral displacement, vault settlement, etc. The monitoring section spacing of peripheral displacement and vault settlement is determined according to the surrounding rock conditions and on-site monitoring conditions. For surrounding rock with Q≤1, it should be 5~10m, for surrounding rock with 1<Q≤4, it should be 10~30m, and for surrounding rock with 4<Q, it should be 30~50m.

[0154] Specifically, the stability monitoring data of the cave are shown in Table 1.

[0155] Table 1. Rock cave deformation monitoring items

[0156]

[0157] According to the excavation data of the water curtain tunnel on the upper layer of the underground water-sealed cavern, a multi-point displacement meter layout plan for the cavern is set up, including measurement point layout, sensor burial and other requirements. By installing multi-point displacement sensors in the water curtain tunnel and the cavern, the internal displacement of the rock mass around the cavern can be monitored in real time, and potential safety hazards in the underground cavern can be discovered in time.

[0158] Multi-point displacement meters are used to monitor the displacement changes of the surrounding rock and supporting structures of the tunnel, and can provide displacement data during the construction and operation of the tunnel. Fig.23As shown, the multi-point displacement meter in the implementation case of the present invention is drilled and installed from the water curtain tunnel and the rock cave respectively. The M5 multi-point displacement meter is used to indicate that 5 displacement sensors are installed at each measuring point to measure the internal displacement of 5 points at different depths of the surrounding rock. Among them, the multi-point displacement holes installed in advance from the water curtain tunnel are deep holes, with the deepest measuring point of 20m. The buried distances of the displacement meter in each measuring point hole from the rock cave wall are 0.5m, 5m, 10m, 15m, and 20m from near to far respectively; the multi-point displacement holes drilled and buried from the inside of the rock cave are shallow holes, with the deepest measuring point of 7m. The buried distances of the displacement meter in each measuring point hole from the rock cave wall are 0.5m, 1.5m, 3m, 5m, and 7m from near to far respectively. The buried depth of the displacement meter can also be fine-tuned according to the actual measurement results.

[0159] In some embodiments of the present disclosure, S300: judging whether the area where the monitoring data is located is in a high-risk area according to the comparison result between the stable monitoring data and the calculation result, specifically includes:

[0160] S310: when the actual ground uplift data exceeds the simulated ground uplift data, the accumulated deformation absolute value is greater than 80 mm, and the change rate is greater than 5 mm / d, the area where the actual ground uplift data is located is determined to be a high-risk area;

[0161] S320: when the actual peripheral displacement data exceeds the simulated peripheral displacement data, the accumulated deformation absolute value is greater than 50 mm, and the change rate is greater than 4 mm / d, the area where the actual peripheral displacement data is located is determined to be a high-risk area;

[0162] S330: when the actual arch subsidence data exceeds the simulated arch subsidence data, the accumulated deformation absolute value is greater than 40 mm, and the change rate is greater than 3 mm / d, it is determined that the area where the actual arch subsidence data is located is a high-risk area;

[0163] S340: When the actual data of the surrounding rock internal displacement exceeds the simulated data of the surrounding rock internal displacement, the absolute value of the accumulated deformation is greater than 50 mm, and the rate of change is greater than 1 mm / d, the area where the actual data of the surrounding rock internal displacement is located is determined to be a high-risk area.

[0164] Specifically, S320: according to the actual peripheral displacement data exceeding the simulated peripheral displacement data, determining that the area where the actual peripheral displacement data is located is a high-risk area, includes:

[0165] The area where the actual data of the surrounding displacement is located is determined to be a low-risk area based on the fact that the actual data of the surrounding displacement is smaller than the simulated data of the surrounding displacement, or the final displacement calculated by regression analysis is smaller than the simulated data of the surrounding displacement;

[0166] According to the fact that the actual data of the peripheral displacement is greater than the simulated data of the peripheral displacement and less than the preset data of the peripheral displacement, and the deformation rate of the peripheral displacement is less than 0.2 mm / d, the area where the actual data of the peripheral displacement is located is determined to be a low-risk area; or the final displacement calculated by regression analysis is greater than the simulated data of the peripheral displacement and less than the preset data of the peripheral displacement, and the deformation rate of the peripheral displacement is less than 0.2 mm / d, the area where the actual data of the peripheral displacement is located is determined to be a low-risk area;

[0167] According to the fact that the actual data of the peripheral displacement is greater than the simulated data of the peripheral displacement and is within the preset data range of the peripheral displacement, and the deformation rate range of the peripheral displacement is 1mm / d~0.2mm / d, the area where the actual data of the peripheral displacement is located is determined to be a medium-risk area;

[0168] According to the fact that the actual data of the peripheral displacement is greater than the simulated data of the peripheral displacement and greater than the preset data range of the peripheral displacement, and the deformation rate of the peripheral displacement is greater than 1mm / d, the area where the actual data of the peripheral displacement is located is determined to be a high-risk area.

[0169] Among them, the relative value of peripheral displacement refers to the ratio of the cumulative value of the measured displacement between two measuring points to the distance between the two measuring points.

[0170] Specifically, the preset data range of peripheral displacement is shown in Table 2.

[0171] Table 2 Relative values ​​of allowable displacement around the cave (%)

[0172]

[0173] S310: When the actual data of ground uplift exceeds the simulated data of ground uplift and exceeds the preset data range of ground uplift, the absolute value of the accumulated deformation is greater than 80 mm, and the rate of change is greater than 5 mm / d, the area where the actual data of ground uplift is located is determined to be a high-risk area; when the actual data of ground uplift is greater than the simulated data of ground uplift and is within the preset data range of ground uplift (50-80 mm), and the deformation rate range of ground uplift is 3 mm / d~5 mm / d, the area where the actual data of ground uplift is located is determined to be a medium-risk area; when the actual data of ground uplift is greater than the simulated data of ground uplift and is within the preset data range of ground uplift, and the deformation rate range of ground uplift is 1 mm / d~3 mm / d, the area where the actual data of ground uplift is located is determined to be a medium-risk area; when the actual data of ground uplift is less than the simulated data of ground uplift, or the final displacement calculated by regression analysis is less than the simulated data of ground uplift, and the deformation rate range of ground uplift is less than 1 mm / d, the area where the actual data of ground uplift is located is determined to be a low-risk area;

[0174] S330: When the actual data of arch subsidence exceeds the simulated data of arch subsidence and exceeds the preset data range of arch subsidence, the accumulated deformation absolute value is greater than 40mm, and the change rate is greater than 3mm / d, the area where the actual data of arch subsidence is located is determined to be a high-risk area; when the actual data of arch subsidence is greater than the simulated data of arch subsidence and is within the preset data range of arch subsidence (20-40mm), and the deformation rate range of arch subsidence is 1mm / d~3mm / d, the area where the actual data of arch subsidence is located is determined to be a stroke area Risk area; if the actual data of arch subsidence is greater than the simulated data of arch subsidence and within the preset data range of arch subsidence, and the deformation rate range of arch subsidence is 0.2mm / d~1mm / d, the area where the actual data of arch subsidence is located is determined to be a medium-risk area; if the actual data of arch subsidence is less than the simulated data of arch subsidence, or the final displacement calculated by regression analysis is less than the simulated data of arch subsidence, and the deformation rate range of arch subsidence is less than 0.2mm / d, the area where the actual data of arch subsidence is located is determined to be a low-risk area;

[0175] S340: When the actual data of the internal displacement of the surrounding rock exceeds the simulated data of the internal displacement of the surrounding rock and exceeds the preset data range of the internal displacement of the surrounding rock, the absolute value of the accumulated deformation is greater than 50 mm, and the change rate is greater than 1 mm / d, the area where the actual data of the internal displacement of the surrounding rock is located is determined to be a high-risk area. According to the fact that the actual data of the surrounding rock internal displacement is greater than the simulated data of the surrounding rock internal displacement and is within the preset data range of the surrounding rock internal displacement (20-50mm), and the deformation rate of the surrounding rock internal displacement is in the range of 0.2mm / d~1mm / d, the area where the actual data of the surrounding rock internal displacement is located is determined to be a medium-risk area; according to the fact that the actual data of the surrounding rock internal displacement is greater than the simulated data of the surrounding rock internal displacement and is within the preset data range of the surrounding rock internal displacement, and the deformation rate of the surrounding rock internal displacement is less than 0.2mm / d, the area where the actual data of the surrounding rock internal displacement is located is determined to be a medium-risk area; according to the fact that the actual data of the surrounding rock internal displacement is less than the simulated data of the surrounding rock internal displacement, or the final displacement calculated by regression analysis is less than the simulated data of the surrounding rock internal displacement, and the deformation rate of the surrounding rock internal displacement is less than 0.2mm / d, the area where the actual data of the surrounding rock internal displacement is located is determined to be a low-risk area;

[0176] In some embodiments of the present disclosure, after step S122: calculating the nonlinear model of the rock cave and the support structure model to obtain the simulated force data of the support structure, step S200: arranging a stability monitoring device in and around the rock cave under construction according to the calculation results of the nonlinear model of the underground water-sealed cavern, specifically includes:

[0177] S230: According to the calculation of the nonlinear model of the support structure, the anchor axial force simulation data, the steel frame internal force and external force simulation data, the surrounding rock pressure simulation data and the support structure internal stress simulation data are obtained;

[0178] S240: Set up data monitoring devices on the support structure and its surroundings according to the simulated data of bolt axial force, internal and external forces of steel frames, surrounding rock pressure, and internal stress of the support structure;

[0179] S250: Determine the area where the actual monitoring data is located as a high-risk area according to the simulated data where the actual monitoring data exceeds the preset multiple.

[0180] As Fig. 20 、 Fig.21 shown, from the calculation results of the non-linear model of the support structure, the simulated data of bolt axial force, internal and external forces of steel frames, surrounding rock pressure, and internal stress of the support structure can be obtained. According to the simulated data of bolt axial force, internal and external forces of steel frames, surrounding rock pressure, and internal stress of the support structure, corresponding stability monitoring devices are respectively set on the support structure of the excavated rock cave and its vicinity to monitor the actual data of bolt axial force, internal and external forces of steel frames, surrounding rock pressure, and internal stress of the support structure, so as to detect abnormal monitoring data in time.

[0181] After calculation, the maximum axial force of the bolts in the section where Q≤0.1 is 24.4kN, the maximum axial force of the bolts in the section where 0.1<Q≤1 is 13.7kN, and the maximum axial force of the bolts in the section where Q>4 is 8.57kN for the bolt axial force in the implementation case of the present disclosure.

[0182] Specifically, the support structure generally includes a steel frame and concrete. By respectively monitoring parameters such as the stress of the steel frame and the stress of the concrete layer, the actual monitoring data of the support structure is obtained, and then the stability is judged. The stress monitoring items of the rock cave mainly include the internal force of the steel frame, the surrounding rock pressure, the bolt axial force, the internal stress of the support, etc. The layout schematic is as Fig. 22 shown. Different rock mass qualities are taken as 1 representative section, and different monitoring schemes are set. In the section with poor rock mass quality or significant geological changes, the measurement sections should be appropriately densified, and the measurement interval time should be taken as a high value. Specifically, the stability monitoring data of the support structure is shown in Table 3.

[0183] Table 3 Stress Monitoring Items of the Support Structure

[0184]

[0185] The monitoring range value of the bolt axial force is 0 - 1.5 times the design value. Usually, 22 and 25 bolt supports are used, and the design values of the pull-out resistance are 120kN and 150kN respectively. Then the monitoring range of the axial force of the 22 bolts is 0 - 180kN MPa, the monitoring range of the axial force of the 25 bolts is 0 - 225kN, and the monitoring accuracy is 0.1kN.

[0186] The monitoring range of steel frame internal force is 0-1.5 times the design value. Q235 I-beam is usually used, so the monitoring range of steel frame internal force is 0-353 MPa, and the accuracy is not less than 0.1MPa.

[0187] The monitoring range of surrounding rock pressure is 0-2 times of the design value. The design value is obtained through numerical simulation and is usually not greater than 30MPa. The monitoring range of surrounding rock pressure can be set to 0-60MPa with an accuracy of not less than 0.01MPa.

[0188] The monitoring range of stress inside the support is 0-2 times the design value. Usually, C25 concrete spraying support is used in the tunnel with a compressive strength of 5MPa. The monitoring range of stress inside the surrounding support is 0-10MPa, with an accuracy of not less than 0.01MPa.

[0189] In some embodiments of the present disclosure, step S300: determining that the area where the actual monitoring data is located is a high-risk area according to the actual monitoring data exceeding the simulation data, specifically includes:

[0190] S350: According to the anchor rod axial force simulation data where the anchor rod axial force actual data exceeds the preset multiple, determining that the area where the anchor rod axial force actual data is located is a high-risk area;

[0191] S360: According to the steel frame internal force and external force simulation data where the actual data of the steel frame internal force and external force exceeds the preset multiple, determining that the area where the actual data of the steel frame internal force and external force is located is a high-risk area;

[0192] S370: According to the surrounding rock pressure simulation data where the actual surrounding rock pressure data exceeds the preset multiple, determining that the area where the actual surrounding rock pressure data is located is a high-risk area;

[0193] S380: According to the fact that the actual data of the internal stress of the supporting structure exceeds the simulated data of the internal stress of the supporting structure by a preset multiple, it is determined that the area where the actual data of the internal stress of the supporting structure is located is a high-risk area.

[0194] Specifically, according to the anchor rod axial force actual data exceeding 0.9 times the anchor rod axial force simulation data, the area where the anchor rod axial force actual data is located is determined to be a high-risk area;

[0195] According to the simulated data of the internal and external forces of the steel frame, which is 0.9 times the actual data of the internal and external forces of the steel frame, the area where the actual data of the internal and external forces of the steel frame are located is determined to be a high-risk area;

[0196] According to the surrounding rock pressure simulation data where the actual data of surrounding rock pressure exceeds 0.9 times, the area where the actual data of surrounding rock pressure is located is determined to be a high-risk area;

[0197] According to the fact that the actual data of the internal stress of the supporting structure exceeds the simulated data of the internal stress of the supporting structure by 0.8 times, the area where the actual data of the internal stress of the supporting structure is located is determined to be a high-risk area.

[0198] The stability of anchor, steel frame, surrounding rock and support internal stress is not only affected by the simulation data, but also by their own bearing capacity. Specifically, the different levels of anchor pressure, steel frame internal stress, surrounding rock pressure and support internal stress are divided into different levels, as shown in Table 4. The simulation data of each parameter in the table is represented by f, and the design value of each construction bearing capacity is represented by fz.

[0199] Table 4 Risk level classification of anchor pressure, steel frame internal force, surrounding rock pressure and support internal stress

[0200]

[0201] In some embodiments of the present disclosure, S500: judging whether the area where the vibration monitoring data is located is in a high-risk area according to the calculation result of the vibration monitoring data specifically includes:

[0202] S510: Arrange a vibration monitoring device according to the finite element analysis results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cavern;

[0203] S520: Determine whether the area where the vibration monitoring data is located is in a high-risk area based on the event rate, magnitude, cumulative apparent volume-energy index, energy-seismic moment and η value of the monitoring data.

[0204] Specifically, S510: Arrange a vibration monitoring device based on the finite element analysis results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cave; based on the finite element analysis results of the nonlinear simulation of the underground water-sealed cave, the stress conditions of the surrounding rock of the cave can be obtained, and arrange a vibration monitoring device based on the stress distribution of the surrounding rock and the cracks and fragmentation of the rock mass obtained by the actual excavation of the cave.

[0205] It should be noted that vibration monitoring should be carried out throughout the construction and operation periods to achieve vibration monitoring of the entire life cycle of the underground water-sealed cavern.

[0206] Specific layout steps of the vibration monitoring device:

[0207] 1) Measurement point layout

[0208] In different rock masses, caves with different elevations, and surrounding rock positions, a certain number of vibration sensors are arranged to form a spatial array. The depth standard should be within a space of 10 to 70 meters from the cave bottom, effectively covering the entire cave. Among them, the shortest distance between the vibration sensor and the edge of the cave is 20 meters.

[0209] 2) Sensor embedding

[0210] In the embodiment of the present disclosure, a water curtain tunnel is provided above the rock cave, and the vibration sensor installation hole is located on the bottom plate of the water curtain tunnel, 1m away from the side wall of the water curtain tunnel. After the vibration installation hole is drilled, the hole should be cleaned immediately and the sensor should be installed to avoid the impact of the sensor installation due to factors such as upper gravel and mud and sand collapse. If the vibration sensor installation lag time is long, it is necessary to take measures to protect the hole mouth and prevent the hole from collapsing before the vibration sensor is installed. When the sensor is installed, the hole depth should be re-measured to ensure that the sensor is installed in place.

[0211] The inner diameter of the vibration sensor installation hole should not be less than 100mm, the verticality deviation of the installation hole should not be greater than 5cm, and the depth error should not be greater than 5cm. After drilling, the cavity needs to be flushed to clean up debris such as gravel and mud.

[0212] There are two types of vibration sensors: uniaxial and triaxial. Uniaxial sensors are arranged in areas with better rock mass quality (Q>1), and triaxial sensors are arranged in areas with poorer rock mass quality (Q≤1). Fig.24 As shown, the vibration sensor is tied to the PVC sleeve. The diameter of the PVC sleeve is not less than 30mm. A grouting hole is reserved at the bottom of the sleeve. After installation, the vibration sensor installation hole is sealed by grouting the PVC sleeve. The package diameter of the single-axis sensor is 6mm, and the package diameter of the three-axis sensor is 9.5mm; the diameter of the internal signal line is not less than 1.5mm. Each pair of cable cores has a separate shielding layer, and the entire cable has a shielding layer and PVC insulation.

[0213] 3) Test accuracy

[0214] The vibration monitoring system should measure earthquake magnitude with an accuracy better than -2 moment magnitude, which is equivalent to a vibration event caused by a rockfall with a diameter of 1 cubic meter.

[0215] 4) Data transmission

[0216] The vibration data collector directly collects vibration sensor data. It should at least have the functions of data collection and processing, real-time and historical data management, etc. The system is powered by an independent uninterruptible power supply, and the uninterruptible power supply module must be included in the data acquisition junction box.

[0217] 5) Waveform recognition, analysis and early warning

[0218] Vibration monitoring can detect the expansion and fracture of tiny cracks in rocks, and plays an important role in predicting and preventing rock burst accidents and monitoring the stability of surrounding rocks. By deploying a vibration sensor network, the vibration activity in the tunnel surrounding rock can be captured, thereby analyzing the stability and safety of the rock mass.

[0219] In the sensor array arranged around the seismic source monitoring area, the relative distance between sensors is known. The difference in arrival time of the elastic wave picked up by each sensor in the array is called the time difference. The time difference provides the distance information between the source event and the sensor array. By selecting a suitable seismic wave velocity model, the location of the source event can be determined through calculation.

[0220] However, due to the large number of various signals during the construction and operation of underground caverns, it is necessary to identify and analyze the waveforms of various times, mainly including vibration signals, blasting signals, mechanical drilling signals, current interference signals and unknown signals, as described below:

[0221] (a) Vibration signal: The waveform component is single, the amplitude is tens to hundreds of millivolts, the frequency is mainly distributed around 300 Hz, and the tail wave is relatively developed during the attenuation process.

[0222] (b) Explosion signal: multiple waveforms in one window, with neat waveforms and long duration, high frequency and high amplitude.

[0223] (c) Mechanical drilling signal: multiple waveforms in one observation, regular repeated fluctuations, long duration and high frequency.

[0224] (d) Current interference signal and unknown signal: The waveform fluctuates irregularly and the amplitude is low.

[0225] When a vibration event occurs, the elastic waves it generates propagate outward through the surrounding medium and are received by sensors installed in the hole close to the rock wall. The sensors convert the vibration signals into electrical signals and send them to the signal acquisition instrument via cables. The signal acquisition instrument converts the electrical signals into digital signals and transmits them to the analysis computer.

[0226] like Fig.25 and Fig.26 As shown, Fig.25 is the microseismic event distribution map, Fig.26 The waveform processing software is used to analyze and process the vibration events, and the three-dimensional visualization software is used for entity demonstration. The time, spatial position and intensity information of the rock mass vibration event can be obtained, that is, the three elements of "time, space and strength" of rock microfracture. In addition, the waveform processing software can also be used to analyze and process the vibration events. The normal distribution parameters such as the cumulative apparent volume-energy index, energy-moment magnitude, and η value can be obtained. The maximum value of the cumulative apparent volume-energy index is taken as its value, the maximum value of the energy-moment magnitude is taken as its value, and the maximum value of the η value is taken as its value. The waveform processing software can also be used to analyze and process the vibration events to obtain parameters such as event rate and magnitude. When the parameters such as event rate, magnitude, cumulative apparent volume-energy index, energy-moment magnitude, and η value are not integers, each parameter is rounded to an integer value to be calculated through Table 5.

[0227] S520: Determine whether the area where the vibration monitoring data is located is in a high-risk area based on the event rate, magnitude, cumulative apparent volume-energy index, energy-seismic moment and η value of the monitoring data.

[0228] Vibration monitoring should be carried out throughout the construction period and the operation period to achieve vibration monitoring of the entire life cycle of the underground water-sealed cavern. The early warning plan is to divide the risk level and make corresponding early warnings by using weighted scoring and comprehensive score evaluation. The comprehensive score below 1 is a risk-free zone; between 1-2 points is a low-risk zone; between 2-3 points is a medium-risk zone; and greater than 3 points is a high-risk zone. Each indicator is divided into 1, 2, 3, and 4 different levels from weak to strong, and is assigned a value. As shown in Table 5, after the implementation case of the present disclosure assigns a value to each indicator separately according to the actual vibration event, the cumulative score after multiplying by the corresponding weight coefficient is 1.95 points, which is in the low-risk zone.

[0229] Specifically, the evaluation criteria for vibration monitoring data are shown in Table 5. Among them, the indicators are divided into 4 levels according to their energy strength, corresponding to 1-4 points. 1 point is the lowest energy level, and 4 points is the highest energy level.

[0230] Table 5 Vibration comprehensive index integration method

[0231]

[0232] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present disclosure, but the present disclosure is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and substance of the present disclosure, and these modifications and improvements are also considered to be within the scope of protection of the present disclosure.

Claims

1. A method for monitoring the stability of an underground water-sealed cavern, characterized in that: The stability monitoring method of the underground water-sealed cavern comprises: According to the rock mass quality and blasting conditions, a nonlinear model of underground water-sealed caverns is constructed, and a linear model of underground water-sealed caverns is calculated; According to the calculation results of the nonlinear model of underground water-sealed caverns, stability monitoring devices are arranged in and around the caverns under construction; According to the comparison between stable monitoring data and calculation results, it is judged whether the area where the monitoring data is located is in a high-risk area; According to the calculation results of the nonlinear model of the underground water-sealed cavern and the actual excavation situation of the cavern, a vibration monitoring device is arranged around the construction cavern. Determine whether the area where the vibration monitoring data is located is in a high-risk area based on the calculation results of the vibration monitoring data; The rock cave is judged to be in an unstable state according to the area where the stable monitoring data is located being in a high-risk area or the area where the vibration monitoring data is located being in a high-risk area; The nonlinear model of the underground water-sealed cavern is constructed according to the rock mass quality and blasting conditions, and the linear model of the underground water-sealed cavern is calculated, which specifically includes: Construct a nonlinear model of the underground water-sealed cavern based on rock mass quality and blasting conditions, and calculate the nonlinear model of the cavern; According to the calculation results of the nonlinear model of the rock cave, the nonlinear model of the rock cave support structure is constructed, and the nonlinear model of the support structure is calculated; Nonlinear model of caves, including: Constructing the geometric model of the underground water-sealed cavern according to the rock mass quality, blasting conditions and the preset geometric dimensions of the cavern; Set the geological parameters of the geometric model according to the geology surrounding the cave; Set the strength parameters of the geometric model according to the HB strength criterion; Estimate the geostress field of the geometric model based on the structural analysis map of China, the distribution map of crustal movement velocity and the distribution of geostress; According to the preset cross-sectional dimensions of the rock cave, the step excavation conditions of the rock cave are set; Calculate the force data of different step excavation conditions in the rock cave; The method of constructing a nonlinear model of the support structure of the rock cave according to the calculation result of the nonlinear model of the rock cave and calculating the nonlinear model of the support structure specifically includes: According to the calculation results of the nonlinear model of the rock cave, a support structure model corresponding to the stress condition of the nonlinear model of the rock cave is constructed, and the parameters of the support structure model are set; The nonlinear model of the rock cave and the supporting structure model are calculated to obtain the simulated force data of the supporting structure.

2. The stability monitoring method of underground water-sealed cavern according to claim 1 is characterized in that: According to the calculation results of the nonlinear model of the underground water-sealed cavern, a stability monitoring device is arranged in and around the cavern under construction, specifically including: According to the calculation results of the nonlinear model of the rock cave, the simulation data of ground uplift, the simulation data of peripheral displacement, the simulation data of arch subsidence and the simulation data are obtained; Based on the ground uplift simulation data, peripheral displacement simulation data, arch subsidence simulation data and surrounding rock internal displacement simulation data, stability monitoring devices are set up in the excavated cave and its surroundings.

3. The stability monitoring method of underground water-sealed cavern according to claim 2 is characterized in that: The step of judging whether the area where the monitoring data is located is in a high-risk area based on the comparison result between the stable monitoring data and the calculation result specifically includes: According to the fact that the stability monitoring data is greater than the simulation data of the calculation result and the deformation parameter is greater than the preset value, it is determined that the area where the stability monitoring data is located is in a high-risk area.

4. The stability monitoring method of underground water-sealed cavern according to claim 3 is characterized in that: The step of determining that the area where the stable monitoring data is located is in a high-risk area according to the stable monitoring data being greater than the calculated result simulation data and the deformation parameter being greater than a preset value specifically includes: When the actual ground uplift data exceeds the simulated ground uplift data, the accumulated deformation absolute value is greater than 80 mm, and the rate of change is greater than 5 mm / d, the area where the actual ground uplift data is located is determined to be a high-risk area; When the actual data of peripheral displacement exceeds the simulated data of peripheral displacement, the absolute value of the accumulated deformation is greater than 50 mm, and the rate of change is greater than 4 mm / d, the area where the actual data of peripheral displacement is located is determined to be a high-risk area; When the actual data of arch subsidence exceeds the simulated data of arch subsidence, the absolute value of the accumulated deformation is greater than 40 mm, and the rate of change is greater than 3 mm / d, the area where the actual data of arch subsidence is located is determined to be a high-risk area; When the actual data of internal displacement of the surrounding rock exceeds the simulated data of internal displacement of the surrounding rock, the absolute value of the accumulated deformation is greater than 50 mm, and the rate of change is greater than 1 mm / d, the area where the actual data of internal displacement of the surrounding rock is located is judged to be a high-risk area.

5. The stability monitoring method of underground water-sealed cavern according to claim 1 is characterized in that: The calculation of the rock cave nonlinear model and the support structure model to obtain the simulated force data of the support structure includes: According to the calculation of the nonlinear model of the support structure, the simulation data of the anchor axial force, the simulation data of the internal and external forces of the steel frame, the simulation data of the surrounding rock pressure and the simulation data of the internal stress of the support structure are obtained; According to the simulation data of anchor axial force, steel frame internal and external force, surrounding rock pressure and support structure internal stress, data monitoring devices are set up in and around the support structure; Based on the fact that the actual monitoring data exceeds the simulation data, the area where the actual monitoring data is located is judged to be a high-risk area.

6. The stability monitoring method of underground water-sealed cavern according to claim 5 is characterized in that: The step of judging whether the area where the monitoring data is located is in a high-risk area based on the comparison result between the stable monitoring data and the calculation result specifically includes: According to the anchor rod axial force simulation data where the actual anchor rod axial force data exceeds the preset multiple, the area where the actual anchor rod axial force data is located is determined to be a high-risk area; According to the simulated data of the internal and external forces of the steel frame where the actual data of the internal and external forces of the steel frame exceeds the preset multiple, the area where the actual data of the internal and external forces of the steel frame are located is determined to be a high-risk area; According to the surrounding rock pressure simulation data where the actual surrounding rock pressure data exceeds the preset multiple, the area where the actual surrounding rock pressure data is located is determined to be a high-risk area; According to the support structure internal stress simulation data where the actual data of the support structure internal stress exceeds the preset multiple, the area where the actual data of the support structure internal stress is located is determined to be a high-risk area.

7. The stability monitoring method of underground water-sealed cavern according to claim 1 is characterized in that: The step of judging whether the area where the vibration monitoring data is located is in a high-risk area according to the calculation result of the vibration monitoring data specifically includes: Arrange vibration monitoring devices based on the finite element analysis results of the nonlinear model of the underground water-sealed cavern and the actual excavation conditions of the cavern; Based on the event rate, magnitude, cumulative apparent volume-energy index, energy-seismic moment and η value of the monitoring data of the vibration monitoring device, it is determined whether the cave is in a high-risk area.

Citation Information

Cited By

  • Underground water-sealed cave depot up-down combined microseism monitoring system and method

    CN119781054A