A water level measuring device and a measuring method for building survey

By designing structures such as floating plates, dustproof plates and sliding rings in the water level measurement device, the problems of inaccurate water level measurement and impurities in the prior art are solved, and higher detection accuracy and operational convenience are achieved.

CN118687656BActive Publication Date: 2024-11-15玖隆能源建设集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411162544.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-15
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The existing water level measuring device cannot accurately measure groundwater levels, and the detection results are inaccurate because of the entry of impurities in the monitoring well.

Method used

A water level measuring device including floating plate, dustproof plate, sliding ring and elastic lock block is designed. The floating plate drives the dustproof plate to open, the sliding ring drives the L-shaped rod to rotate, and the elastic lock block is removed from the lock groove to achieve automatic adjustment. and tighten the measuring rope to ensure the precise position and measurement of the device in groundwater.

Benefits of technology

Effectively prevent impurities on the groundwater surface from entering the drainage tube, slow down the movement speed of the device, improve detection accuracy, and facilitate reading of measurement data to ensure the accuracy of water level measurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118687656B_ABST
    Figure CN118687656B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building measurement technology, and in particular to a water level measuring device and a measuring method for building survey. The technical problem to be solved by the present invention is that the measuring device in the prior art cannot accurately measure the water level, and the presence of other impurities such as dirt in the monitoring well will also lead to inaccurate measurement results. The technical scheme is: it includes a shell, a cavity is opened inside the shell, a measuring rope is arranged on the upper side of the shell, two floating balls are connected to the top of the shell by a soft rope, and a sinking mechanism is also included. The sinking mechanism includes a water storage pipe, a water storage pipe is arranged at the bottom of the shell, a deceleration mechanism for slowing down the moving speed of the shell and the water storage pipe is arranged on the shell, and a floating mechanism for making the shell and the water storage pipe movable is arranged inside the shell. The present invention can effectively prevent impurities such as dirt on the surface of the groundwater from entering the inside of the drainage pipe when the drainage pipe sinks into the groundwater by designing the floating plate A and the dustproof plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building measurement, and in particular to a water level measuring device and a measuring method for building survey. Background Art

[0002] In the summary of construction survey work, the measurement of groundwater level plays an important role in engineering construction. By measuring the groundwater level, it can not only ensure the accuracy of engineering geology and hydrogeology, but also reduce the impact of groundwater on the project.

[0003] In the prior art, when measuring the groundwater level, a probe is usually sunk into a monitoring well through a measuring rope. Due to the low groundwater level, construction workers cannot accurately judge the depth of the probe into the groundwater, and can only judge based on the feedback signal from the probe through the cable. In addition, impurities such as soil are easily introduced into the monitoring well, causing the groundwater to become turbid or soil to condense on the surface of the groundwater, thereby reducing the accuracy of the probe's detection. Summary of the invention

[0004] In order to overcome the shortcomings of the water level measuring device in the prior art that it cannot measure accurately and other impurities such as dirt entering the monitoring well lead to inaccurate detection results, the present invention provides a water level measuring device and a measuring method for building survey.

[0005] The technical solution is: a water level measuring device for building survey, including a shell, a cavity is opened inside the shell, a measuring rope is arranged on the upper side of the shell, two floating balls are connected to the top of the shell through a soft rope, and a sinking mechanism is also included, the sinking mechanism includes a water storage pipe, the water storage pipe is arranged at the bottom of the shell, a first elastic member is arranged between the shell and the top of the water storage pipe, a one-way valve is installed at the bottom of the water storage pipe, a deceleration mechanism for slowing down the moving speed of the shell and the water storage pipe is arranged on the shell, and a floating mechanism for moving the shell and the water storage pipe is arranged inside the shell. The bottom of the water storage pipe is symmetrically connected to one end of the drainage pipe, the lower part of the outer wall of the drainage pipe is slidably connected to a floating plate A, a second elastic member is arranged between the floating plate A and the outer wall of the drainage pipe, the bottom of the floating plate A is hinged with a plurality of evenly distributed connecting rods, the bottom of the drainage pipe is hinged with a plurality of evenly distributed dustproof plates, the dustproof plates are in an inverted triangle shape, the ends of the connecting rods away from the floating plate A are hinged to the dustproof plates, a one-way exhaust valve is installed on the top of the water storage pipe, the telescopic end of a special-shaped telescopic tube is connected to the one-way exhaust valve, the top end of the special-shaped telescopic tube passes through the outer shell and is fixed to the outer shell.

[0006] Furthermore, the speed reduction mechanism includes a connecting rod, one end of the connecting rod is symmetrically fixed to the top of the water storage pipe, the other ends of the two connecting rods slide through the bottom of the shell and are commonly fixed to a sliding ring, the outer wall of the sliding ring is slidably connected to the inner wall of the shell, a plurality of evenly distributed connecting plates are hinged on the top of the sliding ring, the ends of the plurality of connecting plates away from the sliding ring are hinged to one end of an L-shaped rod, one end of the L-shaped rod penetrates the outer wall of the shell and is sealingly hinged to the shell, and the bottom ends of the L-shaped rods are symmetrically rotatably connected to rollers.

[0007] Furthermore, the floating mechanism includes a sleeve A, which is slidably connected to the top of the shell, and the bottom of the outer wall of the sleeve A is symmetrically provided with locking grooves, and the inner wall of the sliding ring is symmetrically fixed with rectangular plates, and the ends of the two rectangular plates close to each other are slidably connected with elastic locking blocks used in conjunction with the locking grooves.

[0008] Furthermore, resistance bars are symmetrically arranged on the outer wall of the sliding sleeve A, and the resistance bars are used to make the sliding sleeve A move slowly.

[0009] Furthermore, the floating mechanism also includes a floating board B, which is arranged on the upper side of the outer shell, and support blocks are symmetrically fixed to the top of the outer shell, and the ends of the support blocks away from the outer shell are both against the floating board B, and a floating board C is arranged on the top of the outer shell, and the top of the sliding sleeve A is fixed to the floating board C, and a third elastic member is arranged between the floating board B and the floating board C.

[0010] Furthermore, it also includes a sliding shaft, one end of which is fixedly connected to the bottom of the floating board B, and the other end of the sliding shaft passes through the top of the floating board C. The measuring rope is slidably connected to the sliding shaft in a penetrating manner, and the end of the sliding shaft away from the floating board B is movably inserted into the sliding sleeve A and slides in the sliding sleeve A, and a locking rod is fixedly connected to one side of the bottom of the outer wall of the sliding sleeve A.

[0011] Furthermore, it also includes a tightening mechanism arranged inside the shell, the tightening mechanism includes a mounting seat, the mounting seat is fixedly connected to the inner wall of the shell, the upper part of the mounting seat is rotatably connected with a rotating shaft, one end of the rotating shaft is rotatably connected to the shell in a through-type manner, a fourth elastic member is arranged between the rotating shaft and the mounting seat, a take-up wheel is fixedly connected to the rotating shaft, one end of a pull rope is fixedly connected to the take-up wheel, and the other end of the pull rope is fixedly connected to the measuring rope, and a rectangular groove used in conjunction with the locking rod is provided at one end of the rotating shaft close to the locking rod.

[0012] Furthermore, it also includes a rotating rod, and the outer wall of the water storage pipe is hinged with a plurality of evenly distributed rotating rods, a fifth elastic member is arranged between the rotating rod and the outer wall of the water storage pipe, and a salvage net is installed between the plurality of rotating rods.

[0013] Furthermore, a guide plate is included, and one end of a plurality of the rotating rods is fixedly connected to the guide plate.

[0014] A measuring method of a water level measuring device for building survey comprises the following steps:

[0015] S1: The whole device is placed into the monitoring well through the measuring rope, and the dustproof plate contacts the groundwater first. When the shell, the water storage pipe and the drainage pipe are completely immersed in the groundwater, the floating plate A floats upward under the influence of the groundwater. The floating plate A drives the dustproof plate to open through the connecting rod, so that the groundwater enters the water storage pipe through the drainage pipe;

[0016] S2: After groundwater enters the water storage pipe, the water storage pipe moves downward due to the weight of the groundwater, and the water storage pipe drives the connecting rod to move downward, and the connecting rod drives the sliding ring to move, so that the L-shaped rod rotates, and the L-shaped rod rotates to drive the roller to contact the inner wall of the monitoring well;

[0017] S3: After the sliding ring moves, the elastic locking block is disengaged from the locking groove of the sliding sleeve A. After the sliding sleeve A is disengaged from the restriction, the floating board C can move. The floating board C floats upward under the influence of groundwater. After the floating board C slides, it fits with the bottom surface of the floating board B.

[0018] S4: After the sliding shaft slides, it drives the locking rod to disengage from the rectangular groove of the rotating shaft. After the rotating shaft is disengaged from the restriction of the locking rod, the fourth elastic member is used to release the rapid rotation and tighten the measuring rope, and then the staff reads the measurement data. Beneficial Effects

[0019] 1. The present invention, through the design of the floating board A and the dustproof board, can effectively prevent impurities such as soil on the surface of the groundwater from entering the interior of the drainage pipe when the drainage pipe sinks into the groundwater, and as the floating board A enters the groundwater, the groundwater generates buoyancy on the floating board A, so that the floating board A drives the dustproof board to open through the connecting rod, and no other power source is required for auxiliary work, which further improves the practicality of the present invention.

[0020] 2. The present invention designs the sliding ring and the L-shaped rod so that the L-shaped rod rotates when the water storage pipe sinks downward, and the L-shaped rod drives the roller to contact the inner wall of the monitoring well, thereby preventing the outer shell from moving significantly, thereby affecting the accuracy of the detection result.

[0021] 3. The present invention, through the design of the floating plates B and C, can drive the outer shell to move upward through the floating plates B and C, so that the outer shell automatically adjusts its position in the groundwater, further improving the detection accuracy of the water level of the overall device.

[0022] 4. Through the design of the locking rod and the rotating shaft, the locking rod is disengaged from the rectangular groove of the rotating shaft after the sleeve A moves upward, and the rotating shaft drives the take-up wheel to reel in the measuring rope, so that the staff can clearly know that the overall device has completed the water level measurement, which is more convenient for the staff to read the measurement data. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0024] Figure 2 It is a structural schematic diagram of the sedimentation mechanism of the present invention;

[0025] Figure 3 It is a structural schematic diagram of the speed reduction mechanism of the present invention;

[0026] Figure 4 This is a schematic diagram of the installation of the elastic locking block of the present invention;

[0027] Figure 5 It is a structural schematic diagram of the tightening mechanism of the present invention;

[0028] Figure 6 This is a schematic diagram of the installation of the lock rod of the present invention;

[0029] Figure 7 It is a schematic diagram of the installation of the rotating rod of the present invention.

[0030] Figure numbers: 1_housing, 201_water storage pipe, 202_drainage pipe, 203_floating plate A, 204_connecting rod, 205_dustproof plate, 206_one-way exhaust valve, 207_special-shaped telescopic tube, 301_connecting rod, 302_sliding ring, 303_connecting plate, 304_L-shaped rod, 401_sleeve A, 402_rectangular plate, 403_elastic locking block, 501_floating plate B, 502_support block, 503_floating plate C, 601_sliding shaft, 602_locking rod, 701_mounting seat, 702_rotating shaft, 703_reel, 801_rotating rod, 802_fishing net, 803_guide plate, 100_measuring rope, 200_floating ball. DETAILED DESCRIPTION

[0031] The technical solution of the present invention is further described below in conjunction with the accompanying drawings. Example 1

[0032] A water level measuring device for building survey, see Figure 1-Figure 7, including a shell 1, a cavity is opened inside the shell 1, a measuring rope 100 is arranged on the upper side of the shell 1, two floating balls 200 are connected to the top of the shell 1 through a soft rope, and a sinking mechanism is also included, the sinking mechanism includes a water storage pipe 201, a water storage pipe 201 is arranged at the bottom of the shell 1, the bottom end of the water storage pipe 201 is conical, a first elastic member is arranged between the shell 1 and the water storage pipe 201, the first elastic member is an elastic telescopic rod, a one-way valve is installed at the bottom of the water storage pipe 201, a deceleration mechanism for slowing down the moving speed of the shell 1 and the water storage pipe 201 in the monitoring well is arranged on the shell 1, a floating mechanism for moving the shell 1 and the water storage pipe 201 in the monitoring well is arranged inside the shell 1, and the bottom of the water storage pipe 201 is symmetrically connected with One end of the drainage tube 202 and the lower part of the outer wall of the drainage tube 202 are slidably connected with a floating plate A203, a second elastic member is arranged between the floating plate A203 and the outer wall of the drainage tube 202, the second elastic member is a compression spring, a plurality of evenly distributed connecting rods 204 are hinged at the bottom of the floating plate A203, a plurality of evenly distributed dustproof plates 205 are hinged at the bottom of the drainage tube 202, the dustproof plates 205 are in an inverted triangle shape, and one end of the connecting rod 204 away from the floating plate A203 is hinged to the dustproof plate 205, a one-way exhaust valve 206 is installed on the top of the water storage pipe 201, the one-way exhaust valve 206 is connected to the telescopic end of a special-shaped telescopic tube 207, and the top end of the special-shaped telescopic tube 207 passes through the outer shell 1 and is fixedly connected to the outer shell 1.

[0033] The speed reduction mechanism includes a connecting rod 301, one end of which is symmetrically fixed to the top of the water storage pipe 201, and the other ends of the two connecting rods 301 slide through the bottom of the shell 1 and are commonly fixed to a sliding ring 302. The outer wall of the sliding ring 302 is slidingly connected to the inner wall of the shell 1, and a plurality of evenly distributed connecting plates 303 are hinged on the top of the sliding ring 302. The ends of the plurality of connecting plates 303 away from the sliding ring 302 are hinged to one end of an L-shaped rod 304, and the corners of the L-shaped rod 304 are sealed and hinged to the shell 1. The bottom ends of the L-shaped rods 304 are symmetrically rotatably connected to rollers. When the sliding ring 302 moves downward, it can drive the L-shaped rod 304 to rotate through the connecting plates 303, so that the L-shaped rod 304 drives the roller to contact the inner wall of the monitoring well.

[0034] The floating mechanism includes a sleeve A401, which is slidably connected to the top of the shell 1, and a locking groove is symmetrically provided at the bottom of the outer wall of the sleeve A401. A rectangular plate 402 is symmetrically fixed to the inner wall of the sliding ring 302, and one end of the two rectangular plates 402 close to each other is slidably connected to an elastic locking block 403 used in conjunction with the locking groove, and the elastic locking block 403 and the locking groove are both trapezoidal.

[0035] The outer wall of the sliding sleeve A401 is symmetrically provided with resistance bars, and the resistance bars are used to make the sliding sleeve A401 move slowly, so as to achieve the purpose of making the floating board C503 move slowly.

[0036] The floating mechanism also includes a floating plate B501. The floating plate B501 is arranged on the upper side of the outer shell 1. Support blocks 502 are symmetrically fixed to the top of the outer shell 1. The ends of the support blocks 502 away from the outer shell 1 are against the floating plate B501. A floating plate C503 is arranged on the top of the outer shell 1. The support block 502 can leave a gap between the floating plate B501 and the floating plate C503. The top of the sliding sleeve A401 is fixed to the floating plate C503. A third elastic member is arranged between the floating plate B501 and the floating plate C503, and the third elastic member is a tension spring.

[0037] Initially, the first elastic member is in a contracted state, and the first elastic member drives the top of the water storage pipe 201 to fit with the bottom of the shell 1. The staff first releases the measuring rope 100 to place the entire device into the monitoring well. As the entire device descends, the dustproof plate 205 first contacts the groundwater. When there are impurities such as soil on the surface of the groundwater, the dustproof plate 205 can effectively prevent impurities such as soil from entering the drainage pipe 202. When the entire device except the floating ball 200 is completely sunk into the groundwater, the floating plate B501 floats upward under the influence of the groundwater. After floating, the floating plate B501 no longer contacts the top of the support block 502, and the third elastic member between the floating plate B501 and the floating plate C503 is stretched, and at this time the floating plate B501 cannot be The whole device provides enough buoyancy to rise. Except for the floating ball 200, the whole device can be completely sunk into the groundwater. At this time, the top surface of the floating plate B501 is located below the liquid surface of the groundwater. The two floating balls 200 float on the water surface and exert a pulling force on the shell 1, so that the whole device cannot continue to sink. At this time, the top of the special-shaped telescopic tube 207 is located above the liquid surface of the groundwater. The buoyancy of the floating plate A203 is greater than the elastic force of the second elastic member. At this time, the floating plate A203 floats upward along the outer wall of the drainage tube 202. After the floating plate A203 floats, the second elastic member contracts, and the floating plate A203 drives the dust plate 205 to rotate with its connection with the drainage tube 202 as the center through the connecting rod 204. The four adjacent dust plates 205 are respectively upward. The dustproof plate 205 rotates, and the bottom end of the drainage pipe 202 is no longer sealed after the dustproof plate 205 rotates, so that the groundwater enters the water storage pipe 201 through the drainage pipe 202. As the groundwater continues to enter the water storage pipe 201, the air in the water storage pipe 201 is discharged into the special-shaped telescopic pipe 207 through the one-way exhaust valve 206, and is discharged through the top of the special-shaped telescopic pipe 207. When the water in the water storage pipe 201 is full, the water storage pipe 201 slides downward under the influence of the gravity of the water, and the water storage pipe 201 is driven by the force to drive the sedimentation mechanism to sink downward. At this time, the top end of the water storage pipe 201 is away from the bottom end of the shell 1, and the water storage pipe 201 drives the telescopic end of the special-shaped telescopic pipe 207 to move downward. The other end of the special-shaped telescopic pipe 207 is restricted by the shell 1 to maintain a stable height. At this time, the special-shaped telescopic pipe 20 7 begins to extend, and at the same time, the first elastic member between the water storage pipe 201 and the shell 1 is extended by force. At this time, the shell 1 is always in a sealed state, and groundwater cannot enter the shell 1. The water storage pipe 201 drives the sliding ring 302 to slide downward through the connecting rod 301, and the sliding ring 302 drives the L-shaped rod 304 to rotate through the connecting plate 303. The L-shaped rod 304 drives the roller to rotate toward the side away from the outer wall of the shell 1 with the connection between it and the shell 1 as the center of the circle. After the roller rotates, it fits with the inner wall of the monitoring well. The L-shaped rod 304 drives the roller to fit with the inner wall of the monitoring well, so that the shell 1 can be coaxial with the monitoring well and the moving speed of the shell 1 can be slowed down. At the same time, the sliding ring 302 drives the two elastic locking blocks 403 to move downward through the two rectangular plates 402.After the elastic locking block 403 moves downward, it contacts the adjacent locking groove. The elastic locking block 403 is squeezed and slid by the inner wall of the locking groove. After the elastic locking block 403 continues to slide downward, it disengages from the locking groove and no longer contacts the outer wall of the sliding sleeve A401. At this time, the sliding sleeve A401 is free from restriction and can move. At this time, the floating board B501 floats upward under the influence of groundwater and pulls the floating board C503 upward through the third elastic member. The floating board C503 drives the sliding sleeve A401 to move upward. The sliding sleeve A401 is restricted by the resistance bar to make the floating board C503 slide slowly upward, thereby preventing the floating board C503 from floating too fast, causing the entire device to shake significantly, thereby affecting the final measurement result. After the floating board C503 moves, a gap is generated between the floating board C503 and the top of the outer shell 1. At this time, groundwater enters the gap between the floating board C503 and the outer shell 1, thereby exerting buoyancy on the floating board C503. The floating board B501 and the floating The upward buoyancy of the floating plate C503 is applied to the outer shell 1. The force on the outer shell 1 can make the whole device float upward in the groundwater. During this process, the L-shaped rod 304 drives the roller to always keep in contact with the inner wall of the monitoring well. The roller rotates after rubbing against the inner wall of the monitoring well. The floating plate B501 floats to the surface of the groundwater and pushes away the debris on the surface of the groundwater. When the floating plate B501 floats to the surface of the groundwater, the sum of the buoyancy of the floating plates B501 and C503 can only drive the whole device to remain stable, and the floating plates B501 and C503 no longer drive the outer shell 1 to move upward, thereby completing the automatic adjustment of the position of the whole device in the groundwater. There is no need for the staff to detect and locate with other tools. By first sinking the whole device into the water and then floating it upward, it can effectively prevent the impurities on the surface of the groundwater from affecting the whole device. Example 2

[0038] See also Figure 1-Figure 7 , also includes a sliding shaft 601, one end of the sliding shaft 601 is fixedly connected to the middle position of the bottom of the floating board B501, the other end of the sliding shaft 601 passes through the top of the floating board C503, the measuring rope 100 is slidably connected with the sliding shaft 601, the end of the sliding shaft 601 away from the floating board B501 is movably inserted into the sliding sleeve A401 and slides in the sliding sleeve A401, and a locking rod 602 is fixedly connected to one side of the bottom of the outer wall of the sliding sleeve A401, and the locking rod 602 is L-shaped.

[0039] It also includes a tightening mechanism arranged inside the shell 1, the tightening mechanism includes a mounting seat 701, the mounting seat 701 is fixedly connected to the inner wall of the shell 1, the upper part of the mounting seat 701 is rotatably connected to a rotating shaft 702, one end of the rotating shaft 702 is rotatably connected to the shell 1, a fourth elastic member is arranged between the rotating shaft 702 and the mounting seat 701, the fourth elastic member is a clockwork spring, a take-up wheel 703 is fixedly connected to the rotating shaft 702, one end of a pull rope is fixedly connected to the take-up wheel 703, the other end of the pull rope is fixedly connected to the measuring rope 100, and a rectangular groove used in conjunction with the locking rod 602 is provided at one end of the rotating shaft 702 close to the locking rod 602.

[0040] It also includes a rotating rod 801. The outer wall of the water storage pipe 201 is hinged with several evenly distributed rotating rods 801. A fifth elastic member is arranged between the rotating rod 801 and the outer wall of the water storage pipe 201. The fifth elastic member is a torsion spring. A salvage net 802 is installed between the several rotating rods 801. The salvage net 802 is made of elastic material.

[0041] It also includes a guide plate 803. One end of each of the plurality of rotating rods 8011 is fixedly connected to the guide plate 803. The guide plate 803 is arranged in an inclined manner.

[0042] Initially, the locking rod 602 is inserted into the rectangular groove of the rotating shaft 702 to limit the rotating shaft 702, and the fourth elastic member between the rotating shaft 702 and the mounting seat 701 is in a contracted state. When the sliding sleeve A401 slides upward, the sliding sleeve A401 drives the locking rod 602 to move. After the locking rod 602 moves, it disengages from the rectangular groove of the rotating shaft 702. The rotating shaft 702 is free from the restriction and can move. At this time, the fourth elastic member is released to drive the rotating shaft 702 to rotate, and the rotating shaft 702 drives the take-up wheel 703 to rotate. The rotation distance of the wire wheel 703 is a fixed value. After the take-up wheel 703 rotates, the measuring rope 100 is wound up by pulling the rope. The excess length of the measuring rope 100 before being wound up is a fixed value. The length of the measuring rope 100 after being wound up is The worker can then feel the measuring rope 100 being obviously pulled, thereby confirming that the whole device has completed the water level measurement. The construction worker then slowly pulls the measuring rope 100. When the measuring rope 100 is in a taut state, the construction worker feels the feedback of the measuring rope 100, and then records the measurement result. The measuring rope 100 is then pulled to drive the whole device to take out the monitoring well. At this time, the whole device moves upward in the monitoring well. The guide plate 803 is affected by the resistance of the groundwater and drives several rotating rods 801 to rotate outward with the connection point with the water storage pipe 201 as the center. Several rotating rods 801 drive the salvage net 802 to unfold. After the salvage net 802 is unfolded, impurities such as condensed soil in the monitoring well are removed. After the whole device is taken out of the monitoring well, the water inside the water storage pipe 201 is discharged through the one-way valve at the bottom of the water storage pipe 201. At this time, the water storage pipe 201 is no longer affected by the gravity of the water and is reset through the first elastic member. The water storage pipe 201 drives the deceleration mechanism to reset through the connecting rod 301, and the water storage pipe 201 drives the special-shaped telescopic tube 207 to shrink and reset. At the same time, the floating board B501 and the floating board C503 in the floating mechanism are no longer affected by the buoyancy. The floating board C503 pulls the floating board B501 to reset through the third elastic member, and the floating board C503 drives the sliding sleeve A401 to slide under the influence of its own gravity. After the sliding sleeve A401 slides, its bottom contacts the elastic locking block 403 and cannot continue to move. The tool drives the rotating shaft 702 to rotate and reset, and the fourth elastic member between the rotating shaft 702 and the mounting seat 701 shrinks and resets. After the rotating shaft 702 rotates, the pull rope is released through the take-up wheel 703, and then the staff presses the floating plate C503 downward, and the floating plate C503 drives the sliding sleeve A401 to move downward, and the sliding sleeve A401 squeezes the elastic locking block 403 to make the elastic locking block 403 shrink and slide, and the sliding sleeve A401 continues to move the locking groove of its outer wall to align with the elastic locking block 403, and the elastic locking block 403 is stuck in the locking groove again to limit the sliding sleeve A401, thereby completing the operation and reset of the entire device. The present invention can effectively solve the disadvantage that the measuring equipment in the prior art cannot accurately measure the water level.

[0043] A measuring method of a water level measuring device for building survey comprises the following steps:

[0044] S1: The whole device is placed into the monitoring well through the measuring rope 100, and the dustproof plate 205 contacts the groundwater first. When the housing 1, the water storage pipe 201 and the drainage pipe 202 are completely immersed in the groundwater, the floating plate A203 floats upward under the influence of the groundwater. The floating plate A203 drives the dustproof plate 205 to open through the connecting rod 204, so that the groundwater enters the water storage pipe 201 through the drainage pipe 202;

[0045] S2: After groundwater enters the water storage pipe 201, the water storage pipe 201 moves downward due to the weight of the groundwater, and the water storage pipe 201 drives the connecting rod 301 to move downward, and the connecting rod 301 drives the sliding ring 302 to move, so that the L-shaped rod 304 rotates, and the L-shaped rod 304 rotates and drives the roller to contact the inner wall of the monitoring well;

[0046] S3: After the sliding ring 302 moves, the elastic locking block 403 is separated from the locking groove of the sliding sleeve A401. After the sliding sleeve A401 is freed from the restriction, the floating board C503 can move. The floating board C503 floats upward under the influence of groundwater. The floating board C503 and the floating board B501 drive the housing 1 to float upward to adjust the position;

[0047] S4: After the sliding shaft 601 slides, it drives the locking rod 602 to disengage from the rectangular groove of the rotating shaft 702. After the rotating shaft 702 is freed from the restriction of the locking rod 602, it is released through the fourth elastic member to quickly rotate and tighten the measuring rope 100, and then the staff reads the measurement data.

[0048] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A water level measuring device for building survey, comprising a housing (1), a cavity being formed inside the housing (1), a measuring rope (100) being arranged on the upper side of the housing (1), and two floating balls (200) being connected to the top of the housing (1) via a soft rope, characterized in that: The housing (1) further comprises a settling mechanism, the settling mechanism comprising a water storage pipe (201), the water storage pipe (201) being arranged at the bottom of the housing (1), a first elastic member being arranged between the housing (1) and the top of the water storage pipe (201), a one-way valve being installed at the bottom of the water storage pipe (201), a deceleration mechanism being arranged on the housing (1) for slowing down the moving speed of the housing (1) and the water storage pipe (201), a floating mechanism being arranged inside the housing (1) for moving the housing (1) and the water storage pipe (201), one end of a drainage pipe (202) being symmetrically connected to the bottom of the water storage pipe (201), a floating plate A (203) being slidably connected to the lower part of the outer wall of the drainage pipe (202), the floating plate A (203) being arranged on the bottom of the water storage pipe (201), and the floating plate A (203) being arranged on the lower part of the outer wall of the drainage pipe (202). A second elastic member is provided between the plate A (203) and the outer wall of the drainage tube (202); a plurality of evenly distributed connecting rods (204) are hingedly connected to the bottom of the floating plate A (203); a plurality of evenly distributed dustproof plates (205) are hingedly connected to the bottom of the drainage tube (202); the dustproof plates (205) are in the shape of an inverted triangle; one end of the connecting rod (204) away from the floating plate A (203) is hingedly connected to the dustproof plate (205); a one-way exhaust valve (206) is installed on the top of the water storage tube (201); the one-way exhaust valve (206) is connected to the telescopic end of a special-shaped telescopic tube (207); the top end of the special-shaped telescopic tube (207) passes through the outer shell (1) and is fixedly connected to the outer shell (1).

2. A water level measuring device for building survey according to claim 1, characterized in that: The speed reduction mechanism comprises a connecting rod (301), one end of the connecting rod (301) is symmetrically fixed to the top of the water storage pipe (201), the other ends of the two connecting rods (301) slide through the bottom of the outer shell (1) and are commonly fixed to a sliding ring (302), the outer wall of the sliding ring (302) is slidably connected to the inner wall of the outer shell (1), a plurality of evenly distributed connecting plates (303) are hinged to the top of the sliding ring (302), the ends of the plurality of connecting plates (303) away from the sliding ring (302) are hinged to one end of an L-shaped rod (304), one end of the L-shaped rod (304) penetrates the outer wall of the outer shell (1) and is sealed and hinged to the outer shell (1), and the bottom ends of the L-shaped rods (304) are symmetrically rotatably connected to rollers.

3. A water level measuring device for building survey according to claim 2, characterized in that: The floating mechanism comprises a sliding sleeve A (401), the top of the housing (1) is slidably connected to the sliding sleeve A (401), the bottom of the outer wall of the sliding sleeve A (401) is symmetrically provided with locking grooves, the inner wall of the sliding ring (302) is symmetrically fixed with rectangular plates (402), and the ends of the two rectangular plates (402) close to each other are slidably connected to elastic locking blocks (403) used in conjunction with the locking grooves.

4. A water level measuring device for building survey according to claim 3, characterized in that: The outer wall of the sliding sleeve A (401) is symmetrically provided with resistance bars, and the resistance bars are used to enable the sliding sleeve A (401) to move slowly.

5. A water level measuring device for building survey according to claim 4, characterized in that: The floating mechanism further comprises a floating plate B (501), the floating plate B (501) being arranged on the upper side of the shell (1), a supporting block (502) being symmetrically fixedly connected to the top of the shell (1), an end of each of the supporting blocks (502) away from the shell (1) being in contact with the floating plate B (501), a floating plate C (503) being arranged on the top of the shell (1), a top end of the sliding sleeve A (401) being fixedly connected to the floating plate C (503), and a third elastic member being arranged between the floating plate B (501) and the floating plate C (503).

6. A water level measuring device for building survey according to claim 5, characterized in that: The invention also comprises a sliding shaft (601), one end of the sliding shaft (601) is fixedly connected to the bottom of the floating board B (501), the other end of the sliding shaft (601) passes through the top of the floating board C (503), the measuring rope (100) is slidably connected to the sliding shaft (601) through the sliding shaft (601), one end of the sliding shaft (601) away from the floating board B (501) is movably inserted into the sliding sleeve A (401) and slides in the sliding sleeve A (401), and a locking rod (602) is fixedly connected to one side of the bottom of the outer wall of the sliding sleeve A (401).

7. A water level measuring device for building survey according to claim 6, characterized in that: The invention also comprises a tightening mechanism arranged inside the housing (1), the tightening mechanism comprising a mounting seat (701), the mounting seat (701) being fixedly connected to the inner wall of the housing (1), a rotating shaft (702) being rotatably connected to the upper part of the mounting seat (701), one end of the rotating shaft (702) being rotatably connected to the housing (1) in a through-type manner, a fourth elastic member being arranged between the rotating shaft (702) and the mounting seat (701), a wire-receiving wheel (703) being fixedly connected to the rotating shaft (702), one end of a pull rope being fixedly connected to the wire-receiving wheel (703), the other end of the pull rope being fixedly connected to the measuring rope (100), and a rectangular groove for use with the locking rod (602) being provided at one end of the rotating shaft (702) close to the locking rod (602).

8. A water level measuring device for building survey according to claim 7, characterized in that: It also comprises a rotating rod (801), the outer wall of the water storage pipe (201) being hinged with a plurality of evenly distributed rotating rods (801), a fifth elastic member being arranged between the rotating rod (801) and the outer wall of the water storage pipe (201), and a salvaging net (802) being installed between the plurality of rotating rods (801).

9. A water level measuring device for building survey according to claim 8, characterized in that: It also includes a guide plate (803), and one end of each of the plurality of rotating rods (801) is fixedly connected to the guide plate (803).

10. The measuring method of the water level measuring device for building survey according to claim 9, characterized in that: The following steps are included: S1: The entire device is placed into a monitoring well via the measuring rope (100), the dustproof plate (205) first contacts the groundwater, and when the housing (1), the water storage pipe (201) and the drainage pipe (202) are completely immersed in the groundwater, the floating plate A (203) floats upward under the influence of the groundwater, and the floating plate A (203) drives the dustproof plate (205) to open via the connecting rod (204), so that the groundwater enters the water storage pipe (201) through the drainage pipe (202); S2: After groundwater enters the water storage pipe (201), the water storage pipe (201) moves downward due to the weight of the groundwater, and the water storage pipe (201) drives the connecting rod (301) to move downward. The connecting rod (301) drives the sliding ring (302) to move, thereby causing the L-shaped rod (304) to rotate. After the L-shaped rod (304) rotates, it drives the roller to contact the inner wall of the monitoring well; S3: After the sliding ring (302) moves, the elastic locking block (403) is disengaged from the locking groove of the sliding sleeve A (401). After the sliding sleeve A (401) is disengaged from the restriction, the floating board C (503) can move. The floating board C (503) floats upward under the influence of groundwater. The floating board C (503) and the floating board B (501) drive the housing (1) to float upward to adjust the position; S4: After the sliding shaft (601) slides, it drives the locking rod (602) to disengage from the rectangular groove of the rotating shaft (702). After the rotating shaft (702) is freed from the restriction of the locking rod (602), the fourth elastic member is released to quickly rotate and tighten the measuring rope (100), and then the staff reads the measurement data.