Material data management method and system for seamless steel pipe production
Through real-time monitoring and characteristic marking of unqualified pipes, the problem of tracking and recycling of unqualified pipes in seamless steel pipe production is solved, effectively tracking and recycling of unqualified pipes is realized, and resource utilization is improved. Production process supervision capabilities.
Patent Information
- Application Number
- CN202411132955.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The existing material tracking system cannot effectively track and deal with unqualified pipe bodies during the production process of seamless steel pipes, resulting in long-term accumulation in the waste buffer zone and cannot be reasonably recycled and reused.
A material data management method is designed to generate production tracking data by monitoring and tracking pipe production information in real time, collecting characteristic information for unqualified pipes, generating anti-discriminatory characteristics, marking them as unqualified pipes, and storing them in a database In this paper, the processing and recycling process of waste buffers is optimized based on feature information screening and recommendation of recycling schemes.
It realizes effective tracking and distinction of unqualified pipe bodies, reduces resource waste, improves recycling and utilization efficiency, and meets customers' needs for steel pipe quality traceability and production process supervision.
Smart Images

Figure CN118689184B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of material data management, and in particular to a material data management method and system for seamless steel pipe production. Background Art
[0002] The process control system is the bridge between the MES system and basic automation. It uses a standard and mature industrial communication interface to automatically collect various data from the production line and monitor the production situation, so as to grasp the production rhythm, equipment operation overview, etc. in real time, provide a data source for the MES system, and integrate the MES system with the basic automation system data to play a cluster effect. One of the main functions of the process control system is material tracking, which is especially important for similar steel pipe manufacturers. In recent years, customers have not only paid more and more attention to product quality, but also paid more and more attention to quality supervision in the production process, especially for seamless steel pipes used in special industries such as nuclear power, oil drilling, and high-pressure boilers. Not only foreign users, but also domestic users have begun to require manufacturers to establish a tracking system to collect the quality of steel pipes in the process, and to be able to trace the production data of steel pipes at any time. Some users also specifically require the provision of product production process quality data at the time of delivery. Therefore, in order to ensure the accuracy of material tracking, it is necessary to design a specific tracking algorithm to meet project requirements.
[0003] The current material tracking system mainly collects processing information during the production process of seamless steel pipes to facilitate the subsequent traceability of qualified seamless steel pipes. However, for unqualified seamless steel pipes that come off the line during the processing, it does not continue to track and record their subsequent processing, and unqualified seamless steel pipes are piled up in the waste buffer for a long time, and cannot be reasonably and effectively recycled. Summary of the invention
[0004] The purpose of the present invention is to provide a material data management method and system for seamless steel pipe production to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solution: a material data management method for seamless steel pipe production, the method comprising the following steps:
[0006] Step S1, formulate a production plan, obtain pipe bundle information, perform furnace preparation operations according to the pipe bundle information, and assign pipe numbers to the pipe bodies;
[0007] Step S2: real-time monitoring of the production information of the pipe body, tracking the production information of the pipe body, and storing the collected production information data in a database. After the pipe body is manufactured, the pipe number and all production information corresponding to the pipe body are extracted to generate production tracking data of the branch pipe body;
[0008] Step S3: if the tube is offline during the processing, it is marked as an unqualified tube, and the unqualified tube is transported to the waste buffer, and the unqualified information of the unqualified tube is collected and stored;
[0009] Step S4: Screen the unqualified tube bodies in the waste buffer according to the specified characteristic screening information, and output a recommended plan for recycling the unqualified tube bodies.
[0010] Furthermore, the step S1 includes:
[0011] Step S101, receiving the production contract and production plan information issued by the MES system, organizing the physical information according to the contract standard, compiling the production plan, and issuing the production plan to the L2 system in units of pipe bundles, wherein the pipe bundle includes N pipe bodies, and the L2 system organizes production according to the production plan;
[0012] Step S102, performing furnace preparation operations according to the tube bundle information, wherein the tube bundle information includes tube bundle number, contract number, rolling lot number, steel grade, material, contract user name, tube blank specification, finished product specification and heat treatment method;
[0013] Step S103: assign a unique tube number to each tube body for tracking according to the production sequence, where the tube number is X.
[0014] Furthermore, the step S2 includes:
[0015] Step S201, dividing the data storage area according to the production process, wherein the production process includes annular furnace heating, perforation, rolling mill, hot saw, reheating and sizing;
[0016] Step S202, tracking the production information of the tube during the production process of annular furnace heating, perforation, rolling mill, hot sawing, reheating and sizing, and storing the production information in a corresponding data storage area, wherein the production information includes the start time of the tube processing, the tube processing process and the end time of the tube processing;
[0017] Step S203: extract the production information of each production process of the processed pipe body, generate the production tracking data of the pipe body, store it in the database, and retrieve it through the user terminal.
[0018] In step S202, the production information storage process in the production process of the ring furnace heating is as follows:
[0019] Automatically record the time and temperature of tube billet entering and leaving the furnace;
[0020] Track the material position of each tube billet in the furnace, and distinguish different furnace numbers by the empty material position;
[0021] Record the moment when each tube billet enters each heating section, and automatically calculate the heating time of each tube billet in each heating section;
[0022] Automatically record the heating data of each steel pipe in the furnace and draw a heating curve.
[0023] The process of tracking production information in the production process of ring furnace heating is:
[0024] When the tube billet enters the furnace, the L1 system sends a furnace entry signal to the L2 system, and the L2 system triggers the tube billet furnace entry logic after receiving the signal;
[0025] After the tube billet enters the furnace, it starts tracking. The L1 system provides the annular furnace rotation start signal, rotation end signal, and each rotation angle information to the L2 system;
[0026] The L2 system processes the annular furnace rotation information according to the annular furnace rotation information sent by the L1 system, records each rotation signal and angle, and performs cumulative calculations. It calculates the position information of the tube body in the furnace according to the angle accumulation logic, and records the moment and residence time of each section, and binds the temperature information.
[0027] Furthermore, the step S3 includes:
[0028] Step S301, mark the unfinished offline pipe body as an unqualified pipe body, obtain characteristic information of the unqualified pipe body, the characteristic information includes pipe number, pipe body size, pipe body length, pipe body material and offline time; record the unqualified reason of the unqualified pipe body, and input the processing technology that can be retained for the unqualified pipe body, if there is no processing technology that can be retained, it is recorded as 0;
[0029] Step S302, analyzing the physical damage caused to the unqualified pipe body by the unqualified reasons, and collecting the characteristic image of the physical damage, which is used as the anti-distinguishing feature and stored in the unqualified database;
[0030] Step S303: after the anti-distinguishing feature is collected, the anti-distinguishing feature is compared with the unqualified database. If there is no identical anti-distinguishing feature, the anti-distinguishing feature is used as the marking feature of the unqualified pipe body;
[0031] If there is the same anti-distinguishing feature in the unqualified database, compare the feature information of the current unqualified pipe body with that of the unqualified pipe body in the unqualified database to see if they are exactly the same; if they have different feature information, use the different feature information as the marking feature of the unqualified pipe body;
[0032] If the characteristic information is exactly the same, the current unqualified pipe body is marked, and the marking pattern is used as the marking feature of the current unqualified pipe body;
[0033] Step S304, when recycling and reusing unqualified pipe bodies in the waste buffer, the characteristic information of the unqualified pipe bodies is identified according to the marking characteristics, the pipe number of the unqualified pipe bodies is matched, the recycling result is automatically recorded in the production information of the unqualified pipe bodies, and the production information of the unqualified pipe bodies is continued to be tracked.
[0034] Further, the step S4 includes:
[0035] Step S401: Take the tube bundle information as feature screening information, input the specified feature screening information, screen the unqualified tube bodies in the waste buffer, and extract the unqualified tube bodies H that meet the feature screening information. n , forming a screening set = {H1, H2, H3......H n};
[0036] Step S402: Divide a plurality of waste buffer areas L according to the processing technology n , mark the number of unqualified tubes in each waste buffer that meet the feature screening information as S L H , the number of unqualified tube bodies with retainable processing technology is recorded as S L ’ , set the number of unqualified tubes to be recycled as S 总 ;
[0037] Step S403: Generate a time axis based on the processing technology of the tube body according to the time sequence, and select the unqualified tube bodies H in the screening set. n The reservable processing technology is marked on the time axis, and the time length of the reservable processing technology of each unqualified tube body H is recorded as Tn. Taking a waste buffer as a unit, the time length of the reservable processing technology of each unqualified tube body in the waste buffer is summed up and divided by the number of unqualified tube bodies with reservable processing technology in the waste buffer S L ’ , the average processing saving time of each waste buffer is obtained as Jn, and the average processing saving time Jn of each waste buffer is arranged in descending order;
[0038] Step S404: Select S 总 ≤S L H The waste buffer of the garbage buffer, if S 总 >S L ’ , then calculate S 总 -S L ’ The calculated difference Sa is formed into a set, and the Sa with the smallest difference in the set is extracted. minThe corresponding waste buffer is used as a recycling recommendation to recycle the unqualified tube bodies in the waste buffer;
[0039] If S 总 >S L H , then obtain the unqualified tube bodies S in multiple waste buffers L H Greater than S 总 , and calculate the average processing time Jn of the waste buffer in each combination, and select the Jn with the largest average processing time saving max The corresponding combination method is used as a recommended recycling solution to recycle the unqualified tube bodies in the waste buffer.
[0040] Furthermore, the L2 system is a PCS system, and the L1 is a basic automation system.
[0041] A material data management system for seamless steel pipe production, the management system comprising a processor and a computer program that can be run on the processor, and the processor implements the steps of the material data management method for seamless steel pipe production when executing the computer program.
[0042] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0043] The present invention takes material tracking and process quality data collection as important starting points, realizes material tracking in units of "pieces", and realizes the collection and binding of process quality data and processing parameters, which not only meets the user's needs for steel pipe production process supervision, but also meets the customer's requirements for steel pipe quality traceability.
[0044] The present invention generates anti-distinguishing features by collecting unqualified images of unqualified pipe bodies, so that the uniqueness of the unqualified images can be used as marking features of the unqualified pipe bodies, thereby reducing independent marking as much as possible and saving resources. The marking features can be stored according to the specific circumstances of the unqualified pipe bodies, which can not only meet the requirements of distinguishing different unqualified pipe bodies, but also eliminate the need to repeatedly record the same information of each unqualified pipe body, thereby reducing the storage space occupied.
[0045] The present invention analyzes the conditions of unqualified tube bodies in each waste buffer zone, and proposes a recycling recommendation plan based on the processing technology that can be retained for the unqualified tube bodies and the number of tube bodies that need to be recycled, so as to fully recycle the unqualified tube bodies and reduce the processing procedures required for reuse as much as possible, thereby saving resources and improving processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0047] Figure 1 It is a schematic flow chart of the material data management method for seamless steel pipe production according to the present invention. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] See also Figure 1 The present invention provides a technical solution: a material data management method for seamless steel pipe production, the method comprising the following steps:
[0050] Step S1, formulate a production plan, obtain pipe bundle information, perform furnace preparation operations according to the pipe bundle information, and assign pipe numbers to the pipe bodies;
[0051] The step S1 comprises:
[0052] Step S101, receiving the production contract and production plan information issued by the MES system, organizing the physical information according to the contract standard, compiling the production plan, and issuing the production plan to the L2 system in units of pipe bundles, wherein the pipe bundle includes N pipe bodies, and the L2 system organizes production according to the production plan;
[0053] Step S102, performing furnace preparation operations according to the tube bundle information, wherein the tube bundle information includes tube bundle number, contract number, rolling lot number, steel grade, material, contract user name, tube blank specification, finished product specification and heat treatment method;
[0054] Step S103: assign a unique tube number to each tube body for tracking according to the production sequence, where the tube number is X.
[0055] Step S2: real-time monitoring of the production information of the pipe body, tracking the production information of the pipe body, and storing the collected production information data in a database. After the pipe body is manufactured, the pipe number and all production information corresponding to the pipe body are extracted to generate production tracking data of the branch pipe body;
[0056] The step S2 comprises:
[0057] Step S201, dividing the data storage area according to the production process, wherein the production process includes annular furnace heating, perforation, rolling mill, hot saw, reheating and sizing;
[0058] Step S202, tracking the production information of the tube during the production process of annular furnace heating, perforation, rolling mill, hot sawing, reheating and sizing, and storing the production information in a corresponding data storage area, wherein the production information includes the start time of the tube processing, the tube processing process and the end time of the tube processing;
[0059] Step S203: extract the production information of each production process of the processed pipe body, generate the production tracking data of the pipe body, store it in the database, and retrieve it through the user terminal.
[0060] In step S202, the production information storage process in the production process of the ring furnace heating is as follows:
[0061] Automatically record the time and temperature of tube billet entering and leaving the furnace;
[0062] Track the material position of each tube billet in the furnace, and distinguish different furnace numbers by the empty material position;
[0063] Record the moment when each tube billet enters each heating section, and automatically calculate the heating time of each tube billet in each heating section;
[0064] Automatically record the heating data of each steel pipe in the furnace and draw a heating curve.
[0065] The process of tracking production information in the production process of ring furnace heating is:
[0066] When the tube billet enters the furnace, the L1 system sends a furnace entry signal to the L2 system, and the L2 system triggers the tube billet furnace entry logic after receiving the signal;
[0067] After the tube billet enters the furnace, it starts tracking. The L1 system provides the annular furnace rotation start signal, rotation end signal, and each rotation angle information to the L2 system;
[0068] The L2 system processes the annular furnace rotation information according to the annular furnace rotation information sent by the L1 system, records each rotation signal and angle, and performs cumulative calculations. It calculates the position information of the tube body in the furnace according to the angle accumulation logic, and records the moment and residence time of each section, and binds the temperature information.
[0069] Step S3: if the tube is offline during the processing, it is marked as an unqualified tube, and the unqualified tube is transported to the waste buffer, and the unqualified information of the unqualified tube is collected and stored;
[0070] In one embodiment, the process of tracking production information in the perforation production process is as follows: after the tube billet comes out of the ring furnace, it enters the perforator production queue, the tube billet waits for feeding, the operator operates the feeding button in the system or the system starts the perforation operation according to the control system, the system starts material tracking, and collects relevant set parameters and measured data in real time, and stores the bound data in the database; if an abnormality occurs in the steel pipe during perforation or rod removal, the steel pipe that needs to be taken offline must be manually intervened and the reason for going offline must be filled in, and then the L2 system sends such information to the MES system.
[0071] In another embodiment, the process of tracking production information in a rolling mill production process is: the rolling mill tracking logic adopts the piercing machine tracking process;
[0072] In another embodiment, the process of tracking production information in the heat treatment and sizing mill production process is as follows: the subsequent tracking logic of the rolling mill is relatively complex due to different processing methods and production processes, especially the reheating furnace can be used for online heat treatment in the normal production process (the pipe billet starts from the ring furnace to the output of the pipe cooling bed), and can also be used as an offline process (directly using it for normalizing, quenching or tempering of the steel pipe).
[0073] The step S3 comprises:
[0074] Step S301, mark the unfinished offline pipe body as an unqualified pipe body, obtain characteristic information of the unqualified pipe body, the characteristic information includes pipe number, pipe body size, pipe body length, pipe body material and offline time; record the unqualified reason of the unqualified pipe body, and input the processing technology that can be retained for the unqualified pipe body, if there is no processing technology that can be retained, it is recorded as 0;
[0075] Step S302, analyzing the physical damage caused to the unqualified pipe body by the unqualified reasons, and collecting the characteristic image of the physical damage, which is used as the anti-distinguishing feature and stored in the unqualified database;
[0076] Step S303: after the anti-distinguishing feature is collected, the anti-distinguishing feature is compared with the unqualified database. If there is no identical anti-distinguishing feature, the anti-distinguishing feature is used as the marking feature of the unqualified pipe body;
[0077] If there is the same anti-distinguishing feature in the unqualified database, compare the feature information of the current unqualified pipe body with that of the unqualified pipe body in the unqualified database to see if they are exactly the same; if they have different feature information, use the different feature information as the marking feature of the unqualified pipe body;
[0078] If the characteristic information is exactly the same, the current unqualified pipe body is marked, and the marking pattern is used as the marking feature of the current unqualified pipe body;
[0079] Step S304, when recycling and reusing unqualified pipe bodies in the waste buffer, the characteristic information of the unqualified pipe bodies is identified according to the marking characteristics, the pipe number of the unqualified pipe bodies is matched, the recycling result is automatically recorded in the production information of the unqualified pipe bodies, and the production information of the unqualified pipe bodies is continued to be tracked.
[0080] For example, since the reasons for the failure of each unqualified pipe body may be different, and the material damage on the outer wall of the pipe body is almost never the same, the image of the material damage on each unqualified pipe body is collected and used as an anti-distinguishing feature, which can well distinguish the unqualified pipe bodies. If there are pipes with exactly the same material damage that meet the standards, there is no need to mark each pipe body, which can reduce resource waste.
[0081] Step S4: Screen the unqualified tube bodies in the waste buffer according to the specified characteristic screening information, and output a recommended plan for recycling the unqualified tube bodies.
[0082] The step S4 comprises:
[0083] Step S401: Take the tube bundle information as feature screening information, input the specified feature screening information, screen the unqualified tube bodies in the waste buffer, and extract the unqualified tube bodies H that meet the feature screening information. n , forming a screening set = {H1, H2, H3......H n};
[0084] Step S402: Divide a plurality of waste buffer areas L according to the processing technology n , mark the number of unqualified tubes in each waste buffer that meet the feature screening information as S L H , the number of unqualified tube bodies with retainable processing technology is recorded as S L ’ , set the number of unqualified tubes to be recycled as S 总 ;
[0085] Step S403: Generate a time axis based on the processing technology of the tube body according to the time sequence, and select the unqualified tube bodies H in the screening set. n The reservable processing technology is marked on the time axis, and the time length of the reservable processing technology of each unqualified tube body H is recorded as Tn. Taking a waste buffer as a unit, the time length of the reservable processing technology of each unqualified tube body in the waste buffer is summed up and divided by the number of unqualified tube bodies with reservable processing technology in the waste buffer S L ’ , the average processing saving time of each waste buffer is obtained as Jn, and the average processing saving time Jn of each waste buffer is arranged in descending order;
[0086] Step S404: Select S 总 ≤S L H The waste buffer of the garbage buffer, if S 总 >S L ’ , then calculate S 总 -S L ’ The calculated difference Sa is formed into a set, and the Sa with the smallest difference in the set is extracted. min The corresponding waste buffer is used as a recycling recommendation to recycle the unqualified tube bodies in the waste buffer;
[0087] If S 总 >S L H , then obtain the unqualified tube bodies S in multiple waste buffers L H Greater than S 总 , and calculate the average processing time Jn of the waste buffer in each combination, and select the Jn with the largest average processing time saving max The corresponding combination method is used as a recommended recycling solution to recycle the unqualified tube bodies in the waste buffer.
[0088] For example, one or more of the following pipe bundle information may be selected: pipe bundle number, contract number, rolling batch number, steel grade, material, contract user name, pipe blank specification, finished product specification and heat treatment method; such as steel grade and material, unqualified pipe bodies that meet the steel grade and material requirements need to be screened out for recycling, the number of unqualified pipe bodies that meet the requirements in each scrap buffer may be obtained, and the average processing time saving of the processing technology that can be retained may be calculated. If there are three processing technologies that can be retained with a time of 1h, 2h and 1.5h, the average processing time saving is 1.5h, and the one with the longest average processing time saving is selected, so that the processing time can be saved to the maximum extent, and the scrap buffer that meets the recycling requirements may be output as a recycling recommendation plan.
[0089] The L2 system is a PCS system, and the L1 is a basic automation system.
[0090] A material data management system for seamless steel pipe production, the management system comprising a processor and a computer program that can be run on the processor, and the processor implements the steps of the material data management method for seamless steel pipe production when executing the computer program.
[0091] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A material data management method for seamless steel pipe production, characterized in that: The method comprises the following steps: Step S1, formulate a production plan, obtain pipe bundle information, perform furnace preparation operations according to the pipe bundle information, and assign pipe numbers to the pipe bodies; Step S2: real-time monitoring of the production information of the pipe body, tracking the production information of the pipe body, and storing the collected production information data in a database. After the pipe body is manufactured, the pipe number and all production information corresponding to the pipe body are extracted to generate production tracking data of the branch pipe body; Step S3: if the tube is offline during the processing, it is marked as an unqualified tube, and the unqualified tube is transported to the waste buffer, and the unqualified information of the unqualified tube is collected and stored; The step S3 comprises: Step S301, mark the unfinished offline pipe body as an unqualified pipe body, obtain characteristic information of the unqualified pipe body, the characteristic information includes pipe number, pipe body size, pipe body length, pipe body material and offline time; record the unqualified reason of the unqualified pipe body, and input the processing technology that can be retained for the unqualified pipe body, if there is no processing technology that can be retained, it is recorded as 0; Step S302, analyzing the physical damage caused to the unqualified pipe body by the unqualified reasons, and collecting the characteristic image of the physical damage, which is used as the anti-distinguishing feature and stored in the unqualified database; Step S303: after the anti-distinguishing feature is collected, the anti-distinguishing feature is compared with the unqualified database. If there is no identical anti-distinguishing feature, the anti-distinguishing feature is used as the marking feature of the unqualified pipe body; If there is the same anti-distinguishing feature in the unqualified database, compare the feature information of the current unqualified pipe body with that of the unqualified pipe body in the unqualified database to see if they are exactly the same; if they have different feature information, use the different feature information as the marking feature of the unqualified pipe body; If the characteristic information is exactly the same, the current unqualified pipe body is marked, and the marking pattern is used as the marking feature of the current unqualified pipe body; Step S304: when recycling the unqualified pipe body in the waste buffer, the characteristic information of the unqualified pipe body is identified according to the marking feature, the pipe number of the unqualified pipe body is matched, the recycling result is automatically recorded in the production information of the unqualified pipe body, and the production information of the unqualified pipe body is continuously tracked; Step S4, screening the unqualified tube bodies in the waste buffer according to the specified characteristic screening information, and outputting a recommended plan for recycling the unqualified tube bodies; The step S4 comprises: Step S401: Take the tube bundle information as feature screening information, input the specified feature screening information, screen the unqualified tube bodies in the waste buffer, and extract the unqualified tube bodies H that meet the feature screening information. n , forming a screening set = {H1, H2, H3......H n }; Step S402: Divide a plurality of waste buffer areas L according to the processing technology n , mark the number of unqualified tubes in each waste buffer that meet the feature screening information as S L H , the number of unqualified tube bodies with retainable processing technology is recorded as S L ’ , set the number of unqualified tubes to be recycled as S 总 ; Step S403: Generate a time axis based on the processing technology of the tube body according to the time sequence, and select the unqualified tube bodies H in the screening set. n The reservable processing technology is marked on the time axis, and the time length of the reservable processing technology of each unqualified tube body H is recorded as Tn. Taking a waste buffer as a unit, the time length of the reservable processing technology of each unqualified tube body in the waste buffer is summed up and divided by the number of unqualified tube bodies with reservable processing technology in the waste buffer S L ’ , the average processing saving time of each waste buffer is obtained as Jn, and the average processing saving time Jn of each waste buffer is arranged in descending order; Step S404: Select S 总 ≤S L H The waste buffer of the garbage buffer, if S 总 >S L ’ , then calculate S 总 -S L ’ The calculated difference Sa is formed into a set, and the Sa with the smallest difference in the set is extracted. min The corresponding waste buffer is used as a recycling recommendation to recycle the unqualified tube bodies in the waste buffer; If S 总 >S L H , then obtain the unqualified tube bodies S in multiple waste buffers L H Greater than S 总 , and calculate the average processing time Jn of the waste buffer in each combination, and select the Jn with the largest average processing time saving max The corresponding combination method is used as a recycling recommendation to recycle the unqualified tube bodies in the waste buffer.
2. The material data management method for seamless steel pipe production according to claim 1, characterized in that: The step S1 comprises: Step S101, receiving the production contract and production plan information issued by the MES system, organizing the physical information according to the contract standard, compiling the production plan, and issuing the production plan to the L2 system in units of pipe bundles, wherein the pipe bundle includes N pipe bodies, and the L2 system organizes production according to the production plan; Step S102, performing furnace preparation operations according to the tube bundle information, wherein the tube bundle information includes tube bundle number, contract number, rolling lot number, steel grade, material, contract user name, tube blank specification, finished product specification and heat treatment method; Step S103: assign a unique tube number to each tube body for tracking according to the production sequence, where the tube number is X.
3. The material data management method for seamless steel pipe production according to claim 1, characterized in that: The step S2 comprises: Step S201, dividing the data storage area according to the production process, wherein the production process includes annular furnace heating, perforation, rolling mill, hot saw, reheating and sizing; Step S202, tracking the production information of the tube during the production process of annular furnace heating, perforation, rolling mill, hot sawing, reheating and sizing, and storing the production information in a corresponding data storage area, wherein the production information includes the start time of the tube processing, the tube processing process and the end time of the tube processing; Step S203: extract the production information of each production process of the processed pipe body, generate the production tracking data of the pipe body, store it in the database, and retrieve it through the user terminal.
4. The material data management method for seamless steel pipe production according to claim 3, characterized in that: In step S202, the production information storage process in the production process of the ring furnace heating is as follows: Automatically record the time and temperature of tube billet entering and leaving the furnace; Track the material position of each tube billet in the furnace, and distinguish different furnace numbers by the empty material position; Record the moment when each tube billet enters each heating section, and automatically calculate the heating time of each tube billet in each heating section; Automatically record the heating data of each steel pipe in the furnace and draw a heating curve.
5. The material data management method for seamless steel pipe production according to claim 4, characterized in that: The process of tracking production information in the production process of ring furnace heating is: When the tube billet enters the furnace, the L1 system sends a furnace entry signal to the L2 system, and the L2 system triggers the tube billet furnace entry logic after receiving the signal; After the tube billet enters the furnace, it starts tracking. The L1 system provides the annular furnace rotation start signal, rotation end signal, and each rotation angle information to the L2 system; The L2 system processes the annular furnace rotation information according to the annular furnace rotation information sent by the L1 system, records each rotation signal and angle, and performs cumulative calculations. It calculates the position information of the tube body in the furnace according to the angle accumulation logic, and records the moment and residence time of each section, and binds the temperature information.
6. The material data management method for seamless steel pipe production according to claim 5, characterized in that: The L2 system is a PCS system, and the L1 is a basic automation system.
7. A material data management system for seamless steel pipe production, which is applied to the material data management method for seamless steel pipe production according to any one of claims 1 to 6, characterized in that: The management system includes a processor and a computer program that can be run on the processor. When the processor executes the computer program, the steps of the material data management method for seamless steel pipe production as described in any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Secondary aluminum processing treatment production process
CN108823412A
Material information tracking method for mold intelligent production
CN111695853A
Uncertainty batch scheduling model modeling method considering rework
CN112631224A
Seamless steel tube one-by-one tracking production system
CN114406007A
System for tracking steel pipes one by one and control method thereof
CN117666486A