A method and system for dynamic risk assessment of roof water in mine working face
By combining static evaluation and real-time monitoring data, a three-picture double prediction method is used to generate a comprehensive partition diagram of the top plate water inrush conditions, which solves the problem that the existing technology cannot dynamically evaluate the water damage risk of coal mine working faces, and achieves the accuracy of the water damage risk of coal mine working faces. Dynamic assessment and safe production guarantee.
Patent Information
- Application Number
- CN202411170324.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-26
AI Technical Summary
The existing technology cannot dynamically evaluate the roof water damage risks during coal mine working face mining in real time. Traditional methods mainly rely on static evaluation and cannot cope with the risk changes brought about by changes in hydrological conditions.
The static water damage evaluation was performed through the preset three-picture double prediction method, combined with the real-time acquisition of resistivity monitoring data and the water level monitoring data of long-view holes of the aquifer, the resistivity isometric chart and the drilling water pressure contour chart were drawn. Interpolation processing is used to generate an exception area distribution map, and superimpose the exception area with the static evaluation results through the image overlay algorithm to generate a comprehensive partition map of the top plate water inrush conditions, and iterative optimization is performed to obtain dynamic risk evaluation results.
Real-time dynamic risk assessment of the roof water damage of the entire mining cycle of the mine working face is realized, more accurate water damage risk assessment is provided, and the guarantee of mining safety production is improved.
Smart Images

Figure CN118691094B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mine monitoring, and in particular to a method and system for evaluating the dynamic risk of water on a mine working face roof. Background Art
[0002] Before the mine is put into production, the hydrogeological conditions must be investigated. If they are not investigated, additional hydrogeological surveys should be conducted to evaluate the water hazard risk of the coal mine. The detailed rules for water prevention and control require that mining activities are strictly prohibited before the hidden dangers of water hazards are identified or eliminated. In order to further ensure the safe production of coal mines, it is necessary to re-evaluate the hydrogeological conditions of the mining working face, tunneling tunnels, etc. in a timely manner to meet the water hazard safety risk assessment during the mine production process.
[0003] At present, the existing methods for evaluating the risk of water damage in the roof of coal mine working faces are usually static evaluation methods based on three-image dual prediction. The three-image dual prediction method refers to a method for evaluating the water damage in the roof of coal seams that solves the three major problems of water source, channel and strength of the coal seam roof. However, the current method for evaluating the risk of water damage in the roof of coal mine working faces usually only evaluates the working face before mining, and is mostly a static evaluation method, that is, using the exploration data of mine geophysical exploration and drilling and other projects, combined with the hydrogeological evaluation method, to conduct a one-time static evaluation of a certain area of the mine or coal mining working face. However, with the production of coal mines, the hydrological conditions of the mine will change accordingly, and the water risk is in a changing process. The traditional method cannot realize the real-time dynamic evaluation of the risk of water damage in the roof of the working face during mining. Summary of the invention
[0004] The embodiments of the present invention provide a method and system for dynamic risk assessment of roof water in a mine working face, thereby solving the problem that the prior art cannot achieve real-time dynamic assessment of roof water hazard risk during mining of the working face.
[0005] In order to achieve the above object, the technical solution of the embodiment of the present invention is:
[0006] In a first aspect, the present invention provides a method for evaluating the dynamic risk of water in the roof of a mine working face, comprising: performing a static water hazard evaluation on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method to obtain a static water hazard evaluation result of the mine working face; wherein the static water hazard evaluation result includes: a water-rich zoning map of the water-filled aquifer on the roof of the coal seam of the working face and a cross-crack safety zoning map of the roof of the coal seam; in the production process of the working face, obtaining the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer in real time; drawing a resistivity contour map of the bottom plate of the aquifer based on the resistivity monitoring data of the working face; and interpolating the resistivity contour map through preset resistivity anomaly parameters. , obtain the resistivity anomaly zone distribution map of the aquifer bottom plate; draw the borehole water pressure contour map of the long observation hole according to the water level monitoring data of the aquifer long observation hole; interpolate the borehole water pressure contour map through the preset borehole water pressure anomaly value parameters to obtain the drilling pressure anomaly zone distribution map of the aquifer; superimpose the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the static water hazard evaluation results through the preset image superposition algorithm to obtain the comprehensive zoning map of the working face roof water gushing conditions; iteratively optimize the comprehensive zoning map of the working face roof water gushing conditions according to the real-time resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer, and obtain the dynamic risk evaluation result of the mine working face roof water.
[0007] In some possible implementations, a resistivity contour map of the aquifer bottom is drawn based on the resistivity monitoring data of the working face, including: obtaining coordinate data of the aquifer borehole and the elevation data of the aquifer bottom of the borehole; interpolating the discrete resistivity monitoring data into a continuously distributed resistivity body by the Kriging interpolation method, and performing Kriging interpolation on the discrete aquifer bottom elevation data to obtain a continuous aquifer bottom layer surface; extracting the resistivity layer surface of the aquifer bottom in the resistivity body according to the aquifer bottom layer surface to obtain a resistivity contour map of the aquifer bottom.
[0008] In some possible implementations, a borehole water pressure contour map of the long observation hole is drawn based on the water level monitoring data of the aquifer long observation hole, including: converting the water level monitoring data of the aquifer long observation hole into water pressure data, and drawing the borehole water pressure contour map of the long observation hole based on the water pressure data.
[0009] In some possible implementations, the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map and the static water hazard evaluation results are superimposed through a preset image superposition algorithm to obtain a comprehensive zoning map of water gushing conditions on the working face roof, including: superimposing, cropping and gridding the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map, the water-rich zoning map of the water-filled aquifer on the working face roof and the coal seam roof cross-fracture safety zoning map through an image superposition algorithm to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
[0010] In some possible implementations, the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map and the static water hazard evaluation results are superimposed by a preset image superposition algorithm to obtain a comprehensive zoning map of water gushing conditions on the working face roof, including: normalizing the resistivity anomaly area distribution map and the drilling pressure anomaly area distribution map respectively to obtain a resistivity anomaly area contour map and a drilling pressure anomaly area contour map; wherein the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the coal seam roof water-filled aquifer water-rich zoning map have the same dimension; according to the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the coal seam roof water-filled aquifer water-rich zoning map weights, a dynamic coal seam roof water-filled aquifer water-rich zoning map is generated; the dynamic coal seam roof water-filled aquifer water-rich zoning map and the coal seam roof cross-fracture safety zoning map are graphically superimposed to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
[0011] In some possible implementations, a dynamic risk assessment result of water on the working face roof of a mine is obtained based on a comprehensive zoning map of water gushing conditions on the working face roof, including: dividing the comprehensive zoning map of water gushing conditions on the working face roof into different dangerous areas according to preset hazard level classification conditions to obtain a dynamic risk assessment result of water on the working face roof of a mine.
[0012] In some possible implementations, the preset danger level division conditions include: in the comprehensive zoning map of water gushing conditions in the working face roof, the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof cross-fracture safety zoning map respectively are divided into relatively dangerous areas; the parts where the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the coal seam roof cross-fracture safety zoning map overlap at the same time are divided into dangerous areas; the parts where the coal seam roof water-filled aquifer water-rich zoning map and the coal seam roof cross-fracture safety zoning map overlap are divided into relatively safe areas, transition areas, relatively dangerous areas, and dangerous areas according to the preset contour lines of the coal seam roof water-filled aquifer water-rich zoning map; the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof water-filled aquifer water-rich zoning map, and the areas located in the coal seam roof cross-fracture safety zoning map are divided into dangerous areas.
[0013] In a second aspect, the present invention provides a system for evaluating the dynamic risk of water in the roof of a mine working face, including: a static evaluation module, which is used to perform a static water hazard evaluation on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method, and obtain a static water hazard evaluation result of the mine working face; wherein the static water hazard evaluation result includes: a water-rich zoning map of the water-filled aquifer on the roof of the coal seam of the working face and a cross-crack safety zoning map of the roof of the coal seam; a first drawing module, which is used to draw a resistivity contour map of the bottom plate of the aquifer according to the resistivity monitoring data of the working face; a first interpolation module, which is used to interpolate the resistivity contour map through a preset resistivity anomaly parameter to obtain a resistivity anomaly zone distribution map of the bottom plate of the aquifer; a second drawing module, which is used to draw a resistivity contour map of the bottom plate of the aquifer according to the resistivity monitoring data of the working face; a first interpolation module, which is used to interpolate the resistivity contour map through a preset resistivity anomaly parameter to obtain a resistivity anomaly zone distribution map of the bottom plate of the aquifer; and a second drawing module, which is used to draw a resistivity contour map of the water-filled aquifer on the roof of the coal seam of the working face. A module is used to draw the borehole water pressure contour map of the long observation hole according to the water level monitoring data of the aquifer long observation hole; a second interpolation module is used to interpolate the borehole water pressure contour map through the preset borehole water pressure anomaly parameter to obtain the aquifer drilling pressure anomaly area distribution map; an image superposition module is used to superimpose the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map and the static water hazard evaluation result through the preset image superposition algorithm to obtain the comprehensive zoning map of the working face roof water gushing conditions; an iterative optimization module is used to iteratively optimize the comprehensive zoning map of the working face roof water gushing conditions according to the real-time resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer, so as to obtain the dynamic risk evaluation result of the mine working face roof water.
[0014] One or more technical solutions provided by the present invention have at least the following technical effects or advantages:
[0015] In the present invention, a static water hazard evaluation is performed on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method to obtain a static water hazard evaluation result of the mine working face; wherein, the static water hazard evaluation result includes: a water-rich zoning map of the water-filled aquifer on the roof of the coal seam of the working face and a cross-fracture safety zoning map of the roof of the coal seam; during the production process of the working face, the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer are obtained in real time; according to the resistivity monitoring data of the working face, the resistivity anomaly zone distribution map of the bottom plate of the aquifer is determined; according to the water level monitoring data of the long observation hole of the aquifer, the aquifer drilling pressure anomaly zone distribution map is determined; according to the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the static water hazard evaluation result, the working face roof water gushing condition comprehensive zoning map is determined; according to the working face roof water gushing condition comprehensive zoning map, the mine working face roof water dynamic risk evaluation result is obtained. In this way, the resistivity monitoring data of the working face monitored in real time and the water level monitoring data of the long observation hole of the aquifer are used together with the static water hazard assessment results before mining to conduct a dynamic evaluation, thus providing a more accurate water hazard risk assessment for the safe production of working face mining, and realizing the real-time dynamic risk assessment of roof water hazards in the entire mining cycle of the mine working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention, the accompanying drawings required for use in the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0017] Figure 1 It is a structural schematic diagram of water hazard assessment by three-picture dual prediction method in the prior art;
[0018] Figure 2 A schematic flow chart of an embodiment of a method for dynamic risk assessment of roof water in a mine working face provided for the implementation of the present invention;
[0019] Figure 3 It is a schematic diagram of the structure of obtaining a comprehensive zoning diagram of water inrush conditions on the top of a working face in an embodiment of the present invention;
[0020] Figure 4 It is a schematic diagram of the water-rich zoning map of the working face roof determined by the three-map dual prediction method;
[0021] Figure 5 It is a structural schematic diagram of the static water inrush condition zoning before roof mining combined with the roof cross-crack safety zoning diagram;
[0022] Figure 6 A schematic diagram of a structure for dynamically evaluating the water inrush condition of the roof of a working face by using the method provided by an embodiment of the present invention;
[0023] Figure 7 It is a structural schematic diagram of a mine working face roof water dynamic risk assessment system in an embodiment of the present invention. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] In the relevant description of this embodiment, the terms "including, containing, having" and the like are open terms and are generally understood to include but not be limited to; the term "at least one" is generally understood to mean one or more, where "plurality" refers to two or more; the term "at least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items, for example, "at least one of a, b or c", or "at least one of a, b and c", can all represent: a, b, c, ab (i.e., a and b), ac, bc, or abc, where a, b, c can be single or multiple, respectively; the symbol "A / B" is used to describe the selection relationship of associated objects, generally indicating an "or" relationship before and after.
[0026] In the following description of the present embodiment, the terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "an" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0027] Those skilled in the art should understand that in the following description of the embodiments of the present invention, the order of serial numbers does not mean the order of execution, some or all of the steps can be executed in parallel or sequentially, and the execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0028] It will be appreciated by those skilled in the art that the numerical ranges in the embodiments of the present invention are to be understood as each intermediate value between the upper and lower limits of the scope being specifically disclosed. Each smaller range between the intermediate value in any stated value or stated range and any other stated value or intermediate value in the range is also included in the present invention. The upper and lower limits of these smaller ranges may be independently included or excluded in the scope.
[0029] Unless otherwise specified, the technical / scientific terms used herein have the same meanings as those generally understood by those skilled in the art to which the invention belongs. Although the present invention only describes preferred methods and materials, any methods and materials similar or equivalent to those herein may also be used in the implementation or testing of the present invention. All documents mentioned in this specification are incorporated by reference to disclose and describe methods and / or materials related to the documents. In the event of a conflict with any incorporated document, the content of this specification shall prevail.
[0030] In order to illustrate the technical solution of the present invention, specific embodiments are provided below for illustration.
[0031] Before the mine is put into production, the hydrogeological conditions must be investigated. If they are not investigated, additional hydrogeological surveys should be conducted to evaluate the water hazard risk of the coal mine. The detailed rules for water prevention and control require that mining activities are strictly prohibited before the hidden dangers of water hazards are identified or eliminated. In order to further ensure the safe production of coal mines, it is necessary to re-evaluate the hydrogeological conditions of the mining working face, tunneling tunnels, etc. in a timely manner to meet the water hazard safety risk assessment during the mine production process.
[0032] At present, the existing methods for evaluating the risk of water damage in the roof of coal mine working faces are usually static evaluation methods based on three-image dual prediction. The three-image dual prediction method refers to a roof water damage evaluation method that solves the three major problems of water source, channel and strength of coal seam roof flooding. Figure 1 It is a structural schematic diagram of water hazard evaluation through the three-map double prediction method in the prior art, wherein the "three maps" refer to the water-rich zoning map of the coal seam roof water-filled aquifer, the roof collapse safety zoning map and the roof water inrush (burst) condition comprehensive zoning map. The water-rich zoning map of the coal seam roof water-filled aquifer and the roof collapse safety zoning map are superimposed, and the coal seam roof water-rich zoning map is cut with the dangerous area in the roof collapse safety zoning map through the graphic superposition algorithm, and then the cut coal seam roof water-rich zoning map is re-zoned to obtain the roof water inrush (burst) condition comprehensive zoning map. "Dual prediction" refers to the prediction of water inflow of the mining face segmentation and the overall project before and after the pretreatment of the roof water-filled aquifer.
[0033] However, the current coal mine working face roof water hazard risk assessment method usually only evaluates the working face before mining, and is mostly a static assessment method, that is, using the exploration data of mine geophysical exploration and drilling and other projects, combined with the hydrogeological evaluation method to conduct a one-time static assessment of a certain area of the mine or the coal mining working face. However, with the production of coal mines, the hydrological conditions of the mine will change accordingly, and the water hazard risk is in a changing process. The traditional method cannot achieve real-time dynamic evaluation of the roof water hazard risk during the working face mining process.
[0034] Based on this, the present invention provides a method and system for dynamic risk assessment of roof water in a mine working face, thereby solving the problem that the prior art cannot achieve real-time dynamic assessment of roof water hazard risk during mining of the working face. Specific embodiments are described below.
[0035] Figure 2 A schematic diagram of an embodiment of a method for evaluating the dynamic risk of water in a mine working face roof provided for the implementation of the present invention is shown in FIG. Figure 2 As shown, the above method may include:
[0036] S201, performing static water hazard evaluation on the hydrogeological basic data and geological survey data of the mine by using a preset three-image dual prediction method to obtain a static water hazard evaluation result of the mine working face;
[0037] Among them, the static water hazard assessment results include: water-rich zoning map of the water-filled aquifer in the coal seam roof of the working face and the cross-crack safety zoning map of the coal seam roof;
[0038] In some embodiments, the mine can be a mine used to mine any type of mineral resources. For example, copper mines, iron mines, gold mines, coal mines, etc. In the embodiments of the present invention, it is mainly used for the method for dynamic risk assessment of water in the roof of a coal mine working face. In the following description, the method for dynamic risk assessment of water in the roof of a coal mine working face provided by the embodiment of the present invention is described by taking a coal mine as an example.
[0039] Among them, the basic hydrogeological data and geological exploration data of the mine can be used to understand the hydrogeological conditions of the mine, groundwater distribution, water pressure, water quality, water temperature and other parameters, as well as the relationship between groundwater and surface water. The basic hydrogeological data and geological exploration data can be obtained through exploration, geophysical exploration, drilling and other operations on the hydrogeology of the coal mine, or can be determined by directly consulting the existing data of exploration, geophysical exploration, drilling and other operations on the hydrogeology of the coal mine.
[0040] In an embodiment of the present invention, a water-rich zoning map of the water-filled aquifer of the coal seam roof and a zoning map of the roof collapse safety are prepared according to a static evaluation method, and firstly, the above-mentioned hydrogeological and geological exploration data and other relevant data are collected. For the water-rich zoning map of the water-filled aquifer, the water-rich index can be calculated based on the data such as the thickness, distribution, permeability and groundwater level of the aquifer by analyzing the data, and then the working face can be divided into different water-rich areas, such as high water-rich areas, medium water-rich areas and low water-rich areas. When drawing the zoning map, different colors or patterns can be used to represent different areas, and information such as the distribution of the aquifer and the groundwater level can be marked. As for the zoning map of the roof collapse safety, it is necessary to evaluate the collapse safety of the coal seam roof, which specifically involves a comprehensive analysis of factors such as the strength, stability, and geological structure of the roof rock layer to determine the areas where there are cross-crack safety risks.
[0041] S202, during the production process of the working face, real-time acquisition of resistivity monitoring data of the working face and water level monitoring data of the long observation hole of the aquifer;
[0042] In some embodiments, the resistivity monitoring data and the water level monitoring data of the aquifer long observation hole can be monitoring data obtained by monitoring multiple locations of the working face. Among them, the multiple locations are usually key areas that can reflect the factors of mine water hazards. The location area determination method of the multiple locations can include but is not limited to methods based on geological surveys, historical data analysis, and expert evaluation.
[0043] In the embodiment of the present invention, the resistivity value is mainly the resistivity value of the aquifer bottom plate. Resistivity is a physical parameter that reflects the electrical conductivity of underground media. The resistivity value data of the aquifer bottom plate of the working face can be used to determine whether the fissure development of the working face affects the aquifer and forms a water-conducting channel in the aquifer. First, by measuring the resistivity value of the aquifer bottom plate, the development of the fissure can be judged. If the resistivity value shows a significant decrease, it means that the development of the fissure may have formed a water-conducting channel, allowing groundwater to enter the coal seam through these channels. By arranging resistivity monitoring equipment on the working face, the resistivity changes of the working face can be monitored in real time. These data can reflect information such as the water richness of the aquifer, the flow direction and velocity of groundwater, thereby providing us with real-time information on the water hazard risk of the working face.
[0044] Aquifer long observation wells are observation wells used to monitor changes in aquifer water levels. Water level gauges can be installed in these observation wells to monitor changes in aquifer water levels in real time. These water level change data can reflect the recharge and discharge of the aquifer, as well as the dynamic changes of groundwater. At the same time, combined with resistivity monitoring data, the water richness of the aquifer and the flow state of groundwater can be more accurately judged, thereby timely predicting and assessing water hazard risks.
[0045] S203, drawing a resistivity contour map of the bottom plate of the aquifer based on the resistivity monitoring data of the working face;
[0046] In some embodiments, the above step S203 may specifically include:
[0047] S2031, obtaining coordinate data of the aquifer borehole and elevation data of the aquifer bottom plate of the borehole;
[0048] The aquifer floor elevation data may be the vertical height data of the aquifer floor, such as the aquifer or bedrock below the aquifer, obtained through drilling exploration in geological exploration or hydrogeological survey. These data are expressed as depth relative to a certain reference surface such as sea level or ground elevation. The aquifer floor elevation data can reflect the spatial distribution and morphology of the aquifer, and help understand the storage conditions and flow patterns of groundwater.
[0049] Understandably, since aquifers are usually located deep underground, they cannot be directly observed. Boreholes are an effective means of exploration. They can obtain elevation data of the aquifer floor by drilling holes in the ground or underground projects. Through borehole exploration, we can also understand the thickness, lithology, hydrogeological parameters and other information of the aquifer, providing an important basis for the evaluation and management of groundwater resources.
[0050] The determination of the borehole location can comprehensively consider geological targets, topography, existing data, borehole spacing, depth, environmental and safety factors, and traffic convenience. In the embodiment of the present invention, the borehole can accurately reflect the underground hydrogeological conditions by analyzing the elevation data of the aquifer floor and combining geological exploration and geophysical exploration.
[0051] S2032, interpolating the discrete resistivity monitoring data into a continuously distributed resistivity body by using the Kriging interpolation method, and using the borehole aquifer floor elevation data for Kriging interpolation to obtain the aquifer floor level;
[0052] Among them, Kriging interpolation is a statistical spatial interpolation method, mainly used in geostatistics and geostatistics to estimate the value of unknown points. This method is based on the data of known points and predicts the value of unknown points by considering the spatial autocorrelation of the data. The basic assumption of Kriging interpolation is that close things are similar, that is, points close in space have similar attribute values.
[0053] In the embodiment of the present invention, the specific process of interpolation by the Kriging interpolation method may include:
[0054] First, the measure of the spatial correlation between points is the semivariance, which can be achieved by the following formula (1):
[0055] γ(h)=1 / 2n∑[z(x i )-z(x i +h)]²(1)
[0056] Where h is the distance between sample points; γ(h) is the semivariance; x i is the i-th sample point; n is the number of paired sample points separated by h; z is the attribute value of the point (elevation or other attribute value). When calculating the semivariance, first find the distance between all sample points, then sort all distances from small to large and divide them into n groups, calculate the average distance of each group, and substitute the average distance into the semivariance formula to calculate the experimental variation value corresponding to each group of distances. Next, draw a distance-semivariance scatter plot and find the fitting coefficient, that is, the corresponding parameter.
[0057] Secondly, after the semivariance values at different distances are calculated, a semivariance graph can be drawn, with the horizontal axis representing distance and the vertical axis representing semivariance.
[0058] Finally, the fitted model is used to estimate the attribute value of the unknown point, which can be achieved by the following formula (2):
[0059] Z 0 =C+Σ[λ i *Z i ] (2)
[0060] Among them, Z 0 is the attribute value of the unknown point, C is the constant space expectation, λ i is the weight coefficient, Z i is the attribute value of the known point. Substitute the semivariance value calculated in the above steps into the above matrix, invert the matrix to obtain the weight coefficient, and thus find the attribute of the unknown point.
[0061] Among them, the contour map of the aquifer floor is drawn based on multiple elevation data. It can be directly drawn through existing professional drawing software based on the acquired elevation data. For example, Geographic Information System (GIS) or other professional drawing software. By drawing the contour map corresponding to the elevation data, the map can intuitively show the depth or height of the aquifer floor at different locations. After the contour map is drawn, the contour map can be aligned and merged with the three-dimensional model or terrain model of the aquifer floor to realize the conversion of the aquifer floor contour map to the aquifer floor level. Through this conversion, the distribution and morphology of the aquifer floor in three-dimensional space can be more accurately understood.
[0062] S2033, extracting the resistivity layer of the aquifer bottom plate in the resistivity body through the aquifer bottom plate layer, and obtaining the resistivity contour map of the aquifer bottom plate.
[0063] Specifically, step S2033 may include using the aquifer bottom plate surface as a slicing tool to perform a slicing operation in the resistivity body, thereby extracting the resistivity distribution on the aquifer bottom plate surface, and then obtaining the resistivity surface of the aquifer bottom plate.
[0064] Processing the resistivity monitoring data can be a process of converting the collected raw resistivity data into resistivity distribution in a three-dimensional model after a series of processing processes such as cleaning, preprocessing, interpretation, and interpolation, and outputting it as a resistivity result data body (i.e., resistivity body). This process ensures the accuracy and reliability of the data and intuitively displays the distribution characteristics of resistivity in three-dimensional space.
[0065] Specifically, by using the spatial information of the aquifer bottom layer, the resistivity value of the corresponding layer can be extracted from the resistivity body. Thus, the spatial coordinates of the aquifer bottom layer are accurately matched with the resistivity data body, and the resistivity data on this layer is extracted. Subsequently, based on the extracted data, a resistivity contour map of the aquifer bottom layer can be drawn. The resistivity contour map can graphically display the resistivity distribution on the aquifer bottom layer, which helps to intuitively display the resistivity change characteristics of the aquifer at this layer.
[0066] S204, interpolating the resistivity contour map using preset resistivity anomaly value parameters to obtain a resistivity anomaly area distribution map of the aquifer bottom plate;
[0067] The preset resistivity anomaly parameter may be a preset resistivity anomaly range, which is used to define a normal resistivity range and an abnormal resistivity threshold. Any resistivity value outside this range is determined to be a resistivity anomaly. The interpolation process may use any existing interpolation algorithm or tool to perform numerical estimation in blank areas or sparse areas between resistivity data to generate a more continuous and smooth resistivity distribution. The interpolation process takes into account the resistivity anomaly parameters. Based on these parameters, the interpolation algorithm can identify and highlight resistivity anomaly areas, and finally generate a resistivity anomaly area distribution map.
[0068] S205, drawing a borehole water pressure contour map of the long observation hole according to the water level monitoring data of the long observation hole of the aquifer;
[0069] In some embodiments, the above step S205 may specifically include: converting the water level monitoring data of the long observation hole of the aquifer into water pressure data, and drawing a borehole water pressure contour map of the long observation hole according to the water pressure data.
[0070] Among them, the borehole water pressure contour map of the long observation hole can be drawn according to the water pressure data. The borehole water pressure contour map can be obtained by interpolating the borehole water pressure data through the Kriging interpolation method.
[0071] S206, interpolating the borehole water pressure contour map using preset borehole water pressure anomaly value parameters to obtain a distribution map of the drilling pressure anomaly area of the aquifer;
[0072] Specifically, the borehole water pressure contour map of the Changguan hole graphically displays the water pressure distribution at different locations of the Changguan hole. The preset borehole water pressure anomaly parameter can be data similar to the above-mentioned resistivity anomaly parameter, which is used to define the anomaly range. During the interpolation process, the interpolation algorithm can estimate and supplement the water pressure data according to the parameter settings, thereby generating a drilling pressure anomaly area distribution map, which is used to clearly display the area of drilling pressure anomaly in the aquifer.
[0073] S207, superimposing the resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation result by a preset image superposition algorithm to obtain a comprehensive zoning map of water inrush conditions on the roof of the working face;
[0074] In some embodiments, the above-mentioned step S207 may include: superimposing, cropping, and gridding the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map, the working face coal seam roof water-filled aquifer water-richness zoning map, and the coal seam roof cross-fracture safety zoning map through the image superposition algorithm, so as to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
[0075] Among them, the image overlay algorithm is a technology that overlays and fuses multiple layers or images according to certain rules and algorithms. In the fields of geology, water resources management, environmental monitoring, etc., graphic overlay algorithms are often used to comprehensively analyze and display spatial data from different sources. In the image overlay algorithm, image processing usually includes layer preparation, layer alignment, overlay rules, overlay operations, and result display and analysis. Overlaying multiple images through a graphic overlay algorithm can obtain a new image or data set that integrates the information of multiple layers, which can be used for further display, analysis, and decision support.
[0076] Specifically, before superimposing these layers, coordinate alignment and format unification can be performed first to ensure data consistency and compatibility. During the superposition process, a specific graphic superposition algorithm can be used to superimpose and comprehensively analyze the abnormal areas of different layers to reflect the impact of various factors on the roof water inrush conditions. Then, according to the boundaries and actual needs of the working face, the superimposed image is cropped to remove irrelevant areas. Finally, through gridding processing, the continuous spatial data is converted into discrete grid data for subsequent analysis and display. After this series of processing, a comprehensive zoning map of the roof water inrush conditions of the working face can be obtained. This comprehensive zoning map can reflect various abnormal areas and the actual situation of the working face, providing an important basis for safe production and decision-making of the working face.
[0077] For example, Figure 3 This is a schematic diagram of the structure of obtaining a comprehensive zoning diagram of water inrush conditions on the top of a working face in an embodiment of the present invention. Figure 3 As shown in the figure, by acquiring the resistivity monitoring data and the elevation data of the bottom plate of the borehole aquifer, the interpolation algorithm is used to obtain the resistivity anomaly area distribution map; in addition, based on the acquired long-hole water level monitoring data, the interpolation algorithm is used to obtain the drilling pressure anomaly area distribution map; finally, the resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map, the water-richness zoning map of the water-filled aquifer on the roof of the working face coal seam and the cross-fracture safety zoning map of the coal seam roof are processed using a graphic superposition algorithm to obtain a comprehensive zoning map of water gushing (burst) conditions on the roof of the working face.
[0078] In some other embodiments, the above step S207 may further include:
[0079] S2071, respectively normalizing the resistivity anomaly area distribution map and the drilling pressure anomaly area distribution map to obtain a resistivity anomaly area contour map and a drilling pressure anomaly area contour map; wherein the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the coal seam roof water-filled aquifer water-rich zoning map have the same dimension;
[0080] S2072, generating a dynamic coal seam roof water-filled aquifer water-rich zoning map according to the weights of the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the coal seam roof water-filled aquifer water-rich zoning map;
[0081] S2073, graphically superimpose the dynamic coal seam roof water-filled aquifer water-rich zoning map and the coal seam roof cross-fracture safety zoning map to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
[0082] It should be noted that normalization is a process of converting data to the same scale or dimension, so that data from different sources or types can be compared and analyzed under the same framework. In an embodiment of the present invention, the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map are normalized respectively, so that they can be compared and analyzed with the water-rich zoning map of the coal seam roof water-filled aquifer. In the normalization process, the original data can be mapped to a unified range, such as between 0 and 1, through certain mathematical transformations. For the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map, the corresponding abnormal values can be converted into a relative dimension to match the dimension of the water-rich zoning map of the coal seam roof water-filled aquifer.
[0083] In some embodiments, when generating a dynamic water-rich zoning map of a water-filled aquifer on the roof of a coal seam, the weight reflects the importance of different data sources (i.e., the above-mentioned resistivity anomaly zone contour map, drilling pressure anomaly zone contour map, and coal seam roof water-filled aquifer water-rich zoning map) in the overall evaluation. The determination of the weight requires comprehensive consideration of the reliability and importance of each data source and influencing factor. For example, the analytic hierarchy process (AHP) can be used to determine the subjective weight. Through expert scoring and construction of a judgment matrix, the maximum eigenvector method is used to calculate the subjective weight of each factor. Alternatively, an objective weighting method, such as the entropy method, can also be used. The entropy method analyzes the measured data of each data source and influencing factor, calculates its entropy value, and then obtains the objective weight. The smaller the entropy value, the greater the amount of information of the data source or influencing factor, and the more significant the impact on the water-rich zoning map, so its weight is also greater.
[0084] S208, iteratively optimize the comprehensive zoning map of water inrush conditions on the roof of the working face based on the real-time resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer, and obtain the dynamic risk assessment result of the roof water on the working face of the mine.
[0085] In some embodiments, the above step S208 may include:
[0086] S2081, through the preset hazard level classification conditions, the comprehensive zoning map of the working face roof water inrush conditions is divided into different hazard areas to obtain the dynamic risk assessment results of the mine working face roof water.
[0087] In some embodiments, the preset danger level division conditions may include: in the comprehensive zoning map of water gushing conditions in the working face roof, the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof cross-fracture safety zoning map respectively are divided into relatively dangerous areas; the parts where the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the coal seam roof cross-fracture safety zoning map overlap at the same time are divided into dangerous areas; the parts where the coal seam roof water-filled aquifer water-rich zoning map and the coal seam roof cross-fracture safety zoning map overlap are divided into relatively safe areas, transition areas, relatively dangerous areas, and dangerous areas according to the preset contour lines of the coal seam roof water-filled aquifer water-rich zoning map; the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof water-filled aquifer water-rich zoning map, and the areas located in the coal seam roof cross-fracture safety zoning map are divided into dangerous areas.
[0088] For example, taking the three-image dual prediction method as an example, Figure 4 This is a schematic diagram of the water-rich zoning map of the working face roof determined by the three-map dual prediction method. Figure 5 This is a structural diagram of the static water inrush condition zoning before roof mining combined with the roof cross-crack safety zoning diagram. Figures 4 to 5 As shown in the figure, based on the dual prediction of three maps, the water-richness zoning of the working face roof is determined to be divided into several levels such as extremely strong, strong, medium and weak. Combined with the roof cross-crack safety zoning map, the water hazard risk of the working face roof is divided into dangerous, relatively dangerous, excessive, relatively safe and relatively safe levels according to the overlapping parts of the roof cross-crack safety zoning map and the water-richness zoning map with different water-richness level zones, which are used as the water hazard evaluation results.
[0089] and Figure 6 This is a schematic diagram of a structure for dynamically evaluating the water inrush condition of the roof of a working face using the method provided by an embodiment of the present invention. Figure 6 As shown, Figure 6 The areas shown in are the comprehensive zoning diagram of water inrush conditions on the working face roof obtained in step S207. Figure 5 Each area is divided into different safety levels such as dangerous area, relatively dangerous area, transition area, relatively safe area, and safe area. Figures 4 to 6 As shown, the method provided by the embodiment of the present invention, on the basis of static risk assessment, also combines the evaluation results of dynamic monitoring, enriches the dimension of evaluation data, and makes the evaluation of water inrush risk of the working face roof more comprehensive and detailed.
[0090] Specifically, the static risk assessment map provides basic risk prediction based on historical data and / or geological structure analysis, while the dynamic monitoring and assessment map can reflect the actual status of the current working face in real time. Combining the two can more accurately capture potential risk areas and risk levels.
[0091] In this way, by combining static and dynamic evaluation, not only the accuracy of water hazard evaluation is improved, but also a more scientific basis is provided for subsequent risk management and prevention and control measures. By accurately identifying risk areas and levels, more targeted response measures can be formulated, such as strengthening monitoring, early drainage, and strengthening support, thereby effectively reducing the impact of water hazards on work safety.
[0092] It can be understood that in order to continuously monitor and evaluate the water hazard risks of mines, the comprehensive zoning map of water gushing conditions on the working face roof is iteratively optimized by acquiring real-time resistivity monitoring data of the working face and water level monitoring data of the long observation hole of the aquifer, and the above steps S202 to S207 are repeated to realize real-time evaluation of the dynamic water risk of the working face roof of the mine.
[0093] It should be noted that iterative processing is a process of continuous updating and optimization. By continuously inputting new data and information to iteratively evaluate water hazard risks, the real-time and reliability of risk evaluation can be improved. In order to perform real-time evaluation, the embodiment of the present invention continuously collects and analyzes the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer. These data can be obtained in real time through special monitoring equipment and systems to ensure the accuracy and timeliness of the data.
[0094] Among them, during the iterative processing, the newly acquired monitoring data can be compared and analyzed with the existing data. If the data is found to be abnormal or the change exceeds the preset threshold, the system will trigger an alarm to prompt the staff to conduct further processing and evaluation. At the same time, these data will also be included in the next risk assessment to update and optimize the risk assessment results. Through continuous iterative processing, the dynamic risk assessment of the roof water of the mine working face can be updated and adjusted in real time. This helps to timely discover potential safety hazards and risk points, and provide strong support for the safe production and decision-making of the mine. At the same time, it can also provide a scientific basis for the rational development and utilization of mine water resources.
[0095] In the embodiment of the present invention, a static water hazard evaluation is performed on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method to obtain a static water hazard evaluation result of the mine working face; wherein the static water hazard evaluation result includes: a water-rich zoning map of the water-filled aquifer on the roof of the coal seam of the working face and a cross-crack safety zoning map of the roof of the coal seam; during the production process of the working face, the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer are obtained in real time; based on the resistivity monitoring data of the working face, a resistivity isovalue map of the bottom plate of the aquifer is drawn; through the preset resistivity anomaly parameter, the resistivity isovalue map is interpolated to obtain the resistivity of the bottom plate of the aquifer. Abnormal area distribution map; according to the water level monitoring data of the long observation hole of the aquifer, the borehole water pressure contour map of the long observation hole is drawn; through the preset borehole water pressure abnormal value parameters, the borehole water pressure contour map is interpolated to obtain the drilling pressure abnormal area distribution map of the aquifer; through the preset image superposition algorithm, the resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation results are superimposed to obtain the comprehensive zoning map of the working face roof water inrush conditions; according to the real-time acquired working face resistivity monitoring data and the water level monitoring data of the long observation hole of the aquifer, the comprehensive zoning map of the working face roof water inrush conditions is iteratively optimized to obtain the dynamic risk evaluation result of the mine working face roof water. In this way, the resistivity monitoring data of the working face monitored in real time and the water level monitoring data of the long observation hole of the aquifer are used at the same time, combined with the static water hazard evaluation results before mining, to provide a more accurate water hazard risk evaluation for the safe production of the working face mining, and realize the real-time dynamic risk evaluation of the roof water hazard of the mine working face throughout the mining cycle.
[0096] Based on the same inventive concept, an embodiment of the present invention also provides a mine working face roof water dynamic risk assessment system. Figure 7 FIG. 1 is a schematic diagram of a system for evaluating the dynamic risk of water in a mine working face roof according to an embodiment of the present invention. Figure 7As shown, the mine working face roof water dynamic risk assessment system 600 may include: a static assessment module 601, which is used to perform static water hazard assessment on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method to obtain a static water hazard assessment result of the mine working face; wherein the static water hazard assessment result includes: a water-rich zoning map of the water-filled aquifer on the coal seam roof of the working face and a cross-crack safety zoning map of the coal seam roof; an acquisition module 602, which is used to acquire the resistivity monitoring data of the working face and the water level monitoring data of the aquifer long observation hole in real time during the production process of the working face; a first drawing module 603, which is used to draw a resistivity contour map of the aquifer bottom plate according to the resistivity monitoring data of the working face; a first interpolation module 604, which is used to interpolate the resistivity contour map through a preset resistivity anomaly parameter to obtain Obtain the resistivity anomaly zone distribution map of the aquifer bottom plate; the second drawing module 605 is used to draw the borehole water pressure contour map of the long observation hole according to the water level monitoring data of the aquifer long observation hole; the second interpolation module 606 is used to interpolate the borehole water pressure contour map through the preset borehole water pressure anomaly value parameters to obtain the aquifer drilling pressure anomaly zone distribution map; the image superposition module 607 is used to superimpose the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the static water hazard evaluation result through the preset image superposition algorithm to obtain the comprehensive zoning map of the working face roof water gushing conditions; the iterative optimization module 608 is used to iteratively optimize the comprehensive zoning map of the working face roof water gushing conditions according to the resistivity monitoring data of the working face and the water level monitoring data of the aquifer long observation hole obtained in real time to obtain the dynamic risk evaluation result of the mine working face roof water.
[0097] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other. Each embodiment focuses on the differences from other embodiments.
[0098] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the present invention.
Claims
1. A method for dynamic risk assessment of roof water in a mine working face, characterized in that: include: The static water hazard evaluation of the hydrogeological basic data and geological exploration data of the mine is performed through the preset three-map dual prediction method to obtain the static water hazard evaluation result of the working face of the mine; wherein the static water hazard evaluation result includes: the water-rich zoning map of the water-filled aquifer of the coal seam roof of the working face and the cross-crack safety zoning map of the coal seam roof; During the production process of the working face, real-time acquisition of the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer; Drawing a resistivity contour map of the bottom plate of the aquifer based on the resistivity monitoring data of the working face; The resistivity contour map is interpolated by using preset resistivity anomaly value parameters to obtain a resistivity anomaly area distribution map of the bottom plate of the aquifer; Drawing a borehole water pressure contour map of the long observation hole according to the water level monitoring data of the long observation hole of the aquifer; The borehole water pressure contour map is interpolated by using preset borehole water pressure anomaly value parameters to obtain a drilling pressure anomaly area distribution map of the aquifer; The resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation result are superimposed by a preset image superposition algorithm to obtain a comprehensive zoning map of water inrush conditions on the roof of the working face; The comprehensive zoning map of water gushing conditions on the roof of the working face is iteratively optimized based on the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer acquired in real time, so as to obtain the dynamic risk assessment result of the water on the roof of the working face of the mine.
2. The method according to claim 1, characterized in that The step of drawing a resistivity contour map of the bottom plate of the aquifer according to the resistivity monitoring data of the working surface comprises: Acquire coordinate data of the aquifer borehole and elevation data of the aquifer bottom plate of the borehole; Interpolating the resistivity monitoring data into a resistivity body by using a Kriging interpolation method, and performing Kriging interpolation on the elevation data of the aquifer floor of the borehole to obtain the aquifer floor level; The resistivity plane of the aquifer bottom plate is extracted in the resistivity body according to the plane of the aquifer bottom plate, and the resistivity contour map of the aquifer bottom plate is obtained.
3. The method according to claim 2, characterized in that The method of drawing a borehole water pressure contour map of the long observation hole according to the water level monitoring data of the long observation hole of the aquifer comprises: The water level monitoring data of the long observation hole of the aquifer is converted into water pressure data, and a borehole water pressure contour map of the long observation hole is drawn according to the water pressure data.
4. The method according to claim 3, characterized in that The resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation result are superimposed by a preset image superposition algorithm to obtain a comprehensive zoning map of water inrush conditions on the roof of the working face, including: The resistivity anomaly area distribution map, the drilling pressure anomaly area distribution map, the water-richness zoning map of the coal seam roof water-filled aquifer, and the coal seam roof cross-fracture safety zoning map are superimposed, cropped, and gridded through the image superposition algorithm to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
5. The method according to claim 3, characterized in that: The resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation result are superimposed by a preset image superposition algorithm to obtain a comprehensive zoning map of water inrush conditions on the roof of the working face, including: The resistivity anomaly area distribution map and the drilling pressure anomaly area distribution map are respectively normalized to obtain a resistivity anomaly area contour map and a drilling pressure anomaly area contour map; wherein the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the coal seam roof water-filled aquifer water-rich zoning map have the same dimension; Generate a dynamic coal seam roof water-filled aquifer water-rich zoning map according to the resistivity anomaly area contour map, the drilling pressure anomaly area contour map and the weight of the coal seam roof water-filled aquifer water-rich zoning map; The dynamic coal seam roof water-filled aquifer water-richness zoning map and the coal seam roof cross-fracture safety zoning map are graphically superimposed to obtain a comprehensive zoning map of water gushing conditions on the working face roof.
6. The method according to claim 4 or 5, characterized in that: The obtaining of the mine working face roof water dynamic risk assessment result comprises: By using preset hazard level classification conditions, the comprehensive zoning map of water inrush conditions on the working face roof is divided into different hazard area ranges to obtain the dynamic risk assessment result of water on the working face roof of the mine.
7. The method according to claim 6, characterized in that The preset hazard level classification conditions include: In the comprehensive zoning map of water gushing conditions at the working face roof, the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof cross-fracture safety zoning map respectively are divided into relatively dangerous areas; the parts where the resistivity anomaly zone distribution map, the drilling pressure anomaly zone distribution map and the coal seam roof cross-fracture safety zoning map overlap at the same time are divided into dangerous areas; the parts where the coal seam roof water-filled aquifer water-rich zoning map and the coal seam roof cross-fracture safety zoning map overlap are divided into relatively safe areas, transition areas, relatively dangerous areas and dangerous areas according to the preset contour lines of the coal seam roof water-filled aquifer water-rich zoning map; the parts where the resistivity anomaly zone distribution map and the drilling pressure anomaly zone distribution map overlap with the coal seam roof water-filled aquifer water-rich zoning map, and the areas located in the coal seam roof cross-fracture safety zoning map are divided into dangerous areas.
8. A mine working face roof water dynamic risk assessment system, characterized in that: include: The static evaluation module is used to perform static water hazard evaluation on the hydrogeological basic data and geological exploration data of the mine through a preset three-map dual prediction method to obtain the static water hazard evaluation result of the working face of the mine; wherein the static water hazard evaluation result includes: the water-rich zoning map of the water-filled aquifer on the roof of the coal seam of the working face and the cross-crack safety zoning map of the roof of the coal seam; An acquisition module, used for acquiring the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer in real time during the production process of the working face; A first drawing module is used to draw a resistivity contour map of the bottom plate of the aquifer according to the resistivity monitoring data of the working surface; A first interpolation module is used to interpolate the resistivity contour map by using preset resistivity anomaly value parameters to obtain a resistivity anomaly area distribution map of the bottom plate of the aquifer; The second drawing module is used to draw a borehole water pressure contour map of the long observation hole according to the water level monitoring data of the long observation hole of the aquifer; A second interpolation module is used to interpolate the borehole water pressure contour map according to a preset borehole water pressure anomaly parameter to obtain a drilling pressure anomaly area distribution map of the aquifer; An image superposition module is used to superimpose the resistivity abnormal area distribution map, the drilling pressure abnormal area distribution map and the static water hazard evaluation result through a preset image superposition algorithm to obtain a comprehensive zoning map of water inrush conditions on the roof of the working face; The iterative optimization module is used to iteratively optimize the comprehensive zoning map of water gushing conditions on the roof of the working face according to the resistivity monitoring data of the working face and the water level monitoring data of the long observation hole of the aquifer acquired in real time, so as to obtain the dynamic risk assessment result of the water on the roof of the working face of the mine.
Citation Information
Patent Citations
Comprehensive evaluation method and system for water inrush risk of indirect water filling aquifer
CN105354365A
Exploration method for abnormal area of stope face
CN114675333A
Mine rock burst and water disaster collaborative early warning method based on sound wave detection
CN116006264A
Full-space three-dimensional monitoring intelligent early warning system and method for water disaster risk of coal seam roof
CN118191967A
Evaluation method and evaluation device for water breakthrough risk of production wells in aquifer drive gas reservoirs
GB201520368D0
