A project management system for offshore wind power based on project implementation progress

By collecting and analyzing project data in the offshore wind power project management system, setting user permissions and collaborating on project planning data, the problems of data security and resource waste in traditional project management methods are solved, and more efficient resource utilization and immediate Project planning.

CN118691056BActive Publication Date: 2024-11-05中交海峰风电发展股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188236.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-05
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

Traditional project management methods cannot effectively ensure the security of offshore wind power project data information, and cannot effectively coordinate the supply and demand relationship between multiple streaming sequences, resulting in waste of resources.

Method used

A project management system based on project implementation progress of offshore wind power was designed, including a project management center, built-in project data acquisition module, offshore data acquisition module, project resource management module, project progress analysis module, project collaborative sharing module and project early warning management module , collect and analyze project data through these modules, set user permissions, collaborate on sharing project planning data, and generate early warning information for coordinated management.

Benefits of technology

It improves data information security and resource utilization efficiency in project management, avoids resource waste, and improves the immediacy of project planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118691056B_ABST
    Figure CN118691056B_ABST
Patent Text Reader

Abstract

The invention discloses a project management system for offshore wind power based on project implementation progress. The invention relates to the field of project management, and comprises a project management center, wherein a project data acquisition module, an offshore data acquisition module, a project resource management module, a project collaborative sharing module and a project early warning management module are provided; the project data acquisition module acquires project data information and project personnel data information; the offshore data acquisition module acquires implementation project data and meteorological forecast data; the project resource management module sets project resource nodes and corresponding user authority data according to project data information and project personnel data information; the project collaborative sharing module sets corresponding project planning data according to implementation project data and meteorological forecast data; the project early warning management module performs analysis according to project planning data and implementation project data to obtain project early warning information; the invention improves the security of project management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of project management, and in particular to an offshore wind power project management system based on project implementation progress. Background Art

[0002] As a clean and renewable energy form, offshore wind power has been rapidly developed and applied in recent years. The implementation of offshore wind power projects usually involves multiple links, including preliminary investigation, design, procurement, construction, commissioning and operation. Each link requires meticulous management and control to ensure the smooth progress of the project and the ultimate successful delivery.

[0003] However, since offshore wind power projects involve a wide range of fields, there are many parties that need to be coordinated, and the needs and interests of each party are different, the traditional project management method can no longer meet the management needs of modern offshore wind power projects; in the process of offshore wind power project management, the security of the corresponding project data information cannot be ensured. In addition, in the process of offshore wind power project management, the supply and demand relationship between multiple process sequences cannot be effectively coordinated, which leads to a certain degree of resource waste; therefore, how to improve the safety of the project management process and reduce resource waste is a problem we need to solve. To this end, a project management system for offshore wind power based on project implementation progress is provided. Summary of the invention

[0004] In order to solve the above technical problems, an object of the present invention is to provide an offshore wind power project management system based on project implementation progress.

[0005] The object of the present invention can be achieved by the following technical solutions: an offshore wind power project management system based on project implementation progress, comprising a project management center, wherein the project management center is communicatively connected with a project data acquisition module, an offshore data acquisition module, a project resource management module, a project progress analysis module, a project collaborative sharing module and a project early warning management module;

[0006] The project data collection module is used to collect project data information and project personnel data information corresponding to the corresponding offshore wind power project;

[0007] The offshore data acquisition module is used to collect implementation project data and meteorological forecast data corresponding to the corresponding offshore wind power project;

[0008] The project resource management module is used to split the process of the offshore wind power project according to the project data information, set the project resource nodes according to the splitting results, match the project personnel data information with the corresponding project resource nodes, and set the corresponding user authority data according to the matching results;

[0009] The project progress analysis module is used to split the implementation project data according to the project resource nodes, and obtain the corresponding real-time project progress data in the corresponding project resource nodes according to the split results;

[0010] The project collaborative sharing module is used to set the project planning data in the corresponding project resource node according to the real-time project progress data and weather forecast data, send it to the corresponding project personnel account, and perform project collaborative sharing according to the user authority data;

[0011] The project early warning management module is used to compare and analyze the project planning data and the implementation project data corresponding to the corresponding time, generate project early warning information according to the comparison and analysis results, and perform coordination management according to the project early warning information.

[0012] Furthermore, the process of the project data collection module collecting project data information and project personnel data information corresponding to the corresponding offshore wind power project includes:

[0013] The project data collection module is provided with a project collection unit and a personnel collection unit;

[0014] The project collection unit is used to collect project data information corresponding to the corresponding offshore wind power project, wherein the project data information includes project name, project address, project process data and project qualification data, and to verify the project qualification data in the obtained project data information. If the verification is successful, access rights are set for the corresponding project data information;

[0015] The personnel collection unit is used to collect project personnel data information corresponding to the corresponding offshore wind power project. The project personnel data includes personnel organizational structure information, personnel identity qualification information and personnel job responsibility information, and project personnel accounts are set up based on them.

[0016] Furthermore, the process of the offshore data collection module collecting the implementation project data and meteorological forecast data corresponding to the corresponding offshore wind power project includes:

[0017] The marine data acquisition module is provided with a project monitoring unit and a weather forecasting unit;

[0018] The project monitoring unit is provided with a project monitoring device, and the project monitoring device is used to obtain the corresponding implementation project data during the implementation of the corresponding offshore wind power project;

[0019] The weather forecast unit obtains the corresponding weather station according to the project address, associates with the obtained weather station, and obtains weather forecast data of the location of the project address according to the weather station.

[0020] Furthermore, the process of the project resource management module setting the project resource node includes:

[0021] The project resource management module is provided with a resource management unit;

[0022] The resource management unit is used to obtain project process data included in the project data information, wherein the project process data is construction process data and resource management data corresponding to the implementation process of the offshore wind power project;

[0023] Perform feature extraction on the project process data to obtain project process flow characteristics, split the project process data according to the project process flow characteristics, obtain the corresponding process sequence, set the project resource node according to the process sequence, match the process sequence corresponding to the project process data, and set the project process evaluation index corresponding to the project process data in the process sequence corresponding to the project resource node according to the matching result.

[0024] Furthermore, the process of setting user authority data in the project resource management module includes:

[0025] The project resource management module is provided with a rights management unit;

[0026] The authority management unit obtains the process sequence and project personnel data information corresponding to each project resource node, matches and analyzes the personnel job responsibility information contained in the project personnel data information with the process sequence corresponding to each project resource node, obtains the personnel identity qualification information corresponding to the corresponding project resource node according to the matching analysis result, and sets user authority data according to the personnel identity qualification information;

[0027] Obtain the personnel identity qualification information contained in the corresponding project resource node, set an identity queue matrix of corresponding size according to the number of personnel identity qualification information, serialize the personnel identity qualification information, and obtain the byte sequence corresponding to the personnel identity qualification information; input the obtained byte sequence into the corresponding identity queue matrix according to the row arrangement to obtain the authority queue matrix;

[0028] The byte sequence corresponding to the personnel identity qualification information is analyzed and processed to obtain the corresponding sparse matrix, and the obtained sparse matrix is ​​multiplied with the permission queue matrix to obtain the user permission data of the corresponding project personnel account.

[0029] Furthermore, the project progress analysis module is used to obtain corresponding implementation project data, split the obtained implementation project data according to the project process flow characteristics corresponding to the corresponding project resource nodes, and send the corresponding implementation project data to the corresponding project resource nodes according to the splitting results; the implementation project data corresponding to the splitting results obtained by the project resource nodes are marked as real-time project progress data.

[0030] Furthermore, the process of the project collaborative sharing module setting the project planning data in the corresponding project resource node according to the real-time project progress data and the weather forecast data includes:

[0031] The project collaboration sharing module is provided with a project collaboration unit and a process collaboration unit;

[0032] The project collaboration unit obtains the process sequence corresponding to each project resource node, performs analysis and processing according to the project process flow characteristics corresponding to the process sequence, obtains the association relationship between each project resource node, and the association relationship includes three types: directional relationship, reverse relationship and independent relationship. According to different types of association relationships, collaborative management is performed on each project resource node;

[0033] The process coordination unit is used to obtain the real-time project progress data and weather forecast data corresponding to the project resource nodes and other project resource nodes corresponding to the directional relationship and reverse relationship corresponding to the project resource nodes; set early warning weather data according to the project resource nodes;

[0034] Compare and analyze the obtained meteorological forecast data with the early warning meteorological data, and obtain the corresponding project meteorological planning time based on the comparative analysis results;

[0035] Preset a project planning cycle, obtain the real-time project progress data corresponding to the project resource nodes corresponding to the directional relationship and the reverse relationship corresponding to the project resource nodes according to the project planning cycle, and respectively obtain the directional project change data and the reverse project change data corresponding to the corresponding real-time project progress data within the project planning cycle;

[0036] Analyze and process the obtained directional project change data and reverse change data in combination with the project weather planning time to generate project planning data corresponding to the project resource node;

[0037] The obtained project planning data is sent to the corresponding project personnel account in the project resource node. The project personnel obtain the project planning data in the project personnel account according to the user authority data for project collaborative sharing.

[0038] Further, the project early warning management module is used for each project resource node to obtain corresponding real-time project progress data, perform feature extraction on the obtained real-time project progress data, obtain real-time project evaluation data, match and analyze the obtained real-time project evaluation data with the corresponding project process evaluation index in the project resource node, and generate evaluation project early warning information if it does not meet the standard corresponding to the project process evaluation index;

[0039] If the standards corresponding to the project process evaluation indicators are met, the immediate project progress data is compared and analyzed with the project planning data to obtain the progress deviation value, preset the deviation value threshold, and compare and analyze the obtained progress deviation value with the deviation value threshold;

[0040] When the progress deviation value is greater than the deviation value threshold, a progress project warning information is generated, otherwise it is normal; coordination and management are carried out based on the project warning information obtained.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] 1. By setting up project resource nodes, the corresponding project personnel are associated with the corresponding project resource nodes according to the corresponding job responsibilities of the project personnel, and the corresponding identity queue matrix and sparse matrix are set, so as to obtain the user authority data corresponding to the corresponding project personnel. By setting the corresponding user authority data for the corresponding project personnel account in the project resource node, the security of project data information in the project management process is improved to a certain extent;

[0043] 2. By analyzing and processing the real-time project progress data within the project resource nodes based on the correlation between the project resource nodes, the coordination of the project resource nodes in setting the project planning data is improved to a certain extent, thereby avoiding waste of resources; in addition, by obtaining meteorological forecast data, obtaining the corresponding project meteorological planning time according to the meteorological forecast data, and setting the corresponding project planning data in combination with the meteorological planning time, the immediacy of the project planning process is improved to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 This is a schematic diagram of an offshore wind power project management system based on project implementation progress according to an embodiment of the present application. DETAILED DESCRIPTION

[0045] like Figure 1 As shown, an offshore wind power project management system based on project implementation progress includes a project management center, wherein the project management center is communicatively connected with a project data acquisition module, an offshore data acquisition module, a project resource management module, a project progress analysis module, a project collaborative sharing module, and a project early warning management module;

[0046] The project data acquisition module is used to collect project data information and project personnel data information corresponding to the corresponding offshore wind power project, and send the obtained data information to the project resource management module. The specific implementation process includes:

[0047] The project data collection module is provided with a project collection unit and a personnel collection unit;

[0048] The project collection unit is used to collect project data information corresponding to the offshore wind power project, wherein a project entry window is provided, and the project entry window is used for corresponding staff to enter corresponding project data information, and the project data information includes project name, project location, project design data, project process data and project qualification data;

[0049] Analyze and process the collected project data information, and verify and review the project name, project location and project qualification data contained in the project data information. The project qualification data includes project company qualification information, design unit qualification information, construction qualification information and legal compliance qualification information;

[0050] Analyze and process the obtained project qualification data to determine whether the obtained project data information meets the construction standards. If it meets the standards, the project data information is verified and the corresponding access rights are set for it;

[0051] The personnel collection unit is used to collect project personnel data information corresponding to the corresponding offshore wind power project, and the project personnel data includes personnel organizational structure information, personnel identity qualification information and personnel job responsibility information;

[0052] The personnel organizational structure information includes the organizational chart and job division chart of the project. The organizational chart includes the management department corresponding to the enterprise corresponding to the project, and the job division chart includes the main duties and responsibilities and functional areas corresponding to different positions;

[0053] The personnel identity qualification information includes the identity data information and qualification identity information corresponding to the project personnel, the identity data information includes name, age, gender, ID card number and real-name authenticated mobile phone number, and the qualification identity information includes corresponding qualification certificates or employment data, etc.;

[0054] The personnel job responsibility information includes the work data that the corresponding project personnel need to perform in the corresponding project process.

[0055] The offshore data acquisition module is used to collect the implementation project data and meteorological forecast data corresponding to the corresponding offshore wind power project, and send the acquired data to the project progress analysis module. The specific implementation process includes:

[0056] The marine data acquisition module is provided with a project monitoring unit and a weather forecasting unit;

[0057] The project monitoring unit is provided with a project monitoring device, and the project monitoring device is used to obtain the corresponding implementation project data during the implementation of the corresponding offshore wind power project, and the implementation project data includes construction equipment data, material update data and construction progress data;

[0058] The meteorological forecast unit is provided with a meteorological monitoring device, and the meteorological monitoring device is used to collect real-time meteorological data during the project implementation process;

[0059] The weather forecast unit is associated with a weather station corresponding to the project address, and obtains weather forecast data of the project address according to the weather station.

[0060] The project resource management module is used to split the process of the offshore wind power project according to the project data information, set the project resource node according to the split result, match the project personnel data information with the corresponding project resource node, and set the corresponding user authority data according to the matching result. The specific implementation process includes:

[0061] The project resource management module is provided with a resource management unit and a permission management unit;

[0062] The resource management unit is used to obtain project process data included in the project data information, wherein the project process data is construction process data and resource management data corresponding to the implementation process of the offshore wind power project;

[0063] Extract features from the project process data to obtain project process characteristics, split the project process data according to the project process characteristics, obtain corresponding process sequences, set project resource nodes according to the process sequences, match the resource management data with the process sequences corresponding to the project process data, and mark them as process sequence data according to the matching results;

[0064] Acquire the process sequence data and corresponding data evaluation results included in the corresponding project resource node, generate a process sequence data set, analyze and process the obtained process sequence data set, and generate a project process evaluation index corresponding to the corresponding project resource node according to the analysis and processing results, wherein the project process evaluation index includes a construction process evaluation index and a resource process evaluation index;

[0065] The authority management unit obtains the process sequence and project personnel data information corresponding to each project resource node, matches and analyzes the personnel job responsibility information contained in the project personnel data information with the process sequence corresponding to each project resource node, obtains the personnel identity qualification information corresponding to the corresponding project resource node according to the matching analysis result, and sets user authority data according to the personnel identity qualification information;

[0066] Obtain the personnel identity qualification information contained in the corresponding project resource node, set the corresponding identity queue square matrix of size N according to the number of personnel identity qualification information, serialize the personnel identity qualification information, and obtain the byte sequence corresponding to the personnel identity qualification information, and the number of bits corresponding to the byte sequence is also N; input the obtained byte sequence into the identity queue square matrix of size N according to the row arrangement to obtain the permission queue square matrix;

[0067] Analyze and process the byte sequence corresponding to the personnel identity qualification information to obtain the corresponding sparse matrix, multiply the obtained sparse matrix with the permission queue matrix to obtain the user permission data corresponding to the corresponding project personnel;

[0068] It should be further explained that, in the specific implementation process, the user authority data is the data for identity authentication obtained by the corresponding project personnel through their project personnel account to obtain the corresponding data information in the corresponding project resource node, which improves the security of the project management process to a certain extent.

[0069] The project progress analysis module is used to split the implementation project data according to the project resource nodes, and obtain the corresponding real-time project progress data in the corresponding project resource nodes according to the split results. The specific implementation process includes:

[0070] The project progress analysis module is used to obtain corresponding implementation project data, split the obtained implementation project data according to the project process flow characteristics corresponding to the corresponding project resource nodes, and send the corresponding implementation project data to the corresponding project resource nodes according to the split results; the implementation project data corresponding to the split results obtained by the project resource nodes are marked as real-time project progress data.

[0071] The project collaborative sharing module is used to set the project planning data in the corresponding project resource node according to the real-time project progress data and weather forecast data, and send it to the corresponding user account according to the user authority data to carry out project collaborative sharing. The specific implementation process includes:

[0072] The project collaboration sharing module is provided with a project collaboration unit and a process collaboration unit;

[0073] The project collaboration unit obtains the process sequence corresponding to each project resource node, performs analysis and processing according to the project process flow characteristics corresponding to the process sequence, and obtains the association relationship between each project resource node, wherein the association relationship includes three types: directional relationship, reverse relationship and independent relationship;

[0074] The guiding relationship is the relationship in which the process sequence in other project resource nodes affects the project resource node;

[0075] The reverse relationship is the relationship between the process sequence within the corresponding project process sequence and the impact on other project resource results;

[0076] The independent relationship means that there is no influence relationship between the two project resource nodes;

[0077] Collaboratively manage each project resource node according to the different types of association relationships;

[0078] The process coordination unit is used to obtain the real-time project progress data and weather forecast data corresponding to the project resource nodes, and other project resource nodes corresponding to the directional relationship and reverse relationship corresponding to the project resource nodes;

[0079] Set early warning meteorological data according to the project resource node, obtain real-time meteorological data and the historical implementation project data corresponding to the corresponding project resource node, obtain corresponding meteorological threshold data according to the corresponding results, and set the obtained meteorological threshold data as early warning meteorological data;

[0080] Compare and analyze the obtained meteorological forecast data with the early warning meteorological data, and obtain the corresponding project meteorological planning time based on the comparative analysis results;

[0081] Preset a project planning cycle, obtain the real-time project progress data corresponding to the project resource nodes corresponding to the directional relationship and the reverse relationship corresponding to the project resource nodes according to the project planning cycle, and respectively obtain the directional project change data and the reverse project change data corresponding to the corresponding real-time project progress data within the project planning cycle;

[0082] Analyze and process the obtained directional project change data and reverse change data in combination with the project weather planning time to generate project planning data corresponding to the project resource node;

[0083] The obtained project planning data is sent to the corresponding project personnel account in the project resource node. The project personnel obtain the project planning data in the project personnel account according to the user authority data for project collaborative sharing.

[0084] The project early warning management module is used to compare and analyze the project planning data and the implementation project data corresponding to the corresponding time, generate project early warning information according to the comparison and analysis results, and coordinate management according to the project early warning information. The specific implementation process includes:

[0085] The project early warning management module is used for each project resource node to obtain the corresponding real-time project progress data, perform feature extraction on the obtained real-time project progress data, obtain the real-time project evaluation data, match and analyze the obtained real-time project evaluation data with the corresponding project process evaluation index in the project resource node, and generate evaluation project early warning information if it does not meet the standard corresponding to the project process evaluation index;

[0086] If the standards corresponding to the project process evaluation indicators are met, the immediate project progress data is compared and analyzed with the project planning data to obtain the progress deviation value, preset the deviation value threshold, and compare and analyze the obtained progress deviation value with the deviation value threshold;

[0087] When the progress deviation value is greater than the deviation value threshold, a progress project warning information is generated, otherwise it is normal; coordination and management are carried out based on the project warning information obtained.

[0088] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. An offshore wind power project management system based on project implementation progress, including a project management center, characterized in that: The project management center is communicatively connected with a project data acquisition module, an offshore data acquisition module, a project resource management module, a project progress analysis module, a project collaborative sharing module, and a project early warning management module; The project data collection module is used to collect project data information and project personnel data information corresponding to the corresponding offshore wind power project, wherein the project data information includes project name, project address, project process data and project qualification data, and the project personnel data includes personnel organizational structure information, personnel identity qualification information and personnel job responsibility information; The offshore data acquisition module is used to collect implementation project data and meteorological forecast data corresponding to the corresponding offshore wind power project; The project resource management module is used to split the process of the offshore wind power project according to the project data information, set the project resource nodes according to the splitting results, match the project personnel data information with the corresponding project resource nodes, and set the corresponding user authority data according to the matching results; The project progress analysis module is used to split the implementation project data according to the project resource nodes, and obtain the corresponding real-time project progress data in the corresponding project resource nodes according to the split results; The process of setting the project resource node by the project resource management module includes: The project resource management module is provided with a resource management unit; The resource management unit is used to obtain project process data included in the project data information, wherein the project process data is construction process data and resource management data corresponding to the implementation process of the offshore wind power project; Extract features from project process data to obtain project process characteristics, split the project process data according to the project process characteristics, obtain corresponding process sequences, set project resource nodes according to the process sequences, match the process sequences corresponding to the project process data, and set project process evaluation indicators corresponding to the project process data in the process sequences corresponding to the project resource nodes according to the matching results; The process of setting user authority data in the project resource management module includes: The project resource management module is provided with a rights management unit; The authority management unit obtains the process sequence and project personnel data information corresponding to each project resource node, matches and analyzes the personnel job responsibility information contained in the project personnel data information with the process sequence corresponding to each project resource node, obtains the personnel identity qualification information corresponding to the corresponding project resource node according to the matching analysis result, and sets user authority data according to the personnel identity qualification information; Obtain the personnel identity qualification information contained in the corresponding project resource node, set an identity queue matrix of corresponding size according to the number of personnel identity qualification information, serialize the personnel identity qualification information, and obtain the byte sequence corresponding to the personnel identity qualification information; input the obtained byte sequence into the corresponding identity queue matrix according to the row arrangement to obtain the authority queue matrix; Analyze and process the byte sequence corresponding to the personnel identity qualification information to obtain the corresponding sparse matrix, multiply the obtained sparse matrix with the permission queue matrix to obtain the user permission data of the corresponding project personnel account; The project collaborative sharing module is used to set the project planning data in the corresponding project resource node according to the real-time project progress data and weather forecast data, send it to the corresponding project personnel account, and perform project collaborative sharing according to the user authority data; The project early warning management module is used to compare and analyze the project planning data and the implementation project data corresponding to the corresponding time, generate project early warning information according to the comparison and analysis results, and coordinate management according to the project early warning information; The process of the project collaborative sharing module setting the project planning data in the corresponding project resource node according to the real-time project progress data and the weather forecast data includes: The project collaboration sharing module is provided with a project collaboration unit and a process collaboration unit; The project collaboration unit obtains the process sequence corresponding to each project resource node, performs analysis and processing according to the project process flow characteristics corresponding to the process sequence, and obtains the association relationship between each project resource node, wherein the association relationship includes three types: directional relationship, reverse relationship and independent relationship; The guiding relationship is the relationship in which the process sequence in other project resource nodes affects the project resource node; The reverse relationship is the relationship between the process sequence within the corresponding project process sequence and the impact on other project resource results; The independent relationship means that there is no influence relationship between the two project resource nodes; Collaboratively manage each project resource node according to the different types of association relationships; The process coordination unit is used to obtain the real-time project progress data and weather forecast data corresponding to the project resource nodes and other project resource nodes corresponding to the directional relationship and reverse relationship corresponding to the project resource nodes; set early warning weather data according to the project resource nodes; Compare and analyze the obtained meteorological forecast data with the early warning meteorological data, and obtain the corresponding project meteorological planning time based on the comparative analysis results; Preset a project planning cycle, obtain the real-time project progress data corresponding to the project resource nodes corresponding to the directional relationship and the reverse relationship corresponding to the project resource nodes according to the project planning cycle, and respectively obtain the directional project change data and the reverse project change data corresponding to the corresponding real-time project progress data within the project planning cycle; Analyze and process the obtained directional project change data and reverse change data in combination with the project weather planning time to generate project planning data corresponding to the project resource node; The obtained project planning data is sent to the corresponding project personnel account in the project resource node. The project personnel obtain the project planning data in the project personnel account according to the user authority data for project collaborative sharing; The project early warning management module is used for each project resource node to obtain the corresponding real-time project progress data, perform feature extraction on the obtained real-time project progress data, obtain the real-time project evaluation data, match and analyze the obtained real-time project evaluation data with the corresponding project process evaluation index in the project resource node, and generate evaluation project early warning information if it does not meet the standard corresponding to the project process evaluation index; If the standards corresponding to the project process evaluation indicators are met, the immediate project progress data is compared and analyzed with the project planning data to obtain the progress deviation value, preset the deviation value threshold, and compare and analyze the obtained progress deviation value with the deviation value threshold; When the progress deviation value is greater than the deviation value threshold, a progress project warning information is generated, otherwise it is normal; coordination and management are carried out based on the project warning information obtained.

2. According to claim 1, a project management system for offshore wind power based on project implementation progress is characterized in that: The process of the offshore data acquisition module acquiring the implementation project data and meteorological forecast data corresponding to the corresponding offshore wind power project includes: The marine data acquisition module is provided with a project monitoring unit and a weather forecasting unit; The project monitoring unit is provided with a project monitoring device, and the project monitoring device is used to obtain the corresponding implementation project data during the implementation of the corresponding offshore wind power project; The weather forecast unit obtains the corresponding weather station according to the project address, associates with the obtained weather station, and obtains weather forecast data of the location of the project address according to the weather station.

3. The project management system for offshore wind power based on project implementation progress according to claim 2 is characterized in that: The project progress analysis module is used to obtain corresponding implementation project data, split the obtained implementation project data according to the project process flow characteristics corresponding to the corresponding project resource nodes, and send the corresponding implementation project data to the corresponding project resource nodes according to the split results; the implementation project data corresponding to the split results obtained by the project resource nodes are marked as real-time project progress data.