A method and system for intelligent design of pumped storage reservoir basin based on 3DE platform
By building a three-dimensional intelligent design process for the asphalt concrete panel rock pile dam of the whole warehouse basin on the 3DE platform, the automation and efficiency of intelligent design in the pumped storage project is solved, and efficient parameterized design and standardized project volume output are realized, improving the output of high-quality projects Design efficiency and accuracy.
Patent Information
- Application Number
- CN202411048941.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-01
AI Technical Summary
In pumping and storage projects, the existing three-dimensional intelligent design methods have not yet formed a complete and efficient process, especially for the intelligent design of asphalt concrete panel rock pile dam in the whole warehouse basin, which relies on manual operation, resulting in cumbersome modeling and difficult difficulty. , low efficiency and lack of automation and intelligent means.
Based on the 3DE platform, a professional three-dimensional design process is built, including importing the original landform model, establishing the benchmark library basin profile, verifying modeling parameters, performing balanced design of earth and rock excavation, outputting standardized engineering volume data, and programming through EKL The language realizes the call and assembly of fast parameterized three-dimensional templates, and combines the visual interaction module and the standardized engineering volume calculation module to realize the parameterized design of the stone pile dam of the asphalt concrete panel in the whole warehouse.
The efficient parameterized design of the asphalt concrete panel rock pile dam of the whole warehouse basin has been realized, which has improved the design efficiency and accuracy, solved the problem of repeated comparison of the balanced design of earth and stone excavation and filling, and significantly improved the design quality and efficiency. Ensure the accuracy and standardization of engineering quantity calculations.
Smart Images

Figure CN118673566B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water conservancy and hydropower engineering design, and in particular to a method and system for intelligent design of a pumped storage reservoir basin based on a 3DE platform. Background Art
[0002] The current application of 3D intelligent design in the field of pumped storage engineering still faces certain challenges and it is difficult to completely replace the traditional 2D planar design method. The main problem is that a complete and efficient 3D intelligent design process and a matching 3D intelligent design system have not yet been formed.
[0003] Among the existing three-dimensional design platforms in the field of hydropower and water conservancy projects, although the Dassault 3DE platform occupies an important position, it has not yet established a special modeling process and practical tools for the intelligent design of reservoir basins in pumped storage projects. Especially in the intelligent design of asphalt concrete panel rockfill dams involving the entire reservoir basin, the current three-dimensional model establishment still relies on manual operation and lacks automation and intelligent means. This not only leads to cumbersome modeling process, high modeling difficulty, and increased workload, but also seriously affects the design efficiency. Therefore, it is urgent to develop a complete set of three-dimensional intelligent design process methods and three-dimensional design systems to promote the digital transformation and intelligent upgrading in the field of pumped storage engineering design. Summary of the invention
[0004] The present invention provides a pumped storage whole reservoir basin intelligent design method and system based on 3DE platform, aiming to construct a set of professional three-dimensional design processes that meet the design requirements of asphalt concrete panel rockfill dams, realize the parametric design of asphalt concrete panel rockfill dams in the whole reservoir basin, and output matching standardized engineering quantity data.
[0005] The present invention provides the following technical solutions to achieve the above objectives:
[0006] A pumped storage reservoir basin intelligent design method based on a 3DE platform includes the following steps:
[0007] S1. Import the original landform model into the 3DE system;
[0008] S2. Establish the benchmark reservoir basin contour line and create a primary reservoir basin model based on the original geomorphic model;
[0009] S3, verifying the modeling parameters of the primary reservoir basin model to obtain a modified reservoir basin model;
[0010] S4. Based on the modified reservoir basin model, carry out earthwork excavation and filling balance design, obtain the final reservoir basin design scheme and calculate the engineering quantity;
[0011] The S2 comprises the following steps:
[0012] S201, selecting a dam construction location based on the original geomorphic model, and selecting a horizontal plane at the dam construction location to outline the baseline reservoir basin contour;
[0013] S202, taking the benchmark reservoir contour line as the starting point, first horizontally expanding the benchmark reservoir contour line outward according to preset parameters, and then vertically translating it upward, repeating the expansion and translation process, and obtaining several layers of reservoir contour lines from low to high, each layer of reservoir contour lines and the benchmark reservoir contour line having several control points;
[0014] S203, processing all two adjacent layers of the reservoir contour lines, first comparing the number of control points of the two adjacent layers of the reservoir contour lines, and recording the reservoir contour line with a number of control points not less than that of the other layer as the reservoir contour line a, and the other layer of the reservoir contour line as the reservoir contour line b;
[0015] S204, find the geometric center point of the reservoir contour line a, and connect the geometric center point to each control point of the reservoir contour line a to form a number of guide lines A; project the several guide lines A to the reservoir contour line b to form projection lines, the projection lines intersect with the reservoir contour line b to form intersection points, and for the projection lines that do not form intersection points, extend them to intersect with the reservoir contour line b to form intersection points, find the control points closest to each intersection point on the reservoir contour line b, connect these control points to the control points on the reservoir contour line a corresponding to the guide lines A corresponding to each projection line to form guide lines B; the guide lines B and the reservoir contour line together constitute the reservoir contour surface;
[0016] S205, establishing a dam body foundation model and an excavation surface model based on the reservoir basin contour surface;
[0017] S206, performing Boolean operations on the dam body foundation model, the excavation surface model and the original landform model to obtain a primary reservoir basin model;
[0018] The S4 comprises the following steps:
[0019] S401, optimizing and adjusting the modeling parameters of the modified reservoir basin model to generate a plurality of variant models;
[0020] S402, obtaining corresponding earthwork excavation and filling volumes based on the plurality of variant models, and obtaining earthwork excavation and filling volume ratios according to the earthwork excavation and filling volumes;
[0021] S403, selecting the earthwork excavation volume ratio that is closest to the engineering material ratio from a number of earthwork excavation volume ratios, taking the variant model corresponding to the earthwork excavation volume ratio as the final basin design scheme, and calculating the engineering volume by reading the geometric information of the variant model and according to the design specification requirements.
[0022] The aforementioned intelligent design method for the entire reservoir basin of a pumped storage power plant based on a 3DE platform, said S3 includes the designer adjusting the modeling parameters according to the engineering demand indicators, and repeating step S2 based on the adjusted modeling parameters to generate a modified reservoir basin model.
[0023] The aforementioned intelligent design method for the whole reservoir basin of pumped storage power station based on 3DE platform, S2 is implemented by EKL programming language.
[0024] The aforementioned system of intelligent design method for pumped storage whole reservoir basin based on 3DE platform includes a visualization interaction module, a three-dimensional model parametric modeling module and a standardized engineering quantity calculation module;
[0025] Visual interaction module, through which designers input, edit, adjust, and review design parameters and drive the 3D model parametric modeling module, and call the standardized engineering quantity calculation module to realize the pumped storage reservoir basin design work;
[0026] The three-dimensional model parametric modeling module creates a three-dimensional model of the pumped storage reservoir basin according to the design parameters transmitted by the visualization interaction module;
[0027] Standardized engineering quantity calculation module, calculates engineering quantity based on the reservoir basin model.
[0028] Beneficial Effects
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] 1. The present invention relies on the 3DE platform to construct a set of professional three-dimensional design processes that meet the design requirements of asphalt concrete panel rockfill dams, realize the parametric design of asphalt concrete panel rockfill dams in the entire reservoir basin, and output matching standardized engineering quantity data. It also effectively solves the time-consuming and labor-intensive problem of repeated comparison of earthwork excavation and filling balance design schemes, replaces traditional manual modeling, manual CAD drawing and differentiated engineering quantity calculation methods, and improves design efficiency and accuracy.
[0031] 2. Aiming at the layout characteristics of pumped storage power station hubs, the present invention has developed a set of intelligent design processes for asphalt concrete panel rockfill dams in the entire reservoir basin, which can realize fast design, output of results and scheme comparison. The scheme comparison design has a high degree of integration and parameterization, and the required threshold is low. Especially in the comparison of a large number of pumped storage reservoirs, the quality and efficiency of dam site and dam line selection have been greatly improved.
[0032] 3. The present invention outputs the corresponding standardized engineering quantity calculation draft based on the three-dimensional design model of the full-basin asphalt concrete panel rockfill dam, ensuring that the engineering quantity results can be output while the three-dimensional design is in progress. It effectively avoids the time waste caused by recalculating the engineering quantity due to adjusting the three-dimensional model, thereby constructing a complete intelligent design process for the full-basin asphalt concrete panel rockfill dam. This process enables designers to complete the "design-feedback-redesign" cycle online, and quickly adjust and optimize the design plan. This not only significantly improves the reusability of the model and the standardization of the engineering quantity calculation output, but also realizes the dynamic update of the model and the engineering quantity calculation Excel table, thereby greatly improving the design efficiency.
[0033] 4. The present invention realizes the calling, modification and assembly of rapid parameterized three-dimensional templates through the EKL language, which significantly improves the efficiency and accuracy of the design and modeling of the asphalt concrete panel rockfill dam in the whole reservoir basin, and constructs a complete module library of dam engineering professional components, laying the foundation for subsequent intelligent design. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 Schematic diagram of the pumped storage reservoir basin modeling of the present invention Figure 1 ;
[0035] Figure 2 Schematic diagram of the pumped storage reservoir basin modeling of the present invention Figure 2 ;
[0036] Figure 3 A schematic diagram of a visualized interactive interface of the intelligent design system for pumped-storage reservoir basins of the present invention;
[0037] Figure 4 Schematic diagram of dam type selection for the visual interactive interface;
[0038] Figure 5 This is a schematic diagram of the storage capacity calculation of the visual interactive interface;
[0039] Figure 6 Provides a schematic diagram of the storage capacity curve for the visual interactive interface;
[0040] Figure 7 Create and modify design parameter diagrams for the visual interactive interface library;
[0041] Figure 8 Create a model schematic for the reservoir basin;
[0042] Fig. 9 To indicate the intention of the main quantities;
[0043] Fig.10 To show the intention of comparing the main engineering quantities;
[0044] Fig.11 Standardizing the quantity of work Figure 1 ;
[0045] Fig.12 Standardizing the quantity of work Figure 2 ;
[0046] Fig.13 Programming schematics for EKL;
[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below only relate to some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor. DETAILED DESCRIPTION
[0048] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0049] Embodiment 1. A method for intelligent design of a pumped storage reservoir basin based on a 3DE platform, comprising the following steps:
[0050] S1. Import the original landform model into the 3DE system;
[0051] S2. Establish the benchmark reservoir basin contour line and create a primary reservoir basin model based on the original geomorphic model;
[0052] S3, verifying the modeling parameters of the primary reservoir basin model to obtain a modified reservoir basin model;
[0053] S4. Based on the modified reservoir basin model, carry out earthwork excavation and filling balance design, obtain the final reservoir basin design scheme and calculate the engineering quantity;
[0054] The S2 comprises the following steps:
[0055] S201, based on the original landform model, select a dam construction location, select a horizontal plane at the dam construction location to outline the baseline reservoir basin contour line; the baseline reservoir basin contour line is as follows Figure 1 , as shown in 2;
[0056] S202, taking the benchmark reservoir contour line as the starting point, first horizontally expanding the benchmark reservoir contour line outward according to preset parameters, and then vertically translating it upward, repeating the expansion and translation process from low to high to obtain several layers of reservoir contour lines, each layer of reservoir contour lines and the benchmark reservoir contour line have several control points;
[0057] S203, processing all two adjacent layers of reservoir contour lines, firstly comparing the number of control points of the two adjacent layers of reservoir contour lines, recording one layer of reservoir contour line with no less control points than the other layer of reservoir contour line as reservoir contour line a, and recording the other layer of reservoir contour line as reservoir contour line b;
[0058] S204, find the geometric center point of the reservoir contour line a, and connect the geometric center point to each control point of the reservoir contour line a to form several guide lines A; project several guide lines A to the reservoir contour line b to form projection lines, and the projection lines intersect with the reservoir contour line b to form intersection points. For the projection lines that do not form intersection points, they are extended to intersect with the reservoir contour line b to form intersection points, and the control points closest to each intersection point are found on the reservoir contour line b, and these control points are connected to the control points on the reservoir contour line a corresponding to the guide lines A corresponding to each projection line to form guide lines B; the guide lines B and the reservoir contour line together constitute the reservoir contour surface; through the above-mentioned process of generating guide lines A and projecting to find control points on the reservoir contour lines of different elevations to generate guide lines B, and finally forming the reservoir contour surface, there can be The invention effectively avoids the change of the number of control points caused by the change of the reservoir contour line shape during the expansion process, which eventually leads to the reservoir contour lines of different elevations being unable to be connected through the corresponding control points to form a complete reservoir contour surface; due to the rules of computer graphics processing, during the expansion of the benchmark reservoir contour line, its line type attributes will be adjusted accordingly, resulting in the possible change of the number and position of the control points; however, the key point of constructing the reservoir contour surface is to connect the control points of the reservoir contour lines of different elevations correspondingly, and the method of manually creating reservoir contour lines of different elevations and correspondingly connecting the control points is obviously not satisfactory in efficiency; compared with the design method of manually creating reservoir contour lines of different elevations and connecting the control points one by one to form the reservoir contour surface, the aforementioned process of generating the guide line B significantly improves the work efficiency and accuracy;
[0059] S205, establishing a dam body foundation model and an excavation surface model based on the reservoir basin contour surface; using the function of the 3DE platform itself to read the reservoir basin contour surface, and establishing a dam body foundation model based on the reservoir basin contour surface according to the structural zoning characteristics of the pumped storage reservoir basin, wherein the dam body foundation model includes an asphalt anti-seepage panel, a cushion layer area, a transition layer, a main rockfill area, a secondary rockfill area, a reservoir backfill area, etc.;
[0060] S206, performing Boolean operations on the dam body foundation model, the excavation surface model and the original landform model to obtain a primary reservoir basin model. Performing Boolean operations on the dam body foundation model, the excavation surface model and the original landform model, modifying the dam body foundation model and the excavation surface model to obtain a primary reservoir basin model that matches the original landform characteristics;
[0061] The S4 comprises the following steps:
[0062] S401, optimizing and adjusting the modeling parameters of the modified reservoir basin model to generate a plurality of variant models; fine-tuning the modeling parameters of the modified reservoir basin model including the size of the reference contour line or the dam crest elevation, and repeating step S2 to generate a plurality of variant models;
[0063] S402, obtaining corresponding earthwork excavation and filling volumes based on the variant models, and obtaining an earthwork excavation and filling volume ratio through the earthwork excavation and filling volumes; the earthwork excavation and filling volume ratio is the ratio of the earthwork filling volume to the earthwork excavation volume;
[0064] S403, select the earthwork excavation ratio closest to the engineering material ratio from a number of earthwork excavation ratios, use the variant model corresponding to the earthwork excavation ratio as the final reservoir basin design, and calculate the engineering quantity according to the design specification requirements by reading the geometric information of the variant model. Through steps S401 to S403, on the premise that the modified reservoir basin model meets the engineering demand indicators, the earthwork excavation ratio is used as the selection indicator, the modeling parameters of the modified reservoir basin model are fine-tuned, and the variant model with the earthwork excavation ratio closest to the engineering material ratio is found, which can further reduce the engineering investment.
[0065] The S3 includes the designer adjusting the modeling parameters according to the engineering demand index, and repeating step S2 to generate a modified reservoir basin model based on the adjusted modeling parameters. Taking the reservoir capacity as an example, the engineering demand index is to build a pumped storage reservoir basin with a storage capacity of 5 million cubic meters. When the storage capacity of the primary reservoir basin model does not meet the engineering demand index, the designer repeats step S2 to generate a modified model that meets the engineering demand index by adjusting the modeling parameters. Specifically, if the storage capacity of the primary reservoir basin model is 4 million cubic meters (when the gap with the engineering demand index is large), the designer increases the storage capacity by changing the area of the baseline reservoir basin contour line and generating a larger reservoir basin contour surface. When the storage capacity of the primary reservoir basin model is 4.9 million cubic meters (when the gap with the engineering demand index is small), the designer increases the storage capacity by adjusting the parameters in the model such as increasing the dam top elevation.
[0066] The S2 is implemented by the EKL programming language. The EKL programming language is used to implement the above steps. Compared with other programming languages, EKL is more compatible with the 3DE platform, effectively avoiding program operation errors caused by programming language mismatch, and ensuring stable operation and efficient execution of the system.
[0067] A system of intelligent design methods for the whole reservoir basin of pumped storage based on 3DE platform, including visualization interaction module, 3D model parametric modeling module and standardized engineering quantity calculation module;
[0068] Visual interaction module, through which designers input, edit, adjust, and review design parameters and drive the 3D model parametric modeling module, and call the standardized engineering quantity calculation module to realize the pumped storage reservoir basin design work;
[0069] The three-dimensional model parametric modeling module creates a three-dimensional model of the pumped storage reservoir basin according to the design parameters transmitted by the visualization interaction module;
[0070] Standardized engineering quantity calculation module, calculates engineering quantity based on the reservoir basin model.
[0071] The present invention is further described in detail in conjunction with the actual design process of a full-basin asphalt concrete face rockfill dam in a certain project.
[0072] 1) In the visualization interaction module, select the "Asphalt concrete face rockfill dam solution" in the "Whole reservoir basin anti-seepage solution", such as Figure 4 As shown;
[0073] 2) Click the "Reservoir Capacity Trial Calculation" button to review or modify the normal water level elevation, dead water level elevation, reservoir capacity adjustment requirements, upstream panel slope ratio, dead water level depth, safety superelevation and other design parameters in turn;
[0074] Click the "Input Basin Outline" button to import the basin outline information, and then start the reservoir capacity calculation program (the designer can also choose to click the "AutoCAD Wireframe Import" option to directly import the basin outline from the existing CAD drawings). According to the calculated reservoir capacity results, the designer can confirm or adjust the relevant parameters in a targeted manner, or re-select the basin outline data to import until the reservoir capacity meets the design requirements; Figure 5 As shown; at this time, click the "Output Storage Capacity Curve" button to output the storage capacity curve table, such as Figure 6 As shown;
[0075] 3) Click the "Create Reservoir Basin" button, and based on the reservoir capacity calculation results, review or modify the dam body modeling parameters, such as dam crest width, dam back slope ratio, anti-seepage layer thickness, gravel drainage layer thickness, etc.; review or modify the reservoir basin excavation modeling parameters, such as slope excavation ratio, slope bridleway width, slope single-stage height, etc. Figure 7 , 8 As shown; then click the "Confirm" button to complete the creation of the library basin;
[0076] Click "Output Main Engineering Quantity" to display the main engineering quantity in the pop-up dialog box, such as Fig. 9 As shown;
[0077] 4) Click the "Earthwork Balance" button and enter the utilization rate, step length, and elevation range of the reservoir excavation contour;
[0078] Click the "Start Trial Calculation" button to perform the trial calculation. After the trial calculation is completed, the parameters in the earthwork balance dialog box will be adjusted accordingly, and a comparison table of the main engineering quantities of each party will be output, such as Fig.10 As shown;
[0079] 5) Click the "Output Standardized Bill of Quantities" button to output the detailed bill of quantities of this design scheme according to the design parameters. Fig.11 , 12 As shown;
[0080] Example 2. The intelligent design method and system for the whole reservoir basin of a pumped storage power plant based on a 3DE platform of this example are the same as those of Example 1, with the only difference being that, when the designer finds multiple terrain areas suitable for dam construction in the original landform in step S2, the designer creates a primary reservoir basin model at each dam construction location, modifies each primary reservoir basin model, obtains the corresponding modified reservoir basin model and calculates its engineering quantity, and the designer compares and selects the modified reservoir basin model that best meets the engineering economic principles for earthwork balance design to obtain the final reservoir basin design plan.
[0081] Obviously, the above is only a part of the embodiments of the present invention, not all of the embodiments. The above embodiments are not intended to limit the present invention. For those skilled in the art, the present invention may have various changes and variations. Any combination, modification, equivalent replacement, improvement and all other embodiments that can be made by those of ordinary skill in the art within the spirit and principle of the present invention should be within the protection scope of the present invention.
Claims
1. A 3DE platform-based intelligent design method for a pumped storage reservoir basin, characterized by: The following steps are involved: S1. Import the original landform model into the 3DE system; S2. Establish the benchmark reservoir basin contour line and create a primary reservoir basin model based on the original geomorphic model; S3, verifying the modeling parameters of the primary reservoir basin model to obtain a modified reservoir basin model; S4. Based on the modified reservoir basin model, carry out earthwork excavation and filling balance design, obtain the final reservoir basin design scheme and calculate the engineering quantity; The S2 comprises the following steps: S201, selecting a dam construction location based on the original geomorphic model, and selecting a horizontal plane at the dam construction location to outline the baseline reservoir basin contour; S202, taking the benchmark reservoir contour line as the starting point, first horizontally expanding the benchmark reservoir contour line outward according to preset parameters, and then vertically translating it upward, repeating the expansion and translation process, and obtaining several layers of reservoir contour lines from low to high, each layer of reservoir contour lines and the benchmark reservoir contour line having several control points; S203, processing all two adjacent layers of the reservoir contour lines, first comparing the number of control points of the two adjacent layers of the reservoir contour lines, and recording the reservoir contour line with a number of control points not less than that of the other layer as the reservoir contour line a, and the other layer of the reservoir contour line as the reservoir contour line b; S204, find the geometric center point of the reservoir contour line a, and connect the geometric center point to each control point of the reservoir contour line a to form a number of guide lines A; project the several guide lines A to the reservoir contour line b to form projection lines, the projection lines intersect with the reservoir contour line b to form intersection points, and for the projection lines that do not form intersection points, extend them to intersect with the reservoir contour line b to form intersection points, find the control points closest to each intersection point on the reservoir contour line b, connect these control points to the control points on the reservoir contour line a corresponding to the guide lines A corresponding to each projection line to form guide lines B; the guide lines B and the reservoir contour line together constitute the reservoir contour surface; S205, establishing a dam body foundation model and an excavation surface model based on the reservoir basin contour surface; S206, performing Boolean operations on the dam body foundation model, the excavation surface model and the original landform model to obtain a primary reservoir basin model; The S4 comprises the following steps: S401, optimizing and adjusting the modeling parameters of the modified reservoir basin model to generate a plurality of variant models; S402, obtaining corresponding earthwork excavation and filling volumes based on the plurality of variant models, and obtaining an earthwork excavation and filling volume ratio through the earthwork excavation and filling volumes; S403, selecting the earthwork excavation volume ratio that is closest to the engineering material ratio from a number of earthwork excavation volume ratios, taking the variant model corresponding to the earthwork excavation volume ratio as the final basin design scheme, and calculating the engineering volume by reading the geometric information of the variant model and according to the design specification requirements.
2. The intelligent design method for the whole reservoir basin of pumped storage based on the 3DE platform according to claim 1 is characterized by: The step S3 includes the designer adjusting the modeling parameters according to the engineering requirement indicators, and repeating step S2 to generate a modified reservoir basin model based on the adjusted modeling parameters.
3. The intelligent design method for the whole reservoir basin of pumped storage based on the 3DE platform according to claim 1 is characterized by: The S2 is implemented by the EKL programming language.
4. The system of the intelligent design method for the whole reservoir basin of pumped storage based on the 3DE platform according to any one of claims 1 to 3 is characterized in that: It includes a visualization interaction module, a 3D model parametric modeling module and a standardized engineering quantity calculation module; Visual interaction module, through which designers input, edit, adjust, and review design parameters and drive the 3D model parametric modeling module, and call the standardized engineering quantity calculation module to realize the pumped storage reservoir basin design work; The three-dimensional model parametric modeling module creates a three-dimensional model of the pumped storage reservoir basin according to the design parameters transmitted by the visualization interaction module; Standardized engineering quantity calculation module, calculates engineering quantity based on the reservoir basin model.
