A method for adaptive scheduling of water and solar power under multi-level section constraints and external transmission requirements
By adopting water-optical adaptive scheduling method in hydropower and new energy systems, combining extreme value theory and dual theory, optimizing scheduling results, the problem of multi-level section restrictions and unstable power supply under the demand for transmission is solved, and the multi-functionality of power supply is achieved Stable scheduling and power supply of renewable energy systems.
Patent Information
- Application Number
- CN202411126180.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-16
AI Technical Summary
Under the multi-stage cross-sectional restrictions and transmission demand, it is difficult for the existing technology to effectively dispatch hydropower and new energy systems, resulting in the extrusion of transmission sections and unstable power supply, especially after the scale of new energy and the expansion of complementary clusters of cascade hydropower stations. Achieving adaptive scheduling of multiple renewable energy and stable power supply has become a challenge.
A water-optical adaptive scheduling method under multi-stage section restriction and transmission demand is adopted. By setting the objective function, hydraulic-power coupling constraint, cascaded hydropower active regulation constraint and inequality constraint equivalent transformation, combined with extreme value theory and dual theory , transform the original multi-random decision model into a deterministic and efficient solution mathematical planning model, and optimize the scheduling results to cope with new energy uncertainty and transmission section limitations.
This method takes into account local and exported power demands, coordinates the blockage problem of multi-stage transmission sections, ensures the stability of power supply and the effective absorption of new energy, and fully explores the flexibility of cascade hydropower and complementarity of multi-renewable energy. , providing reliable scheduling decision-making solutions.
Smart Images

Figure CN118659461B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of complementary operation and dispatching of renewable energy, and in particular to complementary dispatching of renewable energy under multi-level section restrictions and external transmission requirements after large-scale new energy is incorporated into a hydropower base, and specifically to a water-solar adaptive dispatching method under multi-level section restrictions and external transmission requirements. Background Art
[0002] In the field of renewable energy, hydropower is the only dispatchable energy that can provide large-scale, multi-temporal and spatial flexibility. China has the richest hydropower resources in the world and has built a number of world-renowned cascade hydropower bases, which provide huge flexibility supply potential for the grid connection of new energy represented by photovoltaic power generation (abbreviated as "PV") and wind power. my country's hydropower is concentrated in the southwest region with large terrain differences and turbulent water flows. It not only provides the local power regulation and power support for the dual supply guarantee, but also transmits power to the high-load demand areas in the east through the interwoven transmission channel architecture. With the large-scale construction of highly uncertain new energy and the expansion of cascade hydropower stations and new energy complementary clusters in the basin, the problem of multiple renewable energy sources squeezing out channels and "bundling" transmission under a more complex power architecture has become increasingly serious. Exploring the complementary and mutually beneficial operation mode of multiple renewable energy sources with the flexible regulation of hydropower as the link has become an important way to solve this problem. The linking role of hydropower in flexible regulation is reflected in its ability to adaptively respond to the uncertainty, volatility and randomness of new energy, improve the stability of multi-directional power supply in local and transmission areas of multi-renewable energy systems, and promptly avoid the phenomenon of power curtailment under the constraints of multi-level transmission sections.
[0003] To this end, the present invention proposes a method for adaptive scheduling of hydropower and photovoltaic power under multi-level section restrictions and external transmission requirements. Taking cascade hydropower stations and multiple photovoltaic power stations interconnected with them as examples, the purpose is to explore the good application benefits of adaptive scheduling of multiple renewable energy sources with the flexible regulation of hydropower as the link in multi-level transmission section restriction congestion management and bundled external transmission. This method takes the load peaking of hourly and multi-day scheduling periods in the medium- and short-term scheduling as the goal, takes into account the hydraulic-electricity coupling constraints and the adaptive constraints of cascade hydropower cascades, and transforms the original multi-random decision model into a deterministic and efficient mathematical programming model through extreme value theory and duality theory. The optimized scheduling results can provide important support for the stable power supply and effective energy consumption of multi-renewable energy systems. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a method for adaptive hydro-solar scheduling under multi-level section restrictions and external transmission requirements. Through adaptive hydro-solar scheduling, local and external multi-regional power demands can be taken into account and the problem of transmission section congestion can be effectively controlled, fully tapping the flexibility of cascade hydropower and the complementarity of multiple renewable energy sources.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A method for adaptive hydropower scheduling under multi-level section restrictions and external transmission requirements, including: setting objective functions, setting hydraulic-electric coupling constraints, setting cascade hydropower active regulation constraints, equivalent transformation of hydropower active regulation inequality constraints, external transmission mode selection, model input and optimization solution. The details are as follows:
[0007] (1) Setting the objective function:
[0008] Hydropower-rich power grids can play the role of "peak shifting and valley filling" by leveraging the flexibility of hydropower. That is, hydropower responds to load changes, undertakes peak loads and mid-loads, and makes the net load after absorbing new energy and hydropower as smooth as possible. The objective function is set as:
[0009] (1)
[0010] (2)
[0011] Where: To achieve the best peak load effect; is the total number of time periods in the scheduling period; , They are Time period load, net load; for The time period system provides power to the local area.
[0012] (2) Setting hydraulic-electrical coupling constraints:
[0013] Hydraulic constraints:
[0014] (3)
[0015] (4)
[0016] (5)
[0017] (6)
[0018] (7)
[0019] (8)
[0020] (9)
[0021] (10)
[0022] (11)
[0023] (12)
[0024] Where: For hydropower station exist Initial storage capacity of the time period; , , , , Hydropower Station exist Inflow and outflow during the period, water inflow between intervals, power generation flow, and abandoned water flow; For hydropower station A collection of upstream hydroelectric stations with direct hydraulic connections; For collection The index of For hydropower station To the hydropower station When the water flow is stagnant; To consider the lag Post upstream power station Flowing into downstream power station Traffic volume; For hydropower station exist The water level above the dam at the beginning of the time period; For hydropower station exist Average water level below the dam during the period; The number of seconds for a single calculation period; , Hydropower Station The functional relationship between the water level above the dam and the reservoir capacity, and the functional relationship between the water level below the dam and the outflow; , , , , , , , Hydropower Station The upper and lower limits of reservoir capacity, water level above the dam, outflow, and power generation flow; , Hydropower Station Control storage capacity at the beginning and end of the dispatch period.
[0025] Power Constraints:
[0026] (13)
[0027] (14)
[0028] (15)
[0029] (16)
[0030] (17)
[0031] (18)
[0032] (19)
[0033] (20)
[0034] (twenty one)
[0035] (twenty two)
[0036] (twenty three)
[0037] (twenty four)
[0038] Where: , They are respectively a collection of all hydropower stations and photovoltaic power stations; For hydropower station exist Output during the time period; For hydropower station exist Water consumption rate for a period of time, 3.6 is the unit conversion factor; For hydropower station exist Power generation during the period; Hours for a single calculation period; , Hydropower Station Output upper and lower limits; For photovoltaic power plants exist Output during time period; For photovoltaic power plants Installed capacity; For photovoltaic power plants exist Installed capacity utilization rate during time period; For photovoltaic power plants exist Power generation during the period; For the The transmission section has limited capacity; , Respectively with cross section A collection of hydropower stations and photovoltaic power stations that are directly or indirectly connected to electricity; , Power station collection , The index of the collection , A power station in China; for Time period system outgoing power; is the total power delivered during the dispatch period; is the proportion of the electricity delivered to the total electricity; for Time period to Fluctuation of external output during the period; The minimum number of stable duration periods for external power transmission; Refers to the first type of special ordered set constraint, which means that there is only one element in the ordered set with a non-zero value.
[0039] It should be noted that equations (20) to (24) are constraints related to power transmission, which limit the proportion of power transmitted in DC power transmission and the smoothness of power fluctuations between time periods.
[0040] (3) Setting active regulation constraints for cascade hydropower:
[0041] Cascade hydropower has flexible supply capacity and can be effectively regulated when the actual output of photovoltaic power deviates from the planned output. The purpose of setting constraints in this step is to fully tap the flexible supply capacity of hydropower and the complementary characteristics of multiple renewable energy sources, so that the cascade hydropower regulation variables can adapt to the uncertainty decision variables of new energy.
[0042] 3.1) Photovoltaic uncertainty bias constraints:
[0043] There are positive or negative deviations between the actual photovoltaic output and the planned output in different periods of time.
[0044] (25)
[0045] (26)
[0046] Where: For photovoltaic power plants exist Output uncertainty deviation during time period; , Photovoltaic power station exist The maximum positive deviation and the maximum negative deviation in the time period.
[0047] The deviation in equations (25) to (26) specifically refers to the difference between the actual output and the planned output of the PV power station. It means that the actual output is greater than the planned output.
[0048] 3.2) Constraints on flexible allocation of hydropower:
[0049] The deviations of each photovoltaic power station are flexibly allocated by cascade hydropower.
[0050] (27)
[0051] (28)
[0052] (29)
[0053] Where: for Time-limited hydropower station Response photovoltaic power station Regulate output fluctuation after deviation; for Time-limited hydropower station Response photovoltaic power station The control coefficient of the deviation.
[0054] 3.3) Uncertain output constraints of water and light:
[0055] (30)
[0056] (31)
[0057] Where: for Time-limited hydropower station Regulate output in response to deviations of multiple PV power stations; for Time-sharing photovoltaic power station uncertainty output.
[0058] Equations (30) and (31) show that each photovoltaic deviation is actively regulated by each hydropower station. After the active regulation of hydropower, the total output of hydropower and photovoltaic power is equal to the original planned total output, as shown in equation (32).
[0059] (32)
[0060] 3.4) Regulating traffic constraints:
[0061] After the active regulation of cascade hydropower, variables such as flow, storage capacity, and water level will also undergo coupled changes. Formula (33) is the formula for coupled changes in flow after cascade hydropower output regulation.
[0062] (33)
[0063] Where: For hydropower station exist Regulate traffic flow by time period.
[0064] 3.5) Regulating water balance constraints:
[0065] The water balance equation between time periods can be derived by aggregating hydraulic constraints and regulated flow constraints.
[0066] (34)
[0067] Where: For hydropower station exist Adjust storage capacity at the beginning of the period; To consider the lag Post upstream power station Flowing into downstream power station Regulating flow; For hydropower station exist Regulate traffic flow by time period.
[0068] 3.6) Control of water level above dam and water level below dam:
[0069] (35)
[0070] (36)
[0071] Where: For hydropower station exist At the beginning of the period, the water level on the dam is regulated; For hydropower station exist The water level below the dam is regulated during different time periods.
[0072] 3.7) Control boundary response constraints:
[0073] (37)
[0074] (38)
[0075] (39)
[0076] (40)
[0077] When the plan is implemented, it is difficult to strictly control the storage capacity at the end of the scheduling period after active regulation of hydropower, and a control range of the final storage capacity of each hydropower station is given.
[0078] (41)
[0079] Where: For hydropower station Storage capacity at the end of the scheduling period compared to storage capacity at the end of the planned scheduling period The maximum fluctuation.
[0080] 3.8) Control section response constraints:
[0081] (42)
[0082] (4) Equivalent transformation of inequality constraints for active hydropower regulation:
[0083] The model includes active hydropower regulation variables , , , photovoltaic uncertainty variable , For a large number of uncertain decision variables, the inequality constraints in step (3) containing uncertain decision variables are equivalently reconstructed.
[0084] 4.1) Control output and constrain conversion:
[0085] The output boundary constraint formula (37) is transformed based on the extreme value concept so that it does not contain uncertain decision variables. ; That is, for , formula (37) can be established. That is:
[0086] (43)
[0087] 4.2) Regulating traffic flow and restricting conversion:
[0088] Similarly, traffic control also needs to meet boundary conditions, namely:
[0089] (44)
[0090] (45)
[0091] 4.3) Regulating storage capacity to constrain conversion:
[0092] The regulation of reservoir capacity is affected by the water balance constraint (34); Formula (34) expresses the water balance relationship between two adjacent time periods, but the regulation of reservoir capacity by The cumulative effect of multiple periods; by recursively deducing formula (34) from each period, the water balance relationship between the current period and the start period can be obtained:
[0093] (46)
[0094] Formula (46) shows that Affected by the multi-dimensional spatiotemporal coupling relationship of the accumulation of multi-period deviations, hydraulic connections of power stations, and the effect of water flow lag; the equivalent transformation of the flow boundary, such as the application of the extreme value principle transformation method, requires uncertainty decision-making Traversing and adding a large number of constraints seriously affects the efficiency of model solving. Therefore, the flow boundary constraints are described as the following constraint relationship:
[0095] (47)
[0096] First, we solve the following two sets of optimization problems to obtain and .
[0097] (48)
[0098] (49)
[0099] Where: For hydropower station exist Water consumption rate during the period; For hydropower station exist Water consumption rate during the period; For photovoltaic power plants exist Output uncertainty deviation during time period; for Time-limited hydropower station Response photovoltaic power station The control coefficient of the deviation.
[0100] First, we introduce the equivalent reconstruction method of equation (48) based on duality theory. The Lagrangian function is constructed as follows:
[0101] (50)
[0102] (51)
[0103] (52)
[0104] (53)
[0105] Where: is the Lagrangian function constructed corresponding to equation (48); and Both introduce Lagrange multipliers; , are the set of decision variables and the set of Lagrange multipliers respectively.
[0106] Lagrangian function for decision making Taking the partial derivative and setting it to zero, we get:
[0107] (54)
[0108] (55)
[0109] (56)
[0110] (57)
[0111] Where: A binary variable is introduced to solve the influence of water flow hysteresis; A is used for comparison and Constants introduced by size relations; A constant tolerance value introduced to handle strict inequalities.
[0112] Then, the dual problem of the original problem can be formulated as:
[0113] (58)
[0114] Where: It is the dual problem of problem (48).
[0115] Finally, based on the strong duality principle, we can obtain that the solutions to the original problem and the dual problem are equal, that is, there exists ; Original regulatory boundary constraints It is equivalent to the constraint ;constraint There is no need to explicitly optimize the solution to problem (58). Instead, it is only necessary to add the following constraint set to the model constructed in steps (1) to (3) of the present invention:
[0116] (59)
[0117] Similarly, the equivalent transformation method of formula (49) is the same, and the constraint set is constructed as follows:
[0118] (60)
[0119] Where: and Both introduce Lagrange multipliers; are the sets of Lagrange multipliers respectively; is the introduced binary variable.
[0120] 4.4) Transformation of cross-section response constraints:
[0121] The uncertain decision variables must not only satisfy the boundary conditions, but also satisfy the transmission section restriction constraint (42) after active hydropower regulation. Equation (42) is equivalent to:
[0122] (61)
[0123] Further, by the relation Can be equivalent to:
[0124] (62)
[0125] Eliminate the same relationship items in the set, further equivalent to:
[0126] (63)
[0127] Where: , Respectively, not with cross section A collection of hydropower stations and photovoltaic power stations with power connections;
[0128] According to the extreme value principle, we can get:
[0129] (64)
[0130] This step reconstructs the equivalent of multiple types of inequality control constraints based on the extreme value principle and the duality principle, and the model no longer contains uncertain decisions.
[0131] (5) Delivery mode selection:
[0132] The system transmits replenishment electricity to high-load demand areas through converter stations. In order to match the replenishment electricity with the electricity demand of the transmission area and meet the stability limit of DC power fluctuations, three transmission modes that coordinate regional electricity demand are proposed: smooth transmission mode, single-peak transmission mode and double-peak transmission mode. Since the local and transmission areas have the same or similar electricity demand, they also present a "two peaks and one valley" curve. The three proposed transmission modes correspond to: smooth electricity does not respond to the peak and valley characteristics of transmission (smooth transmission mode), only responds to the peak of the transmission load (single-peak transmission mode), and responds to the peak and valley characteristics of the transmission load (double-peak transmission mode).
[0133] (6) Model input and optimization solution:
[0134] The model input includes: basic information of cascade hydropower stations and photovoltaic power stations, selection of external transmission mode, water flow in cascade hydropower intervals, forecast output and uncertainty deviation of each photovoltaic power station during the dispatch period, and topological relationship of hydropower-photovoltaic power interconnection. Optimization solution: The model is constructed through steps (1) to (5) and no longer contains uncertain decision variables, and can be solved by mathematical programming solver.
[0135] The results of the present invention have the following beneficial effects: The present invention takes into account the local and multi-regional electricity demand, coordinates the blocking problem of multi-level transmission sections, and adapts to the impact of photovoltaic uncertainty through hydropower regulation to ensure stable power supply and effective consumption of renewable energy. The method of the present invention can effectively alleviate the problems of difficult control of multi-renewable energy transmission sections, power transmission of renewable energy systems, and adaptive scheduling of water and light. The present invention can fully tap the flexibility of cascade hydropower and the complementarity of multiple renewable energy sources, provide a feasible water-light complementary operation mode that meets section restrictions and transmission needs, and adapt to photovoltaic uncertainty through the flexible regulation of cascade hydropower, providing a reliable scheduling decision-making plan for hydropower and new energy-rich areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0136] Figure 1 It is a flow chart of the water-light adaptive scheduling method under multi-level section restrictions and external transmission requirements;
[0137] Figure 2 It is the control diagram of the combined output of water and light under the limited transmission section;
[0138] Figure 3 It is the hydropower regulation coefficient diagram of cascade hydropower adapting to the uncertainty of photovoltaic power generation;
[0139] Figure 4 It is a diagram of different transmission modes and load peak regulation. DETAILED DESCRIPTION
[0140] The present invention is further described below in conjunction with the accompanying drawings and implementation examples.
[0141] The basic process of the water-light adaptive scheduling method under multi-level section restrictions and external transmission requirements of the present invention is as follows: Figure 1 As shown. Taking a hydro-photovoltaic energy complementary system in southwest my country as the engineering background, the model and method proposed in this invention are tested. At present, the study area includes 3 cascade hydropower stations with a total installed capacity of 2478MW and 8 photovoltaic power stations with a total installed capacity of 2125MW. The 3 hydropower stations are respectively connected with the 3 photovoltaic power stations to share the common transmission section, and the other 5 photovoltaic power stations are aggregated into a virtual photovoltaic power station cluster. The blocked surfaces are: 3 groups of hydro-photovoltaic complementary cluster output sections, respectively recorded as H1-P1 section, H2-P2 section and H3-P3 section; total output section. The hydro-photovoltaic power is distributed at the end converter station of the total output section, part of which is consumed locally to adjust the load peak, and part of which is transmitted to high-load demand areas to supply power. The basic information of each power station is shown in Table 1.
[0142] Table 1 Basic information of power station
[0143]
[0144] Figure 2It is the process of optimizing the output of hydropower stations in each transmission section (taking the double-peak transmission mode as an example). Figure 2 As shown in the sub-figures (a) to (d), the upper and lower limits of the hydro-solar output regulation refer to the boundaries of the combined hydro-solar output after the active regulation of cascade hydropower when the actual output of the photovoltaic power station deviates from the planned output. Each transmission section can not only meet the control requirements of the hydro-solar complementary output section, but also meet the section restrictions after the active regulation of cascade hydropower. In addition, Figure 2 As shown in (d), the total hydropower output of the total section is equal to the hydropower control output, which means that the system can provide a constant total power, ensure the stability of local power and output power, and fully exploit the complementary characteristics of hydropower. Therefore, the present invention can effectively control the transmission section restriction demand, exploit the complementary characteristics of hydropower and reduce the risk of renewable energy abandonment.
[0145] Figure 3 The correlation of active regulation coefficients of cascade hydropower is analyzed. The present invention can not only provide the optimized operation results of hydro-photovoltaic complementary output in the medium and short term, but also provide hydro-photovoltaic adaptive scheduling rules through active regulation of cascade hydropower, which are determined by the correlation of regulation coefficients. Figure 3 The deviation of the three-level cascade hydropower stations relative to each photovoltaic power station is actively regulated under the hydraulic-electricity coupling relationship, and the sum of the regulation coefficients is 1, which means that the photovoltaic deviation power is fully distributed by the cascade hydropower. Figure 3 As shown in (a) at 6:00 on September 1, the hydropower station The flexible allocation coefficient is , meaning When the positive deviation is 1MW, the hydropower stations H1, H2, and H3 are reduced by 0.55MW, 0.45MW, and 0MW respectively. Since photovoltaic power does not generate electricity during the night, the hydropower station does not make any effort to regulate. Figure 3 The flexible regulation coefficient of hydropower during night time is not shown. Figure 3 The proportion of the regulation coefficient of each hydropower station, and the regulation priority trend of each hydropower station are H1, H3, and H2. It shows that when the cascade of cascade hydropower regulation changes, the power station with stronger regulation ability will be given priority to respond to the uncertainty and fluctuation demand of the photovoltaic power station under the constraints of the section. Therefore, the present invention makes full use of the different regulation performance of cascade hydropower under the coupling of water and electricity, and responds to the uncertainty of photovoltaic power stations through water-photovoltaic adaptive scheduling, which can give the operation results of the water-photovoltaic complementary plan and the active regulation rules of cascade hydropower adaptively responding to multiple photovoltaic power stations.
[0146] Figure 4The local and transmission area power distribution processes under different transmission modes are analyzed separately. From the perspective of transmission power, the three modes can ensure that the power does not block the channel, and can reduce the degree of planned power fluctuation and ensure the stability of DC power transmission. From the perspective of local load peak regulation effect, the degree of load fluctuation reduction of the smooth transmission mode, single-peak transmission mode, and double-peak transmission mode decreases successively, and the percentages of load fluctuation reduction are 52.8%, 51.62%, and 48.66%, respectively. The selection of the transmission mode can be adjusted according to the power demand of the transmission area. In addition, the proposed scheduling method can provide a smooth power supply, so the power supply of the local and transmission areas is also stable, and is less affected by the uncertainty of energy generation. Therefore, the present invention can take into account the power demand of the local and transmission areas, and provide a stable power supply in multiple regions.
Claims
1. A method for adaptive scheduling of water and solar power under multi-level section restrictions and external transmission requirements, characterized by: include: Set the objective function, set the hydropower-electricity coupling constraint, set the cascade hydropower active regulation constraint, set the equivalent transformation of the hydropower active regulation inequality constraint, select the transmission mode, input the model and optimize the solution; the details are as follows: (1) Set the objective function: The objective function is set as: Where: F is the optimal target for peak load regulation; T is the total number of time periods in the dispatch period; L t , L t ′ are the load and net load in period t respectively; The system provides power to the local area during period t; (2) Setting hydraulic-electrical coupling constraints: Hydraulic constraints: Where: V m,t is the initial storage capacity of hydropower station m in period t; are the inflow, outflow, interval water flow, power generation flow, and abandoned water flow of hydropower station m during period t; m is the set of upstream hydropower stations that have direct hydraulic connection with hydropower station m; γ is the set Υ m Index of ; ι γ,m is the water flow delay time from hydropower station γ to hydropower station m; To consider the lag time γ,m The flow from the upstream power station γ to the downstream power station m; is the initial upper dam water level of hydropower station m at time t; is the average downstream water level of hydropower station m during period t; Δt is the number of seconds in a single calculation period; They are the functional relationship between the water level above the dam and the reservoir capacity, and the functional relationship between the water level below the dam and the outflow; V m 、 are the upper and lower bounds of the hydropower station's storage capacity m, water level above the dam, outflow, and power generation flow respectively; They are the control water levels at the beginning and end of the dispatching period; Power constraints: E m,t =N m,t Δt hour (14) 0≤u p,t ≤1 (17) Where: M and P are the collection of all hydropower stations and photovoltaic power stations respectively; N m,t is the output of hydropower station m during period t; r m,t is the water consumption rate of hydropower station m in period t, 3.6 is the unit conversion coefficient; E m,t is the power generation of hydropower station m in period t; Δt hour Hours for a single calculation period; N m are the upper and lower bounds of the hydropower station m output respectively; The output of photovoltaic power station p during period t; is the installed capacity of the photovoltaic power station p; u p,t is the installed capacity utilization rate of photovoltaic power station p in period t; is the power generation of photovoltaic power station p in period t; The transmission section limit of Article 1; l 、P l They are respectively the collection of hydropower stations and photovoltaic power stations that have direct or indirect power connections with section l; is the system output during period t; E out is the total power delivered during the dispatch period; out The proportion of electricity delivered to the outside in the total electricity; is the fluctuation of the external output from period t to period t+1; Γ is the minimum number of stable duration periods of external output; SOS1{·} refers to the first type of special ordered set constraint, which means that the ordered set has only one element with a non-zero value; (3) Setting active regulation constraints for cascade hydropower: 3.1) Photovoltaic uncertainty bias constraints There are positive or negative deviations between the actual photovoltaic output and the planned output at different times; Where: is the output uncertainty deviation of the photovoltaic power station p in period t; D p,t are the maximum positive deviation and the maximum negative deviation of the photovoltaic power station p in period t, respectively; The deviation in formulas (25) to (26) specifically refers to the difference between the actual output and the planned output of the photovoltaic power station; It means the actual output is greater than the planned output; 3.2) Constraints on flexible allocation of hydropower Deviations of each photovoltaic power station are flexibly allocated by cascade hydropower; 0≤λ m,p,t ≤1 (28) Where: λ is the output fluctuation of hydropower station m in response to the deviation of photovoltaic power station p during period t; m,p,t is the control coefficient of the hydropower station m in response to the deviation of the photovoltaic power station p during period t; 3.3) Uncertain output constraints of water-solar power Where: The output of hydropower station m is regulated in response to the deviations of multiple photovoltaic power stations during period t; is the uncertainty output of the photovoltaic power station p during period t; Equations (30) and (31) indicate that each photovoltaic deviation is actively regulated by each hydropower station. After the active regulation of hydropower, the total output of hydropower and solar power is equal to the original planned total output, as shown in Equation (32); 3.4) Regulating traffic constraints After the active regulation of cascade hydropower, variables such as flow, storage capacity, and water level will also undergo coupled changes. Equation (33) is the formula for the coupled change of flow after the output regulation of cascade hydropower; Where: Regulate the flow of hydropower station m during period t; 3.5) Controlling water balance constraints The water balance equation between time periods is derived by combining hydraulic constraints and control flow constraints. Where: is the initial regulation storage capacity of hydropower station m in period t; To consider the lag time γ,m The regulated flow from the upstream power station γ to the downstream power station m; Regulate the flow of hydropower station m during period t; 3.6) Control of water level above dam and water level below dam Where: The water level on the dam is initially regulated by hydropower station m during period t; Regulate the water level downstream of the dam for hydropower station m during period t; 3.7) Controlling Boundary Response Constraints When the plan is implemented, it is difficult to strictly control the storage capacity at the end of the dispatch period after the active regulation of hydropower, and the control range of the final storage capacity of each hydropower station is given; Where: The storage capacity at the end of the dispatch period of hydropower station m is compared with the storage capacity at the end of the planned dispatch period. The maximum fluctuation of 3.8) Controlling Section Response Constraints (4) Equivalent transformation of inequality constraints for active hydropower regulation: The model includes hydropower active regulation variables Photovoltaic uncertainty variables For a large number of uncertain decision variables, the inequality constraints in step (3) containing uncertain decision variables are equivalently reconstructed; 4.1) Controlling output and restricting conversion The output boundary constraint formula (37) is transformed based on the extreme value concept so that it does not contain uncertain decision variables. That is, for Formula (37) is valid; that is: 4.2) Regulating traffic flow and restricting conversion Similarly, regulating the flow may satisfy boundary conditions, namely: 4.3) Regulating storage capacity to constrain conversion The regulation of storage capacity is affected by the water balance constraint (34); Equation (34) expresses the water balance relationship between two adjacent time periods, but the regulation of storage capacity Affected by the cumulative effect of multiple periods from 1 to (t-1), the water balance relationship between the current period and the start period can be obtained by recursively deducing formula (34) from each period: Formula (46) shows that Affected by the multi-dimensional spatiotemporal coupling relationship of the accumulation of multi-period deviations, hydraulic connections of hydropower stations, and water flow lag effects; Equivalent transformation of the flow control boundary, such as the application of the extreme value principle transformation method, requires uncertainty decision making Traversing and adding a large number of constraints seriously affects the efficiency of model solving. Therefore, the flow boundary constraints are described as the following constraint relationship: First, we solve the following two sets of optimization problems to obtain and Where: For hydropower stationγ in τ-ι γ,m Water consumption rate during the period; r m,τ is the water consumption rate of hydropower station m during period τ; is the photovoltaic power station p in τ-ι γ,m Time period output uncertainty deviation; τ-ι γ,m The control coefficient of the hydropower station m in time period in response to the deviation of the photovoltaic power station p; First, we introduce the equivalent reconstruction method of Equation (48) based on duality theory; the Lagrangian function is constructed as follows: m P,t-1 ={μ 1,1,1 ,...,m p,τ,1 ,...,m P,t-1,1 ,m 1,1,2 ,...,m p,τ,2 ,...,m P,t-1,2 } (52) m p,τ,1 ,m p,τ,2 ≥0 (53) Where: L m,t is the Lagrangian function corresponding to equation (48); μ p,τ,1 and μ p,τ,2 Both introduce Lagrange multipliers; D P,t-1 、μ P,t-1 are the set of decision variables and the set of Lagrange multipliers respectively; Lagrangian function for decision making Taking the partial derivative and setting it to zero, we get: y γ ∈{0,1} (55) τ-(t-1-ι γ,m )≤y γ M (56) τ-(t-1-ι γ,m )≥ε-(1-y γ )M (57) Where: y γ The binary variable introduced to solve the influence of water hysteresis; M is used to compare τ with t-1-ι γ,m The constant introduced by the size relationship; ε is the constant tolerance value introduced to deal with strict inequalities; Then, the dual problem of the original problem can be formulated as: Where: g m,t It is the dual problem of problem (48); Finally, based on the strong duality principle, the solutions to the original problem and the dual problem are equal, that is, there exists Original regulatory boundary constraints This is equivalent to the constraint max g m,t ≥ V m This constraint does not require explicit optimization to solve the problem (58). Instead, it is only necessary to add the following constraint set to the model constructed in steps (1) to (3) of the present invention: Similarly, the equivalent transformation method of formula (49) is the same, and the constraint set is constructed as follows: Where: μ′ p,τ,1 and μ′ p,τ,2 Both introduce Lagrange multipliers; μ′ P,t-1 are the sets of Lagrange multipliers; y′ γ is the introduced binary variable; 4.4) Controlling Section Response Constraint Transformation The uncertainty decision variables must not only satisfy the boundary conditions, but also satisfy the transmission section restriction constraint (42) after active hydropower regulation. Equation (42) is equivalent to: Further by the relation Can be equivalent to: Eliminating the same type of relationship items in the set, further equivalent to: Where: MM l PP l They are respectively the collection of hydropower stations and photovoltaic power stations that have no power connection with section l; According to the extreme value principle, we can get: This step reconstructs the equivalent constraints of multiple types of inequality control based on the extreme value principle and the duality principle. The model no longer contains uncertain decisions. (5) Delivery mode selection: The system transmits supplementary electricity to high-load demand areas through converter stations. To ensure that the supplementary electricity matches the electricity demand of the transmission area and meets the stability constraints of DC transmission power fluctuations, three transmission modes are proposed to coordinate regional electricity demand: smooth transmission mode, single-peak transmission mode, and double-peak transmission mode. The smooth transmission mode corresponds to the case where the smoothed electricity does not respond to the peak and valley characteristics of the transmission; the single-peak transmission mode corresponds to the case where the electricity only responds to the peak of the transmission load; and the double-peak transmission mode corresponds to the case where the electricity responds to the peak and valley characteristics of the transmission load. (6) Model input and optimization solution: The model input includes: basic information of cascade hydropower stations and photovoltaic power stations, selection of external transmission mode, water flow in cascade hydropower intervals, predicted output and uncertainty deviation of each photovoltaic power station during the scheduling period, and topological relationship of hydropower-photovoltaic power interconnection; Optimization solution: the model is constructed through steps (1) to (5) and no longer contains uncertain decision variables, and can be solved by applying a mathematical programming solver.
Citation Information
Patent Citations
Emergency power control method of water-light complementary system considering power transmission dynamic constraint
CN117134425A
Reservoir level disturbance interval evaluation and control method under cascade hydroelectric response flexibility demand mode
CN117709682A
Source network load cooperative elasticity improvement method and system considering multi-fault uncertainty
CN117875161A
Peak regulation optimization scheduling method for cascaded hydro-photovoltaic complementary power generation system
WO2023216780A1