A foundation pit skylight system and control method based on environmental data analysis
By adopting a new laying method and environmental data analysis and control strategy of driving dustproof nets with winding shaft and expansion shaft in the foundation pit trunk trunk system, the problem of slow laying speed of foundation pit trunk trunk system and easy to damage is solved, and efficient Dust control and construction efficiency are improved.
Patent Information
- Application Number
- CN202411167786.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-23
AI Technical Summary
The existing foundation pit trunk trunk system is slow when laying dustproof nets, which affects construction efficiency, and the dustproof nets are easily damaged and difficult to disassemble and transport.
Replace traditional steel ropes with winding shafts and expansion shafts, and drive the dustproof net from the winding shaft to the outer wall of the expansion shaft through synchronous rotation, improve the masking speed, and increase humidification of air and reduce dust through the atomized nozzle. At the same time, environmental data analysis is used to analyze in real time Monitoring and control policies.
The laying speed of the dustproof net is improved, the dust dissipation is prevented, the damage and transportation difficulty of the dustproof net is reduced, and the control strategies of the sky curtain and spray system are optimized through real-time data analysis, improving construction efficiency and environmental protection effect.
Smart Images

Figure CN118681889B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of foundation pit dustproof skylight systems, and in particular to a foundation pit skylight system and a control method based on environmental data analysis. Background Art
[0002] Foundation pit refers to the space below the ground excavated for the construction of the foundation and basement of a building (including structures); dust control during the earthwork construction stage of the foundation pit has always been the focus of wind speed protection work on the construction project site; the existing dust prevention and control model, through the form of artificial covering of dense mesh safety nets to achieve the purpose of reducing dust on site, will cause a waste of manpower and a great waste of dust nets, and some dust nets will enter the fill with the soil construction, polluting the wind speed.
[0003] To solve the above problems, people have developed foundation pit canopies, which are usually built by setting up multiple equally spaced steel ropes on the foundation pit, or setting up slide rails on both sides of the foundation pit, and using mechanical equipment to drive the dust net to slide along the axis of the steel ropes or slide rails, covering from one end of the foundation pit to the other, thereby covering the foundation pit and trapping the dust in the foundation pit. Then, atomizing nozzles are used to spray mist water under the dust net to humidify the air and further reduce dust in the air in the foundation pit.
[0004] Since the foundation pit canopy is usually activated manually according to the weather or needs, the dust-proof net will be slowly laid from one end of the foundation pit to the other end during startup. Construction will start after the laying is completed to prevent dust during construction from affecting the surrounding wind speed. Due to the slow laying speed, the efficiency of construction is affected, and there is a need to improve the laying speed.
[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention
[0006] The purpose of the present invention is to replace the originally installed steel rope with an unfolding shaft and a winding shaft, so that the dustproof net originally placed at one end of the foundation pit is wound on the winding shaft, and the movement state of the dustproof net is changed from one end of the foundation pit to be slowly laid to the other end, and it is changed from being unfolded on the winding shaft to the outer wall of the unfolding shaft, thereby changing the movement mode of the dustproof net cover on the foundation pit, and at the same time, based on the number of winding shafts and unfolding shafts, the speed of the cover is increased to solve the above-mentioned deficiencies in the technology.
[0007] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a foundation pit canopy system based on environmental data analysis, comprising a plurality of hoses installed above the foundation pit, atomizing nozzles facing the foundation pit are installed on the hoses, and a plurality of groups of unfolding components are rotatably installed above the foundation pit, one group of unfolding components comprises a winding shaft and an unfolding shaft parallel thereto, a plurality of equally spaced dust-proof nets are wound on the winding shaft, a binding rope is fixedly installed at the end of the dust-proof net, and the end of the binding rope is fixedly installed on the outer circumference of the unfolding shaft, the unfolding shaft is perpendicular to the hose, and there is a hose between every two dust-proof nets;
[0008] The steel rope in the prior art is replaced by the unfolding shaft and the winding shaft in the unfolding assembly. When the unfolding shaft and the winding shaft rotate synchronously, the restraining rope is wound down from the dustproof net and then wound onto the unfolding shaft, driving the dustproof net to be wound down from the winding shaft, covering the unfolding shaft and the winding shaft to cover the top of the foundation pit.
[0009] Preferably, the unfolding shaft and the winding shaft are composed of multiple connecting shafts and special-shaped blocks slidably installed between two connecting shafts. Countersunk holes are provided at both ends of the connecting shafts, and through holes corresponding to the countersunk holes are provided on the special-shaped blocks. Threaded fasteners for fixing the special-shaped blocks and the connecting shafts are installed in the countersunk holes and the through holes.
[0010] Preferably, the cross-sectional shape of the special-shaped block is set to be a polygon.
[0011] Preferably, both ends of the unfolding shaft are rotatably connected to a mounting frame, the top of the mounting frame has a plurality of upwardly open limiting grooves, and the connecting shaft is rotatably connected to the limiting grooves.
[0012] Preferably, the connecting shafts at one end of the unfolding components are rotatably connected to the mounting frame, a special-shaped block is installed at the end of the connecting shaft, a transmission shaft is fixedly installed on the special-shaped block away from the end of the connecting shaft, a sprocket is fixedly installed on the end of the transmission shaft, the sprockets on the multiple groups of unfolding components are jointly meshed with a chain, a driving wheel is meshed at one end of the chain, a motor is also fixedly installed on the mounting frame, and the motor output shaft is fixedly connected to the driving wheel.
[0013] Preferably, the mounting frame comprises a vertical plate and a horizontal plate fixedly mounted at the bottom of the vertical plate, a limiting groove is provided on the vertical plate, and a top surface of the horizontal plate is in contact with a bottom surface of the chain.
[0014] Preferably, wind speed detectors are fixedly mounted on both ends of the two mounting frames, and the wind speed detectors are respectively located at the four corners of the mounting frames.
[0015] The present invention also provides a method for using a foundation pit canopy system based on environmental data analysis, comprising the following steps:
[0016] S1. The wind speed detector detects the wind speed data and analyzes whether the wind speed data meets the conditions for unfolding the foundation pit canopy;
[0017] S2. When the wind speed data reaches the point where the foundation pit canopy needs to be unfolded, or when the operator deems it necessary to unfold it, the motor is started until the dust screen fits the outer circumference of the unfolding shaft, and then the motor is turned off;
[0018] S3. When the foundation pit canopy does not need to be unfolded, start the motor to reverse until the binding rope is wound around the dustproof net, and then turn off the motor.
[0019] A control method for foundation pit skylight system based on environmental data analysis.
[0020] The steps include:
[0021] S1. Environmental data collection: collect local climate data, including rainfall, wind direction and sunshine data; collect data from air quality detectors and integrate them into environmental data;
[0022] S2. Data analysis: Analyze environmental data to identify climate conditions and air quality conditions inside the foundation pit;
[0023] S3, setting thresholds for relevant conditions for the canopy to be deployed and the hose nozzle to spray, including rainfall, dust level, foundation pit temperature, foundation pit humidity, and sunlight exposure time;
[0024] S4, real-time monitoring and feedback, real-time monitoring of wind speed data and system status to ensure the effective implementation of the control strategy, and dynamically adjust the control strategy of the canopy and sprinkler system by real-time detection of wind speed data;
[0025] S5. Fault detection and emergency handling: set up a fault detection mechanism to promptly detect sensor failures or system abnormalities; when a fault is detected, automatically switch to the backup control strategy to ensure stable operation of the system.
[0026] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0027] 1. The foundation pit canopy replaces the steel rope in the prior art with a winding shaft and an unfolding shaft, and changes the movement mode of the dustproof net from unfolding from one end of the foundation pit to the other end of the foundation pit to directly unfolding from the winding shaft to the surface of the unfolding shaft, thereby increasing the speed of unfolding the dustproof net;
[0028] 2. After the foundation pit canopy is unfolded, the water in the hose will be sprayed out through the atomizing nozzle, and the sprayed atomized water vapor will be sprayed into the foundation pit from between the two dust-proof nets, so that a layer of atomized water vapor air flow layer will be formed above the foundation pit and between the dust-proof nets, which will humidify the air in the foundation pit and play a role in dust reduction, preventing the dust generated by the operation in the foundation pit from diffusing outside the operation area and affecting the environment;
[0029] 3. After the foundation pit canopy is dismantled, the dust-proof net wound on the connecting shaft is wound outside by a binding belt, so that after the device is dismantled, the dust-proof net will not be messy and is easy to carry and transport;
[0030] 4. When installing the foundation pit canopy, you can assemble the unfolding axis and winding axis corresponding to the length according to the width and length of the foundation pit, and then assemble the unfolding axis and winding axis corresponding in number according to the width of the foundation pit. It is suitable for foundation pits of different sizes and is highly practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0032] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0033] Figure 2 It is a schematic diagram of the connection between the connecting shaft and the mounting frame of the present invention;
[0034] Figure 3 It is a schematic diagram of the connection between the connecting shaft and the dustproof net of the present invention;
[0035] Figure 4 A method flow chart of a control method of a foundation pit skylight system based on environmental data analysis of the present invention;
[0036] Figure 5 This is a schematic diagram of a control method for a foundation pit skylight system based on environmental data analysis of the present invention.
[0037] Description of reference numerals:
[0038] 1. Hose; 2. Unfolding assembly; 201. Winding shaft; 202. Unfolding shaft; 203. Dust net; 204. Binding rope; 205. Connecting shaft; 206. Special-shaped block; 207. Countersunk hole; 208. Through hole; 209. Threaded fastener; 3. Mounting frame; 301. Vertical plate; 302. Horizontal plate; 4. Limiting groove; 5. Transmission shaft; 6. Sprocket; 7. Chain; 8. Driving wheel; 9. Motor; 10. Wind speed detector. DETAILED DESCRIPTION
[0039] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application are clearly and completely described below. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0040] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0041] Example 1
[0042] The present invention provides Figure 1-3 The pit canopy system based on environmental data analysis shown in the figure includes a plurality of hoses 1 installed above the pit, atomizing nozzles facing the pit are installed on the hoses 1, and a plurality of unfolding components 2 are rotatably installed above the pit, one group of unfolding components 2 includes a winding shaft 201 and an unfolding shaft 202 parallel thereto, the unfolding shaft 202 and the winding shaft 201 are composed of a plurality of connecting shafts 205, and a polygonal special-shaped block 206 slidably installed between two connecting shafts 205, and countersunk holes are opened at both ends of the connecting shaft 205 207, a through hole 208 corresponding to the countersunk hole 207 is opened on the special-shaped block 206, and a threaded fastener 209 for fixing the special-shaped block 206 and the connecting shaft 205 is installed in the countersunk hole 207 and the through hole 208. According to the number of connecting shafts 205 on the winding shaft 201, a dust net 203 is wound on the connecting shaft 205, and a binding rope 204 is fixedly installed at the end of the dust net 203. The end of the binding rope 204 is fixedly installed on the outer circumference of the connecting shaft 205 on the unfolding shaft 202, and the unfolding shaft 202 is connected to the hose 1 is vertical, and there is a hose 1 between every two dustproof nets 203. A mounting frame 3 consisting of a vertical plate 301 and a horizontal plate 302 is installed on both sides of the foundation pit. The vertical plate 301 is fixedly installed on the horizontal plate 302. A plurality of limit slots 4 rotatably connected to the connecting shaft 205 are opened on the vertical plate 301. The limit slots 4 have an opening upward. A motor 9 is fixedly installed on the horizontal plate 302. A driving wheel 8 is fixedly installed on the end of the output shaft of the motor 9. The unfolding shaft 202 and the winding shaft 201 are both rotatably connected to the limit slots 4. 02 and the end of the connecting shaft 205 near the end of the winding shaft 201 of the motor 9 are both installed with a special-shaped block 206, and the end of the special-shaped block 206 away from the connecting shaft 205 is fixedly installed with a transmission shaft 5, and a sprocket 6 is fixedly installed at the end of the transmission shaft 5. A chain 7 is meshed outside the sprocket 6 and the driving wheel 8 at the same time, and the surface of the bottom of the chain 7 is in contact with the top surface of the cross plate 302. A control panel can also be installed on the mounting frame 3. The control panel is connected to the weather forecast of the local area, and it is judged whether to start the device in advance according to the daily wind force;
[0043] Wind speed detectors 10 are fixedly mounted at both ends of the two mounting frames 3 , and the wind speed detectors 10 are respectively located at the four corners of the mounting frames 3 .
[0044] When the foundation pit needs to be covered, the motor 9 is started, and the output shaft of the motor 9 drives the driving wheel 8 to rotate. The driving wheel 8 drives the sprocket 6 to rotate synchronously through the chain 7. The sprocket 6 drives the transmission shaft 5 to rotate. The transmission shaft 5 drives the connecting shaft 205 to rotate through the special-shaped block 206, thereby driving the unfolding shaft 202 and the winding shaft 201 to rotate synchronously in the same direction. This rotation part is divided into two stages. The first stage is that the restraining belt wound on the dustproof net 203 will gradually be wound onto the unfolding shaft 202. When the restraining belt is no longer wound on the dustproof net 203, it will enter the second stage. The restraining belt will drive the dustproof net 203 to gradually approach the unfolding shaft 202 until it fits with the outer peripheral surface of the unfolding shaft 202. At this time, the dustproof net 203 will cover the entire foundation pit;
[0045] When the unfolding shaft 202 and the winding shaft 201 rotate synchronously, the hose 1 slips on the surface of the connecting shaft 205. When the foundation pit is covered, water is introduced into the hose 1, and the water is sprayed into the foundation pit from the atomizing nozzle. Since each hose 1 is between two dust-proof nets 203, the gap between the two dust-proof nets 203 is continuously driven to spray atomized water vapor, so that a layer of atomized water vapor air flow layer is formed above the foundation pit and between the dust-proof nets 203, which humidifies the air in the foundation pit and plays a role in dust reduction, preventing the dust generated by the operation in the foundation pit from diffusing outside the operation area and affecting the wind speed.
[0046] When the cover needs to be folded up, the output shaft of the start motor 9 is reversed, the dustproof net 203 is first wound on the winding rod, and then the restraining belt is wound on the dustproof net 203 to fix the dustproof net 203 on the winding rod;
[0047] When the device needs to be disassembled, the threaded fastener 209 only needs to be taken out from the through hole 208 and the countersunk hole 207 to separate the special-shaped block 206 and the connecting shaft 205. The dust-proof net 203 wound on the connecting shaft 205 is wound outside with a binding belt, so that after the device is disassembled, the dust-proof net 203 will not be messy and is easy to carry and transport.
[0048] When installing this device, the unfolding shaft 202 and the winding shaft 201 of corresponding lengths can be assembled according to the width and length of the foundation pit, and then the unfolding shaft 202 and the winding shaft 201 of corresponding numbers can be assembled according to the width of the foundation pit. It is highly practical.
[0049] Example 2
[0050] A foundation pit canopy system based on environmental data analysis includes a plurality of hoses 1 installed above the foundation pit, atomizing nozzles facing the foundation pit are installed on the hoses 1, and a plurality of groups of unfolding components 2 are rotatably installed above the foundation pit, one group of unfolding components 2 includes a winding shaft 201 and an unfolding shaft 202 parallel thereto, the unfolding shaft 202 and the winding shaft 201 are composed of a plurality of connecting shafts 205, and a polygonal special-shaped block 206 slidably installed between two connecting shafts 205, and countersunk holes 207 are opened at both ends of the connecting shaft 205. The shaped block 206 is provided with a through hole 208 corresponding to the countersunk hole 207, and the countersunk hole 207 and the through hole 208 are provided with threaded fasteners 209 for fixing the shaped block 206 and the connecting shaft 205. According to the number of connecting shafts 205 on the winding shaft 201, a dust net 203 is wound on the connecting shaft 205, and a binding rope 204 is fixedly installed at the end of the dust net 203. The end of the binding rope 204 is fixedly installed on the outer circumference of the connecting shaft 205 on the unfolding shaft 202, and the unfolding shaft 202 is perpendicular to the hose 1, and There is a hose 1 placed below each two dustproof nets 203, and a mounting frame 3 consisting of a vertical plate 301 and a horizontal plate 302 is installed on both sides of the foundation pit. The vertical plate 301 is fixedly installed on the horizontal plate 302, and a plurality of limit grooves 4 rotatably connected to the connecting shaft 205 are opened on the vertical plate 301. The limit groove 4 has an opening upward, and a motor 9 is fixedly installed on the horizontal plate 302. A driving wheel 8 is fixedly installed at the end of the output shaft of the motor 9. The unfolding shaft 202 and the winding shaft 201 are both rotatably connected to the limit groove 4. 202 and the end of the connecting shaft 205 near the end of the winding shaft 201 of the motor 9 are both installed with a special-shaped block 206, and the end of the special-shaped block 206 away from the connecting shaft 205 is fixedly installed with a transmission shaft 5, and a sprocket 6 is fixedly installed at the end of the transmission shaft 5. A chain 7 is meshed outside the sprocket 6 and the driving wheel 8 at the same time, and the surface of the bottom of the chain 7 is in contact with the top surface of the cross plate 302. A control panel can also be installed on the mounting frame 3. The control panel is connected to the weather forecast of the local area, and it is determined whether to start the device in advance according to the daily wind force.
[0051] In this embodiment, the hose 1 is arranged at the lower part of the dustproof net 203, that is, under the foundation pit skylight system, to achieve the function of spraying the inside of the foundation pit, and a number of light strips are also pasted on the outer wall of the hose 1 distributed in the foundation pit to provide lighting for the inside of the foundation pit.
[0052] Wind speed detectors 10 are fixedly mounted at both ends of the two mounting frames 3 , and the wind speed detectors 10 are respectively located at the four corners of the mounting frames 3 .
[0053] When the foundation pit needs to be covered, the motor 9 is started, and the output shaft of the motor 9 drives the driving wheel 8 to rotate. The driving wheel 8 drives the sprocket 6 to rotate synchronously through the chain 7. The sprocket 6 drives the transmission shaft 5 to rotate. The transmission shaft 5 drives the connecting shaft 205 to rotate through the special-shaped block 206, thereby driving the unfolding shaft 202 and the winding shaft 201 to rotate synchronously in the same direction. This rotation part is divided into two stages. The first stage is that the restraining belt wound on the dustproof net 203 will gradually be wound onto the unfolding shaft 202. When the restraining belt is no longer wound on the dustproof net 203, it will enter the second stage. The restraining belt will drive the dustproof net 203 to gradually approach the unfolding shaft 202 until it fits with the outer peripheral surface of the unfolding shaft 202. At this time, the dustproof net 203 will cover the entire foundation pit;
[0054] When the unfolding shaft 202 and the winding shaft 201 rotate synchronously, the hose 1 slips on the surface of the connecting shaft 205. When the foundation pit is covered, water is introduced into the hose 1, and the water is sprayed into the foundation pit from the atomizing nozzle. Since each hose 1 is between two dust-proof nets 203, the gap between the two dust-proof nets 203 is continuously driven to spray atomized water vapor, so that a layer of atomized water vapor air flow layer is formed above the foundation pit and between the dust-proof nets 203, which humidifies the air in the foundation pit and plays a role in dust reduction, preventing the dust generated by the operation in the foundation pit from diffusing outside the operation area and affecting the wind speed.
[0055] When the cover needs to be folded up, the output shaft of the start motor 9 is reversed, the dustproof net 203 is first wound on the winding rod, and then the restraining belt is wound on the dustproof net 203 to fix the dustproof net 203 on the winding rod;
[0056] When the device needs to be disassembled, the threaded fastener 209 only needs to be taken out from the through hole 208 and the countersunk hole 207 to separate the special-shaped block 206 and the connecting shaft 205. The dust-proof net 203 wound on the connecting shaft 205 is wound outside with a binding belt, so that after the device is disassembled, the dust-proof net 203 will not be messy and is easy to carry and transport.
[0057] When installing this device, the unfolding shaft 202 and the winding shaft 201 of corresponding lengths can be assembled according to the width and length of the foundation pit, and then the unfolding shaft 202 and the winding shaft 201 of corresponding numbers can be assembled according to the width of the foundation pit. It is highly practical.
[0058] Furthermore, in this embodiment, by installing several air quality detectors inside and at the edge of the foundation pit, and installing several noise detectors at the edge of the foundation pit, a monitoring grid covering the edge of the foundation pit is formed to perform dust detection and noise detection on the edge of the foundation pit.
[0059] Example 3
[0060] like Figure 4-5As shown, the present invention provides a control method for a foundation pit skylight system based on environmental data analysis, comprising the following steps:
[0061] S1. Environmental data collection: collect local climate data, including rainfall, wind direction and sunshine data; collect data from air quality detectors and integrate them into environmental data;
[0062] S2. Data analysis: Analyze environmental data to identify climate conditions and air quality conditions inside the foundation pit;
[0063] S3, setting thresholds for relevant conditions for the canopy to be deployed and the hose nozzle to spray, including rainfall, dust level, foundation pit temperature, foundation pit humidity, and sunlight exposure time;
[0064] Among them, the relevant condition thresholds for the sky curtain to unfold include:
[0065] Rainfall: When the rainfall exceeds a certain value (such as continuous rainfall exceeding 10 mm), the canopy will be automatically deployed to protect the foundation pit;
[0066] Wind speed: When the wind speed reaches a certain level (such as above level 6), the canopy will be deployed to reduce dust;
[0067] Dust level: According to dust monitoring data, when dust reaches medium or high levels, the sky curtain will be gradually deployed;
[0068] Pit temperature: In extremely high temperature conditions (e.g. over 35°C), deploy the canopy to provide shade and reduce the pit temperature;
[0069] Pit humidity: When the humidity of the pit is below a certain threshold (e.g. below 30%), dust may be generated. At this time, the canopy is deployed and spraying is performed to a certain extent to maintain humidity;
[0070] Sun exposure duration: During periods of long sunshine (such as during the day and at noon, which may last for more than 4 hours depending on wind speed data), unfold the canopy to reduce the high temperature caused by direct sunlight;
[0071] The relevant condition thresholds for hose nozzles to spray include:
[0072] Dust level: When the dust level reaches a certain threshold, the sprinkler system is activated to reduce dust;
[0073] Foundation pit temperature: In hot weather, when the foundation pit temperature exceeds the set threshold (such as 38°C), the spraying is started to cool it down;
[0074] Pit humidity: When the pit humidity is lower than the set threshold (e.g., lower than 40%), the spraying is started to increase the humidity and reduce dust;
[0075] Sunlight intensity: Under strong sunlight, according to the intensity and duration of sunlight, start the spraying in time to reduce the surface temperature of the foundation pit;
[0076] Rainfall: In dry weather with low or no rainfall, start the sprinkler as needed to keep the foundation pit moist;
[0077] S4, real-time monitoring and feedback, real-time monitoring of wind speed data and system status to ensure the effective implementation of the control strategy, and dynamically adjust the control strategy of the canopy and sprinkler system by real-time detection of wind speed data;
[0078] The control strategy steps for dynamically adjusting the canopy and sprinkler systems are as follows:
[0079] Sa1, read real-time environmental data and historical environmental data;
[0080] Sa2, dynamically adjust thresholds based on real-time environmental data and historical data;
[0081] Sa3. Implement corresponding control measures based on the dynamically adjusted new thresholds;
[0082] The calculation process of the new threshold is:
[0083]
[0084] Among them, α is the adjustment coefficient;
[0085] The gradient descent method is introduced to find the optimal adjustment coefficient α, so that the control strategy tends to be optimal, specifically:
[0086] ① Define an objective function J(α) that measures the performance of the control strategy under the current α; for example, the objective function can be based on the following considerations:
[0087] The number of times the sky canopy is unfolded and folded: too frequent operation may mean that the α value needs to be adjusted;
[0088] Stability of air quality inside the foundation pit: If air quality indicators (such as PM2.5, PM10) fluctuate greatly, α may need to be adjusted;
[0089] Control accuracy of temperature and humidity inside the foundation pit: If the actual value deviates greatly from the set comfort range, α may need to be adjusted;
[0090] The objective function can be a weighted sum of these factors or other forms, for example:
[0091] J(α)=w1·OperationFrequency+w2·AirQualityScore+w3·TemperatureHumidityControlError,
[0092] Among them, w1, w2, and w3 are weight coefficients used to balance the importance of different factors. For example, if air quality is determined to be the most important, resource efficiency is the second most important, and response time is the least important, different values can be set for different weight coefficients.
[0093] For example, the objective function J(α) can be defined as the difference between the number of canopy deployments caused by the current wind speed threshold and the number of deployments actually required:
[0094]
[0095] Among them A i is the number of times the canopy needs to be deployed on the i-th day (based on the actual wind speed data), is the predicted number of expansions calculated based on the current α;
[0096] ② Calculate the gradient, calculate the gradient of J(α) to α, and perform regression analysis on historical data;
[0097] ③Update α and use the gradient descent method to update the value of α:
[0098] Where η is the learning rate, which needs to be adjusted according to the system response and changes in the objective function;
[0099] ④ Apply the updated α value to the control strategy of the skylight system;
[0100] The new threshold calculated according to the above formula will be used as the dynamically adjusted control point;
[0101] S5, Fault detection and emergency handling, set up a fault detection mechanism to promptly detect sensor failures or system abnormalities; when a fault is detected, automatically switch to a backup control strategy to ensure stable operation of the system. This embodiment also provides a central controller for implementing the above method, which is connected to the motor signal to control the opening and closing of the dustproof net, and is also connected to the wind speed detector, air quality detector, and noise detector for communication, and can obtain climate data from the Internet, perform environmental data analysis, and continuously adjust the control threshold.
Claims
1. A foundation pit canopy system based on environmental data analysis, comprising a plurality of hoses (1) installed above the foundation pit, wherein the hoses (1) are provided with atomizing nozzles directed toward the foundation pit. Features: A plurality of groups of unfolding components (2) are rotatably installed above the foundation pit, one group of unfolding components (2) comprises a winding shaft (201) and an unfolding shaft (202) parallel thereto, a plurality of equally spaced dustproof nets (203) are wound on the winding shaft (201), a binding rope (204) is fixedly installed at the end of the dustproof net (203), and the end of the binding rope (204) is fixedly installed on the outer peripheral surface of the unfolding shaft (202), the unfolding shaft (202) is perpendicular to the hose (1), and there is a hose (1) between every two dustproof nets (203); When the unfolding shaft (202) and the winding shaft (201) rotate synchronously, the restraining rope (204) is wound down from the dustproof net (203) and then wound onto the unfolding shaft (202), driving the dustproof net (203) to be wound down from the winding shaft (201), covering between the unfolding shaft (202) and the winding shaft (201) to cover the top of the foundation pit; The unfolding shaft (202) and the winding shaft (201) are composed of a plurality of connecting shafts (205) and a special-shaped block (206) slidably mounted between two connecting shafts (205); countersunk holes (207) are provided at both ends of the connecting shaft (205); a through hole (208) corresponding to the countersunk hole (207) is provided on the special-shaped block (206); and threaded fasteners (209) for fixing the special-shaped block (206) and the connecting shaft (205) are installed in the countersunk hole (207) and the through hole (208); the cross-sectional shape of the special-shaped block (206) is set to be a polygon; The connecting shaft (205) at one end of the unfolding assembly (2) is rotatably connected to the mounting frame (3); a special-shaped block (206) is installed at the end of the connecting shaft (205); a transmission shaft (5) is fixedly installed at one end of the special-shaped block (206) away from the connecting shaft (205); a sprocket (6) is fixedly installed at the end of the transmission shaft (5); a chain (7) is meshed with the sprockets (6) on the multiple groups of unfolding assemblies (2); a driving wheel (8) is meshed at one end of the chain (7); a motor (9) is also fixedly installed on the mounting frame (3); and an output shaft of the motor (9) is fixedly connected to the driving wheel (8).
2. A foundation pit canopy system based on environmental data analysis according to claim 1, Features: Both ends of the unfolding shaft (202) are rotatably connected to a mounting frame (3), the top of the mounting frame (3) is provided with a plurality of upwardly opening limiting grooves (4), and the connecting shaft (205) is rotatably connected to the limiting grooves (4).
3. A foundation pit canopy system based on environmental data analysis according to claim 2, Features: The mounting frame (3) comprises a vertical plate (301) and a horizontal plate (302) fixedly mounted at the bottom of the vertical plate (301); a limiting groove (4) is provided on the vertical plate (301); and the top surface of the horizontal plate (302) is in contact with the bottom surface of the chain (7).
4. A foundation pit canopy system based on environmental data analysis according to claim 3, Features: Wind speed detectors (10) are fixedly mounted at both ends of the two mounting frames (3), and the wind speed detectors (10) are respectively located at the four corners of the mounting frames (3).
5. A control method for a foundation pit canopy system based on environmental data analysis, used to operate a foundation pit canopy system based on environmental data analysis as claimed in any one of claims 1 to 4, Features: The steps include: S1. Environmental data collection: collect local climate data, including rainfall, wind direction and sunshine data; collect data from air quality detectors and integrate them into environmental data; S2. Data analysis: Analyze environmental data to identify climate conditions and air quality conditions inside the foundation pit; S3, setting thresholds for relevant conditions for the canopy to be deployed and the hose nozzle to spray, including rainfall, dust level, foundation pit temperature, foundation pit humidity, and sunlight exposure time; S4, real-time monitoring and feedback, real-time monitoring of wind speed data and system status to ensure the effective implementation of the control strategy, and dynamically adjust the control strategy of the canopy and sprinkler system by real-time detection of wind speed data; S5. Fault detection and emergency handling: set up a fault detection mechanism to detect system anomalies in a timely manner; when a fault is detected, automatically switch to the backup control strategy to ensure the stable operation of the system.
6. A control method for a foundation pit canopy system based on environmental data analysis according to claim 5, Features: The control strategy steps for dynamically adjusting the canopy and sprinkler system in S4 are as follows: Sa1, read real-time environmental data and historical environmental data; Sa2, dynamically adjust thresholds based on real-time environmental data and historical data; Sa3. Implement corresponding control measures based on the dynamically adjusted new thresholds; The calculation process of the new threshold is: Among them, α is the adjustment coefficient; The new threshold calculated according to the above formula will be used as the dynamically adjusted control point.
7. A control method for a foundation pit canopy system based on environmental data analysis according to claim 6, Features: The gradient descent method is introduced in Sa2 to find the optimal adjustment coefficient α so that the control strategy tends to be optimal, specifically: ① Define an objective function J(α), which measures the performance of the control strategy under the current α; ② Calculate the gradient, calculate the gradient of J(α) to α, and perform regression analysis on historical data; ③Update α and use the gradient descent method to update the value of α: Where η is the learning rate, which needs to be adjusted according to the system response and changes in the objective function; ④ Apply the updated α value to the control strategy of the skylight system.