Construction method based on slope groundwater pollution plume repairing device
By setting up incomplete wells and water diversion pipes on slopes to collect polluted water, and using activated biochar composite fillers and reaction walls with steel skeletons, the problems of high construction difficulty and material saturation in the existing technology are solved, and the removal of heavy metals in groundwater is achieved. Efficient removal and long-term stable operation.
Patent Information
- Application Number
- CN202410725132.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-09-24
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When existing permeable reactive walls treat groundwater contamination, the construction difficulty and cost are high, and the saturated deactivation of active materials leads to performance degradation, making it difficult to effectively remove large-scale and deep pollution plumes.
Non-integrated wells are used to collect contaminated water, and it is introduced into an efficient permeable reaction wall through a water diversion pipe. Activated biochar composite filler is used for adsorption and removal. A steel frame and permeable geotextile are combined to improve permeability, and planting soil is set in the reaction wall. and plants to enhance heavy metal absorption.
It significantly reduces the construction difficulty and operating costs, extends the service life of the device, improves the removal efficiency of pollutants, avoids clogging of the reaction wall, and achieves efficient and long-lasting removal of heavy metals in groundwater.
Smart Images

Figure CN118684367A
Abstract
Description
Technical Field
[0001] The invention relates to a construction method of a slope-based groundwater pollution plume repair device, belonging to the technical field of groundwater pollution repair. Background Art
[0003] Permeable reaction wall (PRB) is an emerging in-situ remediation technology that uses specific active fillers to intercept or remove pollutants in groundwater through adsorption, precipitation and redox. The structural type of the permeable reaction wall largely determines the remediation effect and cost of groundwater pollution, and needs to be selected in combination with the hydrogeological characteristics of the contaminated site and the scale of the pollution plume. Permeable reaction walls include continuous wall PRB, funnel-gate type and injection reaction zone. Permeable reaction walls can be filled with activated carbon to treat heavy metals in groundwater, and the use of soil, ryegrass and other vegetation to form a buffer zone can significantly improve the removal of heavy metals in surface runoff and shallow pollution plumes.
[0004] Existing permeable reaction walls are generally constructed by excavating reaction wall trenches over a large area, filling the trenches with adsorbent materials to form active material walls to intercept pollutant plumes, and heavy metals are removed by precipitation and adsorption in the material walls to achieve groundwater purification. The main problems are as follows: (1) It is highly dependent on the scope of the pollution plume at the remediation site. For example, the continuous wall PRB is suitable for treating small groundwater pollution plumes, and the funnel-water gate reaction wall is suitable for treating large-area polluted groundwater. When the groundwater depth and the scope of the pollution plume are large, the wall needs to cover the width and depth of the entire pollutant, which significantly increases the construction difficulty and installation cost. (2) Excavating aquifers over a large area can easily interfere with the groundwater flow field and affect the underground ecological environment. (3) During operation, the reaction capacity of the filled active material reaches saturation and deactivation, and the performance decreases. Due to the large volume of the wall, it is difficult to replace the material. Therefore, it is urgent to optimize and improve the existing permeable reaction wall to effectively solve the above technical problems. Summary of the invention
[0005] 1. Technical issues to be solved
[0006] In view of the deficiencies in the prior art, the present invention provides a construction method based on a slope groundwater pollution plume repair device, which solves the problems existing in the prior art.
[0007] (II) Technical solution
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: A construction method based on a slope groundwater pollution plume repair device, comprising an incomplete well, a water diversion pipe, a permeable reaction wall and a filling material set in a polluted aquifer. The incomplete well is located downstream of the pollution plume, and the contaminated groundwater is decompressed and collected to capture the contaminated groundwater. A water diversion pipe is set on one side of the incomplete well along the runoff direction of the pollution plume, and the water diversion pipe is connected to the permeable reaction wall. The pollution plume in the incomplete well flows into the permeable reaction wall through the water diversion pipe. The permeable reaction wall is filled with active fillers, which efficiently adsorb and remove heavy metals in the groundwater to achieve purification of pollutants.
[0009] Preferably, the incomplete well is set in a contaminated aquifer with a large hydraulic gradient and at a depth of the contaminated groundwater, so as to form a large flow section so that all the contaminated plumes can flow into the incomplete well.
[0010] Preferably, the top depth of the water diversion pipe is lower than the water level in the incomplete well, the water level difference is 10-15 cm, the water level difference drives the pollution plume to flow to the permeable reaction wall, and the water diversion pipe is made of HDPE, PVC or concrete pipe.
[0011] Preferably, the permeable reaction wall has a steel skeleton built into the wall, and the steel skeleton is covered with a permeable geotextile. The permeability coefficient of the wall is 2 to 5 times higher than the permeability coefficient of the nearby aquifer, and increases step by step along the seepage direction of the groundwater pollution plume. The top of the upstream wall is higher than the downstream wall, with an elevation difference of 30 to 50 cm.
[0012] Preferably, the steel reinforcement skeleton is formed by welding a plurality of stainless steel solid tubes vertically and horizontally, with a diameter of 12 to 20 mm, a skeleton width of 30 to 50 cm, and a permeability coefficient of the permeable geotextile of not less than 5.0*10-5 m / s.
[0013] Preferably, the depth of the reaction wall is greater than 1 m of the incomplete well depth, the distance between two adjacent walls is 1.5-2.5 m, and the wall is filled with active materials to form a reaction zone.
[0014] Preferably, a grille is provided at the top of the upstream wall of the permeable reaction wall along the length direction. The grille is welded by longitudinal and transverse steel bars into a hole-shaped grille with a hole spacing of 1 to 2 cm to intercept garbage such as branches and dead leaves on the slope.
[0015] Preferably, the filler is an activated biochar composite filler, the filler is a spherical porous particle, the particle size is 2-3 mm, and the ingredients include 50%-65% bentonite-modified biochar, 5%-10% zero-valent iron, 10%-20% plastic clay, and 15%-20% high permeability raw materials. The bentonite-modified biochar is prepared by mixing bentonite and biochar and then pyrolyzing them after standing. The particle size of the bentonite is 0.05-0.1 mm, the mass ratio of bentonite to biochar is 1:6-20, the pyrolysis temperature is 500-800°C, and the pyrolysis time is 30-60 minutes.
[0016] Preferably, the activated biochar composite filler is filled in the reaction bag to prevent water flow impact and loss. The reaction bag is made of permeable geotextile, which can be filled with materials on the ground first and then sealed, and then hoisted one by one by layering and stacked in the wall through the lifting equipment on the ground, so as to complete the loading of the filler.
[0017] Preferably, the device is suitable for slopes with a slope of 15° to 30°. The top of the reaction zone is filled with planting soil with a thickness of 10 cm to 15 cm. Heavy metal hyperaccumulator herbaceous plants are planted to absorb and stabilize heavy metals, including one or more of Dianthus acutus, Coreopsis grandiflora, alfalfa, Li's grass, Phytolacca baoshanensis, Marigold, ryegrass, and Centipede grass.
[0018] (III) Beneficial effects
[0019] The present invention provides a construction method for a slope groundwater pollution plume repair device. It has the following beneficial effects:
[0020] (1) The present invention gathers groundwater pollution plumes by setting up incomplete wells. The flow collection effect reduces the size of the pollution plumes, thereby reducing the size of the permeable reaction wall. The pollution plumes flow into the reaction zone through the water pipes by gravity, and the hydraulic gradient is used to realize the operation of the device, which significantly reduces the construction difficulty and operation costs.
[0021] (2) After the upstream heavy metal-containing pollution plume runoff enters the reaction zone, various heavy metals are adsorbed in the process of flowing through multiple layers of active fillers, and the concentration of heavy metals in the seeped water is greatly reduced. The construction method of stacking reaction packs in the wall and filling the reaction packs with active materials is adopted, which is convenient for material replacement and management, and maintains long-term stable operation of the device.
[0022] (3) The device has large filler porosity and good permeability, which results in little disturbance to the groundwater flow field, effectively ensuring the activity of the filler and avoiding blockage of the reaction wall, allowing the pollution plume to flow smoothly through the reaction zone, thus achieving efficient and lasting removal of heavy metals in groundwater. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A cross-sectional view of a construction method of a slope groundwater pollution plume repair device according to an embodiment of the present application;
[0024] Figure 2 This is a plan view of the construction method of the slope groundwater pollution plume repair device based on an embodiment of the present application.
[0025] In the figure: 1. Incomplete well; 2. Water diversion pipe; 3. Permeable reaction wall; 3-1. First unit; 3-2. Second unit; 4. Grid. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-2 The present invention provides a technical solution: a construction method based on a slope groundwater pollution plume repair device, comprising an incomplete well, a water diversion pipe, a permeable reaction wall and a filling material set in a polluted aquifer. The incomplete well is located downstream of the pollution plume, and the contaminated groundwater is decompressed and collected to capture the contaminated groundwater. A water diversion pipe is set on one side of the incomplete well along the runoff direction of the pollution plume, and the water diversion pipe is connected to the permeable reaction wall. The pollution plume in the incomplete well flows into the permeable reaction wall through the water diversion pipe. The permeable reaction wall is filled with active fillers, which efficiently adsorb and remove heavy metals in the groundwater to achieve purification of pollutants.
[0028] The incomplete well is set in a contaminated aquifer with a large hydraulic gradient, and its depth is located at the depth of the contaminated groundwater, which can form a large flow section so that all the pollution plumes are gathered and flow into the incomplete well.
[0029] The top depth of the water diversion pipe is lower than the water level in the incomplete well, the water level difference is 10-15 cm, and the water level difference drives the pollution plume to flow to the permeable reaction wall. The water diversion pipe is made of HDPE, PVC or concrete pipe.
[0030] The permeable reaction wall has a steel frame built into the wall, and the steel frame is covered with a permeable geotextile. The permeability coefficient of the wall is 2 to 5 times higher than the permeability coefficient of the nearby aquifer, and increases step by step along the seepage direction of the groundwater pollution plume. The top of the upstream wall is higher than the downstream wall, with an elevation difference of 30 to 50 cm.
[0031] The steel frame is formed by welding a plurality of stainless steel solid pipes in the longitudinal and transverse directions, with a diameter of 12 to 20 mm and a frame width of 30 to 50 cm. The permeability coefficient of the permeable geotextile is not less than 5.0*10-5 m / s.
[0032] The depth of the reaction wall is greater than the depth of the incomplete well by 1 m, the distance between two adjacent walls is 1.5-2.5 m, and the wall is filled with active materials to form a reaction zone.
[0033] The top of the upstream wall of the permeable reaction wall is provided with a grid along the length direction. The grid is welded by longitudinal and transverse steel bars into a hole-shaped grid with a hole spacing of 1 to 2 cm to intercept garbage such as branches and dead leaves on the slope.
[0034] The filler is an activated biochar composite filler, which is a spherical porous particle with a particle size of 2 to 3 mm, and the composition includes 50% to 65% bentonite-modified biochar, 5% to 10% zero-valent iron, 10% to 20% plastic clay, and 15% to 20% high permeability raw materials. The bentonite-modified biochar is prepared by mixing bentonite and biochar and then pyrolyzing them after standing. The particle size of the bentonite is 0.05 to 0.1 mm, the mass ratio of bentonite to biochar is 1:6 to 20, the pyrolysis temperature is 500 to 800°C, and the pyrolysis time is 30 to 60 minutes.
[0035] The activated biochar composite fillers are all filled in the reaction bag to prevent water flow impact and loss. The reaction bag is made of permeable geotextile, which can be filled with materials on the ground first and then sealed, and then hoisted one by one by layer and stacked in the wall through the lifting equipment on the ground, so as to complete the loading of the filler.
[0036] The device is suitable for slopes with a slope of 15° to 30°. The top of the reaction zone is filled with planting soil with a thickness of 10 cm to 15 cm. Heavy metal hyperaccumulator herbaceous plants are planted to absorb and stabilize heavy metals, including one or more of dianthus acutus, coreopsis large-flowered goldenrod, alfalfa, Li's grass, pokeweed, baoshan violet, cosmos, ryegrass, and centipede grass.
[0037] Example:
[0038] Example 1
[0039] from Figures 1-2It can be seen that the slope groundwater pollution plume remediation device of this embodiment includes an incomplete well 1, a water diversion pipe 2, a permeable reaction wall 3 and filling materials set in the polluted aquifer. The incomplete well 1 is located downstream of the pollution plume and is set in the polluted aquifer with a large hydraulic gradient. The depth is located at the depth of the polluted groundwater, forming a large flow section, decompressing and collecting the polluted groundwater, capturing the polluted groundwater, and making the pollution plume all flow into the incomplete well. Along the runoff direction of the pollution plume, a water diversion pipe 2 is set on one side of the incomplete well. The water diversion pipe is connected to the permeable reaction wall. The water diversion pipe is made of HDPE, PVC or concrete pipe with a diameter of 150 to 200 cm. The top depth of the water diversion pipe is 10 to 15 cm lower than the water level in the incomplete well. The water level difference drives the pollution plume to flow through the water diversion pipe to the permeable reaction wall 3. The depth of the reaction wall is greater than the depth of the incomplete well by 1 m. The distance between the two adjacent walls is 1.5 to 2.5 m. The wall is filled with active materials to form a reaction zone. The filler is an activated biochar composite filler, which can efficiently adsorb and remove heavy metals in groundwater to achieve purification of pollutants.
[0040] Specifically, the permeable reaction wall has a steel skeleton built into the wall, and the steel skeleton is covered with a permeable geotextile. The wall permeability coefficient is 2 to 5 times higher than the permeability coefficient of the nearby aquifer, and increases step by step along the seepage direction of the groundwater pollution plume. The top of the upstream wall is higher than the downstream wall, with an elevation difference of 30 to 50 cm. The steel skeleton is made of multiple stainless steel solid pipes welded vertically and horizontally, with a diameter of 12 to 20 mm and a skeleton width of 30 to 50 cm. The permeability coefficient of the permeable geotextile is not less than 5.0*10-5m / s.
[0041] Specifically, a grille 4 is provided at the top of the upstream wall of the permeable reaction wall along the length direction. The grille is welded by longitudinal and transverse steel bars into a hole-shaped grille with a hole spacing of 1 to 2 cm to intercept garbage such as branches and dead leaves on the slope.
[0042] Specifically, the filler is an activated biochar composite filler, which is a spherical porous particle with a particle size of 2 to 3 mm. The ingredients include 50% to 65% bentonite-modified biochar, 5% to 10% zero-valent iron, 10% to 20% plastic clay, and 15% to 20% high permeability raw materials. The bentonite-modified biochar is made by mixing bentonite and biochar and then pyrolyzing them. The particle size of the bentonite is 0.05 to 0.1 mm, the mass ratio of bentonite to biochar is 1:6 to 20, the pyrolysis temperature is 500 to 800 ° C, and the time is 30 to 60 minutes. The activated biochar composite fillers are all filled in the reaction bag to prevent water flow impact and loss. The reaction bag is made of permeable geotextile, which can be sealed after filling the material on the ground, and then hoisted and stacked one by one by the lifting equipment on the ground and placed in the wall, thereby completing the entire loading of the filler.
[0043] Specifically, the device is suitable for slopes with a slope of 15° to 30°. The top of the reaction zone is filled with planting soil with a thickness of 10cm to 15cm, and heavy metal hyperaccumulator herbaceous plants are planted, including one or more of pointed-leaf dianthus, large-flowered coreopsis, alfalfa, Li's grass, pokeweed, Baoshan violet, cosmos, ryegrass, and centipede grass.
[0044] Example 2
[0045] like Figure 1 As shown, the permeable reaction wall 1 can be in the form of a double unit, including a first unit 3-1 and a second unit 3-2 arranged in sequence along the seepage direction of the pollution plume. The first unit is filled with a purification filter material, which is an activated zeolite and volcanic rock composite filter material with a particle size of 2 to 8 mm. The second unit is filled with an activated biochar composite filler, which is a spherical porous particle with a particle size of 2 to 3 mm. The composition includes 50% to 65% bentonite-modified biochar, 5% to 10% zero-valent iron, 10% to 20% plastic clay, and 15% to 20% high permeability raw materials. Specifically, the bentonite-modified biochar is made by mixing bentonite and biochar and then pyrolyzing them. The particle size of the bentonite is 0.05 to 0.1 mm, the mass ratio of bentonite to biochar is 1:6 to 20, the pyrolysis temperature is 500 to 800°C, and the pyrolysis time is 30 to 60 minutes.
[0046] The purification filter material and activated biochar composite filler are filled in the reaction bag to prevent water flow impact and loss, and to facilitate the replacement of fillers. The size of the reaction bag is 0.6m*0.3m*0.2m, and the material is permeable geotextile. The material can be filled on the ground first and then sealed, and then hoisted one by one by the lifting equipment on the ground and stacked in layers and placed in the wall, so as to complete the loading of the filler. When the filler has been used for a long time and the pollutant removal effect is poor, it can be replaced with a new filler.
[0047] The groundwater heavy metal pollution plume flows into the first unit of the reaction wall, the filler absorbs and captures a portion of the heavy metals, and the polluted water enters the second unit, where the active filler further efficiently absorbs the remaining heavy metals. In addition, the plants in the planting belt simultaneously absorb the heavy metals in the polluted water, and through the absorption and enrichment of the plants, the heavy metals and other pollutants in the groundwater are completely removed.
[0048] In summary, the construction method of the slope groundwater pollution plume remediation device, by setting up an incomplete well to gather the groundwater pollution plume, the flow collection effect reduces the scale of the pollution plume, and then reduces the size of the permeable reaction wall; and the pollution plume flows into the reaction zone through the water pipe by gravity, and the hydraulic gradient is used to realize the operation of the device, which significantly reduces the construction difficulty and operation cost;
[0049] After the upstream pollution plume containing heavy metals enters the reaction zone, various heavy metals are adsorbed in the process of flowing through multiple layers of active fillers, and the concentration of heavy metals in the seeped water is greatly reduced. The construction method of stacking reaction packs in the wall and filling the reaction packs with active materials is adopted, which is convenient for material replacement and management, and maintains long-term stable operation of the device;
[0050] The device has large filler porosity, good permeability, and small disturbance to the groundwater flow field, which effectively ensures the activity of the filler, avoids clogging of the reaction wall, and allows the pollution plume to flow smoothly through the reaction zone, thereby achieving efficient and lasting removal of heavy metals in groundwater.
[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for a slope groundwater pollution plume repair device, characterized in that: It includes an incomplete well, a water diversion pipe, a permeable reaction wall and filling materials set in a polluted aquifer. The incomplete well is located downstream of the pollution plume, and the contaminated groundwater is decompressed and collected to capture the contaminated groundwater. A water diversion pipe is set on one side of the incomplete well along the runoff direction of the pollution plume, and the water diversion pipe is connected to the permeable reaction wall. The pollution plume in the incomplete well flows into the permeable reaction wall through the water diversion pipe. The permeable reaction wall is filled with active fillers, which efficiently adsorb and remove heavy metals in the groundwater to achieve purification of pollutants.
2. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The incomplete well is set in a contaminated aquifer with a large hydraulic gradient, and its depth is located at the depth of the contaminated groundwater, which can form a large flow section so that all the pollution plumes are gathered and flow into the incomplete well.
3. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The top depth of the water diversion pipe is lower than the water level in the incomplete well, the water level difference is 10-15 cm, and the water level difference drives the pollution plume to flow to the permeable reaction wall. The water diversion pipe is made of HDPE, PVC or concrete pipe.
4. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The permeable reaction wall has a steel frame built into the wall, and the steel frame is covered with a permeable geotextile. The permeability coefficient of the wall is 2 to 5 times higher than the permeability coefficient of the nearby aquifer, and increases step by step along the seepage direction of the groundwater pollution plume. The top of the upstream wall is higher than the downstream wall, with an elevation difference of 30 to 50 cm.
5. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The steel frame is formed by welding a plurality of stainless steel solid pipes vertically and horizontally, with a diameter of 12 to 20 mm and a frame width of 30 to 50 cm. The permeability coefficient of the permeable geotextile is not less than 5.0*10-5 m / s.
6. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The depth of the reaction wall is greater than the depth of the incomplete well by 1 m, the distance between two adjacent walls is 1.5-2.5 m, and the wall is filled with active materials to form a reaction zone.
7. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: A grille is provided at the top of the upstream wall of the permeable reaction wall along the length direction. The grille is welded by longitudinal and transverse steel bars into a hole-shaped grille with a hole spacing of 1 to 2 cm to intercept garbage such as branches and dead leaves on the slope.
8. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The filler is an activated biochar composite filler, which is a spherical porous particle with a particle size of 2 to 3 mm, and the composition includes 50% to 65% bentonite-modified biochar, 5% to 10% zero-valent iron, 10% to 20% plastic clay, and 15% to 20% high permeability raw materials. The bentonite-modified biochar is prepared by mixing bentonite and biochar and then pyrolyzing them after standing. The particle size of the bentonite is 0.05 to 0.1 mm, the mass ratio of bentonite to biochar is 1:6 to 20, the pyrolysis temperature is 500 to 800°C, and the pyrolysis time is 30 to 60 minutes.
9. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The activated biochar composite fillers are all filled in the reaction bag to prevent water flow impact and loss. The reaction bag is made of permeable geotextile, which can be filled with materials on the ground first and then sealed, and then hoisted one by one by layer and stacked in the wall through the lifting equipment on the ground, so as to complete the loading of the filler.
10. The construction method of the slope groundwater pollution plume repair device according to claim 1 is characterized in that: The device is suitable for slopes with a slope of 15° to 30°. The top of the reaction zone is filled with planting soil with a thickness of 10 cm to 15 cm. Heavy metal hyperaccumulator herbaceous plants are planted to absorb and stabilize heavy metals, including one or more of dianthus acutus, coreopsis large-flowered goldenrod, alfalfa, Li's grass, pokeweed, baoshan violet, cosmos, ryegrass, and centipede grass.
Citation Information
Cited By
Tea garden slope surface runoff nitrogen and phosphorus multi-stage treatment and recovery system and method
CN119591257A
Shallow riverside groundwater treatment system and method
CN119612629A
A shallow riverbank groundwater treatment system and method
CN119612629B
Underground water remediation system
CN121377150A